Communication resource scheduling method and system based on new energy state driving, and network equipment

By obtaining energy consumption values ​​and new energy consumption information of business types in the 5G network, calculating scheduling priorities and allocating communication resources, the problem of low utilization caused by the instability of new energy power supply is solved, and efficient resource scheduling and Sustainable energy utilization reduces operating costs.

CN118804109APending Publication Date: 2024-10-18CHINA MOBILE COMM LTD RES INST +1
View PDF 0 Cites 2 Cited by

Patent Information

Application Number
CN202410009593.1
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-01-02
Publication Date
2024-10-18

AI Technical Summary

Technical Problem

The intermittency and randomness of new energy power supply in 5G networks lead to low utilization of new energy by network equipment, making it difficult to effectively schedule communication resources, affecting business experience and system throughput.

Method used

By obtaining the energy consumption values ​​and new energy consumption information of different business types, calculate the scheduling priority of the business type, prioritize communication resources to maximize the consumption of new energy, and perform package scheduling or load storage when the new energy power is insufficient. Migrate and optimize resource allocation.

Benefits of technology

It improves the utilization rate of new energy, optimizes network resource allocation, reduces dependence on traditional power grids, reduces operating costs, and achieves sustainable use of energy.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118804109A_ABST
    Figure CN118804109A_ABST
Patent Text Reader

Abstract

The invention discloses a communication resource scheduling method and system driven by a new energy state and network equipment. The scheduling method comprises the steps that the network equipment acquires energy consumption values under different service types; the network equipment interacts new energy consumption information with the power distribution network in real time, wherein the new energy consumption information at least comprises the new energy electric quantity and the duration of the new energy electric quantity; and the network equipment allocates different communication resources to different types of communication services based on the energy consumption values of different service types, so that the current new energy electric quantity is consumed to the maximum extent. Based on the scheduling method, the maximum consumption of the new energy electric quantity can be ensured on the premise of effectively meeting the requirements of various services, so that the utilization rate of the new energy is improved, the resource distribution of the whole network is optimized, the dependence on a traditional power grid is reduced, and the sustainable utilization of the energy is favorably realized; in addition, the operation cost of the network can be reduced by utilizing the new energy to the maximum extent, so that the economic benefit of the network is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of communication scheduling technology, and in particular to a communication resource scheduling method, system and network equipment driven by a new energy state. Background Art

[0002] At present, 5G network technology has been widely deployed and has shown its advancement and efficiency in many aspects. 5G networks support various high-demand applications such as high-definition video streaming, large data transmission, and connectivity of IoT devices through the characteristics of high bandwidth and low latency. However, the large-scale use of 5G networks will also bring serious high energy consumption problems. The energy consumption of 5G networks is mainly composed of 5G base stations, air conditioners, and power supplies, among which the energy consumption of 5G base stations accounts for about 60%. There is an obvious dynamic relationship between the power consumption of 5G base stations and the business load. The business load is usually characterized by PRB utilization. The energy consumption of 5G base stations increases with the increase of PRB utilization.

[0003] New energy is seen as an important solution to solve energy and environmental problems and achieve the "dual carbon" goal. With the development of new power systems based on new energy, new energy will be more widely used in 5G networks, promoting the green and sustainable development of 5G networks.

[0004] However, the introduction of new energy sources has also brought new challenges to the wireless resource scheduling of 5G networks. Wireless resource scheduling mainly manages and allocates air interface wireless resources to provide data transmission services for terminals. The scheduling process is that the base station calculates the priority of the service data and users to be scheduled in the cell in each scheduling cycle, and allocates appropriate wireless resources to users according to the priority for sending and receiving data, maximizing system throughput while ensuring user service experience. In order to ensure different types of service experience, the 3GPP protocol defines 5QI (5G QoS Identifier) ​​to describe the indicators of service quality (QoS), which usually include delay, available bandwidth and reliability, etc., to help 5G networks make scheduling decisions to meet the needs of different services and users.

[0005] In the traditional energy power supply mode, the energy supply is stable, and resource scheduling mainly considers the random arrival of services, and allocates resources based on factors such as the QoS requirements of services and the channel quality of users. In the renewable energy power supply mode, due to the intermittent and random nature of renewable energy power generation, resource scheduling needs to consider changes in both service arrival and energy supply. Summary of the invention

[0006] The purpose of the present invention is to provide a communication resource scheduling method, system and network equipment driven by new energy status, which can reasonably schedule communication resources based on the supply status of new energy and the current business status to improve the utilization efficiency of new energy by network equipment.

