Construction method for penetration of PE outer protective pipe heat distribution pipeline in concrete sleeve

Through the combination of the six-way surrounding ball structure and the traction mechanism, the existing technology solves the inconvenient installation and torsion problems of pipes passing through concrete casings, achieves smooth displacement and efficient traction of the pipes, and improves construction efficiency and equipment. life.

CN118793840APending Publication Date: 2024-10-18CHINA CONSTR FIRST BUILDING (GRP) CORP LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410797669.1
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-06-20
Publication Date
2024-10-18

AI Technical Summary

Technical Problem

Existing pipe threading methods have problems such as inconvenient installation, large traction force, torsion effect and large sliding resistance in large pipelines and underground construction. In particular, it is difficult to achieve smooth pipeline displacement and traction when threading pipes in concrete casings.

Method used

It adopts a sliding assembly and traction mechanism with a six-way wrap-around ball structure, realizes all-round displacement and independent height adjustment of the pipeline through a two-way screw shaft and a rolling ball holder, and combines the traction hook and the winch for traction to reduce the impact of torque.

Benefits of technology

It improves the smoothness and traction efficiency of pipe threading, reduces the torsion effect and sliding resistance, extends the service life of the pipe bracket, and reduces the traction force during the pipe threading process.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118793840A_ABST
    Figure CN118793840A_ABST
Patent Text Reader

Abstract

According to the construction method for penetrating the PE outer protection pipe heat distribution pipeline into the concrete sleeve, compared with an existing roller support, the device achieves all-directional displacement of the pipeline through a six-direction surrounding type ball structure, the pipeline penetrating smoothness is improved, the height of a displacement mechanism in each direction can be independently adjusted, and the construction efficiency is improved. And a pipeline traction mechanism is arranged.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the field of pipeline construction, and more specifically to a construction method for passing a PE outer protective pipe thermal pipeline through a concrete casing. Background Art

[0002] With the rapid development of modern industry, many applications have been implemented in the medical field in combination with existing scientific and technological technologies. For example: CN219755579U, a pulley bracket for threading large pipes in a pipe gallery. The utility model discloses a pulley bracket for threading large pipes in a pipe gallery, comprising an I-shaped steel track and a supporting splint, wherein a positioning frame is fixedly connected to the outer side of the I-shaped steel track, the supporting splint is placed on the top surface of the I-shaped steel track, and the supporting splint is screwed and fixed to the positioning frame by locking bolts; by hoisting the pipeline to a position between two I-shaped steel tracks, the outer wall of the pipeline is placed between two pulley guides distributed in a V shape for support, and then the required contact height of the auxiliary guide wheel during pipeline guidance is slidably regulated, so that after the bottom surface position of the pipeline contacts the auxiliary guide wheel, the pipeline is dragged by a fall chain, so that the currently lifted pipeline is lateral limited by the pulley guide while being guided by the sliding of the auxiliary guide wheel and the pulley guide to complete the pipe threading along the supporting path, thereby effectively reducing the contact surface and contact resistance during sliding, playing a role in preventing the pipe wall from being worn and reducing the required traction force for pipe threading. The structure described in the utility model is not suitable for large-scale pipe threading operations in cement pipes or underground operations because of the inconvenience of installation and the limitation of the length of the installation pipe. The structural type is also a common mechanism in this field.

[0003] For example: CN114542801A, a slidable bracket clamp for internally penetrated pipes. The present invention provides a slidable bracket clamp for internally penetrated pipes. The clamp comprises: a main hoop, which is used to support the first internally penetrated pipe; an auxiliary hoop, which is used to support the second internally penetrated pipe, and at least one auxiliary hoop is detachably connected to the outer wall of the main hoop; and rollers, which are provided on both the main hoop and the auxiliary hoop, and the rollers abut against the inner wall of the pipe to be penetrated, so that the clamp slides axially along the pipe to be penetrated. The clamp is used to guide the internally penetrated pipe, which effectively solves the problems of low efficiency and great safety hazards in the construction of municipal pipelines in limited spaces. It not only ensures the construction progress, but also eliminates the safety hazards caused by manual pipe penetration construction in limited spaces. The clamp has high efficiency in pipe penetration construction, and can significantly shorten the construction period by replacing manual labor with the clamp. The pipe threading bracket described in this invention cannot adjust the pulley according to the diameter of the pipe, and a certain torque will be generated on the pipe when the pipe is pulled during the threading. The pulley group is an ordinary heavy-duty pulley with a constant contact area. When subjected to torque, the resistance between the pipe and the inner wall of the pipe will increase. Summary of the invention

