Construction organization design intelligent compilation method and system
The algorithm extracts keywords and disassembly rules, which improves the efficiency of intelligent preparation of construction organization design, solves the low level of intelligence and collaborative management problems in the existing technology, and realizes the rapid preparation and adjustment of construction organization design.
Patent Information
- Application Number
- CN202411288065.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-14
- Publication Date
- 2024-10-18
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
The existing construction organization design and compilation method has a low level of intelligence, relies on manual experience, is difficult to ensure the accuracy of decision-making, and has a low level of collaborative management, making it difficult to achieve multi-objective collaborative management.
An algorithm is used to extract construction organization design keywords, build an initial template, and disassemble the design through preset disassembly rules, and store it in the template database to improve the efficiency of preparation and adjustment.
It realizes the rapid preparation and adjustment of construction organization design and improves the efficiency of construction site management and guidance.
Smart Images

Figure CN118798151A_ABST
Abstract
Description
Technical Field
[0001] The present invention belongs to the technical field of professional technical report preparation, and in particular relates to an intelligent preparation method and system for construction organization design. Background Art
[0002] Railway construction is a large-scale infrastructure project with the characteristics of long construction period, great construction difficulty, high construction standards, and complex coordination relationships. The level of construction organization and management also directly affects the progress, quality, cost and other issues of the project.
[0003] The core and soul of construction project management is construction organization design. Construction organization design is to study how to organize and plan the entire construction process of a proposed project in view of the complexity of engineering construction. Through the planning, design, organization of construction, coordination and control of the entire process of the project, modern management techniques and means are used to reasonably and effectively plan, organize, coordinate and control, organize high-efficiency construction, optimize the combination and reasonable allocation of production factors, seek the most scientific and reasonable construction organization and methods, optimize and reasonably arrange the labor, project funds, materials, machinery and equipment, construction methods and other factors in the construction project, actively coordinate the relationship between various cooperative units and various types of work, so that the construction project achieves the best results and the best economic benefits.
[0004] At present, the current status of construction organization design preparation mainly adopts two preparation methods: manual paper preparation and software preparation. Both have some problems. The problem with manual preparation is that it is difficult to prepare and inefficient, and it is difficult to adjust the construction organization design. Software preparation cannot take into account human and environmental factors, and still requires manual assistance. The current research problems of construction organization design are: first, the level of intelligence is low, mostly relying on manual experience, and the accuracy of decision-making is difficult to guarantee. Second, the level of collaborative management is low, the collaborative management mechanism is unclear, and it is difficult to achieve multi-objective collaborative management. Summary of the invention
[0005] The present invention provides a method and system for intelligently compiling a construction organization design, which are used to solve at least one of the above-mentioned technical problems.
[0006] In a first aspect, the present invention provides an intelligent preparation method for construction organization design, comprising: extracting construction organization design keywords from a construction organization design text according to preset extraction rules, and constructing an initial template for construction organization design according to the construction organization design keywords; filling the initial template for construction organization design with data to obtain a target construction organization design; disassembling the target construction organization design according to a catalog using preset disassembly rules, and storing the disassembled content in a pre-constructed template database.
[0007] In a second aspect, the present invention provides an intelligent construction organization design compilation system, comprising: an extraction module, configured to extract construction organization design keywords in a construction organization design text according to preset extraction rules, and construct an initial construction organization design template based on the construction organization design keywords; a filling module, configured to fill the initial construction organization design template with data to obtain a target construction organization design; a disassembly module, configured to disassemble the target construction organization design according to a catalog using preset disassembly rules, and store the disassembled content in a pre-constructed template database.
[0008] According to a third aspect, an electronic device is provided, comprising: at least one processor, and a memory communicatively connected to the at least one processor, wherein the memory stores instructions executable by the at least one processor, and the instructions are executed by the at least one processor so that the at least one processor can execute the steps of the intelligent construction organization design compilation method of any embodiment of the present invention.
[0009] In a fourth aspect, the present invention further provides a computer-readable storage medium having a computer program stored thereon, wherein when the program instructions are executed by a processor, the processor executes the steps of the intelligent construction organization design preparation method of any embodiment of the present invention.
