Method and device for determining demand quantity of mobile equipment, equipment and medium
By optimizing the scheduling of movable equipment based on the forecast of available workloads and demand in the smart park, the problem of equipment demand forecasting in the smart park is solved and operation efficiency is improved.
Patent Information
- Application Number
- CN202311628466.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2023-11-30
- Publication Date
- 2024-10-18
AI Technical Summary
In smart parks, it is difficult to predict the demand for movable equipment in different operating sub-areas, resulting in the inability to optimize scheduling and affecting operating efficiency.
By determining the total supply of operations based on the amount of work that can be supplied by multiple movable devices in the target area during the target operation period, and combining the operation demand of each operation sub-area to predict and configure the appropriate demand for movable equipment, To optimally schedule equipment.
It improves the job completion efficiency of each job sub-area, ensures that equipment needs are met, and reduces efficiency shortages caused by temporary scheduling.
Smart Images

Figure CN118798512A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of Internet of Things, and in particular to a method, device, equipment and medium for determining the demand for mobile equipment. Background Art
[0002] A smart park refers to an advanced park that integrates new-generation information and communication technologies such as the Internet of Things, big data, cloud computing, and space physics, and can achieve timely, interactive, and integrated information perception, transmission, and processing within the region, and has industrial agglomeration capabilities, corporate economic competitiveness, and sustainable development advantages.
[0003] In smart parks, you can often see a variety of mobile devices, which are used to perform related operations in different sub-areas of the park. Smart parks can manage these mobile devices in a unified manner and allocate a fixed number of mobile devices to each sub-area of the operation. However, it is difficult for smart parks to predict the demand for mobile devices in different sub-areas of the operation, making it impossible for smart parks to optimize the scheduling of mobile devices, resulting in low efficiency in completing related operations in each sub-area of the operation. Summary of the invention
[0004] According to one aspect of the present disclosure, a method for determining a demand amount of a movable device is provided, comprising:
[0005] Determine the total supply of jobs in the target job period based on the supplyable job quantities of the plurality of movable devices in the target area in the target job period, the target area comprising a plurality of job sub-areas, each of the job sub-areas having a job object of the movable device;
[0006] Based on the total supply of operations in the target operation period and the operation demand of each operation sub-area in the target operation period, the demand for movable equipment in each operation sub-area in the target operation period is determined.
[0007] According to another aspect of the present disclosure, there is provided a device for determining a demand amount of a movable device, comprising:
[0008] A first determination module is used to determine the total supply of operations in a target operation period based on the supplyable operation quantities of a plurality of the movable devices in a target area in a target operation period, wherein the target area includes a plurality of operation sub-areas, each of which has an operation object of the movable device;
[0009] The second determination module is used to determine the demand for movable equipment in each of the operation sub-areas during the target operation period based on the total supply of operations in the target operation period and the demand for operations in each of the operation sub-areas during the target operation period.
[0010] According to another aspect of the present disclosure, there is provided an electronic device, comprising:
[0011] processor; and,
[0012] A memory for storing programs;
[0013] The program includes instructions, and when the instructions are executed by the processor, the processor executes the method according to the exemplary embodiment of the present disclosure.
[0014] According to another aspect of the present disclosure, a non-transitory computer-readable storage medium is provided, wherein the non-transitory computer-readable storage medium stores computer instructions, and the computer instructions are used to cause the computer to execute the method according to the exemplary embodiments of the present disclosure.
[0015] One or more technical solutions provided in the exemplary embodiments of the present disclosure can determine the total supply of jobs in a target operation period based on the supplyable jobs of multiple movable devices in the target area during the target operation period. Since the total supply of jobs in the target operation period can reflect the job supply situation in the target area, the job demand of each operation sub-area during the target operation period can reflect the job demand situation of the operation sub-area. Therefore, based on the total supply of jobs in the target operation period and the job demand of each operation sub-area during the target operation period, the demand for movable devices in the target operation period can be adaptively configured for each operation sub-area.
[0016] It can be seen that the method of the exemplary embodiment of the present disclosure can predict the demand for movable equipment of each work sub-area in the target work period according to the supply and demand situation of the work in the target work period, and ensure that the predicted demand for movable equipment of the work sub-area in the target work period can meet the work demand of the work sub-area. Therefore, the method of the exemplary embodiment of the present disclosure can optimize the scheduling of movable equipment in the target area by predicting the demand for movable equipment of each work sub-area in the target work period, thereby improving the completion efficiency of related jobs in each work sub-area. BRIEF DESCRIPTION OF THE DRAWINGS
[0017] Further details, features and advantages of the present disclosure are disclosed in the following description of exemplary embodiments in conjunction with the accompanying drawings, in which:
[0018] Figure 1 A schematic diagram showing the framework structure of a management platform of an exemplary embodiment of the present disclosure is shown;
[0019] Figure 2 A schematic diagram of a device linkage process of an exemplary embodiment of the present disclosure is shown;
[0020] Figure 3A flow chart showing a method for determining the demand for mobile equipment according to an exemplary embodiment of the present disclosure;
[0021] Figure 4 A schematic diagram of a process for determining the demand for mobile equipment according to an exemplary embodiment of the present disclosure is shown;
[0022] Figure 5 Another schematic diagram of a process for determining the demand for mobile equipment according to an exemplary embodiment of the present disclosure is shown;
[0023] Figure 6 A schematic block diagram of functional modules of a device for determining a demand amount of a movable device according to an exemplary embodiment of the present disclosure is shown;
[0024] Figure 7 Another schematic block diagram of functional modules of the apparatus for determining the demand amount of a movable device according to an exemplary embodiment of the present disclosure is shown;
[0025] Figure 8 A schematic block diagram of a chip according to an exemplary embodiment of the present disclosure is shown;
[0026] Fig. 9 A structural block diagram of an exemplary electronic device that can be used to implement the embodiments of the present disclosure is shown. DETAILED DESCRIPTION
[0027] Embodiments of the present disclosure will be described in more detail below with reference to the accompanying drawings. Although certain embodiments of the present disclosure are shown in the accompanying drawings, it should be understood that the present disclosure can be implemented in various forms and should not be construed as being limited to the embodiments described herein, which are instead provided for a more thorough and complete understanding of the present disclosure. It should be understood that the drawings and embodiments of the present disclosure are only for exemplary purposes and are not intended to limit the scope of protection of the present disclosure.
[0028] It should be understood that the various steps described in the method embodiments of the present disclosure may be performed in different orders and / or in parallel. In addition, the method embodiments may include additional steps and / or omit the steps shown. The scope of the present disclosure is not limited in this respect.
[0029] The term "including" and its variations used in this document are open inclusions, that is, "including but not limited to". The term "based on" means "based at least in part on". The term "one embodiment" means "at least one embodiment"; the term "another embodiment" means "at least one other embodiment"; the term "some embodiments" means "at least some embodiments". Relevant definitions of other terms will be given in the description below. It should be noted that the concepts of "first", "second", etc. mentioned in this disclosure are only used to distinguish different devices, modules or units, and are not used to limit the order or interdependence of the functions performed by these devices, modules or units.
[0030] It should be noted that the modifications of "one" and "plurality" mentioned in the present disclosure are illustrative rather than restrictive, and those skilled in the art should understand that unless otherwise clearly indicated in the context, it should be understood as "one or more".
[0031] The exemplary embodiments of the present disclosure provide a method for determining the demand for movable equipment, which can be applied to various target areas such as industrial parks, office parks, and logistics storage sites, and the target area can include multiple operating sub-areas. The movable equipment can include but is not limited to vehicles, robots, and other movable equipment that can be uniformly deployed in different operating sub-areas.
[0032] The method of the exemplary embodiment of the present disclosure can predict the demand for movable equipment in different operation sub-areas. The demand for movable equipment in each operation sub-area can be used to optimize the scheduling of movable equipment in the smart park, thereby improving the completion efficiency of related operations in each operation sub-area.
[0033] The method for determining the demand for mobile equipment provided by the exemplary embodiment of the present disclosure can be applied to the management platform. The management platform architecture is described below using the smart park platform as an example. It should be understood that the smart park is only used as an example and is not intended to limit the application of the management platform of the exemplary embodiment of the present disclosure.