[0004] The purpose of the present invention is to provide a construction method for passing a PE outer sheathed thermal pipeline through a concrete casing. Compared with the existing roller bracket, the present device realizes all-round displacement of the pipeline through a six-way surrounding ball structure, thereby improving the smoothness of the pipeline passing through the pipeline. The displacement mechanism in each direction can independently adjust the height and is equipped with a pipeline traction mechanism.

[0005] The purpose of the present invention is achieved through the following technical solutions:

[0006] A construction method for passing a PE outer sheathed thermal pipeline through a concrete casing, characterized in that it comprises a traction assembly and a sliding assembly, wherein the traction assembly is connected to the sliding assembly.

[0007] As a further optimization of the technical solution, the present invention provides a construction method for passing a PE outer sheathed thermal pipeline through a concrete casing, wherein the traction assembly includes a pipeline, a fixed bracket A, a fixed bolt A, a fixed bracket B, a fixed bracket C, a fixed bolt B, a fixed bracket D, a fixed bracket E, a fixed bolt C, a fixed bracket F, a traction bracket, a traction hook, a fixed bolt D, a fixed bolt E, a fixed bolt F, and a fixed bolt G, wherein the fixed bracket A is fixedly connected to the fixed bracket B by the fixed bolt A, the fixed bracket C is fixedly connected to the fixed bracket D by the fixed bolt B, the fixed bracket E is fixedly connected to the fixed bracket F by the fixed bolt C, the fixed bracket A, the fixed bracket B, the fixed bracket C, the fixed bracket D, the fixed bracket E, and the fixed bracket F are all fixedly connected to the pipeline, the fixed bolt D, the fixed bolt E, the fixed bolt F, and the fixed bolt G are all fixedly connected to the traction bracket, the traction bracket is fixedly connected to the traction hook, the fixed bolt D and the fixed bolt E are all fixedly connected to the fixed bracket A, the fixed bracket C, and the fixed bracket E, and the fixed bolt F and the fixed bolt G are all fixedly connected to the fixed bracket B, the fixed bracket D, and the fixed bracket F.

[0008] As a further optimization of the technical solution, the present invention provides a construction method for passing a PE outer sheath thermal pipeline through a concrete casing, wherein the sliding assembly comprises a bearing bracket A, a pipeline fixing plate A, a bidirectional screw shaft, a connecting rod A, a connecting rod B, a screw seat A, a spring A, a rolling ball fixing seat A, an anti-slip bolt A, a rolling ball fixing seat B, a fixing piece A, a steel ball A, a fixing nut, a bearing bracket B, a connecting rod C, a connecting rod D, a screw seat B, a spring B, a pipeline fixing plate B, a rolling ball fixing seat C, an anti-slip bolt B, a rolling ball fixing seat D, a fixing piece B, and a steel ball B, wherein the bearing bracket A is fixedly connected to the pipeline fixing plate A, the bidirectional screw shaft is rotatably connected to the bearing bracket A and the bearing bracket B, the connecting rod A is rotatably connected to the bearing bracket A, the connecting rod A is rotatably connected to the connecting rod B, the connecting rod B is rotatably connected to the screw seat A, the screw seat A, The fixing nut and the screw seat B are both meshed and connected with the bidirectional screw shaft, the screw seat A is fixedly connected with the spring A, the rolling ball seat A is fixedly connected with the connecting rod A through the anti-slip bolt A, the rolling ball seat A is fixedly connected with the rolling ball seat B through the fixing piece A, the steel ball A is rotatably connected with the rolling ball seat A and the rolling ball seat B, the fixing nut is fixedly connected with the bearing bracket B through the bidirectional screw shaft, the bearing bracket B is rotatably connected with the connecting rod C, the bearing bracket B is fixedly connected with the pipe fixing plate B, the connecting rod C is rotatably connected with the connecting rod D, the connecting rod D is rotatably connected with the screw seat B, the screw seat B is fixedly connected with the spring B, the rolling ball seat C is fixedly connected with the connecting rod C through the anti-slip bolt B, the rolling ball seat C is fixedly connected with the rolling ball seat D through the fixing piece B, and the steel ball B is rotatably connected with the rolling ball seat C and the rolling ball seat D.

