Rail transit network-source-storage-vehicle system energy storage configuration method considering hydrogen energy storage
By introducing hydrogen energy storage into the rail transit network-source-storage-car system, optimizing photovoltaic, wind power and hydrogen energy systems solves the problem of renewable energy volatility, improves system stability and reduces carbon emissions, and achieves long-term Clean energy storage.
Patent Information
- Application Number
- CN202410825765.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-25
- Publication Date
- 2024-10-18
AI Technical Summary
The existing rail transit ‘grid-source-storage-train’ collaborative energy supply system is difficult to ensure stable and efficient operation due to the volatility and intervals of renewable energy.
Introducing hydrogen energy storage, by establishing objective functions and constraints, optimize the daily net income of photovoltaic power generation, wind power generation, hydrogen energy systems and regenerative braking systems, and determine the installed capacity of photovoltaic and wind power, the power of regenerative braking systems and hydrogen storage capacity, using CPLEX to solve for the maximum value to achieve power balance.
It improves the operational stability of the rail transit network-source-storage-car system, and reduces carbon emissions through the collaborative energy supply of renewable energy to achieve long-term clean energy storage.
Smart Images

Figure CN118801428A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the field of rail transit energy supply technology, and more specifically, to a rail transit network-source-storage-vehicle system energy storage configuration method taking hydrogen energy storage into account, a computer device, a computer-readable storage medium, and a computer program product. Background Art
[0002] At present, there are abundant renewable energy sources along the high-speed railway, including solar energy, wind energy, etc., but the utilization rate of these renewable energy sources is insufficient. Therefore, the existing technology proposes a rail transit "grid-source-storage-vehicle" coordinated energy supply system.
[0003] However, considering the volatility and intermittent nature of renewable energy output, how to ensure the stable and efficient operation of the rail transit "grid-source-storage-vehicle" collaborative energy supply system has become an urgent problem to be solved. Summary of the invention
[0004] In order to solve the above problems, the present invention provides a rail transit network-source-storage-vehicle system energy storage configuration method, computer equipment, computer-readable storage medium and computer program product taking into account hydrogen energy storage, which integrates hydrogen energy, a new type of energy storage, into the network-source-storage-vehicle system, which helps to further reduce carbon emissions and improve the operating stability of the network-source-storage-vehicle system.
[0005] To achieve the above objectives, according to a first aspect of the present invention, a method for configuring energy storage of a rail transit network-source-storage-vehicle system taking into account hydrogen energy storage is provided, the method comprising:
[0006] Establish the objective function of the rail transit network-source-storage-vehicle system, which is the sum of the daily net benefits of the photovoltaic power generation system, wind power generation system, hydrogen energy system and regenerative braking system;
[0007] Establishing constraint conditions, wherein the constraint conditions include at least one of photovoltaic and wind power installed capacity constraints, power balance constraints, hydrogen storage constraints, and regenerative braking device power constraints;
[0008] Based on the constraints, find the maximum value of the objective function;
[0009] According to the constraints when the objective function takes the maximum value, the installed capacity of photovoltaic and wind power, the power of the regenerative braking system and the hydrogen storage capacity are determined.
[0010] Furthermore, the power balance constraint includes that the load power of the rail transit network-source-storage-vehicle system is the sum of the real-time power of the photovoltaic power generation system, the real-time power of the wind power generation system, the real-time power of the regenerative braking system, the real-time power of the hydrogen storage system and the power supply and demand of the power grid, wherein, when the power supply and demand of the power grid is a positive value, it indicates that the rail transit network-source-storage-vehicle system purchases electricity from the power grid, and when the power supply and demand of the power grid is a negative value, it indicates that the rail transit network-source-storage-vehicle system supplies electricity to the power grid.
[0011] Furthermore, the above-mentioned rail transit network-source-storage-vehicle system energy storage configuration method taking into account hydrogen energy storage also includes obtaining the load power of the rail transit network-source-storage-vehicle system according to the traction load power prediction model; obtaining the real-time power of the photovoltaic power generation system according to the photovoltaic power generation power prediction model; obtaining the real-time power of the wind power generation system according to the wind power generation power prediction model; calculating the sum of the real-time power of the fuel cell, the real-time power of the battery and the real-time power of the electrolyzer to obtain the real-time power of the hydrogen storage system.