[0007] In order to achieve the above-mentioned object, the present invention discloses a communication resource scheduling method driven by a new energy state, which is used for a communication network device equipped with a new energy power supply network. The scheduling method comprises:

[0008] The network device obtains energy consumption values ​​under different service types;

[0009] The network device exchanges new energy consumption information with the distribution network in real time, and the new energy consumption information at least includes the amount of new energy and the duration of the amount of new energy;

[0010] The network device allocates different communication resources to different types of communication services based on the energy consumption values ​​of different service types, so as to maximize the consumption of the current new energy electricity.

[0011] Preferably, when the amount of new energy power is not zero and the service cache in the network device is not empty:

[0012] Calculating the scheduling priority of each service type based on a preset priority calculation method, wherein the calculation parameters of the scheduling priority include at least a first parameter obtained based on the energy consumption value corresponding to the current service type;

[0013] Communication resources are preferentially allocated to the service types with high scheduling priorities.

[0014] Preferably, the calculation parameters of the scheduling priority also include: a second parameter obtained based on the wireless channel quality of the current user, a third parameter obtained based on the service bearer level requirement corresponding to the current service type, a fourth parameter obtained based on the service GBR rate requirement corresponding to the current service type, and a fifth parameter obtained based on the service cache waiting delay corresponding to the current service type.

[0015] Preferably, the calculation formula of the scheduling priority P is:

[0016] P=α1f(A)+α2f(B)+α3f(C)+α4f(D)+α5f(E)

[0017] Among them, f(A) is the first parameter; f(B) is the second parameter; α3f(C) is the third parameter; f(D) is the fourth parameter; f(E) is the fifth parameter; α1, α2, α3, α4, α5 are the weight factors corresponding to the first parameter, the second parameter, the third parameter, the fourth parameter, and the fifth parameter respectively.

[0018] Preferably, when the amount of new energy power is not zero and the service cache in the current network device is not empty:

[0019] The network device currently sends a first message to the core network or sends a second message to the terminal device;

[0020] The first message is used to trigger the core network to initiate a configuration update process of a service quality flow to provide a higher level of service transmission quality;

[0021] The second message is used to trigger the terminal device to initiate a configuration update process of the service quality flow to require a higher level of service transmission quality.

[0022] Preferably, when the amount of new energy power is not zero and the service cache in the current network device is empty:

[0023] The network device currently sends a third message to the terminal device or sends a fourth message to other adjacent network devices;

[0024] The third message is used to trigger the terminal device to actively initiate a large-capacity service demand based on new energy consumption;

[0025] The fourth message is used to trigger other adjacent base stations to actively initiate a cell switching service to migrate the load to the current network device.

[0026] Preferably, when the amount of electricity from the new energy source is zero and the service cache in the current network device is not empty:

[0027] The arrival time of the new energy power recovery is predicted. If the arrival time is less than a preset value, the delay-tolerant service is scheduled to accumulate packets to wait for the use of new energy.

[0028] The present invention also discloses a network device, which comprises a control processor, and the control processor works based on the above communication resource scheduling method.

[0029] The present invention also discloses a communication resource scheduling system, which comprises:

[0030] one or more processors;

[0031] Memory;

[0032] and one or more programs, wherein the one or more programs are stored in the memory and configured to be executed by the one or more processors, the programs comprising instructions for executing the communication resource scheduling method as described above.

[0033] The present invention also discloses a computer-readable storage medium, which includes a computer program, and the computer program can be executed by a processor to complete the communication resource scheduling method as described above.

[0034] Compared with the prior art, the scheduling method disclosed in the above technical solution of the present invention can obtain the power information of new energy in real time, and allocate communication resources to different types of communication services based on this information and the energy consumption values ​​of different business types. In this way, it can ensure that the power of new energy is consumed to the maximum extent while effectively meeting the needs of various businesses, thereby improving the utilization rate of new energy, optimizing the resource allocation of the entire network, reducing dependence on traditional power grids, and helping to achieve sustainable utilization of energy; in addition, by maximizing the utilization of new energy, the operating cost of the network can also be reduced, thereby improving the economic benefits of the network. BRIEF DESCRIPTION OF THE DRAWINGS

[0035] Figure 1 The present invention is a flow chart of a communication resource scheduling method in an embodiment of the present invention.

[0036] Figure 2 This is a signaling diagram of a configuration update process of a core network initiating a service quality flow based on a message sent by a base station in an embodiment of the present invention.

[0037] Figure 3 It is a signaling diagram between the terminal and the base station.

