Intelligent snow removal method and device, electronic equipment and medium

By acquiring and processing the pre-snowfall period, the actual snowfall amount is determined to control the heating and snow removal of photovoltaic modules, which solves the problem of high camera detection costs in the existing technology and achieves cost-saving snow removal control.

CN118801802APending Publication Date: 2024-10-18DAS SOLAR CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410880686.1
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-02
Publication Date
2024-10-18

AI Technical Summary

Technical Problem

Existing photovoltaic module snow removal technology requires specially set up cameras to detect snow thickness, which has high application costs and limited scenarios.

Method used

By obtaining the pre-snowfall period, preprocessing is performed to determine the initial snowfall period, determine whether the current time belongs to these periods, and obtain the actual snowfall amount. If it is within the preset range, the heating equipment is controlled to remove snow, without the need for a dedicated camera to monitor the snow thickness.

Benefits of technology

It enables heating snow removal to be started at the appropriate time, reducing snow removal costs and avoiding the need for dedicated cameras.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118801802A_ABST
    Figure CN118801802A_ABST
Patent Text Reader

Abstract

The invention provides an intelligent snow removal method and device, electronic equipment and a medium, and relates to the technical field of intelligent snow removal of photovoltaic modules, the method comprises the following steps: obtaining a plurality of pre-snowfall time periods, the pre-snowfall time periods being a period in which the snowfall probability is greater than a preset probability threshold within a preset time; pre-processing the plurality of pre-snowfall time periods to obtain a plurality of initial snowfall time periods; acquiring first time, and determining a target snowfall time period from the plurality of initial snowfall time periods according to the first time; the actual snowfall amount of the area where the equipment to be subjected to snow removal is located in the target snowfall time period is obtained; whether the actual snowfall belongs to a preset snowfall range or not is judged, and if yes, the equipment to be subjected to snow removal is controlled to heat and remove snow. According to the invention, the snow removal cost of intelligent snow removal of the photovoltaic module is saved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of intelligent snow removal for photovoltaic modules, and in particular to an intelligent snow removal method, device, electronic equipment and medium. Background Art

[0002] On snowy days, snow easily accumulates on the surface of photovoltaic modules. In the prior art, the method of removing snow on the surface of photovoltaic modules is to set up a special camera for detecting the thickness of snow on the surface of photovoltaic modules, and when the thickness of snow reaches a certain level, turn on the heating and snow removal function of the photovoltaic modules. This method of the prior art requires a special camera for detecting the thickness of snow, and the application cost is high. Summary of the invention

[0003] In view of this, the purpose of the present invention is to overcome the deficiencies in the prior art and provide an intelligent snow removal method, device, electronic device and medium, aiming to reduce the cost of snow removal. The present invention provides the following technical solutions:

[0004] In a first aspect, the present invention provides an intelligent snow removal method, the method comprising:

[0005] Acquire multiple predicted snowfall periods, where the predicted snowfall period is a period of time within a preset time when the probability of snowfall is greater than a preset probability threshold;

[0006] Preprocessing the plurality of predicted snowfall periods to obtain a plurality of initial snowfall periods;

[0007] Acquire a first time, and determine a target snowfall period from a plurality of initial snowfall periods according to the first time;

[0008] Obtaining the actual snowfall amount in the area where the snow removal equipment is located during the target snowfall period;

[0009] Determine whether the actual snowfall is within a preset snowfall range, and if so, control the snow removal equipment to be heated to remove snow.

[0010] In one embodiment, the multiple predicted snowfall periods are pre-processed to obtain multiple initial snowfall periods, including: determining the interval time between adjacent predicted snowfall periods, and judging whether each interval time is less than a preset interval time; if so, merging adjacent predicted snowfall periods and the interval time between adjacent predicted snowfall periods to obtain the initial snowfall period.

[0011] In one embodiment, determining a target snowfall period from a plurality of initial snowfall periods according to the first time includes: if the first time belongs to any of the initial snowfall periods, determining the initial snowfall period to which the first time belongs as the target snowfall period.