[0012] Furthermore, the hydrogen storage constraints include quantity constraints, electrolyzer power constraints, fuel cell power constraints and battery capacity constraints; the quantity constraint is that the number of electrolyzers, hydrogen storage tanks, fuel cells and batteries are all within their respective preset quantity ranges; the electrolyzer power constraint is that the real-time power of the electrolyzer does not exceed the maximum operating power of the electrolyzer; the fuel cell power constraint is that the real-time power of the fuel cell does not exceed the maximum operating power of the fuel cell; the battery capacity constraint is that the battery capacity does not exceed the maximum capacity of the battery.
[0013] Furthermore, hydrogen storage constraints also include constraints on the amount of hydrogen stored in the hydrogen storage tank and the amount of hydrogen consumed.
[0014] Furthermore, the power constraint of the regenerative braking device includes the power constraint of the power electronic device and the constraint of the energy storage device in the regenerative braking system.
[0015] Further, based on the constraint condition, solving the maximum value of the objective function includes solving the maximum value of the objective function based on the constraint condition using CPLEX.
[0016] According to a second aspect of the present invention, there is also provided a computer device, which includes a memory, a processor and a computer program stored in the memory, and the processor executes the computer program to implement the steps of any one of the above methods.
[0017] According to a third aspect of the present invention, there is also provided a computer-readable storage medium on which a computer program is stored, and when the computer program is executed by a processor, the steps of any of the above methods are implemented.
[0018] According to a fourth aspect of the present invention, there is also provided a computer program product, comprising a computer program, which implements the steps of any of the above methods when executed by a processor.
[0019] In general, the above technical solutions conceived by the present invention can achieve the following beneficial effects compared with the prior art:
[0020] The energy storage configuration method of the rail transit network-source-storage-vehicle system taking hydrogen energy storage into account provided by the present invention integrates hydrogen energy, a new type of energy storage, into the network-source-storage-vehicle system and determines the installed capacity of photovoltaic and wind power, the power of the regenerative braking system and the hydrogen storage capacity, thereby realizing the coordinated energy supply of the photovoltaic power generation system, the wind power generation system and the hydrogen energy system, and improving the operational stability of the network-source-storage-vehicle system. In addition, solar energy, wind energy and hydrogen energy are all renewable clean energy sources, so long-term energy storage can also be achieved, which helps to further reduce carbon emissions and plays an important role in long-term energy storage. BRIEF DESCRIPTION OF THE DRAWINGS
[0021] In order to more clearly illustrate the technical solutions in the embodiments of the present application, the drawings required for use in the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0022] Figure 1 A schematic diagram of the structure of a rail transit network-source-storage-vehicle system taking into account hydrogen energy storage provided in an embodiment of the present application;
[0023] Figure 2 A schematic flow chart of a method for configuring energy storage for a rail transit network-source-storage-vehicle system taking hydrogen energy storage into account provided in an embodiment of the present application;
[0024] Figure 3 A schematic diagram of the internal structure of a computer device provided in an embodiment of the present application. DETAILED DESCRIPTION
[0025] In order to make the purpose, technical solutions and advantages of the present invention more clearly understood, the present invention is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present invention and are not intended to limit the present invention. In addition, the technical features involved in the various embodiments of the present invention described below can be combined with each other as long as they do not conflict with each other.
[0026] The terms "first", "second", "third", etc. in the specification and claims of this application and the above-mentioned drawings are used to distinguish different objects, rather than to describe a specific order. In addition, the terms "including" and "having" and any variations thereof are intended to cover non-exclusive inclusions. For example, a process, method, system, product or device that includes a series of steps or units is not limited to the listed steps or units, but optionally includes steps or units that are not listed, or optionally includes other steps or units inherent to these processes, methods, products or devices.
