Ventilation facility for small-hole-diameter gas tunnel and use method

By using steel frames and windshield structures in small-diameter hydraulic tunnels, the problem of increased gas concentration caused by unstable wind direction during construction was solved, stable ventilation was achieved, and construction safety was ensured.

CN118793471APending Publication Date: 2024-10-18NORTHWEST ENGINEERING CORPORATION LIMITED
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411054408.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-02
Publication Date
2024-10-18

AI Technical Summary

Technical Problem

During the construction of hydraulic tunnels, especially in areas with small diameters, the unstable wind direction after penetration makes it difficult for ventilation facilities to reduce gas concentration. Existing technology cannot effectively solve the ventilation needs of high-gas hydraulic tunnels. Construction workers usually need to wear oxygen masks. It will bring inconvenience to the construction.

Method used

A ventilation facility for small-diameter gas tunnels is designed, including a steel frame and a windshield. The windshield is fixed through the crossbeam and longitudinal beam structures on the inside of the steel frame to form a partition, reduce the impact of convective wind, and prevent slipping during walking. The pulley and sealing structure stably installs the ventilation duct to ensure stable wind direction.

Benefits of technology

By establishing a partition similar to the tunnel face, the wind direction in the tunnel is stabilized, the gas concentration is reduced, the ventilation device is ensured to operate normally, a good construction environment is provided, and accidents are avoided.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118793471A_ABST
    Figure CN118793471A_ABST
Patent Text Reader

Abstract

The invention discloses a ventilation facility for a small-hole-diameter gas tunnel and a using method, the ventilation facility comprises a profile steel frame, the inner side of the profile steel frame is fixedly connected with a wind blocking face, the wind blocking face is of a plane structure defined by the profile steel frame, and a ventilation pipe penetrates through the wind blocking face. Through the arrangement of the profile steel frame and the wind blocking face, a partition plate similar to a tunnel face is artificially arranged in the through tunnel, and the partition plate aims at cutting off air convection in the through tunnel, ensuring that the efficiency of a ventilation system is not interfered by unstable convection air flow, reducing the gas concentration in the tunnel and improving the ventilation efficiency of the tunnel. And a good air environment is provided for construction operation in the tunnel.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of hydraulic tunnels, and relates to a ventilation facility for a small-diameter gas tunnel, and also relates to a method for using the facility. Background Art

[0002] During the construction of hydraulic tunnels, oil, gas or coal mining areas will be encountered. When these hydraulic tunnels pass through oil, gas or coal mining areas, the gas problem is particularly prominent. In order to ensure safe construction during tunnel construction, ventilation in the tunnel is essential.

[0003] The difference between hydraulic tunnels and traffic tunnels is that the cross-sectional dimensions vary greatly. For large caverns with a span of more than 7m, hydraulic tunnel construction adopts the same technical method as the transportation industry, that is, the follow-up lining method. By setting up ventilation ducts and other systems in the cavern, the ventilation system can effectively play a role due to the existence of the front heading, meeting the requirements of excavation support and lining.

[0004] However, for caverns below 7m, due to the small space of the caverns, it is often difficult to meet the requirements of arranging ventilation pipes on the upper part and arranging steel mold trolleys to cast concrete in the cave while excavating the tunnel. We can only wait until the tunnel excavation is completed and then cast concrete section by section. For ordinary tunnels below the low gas concentration level, there is no problem with the above construction process. However, for high-gas hydraulic tunnels, natural ventilation after the tunnel is connected is difficult to ensure the ventilation wind speed requirements required by high-gas tunnels. It is necessary to set up a fan at the entrance of the tunnel to press fresh air into the tunnel through the ventilation duct. At this time, due to the unstable wind direction inside the tunnel after the tunnel is connected, the ventilation facilities are difficult to reduce the gas concentration in the tunnel due to the influence of convection wind. At present, the water conservancy industry has not yet found a good solution to the ventilation needs of such small-diameter high-gas hydraulic tunnels. It is usually solved by construction workers wearing oxygen masks, which brings great inconvenience to construction. Summary of the invention

[0005] The purpose of the present invention is to provide a ventilation facility for a small-diameter gas tunnel, which solves the problem in the prior art that the wind direction inside the tunnel is unstable during the construction of a small-diameter hydraulic tunnel, and the ventilation facility is difficult to reduce the gas concentration in the tunnel due to the influence of convection wind.