[0012] In one embodiment, the method further includes: if the first time does not belong to any of the initial snowfall periods, reacquiring the first time.

[0013] In one embodiment, before obtaining the actual snowfall amount corresponding to the target snowfall period, it also includes: obtaining a second time, determining whether the second time belongs to the target snowfall period, if not, obtaining the actual snowfall amount corresponding to the target snowfall period; if yes, re-obtaining the second time.

[0014] In one embodiment, controlling the snow-removing equipment to heat and remove snow includes: obtaining the current ambient temperature, snow density, and equipment inclination angle, and determining the heating power of the snow-removing equipment based on the current ambient temperature, the snow density, the equipment inclination angle, and the actual snowfall; and controlling the snow-removing equipment to heat and remove snow with the heating power.

[0015] In one embodiment, the method further includes: if the actual snowfall amount does not fall within the preset snowfall amount range, generating an alarm signal, wherein the alarm signal is used to prompt mechanical snow removal.

[0016] In a second aspect, the present invention provides an intelligent snow removal device, the device comprising:

[0017] A first acquisition module is used to acquire a plurality of predicted snowfall periods, wherein the predicted snowfall period is a period of time within a preset time when the probability of snowfall is greater than a preset probability threshold;

[0018] A preprocessing module, used for preprocessing the plurality of pre-snowfall periods to obtain a plurality of initial snowfall periods;

[0019] A determination module, configured to obtain a first time, and determine a target snowfall period from a plurality of initial snowfall periods according to the first time;

[0020] The second acquisition module is used to obtain the actual snowfall amount in the area where the snow removal equipment is located during the target snowfall period;

[0021] The snow removal module is used to determine whether the actual snowfall is within the preset snowfall range. If so, the snow removal equipment is controlled to heat and remove snow.

[0022] In a third aspect, the present invention provides an electronic device, comprising a memory and a processor, wherein the memory stores a computer program, and when the computer program runs on the processor, the intelligent snow removal method described in the first aspect is executed.

[0023] In a fourth aspect, the present invention provides a computer-readable storage medium storing a computer program, wherein the computer program is executed by a processor to perform the intelligent snow removal method described in the first aspect.

[0024] The intelligent snow removal method, device, electronic device and medium provided by the present invention obtain multiple pre-snowfall periods, wherein the pre-snowfall period is a period of time within a preset time when the probability of snowfall is greater than a preset probability threshold; pre-process the multiple pre-snowfall periods to obtain multiple initial snowfall periods; obtain a first time, and determine a target snowfall period from the multiple initial snowfall periods according to the first time; obtain the actual snowfall amount in the area where the snow removal equipment is located within the target snowfall period; determine whether the actual snowfall amount falls within the preset snowfall amount range, and if so, control the snow removal equipment to be removed to heat and remove snow. The embodiment of the present invention obtains multiple snowfall periods, determines the target snowfall period from the multiple snowfall periods, compares the actual snowfall amount corresponding to the target snowfall period with the preset snowfall amount range, and then controls the snow removal equipment to be removed to start heating and snow removal at an appropriate time, and snow removal control can be achieved without setting up a special camera to monitor the thickness of snow accumulation, thereby saving application costs.

[0025] In order to make the above-mentioned objects, features and advantages of the present invention more obvious and understandable, preferred embodiments are given below and described in detail with reference to the accompanying drawings. BRIEF DESCRIPTION OF THE DRAWINGS

[0026] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the drawings required for use in the embodiments are briefly introduced below. It should be understood that the following drawings only show certain embodiments of the present invention and therefore should not be regarded as limiting the scope. For ordinary technicians in this field, other related drawings can be obtained based on these drawings without creative work.

