Bidding document analysis method and device

By automatically generating the list analysis table and data preprocessing table, the inefficiency and accuracy problems of manual analysis are solved, the rapid and accurate screening and verification of bidding documents is achieved, and the final winning bidder is more in line with the requirements.

CN118798145AInactive Publication Date: 2024-10-18SHENZHEN HAIZHICHUANG TECH CO LTD +1
View PDF 4 Cites 0 Cited by

Patent Information

Application Number
CN202411273243.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-12
Publication Date
2024-10-18
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

In the existing technology, bid document analysis relies on manual operations, resulting in low efficiency and low accuracy, and is prone to human errors.

Method used

By extracting target data from multiple inventory data files, inventory analysis tables and data preprocessing tables are automatically generated to realize automated data processing and screening, select the lowest price unit and verify its price rationality.

Benefits of technology

It improves the speed and accuracy of bid document analysis, reduces manual errors, simplifies the data collection and sorting process, improves the convenience and intuitiveness of data comparison, and ensures that the finalized winning bidder meets the requirements.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118798145A_ABST
    Figure CN118798145A_ABST
Patent Text Reader

Abstract

The invention discloses a bidding file analysis method and device. The method comprises the following steps: acquiring list data files of a plurality of bid returning units; extracting target data from the plurality of list data files, and generating a list analysis table and a data preprocessing table based on the target data; and based on the list analysis table and the data preprocessing table, screening out a target bid winning unit from the plurality of bid returning units. The bidding file analysis speed and accuracy can be improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of data processing, and in particular to a method and device for analyzing bidding documents. Background Art

[0002] In the current bidding process, the analysis of bidding documents mostly relies on manual operations. For example, it is necessary to carefully review the contents of each bidding document one by one to ensure that there are no abnormalities or omissions in the data in the bidding documents. Secondly, it is necessary to compare the data of different bidding units to ensure that the data is reasonable.

[0003] Since the manual comparison process is often complicated and time-consuming, the manual review and analysis method is not only inefficient but also prone to human errors, resulting in low accuracy of the analysis results. Summary of the invention

[0004] The present application provides a bidding document analysis method and device, which can improve the speed and accuracy of bidding document analysis.

[0005] In a first aspect, the present application provides a method for analyzing a bidding document, the method comprising: Obtain inventory data files of multiple bidding units; Extract target data from multiple inventory data files, and generate inventory analysis tables and data preprocessing tables based on the target data; Based on the list analysis table and data pre-processing table, the target winning bidder is selected from multiple returning bidders.

[0006] Its further technical solution is to select the target winning bidder from multiple bidders based on the list analysis table and data preprocessing table, including: Use the list analysis table and data pre-processing table to determine whether the quotations of each bidding unit are normal; If the quotations of each bidding unit are normal, the unit with the lowest bid price among the multiple bidding units will be selected based on the list analysis table; Based on the list analysis table, confirm whether the price of the lowest bid unit is reasonable; If the price of the unit with the lowest bid is reasonable, the unit with the lowest bid will be selected as the target winning bidder among multiple bidding units.

[0007] Its further technical solution is that the list analysis table includes the total price table of all previous bid returns and the price set analysis table; Based on the list analysis table, select the unit with the lowest bid price among multiple bidders, including: Based on the total price list of previous bids, obtain the unit with the lowest bid price among multiple bid units; Based on the list analysis table, confirm whether the price of the lowest bid unit is reasonable, including: Based on the price analysis table, determine whether the price of the lowest priced unit is reasonable.

[0008] A further technical solution is to determine whether the price of the lowest bid unit is reasonable based on the price analysis table, including: Obtain data information of target units that have won bids within a preset time period; Based on the preset price comparison items, query the relevant information of each list item in the preset price comparison items from the data information of the target unit that has won the bid; Based on the relevant information of each list item in the preset package price comparison item, determine the unit price of each list item in the package price analysis table; Based on the unit price of each list item, the comprehensive unit price and total price of each list item are obtained; If the total price of all list items is within the preset reasonable price range, the price of the lowest bid unit is determined to be reasonable.

