Dynamic mutual feedback property flood avoidance placement method, product, medium and equipment
Through the dynamic mutual feedback property flood avoidance method, GIS and two-dimensional hydrodynamic models are used to generate flood inundation maps, divide risk areas and safety areas, build a passable road network, and generate optimal transfer routes, solving the problem of property flood avoidance in traditional methods. It solves the problems of unsafe and low-efficiency resettlement and achieves efficient, safe and rapid response to property transfer.
Patent Information
- Application Number
- CN202410772815.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-14
- Publication Date
- 2024-10-18
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
Traditional property flood avoidance resettlement methods lack consideration of the dynamic mutual feedback relationship between flood risks, property resettlement conditions, and transfer routes, resulting in unsafe transfer routes, low efficiency, and underutilization of resettlement areas.
By collecting basic geography, hydrometeorology and water conservancy facility data, using GIS combined with the two-dimensional hydrodynamic model to generate flood inundation maps, dividing property risk areas and safety areas, constructing a passable road network topology, using gridding, classification and Specialized rules generate feasible transfer routes, and a heuristic optimization algorithm is used to solve the optimal flood avoidance transfer route.
It improves the safety and efficiency of property transfer, optimizes resource allocation, reduces resource waste, and enhances transportation accuracy and emergency response speed.
Smart Images

Figure CN118799147A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of emergency risk avoidance, and in particular to a method, product, medium and equipment for dynamically feeding back property to avoid floods. Background Art
[0002] With global climate change and intensified human activities, the frequency, intensity, duration and scope of extreme rainstorm events have increased significantly, which has directly led to an increase in the probability of major flood disasters, which in turn caused huge economic losses. In this context, emergency evacuation has become an important non-engineering measure to deal with flood disasters. Therefore, exploring an emergency evacuation and resettlement strategy that can ensure the organized, orderly, safe and timely transfer of important properties in extreme flood events is crucial to minimize the economic losses caused by floods.
[0003] Traditional methods of property resettlement for flood avoidance usually formulate emergency risk avoidance plans based on preset flood inundation scenarios, and residents and rescue vehicles transport important property to designated resettlement sites according to established transfer routes. However, these methods are mostly based on hypothetical flood scenarios and rely too much on historical experience. Traditional property resettlement methods lack consideration of the dynamic feedback relationship between "water" (flood risk impact), "objects" (property resettlement situation) and "land" (risk area, resettlement area and transfer route). The lack of this feedback relationship is manifested in the following aspects: on the one hand, the transfer route is not adjusted according to real-time flood risk information, the established route may no longer be safe or feasible, and the transfer route lacks connection with flood risk; on the other hand, different risk areas and different types of property are not transported in a classified manner, resulting in low transportation efficiency of the transfer route; on the other hand, multiple properties are resettled in the same area, resulting in insufficient utilization of the resettlement area and reduced resettlement efficiency. In order to achieve this dynamic feedback, a flood avoidance resettlement method based on orderly rules must be established to ensure the safety and efficiency of property transfer. Summary of the invention
[0004] The purpose of the present invention is to provide a dynamic mutual feedback property flood avoidance placement method, product, medium and equipment to improve the efficiency and safety of property transfer and placement.
[0005] To achieve the above object, the present invention provides the following solution.
[0006] In one aspect, the present invention provides a method for dynamically feeding back property flood avoidance placement, comprising:
[0007] Collect basic geographic data, hydrological and meteorological data and basic data of water conservancy facilities in the target area as basic data; the basic geographic data include basic terrain, road network, administrative divisions, digital elevation model and remote sensing image data; the hydrological and meteorological data include the measured rainfall, flow, flow velocity and water level data of hydrological and meteorological stations in the basin; the basic data of water conservancy facilities include the scale of flood control project facilities, engineering design parameters and operation status data;
[0008] Based on the basic data of the target area, GIS combined with a two-dimensional hydrodynamic model is used to generate a flood inundation map of the target area;
[0009] Divide the village and group property risk areas and village and group property safety areas according to the flood inundation map of the target area;
[0010] Construct a road network topology based on the road network data of the target area, and perform a road section accessibility analysis based on the flood inundation map to form a traversable road network topology;
[0011] Determine the property resettlement method for the property risk zone of the village group based on the flood inundation map; the property resettlement method includes resettlement within the zone and relocation resettlement;
[0012] If the property resettlement method is intra-regional resettlement, the property within the property risk zone of the village group shall be resettled in the resettlement area of the village group nearby;
[0013] If the property resettlement method is transfer resettlement, the property risk area of the village group is taken as the starting point, and the resettlement area in the property safety area of another village group is taken as the end point. Based on the grid transfer, classified transportation and special resettlement rules, a feasible transfer resettlement route set is generated according to the topological structure of the accessible road network;
[0014] The heuristic optimization algorithm is used to iterate the path calculation of the feasible transfer and resettlement route set to obtain the optimal flood avoidance transfer and resettlement route;
[0015] According to the optimal flood avoidance and resettlement route, the property in the property risk zone of this village group will be transferred to the resettlement area in the property safety zone of another village group.
[0016] Optionally, the method of generating a flood inundation map of the target area by calculating based on the basic data of the target area using GIS combined with a two-dimensional hydrodynamic model specifically includes:
[0017] The target area is divided into grids using two-dimensional hydrodynamic model calculation software;
[0018] The boundary conditions, initial conditions and input parameters of the two-dimensional hydrodynamic model are set according to the basic data of the target area, and the two-dimensional hydrodynamic model calculation software is used to calculate and obtain the risk factor value of each grid; the risk factor of each grid includes the flood peak arrival time, flood depth and flood duration;
[0019] GIS is used to convert the risk factor values of each grid into visual graphics to obtain the flood inundation map of the target area.
[0020] Optionally, dividing the village property risk area and the village property safety area according to the flood inundation map of the target area specifically includes:
[0021] According to the formula Divide the village group property risk area; M represents the scope of the village group property risk area; S j represents the administrative area of the j village group; S m,j represents the mth grid area of the jth village group; Z represents the flooding depth of the grid; Z 0 Indicates the actual height of the grid; S m,j (Z>Z 0 ) is a risk grid area; x is the number of risk grids;
[0022] According to the formula Divide the village group property safety zone; D represents the scope of the village group property safety zone; S d,j represents the dth grid area of the j-th village group; S d,j (Z≤Z 0 ) is a safe grid area; y is the number of safe grids.
[0023] Optionally, the step of constructing a road network topology structure based on the road network data of the target area and performing a road section passability analysis based on a flood inundation map to form a passable road network topology structure specifically includes:
[0024] The road data in the road network data is used as edges, nodes are created at the road intersections and endpoints, and attribute information is assigned to the edges and nodes in the road network to form an initial road network topology structure;
[0025] Determine the flooded sections and corresponding flooding depths in the initial road network topology according to the flood inundation map;
[0026] The road sections where the flooding depth is higher than the preset distance of the road surface are regarded as impassable sections;
[0027] The node tool of GIS is used to interrupt the impassable sections in the initial road network topology to form a traversable road network topology.