[0027] Figure 1 A schematic diagram of a process of an intelligent snow removal method provided by an embodiment of the present invention is shown;

[0028] Figure 2 An example diagram of a snow removal situation provided by an embodiment of the present invention is shown;

[0029] Figure 3 A schematic diagram of the structure of an intelligent snow removal device provided by an embodiment of the present invention is shown;

[0030] Figure 4 A schematic structural diagram of an electronic device provided by an embodiment of the present invention is shown.

[0031] Description of main component symbols:

[0032] 300 - intelligent snow removal device; 310 - first acquisition module; 320 - pre-processing module; 330 - determination module; 340 - second acquisition module; 350 - snow removal module; 400 - electronic device; 401 - transceiver; 402 - processor; 403 - memory. DETAILED DESCRIPTION

[0033] Embodiments of the present invention are described in detail below, examples of which are shown in the accompanying drawings, wherein the same or similar reference numerals throughout represent the same or similar elements or elements having the same or similar functions. The embodiments described below with reference to the accompanying drawings are exemplary and are only used to explain the present invention, and cannot be understood as limiting the present invention.

[0034] In addition, the terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Therefore, the features defined as "first" and "second" may explicitly or implicitly include one or more of the features. In the description of the present invention, the meaning of "plurality" is two or more, unless otherwise clearly and specifically defined.

[0035] Unless otherwise defined, all technical and scientific terms used herein have the same meaning as those commonly understood by those skilled in the art to which this application belongs. The terms used herein in the specification of the template are only for the purpose of describing specific embodiments and are not intended to limit the present invention. The term "and / or" used herein includes any and all combinations of one or more of the related listed items.

[0036] Example 1

[0037] On snowy days, snow easily accumulates on the surface of photovoltaic modules, thus having a negative impact on the normal operation of the photovoltaic modules. In the prior art, in order to promptly remove snow from the surface of photovoltaic modules, cameras specifically used to detect snow conditions are arranged around the photovoltaic modules. Specifically, the camera collects images within a preset angle and a preset range, performs image analysis on the acquired images, and then obtains the current snow thickness, and takes corresponding snow removal measures according to the snow thickness. This method of the prior art requires a camera specifically set up to detect snow conditions, which has a high application cost and limited application scenarios. In order to reduce the cost of snow removal from photovoltaic modules, an embodiment of the present invention provides an intelligent snow removal method, please refer to Figure 1 , the method includes steps S110 to S150.

[0038] Step S110, obtaining a plurality of predicted snowfall periods, wherein the predicted snowfall period is a period of time within a preset time when the probability of snowfall is greater than a preset probability threshold.

[0039] In this embodiment, the snowfall probability of each time period can be determined by using the weather data within a preset time period, such as the next 24 hours, and the time period with a snowfall probability greater than a preset probability threshold is determined as a predicted snowfall period. For example, if the preset probability threshold is 60%, within the next 24 hours, the snowfall probability between 1 and 3 o'clock is 95%, the snowfall probability between 6 and 10 o'clock is 13%, the snowfall probability between 16 and 18 o'clock is 64%, the snowfall probability between 19 and 21 o'clock is 75%, and the snowfall probability of the remaining time periods is 0%, then it can be determined that within the next 24 hours, multiple predicted snowfall periods include: 1 to 3 o'clock, 16 to 18 o'clock, and 19 to 21 o'clock.

[0040] Step S120, pre-processing the plurality of predicted snowfall periods to obtain a plurality of initial snowfall periods.

[0041] Among multiple predicted snowfall periods, the interval time between any adjacent predicted snowfall periods may be different. In order to avoid frequent starting and stopping of snow removal equipment in the later stage, the predicted snowfall periods with interval time less than the preset interval time can be merged in advance.