[0009] A further technical solution is to determine the unit price of each list item in the package price analysis table based on the relevant information of each list item in the preset package price comparison item, including: If a list item with completely identical attributes is found from the target unit that has won the bid, the price of the list item in this bid in the price analysis table will be directly replaced with the price of the same list item in the target unit that has won the bid, and the same unit price will be marked at the unit price source in the price analysis table; If some list items with the same attributes are found from the target unit that has won the bid, the price of the list item in this bid in the price analysis table will be converted to the price of the same list item in the target unit that has won the bid, and the unit price source in the price analysis table will be marked as similar unit price; If no consistent list items are found from the data information of the previous successful bidder, fill in the list item prices for this bid in the price analysis table and mark the lowest unit price at the source of the unit price in the price analysis table.

[0010] A further technical solution is to extract target data from multiple inventory data files and generate a data preprocessing table, including: Based on the preset universal package dimensions, target data corresponding to the preset universal package dimensions are extracted from multiple inventory data files, and a data preprocessing table is automatically generated.

[0011] A further technical solution is to extract target data from multiple inventory data files and generate a data preprocessing table, and also includes: Based on the customized analysis dimension, target data corresponding to the customized analysis dimension is extracted from multiple inventory data files to generate a data preprocessing table.

[0012] A further technical solution is that the customized analysis dimension includes an area dimension, target data corresponding to the customized analysis dimension is extracted from multiple inventory data files, and a data preprocessing table is generated, including: Extract area data corresponding to area dimensions from multiple inventory data files; Based on the area data, the index content of the building materials corresponding to the area data is obtained; Based on the index content of building materials, a data preprocessing table is generated.

[0013] A further technical solution is that the user-defined analysis dimension includes a first part analysis dimension, a second part analysis dimension and a third part analysis dimension; Extract target data corresponding to customized analysis dimensions from multiple inventory data files and generate data preprocessing tables, including: Extracting target data corresponding to the first part analysis dimension, the second part analysis dimension and the third part analysis dimension from the plurality of inventory data files; Based on the order of selecting the first part analysis dimension, the second part analysis dimension and the third part analysis dimension, a data preprocessing table of layout settings corresponding to the selection order is generated.

[0014] In a second aspect, the present application provides a bidding document analysis device, the bidding document analysis device comprising: An acquisition module is used to acquire inventory data files of multiple bidding units; A generation module, used for extracting target data from multiple inventory data files, and generating an inventory analysis table and a data preprocessing table based on the target data; The analysis module is used to screen out the target winning bidder from multiple returning bidders based on the list analysis table and the data preprocessing table.

[0015] The beneficial effects of the present application are as follows: different from the prior art, the present application automatically generates a list analysis table and a data preprocessing table by extracting target data from multiple list data files, that is, the data in the bidding documents is acquired and processed by automated means, which simplifies the process of data collection and organization, and eliminates the need for manual extraction operations one by one, thereby helping to avoid the tedious work of manually screening data one by one, thereby improving the efficiency of data processing; secondly, the automated extraction process also helps to reduce data errors caused by manual operational errors, thereby improving the accuracy and reliability of the data; in addition, users can directly use the generated list analysis table and data preprocessing table to compare the data of different bidding units, without having to repeatedly refer to the original files to verify individual data points, thereby improving the convenience and intuitiveness of data comparison, thereby improving the efficiency and accuracy of data analysis, so that the target winning bidder finally determined is the most in line with the requirements. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] In order to more clearly illustrate the technical solutions in the embodiments of the present application, the following briefly introduces the drawings required for use in the description of the embodiments. Obviously, the drawings described below are only some embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work. Among them: Figure 1 It is a flowchart of the first embodiment of the bidding document analysis method provided by the present application; Figure 2 It is a structural schematic diagram of an embodiment of a computer-readable storage medium provided by the present application. DETAILED DESCRIPTION

[0017] The technical solutions in the embodiments of the present application will be clearly and completely described below in conjunction with the drawings in the embodiments of the present application. It will be understood that the specific embodiments described herein are only used to explain the present application, rather than to limit the present application. It should also be noted that, for ease of description, only some but not all structures related to the present application are shown in the drawings. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in the field without making creative work are within the scope of protection of the present application.

[0018] Reference to "embodiments" herein means that a particular feature, structure, or characteristic described in conjunction with the embodiments may be included in at least one embodiment of the present application. The appearance of the phrase at various locations in the specification does not necessarily refer to the same embodiment, nor is it an independent or alternative embodiment that is mutually exclusive with other embodiments. It is explicitly and implicitly understood by those skilled in the art that the embodiments described herein may be combined with other embodiments.