[0027] like Figure 1 As shown, a rail transit network-source-storage-vehicle system taking hydrogen energy storage into account is provided, including a photovoltaic power station (also called a photovoltaic power generation system), a wind farm (also called a wind power generation system) and a hydrogen energy system.
[0028] Compared with other energy storage methods, hydrogen energy storage is a new type of energy storage that is clean and can be stored in large capacity. It helps to further reduce carbon emissions and can play an important role in long-term energy storage. During the low electricity consumption period, the surplus new energy electricity during the low electricity consumption period can be used to electrolyze water to produce hydrogen, which can be stored or used by downstream industries; during the peak electricity consumption period, hydrogen energy can be used to generate electricity using fuel cells and connected to the contact network or public power grid.
[0029] like Figure 2 As shown, a method for configuring energy storage of a rail transit network-source-storage-vehicle system taking into account hydrogen energy storage is provided. The method can be executed by a terminal or by a server that communicates with the terminal through a network. The terminal can be, but is not limited to, various personal computers, laptops, smart phones, tablet computers, etc. The server can be an independent server or a server cluster composed of multiple servers. Taking the method applied to a terminal as an example, the method includes the following steps:
[0030] Step 201, establish the objective function of the rail transit network-source-storage-vehicle system, the objective function is the sum of the daily net income of the photovoltaic power generation system, the wind power generation system, the hydrogen energy system and the regenerative braking system, that is:
[0031] C s =C PV +C WT +C H +C RBS , (1)
[0032] Among them, C s is the daily net income, C PV is the daily net income of the photovoltaic power generation system, C WT is the daily net income of the wind power generation system, C H is the daily net income of the hydrogen energy system, C RBSis the daily net benefit of the regenerative braking system.
[0033] The calculation method of the daily net income of the photovoltaic power generation system is:
[0034] C PV =R PV.sell -F PV.inv / 365-F PV.run / 365-F PV.buy , (2)
[0035] Among them, R PV.sell is the daily electricity sales revenue of the photovoltaic power generation system, F PV.inv is the annual investment cost of the photovoltaic power generation system, F PV.run is the annual operation and maintenance cost of the photovoltaic power generation system, F PV.buy For the cost of purchasing electricity.
[0036] The calculation method of the daily net income of the wind power generation system is:
[0037] C WT =R WT.sell -F WT.inv / 365-F WT.run / 365-F WT.buy , (3)
[0038] Among them, R WT.sell is the daily electricity sales revenue of the wind power generation system, F WT.inv is the annual investment cost of the wind power generation system, F WT.run is the annual operation and maintenance cost of the wind power generation system, F WT.buy For the cost of purchasing electricity.
[0039] The calculation method of the daily net income of the hydrogen energy system is:
[0040] C H =R H.sell +R H.gas -F H.inv / 365-F H.run / 365-F H.buy , (4)
[0041] Among them, R H.sell is the daily electricity sales revenue of the hydrogen energy system, R H.gas is the daily gas sales revenue of the hydrogen energy system, F H.inv is the annual investment cost of the hydrogen energy system, F H.run is the annual operation and maintenance cost of the hydrogen energy system, F H.buy For the cost of purchasing electricity.
[0042] The calculation method of the net daily benefit of the regenerative braking system is:
[0043] C RBS =RRBS.sell -F RBS.inv / 365-F RBS.run / 365, (5)
[0044] Among them, R RBS.sell The electricity cost saving benefit of the regenerative braking system, F RBS.inv is the annual investment cost of the regenerative braking system, F RBS.run It is the annual operation and maintenance cost of the regenerative braking system.
[0045] Step 202, establishing constraint conditions, wherein the constraint conditions include at least one of photovoltaic and wind power installed capacity constraints, power balance constraints, hydrogen storage constraints, and regenerative braking device power constraints.
[0046] Among them, the installed capacity constraints of photovoltaic and wind power are the installed capacity of photovoltaic power stations and wind farms. Specifically, the installed capacity of photovoltaic power stations and wind farms shall not exceed the maximum installed capacity of photovoltaic power stations and wind farms.
[0047] Step 203, based on the constraint conditions, solve the maximum value of the objective function.