[0028] Optionally, the method of determining the property resettlement method of the property risk zone of the village group based on the flood inundation map specifically includes:
[0029] When the resettlement area identification conditions of the village group property risk area are met When determining the property resettlement method for the property risk area of the village group, the resettlement method shall be within the area; H is within the property risk area i of this village group f The number of type properties; x 1 is the number of property risk areas in this village group; i p The resettlement area within the property risk zone i of the village group is called the resettlement area of the village group; i 1 This is a building in this village; 2 It is a temporary warehouse for this village group; 3 This is the high terrain area of this village group; 1 The number of resettlement areas in this village group; H f is the property type; H 1 For electromechanical equipment; H 2 For grain oil; H 3 For important archival materials; Resettlement area for this village group p Medium H f Maximum capacity of the type of property; Resettlement area for this village group p Height; Z i is the flooding depth of the property risk zone i of the village group; Z' i is the safety margin of the property risk zone i of the village group;
[0030] When the resettlement zone identification conditions of another village group property safety zone are met When the property risk area of the village group is determined to be resettled by transfer; p The resettlement area for the property safety zone of another village group is called the resettlement area of another village group; 1 It is an empty factory; 2 For warehouse; q 3 For school classrooms; 4 For the school playground; 2 The number of resettlement areas for another village group; Resettlement area for another village group p Medium H f The maximum capacity of a type property.
[0031] Optionally, the generation of a feasible transfer and resettlement route set based on grid-based transfer, classified transportation and specialized resettlement rules according to the traversable road network topology structure specifically includes:
[0032] Establish a grid-based transfer rule in which the transfer routes of different village and group property risk areas do not overlap with each other Among them l i are all feasible transfer routes for the property risk area i of the village group in the accessible road network topology; l i' = H(i) is the set of properties to be transferred in the property risk zone i of the village group in the topological structure of the accessible road network; H(q) is the set of properties to be transferred from the property risk zone i of the village group to the resettlement zone q of another village group p The property set of H(i 0 ) is the resettlement area for this village group p The collection of properties housed in
[0033] Establishing classified transportation rules to ensure that vehicle transfer routes for different types of property do not occupy each other where h f Vehicles for transporting different types of property; 1 Trucks for transporting electromechanical equipment; 2 Trucks for transporting grain and oil; 3 Pickup truck for transporting important archival materials; 4 Trucks used to transport other important property of residents; L i is the feasible transfer route for all vehicles transferring property in the property risk zone i of this village group in the accessible road network topology; L i' is the feasible transfer route for all vehicles transferring property in the property risk area i' of this village group in the accessible road network topology;
[0034] Establishing special resettlement rules for different types of property to be stored in corresponding resettlement areas q f Resettlement area for another village group p A dedicated area for storing different types of assets; 4 Other important property of residents; f (i) is the type of property to be transferred in the property risk zone i of the village group; H f (q f ) is the property risk area i of the village group transferred to the special area q f Type of property;
[0035] For the property risk area i of the village group whose property resettlement method is transfer resettlement, the spatial analysis of GIS is used to identify the property risk area i of the village group as the starting point and the resettlement area q of another village group as the starting point. p As the end point, a feasible transfer and resettlement route set of all feasible transfer and resettlement routes is generated based on grid transfer, classified transportation and specialized resettlement rules.
[0036] Optionally, the heuristic optimization algorithm is used to perform path iteration calculation on a set of feasible transfer and resettlement routes to obtain an optimal flood avoidance transfer and resettlement route, specifically including:
[0037] Constructing the objective function of the optimal flood avoidance and resettlement route and corresponding constraints; the constraints include road section time constraints, road design speed constraints, and vehicle flow and property transfer constraints; where T is the total transfer time; l i,k is the kth feasible resettlement route for the property risk zone i of the village group; a(l i,k ) and t(l i,k ) represent the feasible transfer and resettlement routes l i,k Traffic volume and time required to transfer property; x 2 is the number of feasible transfer and resettlement routes for property risk zone i of this village group;
[0038] The heuristic optimization algorithm is used to iteratively calculate the paths of the feasible transfer and resettlement routes to obtain the optimal flood avoidance transfer and resettlement route that meets the objective function and its constraints.
[0039] On the other hand, the present invention also provides a computer program product, including a computer program, which implements the dynamic mutual feedback property flood avoidance placement method when executed by a processor.
[0040] On the other hand, the present invention also provides a computer-readable storage medium having a computer program stored thereon, which, when executed by a processor, implements the dynamic mutual-feedback property flood avoidance placement method.
[0041] On the other hand, the present invention further provides a computer device, comprising: a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein the processor executes the computer program to implement the dynamic mutual feedback property flood avoidance placement method.
[0042] According to the specific embodiments provided by the present invention, the present invention discloses the following technical effects:
[0043] On the one hand, the present invention divides the village property risk area and the village property safety area according to the flood inundation map within the administrative area of a village group, providing basic support for the orderly development of subsequent property resettlement work. On the other hand, the present invention uses GIS spatial analysis to determine the resettlement methods and corresponding resettlement areas of different types of property in the village property risk area according to the flood risk situation of the village property risk area, reflecting the mutual feedback relationship between "water" and "objects", "water" and "land"; establishes rules for grid transfer, special area resettlement and classified transportation, generates all feasible transfer and resettlement route sets, reflecting the mutual feedback relationship between "objects" and "land"; the present invention optimizes resource allocation, reduces resource waste, improves traffic efficiency, enhances transportation accuracy, and ensures the safety and efficiency of property transfer through the above methods. On the other hand, the present invention uses a heuristic optimization algorithm to iteratively solve the optimal path, which can adapt to road network structures of different scales and complexities, and realizes the rapid resettlement of property to avoid floods by optimizing stage by stage, thereby improving the emergency response speed. BRIEF DESCRIPTION OF THE DRAWINGS
[0044] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0045] Figure 1 A flow chart of the dynamic mutual-feedback property flood avoidance placement method provided by the present invention;
[0046] Figure 2 A schematic diagram of the principle of the dynamic mutual-feedback property flood avoidance placement method provided by the present invention;
[0047] Figure 3 Simplified diagram of flood avoidance resettlement route for dynamic mutual feed property;
[0048] Figure 4 Schematic diagram of the shortest time path model for flood avoidance resettlement of dynamic mutual feedback properties. DETAILED DESCRIPTION
[0049] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0050] The present invention aims to provide a dynamic mutual-feedback property flood avoidance placement method, product, medium and equipment to improve the efficiency and safety of property transfer and placement.
[0051] In order to make the above-mentioned objects, features and advantages of the present invention more obvious and easy to understand, the present invention is further described in detail below with reference to the accompanying drawings and specific embodiments.
