Task allocation method and device, electronic equipment and storage medium
By obtaining employee portraits and engineering consulting project information, and using machine learning models to allocate tasks, it solves the problem of traditional task allocation relying on experience and intuition, achieves more efficient and balanced task allocation, and reduces the complexity of project management.
Patent Information
- Application Number
- CN202411276856.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-12
- Publication Date
- 2024-10-18
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
Traditional task allocation methods are highly dependent on personal experience and intuition, resulting in unreasonable or uneven task allocation, affecting project progress and efficiency. Different project managers' allocation methods lead to poor project comparability and replicability, which increases the complexity of project management. complexity and uncertainty.
By obtaining basic information about employee portraits and engineering consulting projects, we determine the set of standard subtasks and their attribute information, use preset machine learning models to allocate tasks, and automate the task allocation process to ensure rationality and balance.
It improves the efficiency of task allocation, reduces the complexity and uncertainty of engineering consulting project management, ensures the rationality and balance of task allocation, and reduces reliance on manual allocation.
Smart Images

Figure CN118798598A_ABST
Abstract
Description
Technical Field
[0001] The present disclosure relates to the field of computer technology, and in particular to a task allocation method, device, electronic device and storage medium. Background Art
[0002] Project task allocation is an important part of project management. It is crucial to reasonably allocate various tasks in the project to project team members to ensure the smooth progress and efficient completion of the project.
[0003] However, the traditional task allocation method is mainly allocated by the project manager or team leader based on experience, and different project managers or team leaders may adopt different allocation methods. Therefore, the traditional task allocation method is highly dependent on personal experience and intuition, and there are unreasonable or unbalanced task allocation, which affects the overall progress of the project and the problem of low allocation efficiency; at the same time, different project managers or team leaders also have different task allocations, resulting in poor comparability and replicability between projects, which increases the complexity and uncertainty of project management.
[0004] Therefore, how to quickly and reasonably allocate tasks is an urgent problem to be solved. Summary of the invention
[0005] In order to solve the above technical problems, the present disclosure provides a task allocation method, device, electronic device and storage medium.
[0006] A first aspect of an embodiment of the present disclosure provides a task allocation method, including: Obtain employee portraits; Obtain basic information of the engineering consulting project, and determine a set of standard subtasks corresponding to the engineering consulting project based on the basic information of the engineering consulting project; Determine task attribute information corresponding to each subtask in the standard subtask set, where the task attribute information includes at least one of a priority level of the task, a difficulty level of the task, and an urgency level of the task; The employee portrait, standard subtask set and task attribute information are input into the preset machine learning model, and the preset machine learning model allocates each subtask in the standard subtask set to obtain the task allocation result.
[0007] A second aspect of an embodiment of the present disclosure provides a task allocation device, including: The first acquisition module is used to obtain employee portraits; The second acquisition module is used to acquire basic information of the engineering consulting project and determine a set of standard subtasks corresponding to the engineering consulting project based on the basic information of the engineering consulting project; An attribute information determination module, used to determine task attribute information corresponding to each subtask in the standard subtask set, the task attribute information including at least one of the priority of the task, the difficulty level of the task, and the urgency of the task; The task assignment module is used to input employee portraits, standard subtask sets and task attribute information into a preset machine learning model, and the preset machine learning model assigns each subtask in the standard subtask set to obtain the task assignment result.
[0008] A third aspect of the embodiments of the present disclosure provides an electronic device, including: processor; A memory for storing executable instructions; The processor is used to read executable instructions from the memory and execute the executable instructions to implement the task allocation method provided in the first aspect above.
[0009] A fourth aspect of an embodiment of the present disclosure provides a computer-readable storage medium, which stores a computer program. When the computer program is executed by a processor, the processor implements the task allocation method provided by the first aspect.
[0010] Compared with the prior art, the technical solution provided by the embodiments of the present disclosure has the following advantages: The task assignment method, device, electronic device and storage medium provided by the embodiments of the present disclosure can obtain employee portraits and basic information of engineering consulting projects, determine the standard subtask set corresponding to the engineering consulting project based on the basic information of the engineering consulting project; determine the task attribute information corresponding to each subtask in the standard subtask set, the task attribute information includes at least one of the priority of the task, the difficulty level of the task and the urgency of the task, input the employee portrait, the standard subtask set and the task attribute information into a preset machine learning model, and the preset machine learning model is used to assign each subtask in the standard subtask set to obtain a task assignment result. As a result, tasks can be assigned through the preset machine learning model without relying on manual task assignment, thereby improving the efficiency of task assignment and reducing the complexity and uncertainty of engineering consulting project management. At the same time, task assignment based on employee portraits and task attribute information ensures the rationality and balance of task assignment. BRIEF DESCRIPTION OF THE DRAWINGS
[0011] The accompanying drawings, which are incorporated in and constitute a part of this specification, illustrate embodiments consistent with the present disclosure and, together with the description, serve to explain the principles of the present disclosure.