[0048] Step 204, according to the constraint conditions when the objective function takes the maximum value, determine the installed capacity of photovoltaic and wind power, the power of the regenerative braking system and the hydrogen storage capacity.
[0049] The above-mentioned rail transit network-source-storage-vehicle system energy storage configuration method taking hydrogen energy storage into account integrates hydrogen energy, a new type of energy storage, into the network-source-storage-vehicle system, which helps to further reduce carbon emissions and improve the operating stability of the network-source-storage-vehicle system.
[0050] Furthermore, in formulas (2)-(5), the calculation methods for the investment costs of the photovoltaic power generation system, wind power generation system, hydrogen energy system and regenerative braking system are respectively:
[0051]
[0052] Among them, P PV , P WT are the installed capacity of photovoltaic power stations and wind farms respectively; P RBS is the rated power of the regenerative braking system; U PV , U WT are the investment costs required for the unit installed capacity of photovoltaic power stations and wind farms respectively; U RBS is the investment cost per unit power of the regenerative braking system; r is the depreciation rate; m is the service life; N ec 、N hst 、N fc 、N bat are the number of electrolyzers, hydrogen storage tanks, fuel cells, and batteries respectively; U ec, U hst , U fc , U bat These are the unit prices of electrolyzer, hydrogen storage tank, fuel cell and battery respectively.
[0053] Furthermore, in formulas (2)-(5), the annual operation and maintenance costs of photovoltaic power generation, wind power generation, hydrogen energy system and regenerative braking system are calculated as follows:
[0054]
[0055] Among them, γ PV , γ WT , γ RBS , γ ec , γ hst , γ fc , γ bat are the operation and maintenance coefficients of photovoltaic power stations, wind farms, regenerative braking systems, electrolyzers, hydrogen storage tanks, fuel cells, and batteries; P ec , P fc are the power of electrolyzer and fuel cell respectively; is the upper limit of hydrogen storage tank capacity; The upper limit of battery capacity.
[0056] Furthermore, in formulas (2)-(5), the daily electricity sales revenue of the photovoltaic power generation system, wind power generation system, hydrogen energy system and regenerative braking system are calculated as follows:
[0057]
[0058] Where T is the calculation period, T dj For electricity price.
[0059] Among them, the power sold by each system is:
[0060]
[0061] Among them, P x.sell (t) is the electricity sales power of x at time t (x can be a photovoltaic power station, a wind farm and a hydrogen energy system); P x (t) is the output power of x at time t; P max (t) is the maximum power that the system can consume at time t, which is the sum of the railway load and the battery power.
[0062] Furthermore, in formula (4), the daily gas sales revenue of the hydrogen energy system is:
[0063]
[0064] Among them, V ec.t is the amount of hydrogen produced by the electrolyzer during period t, is the volume of oxygen produced when the electrolyzer electrolyzes water, is the volume of hydrogen produced when the electrolyzer electrolyzes water, is the unit price of oxygen, and csell.H2 is the unit price of hydrogen.
[0065] Furthermore, the installed capacity constraints of photovoltaic and wind power are:
[0066]
[0067] Where P PV.max , P WT.max They are the maximum installed capacities of photovoltaic power stations and wind farms respectively.
[0068] In one embodiment, the power balance constraint is:
[0069]
[0070] Among them, P load (t) is the load power of the rail transit network-source-storage-vehicle system, P PV (t) is the real-time power of the photovoltaic power generation system, P WT (t) is the real-time power of the wind power generation system, P RBS (t) is the real-time power of the regenerative braking system, P H (t) is the real-time power of the hydrogen storage system, P grid (t) is the power supply and demand of the power grid, where P grid When (t) is positive, it means that the rail transit network-source-storage-vehicle system purchases electricity from the power grid, P grid When (t) is a negative value, it means that the rail transit network-source-storage-vehicle system supplies power to the grid.
