A base station air conditioning energy consumption management system and method
Through the IoT platform and FSU dynamic ring monitoring system, the base station environment and air conditioning data is monitored in real time, and the air conditioning output power is optimized using dynamic polling algorithms and EER values, which solves the problem of ineffective energy consumption and fault detection under high load operation of base station air conditioners, and realizes the problem of ineffective energy consumption and fault detection under high load operation of base station air conditioners. The stability of air conditioning group load balancing and remote control reduces operating costs.
Patent Information
- Application Number
- CN202411284882.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-13
- Publication Date
- 2024-11-15
- Estimated Expiration
- 2044-09-13
AI Technical Summary
Base station air conditioners have problems such as ineffective energy consumption and difficulty in detecting failures in time when operating at high loads. Traditional infrared control is easily disturbed, and machine learning models are difficult to quickly adapt to changes in practical applications, resulting in high operating costs and difficult maintenance.
Through the IoT platform and the FSU dynamic ring monitoring system, the base station environmental parameters and air conditioning data are monitored in real time, the air conditioning output power is intelligently adjusted using dynamic polling algorithm, and combined with EER value calculation to optimize the load balancing of the air conditioning group, realizing remote control and fault alarms.
It reduces the ineffective energy consumption of air conditioners, extends the service life of air conditioners, improves the success rate and stability of remote control, reduces operating costs, and achieves balanced operation of air conditioners.
Smart Images

Figure CN118804572B_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of base station energy conservation, and in particular to a base station air conditioning energy consumption management system and method. Background Art
[0002] With the rapid development of communication services such as 5G, the number of communication equipment in base station rooms has increased, the heat generation has increased, and air conditioners need to operate at high load all year round, and lack real-time monitoring. Traditional computer room air conditioners have many different types of products from different manufacturers. The operation of air conditioners is mainly managed by operation and maintenance personnel. There are problems such as unreasonable use of air conditioners, difficult to detect faults such as air conditioner aging, and inability to efficiently dispatch air conditioning refrigeration resources in real time, resulting in serious problems such as excessive refrigeration and invalid energy consumption caused by faults.
[0003] In the prior art, infrared control is usually used to remotely switch air conditioners on and off, and regular maintenance is performed to discover potential faults in air conditioners. Machine learning models or deep learning models are used to control air conditioner efficiency and energy consumption. However, infrared control signals are easily interfered by signals such as other light sources and electromagnetic radiation in the machine room, resulting in control failure, mode switching errors, and unstable control. Regular maintenance of base stations consumes a lot of manpower and material resources due to the scattered and remote locations of base stations, and it is difficult to comprehensively and timely repair problems with air conditioners. Machine learning models or deep learning models are prone to overfitting due to their high complexity, that is, the model performs well on training data, but cannot effectively respond to new and unseen data in actual applications. When changes occur in base station communication equipment and air conditioning equipment or temperature changes, resulting in changes in the required cooling capacity, it is difficult to quickly adapt and make reasonable control. In addition, a large amount of computing resources are required, the operating cost is high, and it is difficult to update and maintain. Summary of the invention
[0004] The present application is made in view of the above-mentioned problems, and its purpose is to provide a base station air-conditioning energy consumption management system and method, remotely control the air-conditioning equipment through the Internet of Things platform, monitor the base station environmental parameters and the working data of the air-conditioning in real time and issue fault alarms through the FSU (Facility Status Unit) dynamic environment monitoring system, calculate the EER (Energy Efficiency Ratio) value of each air-conditioning and the real-time cooling demand of the base station, turn on a suitable number of air-conditioners and the sum of the EER values of each air-conditioning turned on is the largest in the same air-conditioning quantity allocation scheme of all air-conditioning, thereby achieving energy-saving effects and reducing the ineffective energy consumption of the air-conditioning; use a dynamic polling algorithm to intelligently adjust the output power of the air-conditioning, so that the air-conditioning group achieves load balancing, avoids damage to the air-conditioning due to long-term full-load operation, and extends the service life of the air-conditioning.
[0005] Specifically as follows, the first aspect of the present application provides a base station air conditioning energy consumption management system, including a data storage module, an FSU dynamic environment monitoring system, an Internet of Things platform, an intelligent management and control module, and a base station air conditioning group;
[0006] The data storage module is used to store the working data and abnormal fault data of the air conditioner, and is electrically connected to the intelligent management and control module;
[0007] The data storage module uses cloud database for storage, providing a flexible, scalable, and highly available database solution. It does not require the underlying configuration and maintenance of the database, greatly simplifying the deployment and operation of the database. It is used to store the base station environmental parameters and air conditioning working data collected by the FSU dynamic environment monitoring system, as well as abnormal problem alarm data.