[0019] In the current bidding process, the analysis of bidding documents mostly relies on manual operations. For example, it is necessary to carefully review the contents of each bidding document one by one to ensure that there are no abnormalities or omissions in the data in the bidding documents. Secondly, it is necessary to compare the data of different bidding units to ensure that the data is reasonable.

[0020] For example, for some complex bidding documents, the list items may contain thousands of items. In the process of judging whether the data is reasonable, the existing method is generally to select some of the more important list items from the thousands of list items for comparison. Although this method can improve efficiency to a certain extent, it is easy to lead to low accuracy in judging the rationality because only some list items are selected for judgment.

[0021] If all the list items are reviewed manually offline one by one and compared and analyzed, this method can improve the judgment accuracy, but the workload is very large, resulting in very low efficiency and high labor costs.

[0022] Therefore, in order to solve the technical problems in the prior art that the analysis method using manual review leads to low efficiency and low accuracy of the analysis results, the present application provides a bidding document analysis method that can improve the speed and accuracy of bidding document analysis. Please refer to the following embodiments for details.

[0023] See also Figure 1 , Figure 1 This is a flow chart of the first embodiment of the bidding document analysis method provided by this application. The method comprises the following steps: In a first aspect, the present application provides a method for analyzing a bidding document, the method comprising: Step 110: Obtain list data files of multiple bidding units.

[0024] The data files submitted by all the bidders can be collected as the list data files, which can contain specific information about the bid items, such as material costs, labor costs, etc.

[0025] For example, each bidding unit may have one set of list data files, which may actually include many Excel files, and each Excel file may also contain multiple sheet files.

[0026] Step 120: extracting target data from multiple inventory data files, and generating an inventory analysis table and a data preprocessing table based on the target data.

[0027] Among them, the list analysis table can be a commonly used analysis table that is automatically generated. For example, it can include the total price table of all previous bid returns, the comparison analysis table of start-up costs, the comparison analysis table of unit costs, the comparison analysis table of major economic indicators, the comparison analysis table of comprehensive unit prices (original), the comparison analysis table of comprehensive unit prices (set price items), the summary table of prices of Party A's materials and Party A's subcontracts, the cost analysis table, the comparison analysis table of list set prices, etc.

[0028] The data preprocessing table can generate the data required by the user based on the attributes of the inventory data (such as inventory file attributes, inventory attribute columns) and the required analysis dimensions.

[0029] Step 130: Based on the list analysis table and the data pre-processing table, select the target winning bidder from the multiple bidding units.

[0030] Among them, the data in each bidding unit can be analyzed based on the list analysis table and the data preprocessing table to determine whether they are abnormal and reasonable.

[0031] This embodiment automatically generates a list analysis table and a data preprocessing table by extracting target data from multiple list data files, that is, it obtains and processes the data in the bidding documents through automated means, thereby simplifying the process of data collection and organization, eliminating the need for manual extraction operations one by one, and thus helping to avoid the tedious work of manually screening data one by one, thereby improving the efficiency of data processing; secondly, the automated extraction process also helps to reduce data errors caused by manual operational errors, thereby improving the accuracy and reliability of the data; in addition, users can directly use the generated list analysis table and data preprocessing table to compare the data of different bidding units, without having to repeatedly refer to the original files to verify individual data points, thereby improving the convenience and intuitiveness of data comparison, thereby improving the efficiency and accuracy of data analysis, so that the target winning bidder finally determined is the most in line with the requirements.

[0032] Refer to the second embodiment of the bidding document analysis method provided by this application. The second embodiment includes the following steps: Step 210: Obtain list data files of multiple bidding units.

[0033] Step 220: extracting target data from multiple inventory data files, and generating an inventory analysis table and a data preprocessing table based on the target data.

[0034] Step 230: Use the list analysis table and the data pre-processing table to determine whether the quotations of each bidding unit are normal.

[0035] Determining whether the quotations of each bidding unit are normal may include determining whether the units, values, etc. of the quotations are normal.

[0036] For example, suppose there is a project to set up a flower bed on the balcony, and the bid documents are received from five units. For example, the quotations of Unit A, Unit B, Unit C, Unit D, and Unit E are: 20,000, 23,000, 19,000, 300,000, and 27,000 respectively. It can be found that the quotation of 300,000 is obviously abnormal.

