Concrete-filled steel tube special-shaped column structure
By using T-shaped steel and reinforced components in the concrete-filled steel tube special-shaped column structure, combined with full-bolt and ring-rib connections, the existing steel structure system solves the problems of large steel consumption and low degree of assembly, and achieves efficient and safe steel structure assembly. , improving the stiffness and strength of the node domain.
Patent Information
- Application Number
- CN202411062744.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Priority Date
- 2023-10-25
- Filing Date
- 2024-08-05
- Publication Date
- 2024-10-22
AI Technical Summary
The existing steel structure system uses a large amount of steel, has high production costs, and has a low degree of assembly. The welding process is complex and it is difficult to ensure welding quality, which affects assembly efficiency.
Adopting a concrete-filled steel tube special-shaped column structure, by setting T-shaped steel and reinforced components on the steel pipe, using full bolt connections and ring ribs to connect the steel bars, eliminating on-site welding, and using full bolt and high-strength bolt connections to optimize the load transfer path and improve the node domain Stiffness and strength.
It effectively reduces the amount of steel used, improves assembly efficiency, enhances the stiffness and strength of the node domain, avoids the complexity of the welding process, ensures the safety and strength of the connection, and reduces production costs.
Smart Images

Figure CN118815079A_ABST
Abstract
Description
Technical Field
[0001] The present invention belongs to the technical field of steel tube concrete special-shaped column, and more specifically, relates to a steel tube concrete special-shaped column structure. This application claims priority, the application number of the prior application is: 2023113970749, title: A steel tube concrete special-shaped column structure, priority date, October 25, 2023. Background Art
[0002] Prefabricated buildings are the direction of transformation and upgrading of the construction industry, and are an emerging sunrise industry that the country is vigorously promoting. At present, steel structure prefabricated buildings account for about 30% of prefabricated buildings, most of which are public buildings, and residential products are almost negligible. According to the goal of reaching 30% of prefabricated buildings in new buildings by 2025, the development prospects of steel structure prefabricated houses are huge.
[0003] At present, the domestic steel structure building system is still stuck in the conventional steel support-frame system, steel frame-concrete core tube system, steel frame-steel plate shear wall system, etc. The above existing steel structure systems have the disadvantages of large amount of structural steel and high production cost. In addition, the existing steel structure system has a large amount of on-site welding work, which not only makes it difficult to ensure the welding quality, but also leads to a low degree of assembly.
[0004] After searching, the application case with Chinese patent publication number CN 209603378 U discloses a multi-cavity rectangular steel tube concrete special-shaped column structure. The application case includes an assembled special-shaped column and an H-shaped steel beam. The assembled special-shaped column includes an upper column and a lower column. The lower end of the upper column is provided with a protrusion, and the upper end of the lower column is provided with a recessed portion. The protrusion is inserted into the recessed portion, and the upper column and the lower column are inserted together. The connection between the upper column and the lower column is fixedly connected with a node plate by bolts, and the node plate is welded to the outer wall of the upper column and the lower column. The H-shaped steel beam includes a beam body, and an end plate is provided at the end of the beam body. After the upper column and the lower column are connected, the end plate is connected to the edge of the connection between the upper column and the lower column by bolts. The structure of the application case can effectively reduce the amount of steel used, but the application case still needs to perform welding operations during the assembly process, thereby improving the assembly efficiency. At the same time, the node uses long bolts to pass through the screw holes in the node area to achieve a stable connection. However, it has very high requirements on processing accuracy, and efficient connection on site is difficult to achieve; the distance between the long bolts and the side wall of the multi-cavity steel pipe column is small, making it difficult to ensure the workability of the freshly mixed concrete. Summary of the invention
[0005] 1. Problems to be solved
[0006] In view of at least some of the problems existing in the above prior art, the present invention proposes a steel tube concrete special-shaped column structure, which aims to solve the problems of large steel consumption and low degree of assembly of the existing steel tube concrete special-shaped column structure.
[0007] 2. Technical solution
[0008] In order to solve the above problems, the technical solution adopted by the present invention is as follows:
[0009] A steel tube concrete special-shaped column structure of the present invention comprises a special-shaped column and a steel beam, wherein the special-shaped column comprises a steel tube and a plurality of T-shaped steels arranged along the peripheral wall of the steel tube;
[0010] The steel beam is connected to the flange of the T-shaped steel by means of a connecting plate, and a reinforcing member is provided at the connection node between the two;
[0011] The reinforcing member comprises a sleeve and a stiffening rib arranged on the sleeve; wherein the sleeve is fixedly sleeved on the steel pipe, the side surface of the stiffening rib is connected to the web of the T-shaped steel, and the end portion thereof is connected to the wing plate of the T-shaped steel.