[0008] The FSU dynamic environment monitoring system is used to monitor the base station environmental parameters and air conditioning working data in real time, and to issue abnormal problem alarms, and is electrically connected to the intelligent management and control module;
[0009] The FSU dynamic environment monitoring system integrates multiple sensors and controllers, and is used in the management of communication base stations. It monitors the operating status and environmental parameters of base station equipment in real time, including communication equipment, air conditioners and environmental data. It can detect equipment failures and issue alarms in a timely manner by monitoring abnormal data, thus ensuring the stable operation of base station equipment and air conditioners.
[0010] The Internet of Things platform is used to remotely connect and control the air conditioning group equipment and is electrically connected to the intelligent management and control module;
[0011] The Internet of Things platform is used to connect the air-conditioning equipment of the base station, connect the equipment to the platform through communication methods such as WiFi and Bluetooth, and manage the equipment in a unified manner. Users can remotely start and stop the corresponding equipment through mobile phone apps, computer web pages, etc.
[0012] The intelligent management and control module is used to remotely control the base station air conditioning group through the Internet of Things platform, and to intelligently adjust the output power of the air conditioner by using a dynamic polling algorithm by calculating the real-time cooling demand of the base station and the EER value of each air conditioner;
[0013] The calculation formula for the cooling demand of the base station is as follows:
[0014] ;
[0015] ;
[0016] ;
[0017] ;
[0018] in: To meet the cooling needs of base stations; For indoor equipment load;
[0019] Dissipate heat load for personnel; is the heat conduction of the base station;
[0020] is the total power of the equipment; is the number of people in the base station; is the clustering coefficient;
[0021] is the sensible heat dissipation; is the thermal conductivity of the material;
[0022] is the base station area; is the temperature difference between indoor and outdoor;
[0023] The EER value calculation formula of the air conditioner is as follows: ;
[0024] in: is the EER value of the air conditioner;
[0025] is the cooling capacity of the air conditioner;
[0026] It is the power consumed during the air conditioning cooling process.
[0027] The indoor equipment load is one of the main sources of heat in the base station. The heat load is estimated by multiplying the total power of the equipment by 0.8, because there will be a certain margin when the equipment is actually used.
[0028] The clustering coefficient is based on the heat and moisture dissipation of adult males, and is a reduction factor that is considered according to the age, gender composition, and density of the personnel. Under the same environment, the heat and moisture dissipation of adult women is about 85% of that of adult men, and the heat and moisture dissipation of children is about 75% of that of adult men.
[0029] Use a dynamic polling algorithm to intelligently adjust the output power of the air conditioner, including:
[0030] The PLC uses a dynamic polling algorithm to monitor the changes in the load of each air conditioner in real time and control the output power of each air conditioner in real time by cyclically visiting each air conditioner. It can quickly adjust the output power of the air conditioner when an imbalance in the air conditioner load or a change in the cooling demand of the base station is detected. The load of the air conditioner is the ratio of the output power to the rated power.
[0031] When the dynamic polling algorithm detects that the load of an air conditioner exceeds 90% or is less than 40%, the output power of the air conditioner is controlled through the air conditioner's inverter to make the load of the air conditioner return to the average load of the air conditioners that have been turned on. If the average load of the air conditioners that have been turned on exceeds 80% or is less than 50%, the number of air conditioners that need to be turned on is readjusted.
[0032] Furthermore, the base station environmental parameters and the working status data of the air conditioner specifically include:
[0033] Indoor temperature and humidity data, outdoor temperature and humidity data, compressor running time, compressor suction and exhaust temperature, working voltage and current, air conditioning wind speed, and air conditioning group start and stop data.
[0034] The above data is monitored for calculating cooling demand on the one hand, and for real-time monitoring of the operating status of each device in the base station on the other hand, and alarms are issued when problems occur.
[0035] Furthermore, the abnormal problem alarm specifically includes:
[0036] Disconnection, temperature is too high, air conditioner does not cool, power is not turned on, and refrigerant is insufficient.
[0037] Disconnection means that the air conditioner is disconnected from the power supply, and an alarm is triggered when the working current is 0; overtemperature means that an alarm is triggered when the indoor temperature sensor is higher than 30 degrees; failure to cool means that the air conditioner is not turned on normally when there is no abnormality in the current or voltage; insufficient refrigerant means that there is insufficient refrigerant in the air conditioner, resulting in failure to cool normally.