[0052] Figure 1 A flow chart of the dynamic mutual-feedback property flood avoidance placement method provided by the present invention, Figure 2 This is a schematic diagram of the principle of the dynamic mutual feedback property flood avoidance placement method provided by the present invention. Figure 1 and Figure 2 The present invention provides a dynamic mutual-feed property flood avoidance placement method, comprising:
[0053] Step 1: Collect basic geographic data, hydrological and meteorological data, and basic data of water conservancy facilities in the target area as basic data.
[0054] Specifically, the basic geographic data collected for the target area include basic terrain, road network, administrative divisions, digital elevation models, remote sensing images and other data. The road network data specifically includes road name, location, grade, length, traffic volume, driving time, actual operating capacity and other data. The hydrological and meteorological data include data such as rainfall, flow, flow rate and water level data measured by hydrological and meteorological stations in the basin. The basic data of water conservancy facilities include data such as the scale of flood control project facilities, engineering design parameters and operating conditions.
[0055] Step 2: Based on the basic data of the target area, GIS combined with a two-dimensional hydrodynamic model is used to generate a flood inundation map of the target area.
[0056] Based on the collected basic data and two-dimensional hydrodynamic models, the present invention calculates flood risk factors, identifies the scope of village property risk areas and village property safety areas, and constructs a navigable road network topology.
[0057] Specifically, the step 2 includes:
[0058] Step 2.1: Divide the target area into grids using two-dimensional hydrodynamic model calculation software.
[0059] Select two-dimensional hydrodynamic model calculation software, such as MIKE 21, SOBEK, HEC-RAS, etc., and divide the target area into grids.
[0060] Step 2.2: Set the boundary conditions, initial conditions and input parameters of the two-dimensional hydrodynamic model according to the basic data of the target area, and use the two-dimensional hydrodynamic model calculation software to calculate and obtain the risk factor value of each grid; the risk factors of each grid include flood peak arrival time, inundation depth and inundation duration.
[0061] According to the collected basic data, the boundary conditions and initial conditions of the model (water level, flow rate, flow velocity, etc.) are set, and the parameters of the model (coefficient of riverbed friction) are input. Based on the known conditions, the two-dimensional hydrodynamic model calculation software is used to calculate the risk factor values such as the flood peak arrival time, flood depth (relative to the average sea level) and flood duration of each grid.
[0062] Step 2.3: Use GIS to convert the risk factor values of each grid into visual graphics to obtain the flood inundation map of the target area.
[0063] By using the geographic information system (GIS) combined with the results of two-dimensional hydrodynamic model calculations, the risk factor values such as the flood peak arrival time, inundation depth and inundation duration of each grid are converted into visual graphics. For example, different colors or shadows are used to represent different inundation depths, and a flood inundation map of the target area can be generated.
[0064] Step 3: Divide the village property risk area and village property safety area based on the flood inundation map of the target area.
[0065] The flood inundation map obtained by the hydrodynamic model calculation software was imported into GIS and converted into vector data using the raster-to-vector tool. The actual elevation of each grid (relative to the mean sea level) was converted into the vector data. 0 Compared with the calculated flooding depth Z, the grids with flooding depth higher than the actual height are regarded as risk grids S (Z>Z 0 ).
[0066] According to the comparison results, the area composed of risk grids is identified as the village group property risk area with the zoning range of a village group as the boundary. The determination formula is as follows:
[0067]
[0068] Where M represents the scope of the village property risk area; S j represents the administrative area of the j village group; S m,j represents the mth grid area of the jth village group; Z represents the flooding depth of the grid; Z 0 Indicates the actual height of the grid; S m,j (Z>Z 0 ) is a risk grid area; x is the number of risk grids.
[0069] Similarly, taking the zoning range of a village group as the boundary, the area composed of the safety grid is identified as the village group property safety zone. The determination formula is as follows:
[0070]
[0071] Where D represents the scope of the village property safety zone; S d,jrepresents the dth grid area of the j-th village group; S d,j (Z≤Z 0 ) is a safe grid area; y is the number of safe grids.
[0072] Two-dimensional hydrodynamic model calculation software is used to generate village property risk areas and village property safety areas based on the identification results and update and maintain them in real time.
[0073] Step 4: Construct a road network topology based on the road network data of the target area, and perform road section accessibility analysis based on the flood inundation map to form a traversable road network topology.
[0074] According to the collected road network data (road grade, location, etc.), a road network topology structure is constructed. The step 4 specifically includes:
[0075] Step 4.1: Use the road data in the road network data as edges, create nodes at road intersections and endpoints, and assign attribute information to the edges and nodes in the road network to form an initial road network topology structure.
[0076] In GIS, create a new topology layer or workspace, add the road vector data in the road network data to the topology, and use the road data as edges. Define the topology rules, edges must end at nodes, and edges cannot intersect themselves. Use GIS to identify road intersections and endpoints, and create nodes at these locations. Then assign attribute information to the edges and nodes in the road network, such as section name, grade, etc., store these attribute data in the attribute table, and correspond one-to-one with the corresponding vector graphics, thus forming the initial road network topology structure.
[0077] Step 4.2: Determine the flooded sections and corresponding flooding depths in the initial road network topology according to the flood inundation map.
[0078] Specifically, based on the initial road network topology structure, GIS is used to perform layer overlay analysis on the established topological road network, flood inundation map, village property risk area, and village property safety area; the flood inundation layer is analyzed to determine which road sections are flooded and the corresponding inundation depth.
[0079] Step 4.3: The road sections where the flooding depth is higher than the preset distance of the road surface height are regarded as impassable sections.
[0080] Based on the flood depth and road characteristics (such as road surface height), roads are considered impassable if the flooding depth is higher than a preset distance (30cm to 50cm) above the road surface height.
[0081] Step 4.4: Use the node tool of GIS to break up the inaccessible sections in the initial road network topology to form a accessible road network topology.
[0082] Based on the above analysis of flood inundation, the node tool of GIS is used to interrupt the impassable roads and update the road network to form a passable road network topology.
[0083] Step 5: Determine the property resettlement method for the property risk zone of the village group based on the flood inundation map; the property resettlement method includes intra-area resettlement and transfer resettlement.
[0084] Using GIS spatial analysis, the spatial data of buildings in the target area, property data and flood inundation maps are spatially superimposed, and the inundation depth of different types of buildings and the safety margin (flood fluctuation value) of village property risk areas to cope with floods are calculated to determine the property resettlement method in village property risk areas.
