Mass high-concurrency data access method and system for large-scale power grid nodes

By constructing an empirical model of data access tides and dynamic resource allocation, the computational load imbalance problem caused by data tides and sample sparsity in the existing technology is solved, the efficiency and stability of power grid data access are improved, and the security of the power grid is ensured. run.

CN118802928APending Publication Date: 2024-10-18DEZHOU POWER SUPPLY COMPANY OF STATE GRID SHANDONG ELECTRIC POWER +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410832228.0
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-06-26
Publication Date
2024-10-18

AI Technical Summary

Technical Problem

Existing technologies fail to effectively consider the impact of data tides on computing load balancing, and ignore the data access situation and sample sparsity in the future, resulting in unreasonable allocation of server resources, increased data backlog and delay, and affecting the operating efficiency and security of the power grid. sex.

Method used

Build a data access tidal experience model based on historical data access conditions, predict the peak value and peak time of data access volume, dynamically update resource allocation, adjust computing resource allocation based on server performance deviation, and optimize resource utilization and model accuracy.

Benefits of technology

It achieves balanced distribution of computing loads, reduces data backlog, improves the efficiency and stability of power grid data access, and ensures the safe operation of the power grid.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118802928A_ABST
    Figure CN118802928A_ABST
Patent Text Reader

Abstract

The invention relates to a massive high-concurrency data access method and system for large-scale power grid nodes, and belongs to the technical field of telecommunication. Constructing a data access tide empirical model; inputting the access condition of the data in the observation time window into the data access tide empirical model, and judging the tide condition of the data volume; based on the data tide condition, computing resource allocation is carried out, the balance of resource allocation of a power grid computing load among different nodes is improved, data backlog is reduced, and efficient processing of massive high-concurrency data access of large-scale power grid nodes is achieved. An error function is constructed based on data tide prediction results of recent several time slots, and then relevant parameters of the data access tide empirical model are updated. And related parameters in the computing resource allocation method are updated based on the current performance deviation of the server. The model accuracy and the resource utilization rate are improved, accurate, timely and reliable access of power grid data is ensured, and powerful support is provided for safe and stable operation of a power grid.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to a method and system for accessing massive and high-concurrency data for large-scale power grid nodes, and belongs to the technical field of electrical communications. Background Art

[0002] At present, with the digital transformation of the power system, massive high-concurrency data from various sensors, monitoring equipment, metering equipment, etc. are widely accessed, which puts forward higher requirements for the monitoring, fault diagnosis and prediction of the power grid operation status. Massive high-concurrency data access has great advantages such as wide range and strong scalability, which provides important support for the digital transformation of the power system. However, due to the rapid growth of terminal data access in the power system, the massive data operation generated has brought tremendous pressure to the power system. The current data access method and system ignore the data access situation at future moments, resulting in the inability to reasonably allocate server resources at peak moments, large data backlog, and a surge in latency. At the same time, due to the uneven distribution of samples, the number of samples in some areas is small, that is, the sample sparsity will lead to low efficiency of parameter update learning, which seriously affects the overall performance of the system and restricts the safe and stable operation of the power grid. Therefore, there is an urgent need to design a method and system for massive high-concurrency data access for large-scale power grid nodes. By considering the historical data access tide situation, a data access tide model is constructed, and according to the data access situation in the time window and the historical data comparative analysis, the resource allocation related parameters are dynamically updated to achieve massive high-concurrency data access in the power system, reduce the data transmission and processing pressure of the power grid, and improve the operation efficiency, stability and security of the power system. However, the existing technology: (1) does not consider the impact of data tide on computing load balancing, ignores the data access situation in the future, resulting in the inability to reasonably allocate server resources at peak times, large data backlogs, and a surge in latency. (2) Ignores the impact of sample sparsity and actual container performance deviation on the data access tide empirical model and resource allocation model, resulting in poor model accuracy and low resource utilization.

[0003] In view of the above-mentioned defects, the present invention aims to create a method and system for accessing massive and high-concurrency data for large-scale power grid nodes, so as to make it more valuable for industrial use. Summary of the invention

[0004] In order to solve the above technical problems, the purpose of the present invention is to provide a method and system for accessing massive and high-concurrency data for large-scale power grid nodes.

