Attention degree prediction method and device, electronic equipment, storage medium and product

By obtaining the historical time series data and attention behavior information of e-commerce platform objects, and combining multiple factors for prediction, the problem of poor prediction accuracy in the existing technology is solved, and the accuracy and effectiveness of the attention level information are improved.

CN118798949APending Publication Date: 2024-10-18BEIJING JINGDONG TUOXIAN TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410777769.8
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-06-17
Publication Date
2024-10-18

AI Technical Summary

Technical Problem

When predicting the future attention of an e-commerce platform object, the existing technology only considers the sales situation, resulting in poor accuracy of prediction results and a lack of comprehensive consideration of multiple factors.

Method used

By obtaining the historical time series data and attention behavior information of the object to be predicted, the attention tendency value and attention degree information are determined, and predictions are made based on multiple factors, including the application of outlier processing, integrated learning models and time series prediction models.

Benefits of technology

It improves the accuracy and validity of the information on the degree of attention, takes into account the influence of the behavioral factors of the interested party on the trend, and enhances the reliability of the prediction results.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118798949A_ABST
    Figure CN118798949A_ABST
Patent Text Reader

Abstract

The embodiment of the invention discloses an attention degree prediction method and device, electronic equipment, a storage medium and a product. The method comprises the following steps: acquiring concerned time sequence data and concerned behavior information corresponding to a to-be-predicted object in a historical time period; based on the attention behavior information, determining an attention tendency value corresponding to the to-be-predicted object in the prediction time period; determining concerned degree information of the to-be-predicted object in the prediction time period based on the concerned tendency value and the concerned time sequence data; wherein the concerned time sequence data comprises concerned data of the to-be-predicted object at each time sequence time node of a historical time period; the attention behavior information comprises attention behavior data of each attention party on the to-be-predicted object. According to the technical scheme provided by the embodiment of the invention, the concerned degree information can be determined in combination with multiple factors, and the accuracy and effectiveness of the determined concerned degree information can be improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] Embodiments of the present invention relate to the field of computer technology, and in particular, to a method, device, electronic device, storage medium and product for predicting the degree of attention. Background Art

[0002] With the rapid development of e-commerce, more and more users choose to consume online. In order to better meet the needs of users, it is necessary to predict the degree of attention of objects on the e-commerce platform in the future time period.

[0003] In the prior art, the degree of attention of an object in a future time period is usually predicted based on the sales of the object in a historical time period. However, in the process of implementing the present invention, it is found that the prior art has at least the following technical problems: the degree of attention of an object is predicted by only considering the sales situation, and the factors considered are relatively single, resulting in poor accuracy of the prediction result of the degree of attention. Summary of the invention

[0004] The embodiments of the present invention provide a method, device, electronic device, storage medium and product for predicting the degree of attention, so as to achieve the purpose of improving the accuracy and effectiveness of the determined degree of attention information.

[0005] According to one aspect of the present invention, a method for predicting the degree of attention is provided, comprising:

[0006] Obtain the concerned time series data and concerned behavior information corresponding to the object to be predicted in the historical time period;

[0007] Based on the attention behavior information, determine the attention tendency value corresponding to the object to be predicted in the prediction time period;

[0008] Based on the attention tendency value and the attention time series data, determine the attention level information of the object to be predicted in the prediction time period;

[0009] The concerned time series data includes concerned data of each time series time node of the object to be predicted in the historical time period; the concerned behavior information includes the concerned behavior data of each concerned party on the object to be predicted.

[0010] According to another aspect of the present invention, there is provided a device for predicting the degree of attention, the device comprising:

[0011] An information acquisition module is used to obtain the concerned time series data and concerned behavior information corresponding to the object to be predicted in the historical time period;

[0012] A module for determining an attention tendency value, for determining an attention tendency value corresponding to the object to be predicted in the prediction time period based on the attention behavior information;

[0013] The attention degree information determination module is used to determine the attention degree information of the object to be predicted in the prediction time period based on the attention tendency value and the attention time series data;

[0014] The concerned time series data includes concerned data of each time series time node of the object to be predicted in the historical time period; the concerned behavior information includes the concerned behavior data of each concerned party on the object to be predicted.

[0015] According to another aspect of the present invention, an electronic device is provided, the electronic device comprising:

[0016] at least one processor; and

[0017] a memory communicatively connected to at least one processor; wherein,

[0018] The memory stores a computer program that can be executed by at least one processor. The computer program is executed by at least one processor so that the at least one processor can execute the method for predicting the degree of attention of any embodiment of the present invention.

[0019] According to another aspect of the present invention, a computer-readable storage medium is provided, wherein the computer-readable storage medium stores computer instructions, and the computer instructions are used to enable a processor to implement the method for predicting the degree of attention of any embodiment of the present invention when executed.

[0020] According to another aspect of the present invention, a computer program product is provided, including a computer program, and when the computer program is executed by a processor, the computer program implements the method for predicting the degree of attention of any embodiment of the present invention.

[0021] The technical solution of the embodiment of the present invention obtains the corresponding time series data of attention and attention behavior information of the object to be predicted in the historical time period; the acquired attention behavior information can reflect the attention behavior data of each concerned party to the object to be predicted, and based on the attention behavior information, determines the corresponding attention tendency value of the object to be predicted in the prediction time period, so that in combination with the attention behavior data of the concerned party, the attention tendency value is determined, so that when determining the attention degree information through the attention tendency value and the time series data of attention, not only the attention situation of the object to be predicted in the historical time period is taken into account, but also the influence of the behavioral factors of the concerned party on the attention trend is taken into account, so that the attention degree information is determined by combining multiple factors, which is conducive to improving the accuracy and effectiveness of the determined attention degree information.

[0022] It should be understood that the contents described in this section are not intended to identify the key or important features of the embodiments of the present invention, nor are they intended to limit the scope of the present invention. Other features of the present invention will become easily understood through the following description. BRIEF DESCRIPTION OF THE DRAWINGS

[0023] In order to more clearly illustrate the technical solutions in the embodiments of the present invention, the following briefly introduces the drawings required for use in the description of the embodiments. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work.

[0024] Figure 1 is a flow chart of a method for predicting the degree of attention provided according to an embodiment of the present invention;

[0025] Figure 2 is a flowchart of another method for predicting the degree of attention provided by an embodiment of the present invention;

[0026] Figure 3 is a flowchart of another method for predicting the degree of attention provided according to an embodiment of the present invention;

[0027] Figure 4 is a flowchart of a process for sorting items to be predicted provided according to an embodiment of the present invention;

[0028] Figure 5 is a schematic diagram of determining attention trend information provided according to an embodiment of the present invention;

[0029] Figure 6 is a schematic diagram of another method for determining attention trend information provided according to an embodiment of the present invention;

[0030] Figure 7 is a schematic diagram of another method for determining attention trend information provided according to an embodiment of the present invention;

[0031] Figure 8 is a structural schematic diagram of a device for predicting the degree of attention provided according to an embodiment of the present invention;

[0032] Fig. 9 It is a schematic diagram of the structure of an electronic device for implementing the method for predicting the degree of attention of an embodiment of the present invention. DETAILED DESCRIPTION

[0033] In order to enable those skilled in the art to better understand the scheme of the present invention, the technical scheme in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work should fall within the scope of protection of the present invention.

[0034] It should be noted that the terms "first", "second", etc. in the specification and claims of the present invention and the above-mentioned drawings are used to distinguish similar objects, and are not necessarily used to describe a specific order or sequence. It should be understood that the data used in this way can be interchanged where appropriate, so that the embodiments of the present invention described herein can be implemented in an order other than those illustrated or described herein. In addition, the terms "including" and "etc." and any variations thereof are intended to cover non-exclusive inclusions, for example, a process, method, system, product or device that includes a series of steps or units is not necessarily limited to those steps or units that are clearly listed, but may include other steps or units that are not clearly listed or inherent to these processes, methods, products or devices.

[0035] It should be noted that the collection, collection, updating, analysis, processing, use, transmission, storage and other aspects of user personal information involved in the technical solution of this disclosure are in compliance with the provisions of relevant laws and regulations, are used for legitimate purposes, and do not violate public order and good morals. Necessary measures are taken for user personal information to prevent illegal access to user personal information data and maintain the security of user personal information and network security.