[0009] A method for threading a PE outer sheathed thermal pipe in a concrete casing is specifically implemented by a construction method for threading a PE outer sheathed thermal pipe in a concrete casing in claims 1-3 above. Compared with the existing roller bracket, the device realizes all-round displacement of the pipe through a six-way surrounding ball structure, improves the smoothness of the pipe threading, and each directional displacement mechanism can independently adjust the height and is equipped with a pipe traction mechanism, comprising the following steps:

[0010] S1. Before the pipeline is threaded, the pipeline 101 is lifted by a crane, and then the fixing bracket A102, the fixing bracket C105, and the fixing bracket E108 are placed in sequence at the front end of the pipeline to be threaded, and then the fixing bolts D113 and the fixing bolts E114 are passed through the fixing brackets A102, the fixing bracket C105, and the fixing bracket E108, and the fixing nuts are tightened to fix them with the fixing brackets A102, the fixing bracket C105, and the fixing bracket E108. The spacing between any two fixing brackets can be adjusted according to actual needs, and the appropriate distance is adjusted for the installation and fixation of the rear traction bracket 111, and then the fixing bracket A102 is fastened to the fixing bracket B104 by the fixing bolt A103, and the fixing bracket is fixed by the fixing bolt B106. C105 is fastened to the fixed bracket D107, and the fixed bracket E108 is fastened to the fixed bracket F110 through the fixing bolt C109. The fixing bolts F115 and G116 are passed through the fixed brackets B104, D107 and F110, and the fixing nuts are tightened to fix them with the fixed brackets B104, D107 and F110. The distance between any two fixed brackets can be adjusted according to actual needs. The traction bracket 111 is fixed to the front end of the fixing bolts D113, E114, F115 and G116. At this time, the traction bracket 111 is right in front of the pipeline 101, and the traction hook 112 is placed in the middle of the traction bracket 111 to facilitate the subsequent hoisting and traction;