[0037] In addition, it is also possible to determine whether there are any missing data in the return bid unit.

[0038] Step 240: If the quotations of each bidding unit are normal, the unit with the lowest bid price among the multiple bidding units is selected based on the list analysis table.

[0039] For example, in step 230, the bid of 300,000 is abnormal, so unit D can be screened out, and the unit with the lowest bid price among the four units of unit A, unit B, unit C, and unit E can be determined to be unit C.

[0040] Alternatively, the quotation can be revised, for example, changing 300,000 to 30,000, and then determining the unit with the lowest bid among the four units A, B, C, D, and E to be Unit C.

[0041] It should be noted that the processing of abnormal data can be comprehensively considered based on the actual situation.

[0042] Step 250: Based on the list analysis table, confirm whether the price of the lowest priced unit is reasonable.

[0043] The list analysis table includes the total price table of all previous bid returns and the price set analysis table; Step 240 and Step 250 may be the following steps: Based on the total price list of all previous bids, the unit with the lowest bid price among multiple bidders is obtained; wherein the total price list of all previous bids may include data such as the bidding unit, ranking, tax rate, material amount and unit cost.

[0044] For example, the total price list of all previous bids can be the following Table 1.

[0045] Table 1

[0046] You can directly locate the ranking column from the total price list of all previous bids, i.e. Table 1, and then find out that Unit A is the unit with the lowest bid price.

[0047] 2) Based on the price analysis table, determine whether the price of the lowest priced unit is reasonable.

[0048] In some implementations, determining whether the price of the lowest priced unit is reasonable based on the package price analysis table may include the following steps: Step 310: Obtain data information of target units that have won bids within a preset time period.

[0049] Among them, the preset time period can be 1 month ago, 2 months ago, 6 months ago or 1 year ago, etc., and can be selected according to actual conditions. This application does not limit this.

[0050] Among them, the data information of the target unit that has won the bid may include quotation, list items, list area, list practices and other information.

[0051] For example, there are five bidders and the unit with the lowest bid is Unit A. Then, you can select Unit B, which won the bid three months ago (i.e., the target unit that has won the bid), for comparison and obtain Unit B’s data information.

[0052] In other implementations, a standard list library may be compiled, and then a standard price library may be compiled based on the standard list library, wherein the standard price library may include common list items of various professions in various regions and corresponding standard prices.

[0053] When determining whether the price of the lowest priced unit is reasonable, data information in the standard price database can be obtained to perform price comparison, and then determine whether the price of the lowest priced unit is reasonable.

[0054] Step 320: Based on the preset price comparison items, query the data information of the target unit that has won the bid for the relevant information of each list item in the preset price comparison items.

[0055] Among them, the preset price comparison items can be material type + keyword + specification size + method, etc., which can be set according to actual conditions, and this application does not limit it here.

[0056] Step 330: Based on the relevant information of each list item in the preset package price comparison item, determine the unit price of each list item in the package price analysis table.

[0057] Wherein, step 330 may include the following steps: Step 331: If a list item with completely identical attributes is found from the target unit that has won the bid, the price of the list item in this bid in the price analysis table is directly replaced with the price of the same list item in the target unit that has won the bid, and the same unit price is marked at the unit price source in the price analysis table.

[0058] Step 332: If some list items with the same attributes are found from the target unit that has won the bid, the price of the list item in this bid in the price analysis table is converted into the price of the same list item in the target unit that has won the bid, and marked as a similar unit price at the unit price source in the price analysis table.

[0059] Step 333: If no consistent list item is found from the data information of the previous successful bidder, fill in the list item price of this bid in the price analysis table, and mark the lowest bid price at the unit price source in the price analysis table.

[0060] For steps 331 to 333, the following specific examples may be referred to: For example, one of the items on the bid list is a hallway cabinet, which costs RMB 10,000 per set and is 1.5 meters long.

[0061] If a porch cabinet is also found from the target unit that has won the bid, with a price of RMB 10,000 per set and a length of 1.5m, the method is the same, that is, it can be represented as a list item with completely identical properties. In this case, the price of the list item in this bid in the price analysis table will be directly replaced with the price of the same list item in the target unit that has won the bid, that is, RMB 10,000 per set, and marked as the same unit price at the source of the unit price in the price analysis table.