[0010] The intelligent preparation method and system of the construction organization design of the present application use an algorithm to extract construction organization design keywords, create different construction organization design templates and a construction organization design parameter database for different construction projects; construction professionals modify and improve the templates, and edit the contents and parameters therein, and finally generate the construction organization design; the construction organization design is disassembled according to the catalog, and the disassembled contents are saved in the template database. By formulating the construction organization design template, the efficiency of rapid preparation and adjustment of the construction organization design is improved, which is of great significance to the construction site management and construction guidance. BRIEF DESCRIPTION OF THE DRAWINGS
[0011] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the following briefly introduces the drawings required for use in the description of the embodiments. Obviously, the drawings described below are some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work.
[0012] Figure 1 A flowchart of a method for intelligently compiling a construction organization design provided by an embodiment of the present invention; Figure 2 A structural block diagram of an intelligent compilation system for construction organization design provided by an embodiment of the present invention; Figure 3 It is a schematic diagram of the structure of an electronic device provided by an embodiment of the present invention. DETAILED DESCRIPTION
[0013] In order to make the purpose, technical solution and advantages of the embodiments of the present invention clearer, the technical solution in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0014] See also Figure 1 , which shows a flow chart of an intelligent construction organization design preparation method of the present application.
[0015] like Figure 1 As shown in the figure, the intelligent preparation method of construction organization design specifically includes the following steps: Step S101 : extracting construction organization design keywords from a construction organization design text according to a preset extraction rule, and constructing an initial template of the construction organization design according to the construction organization design keywords.
[0016] In this step, the construction organization design text is preprocessed, and Jieba segmentation is used to segment and mark the parts of speech, and the text is divided into sentences according to punctuation marks. After the text is segmented, stop words are removed, and parts of speech filtering is performed. Verbs and nouns are retained as candidate words to obtain a candidate vocabulary set; The word frequencies of all candidate words in the candidate vocabulary set are calculated according to the improved TF-IDF algorithm, wherein the expression for calculating the word frequencies of all candidate words in the candidate vocabulary set is: , In the formula, Words The frequency of occurrence in document d, Words The number of occurrences in document d, is the total number of documents in the corpus, The corpus contains words The number of documents; For any sentence in the text , according to the number of times the candidate word appears, it is represented as an r-dimensional vector. If the text has n sentences in total, an r×n sentence-word matrix is constructed, where the expression of the sentence-word matrix is: , In the formula, is the sentence-word matrix, Candidate word In the sentence The number of times it appears in Candidate word score; Combine the sentence-word matrix with the sentence score vector Perform a dot multiplication operation to obtain the final score vector of the candidate word; The candidate words are sorted according to their final score vectors, and words with a score vector threshold greater than the score vector threshold are selected as the final keywords of the construction organization design text to form an initial template for the construction organization design.
[0017] It should be noted that, among them, the score vector of the sentence is calculated The expression is: , In the formula, is the sentence score vector of document N, is the inverse document frequency of the word, For the order of words; Among them, the calculation formulas for the inverse document frequency of a word and the word ranking are: , In the formula, is the total number of documents, To contain words The number of documents, is the word in document N The frequency of occurrence, is the adjustment factor for document length normalization, To adjust the word in document N Smoothing factor for the frequency of occurrence, is the average length of documents in the document library, is the total number of candidate words in document N.
[0018] Step S102, filling the initial template of the construction organization design with data to obtain a target construction organization design.
[0019] In this step, construction professionals add or delete the initial template of the construction organization design according to the construction organization design preparation specifications and the actual construction situation to form the final construction organization design template; Connected with the construction organization design template module, the designer calculates the parameters in the template, fills the calculated parameters into the template, and saves them to the construction organization design parameter database; The construction site personnel will compile the content of the project according to the actual situation of the project. The construction organization design parameter database and various construction standards and specifications databases used in construction will be directly applied during the compilation. When the parameters in the construction organization database and the parameters in the standard or specification parameter library change in value, the content that references the parameter will be automatically updated. During the compilation process, according to the scene to which the currently compiled construction organization design belongs and the compiled part, previous construction plans in the database and current industry standards and specifications are automatically recommended; Based on the preparation of each department, a construction organization design suitable for the project is finally generated.