[0011] S2. Then, the sliding assembly 2 is divided into six groups and installed on the traction assembly 1. Specifically, three groups of sliding assemblies 2 are installed and fixed on the fixed bracket A102, the fixed bracket C105, and the fixed bracket E108. The three groups of sliding assemblies 2 are installed on the fixed bracket B104, the fixed bracket D107, and the fixed bracket F110. Taking the installation on the fixed bracket A102, the fixed bracket C105, and the fixed bracket E108 as an example, the bearing bracket B214 is installed on the bearing bracket A201, the pipeline fixing plate A202 is bridged and fixed with the fixed bracket A102 and the fixed bracket C105, and the tightness with the pipeline 101 is adjusted. The pipeline fixing plate B219 is connected with the fixed bracket C105 and the fixed bracket E108. 8 bridge fixation, and adjust the tightness with the pipe 101, install the bearing bracket B214 on the fixed bracket E108, then unscrew the fixing nut 213, and then use the tool to rotate the bidirectional screw shaft 203. The structure of the bidirectional screw shaft 203 is that the screw threads on the left and right sides are opposite, the left side is left-handed, and the right side is right-handed. The purpose is that when the bidirectional screw shaft 203 rotates, the screw seat A206 and the screw seat B217 move synchronously along the bidirectional screw shaft 203 linearly, and the movement pattern is symmetrical along the center of the bidirectional screw shaft 203. When the screw seat A206 moves, it drives the connecting rod A204 to rotate along the bearing bracket A201 through the connecting rod B205. When the connecting rod A204 rotates, it is driven by the anti-slip bolt A20 9 drives the rolling ball fixing seat A208 and the rolling ball fixing seat B210 to move up and down, and the rolling ball fixing seat A208 and the rolling ball fixing seat B210 drive the steel ball A212 to move with them, and when the screw seat B217 moves, it drives the connecting rod C215 to rotate along the bearing bracket B214 through the connecting rod D216, and when the connecting rod C215 rotates, it drives the rolling ball fixing seat C220 and the rolling ball fixing seat D222 to move up and down through the anti-skid bolt B221, and when the rolling ball fixing seat C220 and the rolling ball fixing seat D222 move, it drives the steel ball B224 to move with them, and the two-way screw shaft 203 is continuously rotated with a tool until the steel balls A212 and B224 can contact the inner wall of the cement pipe, and the two-way screw shaft 203 is stopped. 3. Finally, fix the bidirectional screw shaft 203 in the bearing bracket B214 through the fixing nut 213, and continuously install it on the traction assembly 1 in this installation form. Then, connect the traction hook 112 in the traction assembly 1 through the traction mechanism of the winch to start traction. During traction, the traction assembly 1 is driven by the six sets of sliding assemblies 2 to make the steel balls A212 and B224 in the sliding assembly 2 completely contact with the inner wall of the cement pipe. The steel balls have a larger contact area than the pulley group of the traditional pipe support. When the pipe rotates unrestricted during the insertion process, it can also rotate well under force. When the traditional pulley swings or rotates to a certain extent in the pipe, torque will occur, which delays the pipe insertion speed and the service life of the pipe support.However, when the pipe 101 is inserted during the sliding process of the device, there will be no opposite torque when a certain amplitude of swing occurs due to the influence of traction and sliding of the steel ball.

[0012] The invention discloses a construction method for passing a PE outer sheathed thermal pipeline through a concrete casing, which has the following beneficial effects: 1. Compared with the existing roller bracket, the device realizes all-round displacement of the pipeline through a six-way surrounding ball structure, thereby improving the smoothness of the pipeline passing through the pipe; 2. Each directional displacement mechanism can independently adjust the height and is equipped with a pipeline traction mechanism. BRIEF DESCRIPTION OF THE DRAWINGS

[0013] The present invention is further described in detail below with reference to the accompanying drawings and specific implementation methods.

[0014] Figure 1 The overall structure of the present invention is shown in FIG. Figure 1 ;

[0015] Figure 2 The traction assembly structure of the present invention is schematically shown in FIG. Figure 1 ;

[0016] Figure 3 The traction assembly structure of the present invention is schematically shown in FIG. Figure 2 ;

[0017] Figure 4 The sliding assembly structure of the present invention is schematically shown in FIG. Figure 1 ;

[0018] Figure 5 The construction structure of the present invention is schematically shown in FIG. Figure 1 ;

[0019] In the figure: traction assembly 1; pipeline 101; fixing bracket A102; fixing bolt A103; fixing bracket B104; fixing bracket C105; fixing bolt B106; fixing bracket D107; fixing bracket E108; fixing bolt C109; fixing bracket F110; traction bracket 111; traction hook 112; fixing bolt D113; fixing bolt E114; fixing bolt F115; fixing bolt G116; sliding assembly 2; bearing bracket A201; pipeline fixing plate A202; bidirectional screw shaft 20 3; connecting rod A204; connecting rod B205; screw seat A206; spring A207; rolling ball fixing seat A208; anti-skid bolt A209; rolling ball fixing seat B210; fixing piece A211; steel ball A212; fixing nut 213; bearing bracket B214; connecting rod C215; connecting rod D216; screw seat B217; spring B218; pipe fixing plate B219; rolling ball fixing seat C220; anti-skid bolt B221; rolling ball fixing seat D222; fixing piece B223; steel ball B224. Specific embodiments