[0085] 5.1 Resettlement within the region:
[0086] When the sum of the flood inundation depth and the safety margin does not exceed the terrain height of the resettlement area corresponding to the village group, mechanical and electrical equipment, grain and oil, and important archives and materials can be resettled in the area, that is, the identification conditions of the resettlement area of the property risk area of the village group are as follows:
[0087]
[0088] When the conditions of formula (3) are met, the property resettlement method of the property risk zone of the village group is determined to be intra-zone resettlement. In the present invention, the i-th property risk zone of the village group is referred to as the village group property risk zone i; C i,Hf H is within the property risk area i of this village group f The number of type properties; x 1 is the number of property risk areas in this village group; i p The resettlement area within the property risk zone i of the village group is called the resettlement area of the village group; i 1 This is a building in this village; 2 It is a temporary warehouse for this village group; 3 This is the high terrain area of this village group; 1 H is the number of resettlement areas in this village group; f is the property type; H 1 For electromechanical equipment; H 2 For grain oil; H 3 For important archival materials; H 4 Other important properties of residents include agricultural production machinery, two-wheeled and three-wheeled motor vehicles, etc. Resettlement area for this village group p Medium H f Maximum capacity of the type of property; Resettlement area for this village group p Height; Z i is the flooding depth of the property risk zone i of the village group; Z' iis the safety margin of the property risk zone i of the village group;
[0089] 5.2 Relocation and resettlement:
[0090] When the sum of the flood inundation depth and the safety margin exceeds the terrain height of the corresponding resettlement area of the village group, mechanical and electrical equipment, grain and oil, and important archives and materials must be relocated, that is, the resettlement area identification conditions of another village group property safety zone are as follows:
[0091]
[0092] When the conditions of formula (4) are met, the property resettlement method for the property risk zone of the village group is determined to be transfer resettlement. p The resettlement area for the property safety zone of another village group is called the resettlement area of another village group; 1 It is an empty factory; 2 For warehouse; q 3 For school classrooms; 4 For the school playground; 2 The number of resettlement areas for another village group; Resettlement area for another village group p Medium H f The maximum capacity of a type property.
[0093] In addition, residents' other important properties must be relocated regardless of whether the sum of the flood inundation depth and the safety margin exceeds the terrain height of the corresponding resettlement area of the village group.
[0094] Step 6: If the property resettlement method is intra-regional resettlement, the property within the property risk zone of the village group will be resettled in the resettlement area of the village group nearby.
[0095] When the conditions of formula (3) are met, it means that the property can be resettled within the village group. In this case, the property within the property risk zone of the village group will be resettled in the resettlement area of the village group.
[0096] Step 7: If the property resettlement method is transfer resettlement, the property risk area of the village group is taken as the starting point, and the resettlement area in the property safety area of another village group is taken as the end point. Based on the grid transfer, classified transportation and specialized resettlement rules, a set of feasible transfer resettlement routes is generated according to the topological structure of the accessible road network.
[0097] When the conditions of formula (4) are met, the property in the property risk zone of the village group must be transferred to another village group. The transfer and resettlement rules include the following grid transfer, classified transportation and specialized resettlement.
[0098] 7.1 Grid transfer:
[0099] The villages are matched with each other, and the groups are matched with each other. The property is transferred from one village group to another. During the transfer process, the transfer routes of the property risk areas of different villages and groups must not overlap. The corresponding grid transfer rules are as follows:
[0100]
[0101] Among them l i are all feasible transfer routes for the property risk area i of the village group in the accessible road network topology; l i' = H(i) is the set of properties to be transferred in the property risk zone i of the village group in the topological structure of the accessible road network; H(q) is the set of properties to be transferred from the property risk zone i of the village group to the resettlement zone q of another village group p The property set of H(i 0 ) is the resettlement area for this village group p The collection of properties housed in.
[0102] 7.2 Classified transportation:
[0103] Different types of property are transported by corresponding special vehicles. During the transportation process, it is required that the vehicle transfer routes of various types of property in different village and group property risk areas do not occupy each other. The corresponding classified transportation rules are as follows:
[0104]
[0105] where h f Vehicles for transporting different types of property; 1 Trucks for transporting electromechanical equipment; 2 Trucks for transporting grain and oil; 3 Pickup truck for transporting important archival materials; 4 Trucks used to transport other important property of residents. i is the feasible transfer route for all vehicles transferring property in the property risk zone i of this village group in the accessible road network topology; L i' It is the feasible transfer route for all vehicles transferring property in the property risk area i' of this village group in the accessible road network topology.
[0106] 7.3 Specialized resettlement:
[0107] Different types of property are stored in corresponding resettlement areas. The resettlement rules established accordingly are as follows:
[0108]
[0109] where q f Resettlement area for another village group p A dedicated area for storing different types of assets; 4Other important property of residents; f (i) is the type of property to be transferred in the property risk zone i of the village group; H f (q f ) is the property risk area i of the village group transferred to the special area q f The type of property.
[0110] The present invention does not perform path optimization calculations for the village group property risk areas that are resettled in the area; however, for the village group property risk area i where the property resettlement method is transfer resettlement, it is necessary to use GIS spatial analysis to take the village group property risk area i as the starting point and the other village group resettlement area q p As the end point, a feasible transfer and resettlement route set of all feasible transfer and resettlement routes is generated based on grid transfer, classified transportation and specialized resettlement rules.
[0111] Step 8: Use the heuristic optimization algorithm to iteratively calculate the paths of the feasible resettlement routes and obtain the optimal flood avoidance resettlement route.
[0112] Based on the feasible transfer and resettlement route set, the network analysis tool in GIS is used to run the heuristic optimization algorithm, starting from the village group property risk area and ending at the resettlement area of another village group property safety area, and performing path iterative calculation to obtain the optimal flood avoidance transfer and resettlement route from each village group property risk area to the designated village group property safety area resettlement area. The step 8 specifically includes:
[0113] Step 8.1: Construct the objective function of the optimal flood avoidance and resettlement route:
[0114]
[0115] Where T is the total transfer time (min); l i,k is the kth feasible resettlement route for the property risk zone i of the village group, referred to as the transfer route; a(l i,k ) and t(l i,k ) represent the feasible transfer and resettlement routes l i,k Traffic volume and time required for property transfer (min); x 2 is the number of feasible transfer and resettlement routes for property risk zone i of this village group.
[0116] The constraints corresponding to the objective function (8) include road section time constraints, road design speed constraints, and vehicle flow and property transfer constraints.
[0117] Step 8.2: Construct the time constraints of the road segment as follows:
[0118]
[0119] Where, t c (li,k ) is the time taken for the vehicle to pass through section c (min); x 3 For the property risk area i of this village group, take the kth transfer route l i,k The number of road sections; t(l i,k ) is the property risk area i of the village group through the kth transfer route l i,k The time taken (min).
[0120] The transfer of property to avoid danger will be affected by factors such as road grade and road congestion. The present invention establishes a road right function and corresponding constraints to convert t c (l i,k ) is used as a time index to represent the comprehensive time attributes of each road section:
[0121]
[0122] Where, t c (l i,k ) as the time index of section c; x c is the traffic volume of the road section (vehicles / h); C c is the actual traffic capacity (vehicles / h); t c0 (l i,k ) is the travel time (min) when there is no other traffic on section c; R c (l i,k ) is the length of section c; v' is the vehicle speed; α and β are 1.4 to 1.8.