[0005] The present invention provides a method for accessing massive and high-concurrency data to large-scale power grid nodes, and the specific access steps are as follows:

[0006] Firstly, based on the historical data access situation, a data access tidal empirical model is constructed; secondly, the data access situation in the observation time window is input into the data access tidal empirical model to judge the tidal situation of the data volume, and obtain the peak value of the data access volume and the time when the peak value arrives; finally, based on the data tidal situation, the resource allocation is calculated to obtain the resource allocation model;

[0007] Based on the data tidal prediction results of the data access tidal empirical model in recent time slots, an error function is constructed, and then the weight and bias parameter matrix of the data access tidal empirical model is updated. Finally, the relevant parameters in the computing resource allocation method are updated based on the current performance deviation of the server to realize massive and high-concurrency data access for large-scale power grid nodes.

[0008] Furthermore, the steps of constructing the data access tidal empirical model are as follows:

[0009] Define T time slots, the set is Define M servers, the set is Among them, g m is the mth server; define the observation time window length as L, server g m The data access tidal empirical model is as follows:

[0010]

[0011] Where: is the actual data access vector in an observation time window, including time slot tL to time slot t server g m The actual amount of data access, in, For time slot t server g m The actual amount of data access; To predict the data access vector, including time slot t to time slot T pro Server m The predicted data access volume, in, Server g is time slot t+1 m The predicted data access volume; f m () is the server g trained based on historical tidal data m The data access tidal network can be used to predict the future T by observing the L access data volume in the time window. pro The amount of access data in each time slot is predicted.

[0012] Furthermore, the specific steps of inputting the access situation of data in the observation time window into the data access tidal empirical model, judging the tidal situation of the data volume, and obtaining the peak value of the data access volume and the time when the peak value arrives are:

[0013] After using the historical data access volume to train the data access to the tidal network, the data access volume in the observation time window is input into the data access tidal empirical model to obtain the future T pro The predicted access data volume of each time slot; and further calculate the future data access volume peak value and peak arrival time T m (t);

[0014]

[0015] Furthermore, the specific steps of allocating computing resources based on data tide conditions are:

[0016] Calculate resource allocation based on the access volume of the server in the current time slot, the predicted access volume peak and the peak arrival time; server g m The allocated computing resources ψ m (t) is:

[0017]

[0018] Where ψ(t) is the total amount of computing resources that can be allocated in time slot t, ω m (t) is server g m The greater the access volume of the server in the current time slot, the higher the predicted access volume peak, and the closer the peak arrival time, the more computing resources are allocated.

[0019] Furthermore, the specific steps of constructing an error function based on the data tidal prediction results of the data access tidal empirical model in recent time slots, and then updating the weight and bias parameter matrix of the data access tidal empirical model are:

[0020] Based on the data access tidal empirical model, define the server g m The weight and bias parameter matrices of the data access tidal empirical model are W m and B m For the data access tidal network training at time slot t, the error function is constructed using the data tidal prediction results of time slot t and the previous L time slots, and the weight and bias parameter matrix of the data access tidal empirical model is updated. m The error function of the data access tidal empirical model is:

[0021]

[0022] Among them, a0δ t-l+1 is the error weight of the data tide prediction at time slot t-l+1, a0 is the unit error weight, δ>1 is the discount coefficient, which means that the closer to time slot t, the greater the error weight of the data tide prediction. Server g for time slot t-l+1 m The predicted data access volume, Server g for time slot t-l+1 m The actual amount of data access;

[0023] Then the update of the weight and bias parameter matrix of the data access tidal empirical model is as follows:

[0024]

[0025] Among them, μ m For server g m The learning rate parameter of the data access tidal empirical model, ΔW m and ΔB m Server g m The data is accessed to the weight update amount and bias parameter update amount of the tidal empirical model.

[0026] Furthermore, the specific steps of updating the relevant parameters in the computing resource allocation method based on the current performance deviation of the server are:

[0027] Based on the resource allocation model, define the time slot t server g m The time delay is τ m (t), and assuming that the minimum server delay requirement is τ0, if the server g m The delay meets the minimum server delay requirement, that is, τ m (t)≤τ0, the resource allocation model parameters do not need to be updated, otherwise, update the server g according to the following formula m The weight ω m :

[0028]

[0029] This formula means that for containers that cannot meet the latency requirements, their computing resource allocation ratio should be appropriately increased by increasing the weight of the service to improve the effectiveness and robustness of the resource allocation model.