[0038] Figure 4 A signaling diagram of a process for updating the configuration of a quality of service flow requested by a terminal based on a message sent by a base station. DETAILED DESCRIPTION

[0039] In order to explain the technical content, structural features, achieved objectives and effects of the present invention in detail, the following is a detailed description in conjunction with the implementation methods and the accompanying drawings.

[0040] This embodiment discloses a communication resource scheduling method for a communication network device configured with a new energy power supply network, aiming to solve the problem of low utilization rate of new energy by network devices due to the randomness and instability of new energy power supply. The network device in this embodiment is a 5G base station, but it is not limited to this. For example, network devices such as wireless access points, relay stations, micro base stations (Micro Base Station), home base stations (Home Base Station) can use this method to optimize the utilization of new energy and the allocation of communication resources. In addition, the new energy in this embodiment can be various electric energy generated by renewable energy such as solar energy, wind energy, hydropower and bioenergy.

[0041] like Figure 1 , the scheduling method includes:

[0042] S1: The base station obtains energy consumption values ​​under different service types.

[0043] Specifically, the base station can obtain the base station energy consumption value under different PRB (Physical Resource Block) utilization rates and the average PRB utilization rates under different service types, and then obtain the energy consumption requirements of different service types to form a service type-energy consumption mapping relationship table. For example, different services such as WeChat, video, and games require different wireless resources for transmission. Usually, video and game service transmissions occupy more resources and generate higher energy consumption.

[0044] Taking the measured energy consumption of the 32TR 320W base station model at different PRB utilization rates as an example, based on the statistics of the historical transmission rate and resource allocation of services such as video and games, the average PRB utilization rate is obtained, and then the energy consumption demand estimate of the service is obtained as shown in Table 1.

[0045] Business Type Average PRB utilization Base station energy consumption (Watts) Video Services 20% 350 Gaming Business 15% 326 Other GBR services 5% 276 Other Non-GBR Business 0.7% 250

[0046] Table 1

[0047] S2: The base station and the power distribution network exchange new energy consumption information in real time, and the new energy consumption information at least includes the amount of new energy and the duration of the amount of new energy.

[0048] In this step, the base station can obtain the duration and corresponding power of the new energy according to the new energy consumption information interacting with the distribution network, and form a new energy time-power mapping relationship table, as shown in Table 2 below.

[0049] time Power (kW) hh1:mm1:ss1 xx …… …… hhn:mmn:ssn xx

[0050] Table 2

[0051] S3: The base station allocates different communication resources to different types of communication services based on the energy consumption values ​​of different service types with the goal of maximizing the consumption of new energy, so that the current new energy power is consumed to the maximum extent.

[0052] Taking Table 1 above as an example, the base station can first allocate communication resources for the video service. According to the base station energy consumption of the video service, if the new energy has not been fully consumed, communication resources can be allocated to the game service, followed by other GBR services and other Non-GBR services.

[0053] For any current base station, communication resources are scheduled in the following three situations based on different energy supply states and service states.

[0054] Case 1: The amount of new energy power is not zero, and the service cache in the network device is not empty.

[0055] In this case, the scheduling priority of each service type is calculated based on a preset priority calculation method, and the calculation parameters of the scheduling priority include at least a first parameter obtained based on the energy consumption value corresponding to the current service type. Communication resources are preferentially allocated to the service type with a high scheduling priority.

[0056] On the other hand, the calculation parameters of the scheduling priority also include: a second parameter obtained based on the wireless channel quality of the current user, a third parameter obtained based on the service bearer level requirement corresponding to the current service type, a fourth parameter obtained based on the service GBR rate requirement corresponding to the current service type, and a fifth parameter obtained based on the service cache waiting delay corresponding to the current service type.

[0057] Based on this, the calculation formula of the scheduling priority P is:

[0058] P=α1f(A)+α2f(B)+α3f(C)+α4f(D)+α5f(E)

[0059] Among them, f(A) is the first parameter; f(B) is the second parameter; α3f(C) is the third parameter; f(D) is the fourth parameter; f(E) is the fifth parameter; α1, α2, α3, α4, α5 are the weight factors corresponding to the first parameter, the second parameter, the third parameter, the fourth parameter, and the fifth parameter respectively.

[0060] Specifically, when the amount of new energy is not zero, that is, when the base station is powered by new energy, the sum of α1, α2, α3, α4, and α5 is 1, and when the amount of new energy is zero, the sum of α2, α3, α4, and α5 is 1. It should also be noted that each weight factor can be configured differently according to actual operating requirements.

[0061] For the first parameter f(A), an optional calculation method is: f(A)=Service_EC / BS_EC_MAX, which represents the ratio of the energy consumption value corresponding to the current service type (Service_EC) to the total energy consumption of the current base station (BS_EC_MAX).