[0042] For example, the preset interval time is 2 hours, and there are three pre-snowfall periods, among which pre-snowfall period 1 is from 1 to 3 o'clock, pre-snowfall period 2 is from 16 to 18 o'clock, and pre-snowfall period 3 is from 19 to 21 o'clock. It can be understood that the interval time between the adjacent pre-snowfall period 1 and the pre-snowfall period 2 is 13 hours, and the interval time between the adjacent pre-snowfall period 2 and the pre-snowfall period 3 is 1 hour. Since the interval time between the pre-snowfall period 2 and the pre-snowfall period 3 is less than the preset interval time of 2 hours, it is necessary to merge the pre-snowfall period 2 and the pre-snowfall period 3 to obtain an initial snowfall period, which includes the pre-snowfall period 2, the pre-snowfall period 3 and the interval time between the pre-snowfall period 2 and the pre-snowfall period 3.

[0043] In one embodiment, the multiple predicted snowfall periods are pre-processed to obtain multiple initial snowfall periods, including: determining the interval time between adjacent predicted snowfall periods, and judging whether each interval time is less than a preset interval time; if so, merging adjacent predicted snowfall periods and the interval time between adjacent predicted snowfall periods to obtain the initial snowfall period.

[0044] In this embodiment, if there are multiple adjacent pre-snowfall periods, and the interval time is less than the preset interval time, then the multiple adjacent pre-snowfall times and their interval time are merged to obtain an initial snowfall period, for example, the adjacent pre-snowfall period 1, pre-snowfall period 2 and pre-snowfall period 3, wherein the interval time between pre-snowfall period 1 and pre-snowfall period 2 is 1 hour, the interval time between pre-snowfall period 2 and pre-snowfall period 3 is 1.5 hours, and the preset interval time is 2 hours. Since the interval time between pre-snowfall period 1 and pre-snowfall period 2 is less than the preset interval time, the interval time between pre-snowfall period 2 and pre-snowfall period 3 is also less than the preset interval time. At this time, pre-snowfall period 1, pre-snowfall period 2, pre-snowfall period 3, the interval time between pre-snowfall period 1 and pre-snowfall period 2, and the interval time between pre-snowfall period 2 and pre-snowfall period 3 can be merged to obtain an initial snowfall period.

[0045] Step S130, obtaining a first time, and determining a target snowfall period from the plurality of initial snowfall periods according to the first time.

[0046] In this embodiment, the first time is used to determine whether the current time enters the initial snowfall period. If the first time belongs to any initial snowfall period, it can be determined that the current time has entered the initial snowfall period. It can be understood that the initial snowfall period to which the first time belongs can be determined as the target snowfall period.

[0047] In one embodiment, determining a target snowfall period from a plurality of initial snowfall periods according to the first time includes: if the first time belongs to any of the initial snowfall periods, determining the initial snowfall period to which the first time belongs as the target snowfall period.

[0048] In this embodiment, for example, the first time obtained is 14:00, and among multiple initial snowfall periods, there is an initial snowfall period of 12-16:00. At this time, the first time belongs to the initial snowfall period, so it can be determined that the target snowfall period is 12-16:00.

[0049] In one embodiment, the method further includes: if the first time does not belong to any of the initial snowfall periods, reacquiring the first time.

[0050] In this embodiment, if the first time does not belong to any initial snowfall period, it can be determined that the current time has not entered the initial snowfall period, and the first time is repeatedly obtained until the first time belongs to any initial snowfall period.

[0051] Step S140, obtaining the actual snowfall amount in the area where the snow removal equipment is located during the target snowfall period.

[0052] In this embodiment, the actual snowfall amount can be determined by re-acquiring weather data, wherein the actual snowfall amount can only be determined after the snowfall ends. Therefore, it is necessary to obtain a second time to determine whether the target snowfall period has ended, and then determine whether the snowfall has ended.

[0053] It should be noted that when the actual snowfall is less than the preset snowfall threshold, there is less snow on the surface of the equipment to be removed. At this time, even if the equipment to be removed is heated, the snow cannot slide off the surface of the equipment to be removed. The remaining snow is easily converted into ice and simply sticks to the surface of the equipment to be removed, which has a negative impact on the normal operation of the equipment. When the actual snowfall is greater than the preset threshold, the efficiency of heating and snow removal is not high.