[0034] Figure 1 FIG. 1 shows a schematic diagram of the framework structure of the management platform of the exemplary embodiment of the present disclosure. Figure 1 As shown, the management platform 100 of the exemplary embodiment of the present disclosure includes a management client 101 and a management server 102. The management client 101 can communicate with the management server 102 through protocols such as Hyper Text Transfer Protocol (HTTP) and WebSocket.
[0035] The management server 102 may include a unified device management module 1021 and multiple sub-device modules 1022. The unified device management module 1021 provides a unified interface to communicate with the management client 101. The unified device management module 1021 and the multiple sub-device modules 1022 may use a distributed architecture solution, and the unified device management module 1021 and each sub-device module 1022 may communicate using protocols such as Message Queuing Telemetry Transport (MQTT) and HTTP.
[0036] In the related art, once other mobile devices of the same type are replaced or new mobile devices are connected, the management server needs to be customized and adjusted. When multiple mobile devices of the same type are connected to the management platform 100, a customized sub-device module 1022 needs to be added for each mobile device. There is heterogeneity between multiple mobile devices of the same type. Therefore, there are problems of relative independence and information islands between each mobile device, which causes heterogeneity between the mobile devices connected to the same management platform 100.
[0037] In order to shield the heterogeneity between different removable devices, the unified device management module 1021 of the exemplary embodiment of the present disclosure can adopt an adapter mode to (upward) output unified device management capabilities to the management client 101, and (downward) connect to the sub-device modules 1022 of various categories of heterogeneous devices and third-party systems.
[0038] Exemplarily, the multiple sub-device modules 1022 of the exemplary embodiment of the present disclosure are divided into multiple sub-device modules 1022 according to the functional level, and each sub-device module 1022 is used to control the same functions of different removable devices. For each sub-device module 1022, a platform software kit (PSK) is also deployed, which can send the collected data of various removable devices to the unified device management module 1021 through a third-party platform.
[0039] The above-mentioned PSK is a set of basic service component packages and is also the cornerstone of the management system. PSK defines and encapsulates the basic data structure of the device, the device command data structure and the device extended attributes. The basic data structure can include common attributes of the device such as device name, device code, device location, etc. The device command data structure contains attributes such as basic information of the command name, execution method, command parameters, etc. The extended attributes mainly refer to the private attributes of the device, such as the video stream address of the camera, the volume of the cloud broadcast, and other attributes that reflect the characteristics of the device.
[0040] PSK also defines functions such as device type definition, device information reporting, command issuance and alarm, and collection data push by integrating MQTT and HTTP clients, and encapsulates them into Remote Procedure Call (RPC) calling methods.
[0041] The management platform 100 of the exemplary embodiment of the present disclosure may also include other business platforms (for example, OA, finance, etc.) and third-party systems or IoT platforms, etc. Each sub-device module 1022 may communicate with the third-party system / IoT platform 103 through protocols such as MQTT and HTTP.
[0042] When the sub-device module 1022 service is started, the PSK in the sub-device module 1022 can actively collect the relevant removable device information that the sub-device module 1022 is responsible for, such as: the basic data structure of the device, the device command data structure and the device extension attributes, and then register these removable device information to the unified device management module 1021 through the RPC call method; at the same time, the unified device management module 1021 can also complete the push of real-time device data, the call of device capabilities and the issuance of commands based on the device information and commands reported by the sub-device module 1022, relying on the RPC method provided by the PSK.
[0043] When the service of sub-device module 1022 is shut down, the PSK in sub-device module 1022 actively notifies unified device management module 1021 that sub-device module 1022 is about to be shut down and that the removable device connected to sub-device module 1022 needs to be suspended or shielded to make it unavailable.
[0044] The sub-device module 1022 of the exemplary embodiment of the present disclosure cooperates with the PSK deployed by the unified device management module 1021 to achieve the unification of the language between the unified device module and each sub-device module 1022, which greatly enhances the scalability of third-party applications. At the same time, the common features of the same type of devices can be abstracted, and the differentiated features can be separated therefrom. Then, according to the functional attributes of the common features and differentiated features, they are assigned to the corresponding sub-device module 1022 for management and control, thereby shielding the heterogeneity between the same type of devices and providing a basis for device data collection and device linkage.
[0045] It can be seen that the unified device management module 1021 of the exemplary embodiment of the present disclosure can output the unified device management capability to the management client 101 through the interface, and connect to various sub-heterogeneous devices and third-party systems and shield their heterogeneity. Therefore, whenever a new device service provider needs to be added, it is only necessary to configure the third-party system to be connected and the unified device management module 1021 and the PSK in the corresponding sub-device module 1022, so that the new device type can be connected in a short time, and the impact on the entire management system can be minimized.
[0046] Exemplarily, when the management client 101 of the exemplary embodiment of the present disclosure may include a security monitoring client, a smart communication client, an energy consumption control client, an environmental monitoring client, a cleaning and maintenance client, etc., the multiple sub-device modules 1022 may include a security monitoring device sub-device module 1022, a smart communication sub-device module, a fire assistance sub-device module, an energy consumption control sub-device module, an environmental detection sub-device module, a cleaning and maintenance sub-device module, etc.
[0047] Taking cleaning and maintenance equipment as an example, when multiple cleaning and maintenance equipment are connected to the management platform 100, the basic function of the multiple cleaning and maintenance equipment is the cleaning function, but some cleaning and maintenance equipment also have other additional functions, such as smart communication function. For this type of cleaning and maintenance equipment, the monitoring function it has can be managed and controlled through the smart communication sub-equipment module 1022.
[0048] The management server 102 of the exemplary embodiment of the present disclosure adopts distributed development technology, and the application supports dynamic expansion, and the development cost and maintenance cost are greatly reduced. In addition, it supports the access of various heterogeneous hardware devices and supports pluggable management of hardware devices. Once a certain type of device needs to be added or deleted, it only needs to add or close the corresponding sub-device module 1022.
[0049] In an optional manner, the unified device management module 1021 of the exemplary embodiment of the present disclosure can implement device information storage, browsing, device information statistics, device information addition, deletion, device linkage, instruction issuance, message subscription and alarm reception. A platform software kit (PSK) is also deployed. The unified device management module 1021 parses and processes the collected data and generates corresponding commands, and then sends the commands to the PSK of the sub-device module 1022 through its own PSK, so that the sub-device module performs corresponding operations based on the command.
[0050] Figure 2 FIG. 2 shows a schematic diagram of a device linkage process of an exemplary embodiment of the present disclosure. Figure 2 As shown, the device linkage method of the exemplary embodiment of the present disclosure may include:
[0051] Step 201: When the hardware device detects an abnormal situation in the hardware device, it sends an alarm message to the unified device management module. Here, the hardware device can transmit the alarm message to the unified device management module through MQTT, connection-oriented transport layer protocol (Transmission Control Protocol, TCP), message-oriented transport layer protocol (User Datagram Protocol, UDP) and other protocols, and can also push the alarm message to a third-party platform or an Internet of Things platform, and transmit it to the unified device management module through the third-party platform or the Internet of Things platform.
[0052] Step 202: After receiving the alarm message, the message subscription center of the unified device management module performs various processes such as decoding and analysis on the alarm message to obtain a processed alarm message.
[0053] Step 203: The unified device management module determines the alarm handling command corresponding to the processed alarm message according to the mapping relationship between the alarm message and the alarm handling instruction.
[0054] Step 204: The unified device management module sends the alarm handling command corresponding to the processed alarm message to the corresponding target sub-device module. Here, the sending process can be completed by the PSK of the unified device management module, and the alarm handling command is not only related to the type of alarm message, but also can be different from the hardware device type.
[0055] Step 205: The target sub-device module encapsulates the alarm handling command corresponding to the processed alarm message received by the PSK to obtain the encapsulated alarm handling command.
[0056] Step 206: The target sub-device module transmits the alarm handling command to the hardware device. Here, the target sub-device module can encapsulate the alarm handling command corresponding to the processed alarm message into a command that the hardware device can recognize, and then transmit it to the hardware device, or encapsulate it into a command that a third-party platform can recognize, and then transparently transmit it to the hardware device through a third-party receipt.
[0057] Step 207: The hardware device executes the received post-encapsulation alarm handling command.