[0036] Before introducing the technical solution, an example explanation of the application scenario can be given. The technical solution can be applied to the scenario of predicting the degree of attention information of the object to be predicted in the prediction time period. Exemplarily, the technical solution can be applied to the field of online shopping, and the object to be predicted can be the displayed items and / or item categories of the online shopping platform; or, the technical solution can also be applied to the field of video playback, and the object to be predicted can be the displayed video resources and / or video resource categories. Based on the solution of this embodiment, the degree of attention information of the object to be predicted can be determined in combination with the factors of the object to be predicted itself and the user behavior factors, which is conducive to improving the accuracy and effectiveness of the determined degree of attention information.

[0037] Figure 1 This is a flowchart of a method for predicting the degree of attention provided by an embodiment of the present invention. This embodiment is applicable to the case of predicting the degree of attention information of the predicted object, and the method can be executed by a device for predicting the degree of attention, which can be implemented in the form of hardware and / or software.

[0038] like Figure 1 As shown, the method of this embodiment may specifically include:

[0039] S110: Obtain the concerned time series data and concerned behavior information corresponding to the object to be predicted in the historical time period.

[0040] The object to be predicted is the object for which the attention is predicted, and the object to be predicted is different in different application fields. For example, in the field of online shopping, the object to be predicted can be a display item displayed on an online shopping platform, or a display item category, that is, this embodiment can predict the attention of an item, and can also predict the attention of an item category.

[0041] In this embodiment, the concerned time series data includes concerned data of each time series time node of the object to be predicted in the historical time period. Specifically, the concerned data may include data such as the number of concerns and the attention duration of the concern operation on the object to be predicted. Exemplarily, in an online shopping scenario, the concern operation may include at least one of browsing, clicking, collecting, and adding to purchase on the displayed items. In a video playback scenario, the concern operation may include at least one of clicking, collecting, and playing on the displayed video resources.

[0042] In a specific implementation, the historical time period can be divided into multiple time series nodes, and the concerned time series data is composed of the concerned data corresponding to each time series node. Exemplarily, the historical time period can be the past month, the past three months, or the past year, and the time series node can be a day. Taking the historical time period as one month as an example, the concerned time series data can be composed of the total number of times or total duration of the object to be predicted being concerned every day in the past month. Through the concerned time series data, the corresponding relationship between different time series nodes and the concerned data can be reflected.

[0043] In a specific implementation, the attention behavior information of the object to be predicted in the historical time period can also be obtained. Among them, the attention behavior information includes the attention behavior data of each attention party on the object to be predicted. The attention party can be the object that performs attention operations on the object to be predicted, and the attention behavior data includes the number of attention operations of the attention party on the object to be predicted in the historical time period, the attention operation duration, etc.

[0044] In a specific implementation, the concerned time series data and attention behavior information corresponding to the object to be predicted in the historical time period can be counted based on the pre-stored attention operation records of the object to be predicted. Exemplarily, the attention operation record records the attention duration and attention party information of each time the object to be predicted is paid attention to in the historical time period. By counting the total number of attentions or the total attention duration of the object to be predicted at each time series time node in the historical time period in the attention operation record, the concerned time series data is determined; based on the attention party information, the number of attentions or attention duration of each attention party to the object to be predicted in the attention operation record is determined as the attention behavior information corresponding to each attention party.

[0045] In order to ensure the validity and integrity of the acquired time series data of interest, before determining the interest tendency value corresponding to the object to be predicted in the prediction time period based on the attention behavior information, it also includes: determining the outliers in the time series data of interest, performing outlier processing on the outliers, and updating the time series data of interest based on the processed data obtained.

[0046] Among them, outliers may include outliers and / or missing values.

[0047] In a specific implementation, outliers in the concerned time series data may be determined, and outliers may be processed as an exception. Optionally, the specific implementation method of determining outliers in the concerned time series data includes: determining missing values ​​in the concerned time series data, and performing data interpolation processing on the missing values. For example, data interpolation may be performed on the missing values ​​by filling in zeros; or, the average value between adjacent values ​​adjacent to the missing value may be determined, and data interpolation processing may be performed on the missing values ​​based on the average value.

[0048] In this embodiment, the data obtained after the exception processing can be used as the updated time series data of interest to ensure the data integrity and validity of the updated time series data of interest, so as to determine the degree of interest of the object to be predicted based on the time series data of interest.

[0049] In this embodiment, the specific implementation method of determining the abnormal value in the concerned time series data may also be: determining the outlier value in the concerned time series data based on the outlier detection technology.

[0050] Among them, the outlier value is the data value whose numerical difference with other values ​​in the concerned time series data is greater than the preset difference value. Since the numerical difference between the outlier value and other values ​​in the concerned time series data is large, it cannot accurately reflect the attention of the object to be predicted in the historical time period, and affects the validity of the concerned time series data. Therefore, the outlier value can be treated as an abnormal value and abnormal processing can be performed.

[0051] Specifically, the outlier detection technology includes at least one of an outlier detection technology based on statistical distribution, an outlier detection technology based on distance, a density-based local outlier detection, and an outlier detection technology based on deviation.

[0052] In this embodiment, outlier detection technology is used to determine outliers in the concerned time series data, delete outliers, determine replacement values ​​of outliers corresponding to outliers, insert replacement values ​​into corresponding outliers in the concerned time series data, and update the obtained data to the concerned time series data. The replacement value of the outlier can be determined by determining the average value between the values ​​of the points adjacent to the outlier, and determining the average value as the replacement value of the outlier.

[0053] In this embodiment, outlier detection technology can be used to quickly determine outliers in the time series data of interest. The time series data of interest is updated using data obtained after processing the outliers, which helps to improve the accuracy of the time series data of interest.

[0054] S120: Based on the attention behavior information, determine the attention tendency value corresponding to the object to be predicted in the prediction time period.

[0055] The attention tendency value is used to reflect the possibility of each attention party paying attention to the predicted object in the prediction time period. The prediction time period can be a certain day, a certain week or a certain month in the future.

[0056] In a specific implementation, the attention behavior information may be the number of attention operations performed by each concerned party on the predicted object in a historical time period. Specifically, the average value of the number of attention operations performed by each concerned party on the predicted object in a historical time period may be determined, and the average value may be determined as the attention tendency value of the predicted object in the predicted time period. Alternatively, based on the attention behavior information, the method of determining the attention tendency value corresponding to the predicted object in the predicted time period includes: inputting the attention behavior information into a pre-trained integrated learning model; and determining the attention tendency value of the predicted object in the predicted time period based on the output value of the integrated learning model.

[0057] The integrated learning model includes a gradient boosting tree model and / or a random forest model.

[0058] In order to quickly determine the attention tendency value of the object to be predicted, an integrated learning model can be pre-trained. By inputting the attention behavior information into the pre-trained integrated learning model, the output value of the integrated learning model is obtained, and the output value is determined as the attention tendency value of the object to be predicted in the prediction time period.

[0059] In this embodiment, the pre-trained integrated learning model can be used to quickly and accurately determine the concerned tendency value; and the trained integrated learning model can be used to determine the concerned tendency value for different objects to be predicted multiple times, thereby improving the convenience of determining the concerned tendency value.

[0060] S130: Determine the attention level information of the object to be predicted in the prediction time period based on the attention tendency value and the attention time series data.

[0061] The attention level information is used to reflect the number of times and / or duration of attention paid to the object to be predicted in the prediction time period.

[0062] In a specific implementation, a machine learning model can be pre-trained, and based on the trained machine learning model, the attention tendency value and the attention time series data, the attention degree information of the object to be predicted in the prediction time period can be determined. Alternatively, a mathematical model can be constructed based on the attention tendency value, and based on the attention time series data and the constructed data model, the attention degree information of the object to be predicted in the prediction time period can be determined.

[0063] The technical solution of the embodiment of the present invention obtains the corresponding time series data of attention and attention behavior information of the object to be predicted in the historical time period; the acquired attention behavior information can reflect the attention behavior data of each concerned party to the object to be predicted, and based on the attention behavior information, determines the corresponding attention tendency value of the object to be predicted in the prediction time period, so that in combination with the attention behavior data of the concerned party, the attention tendency value is determined, so that when determining the attention degree information through the attention tendency value and the time series data of attention, not only the attention situation of the object to be predicted in the historical time period is taken into account, but also the influence of the behavioral factors of the concerned party on the attention trend is taken into account, so that the attention degree information is determined by combining multiple factors, which is conducive to improving the accuracy and effectiveness of the determined attention degree information.