[0054] In one embodiment, before obtaining the actual snowfall amount corresponding to the target snowfall period, it also includes: obtaining a second time, determining whether the second time belongs to the target snowfall period, if not, obtaining the actual snowfall amount corresponding to the target snowfall period; if yes, re-obtaining the second time.

[0055] In this embodiment, the second time is used to determine whether the target snowfall period has ended. If the second time does not belong to the target snowfall period, it can be determined that the target snowfall period has ended, that is, the snowfall has ended, so that the actual snowfall amount corresponding to the target snowfall period can be obtained. If the second time still belongs to the target snowfall period, it can be determined that the snowfall is still continuing, and the second time needs to be continuously monitored until the snowfall ends.

[0056] For example, the target snowfall period is 12 to 14 o'clock. If the second time is 13 o'clock, which belongs to the target snowfall period, the second time will continue to be monitored until the second time does not belong to the target snowfall period. If the second time is 14:01, it can be understood that the second time does not belong to the target snowfall period at this time, and it can be considered that the snowfall has ended at this time. At this time, the actual snowfall corresponding to the target snowfall period can be determined by obtaining weather data.

[0057] In another embodiment, it is also possible to obtain camera data, wherein the camera data includes snowfall images, analyze the snowfall images, and then determine whether the snowfall has ended. Specifically, when the first time belongs to any initial snowfall period, the camera is turned on to monitor the snowfall situation, and it is possible to determine whether the snowfall has ended by obtaining and analyzing the snowfall images taken by the camera.

[0058] Step S150, determining whether the actual snowfall is within a preset snowfall range, and if so, controlling the snow removal equipment to be heated to remove snow.

[0059] It should be noted that the time required for the snow removal equipment to heat and remove snow is affected by factors such as snow density, current ambient temperature, equipment inclination, heating power and actual snowfall. For details, please refer to Figure 2 , Figure 2 The relationship between snow removal time and its influencing factors is shown. Among them, the equipment tilt angle refers to the tilt angle of the snow removal equipment, which is mainly affected by latitude. The closer to the north and south, the greater the equipment tilt angle.

[0060] In one embodiment, controlling the snow-removing equipment to heat and remove snow includes: obtaining the current ambient temperature, snow density, and equipment inclination angle, and determining the heating power of the snow-removing equipment based on the current ambient temperature, the snow density, the equipment inclination angle, and the actual snowfall; and controlling the snow-removing equipment to heat and remove snow with the heating power.

[0061] In this embodiment, the snow removal time of the snow removal equipment is different under different heating powers. To ensure the snow removal efficiency, it is necessary to determine the appropriate heating power based on the current ambient temperature, the snow density, the photovoltaic panel inclination and the actual snowfall. It can be understood that the current ambient temperature, snow density and equipment inclination cannot be changed. Therefore, at a specific time and in a specific area, the heating and snow removal time is mainly affected by the heating power.

[0062] In one embodiment, the method further includes: if the actual snowfall amount does not fall within the preset snowfall amount range, generating an alarm signal, wherein the alarm signal is used to prompt mechanical snow removal.

[0063] It should be noted that when the actual snowfall is less than the preset snowfall range or greater than the preset snowfall range, the snow removal efficiency of relying solely on the snow removal equipment to heat the snow is not high. At this time, an alarm signal can be issued to prompt mechanical snow removal. It is understandable that after the above step S120, it can be foreseen that there will be no more snowfall in the short term in the future. At this time, prompting mechanical snow removal also reduces the difficulty of snow removal.

[0064] The embodiment of the present invention provides an intelligent snow removal method, which obtains multiple pre-snowfall periods, wherein the pre-snowfall period is a period of time within a preset time when the probability of snowfall is greater than a preset probability threshold; pre-processes the multiple pre-snowfall periods to obtain multiple initial snowfall periods; obtains a first time, and determines a target snowfall period from the multiple initial snowfall periods according to the first time; obtains the actual snowfall in the area where the snow removal equipment is located within the target snowfall period; determines whether the actual snowfall falls within the preset snowfall range, and if so, controls the snow removal equipment to be heated for snow removal. The embodiment of the present invention obtains multiple snowfall periods, determines the target snowfall period from the multiple snowfall periods, compares the actual snowfall corresponding to the target snowfall period with the preset snowfall range, and then controls the snow removal equipment to be heated for snow removal at an appropriate time. Snow removal control can be achieved without setting up a dedicated camera to monitor the thickness of snow, thereby saving application costs.