[0012] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, for ordinary technicians in this field, other drawings can be obtained based on these drawings without paying any creative labor.
[0013] Figure 1 is a flowchart of a task allocation method provided by an embodiment of the present disclosure; Figure 2 is a flow chart of another task allocation method provided by an embodiment of the present disclosure; Figure 3 is a structural diagram of a task allocation device provided by an embodiment of the present disclosure; Figure 4 It is a structural schematic diagram of an electronic device provided by an embodiment of the present disclosure. DETAILED DESCRIPTION
[0014] In order to more clearly understand the above-mentioned objectives, features and advantages of the present disclosure, the scheme of the present disclosure will be further described below. It should be noted that the embodiments of the present disclosure and the features in the embodiments can be combined with each other without conflict.
[0015] In the following description, many specific details are set forth to facilitate a full understanding of the present disclosure, but the present disclosure may also be implemented in other ways different from those described herein; it is obvious that the embodiments in the specification are only part of the embodiments of the present disclosure, rather than all of the embodiments.
[0016] It should be understood that the various steps described in the method embodiments of the present disclosure may be performed in different orders and / or in parallel. In addition, the method embodiments may include additional steps and / or omit the steps shown. The scope of the present disclosure is not limited in this respect.
[0017] It should be noted that, in this article, relational terms such as "first" and "second" are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device. In the absence of further restrictions, the elements defined by the sentence "comprise a ..." do not exclude the existence of other identical elements in the process, method, article or device including the elements.
[0018] It should be noted that the modifications of "one" and "plurality" mentioned in the present disclosure are illustrative rather than restrictive, and those skilled in the art should understand that unless otherwise clearly indicated in the context, it should be understood as "one or more".
[0019] Generally speaking, the traditional task allocation method is mainly allocated by the project manager or team leader based on experience, and different project managers or team leaders may adopt different allocation methods. Therefore, the traditional task allocation method is highly dependent on personal experience and intuition, and there are problems such as unreasonable or unbalanced task allocation, which affects the overall progress of the project and the problem of low allocation efficiency; at the same time, different project managers or team leaders have different task allocations, resulting in poor comparability and replicability between projects, which increases the complexity and uncertainty of project management. In response to this problem, the embodiment of the present disclosure provides a task allocation method, which is introduced in conjunction with a specific embodiment below.
[0020] Figure 1 It is a flowchart of a task allocation method provided by an embodiment of the present disclosure. The method can be executed by a task allocation device. The task allocation device can be implemented in software and / or hardware. The task allocation device can be configured in an electronic device, such as a server or a terminal, wherein the terminal specifically includes a mobile phone, a computer or a tablet computer, etc.
[0021] like Figure 1 As shown, the task allocation method provided in this embodiment includes the following steps.
[0022] S110. Obtain employee portraits.
[0023] In the embodiment of the present disclosure, the employees may be all employees in the enterprise, or may be some employees in the enterprise who are used to execute the engineering consulting project to be executed.
[0024] The employee portrait may include one or more of the employee's comprehensive ability label, skill label, skill score, comprehensive score, permanent work location, employee service evaluation, project experience, years of experience, educational background, etc.
[0025] Skill labels can be understood as labels used to characterize employees' skills, including skills they are good at, years of experience in the skill, and skill certificate information.
[0026] In some embodiments of the present disclosure, the electronic device may parse the task assignment instruction in response to the user's task assignment instruction and obtain the employee portrait from the task assignment instruction. The task assignment instruction may be generated by the user for a target operation to be performed on a certain engineering consulting project to be assigned, and the target operation may be a click operation on a button for the engineering consulting project task assignment.
[0027] In other embodiments of the present disclosure, the electronic device may parse the task assignment instruction in response to the user's task assignment instruction, obtain the employee's identification information from the task assignment instruction, and obtain the employee's portrait from a preset business database based on the identification information.
[0028] In some other embodiments of the present disclosure, the electronic device may parse the task assignment instruction in response to the user's task assignment instruction, obtain the employee's identification information from the task assignment instruction, obtain the employee's basic information from a preset database based on the employee's identification information, and generate an employee portrait of the employee using a preset portrait generation method based on the employee's basic information, wherein the preset portrait generation method may be any method that can generate an employee portrait and is not limited here.
[0029] S120: Obtain basic information of the engineering consulting project, and determine a set of standard subtasks corresponding to the engineering consulting project based on the basic information of the engineering consulting project.
[0030] In the disclosed embodiments, an engineering consulting project can be understood as an engineering consulting project to be task-decomposed and task-assigned. Specifically, an engineering consulting project can include an engineering cost consulting project, an engineering management audit project, an information-based cost consulting project, an engineering supervision and full-process engineering consulting project, an engineering financial consulting project, an engineering investment consulting project, etc., without limitation herein.