[0006] Another object of the present invention is to provide a method for using a ventilation facility for a small-diameter gas tunnel.

[0007] The technical solution adopted by the present invention is:

[0008] The ventilation facility for a small-diameter gas tunnel comprises a steel frame, the inner side of which is fixedly connected with a windshield surface, which is a plane structure surrounded by the steel frame and has a ventilation pipe running through it.

[0009] The present invention is also characterized in that:

[0010] A crossbeam along the secant line of the steel frame is fixedly connected to the inner side of the steel frame, a longitudinal beam a extends upward along the mid-vertical line of the crossbeam, the other end of the longitudinal beam a is connected to the steel frame, a pair of longitudinal beams b are fixedly connected to the other side of the crossbeam opposite to the longitudinal beam a, and the other ends of the two longitudinal beams b are fixedly connected to the steel frame.

[0011] The inner side of the steel frame is divided into five small frames by a cross beam, a longitudinal beam a and a group of longitudinal beams b, wherein a wind shielding surface is fixedly connected to the inner side of each small frame.

[0012] The bottom end of the steel frame is bent inward to form two grooves, and anti-skid walking pulleys are installed in the two grooves, and matching slide rails are laid under the anti-skid walking pulleys.

[0013] A mechanical caster brake structure is installed on the top of the anti-skid walking pulley through bolts.

[0014] The connection between the windshield surface and the steel frame is sealed with sealant.

[0015] The connection between the windshield surface and the ventilation pipe is sealed with a sealing ring.

[0016] Another technical solution adopted by the present invention is a method for using ventilation facilities for a small-diameter gas tunnel, which is specifically implemented according to the following steps:

[0017] Step 1: Push the steel frame along the track into the tunnel. After reaching the designated working position, lock the anti-skid walking pulley through the mechanical caster brake structure;

[0018] Step 2: Use ventilation pipes to introduce fresh air into the tunnel;

[0019] Step 3: After a section of the tunnel is lined, unlock the anti-skid walking pulley and repeat steps 1 and 2 until the inner wall of the tunnel is lined.

[0020] The beneficial effects of the present invention are:

[0021] The present invention artificially establishes a partition similar to the face of the tunnel in the excavated and penetrated tunnel by setting a steel frame and a wind shield surface, which can reduce the convection wind inside the tunnel, stabilize the wind direction of the natural wind in the tunnel, reduce the influence of the natural wind on the ventilation device, enable the ventilation device to operate normally, effectively reduce the gas concentration in the tunnel, provide a good air environment for the construction work in the tunnel, and avoid the occurrence of accidents. BRIEF DESCRIPTION OF THE DRAWINGS

[0022] Figure 1 It is a structural schematic diagram of the longitudinal arrangement of ventilation facilities for a small-diameter gas tunnel according to the present invention;

[0023] Figure 2 The present invention is a schematic structural diagram of a windshield in a ventilation facility for a small-diameter gas tunnel.

[0024] Figure numerals: 1. steel frame; 2. ventilation duct; 3. wind shield; 4. cross beam; 5. longitudinal beam a; 6. longitudinal beam b; 7. groove; 8. anti-skid walking pulley; 9. slide rail. DETAILED DESCRIPTION

[0025] The present invention is described in detail below with reference to the accompanying drawings and specific embodiments.

[0026] Embodiment 1:

[0027] like Figure 1 and Figure 2 As shown, it includes a steel frame 1, the inner side of the steel frame 1 is fixedly connected with a wind shield 3, the wind shield 3 is a plane structure surrounded by the steel frame 1, and a ventilation pipe 2 runs through the wind shield 3.