[0065] Example 2

[0066] The embodiment of the present invention provides an intelligent snow removal device. For details, see Figure 3 , the intelligent snow removal device 300 comprises:

[0067] The first acquisition module 310 is used to acquire a plurality of predicted snowfall periods, wherein the predicted snowfall period is a period of time within a preset time when the probability of snowfall is greater than a preset probability threshold;

[0068] A preprocessing module 320 is used to preprocess the plurality of pre-snowfall periods to obtain a plurality of initial snowfall periods;

[0069] A determination module 330 is used to obtain a first time, and determine a target snowfall period from the plurality of initial snowfall periods according to the first time;

[0070] The second acquisition module 340 is used to obtain the actual snowfall amount in the area where the snow removal equipment is located during the target snowfall period;

[0071] The snow removal module 350 is used to determine whether the actual snowfall is within a preset snowfall range. If so, the snow removal equipment is controlled to heat and remove snow.

[0072] In one embodiment, the preprocessing module 320 is also used to determine the interval time between adjacent pre-snowfall periods, and to determine whether each interval time is less than a preset interval time; if so, the adjacent pre-snowfall periods and the interval time between adjacent pre-snowfall periods are merged to obtain the initial snowfall period.

[0073] In one embodiment, the determination module 330 is further configured to determine the initial snowfall period to which the first time belongs as the target snowfall period if the first time belongs to any of the initial snowfall periods.

[0074] In one embodiment, the determination module 330 is further configured to re-acquire the first time if the first time does not belong to any of the initial snowfall periods.

[0075] In one embodiment, the second acquisition module 340 is also used to obtain a second time, determine whether the second time belongs to the target snowfall period, and if not, obtain the actual snowfall amount corresponding to the target snowfall period; if yes, re-acquire the second time.

[0076] In one embodiment, the snow removal module 350 is also used to obtain the current ambient temperature, snow density, and equipment inclination angle, and determine the heating power of the equipment to be snow removed based on the current ambient temperature, the snow density, the equipment inclination angle and the actual snowfall; and control the equipment to be snow removed to heat and remove snow with the heating power.

[0077] In one embodiment, the snow removal module 350 is further configured to generate an alarm signal if the actual snowfall does not fall within the preset snowfall range, and the alarm signal is configured to prompt mechanical snow removal.

[0078] The intelligent snow removal device 300 provided in the embodiment of the present invention can execute the intelligent snow removal method provided in the above method embodiment 1, and will not be described again here to avoid repetition.

[0079] The embodiment of the present invention provides an intelligent snow removal device, which obtains multiple pre-snowfall periods through a first acquisition module, wherein the pre-snowfall period is a period of time within a preset time when the probability of snowfall is greater than a preset probability threshold; the pre-processing module pre-processes the multiple pre-snowfall periods to obtain multiple initial snowfall periods; the determination module obtains the first time, and determines the target snowfall period from the multiple initial snowfall periods according to the first time; the second acquisition module obtains the actual snowfall amount in the area where the snow removal equipment is located within the target snowfall period; the snow removal module determines whether the actual snowfall amount falls within the preset snowfall amount range, and if so, controls the snow removal equipment to be removed to heat and remove snow. The embodiment of the present invention obtains multiple snowfall periods, determines the target snowfall period from the multiple snowfall periods, compares the actual snowfall amount corresponding to the target snowfall period with the preset snowfall amount range, and then controls the snow removal equipment to be removed to start heating and snow removal at an appropriate time, and snow removal control can be achieved without setting up a special camera to monitor the snow thickness, thereby saving application costs.