[0031] The basic information of an engineering consulting project can be understood as the specific description information of an engineering consulting project. Among them, the basic information of an engineering consulting project can include the objectives, scope and key node information of the engineering consulting project; it can also include the task requirement information corresponding to the engineering consulting project, such as the final output results of the engineering consulting project, the specific requirements of the engineering consulting project, etc.; it can also include the work location, working hours and other information corresponding to the engineering consulting project. The basic information of an engineering consulting project can be stored in the form of documents.
[0032] The standard subtask set includes at least one subtask and the name and skill requirements corresponding to each subtask, and may also include information such as the working time and working duration corresponding to the subtask.
[0033] In some embodiments of the present disclosure, the electronic device may parse the task assignment instruction in response to the user's task assignment instruction, and obtain basic information of the engineering consulting project from the task assignment instruction.
[0034] In other embodiments of the present disclosure, the electronic device may parse the task assignment instruction in response to the user's task assignment instruction, obtain identification information of the engineering consulting project from the task assignment instruction, and obtain basic information of the engineering consulting project from a preset database based on the identification information of the engineering consulting project.
[0035] Furthermore, after acquiring the basic information of the engineering consulting project, the electronic device analyzes the basic information of the engineering consulting project and determines a set of standard subtasks corresponding to the engineering consulting project according to the analysis result.
[0036] In some embodiments of the present disclosure, the electronic device can directly obtain a set of standard subtasks corresponding to the engineering consulting project from a preset database based on the basic information of the engineering consulting project, wherein the set of standard subtasks can be predetermined based on preset project standardization splitting rules and stored in the preset database.
[0037] In other embodiments of the present disclosure, the electronic device may perform task decomposition operations of the engineering consulting project based on basic information of the engineering consulting project and a task decomposition model to obtain a set of standard subtasks corresponding to the engineering consulting project.
[0038] It should be noted that in the embodiment of the present disclosure, the execution order of step S110 and step S120 is not limited, and step S110 and step S120 may be executed simultaneously, step S110 may be executed before step S120, or step S110 may be executed after step S120.
[0039] S130: Determine task attribute information corresponding to each subtask in the standard subtask set, where the task attribute information includes at least one of a priority level of the task, a difficulty level of the task, and an urgency level of the task.
[0040] In an embodiment of the present disclosure, after acquiring a set of standard subtasks, the electronic device can extract the time node information corresponding to each subtask (including the start time and end time of the task) and the task feature information corresponding to each subtask based on information such as the specific requirements of the engineering consulting project in the basic information of the engineering consulting project; and determine the task attribute information based on the time node information and task feature information corresponding to each subtask.
[0041] Exemplarily, the priority of tasks is determined based on the logical relationship between tasks, that is, the sequence of tasks; if the time interval between the start time of a subtask and the task allocation time is less than a preset time threshold, the urgency of the subtask is determined to be high; if the task feature information of a subtask is large and complex, such as the number of technical requirements is greater than a preset number threshold, and / or the task parameters are greater than a preset parameter threshold, then the difficulty level of the task is determined to be high.
[0042] S140. Input the employee portrait, standard subtask set and task attribute information into a preset machine learning model, and use the preset machine learning model to allocate each subtask in the standard subtask set to obtain a task allocation result.
[0043] In the embodiments of the present disclosure, the preset machine learning model can be understood as a pre-trained model for allocating tasks to subtasks corresponding to engineering consulting projects.
[0044] The task allocation result may include a subtask allocation result for each subtask, and may also include an overall task allocation result for all subtasks in the engineering consulting project.
[0045] The subtask assignment result may include at least one assigned person corresponding to each subtask, and may also include the working hours and estimated completion time of each assigned person to perform the subtask.
[0046] The overall task allocation result may include the target assigned personnel corresponding to each subtask, as well as the total working hours required to complete the engineering consulting project and the estimated completion time of the engineering consulting project when the target assigned personnel corresponding to each subtask executes the engineering consulting project.
[0047] Specifically, after the electronic device obtains the employee portrait and the standard subtask set and task attribute information corresponding to the engineering consulting project, the employee portrait, the standard subtask set and the task attribute information are input into a preset machine learning model, and the preset machine learning model allocates each subtask in the standard subtask set to obtain the task allocation result, and then obtains the task allocation result.
[0048] In the disclosed embodiment, by obtaining employee portraits and basic information of the engineering consulting project, a standard subtask set corresponding to the engineering consulting project can be determined based on the basic information of the engineering consulting project; task attribute information corresponding to each subtask in the standard subtask set is determined, the task attribute information including at least one of the priority of the task, the difficulty level of the task, and the urgency of the task, the employee portrait, the standard subtask set and the task attribute information are input into a preset machine learning model, and the preset machine learning model is used to allocate each subtask in the standard subtask set to obtain a task allocation result. As a result, tasks can be allocated through the preset machine learning model without relying on manual task allocation, thereby improving the efficiency of task allocation and reducing the complexity and uncertainty of engineering consulting project management. At the same time, task allocation based on employee portraits and task attribute information ensures the rationality and balance of task allocation.