[0058] The unified device management module of the exemplary embodiment of the present disclosure relies on the basic data structure of the device reported by the sub-device module, the device command data structure and the device extension attribute to control all the hardware devices in the smart park, realize the unified storage, management and statistics of the hardware devices, realize the unified subscription of device messages, and realize real-time, accurate and efficient device linkage. At the same time, the real-time data of various hardware devices are uniformly summarized in the unified device management module, which also provides a data foundation for big data development. Therefore, the management system of the exemplary embodiment of the present disclosure is a centralized device management platform that can realize efficient and convenient.
[0059] Considering that the workload of mobile equipment in different operation sub-areas of the smart park may be different, for operation sub-areas with higher operation demand, mobile equipment often needs to operate more frequently in the operation sub-area, while for operation sub-areas with lower operation demand, mobile equipment often does not need to operate frequently in the operation sub-area. However, the smart park cannot predict the demand for mobile equipment in the operation sub-area. Therefore, when there is a shortage of operation supply in the target operation sub-area, it is necessary to temporarily deploy mobile equipment from the gathering place of mobile equipment to the target operation sub-area to overcome the problem of insufficient operation supply in the target operation sub-area. However, this method of temporarily deploying mobile equipment to the target operation sub-area results in a relatively short effective operation time of the mobile equipment, which cannot maximize the operation efficiency of the mobile equipment.
[0060] In response to the above problems, the method for determining the demand for movable devices of the exemplary embodiment of the present disclosure can be executed by a server or a chip in the server. For example, the method of the exemplary embodiment of the present disclosure can be implemented by a unified device management module of the management server, and the determined demand for movable devices can be transmitted to the corresponding sub-device module in the form of command issuance, and the corresponding number of movable devices can be allocated to each operation sub-area through the sub-device module.
[0061] Figure 3 A flow chart of a method for determining the demand for mobile equipment according to an exemplary embodiment of the present disclosure is shown. Figure 3 As shown, the method for determining the demand amount of movable equipment provided by the exemplary embodiment of the present disclosure may include:
[0062] Step 301: Determine the total supply of jobs in the target job period based on the supplyable jobs of multiple mobile devices in the target area during the target job period. The target area includes multiple job sub-areas, each of which has a job object of a mobile device. It should be understood that the multiple mobile devices of the exemplary embodiment of the present disclosure may refer to mobile devices of the same type, or mobile devices that can achieve the same function. For different mobile devices, the corresponding job object types are the same.
[0063] Taking a smart park as an example, the scope of the smart park can correspond to the target area. The smart park has multiple operation sub-areas, each of which has an operation object of a movable device. The operation object of the movable device here can refer to a target that is subjected to the movable device. For example, the movable device is a cleaning and maintenance device, and the target can be a processing device that needs cleaning and maintenance. Another example is that the movable device is an unmanned vehicle, and the target can be a shelf, etc.
[0064] Step 302: Determine the movable equipment demand of each operation sub-area in the target operation period based on the total operation supply in the target operation period and the operation demand of each operation sub-area in the target operation period.
[0065] Taking into account the supply and demand relationship of job supply and job demand between movable equipment and job objects, the exemplary embodiment of the present disclosure can, after obtaining the total job supply of the target job time period and the job demand of each job sub-area within the target job time period, because the total job supply of the target job time period can reflect the job supply situation of the target area, and the job demand of each job sub-area within the target job time period can reflect the job demand situation of the job sub-area, therefore, based on the total job supply of the target job time period and the job demand of each job sub-area within the target job time period, the demand for movable equipment for the target job time period can be adaptively configured for each job sub-area.
[0066] It can be seen that the method of the exemplary embodiment of the present disclosure can predict the demand for movable equipment of each work sub-area in the target work period according to the supply and demand situation of the work in the target work period, and ensure that the predicted demand for movable equipment of the work sub-area in the target work period can meet the work demand of the work sub-area. Therefore, the method of the exemplary embodiment of the present disclosure can optimize the scheduling of movable equipment in the target area by predicting the demand for movable equipment of each work sub-area in the target work period, thereby improving the completion efficiency of related jobs in each work sub-area.
[0067] In an optional manner, the supplyable operation amount of each mobile device in the target operation period of the exemplary embodiment of the present disclosure is equal to the operation completion amount of the mobile device in the historical operation period, and the duration of the historical operation period is equal to the target operation period. Since the operation completion amount of the mobile device in the historical operation period reflects the operation capacity of the mobile device in the historical operation period, the exemplary embodiment of the present disclosure can dynamically determine the supplyable operation amount of the mobile device in the target operation period with reference to the operation completion amount of the mobile device in the historical operation period.
[0068] It can be seen that the exemplary embodiment of the present disclosure is based on the supplyable work volume of multiple mobile equipment in the target area during the target work period. The total work supply volume of the target work period determined dynamically reflects the work capacity of the mobile equipment in the target area. It can improve the accuracy of the demand for mobile equipment in the work sub-area during the target work period, reduce the probability of temporarily dispatching mobile equipment from the mobile equipment gathering point to the work sub-area, and then maximize the work efficiency of the mobile equipment.
[0069] Exemplarily, the equality of the duration of the historical operation period and the target operation period may be equality in a broad sense, that is, the difference in duration between the historical operation period and the target operation period is within a controllable range, and the historical operation period may be considered to be equal to the target operation period.
[0070] In order to improve the reference value of the work completion amount of the movable device within the historical work period, when the interval between the historical work period and the target work period of the exemplary embodiment of the present disclosure can be equal to the preset time length, the preset time length is less than the time length of the historical work period or the time length of the target work period.
[0071] For example, the preset duration can be set in days, or in other units. When the target operation period is the usage period of the operation object on the current day, and the historical operation period is the usage period of the operation object yesterday, the interval between the historical operation period and the target operation period is less than 1 day.
[0072] Exemplarily, the amount of work completed by each mobile device in the target work period in the exemplary embodiment of the present disclosure can be determined by the work duration and the number of work objects of the mobile device in the historical preset time period. For example: when the mobile device performs work on the work object in the workable sub-area, the number of work objects and the work duration of each work object in the target work period can be collected, and then based on the product of the number of work objects and the work duration of each work object, the amount of work completed by the mobile device in the target work period can be determined, and then the amount of work that can be supplied by the mobile device in the target work period can be estimated with reference.
[0073] For example, the amount of cleaning tasks completed by each cleaning and maintenance equipment in the historical operating period can be obtained. For the amount of cleaning tasks completed by each cleaning and maintenance equipment in the historical operating period, the relationship between the amount of cleaning tasks completed by the cleaning and maintenance equipment in the historical operating period and the amount of cleaning tasks that can be supplied by the corresponding cleaning and maintenance equipment in the historical operating period can be determined, so as to use the judgment result to determine whether the amount of cleaning tasks completed by the cleaning and maintenance equipment in the historical operating period can match the expected amount of cleaning tasks that can be supplied.
[0074] Assume that a certain operation sub-area has N cleaning and maintenance equipment in the historical operation period, and let the cleaning task completion amount of the kth cleaning and maintenance equipment in the historical operation period be W k , the available cleaning task volume W of the kth cleaning and maintenance equipment in the historical operation period i .
[0075] When W k >W i , indicating that the k-th cleaning and maintenance equipment has completed the cleaning and maintenance tasks in excess during the historical operation period. The supply of cleaning tasks W for the k-th cleaning and maintenance equipment during the target operation period can be set i =W k When W k =W i , indicating that the kth cleaning and maintenance equipment just completed the cleaning and maintenance task in the historical operation period. The supply cleaning task quantity W of the kth cleaning and maintenance equipment in the target operation period can be set i =W k When W k <W i , indicating that the k-th cleaning and maintenance equipment has not completed the cleaning and maintenance tasks in the historical operation period. The supply of cleaning tasks W for the k-th cleaning and maintenance equipment in the target operation period can be set i =W k .
[0076] It can be seen that the exemplary embodiment of the present disclosure can determine whether the cleaning and maintenance equipment has completed the cleaning and maintenance tasks in the historical operating period based on the relationship between the amount of cleaning tasks completed and the amount of cleaning tasks that can be supplied by the same cleaning and maintenance equipment in the historical operating period. Regardless of whether the cleaning and maintenance tasks are completed, the amount of cleaning tasks completed by the cleaning and maintenance equipment in the historical operating period can be set as the amount of cleaning tasks that can be supplied by the cleaning and maintenance equipment in the target operating period.