[0123] The vehicle speed v' used in formula (10) is the corrected vehicle speed. In order to ensure the safety of the evacuation process, the present invention introduces the crowd interference factor θ 1 、Road curvature influence factor θ 2 、Road width influence factor θ 3 The specific values of each factor need to be determined according to the "Urban Road Traffic Planning and Design Specifications", "Highway Engineering Technical Standards" and field observations. The corrected driving speed is as follows:
[0124] v'=θ 1 θ 2 θ 3 v 0 (11)
[0125] In the formula, v 0 is the set of design speeds for various types of vehicles on different roads; v' is the corrected set of design speeds.
[0126] Step 8.3: Construct road design speed constraints;
[0127] Considering the speed limit of the road, combined with the "Urban Road Traffic Planning and Design Specifications", "Urban Road Design Specifications" and "Highway Engineering Technical Standards", the design speed constraints of roads at all levels are as follows (in km / h):
[0128]
[0129] In the formula, v 0 (g 0 ,h f ),v 0 (g 1 ,h f ),v 0 (g 2 ,h f ),v 0 (g 3 ,h f ),v 0 (g 4 ,h f ) are the driving speeds of vehicles on expressways, first-class highways, second-class highways, third-class highways, and fourth-class highways respectively; h f is the type of car; v 1 (g 0 ,h f ),v 1 (g 1 ,h f ),v 1 (g 2 ,h f ),v 1 (g 3 ,h f ),v 1 (g 4 ,h f ) are the designed minimum speeds of vehicles on expressways, first-class highways, second-class highways, third-class highways and fourth-class highways respectively; v 2 (g 0 ,h f ),v 2 (g 1 ,h f ),v 2 (g 2 ,h f ),v 2 (g 3 ,h f ),v 2 (g 4 ,h f ) are the designed maximum speeds of vehicles on expressways, first-class highways, second-class highways, third-class highways and fourth-class highways respectively.
[0130] Step 8.4: Construct the traffic flow and property transfer constraints as follows:
[0131]
[0132] In the formula, a(l i,k ) The set of traffic volume of all transfer routes in the property risk zone i of this village group; H is within the property risk area i of this village group f Type property through the kth f Traffic volume on the diversion routes; Indicates whether to select the kth property risk zone i of this village group f feasible transfer routes, 1 if selected, 0 otherwise; x f H is within the property risk area i of this village group f The number of transfer routes of type property; C(h f ) is the property capacity of vehicle hf; is the total amount of property transferred from the village group property risk area i to the resettlement area qf; Ci(Hf) is the initial Hf to be transferred from the village group property risk area i f Total amount of type property; b i,f For property H f transfer ratio; H corresponding to the local standard f Minimum transfer ratio.
[0133] Step 8.5: Model solution; the objective function (8) constructed by the present invention is the shortest time path model;
[0134] Based on the constraints of formulas (9), (12), and (13), the collected road network data is substituted into formula (10) to obtain the time index value t of each road section c (l i,k ) and the corresponding traffic flow a(l i,k ) (GIS has tools to record vehicle flow). c (l i,k ) is expressed as a matrix t(u,v). After iterating the matrix t(u,v), the time path set t(l i,k ) and its corresponding traffic flow a(l i,k ), compare t(l i,k ) size, and then the shortest time path set is obtained as the optimal flood avoidance and transfer resettlement route. The model solution steps are as follows:
[0135] Taking the property risk area i of the village group as the starting point, the intermediate road network has n nodes c 1 ,c 2 ,...,c n , the resettlement area of the village property safety zone is q 1 ,q 2,q 3 and q 4 , can form a graph with n+5 vertices;
[0136] The directed graph is represented by an adjacent directed matrix t, which is a (n+5)×(n+5) matrix. Then t(u,v) can represent the time index from node u to node v. At the same time, i→q 1 ,q 2 ,q 3 ,q 4 is in the positive direction, then t(i,q 1 ) is the time index between two points, and t(q 1 ,i) should be infinite to limit the path solution direction;
[0137] In the initial calculation, the nodes are divided into two groups. According to the time index from the node to the source node, the nodes are divided into nodes with the shortest known time index and nodes with unknown time index;
[0138] Take i as the source node, put i and the adjacent nodes in the direction of each property transfer route into the known node set L1, and store the time index set from the known node to the source node as R. The remaining points form the unknown node set L2, and store the time set from the unknown node to the source node as r. The time from the unknown node to the source node is infinite.
[0139] Sequentially put the neighboring nodes in the solution direction of the terminal node of the shortest path in the previous stage into the set L1 until the end point q 1 ,q 2 ,q 3 and q 4 They are put into the set L1 respectively, the unknown node set L2 is an empty set, and the sum of all time indexes t(l i,k ) and its corresponding traffic flow a(l i,k )), after comparison, a series of shortest time paths (with the smallest sum of time indexes) can be obtained to form the optimal flood avoidance and resettlement route; at the same time, GIS can record the traffic volume a(l i,k ), a(l i,k ) is the number of vehicles.
[0140] Step 9: Transfer the property in the property risk zone of this village group to the resettlement area in the property safety zone of another village group according to the optimal flood avoidance and resettlement route.
[0141] The method of the present invention calculates the impact of flood risks, determines the property resettlement situation, identifies the risk area, safety area and transfer routes, combines the grid-based, classified and zoned property resettlement situations, dynamically calculates the optimal property transfer route, and transfers the property in the property risk area of each village group to the designated resettlement area in the property safety area of another village group according to the optimal flood avoidance transfer and resettlement route, thereby realizing safe and efficient property transfer and resettlement.
[0142] The following uses a specific case to explain the method of the present invention in detail, which also has a guiding role in applying the method of the present invention to the formulation of property flood avoidance resettlement plans in other regions. The implementation steps of this specific case include:
[0143] S1: Collect basic geographic data, hydrological and meteorological data and basic data of water conservancy facilities in the target area as basic data. The basic geographic data include basic terrain, road network, administrative divisions, digital elevation models and remote sensing image data. The hydrological and meteorological data include the measured rainfall, flow, flow velocity and water level data of hydrological and meteorological stations in the basin. The basic data of water conservancy facilities include the scale of flood control project facilities, engineering design parameters and operation status data.
[0144] S2: Based on the basic data of the target area, GIS combined with a two-dimensional hydrodynamic model is used to generate a flood inundation map of the target area.
[0145] S3: Divide the village property risk area and village property safety area based on the flood inundation map of the target area.
[0146] For ease of presentation, this case simplifies the road network structure and only retains important nodes; it also simplifies the number of village property risk areas and village property safety areas.
[0147] like Figure 3 As shown in the figure, by using GIS spatial analysis, i is determined to be the risk area of this village group, i 1 、i 2 、i 3 They are the buildings, temporary warehouses, and the highest terrain area (i.e., high terrain area) of the village group, respectively. 1 ,q 2 ,q 3 ,q 4 They are respectively an empty factory building, warehouse, school classroom and school playground which are the property safety zone of another village group, reflecting the mutual feedback relationship between "water" and "objects" and "water and "land".