[0080] Example 3

[0081] In addition, an embodiment of the present invention provides an electronic device, including a memory and a processor, wherein the memory stores a computer program, and when the computer program runs on the processor, the intelligent snow removal method provided in embodiment 1 is executed.

[0082] For details, see Figure 4 The electronic device 400 includes: a transceiver 401, a bus interface and a processor 402, wherein the processor 402 is used to obtain multiple pre-snowfall periods, wherein the pre-snowfall period is a period of time within a preset time when the probability of snowfall is greater than a preset probability threshold; pre-process the multiple pre-snowfall periods to obtain multiple initial snowfall periods; obtain a first time, and determine a target snowfall period from the multiple initial snowfall periods according to the first time; obtain the actual snowfall amount in the area where the snow removal equipment is located within the target snowfall period; determine whether the actual snowfall amount falls within the preset snowfall amount range, and if so, control the snow removal equipment to be heated to remove snow.

[0083] In one embodiment, the processor 402 is further used to determine the interval time between adjacent predicted snowfall periods, and to determine whether each interval time is less than a preset interval time; if so, the adjacent predicted snowfall periods and the interval time between adjacent predicted snowfall periods are merged to obtain the initial snowfall period.

[0084] In one embodiment, the processor 402 is further configured to determine the initial snowfall period to which the first time belongs as a target snowfall period if the first time belongs to any of the initial snowfall periods.

[0085] In one embodiment, the processor 402 is further configured to reacquire the first time if the first time does not belong to any of the initial snowfall periods.

[0086] In one embodiment, the processor 402 is further used to obtain a second time, determine whether the second time belongs to the target snowfall period, and if not, obtain the actual snowfall amount corresponding to the target snowfall period; if yes, re-acquire the second time.

[0087] In one embodiment, the processor 402 is also used to obtain the current ambient temperature, snow density, and equipment inclination angle, and determine the heating power of the equipment to be snow removed based on the current ambient temperature, the snow density, the equipment inclination angle and the actual snowfall; and control the equipment to be snow removed to heat and remove snow with the heating power.

[0088] In one embodiment, the processor 402 is further configured to generate an alarm signal if the actual snowfall does not fall within the preset snowfall range, and the alarm signal is configured to prompt mechanical snow removal.

[0089] In the embodiment of the present invention, the electronic device 400 further includes a memory 403. Figure 4In the embodiment, the bus architecture may include any number of interconnected buses and bridges, specifically linking various circuits of one or more processors represented by processor 402 and memory represented by memory 403. The bus architecture may also link various other circuits such as peripherals, voltage regulators, and power management circuits, which are well known in the art and are therefore not further described herein. The bus interface provides an interface. The transceiver 401 may be a plurality of components, i.e., including a transmitter and a receiver, providing a unit for communicating with various other devices on a transmission medium. The processor 402 is responsible for managing the bus architecture and general processing, and the memory 403 may store data used by the processor 402 when performing operations.

[0090] The electronic device 400 provided in the embodiment of the present invention can execute the intelligent snow removal method provided in the above method embodiment 1, which will not be described again here to avoid repetition.

[0091] Example 4

[0092] In addition, an embodiment of the present invention provides a computer-readable storage medium, on which a computer program is stored. When the computer program is executed by a processor, the intelligent snow removal method provided in Example 1 is implemented.

[0093] In this embodiment, the computer-readable storage medium may be a read-only memory (ROM), a random access memory (RAM), a magnetic disk, or an optical disk.

[0094] The computer-readable storage medium provided in this embodiment can implement the intelligent snow removal method provided in Example 1, and will not be described again here to avoid repetition.

[0095] In all examples shown and described herein, any specific values ​​should be interpreted as merely exemplary and not as limiting, and thus other examples of the exemplary embodiments may have different values.

[0096] It should be noted that similar reference numerals and letters denote similar items in the following drawings, and therefore, once an item is defined in one drawing, further definition and explanation thereof is not required in subsequent drawings.