[0049] In an embodiment of the present disclosure, before inputting the employee portrait and the standard subtask set into a preset machine learning model and assigning each subtask in the standard subtask set by the preset machine learning model, the task assignment method may also include: obtaining a preset machine learning model.
[0050] In some embodiments of the present disclosure, the electronic device can directly obtain and run the program corresponding to the preset machine learning model from the preset database.
[0051] In some other embodiments of the present disclosure, the electronic device may obtain a first training data set and a first labeling result corresponding to each first training data in the first training data set; for each first training data, the first training data is input into a machine learning model to be trained, and the machine learning model to be trained performs task assignment on the first training data to obtain a task assignment prediction result; a first loss value is determined based on the task assignment prediction result and the first labeling result; and a parameter of the machine learning model to be trained is adjusted based on the first loss value to obtain a trained machine learning model. The trained machine learning model is a preset machine learning model.
[0052] The first training data set may be employee portraits and subtasks corresponding to the engineering consulting project; and the first annotation result corresponding to the first training data may be a task allocation record corresponding to the engineering consulting project.
[0053] The machine learning model to be trained can be a large language model such as a GPT model, a BERT model, or any other model that can perform semantic analysis, without limitation herein.
[0054] Specifically, the electronic device can query from a preset database or obtain the first training data set and the first annotation result corresponding to each first training data in the first training data set from a preset website based on crawling. For each first training data, the first training data is input into the machine learning model to be trained, and the machine learning model to be trained performs task assignment on the first training data to obtain the task assignment prediction result, and then the task assignment prediction result and the first annotation result are input into the preset first loss function to calculate the loss value to obtain the first loss value, and then the parameters of the machine learning model to be trained are adjusted based on the first loss value to obtain a trained machine learning model. Among them, the preset first loss function can be a cross entropy loss function, a reordering loss function, etc., and different loss functions can be selected according to the actual application scenario.
[0055] In an embodiment of the present disclosure, a set of standard subtasks corresponding to an engineering consulting project is determined based on basic information of the engineering consulting project, which may specifically include: inputting the basic information of the engineering consulting project into a task decomposition model, performing task decomposition on the engineering consulting project by the task decomposition model, and obtaining a set of standard subtasks corresponding to the engineering consulting project.
[0056] The task decomposition model can be understood as a model for decomposing tasks in engineering consulting projects. The parameters of the task classification model can include task classification standards, solution strategies and logical reasoning rules.
[0057] The specific method for obtaining the task decomposition model may include: obtaining a second training data set and a second annotation result corresponding to each second training data in the second training data set; for each second training data, inputting the second training data into the task decomposition model to be trained, and the task decomposition model to be trained performs task assignment on the second training data to obtain a task decomposition result; determining a second loss value based on the task decomposition result and the second annotation result; adjusting the parameters of the machine learning model to be trained based on the second loss value to obtain a trained task decomposition model. The trained task decomposition model is the task decomposition model in the embodiment of the present disclosure.
[0058] The second training data set may be a document corresponding to an engineering consulting project; and the second annotation result corresponding to the second training data may be a task decomposition history record corresponding to the engineering consulting project.
[0059] The task decomposition model to be trained can be a large language model such as a GPT model, a BERT model, or any other model that can perform semantic analysis, and is not limited here.
[0060] Furthermore, the basic information of the engineering consulting project is input into the task decomposition model, and the task decomposition model is used to decompose the engineering consulting project to obtain a set of standard subtasks corresponding to the engineering consulting project. Specifically, the following may be included: the basic information of the engineering consulting project and preset project standardization splitting rules are input into the task decomposition model, and the task decomposition model is used to perform semantic analysis on the basic information of the engineering consulting project to obtain semantic analysis results; keywords corresponding to the engineering consulting project are extracted based on the semantic analysis results; at least one task type corresponding to the engineering consulting project, at least one subtask corresponding to each task type, and a hierarchical relationship between at least one subtask are determined based on the keywords and preset project standardization splitting rules; and a set of standard subtasks is obtained based on the hierarchical relationship.
[0061] The task type can be determined based on the service category of the engineering consulting project, and divided into different subtasks according to different service categories. It can also be determined based on the professional type of each project in the project. For example, it can include engineering cost consulting tasks, engineering financial consulting tasks, engineering design tasks, etc.
[0062] The preset standardized project splitting rules are project splitting rules pre-determined according to the workflows corresponding to different types of engineering consulting projects. For example, for the project settlement review project, the first-level splitting points including receiving materials, combing contracts, calculating quantities and pricing, on-site investigation, inquiries on major matters, communication and verification, and compilation of results are determined according to the workflow. Then, the second-level splitting points corresponding to each first-level splitting point are determined according to the workflow corresponding to each first-level splitting point. For example, for the first-level splitting point of calculating quantities and pricing, it can be divided into the second-level splitting points of calculating quantities, pricing, and summarizing and reviewing, and so on.
[0063] Among them, the task decomposition formula is: TD=f(P,M).