[0062] For the second parameter f(B), an optional calculation method is: f(B) = TB_Size / TB_Size_MAX, which represents the ratio of the transport block (TB) size supported by the user's current modulation and coding scheme (MCS) to the maximum TB block size.

[0063] For the third parameter f(C), an optional calculation method is: f(C) = Default_Priority_Level, where Default_Priority_Level is the service bearer level, which can be directly obtained from the default priority configured in 5QI, and the value is an integer.

[0064] For the fourth parameter f(D), an optional calculation method is: f(D)=Vflow_speed / BS_Throughput_AVG, which represents the ratio of the service rate (Vflow_speed) to the average throughput of the base station (BS_Throughput_AVG).

[0065] For the fifth parameter f(E), an optional calculation method is: f(E)=Delay / Delay_Target, which represents the ratio of the service waiting scheduling time (Delay) mapped by 5QI to the service delay requirement (Delay_Target).

[0066] On the other hand, if the amount of new energy is not zero and the service cache in the current network device is not empty, the communication resources can also be scheduled based on the QoS flow configuration update. Specifically, the current base station sends a first message to the core network through an N2 message, such as Figure 2 , inform the core network that the current base station is in the new energy consumption mode and can provide a higher level of service transmission quality. Therefore, the core network is triggered by the first message to initiate a configuration update process of the service quality flow to provide a higher level of service transmission quality.

[0067] Currently, the base station also sends a second message to the terminal device via an SI message, such as Figure 3 , the base station is in the new energy consumption mode and can provide a higher level of service transmission quality. Therefore, the second message is used to trigger the terminal device to initiate a configuration update process of the service quality flow, such as Figure 4 , to require a higher level of business transmission quality.

[0068] Case 2: When the amount of renewable energy is not zero, and the service cache in the current network device is empty.

[0069] In this case, the base station can inform local users through broadcast messages that the base station is currently in the new energy consumption mode and whether the user has any business that needs to be processed in advance.

[0070] Specifically, the base station currently sends the third message to the terminal device or sends the fourth message to other adjacent base stations.

[0071] Through the third message, the terminal device is triggered to actively initiate a large-capacity business demand based on new energy consumption.

[0072] Through the fourth message, other adjacent base stations are triggered to actively initiate a cell switching service, so as to migrate the load to the current base station.

[0073] In this embodiment, the base station can inform the terminal in the SI message that the current base station energy supply mode is the new energy mode. If the terminal has a large bandwidth service, it can actively trigger the service demand and indicate in the Scheduling Request that it is a service demand based on new energy consumption.

[0074] The base station can indicate the target base station in the RESOURCE STATUS REQUEST message, such as defining a 1-bit information indication in the ReportCharacteristics information element, which is a resource status request based on new energy consumption. If the target base station has service load that can be migrated, a cell handover can be initiated.

[0075] Case 3: The amount of renewable energy power is zero, and the service cache in the current network device is not empty.

[0076] In this case, the arrival time of the new energy power recovery is predicted. If the arrival time is less than the preset value, the delay-tolerant service is scheduled to be packaged to wait for the use of new energy, thereby improving the utilization rate of new energy.

[0077] In summary, the communication resource scheduling method disclosed in the present invention can obtain the power information of new energy in real time, and allocate communication resources for different types of communication services based on this information and the energy consumption values ​​of different service types, so that the power of new energy can be maximized while effectively meeting the needs of various services, thereby improving the utilization rate of new energy, optimizing the resource allocation of the entire network, reducing dependence on traditional power grids, and helping to achieve sustainable use of energy. In addition, by maximizing the use of new energy, the operating cost of the network can also be reduced, thereby improving the economic benefits of the network.

[0078] In another preferred embodiment of the present invention, a network device is also disclosed, which includes a control processor, and the control processor works based on the communication resource scheduling method as described above.

[0079] The present invention also discloses a communication resource scheduling system, which includes one or more processors, a memory and one or more programs, wherein the one or more programs are stored in the memory and are configured to be executed by the one or more processors, and the program includes instructions for executing the communication resource scheduling method as described above. The processor can adopt a general central processing unit (CPU), a microprocessor, an application specific integrated circuit (ASIC), or one or more integrated circuits, for executing related programs to implement the functions required to be executed by the modules in the communication resource scheduling system of the embodiment of the present application, or to execute the communication resource scheduling method of the method embodiment of the present application.