[0030] A massive high-concurrency data access system for large-scale power grid nodes, comprising:

[0031] The data collection terminal on the end side;

[0032] Edge-side servers;

[0033] A power grid control center in the cloud;

[0034] The acquisition terminal on the end side is responsible for collecting power grid operation status monitoring data and transmitting it to the edge side server for processing;

[0035] The power grid control center is responsible for making decisions on the allocation of computing resources to each server to achieve load balancing.

[0036] Furthermore, the power grid control center deploys software modules, specifically including a data tidal model construction submodule, a data tidal calculation submodule, a computing resource allocation submodule, a tidal experience model parameter update submodule, a resource allocation model update submodule and a data storage submodule; wherein:

[0037] Data storage submodule: used to store historical data access volume, for training data access to the tidal network and network parameter updates;

[0038] Data tidal model construction submodule: used to train the data access tidal network based on historical data access conditions and build a data access tidal empirical model;

[0039] Data tide calculation submodule: used to determine the tidal situation of data volume based on the data in the observation time window, and calculate the peak value of data access volume and the time when the peak value arrives;

[0040] Computing resource allocation submodule: used to allocate computing resources to each server based on data tide conditions;

[0041] Tidal empirical model parameter update submodule: based on the tidal situation of the current time slot data, update the relevant parameters of the data access tidal empirical model;

[0042] Resource allocation model update submodule: used to update and calculate relevant parameters in the resource allocation method based on the current performance deviation of the server.

[0043] A massive high-concurrency data access device for large-scale power grid nodes, comprising:

[0044] Modeling module: used to build a data access tidal empirical model based on historical data access conditions; input the data access conditions within the observation time window into the data access tidal empirical model to determine the tidal conditions of the data volume, and obtain the peak value of the data access volume and the time when the peak value arrives; finally, based on the data tidal conditions, calculate resource allocation and obtain a resource allocation model;

[0045] Update module: It is used to construct an error function based on the data tidal prediction results of the data access tidal empirical model in recent time slots, and then update the weight and bias parameter matrix of the data access tidal empirical model; finally, based on the current performance deviation of the server, the relevant parameters in the computing resource allocation method are updated to realize massive high-concurrency data access for large-scale power grid nodes.

[0046] Furthermore, the steps of constructing the data access tidal empirical model in the modeling module are as follows:

[0047] Define T time slots, the set is Define M servers, the set is Among them, g m is the mth server; define the observation time window length as L, server g m The data access tidal empirical model is as follows:

[0048]

[0049] Where: is the actual data access vector in an observation time window, including time slot tL to time slot t server g m The actual amount of data access, in, For time slot t server g m The actual amount of data access; To predict the data access vector, including time slot t to time slot T pro Server m The predicted data access volume, in, Server g is time slot t+1 m The predicted data access volume; f m () is the server g trained based on historical tidal data m The data access tidal network can be used to predict the future T by observing the L access data volume in the time window. pro The amount of access data in each time slot is predicted.

[0050] Furthermore, in the updating module, the specific steps of constructing an error function based on the data tidal prediction results of the data access tidal empirical model in recent time slots, and then updating the weight and bias parameter matrix of the data access tidal empirical model are as follows:

[0051] Based on the data access tidal empirical model, define the server g m The weight and bias parameter matrices of the data access tidal empirical model are W m and B m For the data access tidal network training at time slot t, the error function is constructed using the data tidal prediction results of time slot t and the previous L time slots, and the weight and bias parameter matrix of the data access tidal empirical model is updated. m The error function of the data access tidal empirical model is:

[0052]

[0053] Among them, a0δ t-l+1is the error weight of the data tide prediction at time slot t-l+1, a0 is the unit error weight, δ>1 is the discount coefficient, which means that the closer to time slot t, the greater the error weight of the data tide prediction. Server g for time slot t-l+1 m The predicted data access volume, Server g for time slot t-l+1 m The actual amount of data access;

[0054] Then the update of the weight and bias parameter matrix of the data access tidal empirical model is as follows:

[0055]

[0056]

[0057] Among them, μ m For server g m The learning rate parameter of the data access tidal empirical model, ΔW m and ΔB m Server g m The data is accessed to the weight update amount and bias parameter update amount of the tidal empirical model.