[0064] Figure 2 It is a flowchart of another method for predicting the degree of attention provided by an embodiment of the present invention. Based on the above-mentioned embodiment, the method for determining the degree of attention information of the object to be predicted in the prediction time period can be: determining the time series prediction model corresponding to the object to be predicted based on the attention tendency value; determining the degree of attention information of the object to be predicted in the prediction time period based on the time series data of attention and the time series prediction model. Among them, the explanation of the terms that are the same or corresponding to the above-mentioned embodiments will not be repeated here. Figure 2 As shown, the method includes:

[0065] S210: Obtain the concerned time series data and concerned behavior information corresponding to the object to be predicted in the historical time period.

[0066] S220: Based on the attention behavior information, determine the attention tendency value corresponding to the object to be predicted in the prediction time period.

[0067] S230: Determine a time series prediction model corresponding to the object to be predicted based on the concerned tendency value and the concerned time series data.

[0068] The time series prediction model may reflect the corresponding relationship between each time node and the degree of attention information of the object to be predicted. Exemplarily, the time series prediction model may include at least one of an autoregressive difference moving average model, a time series Prophet model, and a seasonal index model.

[0069] In a specific implementation, each component item in the time series prediction model can be determined based on the concerned tendency value and the concerned time series data, and the time series prediction model can be composed based on each component item.

[0070] In this embodiment, the time series prediction model may be a time series Prophet model; the method of determining the time series prediction model corresponding to the object to be predicted may include: based on the time series data of interest, determining the original components in the time series Prophet model; wherein the original components include trend items, cycle items, holiday items, and error items; taking the product of the tendency value of interest and the trend item as the tendency item of interest; and updating the time series Prophet model corresponding to the object to be predicted based on the tendency item of interest, the cycle item, the holiday item, and the error item.

[0071] Among them, the trend term is used to represent the trend changes of non-periodic nature in the time series data of interest, such as: overall rising and falling trends; the cycle term represents the data with periodic changes in the time series data of interest; the holiday term is used to fit the impact of special time nodes in the time series data of interest on the data, such as: holidays and activity days, etc.; the error term is used to fit the random fluctuations in the time series data of interest.

[0072] In a specific implementation, the concerned time series data can be subjected to data fitting operations according to the sub-models corresponding to different original components to obtain trend items, period items, holiday items and error items in the time series Prophet model. Exemplarily, the sub-model corresponding to the trend item can include a linear sub-model and a nonlinear sub-model, and the data fitting operations can be performed according to the sub-models based on the concerned time series data to obtain the trend item. The sub-model corresponding to the period item can be a Fourier series sub-model.

[0073] In order to reflect the influence of the behavior factors of the concerned party on the degree of attention paid to the predicted object in the time series Prophet model, the time series Prophet model can be updated based on the attention tendency value. Specifically, the product of the attention tendency value and the trend term is used as the attention tendency term, and the model obtained by adding the attention tendency term, the cycle term, the holiday term and the error term is updated to the time series Prophet model corresponding to the predicted object.

[0074] In this embodiment, the product of the attention tendency value and the trend term is used as the attention tendency term, and the attention tendency term constitutes a time series Prophet model. Therefore, the time series Prophet model not only reflects the impact of the object to be predicted's own factors on the degree of attention, but also reflects the impact of the behavioral factors of the concerned party on the degree of attention, thereby improving the accuracy of the prediction results of the time series Prophet model.

[0075] In order to make the time series Prophet model more comprehensive and improve the accuracy of the determined degree of attention information, the method also includes: generating autoregressive terms corresponding to the object to be predicted based on the concerned time series data and a pre-built network autoregressive model; updating the time series Prophet model corresponding to the object to be predicted based on the concerned tendency terms, periodic terms, holiday terms and error terms, including: updating the time series Prophet model corresponding to the object to be predicted based on the autoregressive terms, the concerned tendency terms, periodic terms, holiday terms and error terms.

[0076] Among them, the autoregressive term is used to analyze the correlation between a dependent variable series and another or more independent variable series by using the time series of a variable as the dependent variable series and the time series of the same variable shifted several periods in the past as the independent variable series. The autoregressive term can be used to fit the autocorrelation relationship in the time series data of interest.

[0077] In this embodiment, the network autoregressive model (Autoregressive Network, AR-Net) is a neural network model for time series prediction, which is equivalent to imitating the structure of deep learning on the basis of traditional autoregression, adding several hidden layers to enhance the fitting ability of nonlinear relationships. The network autoregressive model includes at least one fully connected layer and at least one hidden layer.

[0078] In a specific implementation, the network autoregressive model can be trained with the concerned time series data, and the trained model can be used as the autoregressive term. The autoregressive term reflects the autocorrelation relationship in the concerned time series data. When determining the time series Prophet model, the model obtained by adding the concerned tendency term, cycle term, holiday term, error term and autoregressive term is updated to the time series Prophet model corresponding to the object to be predicted.

[0079] In this embodiment, the updated time series Prophet model includes an autoregressive term, so that when the time series Prophet model predicts the degree of attention information, it can be combined with the autocorrelation of the time series data of the object to be predicted, which is beneficial to improving the accuracy of determining the degree of attention information.

[0080] S240: Determine the attention level information of the object to be predicted in the prediction time period based on the time series prediction model.

[0081] In a specific implementation, the time series prediction model can reflect the corresponding relationship between each time node and the attention level information of the object to be predicted. By taking the time period to be predicted as input information, the output value of the time series prediction model is determined as the attention level information of the object to be predicted in the prediction time period.

[0082] In this embodiment, the attention level information is determined by constructing a time series prediction model. When determining the attention level information, the two factors of attention behavior information and attention time series data are combined. That is, both the behavioral factors of the concerned party and the inherent factors of the object to be predicted are taken into account at the same time, which is conducive to more accurately determining the attention level information of the object to be predicted in the prediction time period.

[0083] In order to enable the user terminal to timely understand the degree of attention of the object to be predicted in the future prediction time period, so as to make corresponding processing in time based on the degree of attention, the method provided in this embodiment also includes: in response to determining the degree of attention information of each object to be predicted among multiple objects to be predicted, sorting each object to be predicted based on the degree of attention of each attention degree information, and sending the sorted sequence to the target terminal; wherein the target terminal includes an operation terminal and / or a supply chain terminal.

[0084] Specifically, the attention level information corresponding to the object to be predicted can be sent to the target terminal, so that the target terminal can understand the attention level of the object to be predicted in the future prediction time period. In the case of multiple objects to be predicted, in order to facilitate comparison and analysis by the staff, the objects to be predicted can be sorted based on the attention level information, and the sorted sequence can be sent to the target terminal.

[0085] Exemplarily, in an online shopping scenario, the attention level information may be the number of times the object to be predicted has been paid attention to in the prediction time period. The greater the number of times the object has been paid attention to, the higher the attention level of the attention level information; otherwise, the lower the attention level of the attention level information. The corresponding objects to be predicted may be sorted in descending order of the number of times the object has been paid attention to, and the obtained sorting may be sent to the target terminal. Alternatively, the attention level information may be the length of time the object to be predicted has been paid attention to in the prediction time period. The longer the number of times the object has been paid attention to, the higher the attention level of the attention level information; otherwise, the lower the attention level of the attention level information. The corresponding objects to be predicted may be sorted in descending order of the length of time the object has been paid attention to, and the obtained sorting may be sent to the target terminal.

[0086] In this embodiment, the target terminal includes an operation terminal and / or a supply chain terminal. When the target terminal is an operation terminal, after receiving the ranking, the operation terminal can display the information of the object to be predicted according to the ranking, so that the operation personnel can understand the degree of attention of each object to be predicted during the prediction period, and predetermine the operation and maintenance plan of the object to be predicted according to the degree of attention of different objects to be predicted. When the target terminal is a supply chain terminal, the supply chain personnel can understand the degree of attention of each object to be predicted through the ranking displayed by the supply chain terminal, so as to provide corresponding supply chain guarantee for the object to be predicted.

[0087] This embodiment sorts the objects to be predicted based on the attention level information and sends the sequence to the target terminal, so that the operation and maintenance personnel and / or supply chain personnel can understand the attention level of the objects to be predicted and predetermine the corresponding processing methods, thereby providing work convenience for the operation and maintenance personnel and / or supply chain personnel.