[0097] The above-mentioned embodiments only express several implementation methods of the present invention, and the description thereof is relatively specific and detailed, but it cannot be understood as limiting the scope of the present invention. It should be pointed out that for ordinary technicians in this field, several variations and improvements can be made without departing from the concept of the present invention, which all belong to the protection scope of the present invention.

Claims

1. An intelligent snow removal method, characterized in that: The method comprises: Acquire multiple predicted snowfall periods, where the predicted snowfall period is a period of time within a preset time when the probability of snowfall is greater than a preset probability threshold; Preprocessing the plurality of predicted snowfall periods to obtain a plurality of initial snowfall periods; Acquire a first time, and determine a target snowfall period from a plurality of initial snowfall periods according to the first time; Obtaining the actual snowfall amount in the area where the snow removal equipment is located during the target snowfall period; Determine whether the actual snowfall is within a preset snowfall range, and if so, control the snow removal equipment to be heated to remove snow.

2. The intelligent snow removal method according to claim 1, characterized in that: The pre-processing of the plurality of predicted snowfall periods to obtain a plurality of initial snowfall periods comprises: Determine the interval time between adjacent predicted snowfall periods, and judge whether each of the interval time is less than a preset interval time; If so, the adjacent predicted snowfall periods and the intervals between the adjacent predicted snowfall periods are merged to obtain the initial snowfall period.

3. The intelligent snow removal method according to claim 2, characterized in that: The step of determining a target snowfall period from a plurality of initial snowfall periods according to the first time includes: If the first time belongs to any of the initial snowfall periods, the initial snowfall period to which the first time belongs is determined as the target snowfall period.

4. The intelligent snow removal method according to claim 3, characterized in that: The method further comprises: If the first time does not belong to any of the initial snowfall periods, the first time is acquired again.

5. The intelligent snow removal method according to claim 4, characterized in that: Before obtaining the actual snowfall amount corresponding to the target snowfall period, the method further includes: Acquire a second time, determine whether the second time belongs to the target snowfall period, and if not, acquire the actual snowfall amount corresponding to the target snowfall period; If yes, re-acquire the second time.

6. The intelligent snow removal method according to claim 5, characterized in that: The controlling the snow removal equipment to be heated to remove snow comprises: Obtaining the current ambient temperature, snow density, and equipment inclination angle, and determining the heating power of the snow removal equipment according to the current ambient temperature, the snow density, the equipment inclination angle, and the actual snowfall; The snow removal equipment is controlled to heat and remove snow with the heating power.

7. The intelligent snow removal method according to claim 1, characterized in that: The method further comprises: If the actual snowfall does not fall within the preset snowfall range, an alarm signal is generated, and the alarm signal is used to prompt mechanical snow removal.

8. An intelligent snow removal device, characterized in that: The device comprises: A first acquisition module is used to acquire a plurality of predicted snowfall periods, wherein the predicted snowfall period is a period of time within a preset time when the probability of snowfall is greater than a preset probability threshold; A preprocessing module, used for preprocessing the plurality of pre-snowfall periods to obtain a plurality of initial snowfall periods; A determination module, configured to obtain a first time, and determine a target snowfall period from a plurality of initial snowfall periods according to the first time; The second acquisition module is used to obtain the actual snowfall amount in the area where the snow removal equipment is located during the target snowfall period; The snow removal module is used to determine whether the actual snowfall is within the preset snowfall range. If so, the snow removal equipment is controlled to heat and remove snow.

9. An electronic device, characterized in that: The invention comprises a memory and a processor, wherein the memory stores a computer program, and when the computer program is run on the processor, the intelligent snow removal method according to any one of claims 1 to 7 is executed.

10. A computer-readable storage medium, characterized in that: The computer-readable storage medium stores a computer program, and when the computer program is executed by a processor, the intelligent snow removal method according to any one of claims 1 to 7 is implemented.