[0038] Furthermore, the remote control of the base station air conditioning group by the Internet of Things technology specifically includes:
[0039] Step 1: Configure the base station WiFi module to AirLink mode;
[0040] Step 2: Connect the air conditioning group equipment of the base station to the IoT platform via WiFi;
[0041] Step 3: Add air conditioning equipment information on the IoT platform to ensure normal connection;
[0042] Step 4: Send control instructions to the IoT platform through the remote terminal;
[0043] Step 5: The IoT platform controls the corresponding air-conditioning equipment according to the control instructions.
[0044] Furthermore, the intelligent management and control module includes an intelligent gateway and a PLC.
[0045] An intelligent gateway is a network device that connects devices to the cloud and is used to remotely control the start and stop of air-conditioning equipment; a PLC is a programmable logic controller, a digital computing controller with a microprocessor for automated control that can load control instructions into memory at any time for storage and execution, and is used for logical control of the system.
[0046] Furthermore, a base station air conditioning energy consumption management method comprises the following steps:
[0047] Step 1: Collect base station environmental parameters and air conditioner working data in real time through the FSU dynamic environment monitoring system;
[0048] Step 2: Calculate the real-time cooling demand of the base station and the EER value of the air conditioner based on the base station environmental parameters and the working data of the air conditioner;
[0049] Step 3: Use the smart gateway to remotely control the start and stop of the air conditioners in the base station air conditioning group through the Internet of Things platform according to the cooling demand, the rated cooling capacity of the air conditioner and the EER value of the air conditioner;
[0050] According to the calculation results of the cooling demand, the air conditioner with the highest EER value among the unturned air conditioners is selected and turned on in turn. When 80% of the total rated cooling capacity of the selected air conditioner is greater than the cooling demand for the first time, the selected air conditioner is turned on through the intelligent gateway control, and the other unselected air conditioners are turned off.
[0051] Step 4: PLC applies dynamic polling algorithm to dynamically allocate cooling demand according to the processing capacity and load of each air conditioner turned on, so that the cooling load of the air conditioner is relatively balanced;
[0052] The PLC uses a dynamic polling algorithm to continuously monitor the load of each air conditioner and dynamically adjust the cooling capacity allocation strategy based on this information. This means that if an air conditioner is running at full load, more cooling capacity will be distributed to other air conditioners with lighter loads, thus avoiding wear and tear of the air conditioner compressor caused by a single air conditioner running at full load for a long time and reducing its service life.
[0053] Dynamically distribute cooling demand based on the processing capacity and load of each air conditioner, including:
[0054] Based on the total cooling demand of the base station, the PLC applies a dynamic polling algorithm to cyclically visit each air conditioner, and uses the ratio of the rated power of each turned-on air conditioner to the sum of the rated powers of all turned-on air conditioners as the weight for allocating cooling demand, so that the allocation of cooling demand is adapted to the cooling capacity of each air conditioner. Then, based on the load conditions of each air conditioner, the output power is adjusted to achieve the allocated cooling demand, so that the cooling load of each turned-on air conditioner is relatively balanced.
[0055] Step 5: Monitor the operating status of each air conditioner through the FSU dynamic environment monitoring system. When the air conditioner load is too high or too low, adjust the load in time to maintain the overall balance.
[0056] When the air conditioning load exceeds 90% or is less than 40% and lasts for 5 minutes, the PLC's dynamic polling algorithm is called again to adjust the load. If the load still cannot return to the normal range, the PLC display screen will show a polling operation error.
[0057] Furthermore, the EER value of the air conditioner is the ratio of the rated cooling capacity to the power consumption, that is, the cooling capacity corresponding to the unit power consumption of the air conditioner.
[0058] Furthermore, the remote control of the start and stop of the air conditioners in the base station air-conditioning group through the Internet of Things platform specifically includes: selecting the air-conditioning group with a higher EER value and a total customized cooling capacity greater than the cooling demand, and remotely starting it through the Internet of Things platform, and remotely shutting down other air-conditioning groups through the Internet of Things platform.
[0059] Furthermore, the remote start and the remote shutdown, the remote control method specifically includes: Internet of Things platform control, RS485 communication protocol control, smart switch hard shutdown.
[0060] RS485 communication is a serial communication protocol based on differential signal transmission, which can effectively resist common-mode interference and improve signal stability and transmission distance.