[0148] S4: Construct a road network topology structure based on the road network data of the target area, and perform road section accessibility analysis based on the flood inundation map to form a traversable road network topology structure.
[0149] S5: Determine the property resettlement method for the property risk zone of the village group based on the flood inundation map; the property resettlement method includes intra-area resettlement and transfer resettlement.
[0150] S6: If the property resettlement method is intra-district resettlement, the property within the property risk zone of the village group will be resettled in the resettlement area of the village group nearby.
[0151] S7: If the property resettlement method is transfer resettlement, the property risk area of the village group is taken as the starting point, and the resettlement area in the property safety area of another village group is taken as the end point. Based on the grid transfer, classified transportation and special resettlement rules, a set of feasible transfer resettlement routes is generated according to the topological structure of the accessible road network.
[0152] The rules of grid-based transfer, special-area resettlement and classified transportation are established to generate all feasible transfer and resettlement route sets, reflecting the feedback relationship between "objects" and "land". Figure 3 As shown, different line types correspond to the currently feasible transfer and resettlement routes for different types of properties.
[0153] The present invention optimizes resource allocation, reduces resource waste, improves traffic efficiency, enhances transportation accuracy, and ensures the safety and efficiency of property transfer in the above manner.
[0154] S8: Use the heuristic optimization algorithm to iteratively calculate the paths of the feasible resettlement routes and obtain the optimal flood avoidance resettlement route.
[0155] The vehicle transfer routes of various types of property in the same village group property risk area do not occupy each other, so the mechanical and electrical equipment H is used here. 1 Taking the optimal path planning of as an example, the optimal path planning of other types of property can be solved in the same way.
[0156] By solving the shortest time path model (10), the feasible shortest time path and the number of vehicles on the corresponding transfer route can be obtained. The shortest time path optimization is then performed.
[0157] Taking the property risk area i of the village group as the starting point, the intermediate road network has n nodes c 1 ,c 2 ,...,c n , the resettlement area of the village property safety zone is q 1 ,q 2 ,q 3 and q 4 , can form a graph with n+5 vertices, such as Figure 4 The directed graph is represented by an adjacent directed matrix t, which is a (n+5)×(n+5) matrix. Then t(u,v) can represent the time index from node u to node v. At the same time, i→q 1 ,q 2 ,q3 ,q 4 is in the positive direction, then t(i,q 1 ) is the time index between two points, and t(q 1 ,i) should be infinite to limit the path solution direction.
[0158] Table 1 Directed matrix t of dynamic mutual feedback property flood avoidance arrangement
[0159] <![CDATA[t 1 (h)]]> i <![CDATA[c 10 ]]> <![CDATA[i 1 ]]> <![CDATA[c 3 ]]> <![CDATA[c 2 ]]> <![CDATA[c 11 ]]> <![CDATA[c 1 ]]> <![CDATA[q 1 ]]> i 0 1 ∞ ∞ ∞ ∞ ∞ ∞ <![CDATA[c 10 ]]> ∞ 0 1.5 ∞ ∞ 1.3 ∞ ∞ <![CDATA[i 1 ]]> ∞ ∞ 0 1.2 ∞ ∞ 0.9 ∞ <![CDATA[c 3 ]]> ∞ ∞ ∞ 0 0.7 ∞ 0.4 ∞ <![CDATA[c 2 ]]> ∞ ∞ ∞ ∞ 0 ∞ ∞ 1.1 <![CDATA[c 11 ]]> ∞ ∞ ∞ ∞ ∞ 0 4 ∞ <![CDATA[c 1 ]]> ∞ ∞ ∞ ∞ 1.2 ∞ 0 3.1 <![CDATA[q 1 ]]> ∞ ∞ ∞ ∞ ∞ ∞ ∞ 0
[0160] The heuristic optimization algorithm is used to iteratively solve the optimal path, which can adapt to road network structures of different scales and complexities, optimize stage by stage, realize the rapid resettlement of property to avoid floods, and improve the speed of emergency response. The solution steps are as follows:
[0161] ① Initial calculation: divide the nodes into two groups, and divide the nodes into known shortest time path nodes and unknown path nodes according to the time from the node to the source node;
[0162] For electromechanical equipment 1 , i is the source node, first i and its adjacent node c 10 Put it into the known node set L1, then L1={i,c 10}, the corresponding time set storing the known nodes to the source nodes is R 1 ={t(i,i),t(i,c 10 )}, the remaining points form the unknown node set L2 = {i 1 ,c 11 ,c 1 ,c 2 ,c 3 ,q 1}, the corresponding storage time set from unknown node to source node is r = {t(i,i 1 ),t(i,c 11 ),t(i,c 1 ),t(i,c 2 ),t(i,c 3 ),t(i,q 1 )}, the initial conditions are as follows:
[0163] R 1 ={0,1}
[0164] r={x|x=∞}
[0165] ② Change i 1 、c 11 Put it into the set L1, then L1={i,c 10 ,i 1 ,c 11}, the corresponding time set storing the known nodes to the source nodes is R1 ={t(i,i),t(i,c 10 ),t(c 10 ,i 1 )},R 2 ={t(i,i),t(i,c 10 ),t(c 10 ,c 11 )}, the remaining points form L2={c 1 ,c 3 ,c 2 ,q 1}, the corresponding storage time set from unknown node to source node is r = {t(i,c 1 ),t(i,c 3 ),t(i,c 2 ),t(i,q 1 )}, determine the shortest time from set L1 to L2:
[0166] R 1 ={0,1,1.5}
[0167] R 2 ={0,1,1.3}
[0168] r={x|x=∞}
[0169] ③Write c 1 、c 3 Put it into the set L1, then L1={i,c 10 ,i 1 ,c 11 ,c 1 ,c 3}, the corresponding time set storing the known nodes to the source nodes is R 1 ={t(i,i),t(i,c 10 ),t(c 10 ,i 1 ),t(i 1 ,c 3 )},R 2 ={t(i,i),t(i,c 10 ),t(c 10 ,i 1 ),t(i 1 ,c 1 )},R 3 ={t(i,i),t(i,c 10 ),t(c 10 ,c 11 ),t(c 11 ,c 1 )}, the remaining points form L2={c 2 ,q1}, the corresponding storage time set from unknown node to source node is r = {t(i,c 2 ),t(i,q 1 )}, determine the shortest time from set L1 to L2:
[0170] R 1 ={0,1,1.5,1.2}
[0171] R 2 ={0,1,1.5,0.9}
[0172] R 3 ={0,1,1.3,4}
[0173] r={x|x=∞}
[0174] ④ c 2 Put it into the set L1, then L1={i,c 10 ,i 1 ,c 11 ,c 1 ,c 3 ,c 2}, the corresponding time set storing the known nodes to the source nodes is R 1 ={t(i,i),t(i,c 10 ),t(c 10 ,i 1 ),t(i 1 ,c 3 ),t(c 3 ,c 2 ),t(c 2 ,q 1 )},R 2 ={t(i,i),t(i,c 10 ),t(c 10 ,i 1 ),t(i 1 ,c 1 ),t(c 1 ,c 2 ),t(c 2 ,q 1 )},R 3 ={t(i,i),t(i,c 10 ),t(c 10 ,c 11 ),t(c 11 ,c 1 ),t(c 1 ,q 1 )},R 4 ={t(i,i),t(i,c 10 ),t(c10 ,i 1 ),t(i 1 ,c 3 ),t(c 3 ,c 1 ),t(c 1 ,c 2 ),t(c 2 ,q 1 )}, the remaining points form L2={q 1}, the corresponding storage time set from unknown node to source node is r = {t(i,q 1 )}, determine the shortest time from set L1 to L2:
[0175] R 1 ={0,1,1.5,1.2,1.1}
[0176] R 2 ={0,1,1.5,0.9,1.1}
[0177] R 3 ={0,1,1.3,4,3.1}
[0178] R 4 ={0,1,1.3,0.9,3.1}
[0179] r={x|x=∞}
[0180] ⑤q 1 Put it into the set L1, then L1={i,c 10 ,i 1 ,c 11 ,c 1 ,c 3 ,c 2 ,q 1}, and L2 = φ, stop node storage, perform route calculation, and the transfer routes and their time values are as follows:
[0181] i→c 10 →i 1 →c 3 →c 2 →q 1 : 4.8h;
[0182] i→c 10 →i 1 →c 1 →c 2 →q 1 : 4.5h;
[0183] i→c 10 →c 11 →c 1 →q1 : 9.4h;
[0184] i→c 10 →i 1 →c 3 →c 1 →c 2 →q 1 : 6.3h;
[0185] In summary, the transfer routes of all properties in the risk area can be obtained by the same logic, so the mechanical and electrical equipment H 1 The shortest route for relocation is i→c 10 →i 1 →c 1 →c 2 →q 1 (4.5h), this route is the optimal flood avoidance and resettlement route. The number of vehicles corresponding to each route can be recorded using GIS.