[0077] In an optional manner, considering that the job demand of each job sub-area within the target job period is related to the job object within the job sub-area, the job demand of each job sub-area within the target job period in the exemplary embodiment of the present disclosure can be determined by the usage information of all job objects within the job sub-area within the historical job period, and the duration of the historical job period is equal to that of the target job period. For details, please refer to the previous description to determine the relevant description of the equality of the duration of the historical job period and the target job period.
[0078] Exemplarily, the usage information of each operation object in the historical preset period of the exemplary embodiment of the present disclosure includes the number of times the operation object is used and the single use duration in the historical preset period. Here, the more the number of operation objects, the more times they are used, and the longer the single use duration, the greater the workload that needs to be maintained or handled by the operation object, and the corresponding operation demand of the operation sub-area in the target operation period is higher. Therefore, the operation demand of each operation object in the historical operation period is positively correlated with the number of times the operation object is used and the single use duration in the historical preset period, respectively, and the operation demand of the operation sub-area in the target operation period is positively correlated not only with the number of times the operation object is used and the single use duration in the historical preset period, but also with the number of operation objects.
[0079] Taking into account that the handling time of the movable device for the work object is generally less than the usage time, and the work object does not need to be handled by the movable device every time it is used, the work demand of each work sub-area within the target work period can satisfy a=μSnm, where μ represents the adjustment coefficient, which is greater than 0 and less than or equal to 1, and can be set according to the working conditions of the movable device. S represents the single usage time of the work object within the historical preset time period, m represents the number of times the work object is used within the historical preset time period, and n represents the number of work objects in the work sub-area.
[0080] For example, for the processing equipment in a processing workshop, the number of processing equipment can be regarded as the work objects, the number of processing procedures it needs to go through in the historical working period can be regarded as the number of times the processing equipment is used, and the duration of each processing procedure can be defined as the single use duration of the processing equipment.
[0081] For a certain processing workshop, the more processing equipment it includes, the more time it spends on cleaning and maintaining the processing equipment; the longer the duration of each processing step, the more time it spends on cleaning and maintaining the processing equipment; the larger the number of processing steps, the more time it spends on cleaning and maintaining the processing equipment. However, considering that the processing equipment does not require cleaning and maintenance equipment in every processing step, the duration of each cleaning and maintenance of the processing equipment is not equal to the duration of the processing step.
[0082] It can be seen that the exemplary embodiment of the present disclosure can dynamically predict the demand for movable equipment in the work sub-area during the target work period by collecting usage information of work objects in the work sub-area during the historical work period, so that the demand for movable equipment in the work sub-area during the target work period is consistent with the actual demand, avoiding temporary scheduling problems caused by inaccurate demand for movable equipment in the work sub-area during the target work period, and then improving the work efficiency of the work sub-area.
[0083] When the usage information of the work object of the work sub-area in the historical work period of the exemplary embodiment of the present disclosure remains constant, the demand for movable equipment of the work sub-area in the target work period is fixed. In this case, the demand for movable equipment of the work sub-area in the target work period can also be directly set.
[0084] Figure 4 FIG. 2 shows a schematic diagram of a process for determining the demand for mobile equipment according to an exemplary embodiment of the present disclosure. Figure 4 As shown, the exemplary embodiment of the present disclosure determines the demand for movable equipment in each operation sub-area during the target operation period based on the total supply of operations in the target operation period and the demand for operations in each operation sub-area during the target operation period, including:
[0085] Step 401: Determine the total demand for operations in the target operation period based on the operation demands of multiple operation sub-areas in the target operation period. Here, the total demand for operations in the target operation period may be determined by summing the operation demands of multiple operation sub-areas in the target operation period.
[0086] Step 402: Determine whether the total supply of operations in the target operation period is less than the total demand of operations in the target operation period. If the total supply of operations in the target operation period is less than the total demand of operations in the target operation period, it means that the supply of operations in the target operation period is insufficient, and step 403 can be executed. If the total supply of operations in the target operation period is greater than or equal to the total demand of operations in the target operation period, it means that the supply and demand of operations in the target operation period are balanced or the supply exceeds the demand, and step 404 can be executed.
[0087] Step 403: Determine a movable equipment demand correction parameter for each operating sub-area during the target operating period based on the maximum remaining supply of movable equipment in the target area and the proportion of operating demand of each operating sub-area during the target operating period.
[0088] The maximum remaining supply of mobile devices in the target area can be considered as the maximum remaining supply of mobile devices in the target area when each operating sub-area in the target area has a minimum demand for mobile devices. Based on this, the maximum remaining supply of mobile devices in the target area can be determined by the total supply of mobile devices in the target area and the minimum demand for mobile devices in the target area. Here, the minimum demand for mobile devices in the target area can actually be considered to be determined by the minimum demand for available devices in each operating sub-area.
[0089] For example, assuming that the total supply of movable equipment in the target area is q, the minimum demand for movable equipment in each operating sub-area is x, and the number of operating sub-areas in the target area is p, therefore, the maximum remaining supply of movable equipment in the target area = q-xp.
[0090] The proportion of the operation demand of each operation sub-area in the target operation period can be determined by the operation demand of the operation sub-area in the target operation period and the total operation demand of the target area in the target operation period. For example: the operation demand of the jth operation sub-area in the target operation period is a j , the total demand for operations in the target area during the target operation period is A, then the proportion of the demand for operations in the jth operation sub-area during the target operation period = a j / A.
[0091] The proportion of the operation demand of the jth operation sub-area during the target operation period = a j / A, the modified parameter y of the mobile equipment demand of the jth operation sub-area during the target operation period j It can be expressed as:
[0092] j represents an integer greater than or equal to 1 and less than or equal to p, x j It represents the minimum required number of movable equipment in the jth job sub-area.
[0093] Step 404: Determine the mobile equipment requirement of each operation sub-area in the target operation period based on the mobile equipment requirement correction parameter of each operation sub-area in the target operation period and the minimum mobile equipment requirement of the corresponding operation sub-area in the target operation period.
[0094] In practical applications, the exemplary embodiments of the present disclosure can determine the additional demand quantity of movable devices for each operation sub-area during the target operation period based on the movable device demand correction parameter of each operation sub-area during the target operation period, and then determine whether the additional demand quantity of movable devices for the operation sub-area during the target operation period is less than the preset demand quantity, so as to determine whether it is necessary to allocate additional movable devices to the operation sub-area under the minimum demand quantity of movable devices for the operation sub-area during the target operation period. It should be understood that the preset demand quantity can be set according to actual needs, for example, the preset demand quantity can be 1 to 3. When the preset demand quantity is smaller, the operation supply quantity of movable devices for the operation sub-area during the target operation period is larger, and it is easier to meet the operation demand of the operation sub-area during the target operation period.
[0095] If the additional demand quantity of mobile equipment in the operation sub-area during the target operation period is less than the preset demand quantity, then the minimum demand quantity of mobile equipment in the operation sub-area during the target operation period can basically meet the demand for the operation quantity of all operation objects in the operation sub-area, and there is no need to allocate additional mobile equipment to the operation sub-area. Therefore, the demand quantity of mobile equipment in the operation sub-area during the target operation period can be determined based on the minimum demand quantity of mobile equipment in the operation sub-area during the target operation period. For example, the demand quantity of mobile equipment in the operation sub-area during the target operation period can be set equal to the minimum demand quantity of mobile equipment in the operation sub-area during the target operation period.
[0096] If the additional demand quantity of mobile equipment in the operation sub-area during the target operation period is greater than or equal to the preset demand quantity, it means that the operation sub-area cannot meet the demand for the operation quantity of all operation objects in the operation sub-area under the minimum demand quantity of mobile equipment in the target operation period. Therefore, based on the additional demand quantity of mobile equipment in the operation sub-area during the target operation period and the minimum demand quantity of mobile equipment in the operation sub-area during the target operation period, the demand quantity of mobile equipment in the operation sub-area during the target operation period is determined. For example: For the demand quantity of mobile equipment in the j-th operation sub-area during the target operation period, it can be equal to the minimum demand quantity of mobile equipment in the j-th operation sub-area during the target operation period x j and the additional number of mobile equipment required for the jth operation sub-area during the target operation period x' j sum.