[0028] The steel frame 1 provides support for the windshield 3 to maintain its partition state and prevent the windshield 3 from curling and deforming and losing its partition effect under the impact of convection wind. The windshield 3 passes through the partition through the tunnel to avoid the interference of convection wind on the ventilation duct 2 and improve the ventilation effect of the ventilation duct 2.

[0029] Embodiment 2:

[0030] Based on Example 1:

[0031] like Figure 2 As shown, a cross beam 4 along the secant line of the steel frame 1 is fixedly connected to the inner side of the steel frame 1, a longitudinal beam a5 is extended upward along the mid-vertical line of the cross beam 4, the other end of the longitudinal beam a5 is connected to the steel frame 1, a pair of longitudinal beams b6 are fixedly connected to the other side of the cross beam 4 opposite to the longitudinal beam a5, and the other ends of the two longitudinal beams b6 are fixedly connected to the steel frame 1. The cross beam 4, the longitudinal beam a5 and the longitudinal beam b6 can improve the mechanical properties of the steel frame 1, making the steel frame 1 more solid and less prone to deformation.

[0032] like Figure 2 As shown, the inner side of the steel frame 1 is divided into five small frames by a cross beam 4, a longitudinal beam a5 and a group of longitudinal beams b6, wherein a windshield 3 is fixedly connected to the inner side of each small frame. The modular design of the windshield 3 allows for easy replacement of a damaged windshield 3 at any time without removing the entire windshield 3, thereby reducing the maintenance cost of the device.

[0033] A gap of 10 cm to 20 cm is maintained between the side of the steel frame 1 and the wall of the tunnel. A certain gap can be reserved to avoid the steel frame 1 from colliding with the inner wall of the excavated tunnel when moving, thereby limiting the movement of the windshield.

[0034] Embodiment three:

[0035] Based on Example 1:

[0036] like Figure 2 As shown, the bottom end of the steel frame 1 is bent inward to form two grooves 7, and anti-skid walking pulleys 8 are installed on the inner sides of the two grooves 7. Matching slide rails 9 are laid under the anti-skid walking pulleys 8. Construction workers can follow the concrete lining trolley to move the steel frame 1 through the anti-skid walking pulleys 8 and the matching slide rails 9, and adjust the position of the windshield surface 3 to form a better partition effect.

[0037] A mechanical caster brake structure is installed at the top of the anti-skid walking pulley 8 by bolts, which is used to lock the anti-skid walking pulley 8 to prevent the steel frame 1 from being displaced by external forces and colliding with other devices, causing unnecessary casualties and property losses.

[0038] When laying the slide rails 9, the steel frame 1 and the concrete lining trolley can share the same set of slide rails 9. Sharing the slide rails 9 can reduce the cost of laying the slide rails 9 during the construction process, simplify the construction process, and improve the use efficiency of the equipment.

[0039] Embodiment 4:

[0040] Based on Example 1:

[0041] The connection between the windshield surface 3 and the steel frame 1 is sealed with sealant. The sealing treatment prevents air from passing through the connection between the windshield surface 3 and the steel frame 1, further improving the partition effect of the windshield surface 3. At the same time, because the windshield surface 3 will move along the steel frame 1 when in use, while the ventilation pipe 2 fixed to the inner wall of the tunnel remains stationary, the connection between the windshield surface 3 and the ventilation pipe 2 is sealed with a sealing ring. While ensuring that the two can move, air is prevented from passing through the connection between the windshield surface 3 and the ventilation pipe 2, thereby improving the partition effect of the windshield surface 3.

[0042] The present invention artificially establishes a heading face in a through tunnel through the design of a steel frame 1 and a windshield surface 3, partitions the through tunnel, prevents air convection between tunnels, and avoids unstable convection wind in the through tunnel affecting the ventilation effect of the ventilation device in the tunnel.