[0061] During remote control, three methods are used in turn: Internet of Things platform control, RS485 communication protocol control, and intelligent switch hard shutdown. They are remote signal control, remote line control, and remote switch control. Under various combinations, the success rate and stability of remote control are greatly improved compared with infrared remote control.
[0062] Furthermore, the load adjustment to maintain the overall balance specifically includes:
[0063] When the load is too low, the cooling demand is dynamically allocated through PLC to increase the load of this air conditioner. If the loads of multiple air conditioners are too low, the air conditioner with the lowest EER among the currently turned on air conditioners is turned off through the smart gateway;
[0064] When the load is too high, the cooling demand is dynamically allocated through PLC to reduce the load of this air conditioner. If the loads of multiple air conditioners are too high, the air conditioner with the highest EER among the currently unturned air conditioners is turned on through the smart gateway.
[0065] The loads of multiple air conditioners are too high or too low. Specifically, the number of air conditioners with too high or too low loads is greater than or equal to half of the total number of air conditioners that are turned on. This means that the change in the required cooling capacity makes it difficult for the currently turned-on air conditioner to meet the cooling demand within the appropriate load, and a new air conditioner needs to be restarted or shut down.
[0066] In the second aspect, the present application also provides a computing device, which has the function of implementing the method described in the first aspect above. The beneficial effects can be found in the description of the first aspect, which will not be repeated here. The function can be implemented by hardware, or by executing the corresponding software implementation through hardware. The hardware or software includes one or more modules corresponding to the above functions. In one possible design, the structure of the device includes an acquisition module, a training module, and optionally, a construction module. These modules can implement the function of the training node in the method example of the first aspect above. Please refer to the detailed description in the method example for details, which will not be repeated here.
[0067] In the third aspect, the present application also provides a computing device, which is used to implement the functions of the method described in the first aspect above. The beneficial effects can be found in the description of the first aspect and will not be repeated here. The structure of the computing device includes a processor and a memory, and the memory is used to store instructions and / or data. The memory is coupled to the processor, and when the processor executes the program instructions stored in the memory, the function of the training node in the example of the first aspect above can be implemented. The structure of the computing device also includes a communication interface for communicating with other devices.
[0068] In a fourth aspect, the present application also provides a computer-readable storage medium, in which instructions are stored, and when the computer-readable storage medium is run on a computer, the computer executes the method in the above-mentioned first aspect and various possible designs of the first aspect.
[0069] In a fifth aspect, the present application also provides a computer program product comprising instructions, which, when executed on a computer, enables the computer to execute the method in the above-mentioned first aspect and various possible designs of the first aspect.
[0070] In a sixth aspect, the present application also provides a computing chip, which is connected to a memory, and the chip is used to read and execute a software program stored in the memory, and to execute the methods in the above-mentioned first aspect and various possible implementation methods of the first aspect. BRIEF DESCRIPTION OF THE DRAWINGS
[0071] In order to more clearly illustrate the embodiments of the present drawings or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present drawings. For ordinary technicians in this field, other drawings can be obtained based on the structures shown in these drawings without paying any creative work.
[0072] Figure 1 It is a structural block diagram of a base station air conditioning energy consumption management system;
[0073] Figure 2 The present invention is a flowchart of the steps of a base station air conditioning energy consumption management method.
[0074] The purpose, features and advantages of this figure will be further described in conjunction with the embodiments with reference to the accompanying drawings. DETAILED DESCRIPTION
[0075] In order to make the purpose, technical solutions and advantages of the present application clearer, the present application is described and illustrated below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present application and are not intended to limit the present application. Based on the embodiments provided in the present application, all other embodiments obtained by ordinary technicians in the field without making creative work are within the scope of protection of the present application.
[0076] Obviously, the drawings described below are only some examples or embodiments of the present application. For ordinary technicians in this field, the present application can also be applied to other similar scenarios based on these drawings without creative work. In addition, it can also be understood that although the efforts made in this development process may be complicated and lengthy, for ordinary technicians in this field related to the content disclosed in this application, some changes in design, manufacturing or production based on the technical content disclosed in this application are just conventional technical means, and should not be understood as insufficient content disclosed in this application.
[0077] Unless otherwise specified, all embodiments and optional embodiments of the present application can be combined with each other to form a new technical solution.
[0078] Unless otherwise specified, all technical features and optional technical features of this application can be combined with each other to form a new technical solution.