[0058] By means of the above scheme, the present invention has at least the following advantages:

[0059] 1. The present invention proposes a computing load balancing method that takes data tide into account. First, based on the historical data access situation, a data access tidal empirical model is constructed; secondly, the data access situation within the observation time window is input into the data access tidal empirical model to determine the tidal situation of the data volume, that is, the peak value of the data access volume and the time when the peak value arrives; finally, based on the data tidal situation, computing resources are allocated to improve the balance of resource allocation between different nodes of the power grid computing load, reduce data backlog, and realize efficient processing of massive and high-concurrency data access to large-scale power grid nodes.

[0060] 2. The present invention proposes a tidal empirical model and resource allocation model update method that takes into account sample sparsity. First, an error function is constructed based on the data tidal prediction results of recent time slots, and then the relevant parameters of the data access tidal empirical model are updated. Then, the relevant parameters in the calculation resource allocation method are updated based on the current performance deviation of the server. Improve the model accuracy and resource utilization, ensure accurate, timely and reliable access to power grid data, and provide strong support for the safe and stable operation of the power grid.

[0061] The above description is only an overview of the technical solution of the present invention. In order to more clearly understand the technical means of the present invention and implement it according to the contents of the specification, the following is a detailed description of the preferred embodiments of the present invention in conjunction with the accompanying drawings. BRIEF DESCRIPTION OF THE DRAWINGS

[0062] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the drawings required for use in the embodiments are briefly introduced below. It should be understood that the following drawings only show a certain embodiment of the present invention and therefore should not be regarded as limiting the scope. For ordinary technicians in this field, other related drawings can be obtained based on these drawings without creative work.

[0063] Figure 1 This is a diagram of a massive high-concurrency data access system for large-scale power grid nodes of the present invention;

[0064] Figure 2 It is a software module diagram for massive high-concurrency data access for large-scale power grid nodes of the present invention;

[0065] Figure 3 It is a flow chart of the implementation of the method for accessing massive and high-concurrency data to large-scale power grid nodes according to the present invention. DETAILED DESCRIPTION

[0066] The specific implementation of the present invention is further described in detail below in conjunction with the accompanying drawings and examples. The following examples are used to illustrate the present invention, but are not intended to limit the scope of the present invention.

[0067] The present invention proposes a massive high-concurrency data access system for large-scale power grid nodes, such as Figure 1 As shown in the figure. It includes the data collection terminal on the end side, the server on the edge side, and the power grid control center on the cloud layer. The data collection terminal on the end side is responsible for collecting the power grid operation status monitoring data and transmitting it to the edge side server for processing. The power grid control center is responsible for making decisions on the allocation of computing resources to each server to achieve load balancing.

[0068] The present invention proposes a massive high-concurrency data access software module for large-scale power grid nodes, which is deployed in the cloud-based power grid control center. Figure 2 As shown, it specifically includes a data tidal model construction submodule, a data tidal calculation submodule, a computing resource allocation submodule, a tidal experience model parameter update submodule, a resource allocation model update submodule and a data storage submodule.

[0069] Data storage submodule: stores historical data access volume for training data access to the Tidal network and network parameter updates.

[0070] Data tidal model construction submodule: Based on the historical data access situation, the data access tidal network is trained to build a data access tidal empirical model.

[0071] Data tide calculation submodule: Based on the data in the observation time window, judge the tidal situation of the data volume, calculate the peak value of the data access volume and the time when the peak value arrives.

[0072] Computing resource allocation submodule: Allocate computing resources to each server based on data tide conditions.

[0073] Tidal empirical model parameter update submodule: based on the tidal conditions of the current time slot data, update the relevant parameters of the data access tidal empirical model.

[0074] Resource allocation model update submodule: Based on the server's current performance deviation update, calculate the relevant parameters in the resource allocation method.

[0075] The present invention proposes a massive high-concurrency data access method for large-scale power grid nodes, which is deployed in a massive high-concurrency data access software module for large-scale power grid nodes, including a computational load balancing method taking into account data tides and a tidal empirical model and resource allocation model update method taking into account sample sparsity. The implementation process is as follows Figure 3 The specific description is as follows:

[0076] S1: Computational load balancing method taking data tide into account

[0077] The present invention proposes a computing load balancing method that takes data tide into account. First, based on the historical data access situation, a data access tide empirical model is constructed; secondly, the data access situation within the observation time window is input into the data access tide empirical model to determine the tidal situation of the data volume, that is, the peak value of the data access volume and the time when the peak value arrives; finally, based on the data tide situation, computing resources are allocated. The specific process is as follows:

[0078] Step 1: The present invention considers T time slots, which are Consider M servers, the set is Among them, g m is the mth server. Considering the observation time window length is L, server g m The data access tidal empirical model is as follows:

[0079]

[0080] Where: is the actual data access vector in an observation time window, including time slot tL to time slot t server g m The actual amount of data access, in, For time slot t server g m The actual amount of data access. To predict the data access vector, including time slot t to time slot T pro Serverm The predicted data access volume, in, Server g is time slot t+1 m The predicted data access volume. m () is the server g trained based on historical tidal data m The data access tidal network can be used to predict the future T by observing the L access data volume in the time window. pro The amount of access data in each time slot is predicted.