[0062] If the winning target unit also finds that the entrance cabinet is priced at RMB 16,000 per set and is actually 2 meters long, the method is the same, that is, it can be expressed as a list item with partially consistent attributes. Then, based on the information given by the winning target unit, it is converted to RMB 8,000 / m, that is, 1.5 meters is RMB 12,000 per set. In this case, the price of the list item for this bid in the price analysis table will be marked as RMB 12,000 per set, and marked as a similar unit price at the source of the unit price in the price analysis table.

[0063] If no entrance cabinet is found from the target unit that has won the bid, fill in the price of RMB 10,000 per set for the list item of this bid in the price analysis table, and mark it as the lowest bid price in the source of the unit price in the price analysis table.

[0064] Step 340: Based on the unit price of each list item, obtain the comprehensive unit price and total price of each list item.

[0065] For example, see Table 2 below: Table 2

[0066] For example, from Table 2, we can get that the unit price of the list item Grade III steel bars includes the unit price of the main material cost and the unit price of the construction cost, and the comprehensive unit price of the list item Grade III steel bars is the sum of the unit price of the main material cost and the unit price of the construction cost, that is, comprehensive unit price = unit price of the main material cost + unit price of the construction cost, and the total price is equal to comprehensive unit price * quantity.

[0067] Among them, Table 2 can also display specific information such as professional classification, supply method and business format. For example, the business format can include super high-rise, basement others, high-rise, apartment and other specific contents.

[0068] Step 350: If the sum of the total prices of all list items is within a preset reasonable price range, the price of the lowest priced unit is determined to be reasonable.

[0069] That is, based on the bill of quantities and unit prices, a total price can be obtained, and after replacing the unit price of the comparison project with that of this bidding project, another total price can be obtained. By comparing the two total prices, it can be determined whether the price of the lowest bid unit is reasonable.

[0070] For example, there are five bidders in this bidding, and the total price quoted by Unit A with the lowest bid is 10 million. Compared with Unit B which won the bid three months ago, that is, putting the unit price of Unit B into this bidding, the total price obtained is 10.5 million. It can be concluded that in this bidding, the total price quoted by Unit A is 500,000 lower than that of Unit B. Based on the actual situation, we can comprehensively judge whether it is reasonable that the quotation level of Unit A is 500,000 lower than that of Unit B. If it is reasonable, it means that the total price quoted by Unit A of 10 million, that is, the sum of the total prices of all list items, is within a reasonable price range. Therefore, we can determine that the total price quoted by Unit A with the lowest bid is reasonable.

[0071] Among them, the preset reasonable price range can be set artificially after comprehensive judgment based on actual conditions, and this application does not limit it here.

[0072] Step 260: If the price of the unit with the lowest bid is reasonable, the unit with the lowest bid is selected as the target winning bidder among the multiple returning bidders.

[0073] In some embodiments, extracting target data from multiple inventory data files and generating a data preprocessing table may include the following two methods: 1) Based on the preset universal package dimensions, target data corresponding to the preset universal package dimensions are extracted from multiple inventory data files, and a data preprocessing table is automatically generated.

[0074] Among them, you can first select a package in the interactive interface, and then display the corresponding package analysis dimension header, such as key indicator content, ten major subject unilateral, spatial location unilateral, each installation standard construction / Part A supply, Part A subcontract composition, etc. After the user selects and clicks query, the corresponding actual analysis data can be displayed, and then the data you need can be filtered for viewing and export, and the required data pre-processing table can be automatically generated.

[0075] That is to say, the data preprocessing table can have the corresponding output display package built in advance, and then calculate and output the data according to a fixed style. In this way, by presetting a variety of commonly used package options for users to choose from, users do not need to make additional selections or configurations, which can simplify the user's operation process and speed up the generation of data preprocessing tables.

[0076] 2) Based on the customized analysis dimension, target data corresponding to the customized analysis dimension is extracted from multiple inventory data files to generate a data preprocessing table.

[0077] In some embodiments, the customized analysis dimensions may be multiple, such as the first part analysis dimension, the second part analysis dimension, and the third part analysis dimension. Since the final result of the calculation is related to the arrangement of the row and column attribute values ​​filtered by the data preprocessing, and the first part analysis dimension, the second part analysis dimension, and the third part analysis dimension have different selected contents or different selected orders, the layout of the data preprocessing table can be dynamically changed, and the final analysis result can also be different.