[0079] If there is no special explanation, all steps of the present application can be performed sequentially or randomly, preferably sequentially. For example, the method includes steps (a) and (b), which means that the method may include steps (a) and (b) performed sequentially, or may include steps (b) and (a) performed sequentially. For example, the method may further include step (c), which means that step (c) may be added to the method in any order. For example, the method may include steps (a), (b) and (c), or may include steps (a), (c) and (b), or may include steps (c), (a) and (b), etc.
[0080] If there is no special explanation, the "include" and "comprising" mentioned in this application are open-ended or closed-ended. For example, the "include" and "comprising" may mean that other components not listed may also be included or only the listed components may be included or only the listed components may be included.
[0081] If not specifically stated, in this application, the term "or" is inclusive. For example, the phrase "A or B" means "A, B, or both A and B". More specifically, any of the following conditions satisfies the condition "A or B": A is true (or exists) and B is false (or does not exist); A is false (or does not exist) and B is true (or exists); or both A and B are true (or exist).
[0082] In order to better understand the solutions of the embodiments of the present application, some relevant terms and concepts that may be involved in the embodiments of the present application are first introduced below.
[0083] (1)PLC (Programmable Logic Controller) is a digital computing controller with a microprocessor for automatic control. It can load control instructions into memory at any time for storage and execution. A programmable controller consists of functional units such as CPU, instruction and data memory, input / output interface, power supply, digital analog conversion, etc. Early programmable logic controllers only had the function of logic control, so they were named programmable logic controllers. Later, with continuous development, these computer modules with simple functions have various functions including logic control, timing control, analog control, multi-machine communication, etc.
[0084] (2) RS485 communication protocol is a serial communication protocol based on differential signal transmission. In differential signal transmission, the transmitter converts the data into positive and negative states and transmits them through two lines (usually A and B). The receiver determines the state of the data by comparing the voltage difference between the two lines. This method can reduce the impact of electromagnetic interference (EMI) on the signal and ensure reliable signal transmission. Since the signal level of RS485 is low and compatible with TTL level, it can be directly connected to digital circuits such as microcontrollers without the need for additional conversion circuits.
[0085] like Figure 1 As shown, a base station air conditioning energy consumption management system includes a data storage module, an FSU dynamic environment monitoring system, an Internet of Things platform, an intelligent management and control module, and a base station air conditioning group;
[0086] The data storage module is used to store the working data and abnormal fault data of the air conditioner, and is electrically connected to the intelligent control module;
[0087] The data storage module uses cloud database for storage, providing a flexible, scalable, and highly available database solution. It does not require the underlying configuration and maintenance of the database, greatly simplifying the deployment and operation of the database. It is used to store the base station environmental parameters and air conditioning working data collected by the FSU dynamic environment monitoring system, as well as abnormal problem alarm data.
[0088] The FSU dynamic environment monitoring system is used to monitor the base station environmental parameters and air conditioning working data in real time, and issue abnormal problem alarms. It is electrically connected to the intelligent management and control module;
[0089] The FSU dynamic environment monitoring system integrates multiple sensors and controllers, and is used in the management of communication base stations. It monitors the operating status and environmental parameters of base station equipment in real time, including communication equipment, air conditioners and environmental data. It can detect equipment failures and issue alarms in a timely manner by monitoring abnormal data, thus ensuring the stable operation of base station equipment and air conditioners.
[0090] The IoT platform is used to remotely connect and control the air conditioning equipment and is electrically connected to the intelligent management and control module;
[0091] The Internet of Things platform is used to connect the air-conditioning equipment of the base station, connect the equipment to the platform through communication methods such as WiFi and Bluetooth, and manage the equipment in a unified manner. Users can remotely start and stop the corresponding equipment through mobile phone apps, computer web pages, etc.
[0092] The intelligent management and control module is used to remotely control the base station air conditioning group through the Internet of Things platform, and to intelligently adjust the output power of the air conditioner by using a dynamic polling algorithm by calculating the real-time cooling demand of the base station and the EER value of each air conditioner;
[0093] The calculation formula for the cooling demand of the base station is as follows:
[0094] ;
[0095] ;
[0096] ;
[0097] ;
[0098] The EER value calculation formula of the air conditioner is as follows: ;
[0099] The indoor equipment load is one of the main sources of heat in the base station. The heat load is estimated by multiplying the total power of the equipment by 0.8, because there will be a certain margin when the equipment is actually used.
[0100] In this embodiment, the base station area is set to 100 square meters, the total equipment power is 100KW, the thermal conductivity of the base station is 0.5W / (m*K), the indoor and outdoor temperature difference is 20 degrees Celsius, there are 4 adult males in the base station, the clustering coefficient is 1, and the sensible heat dissipation is 80W. Then, it is calculated that the indoor equipment load is 80KW, the personnel heat dissipation load is 0.32KW, the base station heat conduction is 1KW, and the total heat dissipation demand is 81.32KW.