[0088] Figure 3 It is a flowchart of another method for predicting the degree of attention provided by an embodiment of the present invention. Based on the above embodiment, before determining the attention tendency value corresponding to the object to be predicted in the prediction time period, it also includes: determining the attention trend information corresponding to the object to be predicted based on the attention time series data; when the object to be predicted meets the preset trend requirements, determining the attention tendency value corresponding to the object to be predicted in the prediction time period. Among them, the explanations of the terms that are the same or corresponding to the above embodiments are not repeated here. Figure 3 As shown, the method includes:

[0089] S310: Obtain the concerned time series data and concerned behavior information corresponding to the object to be predicted in the historical time period.

[0090] The above describes in detail the embodiments corresponding to the method for predicting the degree of attention. In order to make the technical solution of the method more clear to those skilled in the art, the following describes it in combination with the online shopping application scenario. Figure 4 As shown in the figure, in the online shopping application scenario, the object to be predicted is the item to be predicted displayed on the online shopping platform; the time series data of attention and attention behavior information of the item to be predicted are obtained. The time series data to be paid attention to is preprocessed, and the preprocessing operation includes filling missing values ​​and removing outliers. The time series data to be paid attention to can be the time series data of the number of clicks, the time series data of the number of views, and the time series data of the number of purchases of the item to be predicted.

[0091] S320: Determine the attention trend information corresponding to the object to be predicted based on the concerned time series data.

[0092] The attention trend information is used to reflect the changes in the attention data of the object to be predicted at different time nodes. Exemplarily, the attention trend information includes at least one of an upward trend, a downward trend, a pulse upward trend, a pulse downward trend and a stable trend.

[0093] Specifically, fitting can be performed based on the node data corresponding to each time series time node in the historical time period of the concerned time series data, and the trend corresponding to the curve obtained by fitting is determined as the concerned trend information of the object to be predicted.

[0094] S330: In response to determining that the object to be predicted meets a preset trend requirement based on the attention trend information, determine a corresponding attention tendency value of the object to be predicted in the prediction time period based on the attention behavior information.

[0095] It should be noted that the preset trend requirement can be set according to the actual application requirements. For example, if in actual application, it is necessary to determine the predicted object with a higher degree of attention in the prediction time period to ensure the supply of the predicted object in the prediction time period, the preset trend requirement can be set as follows: the attention trend information corresponding to the predicted object is an upward trend or a pulse upward trend; if in actual application, it is necessary to determine the predicted object with a lower degree of attention in the prediction time period in order to pre-set an operation plan and increase the degree of attention to the predicted object, the preset trend requirement can be set as follows: the attention trend information corresponding to the predicted object is a downward trend or a pulse downward trend.

[0096] like Figure 4 In practical applications, in order to prepare stocks in advance, when it is necessary to determine the predicted items with more browsing, clicking or purchasing times, the preset trend requirement can be set as follows: the concerned trend information corresponding to the predicted object is an upward trend or a pulse upward trend. The predicted items are screened based on the preset trend requirement.

[0097] In a specific implementation, for an object to be predicted that meets the preset trend requirements, the concerned tendency value of the object to be predicted can be further determined to more specifically and clearly determine the degree of concern of the object to be predicted. For an object to be predicted that does not meet the preset trend requirements, it is not necessary to further determine the concerned tendency value, thereby reducing the amount of calculation.

[0098] In the online shopping application scenario, for the items to be predicted that meet the preset trend requirements, the attention tendency value corresponding to the items to be predicted is determined by combining the attention behavior information and the time series data of the items being paid attention to.

[0099] S340: Determine the attention level information of the object to be predicted in the prediction time period based on the attention tendency value and the attention time series data.

[0100] Specifically, based on the attention tendency value and the attention time series data, a time series prediction model corresponding to the item to be predicted is determined; based on the time series prediction model, the attention level information of the item to be predicted in the prediction time period is determined.

[0101] Furthermore, the attention tendency item, cycle item, holiday item and error item in the time series forecasting model can be disassembled to determine the attention level of the predicted items under the influence of different factors such as trends, seasonality and holidays in the forecasting period, and combined with year-on-year and month-on-month analysis methods, determine the predicted items with a rapid growth in attention level. Specifically, the weights corresponding to the year-on-year analysis method and the month-on-month analysis method can be determined in advance, and the year-on-year analysis results and the month-on-month analysis results can be combined for weighted combination to determine the growth of attention level.

[0102] In this embodiment, the method for determining the degree of attention of the predicted item under the influence of different factors such as trends, seasonality and holidays can also be: based on the time series data of attention and the STL (Seasonal and Trend decomposition using Loess) time series decomposition method, determine the degree of attention corresponding to different factors.

[0103] This embodiment determines the attention trend information of the object to be predicted, so that when there are multiple objects to be predicted, the objects to be predicted that meet the preset trend requirements are screened out to determine the attention tendency value, thereby reducing the workload in determining the attention tendency value.

[0104] Figure 5 1 is a schematic diagram of determining attention trend information according to an embodiment of the present invention. Based on the above embodiments, attention trend information can be determined by establishing at least one trend classification model corresponding to the object to be predicted. The explanations of the terms that are the same or corresponding to the above embodiments are not repeated here. Figure 5 As shown, the method includes:

[0105] S410: Based on the concerned time series data, establish at least one trend classification model corresponding to the object to be predicted.

[0106] The trend classification model includes at least one of an ascending model, a descending model, a steady model, a pulse ascending model and a pulse descending model; Figure 4 As shown, the trend classification model is used to simulate at least one of an upward trend, a downward trend, a pulse upward trend, a stable trend and a pulse downward trend. The pulse upward model is a sine function model, the pulse downward model is a cosine function model, and the upward model, the downward model and the stable model are linear function models.

[0107] It should be noted that both the sine function model and the cosine function model can simulate different continuous trends by adjusting parameters such as amplitude, frequency and period, and the linear function model can simulate different continuous trends by adjusting the slope.

[0108] Specifically, the formula corresponding to the sine function model can be:

[0109] y1=a1sin(b1×t+c1)+d1

[0110] Among them, y1 represents the output of the sine function model, t represents the time variable; a1 represents the amplitude parameter corresponding to the sine function model, b1 represents the period parameter corresponding to the sine function model, c1 represents the initial phase parameter corresponding to the sine function model, and d1 represents the upper and lower offset parameters corresponding to the sine function model.

[0111] The formula corresponding to the cosine function model can be:

[0112] y2=a2sin(b2×t+c2)+d2

[0113] Among them, y2 represents the output of the cosine function model, t represents the time variable; a2 represents the amplitude parameter corresponding to the cosine function model, b2 represents the period parameter corresponding to the cosine function model, c2 represents the initial phase parameter corresponding to the cosine function model, and d2 represents the upper and lower offset parameters corresponding to the cosine function model.

[0114] In a specific implementation, the parameters in the trend classification model can be determined based on the data corresponding to each time series time node in the time series data being concerned. In order to reduce the amount of calculation and improve the convenience of determining the trend classification model, the parameters in the trend classification model can also be determined based on the data corresponding to some time series time nodes in the time series data being concerned. Specifically, based on the time series data being concerned, establishing at least one trend classification model corresponding to the object to be predicted includes: determining the maximum concern value and the minimum concern value in the time series data being concerned, and establishing at least one trend classification model corresponding to the object to be predicted based on the maximum concern value and the minimum concern value.

[0115] In a specific implementation, the maximum and minimum values ​​of interest in the time series data of interest can be determined, and based on the maximum and minimum values ​​of interest in the time series data of interest, the parameters in the trend classification model can be determined. It should be noted that a1 and a2 are determined in the same way, and d1 and d2 are determined in the same way. Taking the sine function model as an example, the determination method of a1 and d1 can be:

[0116]

[0117] Wherein, x represents the time series data of interest. max(x) is the maximum value of interest, and min(x) is the minimum value of interest. In this embodiment, b1 and b2 are determined in the same way, and c1 and c2 are determined in the same way. Taking the sine function model as an example, the determination method of b1 and c1 can be:

[0118]

[0119] It should be noted that for the linear function model, the ratio between the maximum attention value and the minimum attention value can be determined as the slope, and the upper and lower offset parameters of the linear function model can be determined based on any value in the concerned time series data and the time series time node corresponding to the value.

[0120] This embodiment determines the parameters corresponding to the trend classification model through the maximum and minimum concern values ​​in the concerned time series data, without the need for all the concerned time series data. Therefore, a trend classification model can still be generated for concerned time series data with a small amount of data, thereby reducing the amount of calculation for generating the trend classification model and improving the convenience of generating the trend classification model.