[0064] TD represents a set of standard subtasks; P represents a detailed description of an engineering consulting project, i.e., basic information about the project; and M represents various algorithms for task decomposition in the model.
[0065] In the disclosed embodiments, the task decomposition model can be used to decompose the engineering consulting project, thereby improving the accuracy and efficiency of the decomposition of the engineering consulting project. At the same time, a standard subtask set can be obtained based on the hierarchical relationship between the subtasks, and the dependency relationship between the subtasks can be determined, which facilitates the subsequent task allocation.
[0066] In an embodiment of the present disclosure, before inputting the employee portrait and the standard subtask set into a preset machine learning model, and the preset machine learning model assigns each subtask in the standard subtask set to obtain the task assignment result, the task assignment method may also include: determining the project label of the engineering consulting project based on the basic information of the engineering consulting project.
[0067] In some examples, the electronic device inputs the employee portrait and the standard subtask set into a preset machine learning model, and the preset machine learning model assigns each subtask in the standard subtask set. Before obtaining the task assignment result, the electronic device determines the project label of the engineering consulting project based on the basic information of the engineering consulting project.
[0068] The project tag can be understood as a tag used to characterize key information of the project. For example, the project tag can include one or more of a project location tag, a project time tag, a project equipment tag, and the like.
[0069] In some other examples, the electronic device inputs the employee portrait and the standard subtask set into a preset machine learning model, and the preset machine learning model assigns each subtask in the standard subtask set. Before obtaining the task assignment result, it determines the task attribute information corresponding to the subtask and determines the project label of the engineering consulting project based on the basic information of the engineering consulting project.
[0070] In some embodiments of the present disclosure, employee portraits and standard subtask sets are input into a preset machine learning model, and the preset machine learning model assigns each subtask in the standard subtask set to obtain a task assignment result, which may specifically include: inputting employee portraits, standard subtask sets, and task attribute information and / or project labels into a preset machine learning model, and the preset machine learning model assigns each subtask based on the employee portrait, the task attribute information and / or project labels corresponding to each subtask in the standard subtask set to obtain a task assignment result.
[0071] In the disclosed embodiment, the employee portrait includes the employee's skill label and the employee's skill score for the skill.
[0072] Specifically, the electronic device inputs the employee portrait, the standard subtask set, and the task attribute information and / or the project label into the preset machine learning model, and the preset machine learning model matches the skill label in the employee portrait with the skill requirements corresponding to the subtask, and determines at least one matching employee who meets the skill requirements of each subtask. Then, based on the task attribute information and / or the project label corresponding to each subtask, the target matching employee who meets the task attribute information and / or the project label is determined from at least one matching employee, and each subtask is assigned according to the target matching employee corresponding to each subtask to obtain a task assignment result.
[0073] In the disclosed embodiment, each subtask can be assigned according to task attribute information and / or project tags, combining the actual situation of each subtask and factors such as the project work location, thereby further improving the accuracy and rationality of task assignment.
[0074] In other embodiments of the present disclosure, before inputting the employee portrait and the standard subtask set into a preset machine learning model, and using the preset machine learning model to assign each subtask in the standard subtask set, and obtaining the task assignment result, the task assignment method may further include: obtaining the employee's working hours, available time periods, and resource information.
[0075] The available time period can be understood as the time period during which the employee is not assigned work or tasks.
[0076] Resource information includes equipment resource information, arrival status of required materials, etc.
[0077] Furthermore, the employee portrait and the standard subtask set are input into a preset machine learning model, and the preset machine learning model allocates each subtask in the standard subtask set to obtain a task allocation result, which may specifically include: inputting the employee portrait, employee working hours and available time periods, resource information, standard subtask set, preset weight parameters, and task attribute information and / or project labels into the preset machine learning model, and the preset machine learning model allocates each subtask based on the preset weight parameters to obtain a task allocation result.
[0078] The formula for task allocation is: TA=g(TD,R,S).
[0079] TA represents the task assignment result; TD represents the standard subtask set; R represents resource information; and S represents task attribute information.
[0080] In the disclosed embodiments, when allocating tasks, each subtask can be allocated in combination with employee time, that is, employee availability, resource availability, etc., and while considering the attributes of each subtask, employee and resource conditions are also taken into consideration, thereby avoiding excessive task allocation caused by overload of employees and equipment, and further improving the rationality and effectiveness of task allocation.
[0081] In the disclosed embodiment, before the electronic device allocates each subtask in the standard subtask set based on the preset machine learning model, it can also obtain a preset weight parameter, allocate each subtask in the standard subtask set based on the preset parameter weight and the preset machine learning model, and obtain a task allocation result. Thus, the accuracy and rationality of the task allocation result are further improved.
[0082] The preset weight parameters are weights of various factors used for subtask allocation in advance according to the characteristics of the engineering consulting project. The various factors may include one or more of the employee skill score, employee service evaluation, employee permanent work location, project experience, employee available time period, etc. in the employee portrait.