[0101] The clustering coefficient is based on the heat and moisture dissipation of adult males, and is a reduction factor that is considered according to the age, gender composition, and density of the personnel. Under the same environment, the heat and moisture dissipation of adult women is about 85% of that of adult men, and the heat and moisture dissipation of children is about 75% of that of adult men.
[0102] Use a dynamic polling algorithm to intelligently adjust the output power of the air conditioner, including:
[0103] The PLC uses a dynamic polling algorithm to monitor the changes in the load of each air conditioner in real time and control the output power of each air conditioner in real time by cyclically visiting each air conditioner. It can quickly adjust the output power of the air conditioner when an imbalance in the air conditioner load or a change in the cooling demand of the base station is detected. The load of the air conditioner is the ratio of the output power to the rated power.
[0104] When the dynamic polling algorithm detects that the load of an air conditioner exceeds 90% or is less than 40%, the output power of the air conditioner is controlled through the air conditioner's inverter to make the load of the air conditioner return to the average load of the air conditioners that have been turned on. If the average load of the air conditioners that have been turned on exceeds 80% or is less than 50%, the number of air conditioners that need to be turned on is readjusted.
[0105] Furthermore, the base station environmental parameters and the working status data of the air conditioner specifically include:
[0106] Indoor temperature and humidity data, outdoor temperature and humidity data, compressor running time, compressor suction and exhaust temperature, working voltage and current, air conditioning wind speed, and air conditioning group start and stop data.
[0107] The above data is monitored for calculating cooling demand on the one hand, and for real-time monitoring of the operating status of each device in the base station on the other hand, and alarms are issued when problems occur.
[0108] Furthermore, abnormal problem alarms include:
[0109] Disconnection, temperature is too high, air conditioner does not cool, power is not turned on, and refrigerant is insufficient.
[0110] Disconnection means that the air conditioner is disconnected from the power supply, and an alarm is triggered when the working current is 0; overtemperature means that an alarm is triggered when the indoor temperature sensor is higher than 30 degrees; failure to cool means that the air conditioner is not turned on normally when there is no abnormality in the current or voltage; insufficient refrigerant means that there is insufficient refrigerant in the air conditioner, resulting in failure to cool normally.
[0111] Furthermore, the base station air conditioning group is remotely controlled by the Internet of Things technology, specifically including:
[0112] Step 1: Configure the base station WiFi module to AirLink mode;
[0113] Step 2: Connect the air conditioning group equipment of the base station to the IoT platform via WiFi;
[0114] Step 3: Add air conditioning equipment information on the IoT platform to ensure normal connection;
[0115] Step 4: Send control instructions to the IoT platform through the remote terminal;
[0116] Step 5: The IoT platform controls the corresponding air-conditioning equipment according to the control instructions.
[0117] Furthermore, the intelligent management and control module includes an intelligent gateway and a PLC.
[0118] An intelligent gateway is a network device that connects devices to the cloud and is used to remotely control the start and stop of air-conditioning equipment; a PLC is a programmable logic controller, a digital computing controller with a microprocessor for automated control that can load control instructions into memory at any time for storage and execution, and is used for logical control of the system.
[0119] Furthermore, if Figure 2 As shown, a base station air conditioning energy consumption management method includes the following steps:
[0120] Step 1: Collect base station environmental parameters and air conditioner working data in real time through the FSU dynamic environment monitoring system;
[0121] Step 2: Calculate the real-time cooling demand of the base station and the EER value of the air conditioner based on the base station environmental parameters and the working data of the air conditioner;
[0122] Step 3: Use the smart gateway to remotely control the start and stop of the air conditioners in the base station air conditioning group through the Internet of Things platform according to the cooling demand, the rated cooling capacity of the air conditioner and the EER value of the air conditioner;
[0123] According to the calculation results of the cooling demand, the air conditioner with the highest EER value among the unturned air conditioners is selected and turned on in turn. When 80% of the total rated cooling capacity of the selected air conditioner is greater than the cooling demand for the first time, the selected air conditioner is turned on through the intelligent gateway control, and the other unselected air conditioners are turned off.