[0020] Step S103, using a preset disassembly rule to disassemble the target construction organization design according to the catalog, and storing the disassembled content in a pre-built template database.
[0021] In this step, in the iterative process, the ant algorithm is used to make the directory point s in the first The probability of being selected by ants during the round iteration for: , In the formula, For directory point s in The pheromones carried during the round iteration, is the pheromone weight, is the heuristic information at directory point s, is the total number of directory points, for heuristic information; By combining determinism and randomness, the database position of ant m at directory point s is determined, which can be expressed as: , In the formula, The location with the highest pheromone concentration. For stopover time, is the set of directories that ant m needs to visit after visiting directory point s. is the pheromone concentration on the path from directory i to database j, is the heuristic information, For the late time, are algorithm parameters, is the total journey time, , are any numbers in [0,1]. is the lower bound of the time window; Determine the moving direction of ant m, the expression is: , In the formula, for locations with the same pheromone concentration; Calculate the ant's forward path, the expression is: , In the formula, is the number of iterations, is the pheromone volatilization rate, It is the pheromone increment between the directory point and the database path; After the disassembly is completed, it is determined whether the disassembly is correct and whether there are any omissions, wherein the judgment formula is: , In the formula, Decompose the judgment matrix for whether the entire directory is correct. Meeting the right goals for your measurement objectives The effective echo at ; Split the entire directory into n first-level headings, and split each first-level heading into A secondary title, The second-level title is used as the detection target, and the expression is: , In the formula, is the measured variable, is the target detection variable, is the detection probability, is all the accumulated measurement data up to time k, is the jth measurement target and target The probability of matching, is the total number of first-level headings, The total number of secondary headings.
[0022] In summary, the method of the present application uses an algorithm to extract construction organization design keywords, creates different construction organization design templates and a construction organization design parameter database for different constructions; construction professionals modify and improve the templates, and compile the contents and parameters therein, and finally generate a construction organization design; the construction organization design is disassembled according to the catalog, and the disassembled contents are saved in the template database. By formulating a construction organization design template, the efficiency of rapid compilation and adjustment of the construction organization design is improved, which is of great significance to construction site management and construction guidance.
[0023] See also Figure 2 , which shows the structural block diagram of the intelligent compilation system of construction organization design of the present application.
[0024] like Figure 2As shown, the intelligent construction organization design compilation system 200 includes an extraction module 210, a filling module 220 and a disassembly module 230.
[0025] Among them, the extraction module 210 is configured to extract construction organization design keywords from the construction organization design text according to preset extraction rules, and construct an initial template for the construction organization design based on the construction organization design keywords; the filling module 220 is configured to fill the initial template for the construction organization design with data to obtain the target construction organization design; the disassembly module 230 is configured to use preset disassembly rules to disassemble the target construction organization design according to the catalog, and store the disassembled content in a pre-constructed template database.
[0026] It should be understood that Figure 2 Modules and references documented in Figure 1 Therefore, the operations and features described above for the method and the corresponding technical effects are also applicable to Figure 2 The modules in it will not be described in detail here.
[0027] In other embodiments, the present invention also provides a computer-readable storage medium having a computer program stored thereon, and when the program instructions are executed by a processor, the processor executes the intelligent construction organization design compilation method in any of the above method embodiments; As an implementation mode, the computer-readable storage medium of the present invention stores computer-executable instructions, and the computer-executable instructions are configured as follows: Extracting construction organization design keywords from the construction organization design text according to a preset extraction rule, and constructing an initial template for the construction organization design according to the construction organization design keywords; Filling the initial template of the construction organization design with data to obtain a target construction organization design; The target construction organization design is disassembled according to the catalog using preset disassembly rules, and the disassembled contents are stored in a pre-built template database.
[0028] The computer-readable storage medium may include a program storage area and a data storage area, wherein the program storage area may store an operating system and application programs required for at least one function; the data storage area may store data created according to the use of the intelligent compilation system for construction organization design, etc. In addition, the computer-readable storage medium may include a high-speed random access memory, and may also include a memory, such as at least one disk storage device, a flash memory device, or other non-volatile solid-state storage device. In some embodiments, the computer-readable storage medium may optionally include a memory remotely disposed relative to the processor, and these remote memories may be connected to the intelligent compilation system for construction organization design via a network. Examples of the above-mentioned network include, but are not limited to, the Internet, an intranet, a local area network, a mobile communication network, and combinations thereof.