[0078] That is, target data corresponding to the first part analysis dimension, the second part analysis dimension and the third part analysis dimension can be extracted from multiple inventory data files; and then based on the selection order of the first part analysis dimension, the second part analysis dimension and the third part analysis dimension, a data preprocessing table for layout settings corresponding to the selection order is generated.

[0079] Among them, the first part analysis dimension, the second part analysis dimension and the third part analysis dimension can be flexibly selected from the options of the manifest file attributes, attribute columns and attribute combination columns.

[0080] Exemplarily, the list file attributes may include bidding section, bidding unit, tab specialty, tab name, business format, decoration category, space, decoration standard, quantity column, original list item, supply method and list unit.

[0081] Attribute columns may include: measurement details (engineering), measurement details (materials), material classification, material brand, product name, keyword, professional classification, subject, location, specification and size, material type, method, and custom.

[0082] The attribute combination columns may include: supply quantity list items, index content items, comprehensive unit price items and package price comparison items.

[0083] Since users can flexibly select the required analysis dimensions from the options of inventory file attributes, attribute columns, and attribute combination columns according to specific needs, data analysis is closer to actual business scenarios and helps improve user experience.

[0084] In addition, you can set the package with customized configuration of advanced settings as a general package, so that users can quickly reference it later without having to customize the settings, thereby improving analysis efficiency.

[0085] In some embodiments, in order to facilitate intuitive comparison of data, the data preprocessing table can be associated with the area attribute of the bidding list to perform multi-dimensional index calculation. Exemplarily, the customized analysis dimension includes the area dimension, which can be the dimensions of project / bid section / format / tab specialty / attribute column.

[0086] Extract target data corresponding to customized analysis dimensions from multiple inventory data files and generate a data preprocessing table. Specifically, the following processes may be involved: 1-1) Extracting area data corresponding to area dimensions from multiple inventory data files; 1-2) based on the area data, obtaining the index content of the building material corresponding to the area data; 1-3) Generate a data preprocessing table based on the index content of building materials.

[0087] For example, if the area data corresponding to the area dimension is extracted for a 120-square-meter house, and both the walls and ceiling need to be painted, and the painting area of ​​unit A is 360 square meters, then the index content of the paint can be calculated to be 3, that is, the generated data preprocessing table can display the data column of the index content of the building materials corresponding to the area data, and display the specific index content value at the corresponding position.

[0088] According to conventional calculations, a 120-square-meter house should normally have a wall painting area of ​​240 square meters. In other words, the conventional index content of the paint is about 2, and the actual calculated index content of the paint is 3, which is significantly higher than the conventional index content of about 2. Therefore, users can further analyze the reasons why the index content is so much higher, and verify whether the area data of the return unit is accurate.

[0089] Among them, the data preprocessing table involves rich content, some of which are display-oriented, or have some summary calculations such as summation; but for indicators, generally a certain quantity is divided by a certain area to get the indicator content. Therefore, by associating area information in the data preprocessing table, more indicator information can be obtained, and the analysis of indicators is more intuitive.

[0090] For example, the paint unit A is 240m 2 , with an area of ​​120m 2 , Unit B coating is 300m 2 , area 150m 2 At this time, it is impossible to immediately determine which unit is more cost-effective. If it is converted into indicators, it can be found that the paint content coefficient of Unit A and the paint content coefficient of Unit B are both 2, then it can be determined that the indicator contents of Unit A and Unit B are the same.

[0091] Based on the above embodiments, the present application automatically generates a list analysis table and a data preprocessing table by extracting target data from multiple list data files, that is, acquiring and processing the data in the bidding documents through automated means, thereby simplifying the process of data collection and organization, and eliminating the need for manual extraction operations one by one, thereby helping to avoid the tedious work of manually screening data one by one, thereby improving the efficiency of data processing; secondly, the automated extraction process also helps to reduce data errors caused by manual operational errors, thereby improving the accuracy and reliability of the data; in addition, users can directly use the generated list analysis table and data preprocessing table to compare the data of different bidding units, without having to repeatedly refer to the original files to verify individual data points, thereby improving the convenience and intuitiveness of data comparison, thereby improving the efficiency and accuracy of data analysis, so that the target winning bidder finally determined is the most in line with the requirements.