[0097] Step 405: Determine the unit operation supply of the movable device based on the total operation supply of the target operation period and the total supply of the movable device in the target area.
[0098] When the total supply of operations in the target operation period can be determined by the available supply of operations of multiple mobile devices included in the target area during the target operation period, the total supply of operations W in the target operation period can be defined as the sum of the available supply of operations of multiple mobile devices included in the target area during the target operation period. At this time, when the total supply of mobile devices in the target area is q, the unit supply of operations of the mobile devices is
[0099] Step 406: Determine the movable equipment demand of each operation sub-area during the target operation period based on the operation demand of the operation sub-area during the target operation period and the unit operation supply of the movable equipment. It should be understood that the operation demand of the operation sub-area during the target operation period can be determined with reference to the above description.
[0100] The demand for mobile equipment in the above-mentioned operation sub-area during the target operation period can be compared with the unit operation supply of mobile equipment negatively correlated, and positively correlated with the operation demand of the operation sub-area during the target operation period. For example, the demand for mobile equipment in the jth operation sub-area during the target operation period can be equal to the operation demand a of the jth operation sub-area during the target operation period. j Unit operation supply with mobile equipment Considering that the ratio may not be an integer, the ratio can be rounded down, and the rounded result is defined as the demand for mobile equipment in the j-th operation sub-area during the target operation period.
[0101] In an optional manner, when determining the additional number of mobile equipment required for each operating sub-area during the target operating period in the exemplary embodiment of the present disclosure, the maximum remaining supply of mobile equipment in the target area may be positively correlated with the mobile equipment demand correction parameter of the operating sub-area during the target operating period, and the maximum remaining supply of mobile equipment in the target area may be positively correlated with the proportion of operating demand in the operating sub-area during the target operating period. Based on this, the additional number of mobile equipment required for the operating sub-area during the target operating period in the exemplary embodiment of the present disclosure is equal to the result of rounding down the mobile equipment demand correction parameter of the operating sub-area during the target operating period.
[0102] Regardless of whether the total supply of operations in the target operation period is greater than the total demand for operations in the target operation period, or the total supply of operations in the target operation period is less than or equal to the total demand for operations in the target operation period, since the demand for movable equipment in the operation sub-area in the target operation period is determined by rounding down, it is possible that the total supply of operations in the target operation period is greater than the demand for movable equipment in the target area.
[0103] To further utilize the available removable devices in the target area, Figure 5 Another schematic diagram of determining the demand for mobile equipment according to an exemplary embodiment of the present disclosure is shown. Figure 5 As shown, the exemplary embodiment method of the present disclosure also includes:
[0104] Step 501: Determine the mobile equipment demand of the target area based on the mobile equipment demand of multiple operation sub-areas in the target operation period. Here, the mobile equipment demand of the target area can be determined by adding the mobile equipment demand of multiple operation sub-areas in the target operation period.
[0105] Step 502: When the total supply of mobile devices in the target area is greater than the demand for mobile devices in the target area, the actual remaining supply of mobile devices is determined based on the total supply of mobile devices in the target area and the demand for mobile devices in the target area. For example, the actual remaining supply of mobile devices can be determined by taking the difference between the total supply of mobile devices in the target area and the demand for mobile devices in the target area.
[0106] Step 503: If the proportion of the operation demand of the operation sub-area in the target operation period is greater than the preset proportion, the demand for movable equipment of the operation sub-area in the target operation period is updated based on the actual remaining supply of movable equipment.
[0107] When the job demand of a job sub-area during the target job period accounts for a certain proportion, it means that the job objects in the job sub-area are relatively busy and require a large number of movable devices for disposal. The actual remaining supply of movable devices refers to the idle movable devices that are not allocated to the job sub-area. Therefore, the actual remaining supply of movable devices can be accumulated on the basis of the demand for movable devices in the job sub-area during the target job period to ensure that the jobs in the job sub-area can be completed efficiently.
[0108] One or more technical solutions provided in the exemplary embodiments of the present disclosure can determine the total supply of jobs in a target operation period based on the supplyable job quantities of multiple movable devices in the target operation period. Since the total supply of jobs in the target operation period can reflect the job supply situation of the target area, the job demand of each operation sub-area in the target operation period can reflect the job demand situation of the operation sub-area. Therefore, based on the total supply of jobs in the target operation period and the job demand of each operation sub-area in the target operation period, the demand for movable devices in the target operation period can be adaptively configured for each operation sub-area.
[0109] It can be seen that the method of the exemplary embodiment of the present disclosure can predict the demand for movable equipment of each work sub-area in the target work period according to the supply and demand situation of the work in the target work period, and ensure that the predicted demand for movable equipment of the work sub-area in the target work period can meet the work demand of the work sub-area. Therefore, the method of the exemplary embodiment of the present disclosure can optimize the scheduling of movable equipment in the target area by predicting the demand for movable equipment of each work sub-area in the target work period, thereby improving the completion efficiency of related jobs in each work sub-area.
[0110] Taking the cleaning and maintenance equipment in the smart park as an example, the method of the exemplary embodiment of the present disclosure can predict the number of cleaning and maintenance equipment required in different operating sub-areas in the smart park during the target operating period, so as to achieve the purpose of adjusting the amount of cleaning tasks completed in each operating sub-area during the target operating period. At the same time, the amount of cleaning tasks completed by the cleaning and maintenance equipment in the historical operating period can be defined as the amount of cleaning tasks that can be supplied by the cleaning and maintenance equipment during the target operating period. Therefore, when determining the amount of cleaning and maintenance equipment required in the operating sub-area during the target operating period, the exemplary embodiment of the present disclosure takes into account the working efficiency of the cleaning and maintenance equipment, so that the process of determining the amount of cleaning and maintenance equipment required in the operating sub-area during the target operating period is more accurate, reducing the probability of temporarily dispatching cleaning and maintenance equipment to the operating sub-area, and improving the utilization efficiency of the cleaning and maintenance equipment.
[0111] As can be seen from the above, the exemplary embodiment of the present disclosure can estimate the current demand for cleaning and maintenance equipment of the processing workshop during the target operation period according to the load of the processing equipment, thereby achieving the purpose of dynamically allocating and indicating the cleaning and maintenance equipment. At the same time, when the number of cleaning and maintenance equipment is insufficient, while ensuring the basic equipment inventory of each processing workshop, the remaining number of cleaning and maintenance equipment is selectively allocated, so that each processing workshop can have the cleaning and maintenance equipment that is closest to the demand.
[0112] The above mainly introduces the solution provided by the embodiment of the present disclosure from the perspective of the server. It is understandable that, in order to implement the above functions, the server includes hardware structures and / or software modules corresponding to the execution of each function. Those skilled in the art should easily realize that, in combination with the units and algorithm steps of each example described in the embodiments disclosed herein, the present disclosure can be implemented in the form of hardware or a combination of hardware and computer software. Whether a function is executed in the form of hardware or computer software driving hardware depends on the specific application and design constraints of the technical solution. Professional and technical personnel can use different methods to implement the described functions for each specific application, but such implementation should not be considered to exceed the scope of the present disclosure.
[0113] The embodiments of the present disclosure may divide the server into functional units according to the above method examples. For example, each functional module may be divided corresponding to each function, or two or more functions may be integrated into one processing module. The above integrated modules may be implemented in the form of hardware or in the form of software functional modules. It should be noted that the division of modules in the embodiments of the present disclosure is schematic and is only a logical functional division. There may be other division methods in actual implementation.
[0114] In the case of dividing each functional module according to each function, an exemplary embodiment of the present disclosure provides a device for determining the demand for a movable device, and the device for determining the demand for a movable device may be a server or a chip applied to a server. Figure 6 FIG. 1 is a schematic block diagram showing a functional module of a device for determining the demand amount of a mobile device according to an exemplary embodiment of the present disclosure. Figure 6 As shown, the device 600 for determining the demand for mobile equipment includes:
[0115] A first determination module 601 is used to determine the total supply of jobs in a target operation period based on the supplyable job quantities of multiple movable devices in a target area in a target operation period, wherein the target area includes multiple operation sub-areas, each of which has an operation object of the movable device;
[0116] The second determination module 602 is used to determine the demand for movable equipment in each of the operation sub-areas during the target operation period based on the total supply of operations in the target operation period and the demand for operations in each of the operation sub-areas during the target operation period.