[0012] Furthermore, the stiffening ribs are arranged in pairs, and are located on both sides of the T-shaped steel web; and each end of the steel beam is equipped with two groups of stiffening ribs, and the arrangement position of each group of stiffening ribs is the same height as the corresponding steel beam flange.
[0013] Furthermore, the end of the sleeve exceeds the end of the steel beam flange by 0.35D, wherein D is the outer diameter of the steel pipe.
[0014] Furthermore, the wall thickness of the sleeve is the same as that of the steel pipe, and the thickness of the stiffening rib is the same as that of the steel beam flange.
[0015] Furthermore, the thickness of the stiffening rib is not greater than the wall thickness of the sleeve.
[0016] Furthermore, t 套管 =α1α2α3t 钢管 ; where t 套管 is the wall thickness of the casing, t 钢管 is the wall thickness of the steel pipe; α1, α2 and α3 represent the influence coefficients of the stiffening rib thickness, node domain height and core concrete strength, respectively.
[0017] Furthermore, the special-shaped columns are connected in the vertical direction through vertical connection nodes, and the vertical connection nodes include ring ribs, connection steel bars and connection cover plates;
[0018] There are multiple connecting steel bars distributed in a ring, one end of which is located inside the steel pipe and the other end extends outside the steel pipe for connecting to another steel pipe;
[0019] The ring rib is arranged on the inner wall of the steel pipe. After the pouring is completed, when the steel pipe concrete is subjected to the tensile force, the ring rib plays an anchoring role for the connecting steel bars.
[0020] The connecting cover plate is used to connect T-shaped steel.
[0021] Furthermore, the ends of the connecting steel bars are provided with end plates, and the end plates include long end plates and short end plates, wherein the ends of the long end plates are in contact with the inner wall of the steel pipe.
[0022] Furthermore, an annular frame steel bar is provided in the space surrounded by the plurality of connecting steel bars, and the frame steel bars are provided in a plurality of groups along the length direction of the connecting steel bars.
[0023] Furthermore, support ribs are provided on the outer sides of the connecting steel bars, and the connecting steel bars are positioned on the ring ribs through the support ribs.
[0024] 3. Beneficial effects
[0025] Compared with the prior art, the present invention has the following beneficial effects:
[0026] (1) A steel tube concrete special-shaped column structure of the present invention, wherein the special-shaped column comprises a steel tube and a T-shaped steel, and the steel beam is connected to the wing plate of the T-shaped steel by a connecting plate in a full bolt form; thereby solving the problem that when the traditional steel node is prefabricated or welded on site, the welding process is complicated, the internal stress is large, the node performance is affected, and the assembly efficiency is low; in addition, by setting the reinforcing member, the load transfer path is optimized, so that the force can be directly transferred from the stiffening rib to the sleeve, and then the load is transferred to the core steel tube concrete node part through the sleeve, which can effectively avoid the steel tube outside the concrete being directly subjected to the normal load, thereby greatly improving the stiffness and strength of the node domain and ensuring safety.
[0027] (2) The steel tube concrete special-shaped column structure of the present invention can be connected to the inner core steel tube concrete by providing annular ribs and connecting steel bars in the steel tube, and can be prefabricated in the factory; compared with the traditional connection nodes, it completely avoids on-site welding operations and improves the efficiency of assembly; at the same time, after pouring and curing, when the steel tube concrete is subjected to tension, the annular ribs play an anchoring role for the connecting steel bars, thereby ensuring the connection strength at the connection node; for the connection between the T-steels on the outside of the special-shaped column, bolt holes are provided on the web and wing plates of the T-steels, and then high-strength bolts and splicing cover plates are used to connect them in a full bolt connection mode; similarly, no on-site welding is required, which can improve the assembly efficiency. In addition, the connection between the T-steels not only ensures the strength of docking, but also helps the core steel tube concrete to be positioned for construction. BRIEF DESCRIPTION OF THE DRAWINGS
[0028] Figure 1It is a schematic diagram of the overall structure of a steel tube concrete special-shaped column structure of the present invention;
[0029] Figure 2 It is a partially enlarged schematic diagram of a steel tube concrete special-shaped column structure of the present invention;
[0030] Figure 3 It is a structural schematic diagram of the reinforcing component in the present invention;
[0031] Figure 4 It is an enlarged schematic diagram of the positive angle of the beam-column node in the present invention;
[0032] Figure 5 It is an enlarged schematic diagram of the inner corner of the beam-column node in the present invention;
[0033] Figure 6 It is a schematic diagram of the ultimate stress state of the reinforced component in the present invention;
[0034] Figure 7 This is a schematic diagram of the stress state of the core steel pipe at the beam-column node of the present invention;
[0035] Figure 8 It is a cross-sectional view of a special-shaped concrete-filled steel tube column in the present invention;
[0036] Fig. 9 It is a structural schematic diagram of the vertical connection node in the present invention;
[0037] Fig.10 for Fig. 9 Sectional view along AA direction;
[0038] Fig.11 for Fig. 9 Cross-sectional view along the BB direction;
[0039] Fig.12 This is a schematic diagram of the connection of the T-shaped steel on the outside of the special-shaped column in the present invention;
[0040] Fig.13 It is the force mechanism diagram of the vertical connection node in the present invention;
[0041] Fig.14 A comparison diagram of earthquake damage between the vertical connection node and the one without annular rib in the present invention;
[0042] Fig.15 It is the node hysteresis curve after the vertical connection node is subjected to force in the present invention;
[0043] Fig.16 It is a schematic diagram of the “pinching” of the hysteresis curve of the vertical connection node after being subjected to force in the present invention;
[0044] Fig.17 It is a schematic diagram of the structure of the flange formed on the outside of the steel pipe in the present invention.