[0043] Construction method: After the tunnel is completed, first select the appropriate steel-welded steel frame 1 and the cross beam 4, longitudinal beam a5 and longitudinal beam b6 inside it according to the cross-sectional shape of the tunnel, and reserve two grooves 7 at the bottom of the steel frame 1. After welding, fix the windshield 3 on the inside of the steel frame 1, fix the anti-skid walking pulley 8 in the groove 7 reserved in the steel frame 1, and use sealant to seal the connection between the windshield 3 and the steel frame 1. Then, lay the slide rail 9 at the bottom of the inner wall of the tunnel, place the steel frame 1 on the slide rail 9, pass the ventilation pipe 2 through the windshield 3, and use a sealing ring to seal the connection between the two.

[0044] Workflow:

[0045] Step 1: After the device is assembled, push the steel frame 1 to the designated working position, and then lock the anti-skid walking pulley 5 through the mechanical caster brake structure to prevent it from moving and prevent air convection between the tunnels;

[0046] Step 2: Use ventilation pipe 2 to introduce fresh air into the tunnel to reduce gas concentration and improve the air environment in the tunnel;

[0047] Step 3: After a section of the tunnel is lined, unlock the anti-skid walking pulley 5 and repeat steps 1 and 2 until the inner wall of the tunnel is lined.

Claims

1. A ventilation facility for a small-diameter gas tunnel, characterized in that: It comprises a steel frame (1), the inner side of which is fixedly connected to a windshield surface (3), the windshield surface (3) being a plane structure surrounded by the steel frame (1), and a ventilation pipe (2) passing through the windshield surface (3).

2. The ventilation facility for a small-diameter gas tunnel according to claim 1, characterized in that: A crossbeam (4) along the secant line of the steel frame (1) is fixedly connected to the inner side of the steel frame (1), a longitudinal beam a (5) is extended upward along the perpendicular line of the crossbeam (4), the other end of the longitudinal beam a (5) is connected to the steel frame (1), a pair of longitudinal beams b (6) are fixedly connected to the other side of the crossbeam (4) opposite to the longitudinal beam a (5), and the other ends of the two longitudinal beams b (6) are fixedly connected to the steel frame (1).

3. The ventilation facility for a small-diameter gas tunnel according to claim 2, characterized in that: The inner side of the steel frame (1) is divided into five small frames by a cross beam (4), a longitudinal beam a (5) and a pair of longitudinal beams b (6), wherein the inner side of each small frame is fixedly connected to a windshield surface (3).

4. The ventilation facility for a small-diameter gas tunnel according to claim 1, characterized in that: The bottom end of the steel frame (1) is bent inward to form two grooves (7), and anti-skid walking pulleys (8) are installed in the two grooves (7). Matching slide rails (9) are laid under the anti-skid walking pulleys (8).

5. The ventilation facility for a small-diameter gas tunnel according to claim 4, characterized in that: A mechanical caster brake structure is installed on the top of the anti-skid walking pulley (8) via bolts.

6. The ventilation facility for a small-diameter gas tunnel according to claim 1, characterized in that: The connection between the wind shield surface (3) and the steel frame (1) is sealed with sealant.

7. The ventilation facility for a small-diameter gas tunnel according to claim 1, characterized in that: The connection between the wind shielding surface (3) and the ventilation pipe (2) is sealed by a sealing ring.

8. The method for using the ventilation facility for a small-diameter gas tunnel according to any one of claims 1 to 7, characterized in that: Follow the steps below to implement it: Step 1: Push the steel frame (1) along the track into the tunnel, and after reaching the designated working position, lock the anti-skid walking pulley (5) through the mechanical caster brake structure; Step 2: Use the ventilation pipe (2) to introduce fresh air into the tunnel; Step 3: After a section of the tunnel is lined, unlock the anti-skid walking pulley (5), and repeat steps 1 and 2 until the inner wall of the tunnel is lined.