[0117] In a possible implementation, the supplyable operation amount of each movable device in the target operation period is equal to the operation completion amount of the movable device in the historical operation period, and the duration of the historical operation period is equal to that of the target operation period.
[0118] In a possible implementation, the amount of work completed by each movable device in the target work period is determined by the work duration and the number of work objects of the movable device in a historical preset time period.
[0119] In a possible implementation, the operation demand of each operation sub-area in the target operation period is determined by the usage information of all operation objects in the operation sub-area in the historical operation period, and the duration of the historical operation period is equal to that of the target operation period.
[0120] In a possible implementation, the usage information of each operation object in the historical preset period includes the number of times the operation object is used in the historical preset period and the duration of a single use;
[0121] The operation demand of each operation object in the historical operation period is positively correlated with the number of times the operation object is used and the single use duration in the historical preset period.
[0122] In one possible implementation, the second determination module 602 is used to determine the total job demand for the target operation period based on the job demand of multiple operation sub-areas in the target operation period. If the total job supply of the target operation period is less than the total job demand for the target operation period, the movable equipment demand correction parameter of each operation sub-area in the target operation period is determined based on the maximum remaining supply of movable equipment in the target area and the proportion of the job demand of each operation sub-area in the target operation period. The movable equipment demand of each operation sub-area in the target operation period is determined based on the movable equipment demand correction parameter of each operation sub-area in the target operation period and the minimum demand for movable equipment of the corresponding operation sub-area in the target operation period.
[0123] In a possible implementation, the maximum remaining supply of movable devices in the target area is determined by the total supply of movable devices in the target area and the minimum demand for movable devices in the target area;
[0124] The proportion of the operation demand of each operation sub-area in the target operation period is determined by the operation demand of the operation sub-area in the target operation period and the total operation demand of the target area in the target operation period.
[0125] In one possible implementation, the second determination module 602 is used to determine the additional demand quantity of movable equipment for each of the operation sub-areas in the target operation period based on the movable equipment demand correction parameter of each of the operation sub-areas in the target operation period; if the additional demand quantity of movable equipment for the operation sub-area in the target operation period is less than the preset demand quantity, the demand quantity of movable equipment for the operation sub-area in the target operation period is determined based on the minimum demand quantity of movable equipment for the operation sub-area in the target operation period; if the additional demand quantity of movable equipment for the operation sub-area in the target operation period is greater than or equal to the preset demand quantity, the demand quantity of movable equipment for the operation sub-area in the target operation period is determined based on the additional demand quantity of movable equipment for the operation sub-area in the target operation period and the minimum demand quantity of movable equipment for the operation sub-area in the target operation period.
[0126] In a possible implementation, the maximum remaining supply of movable equipment in the target area is positively correlated with the movable equipment demand correction parameter of the operation sub-area in the target operation period, and the maximum remaining supply of movable equipment in the target area is positively correlated with the proportion of operation demand of the operation sub-area in the target operation period;
[0127] The additional required number of movable equipment of the operation sub-area in the target operation period is equal to a result of rounding down a modified parameter of the movable equipment requirement of the operation sub-area in the target operation period.
[0128] In a possible implementation, the second determining module 602 is configured to determine the unit operation supply of the movable device based on the total operation supply of the target operation period and the total supply of the movable device in the target area if the total operation supply of the target operation period is greater than or equal to the total operation demand of the target operation period;
[0129] Based on the operation demand of each of the operation sub-areas in the target operation period and the unit operation supply of the movable equipment, the demand for movable equipment of each of the operation sub-areas in the target operation period is determined.
[0130] In one possible implementation, the second determination module 602 is also used to determine the demand for movable equipment in the target area based on the demand for movable equipment of multiple operation sub-areas in the target operation period; if the total supply of movable equipment in the target area is greater than the demand for movable equipment in the target area, the actual remaining supply of the movable equipment is determined based on the total supply of movable equipment in the target area and the demand for movable equipment in the target area; if the proportion of the operation demand of the operation sub-area in the target operation period is greater than the preset proportion, the demand for movable equipment of the operation sub-area in the target operation period is updated based on the actual remaining supply of the movable equipment.
[0131] In the case of dividing each functional module according to each function, the exemplary embodiment of the present disclosure provides another device for determining the demand for a movable device, and the device for determining the demand for a movable device may be a server or a chip applied to a server. Figure 7 FIG. 2 shows another schematic block diagram of functional modules of an apparatus for determining the demand amount of a mobile device according to an exemplary embodiment of the present disclosure. Figure 7 As shown, the device 700 for determining the demand for mobile equipment includes: a terminal acquisition module 701, a workload adjustment module 702 and an equipment quantity adjustment module 703. The terminal acquisition module 701 is electrically connected to the workload adjustment module 702 and the equipment quantity adjustment module 703, and the workload adjustment module 702 is electrically connected to the equipment quantity adjustment module 703.
[0132] like Figure 7 As shown, the terminal acquisition module 701 may include a scanning module 7011 , a workload recording module 7012 , an information receiving module 7013 and an information display module 7014 , and the workload adjustment module 702 includes a workload acquisition module 7021 and a workload update module 7022 .
[0133] like Figure 7 As shown, the information receiving module 7013 is electrically connected to the workload recording module 7012 , the information receiving module 7013 is electrically connected to the information display module 7014 , the workload recording module 7012 is electrically connected to the workload acquisition module 7021 , and the workload acquisition module 7021 is electrically connected to the workload update module 7022 .
[0134] like Figure 7 As shown, the above-mentioned scanning module 7011 is used to collect the number of job objects, the number of times the job objects are used and the duration of a single use, such as the number of processing equipment and the number of processes of the processing equipment, and the duration of the process; the workload recording module 7012 is used to record the amount of work completed by the movable device during the historical operation period.
[0135] like Figure 7 As shown, the information receiving module 7013 is used to receive the mobile equipment demand allocation instruction message of each operation sub-area in the target operation period from the server, and the information display module 7014 is used to display the cleaning and maintenance equipment demand allocation instruction message of each processing workshop. For example: the information receiving module 7013 can receive the cleaning and maintenance equipment demand allocation instruction message of each processing workshop, and the information display module 7014 can display the cleaning and maintenance equipment demand allocation instruction message of each processing workshop.
[0136] like Figure 7 As shown, the above-mentioned workload acquisition module 7021 is used for the workload completed by the movable device in the historical workload period, and the workload update module 7022 is used to update the available workload of the movable device in the target workload period based on the workload completed by the movable device in the historical workload period.
[0137] like Figure 7 As shown, the above-mentioned equipment quantity adjustment module 703 includes an information acquisition module 7031, a workload calculation module 7032, an equipment quantity calculation module 7033, a dynamic adjustment module 7034 and an information sending module 7035. The workpiece scanning module 7011 is electrically connected to the information acquisition module 7031, the information acquisition module 7031 is electrically connected to the workload calculation module 7032, the workload calculation module 7032 is electrically connected to the equipment quantity calculation module 7033, the equipment quantity calculation module 7033 is electrically connected to the dynamic adjustment module 7034, and the dynamic adjustment module 7034 is electrically connected to the information sending module 7035.
[0138] like Figure 7As shown, the above-mentioned information acquisition module 7031 is used to obtain the number of job objects, the number of times the job objects are used and the duration of a single use, such as the number of processing equipment, the number of processes of the processing equipment and the duration of each process. The workload calculation module 7032 is used to calculate the job demand of the job sub-area during the target job time period. For example: based on the number of processing equipment, the number of processes of the processing equipment and the duration of each process in each processing workshop, the cleaning task demand of the processing workshop during the target job time period can be determined.
[0139] like Figure 7 As shown, the above-mentioned equipment quantity calculation module 7033 is used to determine the demand for movable equipment of each work sub-area in the target work period based on the work demand of each work sub-area in the target work period and the total work supply of the target work period, that is, the optimal solution for the number of cleaning and maintenance equipment of the processing workshop in the target work period.
[0140] like Figure 7 As shown, the dynamic adjustment module 7034 is used to adjust the number of movable devices in the corresponding operation sub-area based on the demand for movable devices in each operation sub-area during the target operation period. For example, the number of cleaning and maintenance equipment in the processing workshop can be adjusted based on the optimal solution for the number of cleaning and maintenance equipment in the processing workshop during the target operation period. The information sending module 7035 is used to convey various instruction messages to the movable devices, such as the cleaning and maintenance equipment.