[0071] For example, P load (t), P PV (t), P WT (t) and P H (t) is obtained by obtaining the load power of the rail transit network-source-storage-vehicle system according to the traction load power prediction model; obtaining the real-time power of the photovoltaic power generation system according to the photovoltaic power generation power prediction model; obtaining the real-time power of the wind power generation system according to the wind power generation power prediction model; and calculating the sum of the real-time power of the fuel cell, the real-time power of the battery and the real-time power of the electrolyzer to obtain the real-time power of the hydrogen storage system.
[0072] Among them, the traction load power prediction model is a mathematical model established based on traction calculations and historical train operation diagrams, and its input includes at least locomotive power and train operation diagram data, and its output is the load power of the rail transit network-source-storage-vehicle system; the photovoltaic power generation power prediction model is a mathematical model established based on the historical data of photovoltaic power generation along the railway, and its input includes at least light intensity and light color temperature, and its output is the power generation of the photovoltaic power station. The wind power generation power prediction model is a mathematical model established based on the historical data of wind power generation along the railway, and its input includes at least wind speed and wind strength, and its output is the power generation of the wind farm.
[0073] In one embodiment, the hydrogen storage constraints include quantity constraints, electrolyzer power constraints, fuel cell power constraints, and battery capacity constraints.
[0074] The quantity constraint is that the quantity of electrolyzers, hydrogen storage tanks, fuel cells and batteries are within their respective preset quantity ranges, namely:
[0075]
[0076] Among them, N ec.min 、N hst.min 、N fc.min 、N bat.min are the lower limits of the number of electrolyzers, hydrogen storage tanks, fuel cells, and batteries, respectively. ec.max 、N hst.max 、N fc.max 、N bat.max They are the upper limits of the number of electrolyzers, hydrogen storage tanks, fuel cells, and batteries.
[0077] The electrolyser power constraint is:
[0078] 0≤P ec (t)≤P ec.max , (14)
[0079] Among them, P ec.max is the maximum operating power of the electrolyzer.
[0080] The fuel cell power constraint is:
[0081] 0≤P fc (t)≤P fc.max , (15)
[0082] Among them, P fc.max is the maximum operating power of the fuel cell.
[0083] The battery capacity constraint is:
[0084] 0≤E bat ≤E bat.max , (16)
[0085] Among them, E bat.max Is the maximum capacity of the battery.
[0086] In one embodiment, the hydrogen storage constraint also includes constraints on the amount of hydrogen stored in the hydrogen storage tank and the amount of hydrogen consumed:
[0087]
[0088] in, They are the amount of hydrogen stored in the hydrogen storage tank and the amount of hydrogen consumed at time t respectively; All are binary numbers, design The purpose is to avoid storing and consuming hydrogen at the same time; They are the upper limit coefficient of hydrogen storage and the upper limit coefficient of hydrogen consumption of the hydrogen storage tank at time t respectively; They are the upper limit coefficient and lower limit coefficient of the hydrogen storage tank capacity respectively.
[0089] In one embodiment, the regenerative braking device power constraint includes a power constraint of a power electronic device and a constraint of an energy storage device in the regenerative braking system.
[0090] The power constraint of the power electronics in the regenerative braking system is:
[0091]
[0092] Among them, P RPC is the target power of the power electronics device in the regenerative braking system; is the rated power of the power electronics in the regenerative braking system.
[0093] The constraints of the energy storage device in the regenerative braking system are:
[0094]
[0095] Among them, SoC is the energy storage charge state of the regenerative braking system. L With SoC H are the upper and lower thresholds of SoC, E RBS-c and are the real-time capacity and rated capacity of energy storage of the regenerative braking system respectively; η sds is the self-discharge rate of the energy storage medium; P RBS-c The power of the energy storage of the regenerative braking system.
[0096] In one embodiment, the above step 203, solving the maximum value of the objective function based on the constraint conditions, includes using CPLEX to find the maximum value of the objective function based on the constraint conditions.
[0097] Among them, CPLEX is a mathematical optimization technology that is mainly used to improve efficiency, quickly implement strategies and increase profitability.