[0020] The present invention will be further described in detail below in conjunction with the accompanying drawings. Specific embodiment one:

[0022] Combine the following Figure 1-5 The present embodiment is described as a construction method for passing a PE outer sheathed thermal pipeline through a concrete casing, comprising a traction assembly 1 and a sliding assembly 2, wherein the traction assembly 1 is connected to the sliding assembly 2. Specific embodiment 2:

[0024] Combine the following Figure 1-5 This embodiment is described. This embodiment further describes the first embodiment. The operating principle of the traction assembly 1 is that before the pipeline is penetrated, the pipeline 101 is lifted by a crane, and then the fixed bracket A102, the fixed bracket C105, and the fixed bracket E108 are placed in sequence at the front end position of the pipeline to be penetrated, and then the fixing bolts D113 and the fixing bolts E114 are passed through the fixed bracket A102, the fixed bracket C105, and the fixed bracket E108, and the fixing nuts are tightened to fix them with the fixed bracket A102, the fixed bracket C105, and the fixed bracket E108, and the spacing between any two fixed brackets can be adjusted according to actual needs, and the appropriate distance is adjusted for the installation and fixation of the rear traction bracket 111, and then the fixed bracket A102 is fastened to the fixed bracket B104 by the fixing bolts A103. Next, fasten the fixed bracket C105 and the fixed bracket D107 through the fixing bolt B106, fasten the fixed bracket E108 and the fixed bracket F110 through the fixing bolt C109, pass the fixing bolt F115 and the fixing bolt G116 through the fixing bracket B104, the fixing bracket D107 and the fixing bracket F110, tighten the fixing nuts to fix them with the fixing bracket B104, the fixing bracket D107 and the fixing bracket F110, and the distance between any two fixing brackets can be adjusted according to actual needs, and the traction bracket 111 is fixed to the front end of the fixing bolt D113, the fixing bolt E114, the fixing bolt F115 and the fixing bolt G116. At this time, the traction bracket 111 is right in front of the pipeline 101, and the traction hook 112 is placed in the middle of the traction bracket 111 to facilitate the subsequent winch mounting and traction. Specific embodiment three:

[0026] Combine the following Figure 1-5This embodiment is described. This embodiment further describes the first embodiment. The operating principle of the sliding assembly 2 is that the sliding assembly 2 is then divided into six groups and installed on the traction assembly 1. Specifically, three groups of sliding assemblies 2 are installed and fixed on the fixed bracket A102, the fixed bracket C105, and the fixed bracket E108. The three groups of sliding assemblies 2 are installed on the fixed bracket B104, the fixed bracket D107, and the fixed bracket F110. Taking the installation on the fixed bracket A102, the fixed bracket C105, and the fixed bracket E108 as an example, the bearing bracket B214 is installed on the bearing bracket A201, the pipeline fixing plate A202 is bridged and fixed with the fixed bracket A102 and the fixed bracket C105, and the tightness with the pipeline 101 is adjusted. The pipe fixing plate B219 is bridged and fixed with the fixing bracket C105 and the fixing bracket E108, and the tightness with the pipe 101 is adjusted, and the bearing bracket B214 is installed on the fixing bracket E108, and then the fixing nut 213 is unscrewed, and then the bidirectional screw shaft 203 is rotated by a tool. The structure of the bidirectional screw shaft 203 is that the screw threads on the left and right sides are opposite, the left side is left-handed, and the right side is right-handed. The purpose is that when the bidirectional screw shaft 203 rotates, the screw seat A206 and the screw seat B217 move linearly along the bidirectional screw shaft 203 synchronously, and the movement pattern is symmetrical along the center of the bidirectional screw shaft 203. When the screw seat A206 moves, the connecting rod A204 is driven by the connecting rod B205 to rotate along the bearing bracket A201, and the connecting rod When rod A204 rotates, rolling ball fixing seat A208 and rolling ball fixing seat B210 are driven to move up and down through anti-skid bolt A209, and rolling ball fixing seat A208 and rolling ball fixing seat B210 drive steel ball A212 to follow the movement, and when screw seat B217 moves, connecting rod C215 is driven to rotate along bearing bracket B214 through connecting rod D216, and when connecting rod C215 rotates, rolling ball fixing seat C220 and rolling ball fixing seat D222 are driven to move up and down through anti-skid bolt B221, and when rolling ball fixing seat C220 and rolling ball fixing seat D222 move, steel ball B224 is driven to follow the movement, and the bidirectional screw shaft 203 is continuously rotated with a tool until steel ball A212 and steel ball B224 can contact the inner wall of the cement pipe and stop rotating. The bidirectional screw shaft 203 is moved, and finally the bidirectional screw shaft 203 is fixed in the bearing bracket B214 by the fixing nut 213. In this installation form, it is continuously installed on the traction assembly 1, and then the traction hook 112 in the traction assembly 1 is connected through the traction mechanism of the winch to start traction. During traction, the traction assembly 1 is driven by the six sets of sliding assemblies 2 to make the steel balls A212 and B224 in the sliding assembly 2 completely contact with the inner wall of the cement pipe. The steel balls have a larger contact area than the pulley group of the traditional pipe bracket. When the pipe rotates unrestricted during the insertion process, it can also rotate well under force. When the traditional pulley swings or rotates to a certain extent in the pipe, torque will occur, which delays the pipe insertion speed and the service life of the pipe bracket.However, when the pipe 101 is inserted during the sliding process of the device, there will be no opposite torque when a certain amplitude of swing occurs due to the influence of traction and sliding of the steel ball.

Claims

1. A construction method for passing a PE outer sheath thermal pipeline through a concrete casing, characterized in that: The invention comprises a traction assembly (1) and a sliding assembly (2), wherein the traction assembly (1) is connected to the sliding assembly (2).

2. The construction method of a PE outer sheath thermal pipeline passing through a concrete casing according to claim 1 is characterized in that: The traction assembly (1) comprises a pipeline (101), a fixing bracket A (102), a fixing bolt A (103), a fixing bracket B (104), a fixing bracket C (105), a fixing bolt B (106), a fixing bracket D (107), a fixing bracket E (108), a fixing bolt C (109), a fixing bracket F (110), a traction bracket (111), a traction hook (112), a fixing bolt D (113), a fixing bolt E (114), a fixing bolt F (115), and a fixing bolt G (116), wherein the fixing bracket A (102) is fixedly connected to the fixing bracket B (104) by the fixing bolt A (103), the fixing bracket C (105) is fixedly connected to the fixing bracket D (107) by the fixing bolt B (106), and the fixing bracket E (108) is fixedly connected to the fixing bracket F (110) by the fixing bolt C (109). The fixing bracket A (102), the fixing bracket B (104), the fixing bracket C (105), the fixing bracket D (107), the fixing bracket E (108), and the fixing bracket F (110) are all fixedly connected to the pipeline (101); the fixing bolts D (113), the fixing bolts E (114), the fixing bolts F (115), and the fixing bolts G (116) are all fixedly connected to the traction bracket (111); the traction bracket (111) is fixedly connected to the traction hook (112); the fixing bolts D (113) and the fixing bolts E (114) are all fixedly connected to the fixing bracket A (102), the fixing bracket C (105), and the fixing bracket E (108); and the fixing bolts F (115) and the fixing bolts G (116) are all fixedly connected to the fixing bracket B (104), the fixing bracket D (107), and the fixing bracket F (110).