[0186]
[0187] S9: Follow the optimal flood avoidance and resettlement route i→c 10 →i 1 →c 1 →c 2 →q 1 The electromechanical equipment in the village property risk area 1 Transfer to a resettlement area within the property safety zone of another village group.
[0188] In some embodiments, the present invention further provides a computer program product, comprising a computer program, which implements the dynamic mutual feedback property flood avoidance placement method when executed by a processor.
[0189] In some embodiments, the present invention further provides a computer-readable storage medium having a computer program stored thereon, which, when executed by a processor, implements the dynamic mutual-feed property flood avoidance placement method.
[0190] In some embodiments, the present invention also provides a computer device, which includes a processor, a memory, an input / output interface (Input / Output, referred to as I / O) and a communication interface. The processor, the memory and the input / output interface are connected through a system bus, and the communication interface is connected to the system bus through the input / output interface. The processor of the computer device is used to provide computing and control capabilities. The memory of the computer device includes a non-volatile storage medium and an internal memory. The non-volatile storage medium stores an operating system, a computer program and a database. The internal memory provides an environment for the operation of the operating system and the computer program in the non-volatile storage medium. The database of the computer device is used to store pending transactions. The input / output interface of the computer device is used to exchange information between the processor and an external device. The communication interface of the computer device is used to communicate with an external terminal through a network connection. When the computer program is executed by the processor, the dynamic mutual feedback property flood avoidance resettlement method can be implemented.
[0191] In step 3 of the method of the present invention, within the administrative area of a village group, the area composed of risk grids is identified as the village group property risk area, and the area composed of safety grids is identified as the village group property safety area; the method of identifying property risk areas and property safety areas based on administrative areas as boundaries provides basic support for the orderly development of subsequent property resettlement work.
[0192] In step 5, by using GIS spatial analysis, the resettlement methods and corresponding resettlement areas of different types of properties in the village property risk area are determined according to the flood risk situation in the risk area, reflecting the feedback relationship between "water" and "objects" and "water and "land".
[0193] In step 7, rules for grid-based transfer, specialized resettlement, and classified transportation are established to generate a set of all feasible transfer and resettlement routes, reflecting the feedback relationship between "objects" and "land". The present invention optimizes resource allocation, reduces resource waste, improves traffic efficiency, enhances transportation accuracy, and ensures the safety and efficiency of property transfer in the above manner.
[0194] In step 8, a shortest time path model was constructed to enhance the adaptability to flood events and improve the quality of flood avoidance resettlement decision-making; a heuristic optimization algorithm was further used to iteratively solve the optimal path, which can adapt to road network structures of different scales and complexities, optimize stage by stage, achieve rapid resettlement of property to avoid floods, and improve the speed of emergency response.
[0195] The principles and implementation methods of the present invention are described in this article using specific examples. The description of the above embodiments is only used to help understand the method and core idea of the present invention. At the same time, for those skilled in the art, according to the idea of the present invention, there will be changes in the specific implementation methods and application scope. In summary, the content of this specification should not be understood as limiting the present invention.
Claims
1. A method for flood avoidance placement of dynamic mutual-feed assets, characterized in that: include: Collect basic geographic data, hydrological and meteorological data and basic data of water conservancy facilities in the target area as basic data; the basic geographic data include basic terrain, road network, administrative divisions, digital elevation model and remote sensing image data; the hydrological and meteorological data include the measured rainfall, flow, flow velocity and water level data of hydrological and meteorological stations in the basin; the basic data of water conservancy facilities include the scale of flood control project facilities, engineering design parameters and operation status data; Based on the basic data of the target area, GIS combined with a two-dimensional hydrodynamic model is used to generate a flood inundation map of the target area; Divide the village and group property risk areas and village and group property safety areas according to the flood inundation map of the target area; Construct a road network topology based on the road network data of the target area, and perform a road section accessibility analysis based on the flood inundation map to form a traversable road network topology; Determine the property resettlement method for the property risk zone of the village group based on the flood inundation map; the property resettlement method includes resettlement within the zone and relocation resettlement; If the property resettlement method is intra-regional resettlement, the property within the property risk zone of the village group shall be resettled in the resettlement area of the village group nearby; If the property resettlement method is transfer resettlement, the property risk area of the village group is taken as the starting point, and the resettlement area in the property safety area of another village group is taken as the end point. Based on the grid transfer, classified transportation and special resettlement rules, a feasible transfer resettlement route set is generated according to the topological structure of the accessible road network; The heuristic optimization algorithm is used to iterate the path calculation of the feasible transfer and resettlement route set to obtain the optimal flood avoidance transfer and resettlement route; According to the optimal flood avoidance and resettlement route, the property in the property risk zone of this village group will be transferred to the resettlement area in the property safety zone of another village group.