[0029] Figure 3 is a schematic diagram of the structure of an electronic device provided by an embodiment of the present invention, such as Figure 3 As shown, the device includes: a processor 310 and a memory 320. The electronic device may also include: an input device 330 and an output device 340. The processor 310, the memory 320, the input device 330 and the output device 340 may be connected via a bus or other means. Figure 3 In the example, the connection through the bus is taken as an example. The memory 320 is the above-mentioned computer-readable storage medium. The processor 310 executes various functional applications and data processing of the server by running the non-volatile software programs, instructions and modules stored in the memory 320, that is, the intelligent compilation method of the construction organization design of the above-mentioned method embodiment is realized. The input device 330 can receive input digital or character information, and generate key signal input related to user settings and function control of the intelligent compilation system of the construction organization design. The output device 340 may include display devices such as display screens.
[0030] The electronic device can execute the method provided by the embodiment of the present invention, and has the functional modules and beneficial effects corresponding to the execution method. For technical details not described in detail in this embodiment, please refer to the method provided by the embodiment of the present invention.
[0031] As an implementation mode, the electronic device is applied to the intelligent compilation system of construction organization design, and is used for a client, and includes: at least one processor; and a memory connected to the at least one processor in communication; wherein the memory stores instructions executable by the at least one processor, and the instructions are executed by the at least one processor, so that the at least one processor can: Extracting construction organization design keywords from the construction organization design text according to a preset extraction rule, and constructing an initial template for the construction organization design according to the construction organization design keywords; Filling the initial template of the construction organization design with data to obtain a target construction organization design; The target construction organization design is disassembled according to the catalog using preset disassembly rules, and the disassembled contents are stored in a pre-built template database.
[0032] Through the description of the above implementation modes, those skilled in the art can clearly understand that each implementation mode can be implemented by means of software plus a necessary general hardware platform, or of course by hardware. Based on such an understanding, the above technical solution can essentially or in other words be embodied in the form of a software product that contributes to the prior art. The computer software product can be stored in a computer-readable storage medium, such as ROM / RAM, a magnetic disk, an optical disk, etc., and includes a number of instructions for a computer device (which can be a personal computer, a server, or a network device, etc.) to execute the methods of each embodiment or some parts of the embodiment.
[0033] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit it. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or make equivalent replacements for some of the technical features therein. However, these modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present invention.
Claims
1. A method for intelligently compiling a construction organization design, characterized in that: include: Extracting construction organization design keywords from the construction organization design text according to a preset extraction rule, and constructing an initial template for the construction organization design according to the construction organization design keywords; Filling the initial template of the construction organization design with data to obtain a target construction organization design; The target construction organization design is disassembled according to the catalog using preset disassembly rules, and the disassembled contents are stored in a pre-built template database.
2. The intelligent compilation method of construction organization design according to claim 1 is characterized in that: The step of extracting construction organization design keywords from the construction organization design text according to a preset extraction rule, and constructing an initial template for the construction organization design according to the construction organization design keywords includes: Preprocess the construction organization design text to obtain a candidate vocabulary set; The word frequencies of all candidate words in the candidate vocabulary set are calculated according to the improved TF-IDF algorithm, wherein the expression for calculating the word frequencies of all candidate words in the candidate vocabulary set is: , In the formula, Words The frequency of occurrence in document d, Words The number of occurrences in document d, is the total number of documents in the corpus, The corpus contains words The number of documents; For any sentence in the text , according to the number of times the candidate word appears, it is represented as an r-dimensional vector. If the text has n sentences in total, an r×n sentence-word matrix is constructed, where the expression of the sentence-word matrix is: , In the formula, is the sentence-word matrix, Candidate word In the sentence The number of times it appears in Candidate word score; Combine the sentence-word matrix with the sentence score vector Perform a dot multiplication operation to obtain the final score vector of the candidate word; The candidate words are sorted according to their final score vectors, and words with a score vector threshold greater than the score vector threshold are selected as the final keywords of the construction organization design text to form an initial template for the construction organization design.