[0081] Step 2: Based on the data access situation within the observation time window, the data is input into the tidal empirical model to obtain the data access peak value and the time when the peak value arrives.

[0082] After using the historical data access volume to train the data access to the tidal network, the data access volume in the observation time window is input into the data access tidal empirical model to obtain the future T pro The predicted access data volume of each time slot. And further calculate the future data access volume peak value and peak arrival time T m (t).

[0083]

[0084] Step 3: Calculate resource allocation for each server based on data tide. The traditional method only considers the data access status at the current moment when calculating resource allocation, but ignores the data access status of a server at a future moment, resulting in a large amount of data backlog on the server when the data access peak arrives, and the delay increases sharply. Therefore, the present invention calculates resource allocation based on the access volume of the server in the current time slot, the predicted access peak and the peak arrival time. Server g m The allocated computing resources ψ m (t) is expressed as:

[0085]

[0086] Where ψ(t) is the total amount of computing resources that can be allocated in time slot t, ω m (t) is server g m The greater the access volume of the server in the current time slot, the higher the predicted access volume peak, and the closer the peak arrival time, the more computing resources will be allocated.

[0087] The present invention dynamically allocates computing resources according to the current data access status of the server and the predicted data access trend. This allocation strategy ensures that resources are reasonably allocated to where they are most needed, thereby avoiding overloading of some servers due to excessive data volume, while ensuring that the resources of other servers are fully utilized, effectively achieving load balancing.

[0088] S2: Tidal empirical model and resource allocation model update method considering sample sparsity

[0089] The present invention proposes a tidal empirical model and a resource allocation model update method that takes into account sample sparsity. First, an error function is constructed based on the data tidal prediction results of recent time slots, and then the relevant parameters of the data access tidal empirical model are updated. Then, the relevant parameters in the calculation resource allocation method are updated based on the current performance deviation of the server. The specific process is as follows:

[0090] Step 4: Based on the data obtained in step 1, access the tidal empirical model. Suppose the server g m The weight and bias parameter matrices of the data access tidal empirical model are W m and B m For the data access tidal network training at time slot t, the error function is constructed using the data tidal prediction results of time slot t and the previous L time slots, and the weight and bias parameter matrix of the data access tidal empirical model is updated. m The error function of the data access tidal empirical model can be expressed as

[0091]

[0092] Among them, a0δ t-l+1 is the error weight of the data tide prediction at time slot t-l+1, a0 is the unit error weight, δ>1 is the discount coefficient, which means that the closer to time slot t, the greater the error weight of the data tide prediction. Server g for time slot t-l+1 m The predicted data access volume, Server g for time slot t-l+1 m The actual amount of data access.

[0093] Then the update of the weight and bias parameter matrix of the data access tidal empirical model is as follows:

[0094]

[0095] Among them, μ m For server g m The learning rate parameter of the data access tidal empirical model, ΔW m and ΔB m Server g m The data is accessed to the weight update amount and bias parameter update amount of the tidal empirical model.

[0096] Step 5: Based on the resource allocation model obtained in step 3, assume that time slot t server g m The time delay is τ m(t), and assuming that the minimum server delay requirement is τ0, if the server g m The delay meets the minimum server delay requirement, that is, τ m (t)≤τ0, the resource allocation model parameters do not need to be updated, otherwise, update the server g according to the following formula m The weight ω m :

[0097]

[0098] This formula means that for containers that cannot meet the latency requirements, their computing resource allocation ratio should be appropriately increased by increasing the weight of the service to improve the effectiveness and robustness of the resource allocation model.

[0099] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. It should be pointed out that a person skilled in the art can make several improvements and modifications without departing from the technical principles of the present invention, and these improvements and modifications should also be regarded as within the scope of protection of the present invention.