[0098] In this embodiment, by integrating hydrogen energy, a new type of energy storage, into the grid-source-storage-vehicle system and determining the installed capacity of photovoltaic and wind power, the power of the regenerative braking system and the hydrogen storage capacity, the coordinated energy supply of photovoltaic power generation, wind power generation and hydrogen energy systems is achieved, which can achieve the purpose of ensuring the stable operation of the grid-source-storage-vehicle system.
[0099] The present application also provides a computer device, the internal structure diagram of which can be as follows: Figure 3 As shown. The computer device includes a processor, a memory, an input / output interface, a communication interface, a display unit and an input device. Among them, the processor, the memory and the input / output interface are connected through a system bus, and the communication interface, the display unit and the input device are connected to the system bus through the input / output interface. Among them, the processor of the computer device is used to provide computing and control capabilities. The memory of the computer device includes a non-volatile storage medium and an internal memory. The non-volatile storage medium stores an operating system and a computer program. The internal memory provides an environment for the operation of the operating system and the computer program in the non-volatile storage medium. The input / output interface of the computer device is used to exchange information between the processor and an external device. The communication interface of the computer device is used to communicate with an external terminal in a wired or wireless manner, and the wireless method can be implemented through WIFI, a mobile cellular network, NFC (near field communication) or other technologies. When the computer program is executed by the processor, a rail transit network-source-storage-vehicle system energy storage configuration method taking into account hydrogen energy storage is implemented. The display unit of the computer device is used to form a visually visible image, and can be a display screen, a projection device or a virtual reality imaging device. The input device of the computer device can be a touch layer covered on the display screen, or a button, trackball or touchpad set on the computer device casing, or an external keyboard, touchpad or mouse, etc.
[0100] Those skilled in the art will understand that Figure 3 The structure shown in the figure is only a block diagram of a part of the structure related to the solution of the present application, and does not constitute a limitation on the computer device to which the solution of the present application is applied. The specific computer device may include more or fewer components than those shown in the figure, or combine certain components, or have a different arrangement of components.
[0101] like Figure 3 As shown, the present application also provides a computer device, which includes a memory, a processor, and a computer program stored in the memory, and the processor executes the computer program to implement the steps in the above-mentioned method embodiments.
[0102] The present application also provides a computer-readable storage medium on which a computer program is stored, and when the computer program is executed by a processor, the steps in the above-mentioned method embodiments are implemented. The computer-readable storage medium may include, but is not limited to, any type of disk, including a floppy disk, an optical disk, a DVD, a CD-ROM, a micro drive, and a magneto-optical disk, a ROM, a RAM, an EPROM, an EEPROM, a DRAM, a VRAM, a flash memory device, a magnetic card or an optical card, a nanosystem (including a molecular memory IC), or any type of medium or device suitable for storing instructions and / or data.
[0103] The present application also provides a computer program product, including a computer program, which implements the steps in the above-mentioned method embodiments when executed by a processor.
[0104] It should be noted that, for the aforementioned method embodiments, for the sake of simplicity, they are all expressed as a series of action combinations, but those skilled in the art should be aware that the present application is not limited by the described order of actions, because according to the present application, certain steps can be performed in other orders or simultaneously. Secondly, those skilled in the art should also be aware that the embodiments described in the specification are all preferred embodiments, and the actions and modules involved are not necessarily required by the present application.
[0105] In the above embodiments, the description of each embodiment has its own emphasis. For parts that are not described in detail in a certain embodiment, reference can be made to the relevant descriptions of other embodiments.
[0106] The above is only an exemplary embodiment of the present disclosure, and the scope of the present disclosure cannot be limited thereto. That is, any equivalent changes and modifications made according to the teachings of the present disclosure are still within the scope of the present disclosure. After considering the specification and practicing the disclosure here, those skilled in the art will easily think of the implementation scheme of the present disclosure. This application is intended to cover any modification, use or adaptation of the present disclosure, which follows the general principles of the present disclosure and includes common knowledge or customary technical means in the technical field not recorded in the present disclosure. The description and examples are only regarded as exemplary, and the scope and spirit of the present disclosure are defined by the claims.
[0107] The technical features of the above embodiments may be combined arbitrarily. To make the description concise, not all possible combinations of the technical features in the above embodiments are described. However, as long as there is no contradiction in the combination of these technical features, they should be considered to be within the scope of this specification.