[0092] In a second aspect, the present application provides a bidding document analysis device, which includes an acquisition module, a generation module and an analysis module.

[0093] The acquisition module is used to obtain the list data files of multiple bidding units; The generation module is used to extract target data from multiple inventory data files, and generate an inventory analysis table and a data preprocessing table based on the target data; The analysis module is used to screen out the target winning bidder from multiple returning bidders based on the list analysis table and data preprocessing table.

[0094] It can be understood that the acquisition module, generation module and analysis module are also used to implement the technical solution of any embodiment in the present application.

[0095] The present application also provides a system for generating an analysis table, which includes a memory and a processor, wherein a computer program is stored in the memory; the processor is used to implement the bidding document analysis method provided by any one of the aforementioned method embodiments when executing the computer program.

[0096] See also Figure 2 , Figure 2 1 is a schematic diagram of a structure of an embodiment of a computer-readable storage medium provided by the present application. The computer-readable storage medium 70 is used to store a computer program 71. When the computer program 71 is executed by a processor, it is used to implement the following method steps: Obtain inventory data files of multiple bidding units; Extract target data from multiple inventory data files, and generate inventory analysis tables and data preprocessing tables based on the target data; Based on the list analysis table and data pre-processing table, the target winning bidder is selected from multiple returning bidders.

[0097] It can be understood that when the computer program 71 is executed by the processor, it is also used to implement the technical solution of any embodiment of the present application.

[0098] In the several layers of implementation provided in this application, it should be understood that the disclosed methods and devices can be implemented in other ways. For example, the device implementation described above is only illustrative, for example, the division of modules or units is only a logical function division, and there may be other division methods in actual implementation, such as two layers of units or components can be combined or integrated into another layer of the system, or some features can be ignored or not executed.

[0099] The units described as separate components may or may not be physically separated, and the components shown as units may or may not be physical units, that is, they may be located in one layer or distributed on two layers of network units. Some or all of the units may be selected according to actual needs to achieve the purpose of this embodiment.

[0100] In addition, each functional unit in each layer implementation mode of the present application can be integrated into a layer of processing units, or each layer unit can exist physically separately, or two or more layers of units can be integrated into a layer of units. The above-mentioned integrated units can be implemented in the form of hardware or in the form of software functional units.

[0101] If the integrated units in the above other implementations are implemented in the form of software functional units and sold or used as independent products, they can be stored in a layer of computer-readable storage medium. Based on this understanding, the technical solution of the present application is essentially or the part that contributes to the prior art or all or part of the technical solution can be embodied in the form of a software product. The computer software product is stored in a layer of storage medium, including several instructions to enable a computer device (which can be a layer of personal computers, servers, or network devices, etc.) or a processor (processor) to execute all or part of the steps of the implementation methods of each layer of the present application. The aforementioned storage media include: U disk, mobile hard disk, read-only memory (ROM, Read-Only Memory), random access memory (RAM, Random Access Memory), disk or optical disk and other media that can store program codes.

[0102] The above are only implementation methods of the present application, and are not intended to limit the patent scope of the present application. Any equivalent structure or equivalent process transformation made using the contents of the present application specification and drawings, or directly or indirectly applied in other related technical fields, are also included in the patent protection scope of the present application.

Claims

1. A method for analyzing bidding documents, characterized in that: The method comprises: Obtain inventory data files of multiple bidding units; extracting target data from the plurality of inventory data files, and generating an inventory analysis table and a data preprocessing table based on the target data; Based on the list analysis table and the data preprocessing table, a target winning bidder is screened out from the multiple returning bidders.

2. The bidding document analysis method according to claim 1, characterized in that: The step of selecting a target winning bidder from a plurality of bid-returning bidders based on the list analysis table and the data pre-processing table includes: Determine whether the quotations of each bidding unit are normal by using the list analysis table and the data pre-processing table; If the quotations of the various bidding units are normal, the unit with the lowest bid price among the multiple bidding units is selected based on the list analysis table; Based on the list analysis table, confirm whether the price of the lowest bid unit is reasonable; If the price of the unit with the lowest bid price is reasonable, the unit with the lowest bid price will be taken as the target winning bidder among the multiple returning bidders.