[0083] In the disclosed embodiment, after obtaining the task assignment result, the task assignment method may further include: optimizing the task assignment result based on a preset optimization algorithm to obtain a target assignment result. The preset optimization algorithm aims to minimize the total task completion time and maximize resource utilization corresponding to the engineering consulting project, and to meet the skill requirements corresponding to each task and the availability of employees as constraints.
[0084] The preset optimization algorithm may be integer linear programming, genetic algorithm, etc., which is not limited here.
[0085] In the disclosed embodiment, after obtaining the task allocation result, the task allocation result can be further optimized to ensure the deadline and efficiency of the subsequent engineering consulting project execution.
[0086] After obtaining the task allocation result or the target allocation result, the task allocation result or the target allocation result is fed back to the user and displayed in a visual manner so that the user can view it, or adjust it according to the actual situation, thereby improving the user experience.
[0087] Figure 2 is a flowchart of another task allocation method provided by an embodiment of the present disclosure, such as Figure 2 As shown, the task allocation method may include the following steps: S210. Obtain employee portraits.
[0088] S220. Obtain basic information of the engineering consulting project; input the basic information of the engineering consulting project into a task decomposition model, and use the task decomposition model to perform semantic analysis on the basic information of the engineering consulting project to obtain semantic analysis results; extract keywords corresponding to the engineering consulting project based on the semantic analysis results; determine at least one task type corresponding to the engineering consulting project, at least one subtask corresponding to each task type, and a hierarchical relationship between at least one subtask based on the keywords; and obtain a standard subtask set based on the hierarchical relationship.
[0089] S230: Determine at least one of the task attribute information, project label, employee's working hours and available time period, and resource information corresponding to each subtask in the standard subtask set.
[0090] S240. Input the employee portrait, the standard subtask set, and at least one of the task attribute information, project labels, employee working hours and available time periods, and resource information into a preset machine learning model, and use the preset machine learning model to assign each subtask to obtain a task assignment result.
[0091] S250: Feedback the task assignment result to the user and display it.
[0092] It should be noted that the specific implementation of steps S210-S250 is similar to the implementation of the relevant steps in the above-mentioned embodiment of the present disclosure, and will not be repeated here.
[0093] In the disclosed embodiments, big model technology can be introduced during task assignment to achieve automatic decomposition and automatic assignment of tasks corresponding to engineering consulting projects, without relying on manual task assignment, thereby improving task assignment efficiency and reducing the complexity and uncertainty of engineering consulting project management. At the same time, task assignment is performed based on information such as employee portraits, task attribute information, project labels, employee working hours and available time periods, and resource information, further improving the rationality and balance of task assignment.
[0094] Figure 3 It is a structural diagram of a task allocation device provided in an embodiment of the present disclosure.
[0095] In the disclosed embodiment, the task allocation device can be arranged in an electronic device, and is understood as a part of the functional modules in the electronic device. Specifically, the electronic device can be a server or a terminal, wherein the terminal specifically includes a mobile phone, a computer or a tablet computer, etc., which is not limited here.
[0096] like Figure 3 As shown, the task allocation device 300 may include a first acquisition module 310 , a second acquisition module 320 , an attribute information determination module 330 and a task allocation module 340 .
[0097] The first acquisition module 310 can be used to acquire employee portraits.
[0098] The second acquisition module 320 may be used to acquire basic information of the engineering consulting project, and determine a set of standard subtasks corresponding to the engineering consulting project based on the basic information of the engineering consulting project.
[0099] The attribute information determination module 330 may be used to determine the task attribute information corresponding to each subtask in the standard subtask set, where the task attribute information includes at least one of the priority of the task, the difficulty level of the task, and the urgency of the task; The task assignment module 340 can be used to input employee portraits, standard subtask sets and task attribute information into a preset machine learning model, and the preset machine learning model assigns each subtask in the standard subtask set to obtain a task assignment result.
[0100] In the disclosed embodiment, by obtaining employee portraits and basic information of the engineering consulting project, a standard subtask set corresponding to the engineering consulting project can be determined based on the basic information of the engineering consulting project; task attribute information corresponding to each subtask in the standard subtask set is determined, the task attribute information including at least one of the priority of the task, the difficulty level of the task, and the urgency of the task, the employee portrait, the standard subtask set and the task attribute information are input into a preset machine learning model, and the preset machine learning model is used to allocate each subtask in the standard subtask set to obtain a task allocation result. As a result, tasks can be allocated through the preset machine learning model without relying on manual task allocation, thereby improving the efficiency of task allocation and reducing the complexity and uncertainty of engineering consulting project management. At the same time, task allocation based on employee portraits and task attribute information ensures the rationality and balance of task allocation.
[0101] In some embodiments of the present disclosure, the second acquisition module 320 may be specifically used to input basic information of the engineering consulting project into a task decomposition model, and the task decomposition model may be used to decompose the engineering consulting project to obtain a set of standard subtasks corresponding to the engineering consulting project.