[0141] Figure 8 Schematic block diagram of a chip according to an exemplary embodiment of the present disclosure is shown. Figure 8 As shown, the chip 800 includes one or more (including two) processors 801 and a communication interface 802. The communication interface 802 can support the server to perform the data sending and receiving steps in the above method, and the processor 801 can support the server to perform the data processing steps in the above method.
[0142] Optional, such as Figure 8 As shown, the chip 800 also includes a memory 803, which may include a read-only memory and a random access memory, and provides operation instructions and data to the processor. A portion of the memory may also include a non-volatile random access memory (NVRAM).
[0143] In some embodiments, Figure 8As shown, the processor 801 performs corresponding operations by calling the operation instructions stored in the memory (the operation instructions may be stored in the operating system). The processor 801 controls the processing operations of any one of the terminal devices, and the processor may also be called a central processing unit (CPU). The memory 803 may include a read-only memory and a random access memory, and provides instructions and data to the processor 801. A portion of the memory 803 may also include NVRAM. For example, in an application, the memory, the communication interface, and the memory are coupled together through a bus system, wherein the bus system may include a power bus, a control bus, and a status signal bus in addition to a data bus. However, for the sake of clarity, in Figure 8 Various buses are labeled as bus system 804 .
[0144] The method disclosed in the above-mentioned embodiment of the present disclosure can be applied to a processor or implemented by a processor. The processor may be an integrated circuit chip with signal processing capabilities. In the implementation process, each step of the above method can be completed by an integrated logic circuit of hardware in the processor or an instruction in the form of software. The above-mentioned processor may be a general-purpose processor, a digital signal processor (digital signal processing, DSP), an ASIC, a field-programmable gate array (field-programmable gate array, FPGA) or other programmable logic devices, discrete gates or transistor logic devices, discrete hardware components. The methods, steps and logic block diagrams disclosed in the embodiments of the present disclosure can be implemented or executed. The general-purpose processor may be a microprocessor or the processor may also be any conventional processor, etc. The steps of the method disclosed in conjunction with the embodiment of the present disclosure can be directly embodied as being executed by a hardware decoding processor, or executed by a combination of hardware and software modules in the decoding processor. The software module may be located in a mature storage medium in the field such as a random access memory, a flash memory, a read-only memory, a programmable read-only memory or an electrically erasable programmable memory, a register, etc. The storage medium is located in a memory, and the processor reads the information in the memory and completes the steps of the above method in conjunction with its hardware.
[0145] The exemplary embodiment of the present disclosure also provides an electronic device, comprising: at least one processor; and a memory connected to the at least one processor in communication. The memory stores a computer program that can be executed by the at least one processor, and the computer program is used to cause the electronic device to perform the method according to the embodiment of the present disclosure when executed by the at least one processor.
[0146] The exemplary embodiments of the present disclosure also provide a non-transitory computer-readable storage medium storing a computer program, wherein the computer program, when executed by a processor of a computer, is used to cause the computer to perform the method according to the embodiments of the present disclosure.
[0147] The exemplary embodiments of the present disclosure further provide a computer program product, including a computer program, wherein when the computer program is executed by a processor of a computer, the computer is used to enable the computer to perform the method according to the embodiments of the present disclosure.
[0148] refer to Fig. 9 , a block diagram of an electronic device 900 that can be used as a server or client of the present disclosure will now be described, which is an example of a hardware device that can be applied to various aspects of the present disclosure. The electronic device is intended to represent various forms of digital electronic computer devices, such as laptop computers, desktop computers, workbenches, personal digital assistants, servers, blade servers, mainframe computers, and other suitable computers. The electronic device can also represent various forms of mobile devices, such as personal digital processing, cellular phones, smart phones, wearable devices, and other similar computing devices. The components shown herein, their connections and relationships, and their functions are merely examples and are not intended to limit the implementation of the present disclosure described and / or required herein.
[0149] like Fig. 9 As shown, the electronic device 900 includes a computing unit 901, which can perform various appropriate actions and processes according to a computer program stored in a read-only memory (ROM) 902 or a computer program loaded from a storage unit 908 into a random access memory (RAM) 903. In the RAM 903, various programs and data required for the operation of the device 900 can also be stored. The computing unit 901, the ROM 902, and the RAM 903 are connected to each other via a bus 904. An input / output (I / O) interface 905 is also connected to the bus 904.
[0150] like Fig. 9As shown, multiple components in the electronic device 900 are connected to the I / O interface 905, including: an input unit 906, an output unit 907, a storage unit 908, and a communication unit 909. The input unit 906 can be any type of device that can input information to the electronic device 900, and the input unit 906 can receive input digital or character information, and generate key signal input related to the user settings and / or function control of the electronic device. The output unit 907 can be any type of device that can present information, and can include but is not limited to a display, a speaker, a video / audio output terminal, a vibrator, and / or a printer. The storage unit 908 can include but is not limited to a disk, an optical disk. The communication unit 909 allows the electronic device 900 to exchange information / data with other devices through a computer network such as the Internet and / or various telecommunication networks, and can include but is not limited to a modem, a network card, an infrared communication device, a wireless communication transceiver, and / or a chipset, such as a Bluetooth TM device, a WiFi device, a WiMax device, a cellular communication device, and / or the like.
[0151] The computing unit 901 may be a variety of general and / or special processing components with processing and computing capabilities. Some examples of the computing unit 901 include, but are not limited to, a central processing unit (CPU), a graphics processing unit (GPU), various dedicated artificial intelligence (AI) computing chips, various computing units running machine learning model algorithms, digital signal processors (DSPs), and any appropriate processors, controllers, microcontrollers, etc. The computing unit 901 performs the various methods and processes described above. For example, in some embodiments, the method of the exemplary embodiment of the present disclosure may be implemented as a computer software program, which is tangibly included in a machine-readable medium, such as a storage unit 908. In some embodiments, part or all of the computer program may be loaded and / or installed on the electronic device 900 via the ROM 902 and / or the communication unit 909. In some embodiments, the computing unit 901 may be configured to perform the method of the exemplary embodiment of the present disclosure in any other appropriate manner (e.g., by means of firmware).
[0152] The program code for implementing the method of the present disclosure may be written in any combination of one or more programming languages. These program codes may be provided to a processor or controller of a general-purpose computer, a special-purpose computer, or other programmable data processing device, so that the program code, when executed by the processor or controller, enables the functions / operations specified in the flow chart and / or block diagram to be implemented. The program code may be executed entirely on the machine, partially on the machine, partially on the machine and partially on a remote machine as a stand-alone software package, or entirely on a remote machine or server.
[0153] In the context of the present disclosure, a machine-readable medium may be a tangible medium that may contain or store a program for use by or in conjunction with an instruction execution system, device, or equipment. A machine-readable medium may be a machine-readable signal medium or a machine-readable storage medium. A machine-readable medium may include, but is not limited to, an electronic, magnetic, optical, electromagnetic, infrared, or semiconductor system, device, or equipment, or any suitable combination of the foregoing. A more specific example of a machine-readable storage medium may include an electrical connection based on one or more lines, a portable computer disk, a hard disk, a random access memory (RAM), a read-only memory (ROM), an erasable programmable read-only memory (EPROM or flash memory), an optical fiber, a portable compact disk read-only memory (CD-ROM), an optical storage device, a magnetic storage device, or any suitable combination of the foregoing.
[0154] To provide interaction with a user, the systems and techniques described herein can be implemented on a computer having: a display device (e.g., a CRT (cathode ray tube) or LCD (liquid crystal display) monitor) for displaying information to the user; and a keyboard and pointing device (e.g., a mouse or trackball) through which the user can provide input to the computer. Other types of devices can also be used to provide interaction with the user; for example, the feedback provided to the user can be any form of sensory feedback (e.g., visual feedback, auditory feedback, or tactile feedback); and input from the user can be received in any form (including acoustic input, voice input, or tactile input).