[0121] S420: Determine the similarity between the trend data corresponding to each trend classification model and the concerned time series data respectively, and determine the concerned trend information based on the obtained similarities.

[0122] In this embodiment, after the trend classification model is constructed, the degree of similarity between the trend data corresponding to each trend classification model and the concerned time series data can be determined. It should be noted that the trend data corresponding to the trend classification model can be understood as the data of the trend curve corresponding to the trend classification model. For example, if the trend classification model is a sine function model, the trend data corresponding to the sine function model is the data corresponding to the change of the sine function curve over time.

[0123] In a specific implementation, the similarity between the trend data and the concerned time series data can be determined by means of Euclidean distance algorithm, dynamic time warping algorithm, dynamic time bending algorithm and correlation coefficient algorithm. The model trend information of the trend classification model corresponding to the greatest similarity can be determined as the concerned trend information. For example, if the similarity corresponding to the trend data of the rising model is the greatest, the concerned trend information is determined as the rising trend.

[0124] Figure 6 It is a schematic diagram of another method for determining trend information of interest provided according to an embodiment of the present invention. On the basis of the aforementioned embodiment, the implementation method for determining the degree of similarity between the trend data corresponding to each trend classification model and the concerned time series data includes: determining the first cumulative distance between the trend data and the concerned time series data based on a dynamic time warping algorithm, determining the degree of similarity between the trend data and the concerned time series data based on the first cumulative distance, and determining the trend information of interest based on the degree of similarity. The explanations of the terms that are the same as or corresponding to the aforementioned embodiments are not repeated here. Figure 6 As shown, the method includes:

[0125] S510: Based on the concerned time series data, establish at least one trend classification model corresponding to the object to be predicted.

[0126] S520. For the trend data corresponding to each trend classification model, the first cumulative distance between the trend data and the concerned time series data is determined based on the dynamic time warping algorithm, and the degree of similarity between the trend data and the concerned time series data is determined based on the first cumulative distance, and the concerned trend information is determined based on the obtained degrees of similarity.

[0127] It should be noted that the dynamic time warping algorithm is an algorithm for comparing the similarity of time series. It can automatically distort the time series to make the shapes of the two sequences as consistent as possible. It finds the best matching path between the two sequences through dynamic programming and calculates the cumulative distance between the elements on the path to obtain the maximum possible similarity.

[0128] For example, assuming that two time series are represented as X = {x1, x2, ..., xn} and Y = {y1, y2, ..., yn}, their cumulative cost matrix D(i, j) can be expressed as:

[0129] D(i,j)=Dist(i,j)+min[D(i-1,j),D(i,j-1),D(i-1,j-1)]

[0130] Dist(i,j)=|x i -y j |

[0131] Where i represents the node position on the time series X, j represents the node position on the time series Y; Dist(i,j) represents the Manhattan distance between sequence X and sequence Y at position i and position j. min represents the minimum value operation. Furthermore, in order to quickly determine the degree of similarity, FastDTW (Fast Dynamic Time Warping) can be used to determine the first cumulative distance.

[0132] In this embodiment, the first cumulative distance can be determined by the dynamic time warping algorithm. The smaller the first cumulative distance, the higher the similarity between the trend data and the concerned time series data; the larger the first cumulative distance, the lower the similarity between the trend data and the concerned time series data.

[0133] Exemplarily, the similarity can be a specific ratio value, or can be divided into different levels. For example, when the similarity is a specific ratio, it can be set as the inverse of the first cumulative distance; when the similarity is divided according to the level, the first cumulative distance can be divided into at least one of large, general and small, and the similarity can be divided into at least one of low, medium and high. When the first cumulative distance is general, the similarity can be determined to be medium; when the first cumulative distance is large, the similarity can be low.

[0134] In this embodiment, the similarity degree is determined by a dynamic time warping algorithm, thereby improving the efficiency of the process of determining the similarity degree.

[0135] In this embodiment, the concerned time series data includes operation time series data corresponding to at least one concerned operation; the concerned operation includes at least one operation of clicking, browsing, collecting and placing an order. On the basis of the above-mentioned embodiment, at least one trend classification sub-model can be established for each concerned operation, and the trend classification model is composed of at least one trend classification sub-model corresponding to the concerned operation; for the trend sub-data corresponding to each trend classification sub-model, the second cumulative distance between the trend sub-data and the corresponding operation time series data is determined; based on the second cumulative distance, the first cumulative distance is determined. For a detailed description of the determination process of the concerned trend information, please refer to Figure 7 , ways to determine trend information include:

[0136] S1. For each operation time series data corresponding to each operation of interest, at least one trend classification sub-model corresponding to the object to be predicted is established based on the operation time series data.

[0137] The trend classification model is composed of trend classification sub-models corresponding to at least one focus operation.

[0138] It should be noted that the concerned time series data may include at least one operation time series data corresponding to the concerned operation. Exemplarily, when the concerned operation includes a click operation and an order operation, the concerned time series data includes click operation time series data corresponding to the click operation, and order operation time series data corresponding to the order operation. The click operation time series data is the number of clicks on the object to be predicted at each time series time node in the historical time period; the order operation time series data is the number of orders placed on the object to be predicted at each time series time node in the historical time period.

[0139] When determining the trend classification model, for each operation of interest, a trend classification sub-model can be constructed based on the operation timing data corresponding to the operation of interest. The trend classification sub-model may include at least one of a rising sub-model, a falling sub-model, a stable sub-model, a pulse rising sub-model and a pulse falling sub-model; the pulse rising sub-model is a sine function model, the pulse falling sub-model is a cosine function model, and the rising sub-model, the falling sub-model and the stable sub-model are linear function models. It should be noted that the specific method of establishing the trend classification sub-model can refer to the above-mentioned method of establishing the sine function model, the cosine function model and the linear function model, which will not be repeated here.

[0140] S2. For the trend sub-data corresponding to each trend classification sub-model, determine the second cumulative distance between the trend sub-data and the corresponding operation time series data based on the dynamic time warping algorithm.

[0141] The trend data is composed of trend sub-data corresponding to at least one trend classification sub-model.

[0142] In this embodiment, the trend classification model is composed of at least one trend classification sub-model corresponding to the operation of interest. When determining the first cumulative distance, the second cumulative distance between the trend sub-data corresponding to the trend classification sub-model and the corresponding operation time series data can be determined based on the dynamic time warping algorithm. Exemplarily, for a click operation, the distance between the trend sub-data corresponding to the click operation and the click operation time series data can be determined based on the dynamic time warping algorithm as the second cumulative distance.

[0143] S3. Determine a first cumulative distance between the trend data and the concerned time series data based on each second cumulative distance.

[0144] In a specific implementation, the first cumulative distance may be determined based on the second cumulative distance by: determining the average value of the second cumulative distances corresponding to each focus operation as the first cumulative distance; or determining the maximum or minimum value of the second cumulative distances as the first cumulative distance; or alternatively, determining the sum of the second cumulative distances as the first cumulative distance.

[0145] S4. Determine the degree of similarity between the first accumulated distance and the concerned time series data based on the first accumulated distance, and determine the concerned trend information based on the degree of similarity.

[0146] This embodiment takes into account the influence of different attention operations when determining the first cumulative distance, and determines the first cumulative distance based on the second cumulative distance corresponding to each attention operation, which is conducive to improving the effectiveness of determining the first cumulative distance.

[0147] Furthermore, in order to improve the accuracy of the determined first cumulative distance, before determining the first cumulative distance between the trend data and the time series data of interest based on each second cumulative distance, it also includes: determining the operation weight corresponding to each trend sub-data based on each operation time series data and the principal component analysis method; wherein, determining the first cumulative distance between the trend data and the time series data of interest based on each second cumulative distance includes: for each trend data, performing a weighted sum operation on the operation weight of each trend sub-data corresponding to the trend data and the corresponding second cumulative distance, and determining the obtained sum as the first cumulative distance between the trend data and the time series data of interest.

[0148] Specifically, for each operation of interest, the corresponding operation time series data can be analyzed based on the principal components analysis (PCA) method to determine the operation weight of the trend sub-data corresponding to the operation of interest. The operation weight is used to reflect the degree of influence of the operation time series data corresponding to the operation of interest on the time series data of interest.

[0149] Furthermore, in order to facilitate calculation and comparison, the determined operation weight may be normalized, and the operation weight may be updated based on the value obtained after the normalization.