[0102] In some embodiments of the present disclosure, the second acquisition module 320 can also be specifically used to input the basic information of the engineering consulting project and the preset project standardized splitting rules into the task decomposition model, and the task decomposition model performs semantic analysis on the basic information of the engineering consulting project to obtain semantic analysis results; extract keywords corresponding to the engineering consulting project based on the semantic analysis results; determine at least one task type corresponding to the engineering consulting project, at least one subtask corresponding to each task type, and the hierarchical relationship between at least one subtask based on the keywords and the preset project standardized splitting rules; and obtain a standard subtask set based on the hierarchical relationship.
[0103] In some embodiments of the present disclosure, the attribute information determination module can also be used to input the employee portrait, standard subtask set and task attribute information into a preset machine learning model, and the preset machine learning model assigns each subtask in the standard subtask set to obtain the task assignment result, and then determine the project label of the engineering consulting project based on the basic information of the engineering consulting project.
[0104] In some embodiments of the present disclosure, the task assignment module 340 can be specifically used to input employee portraits, standard subtask sets, task attribute information and project labels into a preset machine learning model, and the preset machine learning model assigns each subtask based on the employee portrait, the task attribute information and project labels corresponding to each subtask in the standard subtask set to obtain a task assignment result.
[0105] In some embodiments of the present disclosure, the task allocation device 300 may further include a task allocation optimization module.
[0106] The task allocation optimization module can be used to optimize the task allocation results based on the preset optimization algorithm after obtaining the task allocation results to obtain the target allocation results. The preset optimization algorithm aims to minimize the total completion time of the tasks corresponding to the engineering consulting project and maximize the resource utilization rate, and to meet the skill requirements corresponding to each task and the availability of employees as constraints.
[0107] It should be noted that Figure 3 The task allocation device 300 shown can execute each step in the above method embodiment and realize each process and effect in the above method embodiment, which will not be described in detail here.
[0108] Figure 4 It is a structural schematic diagram of an electronic device provided by an embodiment of the present disclosure.
[0109] In the disclosed embodiment, Figure 4 The electronic device shown may be a server or a terminal, wherein the terminal specifically includes a mobile phone, a computer or a tablet computer, etc., which is not limited here.
[0110] like Figure 4 As shown, the electronic device may include a processor 410 and a memory 420 storing computer program instructions.
[0111] Specifically, the processor 410 may include a central processing unit (CPU), or an application specific integrated circuit (ASIC), or may be configured to implement one or more integrated circuits of the embodiments of the present disclosure.
[0112] The memory 420 may include a large capacity memory for information or instructions. By way of example and not limitation, the memory 420 may include a hard disk drive (HDD), a floppy disk drive, a flash memory, an optical disk, a magneto-optical disk, a tape, or a universal serial bus (USB) drive or a combination of two or more of these. Where appropriate, the memory 420 may include a removable or non-removable (or fixed) medium. Where appropriate, the memory 420 may be inside or outside the integrated gateway device. In a particular embodiment, the memory 420 is a non-volatile solid-state memory. In a particular embodiment, the memory 420 includes a read-only memory (ROM). Where appropriate, the ROM may be a mask-programmed ROM, a programmable ROM (PROM), an erasable PROM (EPROM), an electrically erasable PROM (Electrically Erasable Programmable ROM, EEPROM), an electrically rewritable ROM (EAROM) or a flash memory, or a combination of two or more of these.
[0113] The processor 410 reads and executes the computer program instructions stored in the memory 420 to perform the steps of the task allocation method provided in the embodiment of the present disclosure.
[0114] In one example, the electronic device may further include a transceiver 430 and a bus 440. Figure 4 As shown, the processor 410, the memory 420 and the transceiver 430 are connected via a bus 440 and communicate with each other.
[0115] The bus 440 includes hardware, software, or both. For example, but not limitation, the bus may include an Accelerated Graphics Port (AGP) or other graphics bus, an Extended Industry Standard Architecture (EISA) bus, a Front Side Bus (FSB), a Hyper Transport (HT) interconnect, an Industrial Standard Architecture (ISA) bus, an InfiniBand interconnect, a Low Pin Count (LPC) bus, a Memory bus, a MicroChannel Architecture (MCA) bus, a Peripheral Component Interconnect (PCI) bus, a PCI-Express (PCI-X) bus, a Serial Advanced Technology Attachment (SATA) bus, a Video Electronics Standards Association Local Bus (VLB) bus, or other suitable buses or a combination of two or more of these. Where appropriate, the bus 440 may include one or more buses.
[0116] The embodiment of the present disclosure further provides a computer-readable storage medium, which may store a computer program. When the computer program is executed by a processor, the processor implements the task allocation method provided by the embodiment of the present disclosure.
[0117] The above-mentioned storage medium may, for example, include a memory 420 of computer program instructions, and the above-mentioned instructions may be executed by the processor 410 of the electronic device to complete the task allocation method provided by the embodiment of the present disclosure. Optionally, the storage medium may be a non-temporary computer-readable storage medium, for example, the non-temporary computer-readable storage medium may be a ROM, a random access memory (Random Access Memory, RAM), a compact disc read-only memory (Compact Disc ROM, CD-ROM), a magnetic tape, a floppy disk, an optical data storage device, etc.