[0080] The present invention also discloses a computer-readable storage medium, which includes a computer program, and the computer program can be executed by a processor to complete the communication resource scheduling method as described above. The computer-readable storage medium can be any available medium that can be accessed by a computer or a data storage device such as a server or a data center that includes one or more available media integrated. The available medium can be a read-only memory (ROM), or a random access memory (RAM), or a magnetic medium, such as a floppy disk, a hard disk, a tape, a magnetic disk, or an optical medium, such as a digital versatile disc (DVD), or a semiconductor medium, such as a solid state disk (SSD), etc.

[0081] The embodiment of the present application also discloses a computer program product or a computer program, which includes a computer instruction stored in a computer-readable storage medium. A processor of an electronic device reads the computer instruction from the computer-readable storage medium, and the processor executes the computer instruction, so that the electronic device executes the above-mentioned communication resource scheduling method.

[0082] The above disclosure is only the preferred embodiment of the present invention, which certainly cannot be used to limit the scope of rights of the present invention. Therefore, equivalent changes made according to the scope of the patent application of the present invention are still within the scope covered by the present invention.

Claims

1. A communication resource scheduling method driven by a new energy state, for use in a communication network device equipped with a new energy power supply network, characterized in that: The scheduling method includes: The network device obtains energy consumption values ​​under different service types; The network device exchanges new energy consumption information with the distribution network in real time, and the new energy consumption information at least includes the amount of new energy and the duration of the amount of new energy; The network device allocates different communication resources to different types of communication services based on the energy consumption values ​​of different service types, so as to maximize the consumption of the current new energy electricity.

2. The communication resource scheduling method according to claim 1, characterized in that: When the amount of new energy power is not zero and the service cache in the network device is not empty: Calculating the scheduling priority of each service type based on a preset priority calculation method, wherein the calculation parameters of the scheduling priority include at least a first parameter obtained based on the energy consumption value corresponding to the current service type; Communication resources are preferentially allocated to the service types with high scheduling priorities.

3. The communication resource scheduling method according to claim 2, characterized in that: The calculation parameters of the scheduling priority also include: a second parameter obtained based on the wireless channel quality of the current user, a third parameter obtained based on the service bearer level requirement corresponding to the current service type, a fourth parameter obtained based on the service GBR rate requirement corresponding to the current service type, and a fifth parameter obtained based on the service cache waiting delay corresponding to the current service type.

4. The communication resource scheduling method according to claim 3, characterized in that: The calculation formula of the scheduling priority P is: P=α1f(A)+α2f(B)+α3f(C)+α4f(D)+α5f(E) Among them, f(A) is the first parameter; f(B) is the second parameter; α3f(C) is the third parameter; f(D) is the fourth parameter; f(E) is the fifth parameter; α1, α2, α3, α4, α5 are the weight factors corresponding to the first parameter, the second parameter, the third parameter, the fourth parameter, and the fifth parameter respectively.

5. The communication resource scheduling method according to claim 1, characterized in that: When the amount of new energy power is not zero and the service cache in the current network device is not empty: The network device currently sends a first message to the core network or sends a second message to the terminal device; The first message is used to trigger the core network to initiate a configuration update process of a service quality flow to provide a higher level of service transmission quality; The second message is used to trigger the terminal device to initiate a configuration update process of the service quality flow to require a higher level of service transmission quality.

6. The communication resource scheduling method according to claim 1, characterized in that: When the amount of new energy power is not zero and the service cache in the current network device is empty: The network device currently sends a third message to the terminal device or sends a fourth message to other adjacent network devices; The third message is used to trigger the terminal device to actively initiate a large-capacity service demand based on new energy consumption; The fourth message is used to trigger other adjacent base stations to actively initiate a cell switching service to migrate the load to the current network device.

7. The communication resource scheduling method according to claim 1, characterized in that: When the amount of new energy is zero and the service cache in the current network device is not empty: The arrival time of the new energy power recovery is predicted. If the arrival time is less than a preset value, the delay-tolerant service is scheduled to accumulate packets to wait for the use of new energy.

8. A network device, characterized in that: It comprises a control processor, which operates based on the communication resource scheduling method according to any one of claims 1 to 7.

9. A communication resource scheduling system, characterized in that: include: one or more processors; Memory; and one or more programs, wherein the one or more programs are stored in the memory and configured to be executed by the one or more processors, the programs comprising instructions for executing the communication resource scheduling method according to any one of claims 1 to 7.

10. A computer-readable storage medium, characterized in that: The method comprises a computer program which can be executed by a processor to implement the communication resource scheduling method as claimed in any one of claims 1 to 7.

Citation Information

Cited By

  • Network equipment energy-saving method and device, network equipment and electronic equipment

    CN119421224A

  • Energy-saving methods, devices, network equipment and electronic equipment for network devices

    CN119421224B