[0150] In order to explain the method of determining the first cumulative distance more clearly and in detail, the trend classification model includes an ascending model and a descending model, and the concerned operations include clicks and orders. Correspondingly, the trend data includes ascending data and descending data. Since the concerned operations include two operations, clicks and orders, the trend sub-data includes click ascending sub-data, click descending sub-data, order ascending sub-data, and order descending sub-data; among which, click ascending sub-data and order ascending sub-data correspond to ascending data; click descending sub-data and order descending sub-data correspond to descending data.

[0151] Specifically, when determining the first cumulative distance between the rising data and the concerned time series data, based on the first operation weight corresponding to the click operation and the second operation weight corresponding to the order operation, the second cumulative distance between the click rising sub-data and the click operation time series data, and the second cumulative distance between the order rising sub-data and the order operation time series data are weighted and summed, and the sum value is determined as the first cumulative distance between the rising data and the concerned time series data. Similarly, when determining the first cumulative distance between the falling data and the concerned time series data, the second cumulative distance between the click falling sub-data and the click operation time series data, and the second cumulative distance between the order falling sub-data and the order operation time series data can be weighted and summed based on the first operation weight and the second operation weight, and the sum value is determined as the first cumulative distance between the falling data and the concerned time series data.

[0152] This embodiment determines the operation weight through principal component analysis, thereby improving the accuracy of the determined operation weight; and, uses the operation weight to determine the first cumulative distance, combining the degree of influence of the operation time series data corresponding to the focus operation on the focused time series data, which is beneficial to improving the accuracy of the determined first cumulative distance.

[0153] Figure 8 1 is a schematic diagram of the structure of a device for predicting the degree of attention provided according to an embodiment of the present invention, and the device is used to execute the method for predicting the degree of attention provided by any of the above embodiments. The device and the method for predicting the degree of attention of the above embodiments belong to the same inventive concept, and the details not described in detail in the embodiment of the device for predicting the degree of attention can refer to the embodiment of the method for predicting the degree of attention. Figure 8 As shown, the device comprises:

[0154] The information acquisition module 10 is used to obtain the concerned time series data and concerned behavior information corresponding to the object to be predicted in the historical time period;

[0155] The attention tendency value determination module 11 is used to determine the attention tendency value corresponding to the object to be predicted in the prediction time period based on the attention behavior information;

[0156] The attention level information determination module 12 is used to determine the attention level information of the object to be predicted in the prediction time period based on the attention tendency value and the attention time series data;

[0157] The concerned time series data includes concerned data of each time series time node of the object to be predicted in the historical time period; the concerned behavior information includes the concerned behavior data of each concerned party on the object to be predicted.

[0158] Based on any optional technical solution in the embodiments of the present invention, optionally, the device further includes:

[0159] The attention trend information determination module is used to determine the attention trend information corresponding to the object to be predicted based on the concerned time series data before determining the concerned tendency value corresponding to the object to be predicted in the prediction time period; wherein the attention trend information is used to reflect the change of the concerned data of the object to be predicted at different time nodes;

[0160] The module 11 for determining the attention tendency value includes:

[0161] The concerned tendency value determination submodule is used to determine the concerned tendency value corresponding to the object to be predicted in the prediction time period based on the concerned behavior information in response to determining that the object to be predicted meets the preset trend requirement based on the concerned trend information.

[0162] Based on any optional technical solution in the embodiments of the present invention, optionally, the module for determining the trend information includes:

[0163] A trend classification model establishment submodule, used to establish at least one trend classification model corresponding to the object to be predicted based on the concerned time series data;

[0164] A similarity determination submodule is used to determine the similarity between the trend data corresponding to each trend classification model and the concerned time series data, and determine the concerned trend information based on the obtained similarities;

[0165] Among them, the trend classification model includes at least one of an ascending model, a descending model, a stable model, a pulse ascending model and a pulse descending model; the pulse ascending model is a sine function model, the pulse descending model is a cosine function model, and the ascending model, the descending model and the stable model are linear function models.

[0166] Based on any optional technical solution in the embodiments of the present invention, optionally, the trend classification model establishment submodule includes:

[0167] A focus value determination unit, used to determine the maximum focus value and the minimum focus value in the focused time series data;

[0168] The model building unit is used to build at least one trend classification model corresponding to the object to be predicted based on the maximum concern value and the minimum concern value.

[0169] Based on any optional technical solution in the embodiments of the present invention, optionally, the similarity determination submodule includes:

[0170] A similarity determination unit is used to determine, for each trend data corresponding to each trend classification model, a first cumulative distance between the trend data and the concerned time series data based on a dynamic time warping algorithm, and to determine the similarity between the trend data and the concerned time series data based on the first cumulative distance.

[0171] On the basis of any optional technical solution in the embodiment of the present invention, optionally, the concerned time series data includes operation time series data corresponding to at least one concerned operation; the concerned operation includes at least one operation of clicking, browsing, collecting and placing an order;

[0172] The trend classification model building submodule includes:

[0173] A trend classification sub-model establishment unit is used to establish at least one trend classification sub-model corresponding to the object to be predicted based on the operation time series data corresponding to each operation of interest; the trend classification model is composed of the trend classification sub-model corresponding to at least one operation of interest;

[0174] The similarity determination unit comprises:

[0175] a second cumulative distance determination subunit, for determining, for each trend sub-data corresponding to each trend classification sub-model, a second cumulative distance between the trend sub-data and the corresponding operation time series data based on a dynamic time warping algorithm; wherein the trend data is composed of trend sub-data corresponding to at least one trend classification sub-model;

[0176] The first cumulative distance determination subunit is used to determine the first cumulative distance between the trend data and the concerned time series data based on each second cumulative distance.

[0177] Based on any optional technical solution in the embodiments of the present invention, optionally, the following further includes:

[0178] an operation weight determination subunit, used to determine the operation weight corresponding to each trend sub-data based on each operation time series data and the principal component analysis method before determining the first cumulative distance between the trend data and the concerned time series data based on each second cumulative distance;

[0179] The first cumulative distance determination subunit is specifically used to perform a weighted sum operation on the operation weight of each trend sub-data corresponding to the trend data and the corresponding second cumulative distance for each trend data, and determine the obtained sum as the first cumulative distance between the trend data and the concerned time series data.

[0180] Based on any optional technical solution in the embodiment of the present invention, optionally, the concerned tendency value determining module 11 includes:

[0181] The attention behavior information input submodule is used to input the attention behavior information into the pre-trained integrated learning model, and determine the attention tendency value of the object to be predicted in the prediction time period based on the output value of the integrated learning model;

[0182] The integrated learning model includes a gradient boosting tree model and / or a random forest model.

[0183] Based on any optional technical solution in the embodiments of the present invention, optionally, the following further includes:

[0184] The outlier determination module is used to determine the outliers in the concerned time series data before determining the concerned tendency value corresponding to the object to be predicted in the prediction time period based on the concerned behavior information, perform abnormal processing on the outliers, and update the concerned time series data based on the processed data.

[0185] Based on any optional technical solution in the embodiments of the present invention, optionally, the outlier determination module includes:

[0186] The outlier determination module is used to determine the outliers in the concerned time series data based on the outlier detection technology.

[0187] Based on any optional technical solution in the embodiment of the present invention, optionally, the attention degree information determination module 12 includes:

[0188] A time series prediction model determination submodule, used to determine a time series prediction model corresponding to the object to be predicted based on the concerned tendency value and the concerned time series data;

[0189] The attention level information determination submodule is used to determine the attention level information of the object to be predicted in the prediction time period based on the time series prediction model.

[0190] Based on any optional technical solution in the embodiments of the present invention, optionally, the time series prediction model includes a time series Prophet model;

[0191] The time series prediction model determines the submodule, including:

[0192] The original component item determination unit is used to determine the original component items in the time series Prophet model based on the concerned time series data; wherein the original component items include trend items, cycle items, holiday items and error items;

[0193] A focus tendency item determination unit, used for taking the product of the focus tendency value and the trend item as the focus tendency item;

[0194] The model updating unit is used to update the time series Prophet model corresponding to the object to be predicted based on the trend item, cycle item, holiday item and error item.

[0195] Based on any optional technical solution in the embodiments of the present invention, optionally, the following further includes:

[0196] An autoregressive term generating unit, used for generating an autoregressive term corresponding to an object to be predicted based on the concerned time series data and a pre-built network autoregressive model;

[0197] Model update unit, including:

[0198] The model updating subunit is used to update the time series Prophet model corresponding to the object to be predicted based on the autoregressive term, the attention tendency term, the periodic term, the holiday term and the error term.