3. The bidding document analysis method according to claim 2, characterized in that: The list analysis table includes the total price table of all previous bid returns and the price package analysis table; The selecting the unit with the lowest bid price among the plurality of the returning bid units based on the list analysis table includes: Based on the total price table of all previous bid returns, obtain the unit with the lowest bid price among the multiple bid return units; The step of confirming whether the price of the lowest bid unit is reasonable based on the list analysis table includes: Based on the package price analysis table, determine whether the price of the lowest priced unit is reasonable.

4. The bidding document analysis method according to claim 3, characterized in that: The determining whether the price of the lowest bid unit is reasonable based on the package price analysis table includes: Obtain data information of target units that have won bids within a preset time period; Based on the preset price comparison items, query the data information of the target unit that has won the bid for the relevant information of each list item in the preset price comparison items; Determine the unit price of each list item in the package price analysis table based on the relevant information of each list item in the preset package price comparison item; Based on the unit price of each of the list items, obtaining a comprehensive unit price and a total price of each of the list items; If the sum of the total prices of all the list items is within a preset reasonable price range, the price of the lowest bid unit is determined to be reasonable.

5. The bidding document analysis method according to claim 4, characterized in that: The determining the unit price of each list item in the package price analysis table based on the relevant information of each list item in the preset package price comparison item includes: If a list item with completely identical attributes is found from the target unit that has won the bid, the price of the list item in the current bid in the price analysis table is directly replaced with the price of the same list item in the target unit that has won the bid, and the same unit price is marked at the unit price source in the price analysis table; If a list item with the same partial attributes is found from the target unit that has won the bid, the price of the list item in the current bid in the price analysis table is converted into the price of the same list item in the target unit that has won the bid, and the unit price source in the price analysis table is marked as a similar unit price; If no consistent list item is found from the target unit that has won the bid, the list item price of this bid is filled in the price analysis table, and the unit price source in the price analysis table is marked as the lowest bid unit price.

6. The bidding document analysis method according to claim 1, characterized in that: Extracting target data from the plurality of inventory data files and generating a data preprocessing table includes: Based on the preset universal package dimension, target data corresponding to the preset universal package dimension is extracted from the plurality of inventory data files, and a data preprocessing table is automatically generated.

7. The bidding document analysis method according to claim 1, characterized in that: Extracting target data from the plurality of inventory data files to generate a data preprocessing table also includes: Based on the user-defined analysis dimension, target data corresponding to the user-defined analysis dimension is extracted from the plurality of inventory data files to generate a data preprocessing table.

8. The bidding document analysis method according to claim 7, characterized in that: The user-defined analysis dimension includes an area dimension, and the step of extracting target data corresponding to the user-defined analysis dimension from the plurality of inventory data files to generate a data preprocessing table includes: Extracting area data corresponding to the area dimension from a plurality of the inventory data files; Based on the area data, obtaining the index content of the building material corresponding to the area data; The data preprocessing table is generated based on the index content of the building materials.

9. The bidding document analysis method according to claim 7, characterized in that: The customized analysis dimensions include a first part analysis dimension, a second part analysis dimension and a third part analysis dimension; The step of extracting target data corresponding to the customized analysis dimension from the plurality of inventory data files and generating a data preprocessing table includes: Extracting target data corresponding to the first part analysis dimension, the second part analysis dimension and the third part analysis dimension from the plurality of inventory data files; Based on the selection order of the first part analysis dimension, the second part analysis dimension and the third part analysis dimension, a data preprocessing table of layout settings corresponding to the selection order is generated.

10. A bidding document analysis device, characterized in that: The bidding document analyzing device comprises: An acquisition module is used to acquire inventory data files of multiple bidding units; A generating module, used for extracting target data from a plurality of said inventory data files, and generating an inventory analysis table and a data preprocessing table based on said target data; The analysis module is used to screen out a target successful bidder from the multiple returning bidders based on the list analysis table and the data preprocessing table.

Citation Information

Patent Citations

  • Method and system for reasonably screening bidding files

    CN111507760A

  • List analysis method and device, computer equipment and storage medium

    CN115935933A

  • Project bid evaluation method, system and equipment and storage medium

    CN118195325A

  • Automated bid decision technique

    US7346571B1