[0155] The systems and techniques described herein may be implemented in a computing system that includes back-end components (e.g., as a data server), or a computing system that includes middleware components (e.g., an application server), or a computing system that includes front-end components (e.g., a user computer with a graphical user interface or a web browser through which a user can interact with implementations of the systems and techniques described herein), or a computing system that includes any combination of such back-end components, middleware components, or front-end components. The components of the system may be interconnected by any form or medium of digital data communication (e.g., a communication network). Examples of communication networks include: a local area network (LAN), a wide area network (WAN), and the Internet.
[0156] A computer system may include clients and servers. Clients and servers are generally remote from each other and usually interact through a communication network. The relationship of client and server is generated by computer programs running on respective computers and having a client-server relationship to each other.
[0157] In the above embodiments, it can be implemented in whole or in part by software, hardware, firmware or any combination thereof. When implemented by software, it can be implemented in whole or in part in the form of a computer program product. The computer program product includes one or more computer programs or instructions. When the computer program or instruction is loaded and executed on a computer, the process or function described in the embodiment of the present disclosure is executed in whole or in part. The computer may be a general-purpose computer, a special-purpose computer, a computer network, a terminal, a user device or other programmable device. The computer program or instruction may be stored in a computer-readable storage medium, or transmitted from one computer-readable storage medium to another computer-readable storage medium, for example, the computer program or instruction may be transmitted from one website site, computer, server or data center to another website site, computer, server or data center by wired or wireless means. The computer-readable storage medium may be any available medium that a computer can access or a data storage device such as a server, data center, etc. that integrates one or more available media. The available medium may be a magnetic medium, for example, a floppy disk, a hard disk, a tape; it may also be an optical medium, for example, a digital video disc (DVD); it may also be a semiconductor medium, for example, a solid state drive (SSD).
[0158] Although the present disclosure has been described in conjunction with specific features and embodiments thereof, it is apparent that various modifications and combinations may be made thereto without departing from the spirit and scope of the present disclosure. Accordingly, this specification and the drawings are merely exemplary illustrations of the present disclosure as defined by the appended claims, and are deemed to have covered any and all modifications, variations, combinations or equivalents within the scope of the present disclosure. Obviously, those skilled in the art may make various modifications and variations to the present disclosure without departing from the spirit and scope of the present disclosure. Thus, if these modifications and variations of the present disclosure fall within the scope of the claims of the present disclosure and their equivalents, the present disclosure is also intended to include these modifications and variations.
Claims
1. A method for determining the demand for mobile equipment, characterized in that: include: Determine the total supply of jobs in the target job period based on the supplyable job quantities of the plurality of movable devices in the target area in the target job period, the target area comprising a plurality of job sub-areas, each of the job sub-areas having a job object of the movable device; Based on the total supply of operations in the target operation period and the operation demand of each operation sub-area in the target operation period, the demand for movable equipment in each operation sub-area in the target operation period is determined.
2. The method according to claim 1, characterized in that The amount of work that can be supplied by each movable device in the target work period is equal to the amount of work completed by the movable device in the historical work period, and the duration of the historical work period is equal to that of the target work period.
3. The method according to claim 2, characterized in that The amount of work completed by each movable device in the target work period is determined by the work duration and the number of work objects of the movable device in the historical preset time period.
4. The method according to claim 1, characterized in that: The operation demand of each operation sub-area in the target operation period is determined by the usage information of all operation objects in the operation sub-area in the historical operation period, and the duration of the historical operation period is equal to that of the target operation period.
5. The method according to claim 4, characterized in that The usage information of each operation object in the historical preset period includes the number of times the operation object is used in the historical preset period and the duration of a single use; The operation demand of each operation object in the historical operation period is positively correlated with the number of times the operation object is used and the single use duration in the historical preset period.
6. The method according to claim 1, characterized in that The step of determining the demand for movable equipment in each operation sub-area during the target operation period based on the total supply of operations in the target operation period and the demand for operations in each operation sub-area during the target operation period comprises: Determining a total demand for operations in the target operation period based on the operation demands of the plurality of operation sub-areas in the target operation period; If the total supply of operations in the target operation period is less than the total demand of operations in the target operation period, based on the maximum remaining supply of movable equipment in the target area and the proportion of the demand of operations in each operation sub-area in the target operation period, determine the demand correction parameter of movable equipment in each operation sub-area in the target operation period; Based on the movable equipment requirement correction parameter of each operation sub-area in the target operation period and the minimum movable equipment requirement of the corresponding operation sub-area in the target operation period, the movable equipment requirement of each operation sub-area in the target operation period is determined.
7. The method according to claim 6, characterized in that The maximum remaining supply of mobile devices in the target area is determined by the total supply of mobile devices in the target area and the minimum demand for mobile devices in the target area; The proportion of the operation demand of each operation sub-area in the target operation period is determined by the operation demand of the operation sub-area in the target operation period and the total operation demand of the target area in the target operation period.
8. The method according to claim 6, characterized in that The step of determining the demand amount of the movable equipment of each operation sub-area in the target operation period based on the demand correction parameter of the movable equipment of each operation sub-area in the target operation period and the minimum demand amount of the movable equipment of the corresponding operation sub-area in the target operation period comprises: Determining the additional required number of movable equipment for each of the operation sub-areas during the target operation period based on the movable equipment requirement correction parameter for each of the operation sub-areas during the target operation period; If the additional demand quantity of movable equipment of the operation sub-area in the target operation period is less than the preset demand quantity, determining the demand quantity of movable equipment of the operation sub-area in the target operation period based on the minimum demand quantity of movable equipment of the operation sub-area in the target operation period; If the additional demand quantity of movable equipment of the operation sub-area during the target operation period is greater than or equal to the preset demand quantity, the demand quantity of movable equipment of the operation sub-area during the target operation period is determined based on the additional demand quantity of movable equipment of the operation sub-area during the target operation period and the minimum demand quantity of movable equipment of the operation sub-area during the target operation period.
9. The method according to claim 8, characterized in that The maximum remaining supply of mobile equipment in the target area is positively correlated with the mobile equipment demand correction parameter of the operation sub-area in the target operation period, and the maximum remaining supply of mobile equipment in the target area is positively correlated with the proportion of operation demand in the operation sub-area in the target operation period; The additional required number of movable equipment of the operation sub-area in the target operation period is equal to a result of rounding down a modified parameter of the movable equipment requirement of the operation sub-area in the target operation period.
10. The method according to claim 6, characterized in that The step of determining the demand for movable equipment in each operation sub-area during the target operation period based on the total supply of operations in the target operation period and the total demand for operations in the target area during the target operation period further includes: If the total supply of operations in the target operation period is greater than or equal to the total demand for operations in the target operation period, determining the unit operation supply of the movable equipment based on the total supply of operations in the target operation period and the total supply of movable equipment in the target area; Based on the operation demand of each of the operation sub-areas in the target operation period and the unit operation supply of the movable equipment, the demand for movable equipment of each of the operation sub-areas in the target operation period is determined.
11. The method according to any one of claims 1 to 10, characterized in that: The method further comprises: Determining the demand for mobile equipment in the target area based on the demand for mobile equipment in the plurality of operation sub-areas during the target operation period; If the total supply of mobile devices in the target area is greater than the demand for mobile devices in the target area, determining the actual remaining supply of the mobile devices based on the total supply of mobile devices in the target area and the demand for mobile devices in the target area; If the proportion of the operation demand of the operation sub-area in the target operation period is greater than the preset proportion, the demand for the movable equipment of the operation sub-area in the target operation period is updated based on the actual remaining supply of the movable equipment.
12. A device for determining the demand for movable equipment, characterized in that: include: A first determination module is used to determine the total supply of operations in a target operation period based on the supplyable operation quantities of a plurality of the movable devices in a target area in a target operation period, wherein the target area includes a plurality of operation sub-areas, each of which has an operation object of the movable device; The second determination module is used to determine the demand for movable equipment in each of the operation sub-areas during the target operation period based on the total supply of operations in the target operation period and the demand for operations in each of the operation sub-areas during the target operation period.
13. An electronic device, characterized in that: include: processor; as well as, A memory for storing programs; The program includes instructions, which, when executed by the processor, cause the processor to perform the method according to any one of claims 1 to 11.
14. A non-transitory computer-readable storage medium, characterized in that The non-transitory computer-readable storage medium stores computer instructions for causing the computer to execute the method according to any one of claims 1 to 11.