Claims

1. A method for accessing massive and high-concurrency data for large-scale power grid nodes, characterized in that The specific access steps are: Firstly, based on the historical data access situation, a data access tidal empirical model is constructed; secondly, the data access situation in the observation time window is input into the data access tidal empirical model to judge the tidal situation of the data volume, and obtain the peak value of the data access volume and the time when the peak value arrives; finally, based on the data tidal situation, the resource allocation is calculated to obtain the resource allocation model; Based on the data tidal prediction results of the data access tidal empirical model in recent time slots, an error function is constructed, and then the weight and bias parameter matrix of the data access tidal empirical model is updated. Finally, the relevant parameters in the computing resource allocation method are updated based on the current performance deviation of the server to realize massive and high-concurrency data access for large-scale power grid nodes.

2. A method for accessing massive and high-concurrency data for large-scale power grid nodes according to claim 1, characterized in that: The steps of constructing the data access tidal empirical model are as follows: Define T time slots, the set is Define M servers, the set is Among them, g m is the mth server; define the observation time window length as L, server g m The data access tidal empirical model is as follows: Where: is the actual data access vector in an observation time window, including time slot tL to time slot t server g m The actual amount of data access, in, For time slot t server g m The actual amount of data access; To predict the data access vector, including time slot t to time slot T pro Server m The predicted data access volume, in, Server g is time slot t+1 m The predicted data access volume; f m () is the server g trained based on historical tidal data m The data access tidal network can be used to predict the future T by observing the L access data volume in the time window. pro The amount of access data in each time slot is predicted.

3. The method for accessing massive and high-concurrency data for large-scale power grid nodes according to claim 1, characterized in that: The specific steps of inputting the data access situation in the observation time window into the data access tidal empirical model, judging the tidal situation of the data volume, and obtaining the data access volume peak value and the time when the peak value arrives are: After using the historical data access volume to train the data access to the tidal network, the data access volume in the observation time window is input into the data access tidal empirical model to obtain the future T pro The predicted access data volume of each time slot; and further calculate the future data access volume peak value and peak arrival time T m (t); 4. The method for accessing massive and high-concurrency data for large-scale power grid nodes according to claim 1, characterized in that: The specific steps of allocating computing resources based on data tide conditions are as follows: Calculate resource allocation based on the access volume of the server in the current time slot, the predicted access volume peak and the peak arrival time; server g m The allocated computing resources ψ m (t) is: Where ψ(t) is the total amount of computing resources that can be allocated in time slot t, ω m (t) is server g m The greater the access volume of the server in the current time slot, the higher the predicted access volume peak, and the closer the peak arrival time, the more computing resources are allocated.

5. The method for accessing massive and high-concurrency data for large-scale power grid nodes according to claim 1, characterized in that: The specific steps of constructing an error function based on the data tide prediction results of the data access tide experience model in recent time slots, and then updating the weight and bias parameter matrix of the data access tide experience model are: Based on the data access tidal empirical model, define the server g m The weight and bias parameter matrices of the data access tidal empirical model are W m and B m For the data access tidal network training at time slot t, the error function is constructed using the data tidal prediction results of time slot t and the previous L time slots, and the weight and bias parameter matrix of the data access tidal empirical model is updated. m The error function of the data access tidal empirical model is: Among them, a0δ t-l+1 is the error weight of the data tide prediction at time slot t-l+1, a0 is the unit error weight, δ>1 is the discount coefficient, which means that the closer to time slot t, the greater the error weight of the data tide prediction. Server g for time slot t-l+1 m The predicted data access volume, Server g for time slot t-l+1 m The actual amount of data access; Then the update of the weight and bias parameter matrix of the data access tidal empirical model is as follows: Among them, μ m For server g m The learning rate parameter of the data access tidal empirical model, ΔW m and ΔB m Server g m The data is accessed to the weight update amount and bias parameter update amount of the tidal empirical model.

6. The method for accessing massive and high-concurrency data for large-scale power grid nodes according to claim 1, characterized in that: The specific steps of updating the relevant parameters in the computing resource allocation method based on the current performance deviation of the server are: Based on the resource allocation model, define the time slot t server g m The delay is τ m (t), and assuming that the minimum server delay requirement is τ0, if the server g m The delay meets the minimum server delay requirement, that is, τ m (t)≤τ0, the resource allocation model parameters do not need to be updated, otherwise, update the server g according to the following formula m The weight ω m : This formula means that for containers that cannot meet the latency requirements, their computing resource allocation ratio should be appropriately increased by increasing the weight of the service to improve the effectiveness and robustness of the resource allocation model.