[0108] It will be easily understood by those skilled in the art that the above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the present invention should be included in the protection scope of the present invention.
Claims
1. A method for configuring energy storage for a rail transit network-source-storage-vehicle system taking hydrogen energy storage into account, characterized in that: include: Establishing an objective function of the rail transit network-source-storage-vehicle system, wherein the objective function is the sum of the daily net income of the photovoltaic power generation system, the wind power generation system, the hydrogen energy system and the regenerative braking system; Establishing constraint conditions, wherein the constraint conditions include at least one of photovoltaic and wind power installed capacity constraints, power balance constraints, hydrogen storage constraints, and regenerative braking device power constraints; Based on the constraint conditions, solving the maximum value of the objective function; According to the constraint conditions when the objective function takes the maximum value, the installed capacity of photovoltaic and wind power, the power of the regenerative braking system and the hydrogen storage capacity are determined.
2. The method according to claim 1, characterized in that The power balance constraints include: The load power of the rail transit network-source-storage-vehicle system is the sum of the real-time power of the photovoltaic power generation system, the real-time power of the wind power generation system, the real-time power of the regenerative braking system, the real-time power of the hydrogen storage system and the power supply and demand of the power grid. When the power supply and demand of the power grid is a positive value, it indicates that the rail transit network-source-storage-vehicle system purchases electricity from the power grid. When the power supply and demand of the power grid is a negative value, it indicates that the rail transit network-source-storage-vehicle system supplies electricity to the power grid.
3. The method according to claim 2, characterized in that The method further comprises: According to the traction load power prediction model, the load power of the rail transit network-source-storage-vehicle system is obtained; According to the photovoltaic power generation power prediction model, the real-time power of the photovoltaic power generation system is obtained; According to the wind power generation power prediction model, the real-time power of the wind power generation system is obtained; The real-time power of the hydrogen storage system is obtained by calculating the sum of the real-time power of the fuel cell, the real-time power of the battery and the real-time power of the electrolyzer.
4. The method according to claim 1, characterized in that The hydrogen storage constraints include quantity constraints, electrolyzer power constraints, fuel cell power constraints and battery capacity constraints; The quantity constraint is that the quantity of the electrolyzer, hydrogen storage tank, fuel cell and battery are all within their respective preset quantity ranges; The electrolytic cell power constraint is that the real-time power of the electrolytic cell does not exceed the maximum working power of the electrolytic cell; The fuel cell power constraint is that the real-time power of the fuel cell does not exceed the maximum operating power of the fuel cell; The battery capacity constraint is that the battery capacity does not exceed the maximum capacity of the battery.
5. The method according to claim 4, characterized in that The hydrogen storage constraints also include constraints on the amount of hydrogen stored in the hydrogen storage tank and the amount of hydrogen consumed, including: in, They are the amount of hydrogen stored in the hydrogen storage tank and the amount of hydrogen consumed at time t respectively; All are binary numbers; They are the upper limit coefficient of hydrogen storage and the upper limit coefficient of hydrogen consumption of the hydrogen storage tank at time t respectively; They are the upper limit coefficient and lower limit coefficient of the hydrogen storage tank capacity respectively.
6. The method according to claim 1, characterized in that The power constraint of the regenerative braking device includes the power constraint of the power electronic device and the constraint of the energy storage device in the regenerative braking system.
7. The method according to claim 1, characterized in that Solving the maximum value of the objective function based on the constraint condition includes solving the maximum value of the objective function using CPLEX based on the constraint condition.
8. A computer device, characterized in that: The method comprises a memory, a processor and a computer program stored in the memory, wherein the processor executes the computer program to implement the steps of the method according to any one of claims 1 to 7.
9. A computer-readable storage medium having a computer program stored thereon, characterized in that: When the computer program is executed by a processor, the steps of the method according to any one of claims 1 to 7 are implemented.
10. A computer program product, comprising a computer program, characterized in that When the computer program is executed by a processor, the steps of the method according to any one of claims 1 to 7 are implemented.