3. The intelligent compilation method of construction organization design according to claim 2 is characterized in that: in, Calculate the score vector of the sentence The expression is: , In the formula, is the sentence score vector of document N, is the inverse document frequency of the word, For the order of words; Among them, the calculation formulas for the inverse document frequency of a word and the word ranking are: , In the formula, is the total number of documents, To contain words The number of documents, is the word in document N The frequency of occurrence, is the adjustment factor for document length normalization, To adjust the word in document N Smoothing factor for the frequency of occurrence, is the average length of documents in the document library, is the total number of candidate words in document N.
4. The intelligent compilation method of construction organization design according to claim 1 is characterized in that: The filling of data into the initial template of the construction organization design to obtain the target construction organization design comprises: The initial template of the construction organization design is added or deleted according to the construction organization design preparation specifications and the actual construction situation to form a construction organization design template; The project content of the construction organization design template is compiled according to the actual project situation to obtain the target construction organization design.
5. The intelligent compilation method of construction organization design according to claim 1 is characterized in that: The method of disassembling the target construction organization design according to the catalog by using a preset disassembly rule and storing the disassembled content in a pre-built template database includes: In the iterative process, the ant algorithm is used to make the directory point s The probability of being selected by ants during the round iteration for: , In the formula, For directory point s in The pheromones carried during the round iteration, is the pheromone weight, is the heuristic information at directory point s, is the total number of directory points, for heuristic information; By combining determinism and randomness, the database position of ant m at directory point s is determined, which can be expressed as: , In the formula, The location with the highest pheromone concentration. For stopover time, is the set of directories that ant m needs to visit after visiting directory point s. is the pheromone concentration on the path from directory i to database j, is the heuristic information, For the late time, are algorithm parameters, is the total journey time, , are any numbers in [0,1]. is the lower bound of the time window; Determine the moving direction of ant m, the expression is: , In the formula, for locations with the same pheromone concentration; Calculate the ant's forward path, the expression is: , In the formula, is the number of iterations, is the pheromone volatilization rate, It is the pheromone increment between the directory point and the database path; After the disassembly is completed, it is determined whether the disassembly is correct and whether there are any omissions, wherein the judgment formula is: , In the formula, Decompose the judgment matrix for whether the entire directory is correct. Meeting the right goals for your measurement objectives The effective echo at time ; Split the entire directory into n first-level headings, and split each first-level heading into A secondary title, The second-level title is used as the detection target, and the expression is: , In the formula, is the measured variable, is the target detection variable, is the detection probability, is all the accumulated measurement data up to time k, is the jth measurement target and target The probability of matching, is the total number of first-level headings, The total number of secondary headings.
6. An intelligent construction organization design compilation system, characterized in that: include: An extraction module, configured to extract construction organization design keywords from the construction organization design text according to a preset extraction rule, and construct an initial template of the construction organization design according to the construction organization design keywords; A filling module is configured to fill the initial template of the construction organization design with data to obtain a target construction organization design; The disassembly module is configured to disassemble the target construction organization design according to the catalog using a preset disassembly rule, and store the disassembled content in a pre-built template database.
7. An electronic device, characterized in that: include: At least one processor, and a memory communicatively connected to the at least one processor, wherein the memory stores instructions executable by the at least one processor, and the instructions are executed by the at least one processor to enable the at least one processor to execute the method described in any one of claims 1 to 5.
8. A computer-readable storage medium having a computer program stored thereon, characterized in that: When the program is executed by a processor, the method according to any one of claims 1 to 5 is implemented.
Citation Information
Patent Citations
Building industry construction scheme intelligent compilation method and system
CN113298435A
Building construction scheme intelligent auditing frame and auditing method
CN115759037A
Automatic building scheme compiling method and system based on NLP
CN117350166A
Intelligent generation method and system for construction contract of construction project
CN117725905A
Construction element extraction method, system and equipment and storage medium
CN118503898A
Cited By
Railway engineering implementation construction organization generation method and related assembly
CN119783641A
Construction organization design word document intelligent generation method and system
CN120409435A
A method and system for intelligently generating word documents for construction organization design
CN120409435B