7. A massive high-concurrency data access system for large-scale power grid nodes, characterized by include: The data collection terminal on the end side; Edge-side servers; A power grid control center in the cloud; The acquisition terminal on the end side is responsible for collecting power grid operation status monitoring data and transmitting it to the edge side server for processing; The power grid control center is responsible for making decisions on the allocation of computing resources to each server to achieve load balancing.

8. A massive high-concurrency data access system for large-scale power grid nodes according to claim 7, characterized in that: The power grid control center deploys software modules, specifically including a data tidal model construction submodule, a data tidal calculation submodule, a computing resource allocation submodule, a tidal experience model parameter update submodule, a resource allocation model update submodule and a data storage submodule; wherein: Data storage submodule: used to store historical data access volume, for training data access to the tidal network and network parameter updates; Data tidal model construction submodule: used to train the data access tidal network based on historical data access conditions and build a data access tidal empirical model; Data tide calculation submodule: used to determine the tidal situation of data volume based on the data in the observation time window, and calculate the peak value of data access volume and the time when the peak value arrives; Computing resource allocation submodule: used to allocate computing resources to each server based on data tide conditions; Tidal empirical model parameter update submodule: based on the tidal situation of the current time slot data, update the relevant parameters of the data access tidal empirical model; Resource allocation model update submodule: used to update and calculate relevant parameters in the resource allocation method based on the current performance deviation of the server.

9. A massive high-concurrency data access device for large-scale power grid nodes, characterized in that include: Modeling module: used to build a data access tidal experience model based on historical data access conditions; The data access situation in the observation time window is input into the data access tide empirical model to determine the tidal situation of the data volume, and obtain the data access volume peak value and the time when the peak value arrives; Finally, based on the data tide situation, computing resources are allocated to obtain a resource allocation model; Update module: It is used to construct an error function based on the data tidal prediction results of the data access tidal empirical model in recent time slots, and then update the weight and bias parameter matrix of the data access tidal empirical model; finally, based on the current performance deviation of the server, the relevant parameters in the computing resource allocation method are updated to realize massive high-concurrency data access for large-scale power grid nodes.

10. The massive high-concurrency data access device for large-scale power grid nodes according to claim 9, characterized in that: The steps of constructing the data access tidal empirical model in the modeling module are as follows: Define T time slots, the set is Define M servers, the set is Among them, g m is the mth server; define the observation time window length as L, server g m The data access tidal empirical model is as follows: Where: is the actual data access vector in an observation time window, including time slot tL to time slot t server g m The actual amount of data access, in, For time slot t server g m The actual amount of data access; To predict the data access vector, including time slot t to time slot T pro Server m The predicted data access volume, in, Server g is time slot t+1 m The predicted data access volume; f m () is the server g trained based on historical tidal data m The data access tidal network can be used to predict the future T by observing the L access data volume in the time window. pro The amount of access data in each time slot is predicted.

11. The device for accessing massive and high-concurrency data for large-scale power grid nodes according to claim 9, characterized in that: In the updating module, the specific steps of constructing an error function based on the data tide prediction results of the data access tide experience model in recent time slots, and then updating the weight and bias parameter matrix of the data access tide experience model are as follows: Based on the data access tidal empirical model, define the server g m The weight and bias parameter matrices of the data access tidal empirical model are W m and B m For the data access tidal network training at time slot t, the error function is constructed using the data tidal prediction results of time slot t and the previous L time slots, and the weight and bias parameter matrix of the data access tidal empirical model is updated. m The error function of the data access tidal empirical model is: Among them, a0δ t-l+1 is the error weight of the data tide prediction at time slot t-l+1, a0 is the unit error weight, δ>1 is the discount coefficient, which means that the closer to time slot t, the greater the error weight of the data tide prediction. Server g for time slot t-l+1 m The predicted data access volume, Server g for time slot t-l+1 m The actual amount of data access; Then the update of the weight and bias parameter matrix of the data access tidal empirical model is as follows: Among them, μ m For server g m The learning rate parameter of the data access tidal empirical model, ΔW m and ΔB m Server g m The data is accessed to the weight update amount and bias parameter update amount of the tidal empirical model.