[0199] Based on any optional technical solution in the embodiments of the present invention, optionally, the following further includes:

[0200] An object sorting module, configured to sort the objects to be predicted based on the attention level of each attention level information in response to determining the attention level information of each object to be predicted among the multiple objects to be predicted, and send the sorted sequence to the target terminal;

[0201] Among them, the target terminals include operation terminals and / or supply chain terminals.

[0202] The technical solution of the embodiment of the present invention obtains the corresponding time series data of attention and attention behavior information of the object to be predicted in the historical time period; the acquired attention behavior information can reflect the attention behavior data of each concerned party to the object to be predicted, and based on the attention behavior information, determines the corresponding attention tendency value of the object to be predicted in the prediction time period, so that in combination with the attention behavior data of the concerned party, the attention tendency value is determined, so that when determining the attention degree information through the attention tendency value and the time series data of attention, not only the attention situation of the object to be predicted in the historical time period is taken into account, but also the influence of the behavioral factors of the concerned party on the attention trend is taken into account, so that the attention degree information is determined by combining multiple factors, which is conducive to improving the accuracy and effectiveness of the determined attention degree information.

[0203] It is worth noting that in the above-mentioned embodiment of the attention degree prediction device, the various units and modules included are only divided according to functional logic, but are not limited to the above-mentioned division, as long as the corresponding functions can be achieved; in addition, the specific names of the functional units are only for the convenience of distinguishing each other, and are not used to limit the scope of protection of the present invention.

[0204] Fig. 9 : is a schematic diagram of the structure of an electronic device that implements the method for predicting the degree of attention of an embodiment of the present invention. The electronic device is intended to represent various forms of digital computers, such as laptop computers, desktop computers, workbenches, personal digital assistants, servers, blade servers, mainframe computers, and other suitable computers. The electronic device can also represent various forms of mobile devices, such as personal digital processing, cellular phones, smart phones, wearable devices (such as helmets, glasses, watches, etc.) and other similar computing devices. The components shown herein, their connections and relationships, and their functions are merely examples and are not intended to limit the implementation of the present invention described and / or required herein.

[0205] like Fig. 9 As shown, the electronic device 20 includes at least one processor 21, and a memory connected to the at least one processor 21, such as a read-only memory (ROM) 22, a random access memory (RAM) 23, etc., wherein the memory stores a computer program that can be executed by at least one processor, and the processor 21 can perform various appropriate actions and processes according to the computer program stored in the read-only memory (ROM) 22 or the computer program loaded from the storage unit 28 to the random access memory (RAM) 23. In RAM23, various programs and data required for the operation of the electronic device 20 can also be stored. The processor 21, ROM22 and RAM23 are connected to each other through a bus 24. An input / output (I / O) interface 25 is also connected to the bus 24.

[0206] A number of components in the electronic device 20 are connected to the I / O interface 25, including: an input unit 26, such as a keyboard, a mouse, etc.; an output unit 27, such as various types of displays, speakers, etc.; a storage unit 28, such as a disk, an optical disk, etc.; and a communication unit 29, such as a network card, a modem, a wireless communication transceiver, etc. The communication unit 29 allows the electronic device 20 to exchange information / data with other devices through a computer network such as the Internet and / or various telecommunication networks.

[0207] The processor 21 may be a variety of general and / or special processing components with processing and computing capabilities. Some examples of the processor 21 include, but are not limited to, a central processing unit (CPU), a graphics processing unit (GPU), various special artificial intelligence (AI) computing chips, various processors running machine learning model algorithms, a digital signal processor (DSP), and any appropriate processor, controller, microcontroller, etc. The processor 21 executes the various methods and processes described above, such as the method for predicting the degree of attention.

[0208] In some embodiments, the method for predicting the degree of attention may be implemented as a computer program, which is tangibly contained in a computer-readable storage medium, such as a storage unit 28. In some embodiments, part or all of the computer program may be loaded and / or installed on the electronic device 20 via the ROM 22 and / or the communication unit 29. When the computer program is loaded into the RAM 23 and executed by the processor 21, one or more steps of the method for predicting the degree of attention described above may be performed. Alternatively, in other embodiments, the processor 21 may be configured to execute the method for predicting the degree of attention by any other appropriate means (e.g., by means of firmware).

[0209] Various implementations of the systems and techniques described above herein can be implemented in digital electronic circuit systems, integrated circuit systems, field programmable gate arrays (FPGAs), application specific integrated circuits (ASICs), application specific standard products (ASSPs), systems on chips (SOCs), load programmable logic devices (CPLDs), computer hardware, firmware, software, and / or combinations thereof. These various implementations can include: being implemented in one or more computer programs that can be executed and / or interpreted on a programmable system including at least one programmable processor, which can be a special purpose or general purpose programmable processor that can receive data and instructions from a storage system, at least one input device, and at least one output device, and transmit data and instructions to the storage system, the at least one input device, and the at least one output device.

[0210] Computer programs for implementing the methods of the present invention may be written in any combination of one or more programming languages. These computer programs may be provided to a processor of a general-purpose computer, a special-purpose computer, or other programmable data processing device, so that when the computer program is executed by the processor, the functions / operations specified in the flow chart and / or block diagram are implemented. The computer program may be executed entirely on the machine, partially on the machine, partially on the machine and partially on a remote machine as a stand-alone software package, or entirely on a remote machine or server.

[0211] In the context of the present invention, a computer-readable storage medium may be a tangible medium that may contain or store a computer program for use by or in combination with an instruction execution system, device or equipment. A computer-readable storage medium may include, but is not limited to, electronic, magnetic, optical, electromagnetic, infrared, or semiconductor systems, devices or equipment, or any suitable combination of the foregoing. Alternatively, a computer-readable storage medium may be a machine-readable signal medium. A more specific example of a machine-readable storage medium may include an electrical connection based on one or more lines, a portable computer disk, a hard disk, a random access memory (RAM), a read-only memory (ROM), an erasable programmable read-only memory (EPROM or flash memory), an optical fiber, a portable compact disk read-only memory (CD-ROM), an optical storage device, a magnetic storage device, or any suitable combination of the foregoing.

[0212] To provide interaction with a user, the systems and techniques described herein may be implemented on an electronic device having: a display device (e.g., a CRT (cathode ray tube) or LCD (liquid crystal display) monitor) for displaying information to the user; and a keyboard and a pointing device (e.g., a mouse or trackball) through which the user can provide input to the electronic device. Other types of devices may also be used to provide interaction with the user; for example, the feedback provided to the user may be any form of sensory feedback (e.g., visual feedback, auditory feedback, or tactile feedback); and input from the user may be received in any form (including acoustic input, voice input, or tactile input).

[0213] The systems and techniques described herein may be implemented in a computing system that includes backend components (e.g., as a data server), or a computing system that includes middleware components (e.g., an application server), or a computing system that includes frontend components (e.g., a user computer with a graphical user interface or a web browser through which a user can interact with implementations of the systems and techniques described herein), or a computing system that includes any combination of such backend components, middleware components, or frontend components. The components of the system may be interconnected by any form or medium of digital data communication (e.g., a communication network). Examples of communication networks include: a local area network (LAN), a wide area network (WAN), a blockchain network, and the Internet.

[0214] A computing system may include a client and a server. The client and the server are generally remote from each other and usually interact through a communication network. The client and server relationship is generated by computer programs running on the corresponding computers and having a client-server relationship with each other. The server may be a cloud server, also known as a cloud computing server or cloud host, which is a host product in the cloud computing service system to solve the defects of difficult management and weak business scalability in traditional physical hosts and VPS services.

[0215] This embodiment also provides a computer program product, including a computer program, which, when executed by a processor, implements the method for predicting the degree of attention provided in any embodiment of the present application.

[0216] In the process of implementation, the computer program product can be written in one or more programming languages ​​or a combination thereof to perform the computer program code of the present invention, including object-oriented programming languages, such as Java, Smalltalk, C++, and conventional procedural programming languages, such as "C" language or similar programming languages. The program code can be executed entirely on the user's computer, partially on the user's computer, as a separate software package, partially on the user's computer and partially on a remote computer, or entirely on a remote computer or server. In the case of a remote computer, the remote computer can be connected to the user's computer through any type of network, including a local area network (LAN) or a wide area network (WAN), or can be connected to an external computer (for example, using an Internet service provider to connect through the Internet).