[0118] The above description is only a specific embodiment of the present disclosure, so that those skilled in the art can understand or implement the present disclosure. Various modifications to these embodiments will be apparent to those skilled in the art, and the general principles defined herein may be implemented in other embodiments without departing from the spirit or scope of the present disclosure. Therefore, the present disclosure will not be limited to the embodiments described herein, but will conform to the widest scope consistent with the principles and novel features disclosed herein.
Claims
1. A task allocation method, characterized in that: include: Obtain employee portraits; Acquire basic information of the engineering consulting project, and determine a set of standard subtasks corresponding to the engineering consulting project based on the basic information of the engineering consulting project; Determining task attribute information corresponding to each subtask in the standard subtask set, wherein the task attribute information includes at least one of a priority level of the task, a difficulty level of the task, and an urgency level of the task; The employee portrait, the standard subtask set and the task attribute information are input into a preset machine learning model, and the preset machine learning model is used to allocate each subtask in the standard subtask set to obtain a task allocation result.
2. The method according to claim 1, characterized in that The step of determining a set of standard subtasks corresponding to the engineering consulting project based on the basic information of the engineering consulting project includes: The basic information of the engineering consulting project is input into a task decomposition model, and the task decomposition model is used to decompose the engineering consulting project to obtain a set of standard subtasks corresponding to the engineering consulting project.
3. The method according to claim 2, characterized in that The basic information of the engineering consulting project is input into the task decomposition model, and the task decomposition model is used to decompose the engineering consulting project to obtain a set of standard subtasks corresponding to the engineering consulting project, including: The basic information of the engineering consulting project and the preset project standardization splitting rules are input into the task decomposition model, and the task decomposition model performs semantic analysis on the basic information of the engineering consulting project to obtain semantic analysis results; based on the semantic analysis results, keywords corresponding to the engineering consulting project are extracted; based on the keywords and the preset project standardization splitting rules, at least one task type corresponding to the engineering consulting project, at least one subtask corresponding to each task type, and a hierarchical relationship between at least one subtask are determined; and the standard subtask set is obtained based on the hierarchical relationship.
4. The method according to claim 1, characterized in that: Before inputting the employee portrait, the standard subtask set, and the task attribute information into a preset machine learning model, and using the preset machine learning model to allocate each subtask in the standard subtask set to obtain a task allocation result, the method further includes: A project label of the engineering consulting project is determined based on the basic information of the engineering consulting project.
5. The method according to claim 4, characterized in that The employee portrait, the standard subtask set and the task attribute information are input into a preset machine learning model, and the preset machine learning model is used to allocate each subtask in the standard subtask set to obtain a task allocation result, including: The employee portrait, the standard subtask set, the task attribute information and the project label are input into the preset machine learning model, and the preset machine learning model assigns each subtask based on the employee portrait, the task attribute information corresponding to each subtask in the standard subtask set and the project label to obtain the task assignment result.
6. The method according to claim 1, characterized in that After obtaining the task allocation result, the method further includes: The task allocation result is optimized based on a preset optimization algorithm to obtain a target allocation result. The preset optimization algorithm aims to minimize the total time for completing the tasks corresponding to the engineering consulting project and maximize resource utilization, and takes meeting the skill requirements corresponding to each task and the availability of employees as constraints.
7. A task allocation device, characterized in that: include: The first acquisition module is used to obtain employee portraits; A second acquisition module is used to acquire basic information of an engineering consulting project, and determine a set of standard subtasks corresponding to the engineering consulting project based on the basic information of the engineering consulting project; An attribute information determination module, used to determine task attribute information corresponding to each subtask in the standard subtask set, wherein the task attribute information includes at least one of a priority level of the task, a difficulty level of the task, and an urgency level of the task; The task assignment module is used to input the employee portrait, the standard subtask set and the task attribute information into a preset machine learning model, and the preset machine learning model assigns each subtask in the standard subtask set to obtain a task assignment result.
8. An electronic device, characterized in that: include: processor; A memory for storing executable instructions; The processor is used to read the executable instructions from the memory and execute the executable instructions to implement the task allocation method described in any one of claims 1 to 6.
9. A computer-readable storage medium, characterized in that: The storage medium stores a computer program, and when the computer program is executed by a processor, the processor implements the task allocation method according to any one of claims 1 to 6.
Citation Information
Patent Citations
Task distribution method and device for financial system, electronic equipment and storage medium
CN109919417A
Task allocation method and device, equipment and storage medium
CN116187675A
Method for decomposing early-stage decision consultation task of complex engineering project
CN116205578A
Task allocation method and device, computer equipment and storage medium
CN116542781A
Consultation work order classification method and device, electronic equipment and storage medium
CN117034949A
Cited By
Task allocation method for flexible employment
CN119443611A