3. The construction method of a PE outer sheath thermal pipeline passing through a concrete casing according to claim 1 is characterized in that: The sliding assembly (2) comprises a bearing bracket A (201), a pipe fixing plate A (202), a bidirectional screw shaft (203), a connecting rod A (204), a connecting rod B (205), a screw seat A (206), a spring A (207), a rolling ball fixing seat A (208), an anti-slip bolt A (209), a rolling ball fixing seat B (210), a fixing member A (211), a steel ball A (212), a fixing nut (213), a bearing bracket B (214), a connecting rod C (215), a connecting rod D (216), a screw seat B (217), a spring B (218), a pipe fixing plate B (219), a rolling ball fixing seat C (220), anti-slip bolt B (221), rolling ball fixing seat D (222), fixing piece B (223), steel ball B (224), wherein the bearing bracket A (201) is fixedly connected to the pipeline fixing plate A (202), the bidirectional screw shaft (203) is rotatably connected to the bearing bracket A (201) and the bearing bracket B (214), the connecting rod A (204) is rotatably connected to the bearing bracket A (201), the connecting rod A (204) is rotatably connected to the connecting rod B (205), the connecting rod B (205) is rotatably connected to the screw seat A (206), the screw seat A (206), the fixing nut (213), and the screw seat B (217) are all The ball bearing support (214) is connected to the two-way screw shaft (203), the ball bearing support (206) is fixedly connected to the spring (207), the ball bearing support (208) is fixedly connected to the connecting rod (204) via an anti-slip bolt (209), the ball bearing support (208) is fixedly connected to the connecting rod (204) via a fixing member (211), the ball bearing support (214) is rotatably connected to the ball bearing support (214) via a fixing member (211), the steel ball (212) is rotatably connected to the ball bearing support (208) and the ball bearing support (210), the fixing nut (213) is fixedly connected to the bearing support (214) via the two-way screw shaft (203), and the bearing support (214) is rotatably connected to the connecting rod (215). The bearing bracket B (214) is fixedly connected to the pipeline fixing plate B (219), the connecting rod C (215) is rotatably connected to the connecting rod D (216), the connecting rod D (216) is rotatably connected to the screw seat B (217), the screw seat B (217) is fixedly connected to the spring B (218), the rolling ball fixing seat C (220) is fixedly connected to the connecting rod C (215) via an anti-slip bolt B (221), the rolling ball fixing seat C (220) is fixedly connected to the rolling ball fixing seat D (222) via a fixing piece B (223), and the steel ball B (224) is rotatably connected to the rolling ball fixing seat C (220) and the rolling ball fixing seat D (222).