[0124] Step 4: PLC applies dynamic polling algorithm to dynamically allocate cooling demand according to the processing capacity and load of each air conditioner turned on, so that the cooling load of the air conditioner is relatively balanced;
[0125] The PLC uses a dynamic polling algorithm to continuously monitor the load of each air conditioner and dynamically adjust the cooling capacity allocation strategy based on this information. This means that if an air conditioner is running at full load, more cooling capacity will be distributed to other air conditioners with lighter loads, thus avoiding wear and tear of the air conditioner compressor caused by a single air conditioner running at full load for a long time and reducing its service life.
[0126] Dynamically distribute cooling demand based on the processing capacity and load of each air conditioner, including:
[0127] Based on the total cooling demand of the base station, the PLC applies a dynamic polling algorithm to cyclically visit each air conditioner, and uses the ratio of the rated power of each turned-on air conditioner to the sum of the rated powers of all turned-on air conditioners as the weight for allocating cooling demand, so that the allocation of cooling demand is adapted to the cooling capacity of each air conditioner. Then, based on the load conditions of each air conditioner, the output power is adjusted to achieve the allocated cooling demand, so that the cooling load of each turned-on air conditioner is relatively balanced.
[0128] Step 5: Monitor the operating status of each air conditioner through the FSU dynamic environment monitoring system. When the air conditioner load is too high or too low, adjust the load in time to maintain the overall balance.
[0129] When the air conditioning load exceeds 90% or is less than 40% and lasts for 5 minutes, the PLC's dynamic polling algorithm is called again to adjust the load. If the load still cannot return to the normal range, the PLC display screen will show a polling operation error.
[0130] Furthermore, the EER value of an air conditioner is the ratio of the rated cooling capacity to the power consumption, that is, the cooling capacity corresponding to the unit power consumption of the air conditioner.
[0131] Furthermore, the start and stop of the air conditioners in the base station air conditioning group are remotely controlled through the Internet of Things platform, specifically including: selecting the air conditioning group with a higher EER value and a total customized cooling capacity greater than the cooling demand, and remotely starting it through the Internet of Things platform, and remotely shutting down other air conditioning groups through the Internet of Things platform.
[0132] Furthermore, the remote start and the remote shutdown, the remote control method specifically includes: Internet of Things platform control, RS485 communication protocol control, smart switch hard shutdown.
[0133] RS485 communication is a serial communication protocol based on differential signal transmission, which can effectively resist common-mode interference and improve signal stability and transmission distance.
[0134] During remote control, three methods are used in turn: Internet of Things platform control, RS485 communication protocol control, and intelligent switch hard shutdown. They are remote signal control, remote line control, and remote switch control. Under various combinations, the success rate and stability of remote control are greatly improved compared with infrared remote control.
[0135] Furthermore, load adjustment is performed to maintain overall balance, including:
[0136] When the load is too low, the cooling demand is dynamically allocated through PLC to increase the load of this air conditioner. If the loads of multiple air conditioners are too low, the air conditioner with the lowest EER among the currently turned on air conditioners is turned off through the smart gateway;
[0137] When the load is too high, the cooling demand is dynamically allocated through PLC to reduce the load of this air conditioner. If the loads of multiple air conditioners are too high, the air conditioner with the highest EER among the currently unturned air conditioners is turned on through the smart gateway.
[0138] The loads of multiple air conditioners are too high or too low. Specifically, the number of air conditioners with too high or too low loads is greater than or equal to half of the total number of air conditioners that are turned on. This means that the change in the required cooling capacity makes it difficult for the currently turned-on air conditioner to meet the cooling demand within the appropriate load, and a new air conditioner needs to be restarted or shut down.
[0139] It should be noted that the present application is not limited to the above-mentioned embodiments. The above-mentioned embodiments are only examples, and the embodiments having the same structure as the technical idea and exerting the same effect within the scope of the technical solution of the present application are all included in the technical scope of the present application. In addition, without departing from the scope of the main purpose of the present application, various modifications that can be thought of by those skilled in the art to the embodiments and other methods of combining some of the constituent elements in the embodiments are also included in the scope of the present application.