[0217] It should be understood that the various forms of processes shown above can be used to reorder, add or delete steps. For example, the steps described in the present invention can be executed in parallel, sequentially or in different orders, as long as the desired results of the technical solution of the present invention can be achieved, and this document does not limit this.

[0218] The above specific implementations do not constitute a limitation on the protection scope of the present invention. It should be understood by those skilled in the art that various modifications, combinations, sub-combinations and substitutions can be made according to design requirements and other factors. Any modification, equivalent substitution and improvement made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims

1. A method for predicting the degree of attention, It is characterized in that include: Obtain the concerned time series data and concerned behavior information corresponding to the object to be predicted in the historical time period; Based on the attention behavior information, determining the attention tendency value corresponding to the object to be predicted in the prediction time period; Based on the attention tendency value and the attention time series data, determining the attention degree information of the object to be predicted in the prediction time period; The concerned time series data includes concerned data of the object to be predicted at each time series time node in the historical time period; the concerned behavior information includes the concerned behavior data of each concerned party on the object to be predicted.

2. The method according to claim 1, It is characterized in that Before determining the concerned tendency value corresponding to the object to be predicted in the prediction time period, the method further includes: Based on the concerned time series data, determining the concerned trend information corresponding to the object to be predicted; wherein the concerned trend information is used to reflect the change of the concerned data of the object to be predicted at different time nodes; Wherein, determining the attention tendency value corresponding to the object to be predicted in the prediction time period based on the attention behavior information includes: In response to determining that the object to be predicted meets a preset trend requirement based on the attention trend information, a corresponding attention tendency value of the object to be predicted in a prediction time period is determined based on the attention behavior information.

3. The method according to claim 2, It is characterized in that The determining, based on the concerned time series data, the concerned trend information corresponding to the object to be predicted includes: Based on the concerned time series data, establishing at least one trend classification model corresponding to the object to be predicted; Respectively determine the similarity between the trend data corresponding to each of the trend classification models and the concerned time series data, and determine the concerned trend information based on the obtained similarities; Among them, the trend classification model includes at least one of an ascending model, a descending model, a stable model, a pulse ascending model and a pulse descending model; the pulse ascending model is a sine function model, the pulse descending model is a cosine function model, and the ascending model, the descending model and the stable model are linear function models.

4. The method according to claim 3, It is characterized in that The step of establishing at least one trend classification model corresponding to the object to be predicted based on the concerned time series data includes: Determine the maximum and minimum values ​​of interest in the time series data of interest; At least one trend classification model corresponding to the object to be predicted is established based on the maximum concern value and the minimum concern value.

5. The method according to claim 3, It is characterized in that The respectively determining the similarity between the trend data corresponding to each trend classification model and the concerned time series data includes: For the trend data corresponding to each of the trend classification models, the first cumulative distance between the trend data and the concerned time series data is determined based on the dynamic time warping algorithm, and the degree of similarity between the trend data and the concerned time series data is determined based on the first cumulative distance.

6. The method according to claim 5, It is characterized in that The concerned time series data includes operation time series data corresponding to at least one concerned operation; the concerned operation includes at least one operation of clicking, browsing, collecting and placing an order; Wherein, the step of establishing at least one trend classification model corresponding to the object to be predicted based on the concerned time series data includes: For each of the operation time series data corresponding to the operation of interest, at least one trend classification sub-model corresponding to the object to be predicted is established based on the operation time series data; the trend classification model is composed of the trend classification sub-model corresponding to at least one of the operation of interest; The step of determining the first cumulative distance between the trend data and the concerned time series data based on the dynamic time warping algorithm for the trend data corresponding to each trend classification model includes: For the trend sub-data corresponding to each trend classification sub-model, a second cumulative distance between the trend sub-data and the corresponding operation time series data is determined based on the dynamic time warping algorithm; wherein the trend data is composed of trend sub-data corresponding to at least one of the trend classification sub-models; A first cumulative distance between the trend data and the concerned time series data is determined based on each of the second cumulative distances.

7. The method according to claim 6, It is characterized in that Before determining the first cumulative distance between the trend data and the concerned time series data based on each of the second cumulative distances, the method further includes: Based on each of the operation time series data and the principal component analysis method, determining the operation weight corresponding to each of the trend sub-data; Wherein, determining the first cumulative distance between the trend data and the concerned time series data based on each of the second cumulative distances includes: For each trend data, a weighted sum operation is performed on the operation weight of each trend sub-data corresponding to the trend data and the corresponding second cumulative distance, and the obtained sum is determined as the first cumulative distance between the trend data and the concerned time series data.

8. The method according to claim 1, It is characterized in that The determining, based on the attention behavior information, a corresponding attention tendency value of the object to be predicted in the prediction time period includes: Inputting the attention behavior information into a pre-trained integrated learning model; Determining a concerned tendency value of the object to be predicted in the prediction time period based on the output value of the integrated learning model; Wherein, the ensemble learning model includes a gradient boosting tree model and / or a random forest model.

9. The method according to claim 1, It is characterized in that Before determining the concerned tendency value corresponding to the object to be predicted in the prediction time period based on the concerned behavior information, the method further includes: An abnormal value in the concerned time series data is determined, an abnormal processing is performed on the abnormal value, and the concerned time series data is updated based on the obtained processed data.

10. The method according to claim 9, It is characterized in that The abnormal value includes an outlier; and the determining of the abnormal value in the concerned time series data includes: Based on the outlier detection technology, outliers in the concerned time series data are determined.

11. The method according to claim 1, It is characterized in that The determining, based on the attention tendency value and the attention time series data, the attention degree information of the object to be predicted in the prediction time period includes: Determining a time series prediction model corresponding to the object to be predicted based on the concerned tendency value and the concerned time series data; Based on the time series prediction model, information on the degree of attention paid to the object to be predicted in the prediction time period is determined.

12. The method according to claim 11, It is characterized in that The time series prediction model includes a time series Prophet model; Wherein, determining the time series prediction model corresponding to the object to be predicted based on the concerned tendency value and the concerned time series data includes: Based on the concerned time series data, determining the original component items in the time series Prophet model; wherein the original component items include trend items, cycle items, holiday items and error items; The product of the concerned tendency value and the trend item is used as the concerned tendency item; Based on the focus tendency item, the cycle item, the holiday item and the error item, the time series Prophet model corresponding to the object to be predicted is updated.

13. The method according to claim 12, It is characterized in that Also includes: Based on the concerned time series data and a pre-built network autoregressive model, generating an autoregressive term corresponding to the object to be predicted; Wherein, updating the time series Prophet model corresponding to the object to be predicted based on the attention tendency item, the cycle item, the holiday item and the error item includes: Based on the autoregressive term, the attention tendency term, the periodic term, the holiday term and the error term, the time series Prophet model corresponding to the object to be predicted is updated.

14. The method according to any one of claims 1 to 13, It is characterized in that Also includes: In response to determining the attention level information of each of the plurality of objects to be predicted, sorting the objects to be predicted based on the attention levels of the attention level information, and sending the sorted sequence to the target terminal; Wherein, the target terminal includes an operation terminal and / or a supply chain terminal.

15. A device for predicting the degree of attention, It is characterized in that include: An information acquisition module is used to obtain the concerned time series data and concerned behavior information corresponding to the object to be predicted in the historical time period; A concerned tendency value determination module, used to determine the concerned tendency value corresponding to the object to be predicted in the prediction time period based on the concerned behavior information; An attention degree information determination module, used to determine the attention degree information of the object to be predicted in the prediction time period based on the attention tendency value and the attention time series data; The concerned time series data includes concerned data of the object to be predicted at each time series time node in the historical time period; the concerned behavior information includes the concerned behavior data of each concerned party on the object to be predicted.

16. An electronic device, It is characterized in that The electronic device comprises: at least one processor; and a memory communicatively connected to the at least one processor; wherein, The memory stores a computer program executable by the at least one processor, and the computer program is executed by the at least one processor so that the at least one processor can execute the method for predicting the degree of attention according to any one of claims 1 to 14.

17. A computer-readable storage medium, It is characterized in that The computer-readable storage medium stores computer instructions, and the computer instructions are used to enable a processor to implement the method for predicting the degree of attention according to any one of claims 1 to 14 when executed.

18. A computer program product, comprising a computer program, wherein when the computer program is executed by a processor, the computer program implements the method for predicting the degree of attention according to any one of claims 1 to 14.