4. A method for threading a PE outer sheathed thermal pipe in a concrete casing, which is specifically implemented by a construction method for threading a PE outer sheathed thermal pipe in a concrete casing in claims 1-3 above. Compared with the existing roller bracket, this device realizes all-round displacement of the pipeline through a six-way surrounding ball structure, improves the smoothness of pipeline threading, and each directional displacement mechanism can independently adjust the height and is equipped with a pipeline traction mechanism, comprising the following steps: S1. Before the pipeline is penetrated, the pipeline (101) is lifted by a crane, and then the fixing bracket A (102), the fixing bracket C (105), and the fixing bracket E (108) are placed in sequence at the front end of the pipeline to be penetrated. Then, the fixing bolts D (113) and the fixing bolts E (114) are passed through the fixing brackets A (102), the fixing brackets C (105), and the fixing brackets E (108), and the fixing nuts are tightened to fix them with the fixing brackets A (102), the fixing brackets C (105), and the fixing brackets E (108). The spacing between any two fixing brackets can be adjusted according to actual needs, and the appropriate distance is adjusted for the installation and fixation of the rear traction bracket (111). Then, the fixing bracket A (102) is fastened to the fixing bracket B (104) by the fixing bolts A (103), and the fixing brackets C (105) are fastened to the fixing brackets B (106). ) is fastened and connected with the fixing bracket D (107), the fixing bracket E (108) is fastened and connected with the fixing bracket F (110) through the fixing bolt C (109), the fixing bolt F (115) and the fixing bolt G (116) are passed through the fixing bracket B (104), the fixing bracket D (107) and the fixing bracket F (110), and the fixing nuts are tightened to fix them with the fixing bracket B (104), the fixing bracket D (107) and the fixing bracket F (110), and the spacing between any two fixing brackets can be adjusted according to actual needs, and the traction bracket (111) is fixed at the front end of the fixing bolt D (113), the fixing bolt E (114), the fixing bolt F (115) and the fixing bolt G (116). At this time, the traction bracket (111) is located right in front of the pipeline (101), and the traction hook (112) is placed in the middle of the traction bracket (111) to facilitate subsequent hoisting and traction; S2. Then, the sliding assembly (2) is divided into six groups and installed on the traction assembly (1). Specifically, three groups of sliding assemblies (2) are installed and fixed on the fixed bracket A (102), the fixed bracket C (105), and the fixed bracket E (108). The three groups of sliding assemblies (2) are installed on the fixed bracket B (104), the fixed bracket D (107), and the fixed bracket F (110). Taking the installation of the fixed bracket A (102), the fixed bracket C (105), and the fixed bracket E (108) as an example, the bearing bracket B (214) is installed on the bearing bracket A (201), the pipeline fixing plate A (202) is bridged and fixed with the fixed bracket A (102) and the fixed bracket C (105), and the tightness with the pipeline (101) is adjusted. , bridge and fix the pipe fixing plate B (219) with the fixing bracket C (105) and the fixing bracket E (108), and adjust the tightness with the pipe (101), install the bearing bracket B (214) on the fixing bracket E (108), then unscrew the fixing nut (213), and then rotate the bidirectional screw shaft (203) with a tool. The structure of the bidirectional screw shaft (203) is that the screw threads on the left and right sides are opposite in direction, the left side is left-handed and the right side is right-handed. The purpose is that when the bidirectional screw shaft (203) rotates, the screw seat A (206) and the screw seat B (217) move linearly along the bidirectional screw shaft (203) synchronously, and the movement pattern moves symmetrically along the center of the bidirectional screw shaft (203). When the screw seat A (206) moves The connecting rod A (204) is driven to rotate along the bearing bracket A (201) through the connecting rod B (205). When the connecting rod A (204) rotates, the rolling ball fixing seat A (208) and the rolling ball fixing seat B (210) are driven to move up and down through the anti-slip bolt A (209). The rolling ball fixing seat A (208) and the rolling ball fixing seat B (210) drive the steel ball A (212) to move accordingly. When the screw seat B (217) moves, the connecting rod C (215) is driven to rotate along the bearing bracket B (214) through the connecting rod D (216). When the connecting rod C (215) rotates, the rolling ball fixing seat C (220) and the rolling ball fixing seat D (222) are driven to move up and down through the anti-slip bolt B (221). The rolling ball fixing seat C (220) and the rolling ball fixing seat D (222) are driven to move up and down. When the seat D (222) moves, the steel ball B (224) moves with it, and the bidirectional screw shaft (203) is continuously rotated by a tool until the steel balls A (212) and B (224) can contact the inner wall of the cement pipe, and then the bidirectional screw shaft (203) is stopped from rotating. Finally, the bidirectional screw shaft (203) is fixed in the bearing bracket B (214) by the fixing nut (213), and then the traction assembly (1) is continuously installed in this installation form. Then, the traction hook (112) in the traction assembly (1) is connected by the traction mechanism of the winch, and traction begins. During traction, the traction assembly (1) is driven by the six sets of sliding assemblies (2) so that the steel balls A (212) and B (224) in the sliding assembly (2) are completely in contact with the inner wall of the cement pipe.Compared with the pulley group of the traditional pipe support, the steel ball has a larger contact area, and can rotate well when the pipe rotates unrestricted during the insertion process. When the traditional pulley swings or rotates to a certain extent in the pipe, torque will be generated, which delays the pipe insertion speed and the service life of the pipe support. However, when the pipe (101) swings to a certain extent during the sliding process due to the traction force and the sliding of the steel ball, the device will not generate an opposite torque.