Claims
1. A base station air conditioning energy consumption management system, characterized in that: Including data storage module, FSU dynamic environment monitoring system, Internet of Things platform, intelligent management and control module, base station air conditioning group; The data storage module is used to store the working data and abnormal fault data of the air conditioner, and is electrically connected to the intelligent management and control module; The FSU dynamic environment monitoring system is used to monitor the base station environmental parameters and air conditioning working data in real time, and to issue abnormal problem alarms, and is electrically connected to the intelligent management and control module; The Internet of Things platform is used to remotely connect and control the air conditioning group equipment and is electrically connected to the intelligent management and control module; The intelligent management and control module is used to remotely control the base station air conditioning group through the Internet of Things platform, and to intelligently adjust the output power of the air conditioner by using a dynamic polling algorithm by calculating the real-time cooling demand of the base station and the EER value of each air conditioner; The calculation formula for the cooling demand of the base station is as follows: ; ; ; ; in: To meet the cooling needs of base stations; For indoor equipment load; Dissipate heat load for personnel; is the heat conduction of the base station; is the total power of the equipment; is the number of people in the base station; is the clustering coefficient; is the sensible heat dissipation; is the thermal conductivity of the base station; is the base station area; is the temperature difference between indoor and outdoor; The EER value calculation formula of the air conditioner is as follows: ; in: is the EER value of the air conditioner; is the cooling capacity of the air conditioner; It is the power consumed during the air conditioning cooling process.
2. A base station air conditioning energy consumption management system according to claim 1, characterized in that: The base station environmental parameters and air conditioner working status data specifically include: Indoor temperature and humidity data, outdoor temperature and humidity data, compressor running time, compressor suction and exhaust temperature, working voltage and current, air conditioning wind speed, and air conditioning group start and stop data.
3. A base station air conditioning energy consumption management system according to claim 1, characterized in that: The abnormal problem alarm specifically includes: Disconnection, temperature is too high, air conditioner does not cool, power is not turned on, and refrigerant is insufficient.
4. A base station air conditioning energy consumption management system according to claim 1, characterized in that: The remote control of the base station air conditioning group through the Internet of Things platform specifically includes: Step 1: Configure the base station WiFi module to AirLink mode; Step 2: Connect the air conditioning group equipment of the base station to the IoT platform via WiFi; Step 3: Add air conditioning equipment information on the IoT platform to ensure normal connection; Step 4: Send control instructions to the IoT platform through the remote terminal; Step 5: The IoT platform controls the corresponding air-conditioning equipment according to the control instructions.
5. The base station air conditioning energy consumption management system according to claim 1, characterized in that: The intelligent management and control module includes an intelligent gateway and a PLC.
6. A base station air conditioning energy consumption management method, using a base station air conditioning energy consumption management system as claimed in claim 5 for management, characterized in that: The following steps are involved: Step 1: Collect base station environmental parameters and air conditioner working data in real time through the FSU dynamic environment monitoring system; Step 2: Calculate the real-time cooling demand of the base station and the EER value of the air conditioner based on the base station environmental parameters and the working data of the air conditioner; Step 3: Use the smart gateway to remotely control the start and stop of the air conditioners in the base station air conditioning group through the Internet of Things platform according to the cooling demand, the rated cooling capacity of the air conditioner and the EER value of the air conditioner; Step 4: PLC applies dynamic polling algorithm to dynamically allocate cooling demand according to the processing capacity and load of each air conditioner turned on, so that the cooling load of the air conditioner is relatively balanced; Step 5: Monitor the operating status of each air conditioner through the FSU dynamic environment monitoring system. When the air conditioner load is too high or too low, adjust the load in time to maintain the overall balance.
7. A base station air conditioning energy consumption management method according to claim 6, characterized in that: The EER value of the air conditioner is the ratio of the rated cooling capacity to the power consumption, that is, the cooling capacity corresponding to the unit power consumption of the air conditioner.
8. A base station air conditioning energy consumption management method according to claim 6, characterized in that: The remote control of the start and stop of the air conditioners in the base station air conditioning group through the Internet of Things platform specifically includes: selecting the air conditioning group with a higher EER value and a total customized cooling capacity greater than the cooling demand, and remotely starting it through the Internet of Things platform, and remotely shutting down other air conditioning groups through the Internet of Things platform.
9. A base station air conditioning energy consumption management method according to claim 8, characterized in that: The remote start and the remote shutdown, the remote control method specifically includes: Internet of Things platform control, RS485 communication protocol control, smart switch hard shutdown.
10. A base station air conditioning energy consumption management method according to claim 6, characterized in that: The load adjustment to maintain the overall balance specifically includes: When the load is too low, the cooling demand is dynamically allocated through PLC to increase the load of this air conditioner. If the loads of multiple air conditioners are too low, the air conditioner with the lowest EER among the currently turned on air conditioners is turned off through the smart gateway; When the load is too high, the cooling demand is dynamically allocated through PLC to reduce the load of this air conditioner. If the loads of multiple air conditioners are too high, the air conditioner with the highest EER among the currently unturned air conditioners is turned on through the smart gateway.