2. The method for flood avoidance and resettlement of dynamic mutual-feeding assets according to claim 1, characterized in that: The basic data of the target area is calculated by using GIS combined with a two-dimensional hydrodynamic model to generate a flood inundation map of the target area, specifically including: The target area is divided into grids using two-dimensional hydrodynamic model calculation software; The boundary conditions, initial conditions and input parameters of the two-dimensional hydrodynamic model are set according to the basic data of the target area, and the two-dimensional hydrodynamic model calculation software is used to calculate and obtain the risk factor value of each grid; the risk factor of each grid includes the flood peak arrival time, flood depth and flood duration; GIS is used to convert the risk factor values of each grid into visual graphics to obtain the flood inundation map of the target area.
3. The method for flood avoidance and resettlement of dynamic mutual-feeding assets according to claim 2, characterized in that: The division of village property risk areas and village property safety areas based on the flood inundation map of the target area specifically includes: According to the formula Divide the village group property risk area; M represents the scope of the village group property risk area; S j represents the administrative area of village group j; S m,j represents the mth grid area of the jth village group; Z represents the flooding depth of the grid; Z0 represents the actual height of the grid; S m,j (Z>Z0) is a risk grid area; x is the number of risk grids; According to the formula Divide the village group property safety zone; D represents the scope of the village group property safety zone; S d,j represents the dth grid area of the j-th village group; S d,j (Z≤Z0) is a safe grid area; y is the number of safe grids.
4. The method for flood avoidance and resettlement of dynamic mutual-feeding assets according to claim 3 is characterized in that: The method of constructing a road network topology structure according to the road network data of the target area and performing a road section passability analysis based on the flood inundation map to form a passable road network topology structure specifically includes: The road data in the road network data is used as edges, nodes are created at the road intersections and endpoints, and attribute information is assigned to the edges and nodes in the road network to form an initial road network topology structure; Determine the flooded sections and corresponding flooding depths in the initial road network topology according to the flood inundation map; The road sections where the flooding depth is higher than the preset distance of the road surface are regarded as impassable sections; The node tool of GIS is used to interrupt the impassable sections in the initial road network topology to form a traversable road network topology.
5. The method for flood avoidance and resettlement of dynamic mutual-feeding assets according to claim 4, characterized in that: The property resettlement method based on the flood inundation map to determine the property risk area of the village group specifically includes: When the resettlement area identification conditions of the village group property risk area are met When determining the property resettlement method for the property risk area of the village group, the resettlement method shall be within the area; H is within the property risk area i of this village group f x1 is the number of property risk areas in this village group; i p is the resettlement area within the property risk zone i of the village group, which is called the resettlement area of the village group; i1 is the building of the village group; i2 is the temporary warehouse of the village group; i3 is the high terrain area of the village group; z1 is the number of resettlement areas of the village group; H f is the property type; H1 is electromechanical equipment; H2 is grain and oil; H3 is important archival materials; Resettlement area for this village group p Medium H f Maximum capacity of the type of property; Resettlement area for this village group p Height; Z i is the flooding depth of the property risk zone i of the village group; Z' i is the safety margin of the property risk zone i of the village group; When the resettlement zone identification conditions of another village group property safety zone are met When the property risk area of the village group is determined to be resettled by transfer; p The resettlement area for the property safety zone of another village group is called the resettlement area of another village group; q1 is an empty factory building; q2 is a warehouse; q3 is a school classroom; q4 is a school playground; z2 is the number of resettlement areas of another village group; Resettlement area for another village group p Medium H f The maximum capacity of a type property.
6. The method for flood avoidance and resettlement of dynamic mutual-feeding assets according to claim 5, characterized in that: The grid-based transfer, classified transportation and special resettlement rules generate a feasible transfer and resettlement route set according to the topological structure of the accessible road network, specifically including: Establish a grid-based transfer rule in which the transfer routes of different village and group property risk areas do not overlap with each other Among them l i are all feasible transfer routes for the property risk area i of the village group in the accessible road network topology; l i' = H(i) is the set of properties to be transferred in the property risk zone i of the village group in the topological structure of the accessible road network; H(q) is the set of properties to be transferred from the property risk zone i of the village group to the resettlement zone q of another village group p The property set of H(i 0 ) is the resettlement area for this village group p The collection of properties housed in Establishing classified transportation rules to ensure that vehicle transfer routes for different types of property do not occupy each other where h f Vehicles for transporting different types of property; h1 is a truck for transporting electromechanical equipment; h2 is a truck for transporting grain and oil; h3 is a pickup truck for transporting important archives; h4 is a truck for transporting other important property of residents; L i is the feasible transfer route for all vehicles transferring property in the property risk zone i of this village group in the accessible road network topology; L i' is the feasible transfer route for all vehicles transferring property in the property risk area i' of this village group in the accessible road network topology; Establishing special resettlement rules for different types of property to be stored in corresponding resettlement areas q f Resettlement area for another village group p A special area for storing different types of property; H4 is for other important property of residents; H f (i) is the type of property to be transferred in the property risk zone i of the village group; H f (q f ) is the property risk area i of the village group transferred to the special area q f Type of property; For the property risk area i of the village group whose property resettlement method is transfer resettlement, the spatial analysis of GIS is used to identify the property risk area i of the village group as the starting point and the resettlement area q of another village group as the starting point. p As the end point, a feasible transfer and resettlement route set of all feasible transfer and resettlement routes is generated based on grid transfer, classified transportation and specialized resettlement rules.
7. The method for flood avoidance and resettlement of dynamic mutual-feeding assets according to claim 6, characterized in that: The heuristic optimization algorithm is used to perform path iteration calculation on a set of feasible transfer and resettlement routes to obtain the optimal flood avoidance transfer and resettlement route, specifically including: Constructing the objective function of the optimal flood avoidance and resettlement route and corresponding constraints; the constraints include road section time constraints, road design speed constraints, and vehicle flow and property transfer constraints; where T is the total transfer time; l i,k is the kth feasible resettlement route for the property risk zone i of the village group; a(l i,k ) and t(l i,k ) represent the feasible transfer and resettlement routes l i,k The traffic volume and time required for property transfer; x2 is the number of feasible transfer and resettlement routes for property risk zone i in this village group; The heuristic optimization algorithm is used to iteratively calculate the paths of the feasible transfer and resettlement routes to obtain the optimal flood avoidance transfer and resettlement route that meets the objective function and its constraints.
8. A computer program product, comprising a computer program, characterized in that When the computer program is executed by a processor, the dynamic mutual-feed property flood avoidance placement method described in any one of claims 1 to 7 is implemented.
9. A computer-readable storage medium having a computer program stored thereon, characterized in that: When the computer program is executed by a processor, the dynamic mutual-feed property flood avoidance placement method described in any one of claims 1 to 7 is implemented.
10. A computer device comprising: A memory, a processor, and a computer program stored in the memory and executable on the processor, wherein the processor executes the computer program to implement the dynamic mutual-feeding property flood avoidance placement method according to any one of claims 1 to 7.
Citation Information
Cited By
Flood storage and detention area dynamic risk avoiding transfer method and system based on flood information and road network reconstruction
CN119358798A