[0045] In the figure: 1, special-shaped column; 11, steel pipe; 12, T-shaped steel; 13, concrete;
[0046] 2. Steel beam; 21. Connecting plate; 22. Steel beam flange;
[0047] 3. Reinforced components; 31. Casing; 32. Stiffening ribs;
[0048] 4. Vertical connection node; 41. Ring rib; 42. Connecting steel bar; 43. End plate; 431. Long end plate; 432. Short end plate; 44. Standing steel bar; 45. Connecting cover plate; 46. Fastener; 47. Positioning flange. DETAILED DESCRIPTION
[0049] The present invention is further described below in conjunction with specific embodiments.
[0050] Example 1
[0051] like Figure 1 As shown, a steel tube concrete special-shaped column structure of this embodiment includes a special-shaped column 1 and a steel beam 2, wherein the steel beam 2 and the special-shaped column 1 are connected by full bolts.
[0052] Specifically, refer to Figure 8 As shown, the special-shaped column 1 is a TO steel tube concrete special-shaped column, hereinafter referred to as a TO special-shaped column. The TO special-shaped column comprises a steel tube 11 and a plurality of T-shaped steels 12 arranged outside the steel tube 11. The inner cavity of the steel tube 11 is used for pouring concrete 13. The T-shaped steel 12 is welded to the outer wall of the steel tube 11 through its web, and the welding operation can be performed in a factory.
[0053] The specific distribution of the T-shaped steel 12 is varied, and this embodiment lists several conventional cross-sectional forms of TO special-shaped columns. Of course, other cross-sectional forms may also be used according to actual construction requirements.
[0054] like Figure 8 As shown in (a), two T-shaped steels 12 are symmetrically arranged, and the webs of the two T-shaped steels 12 form a straight line; Figure 8 As shown in (b), there are also two T-shaped steels 12, but the webs of the two T-shaped steels 12 are vertical to form an L shape; Figure 8 As shown in (d), there are three T-shaped steels 12, and the webs of the three T-shaped steels 12 are arranged in a T shape; Figure 8 As shown in (c), there are four T-shaped steels 12, and the webs of the four T-shaped steels 12 are arranged in a cross shape.
[0055] like Figure 2As shown, the steel beam 2 is an H-shaped steel beam, and a connecting plate 21 is provided at its end, and a mounting hole is provided on the connecting plate 21; the relative position of the wing plate of the T-shaped steel 12 is also provided with a mounting hole, and the assembly operation between the steel beam 2 and the special-shaped column 1 can be completed by high-strength bolts. This solves the problem of complex welding process, large internal stress, affecting node performance and low assembly efficiency when the traditional steel node is prefabricated or welded on site.
[0056] Since the out-of-plane bending resistance of the flange of the T-shaped steel 12 and the wall of the steel pipe 11 is relatively poor, in this embodiment, a reinforcing member 3 is provided at the connection node between the steel beam 2 and the special-shaped column 1 to enhance the rigidity and strength of the node area.
[0057] refer to Figure 3 , Figure 4 , Figure 5 As shown, the reinforcing member 3 comprises a sleeve 31 and a stiffening rib 32 arranged on the sleeve 31. The sleeve 31 is fixedly sleeved on the steel pipe 11, and the end of the stiffening rib 32 is connected to the inner side of the wing plate of the T-shaped steel 12.
[0058] Of course, the specific distribution of the stiffening ribs 32 is consistent with the cross-sectional form of the corresponding special-shaped column 1. In other words, the commonly used cross-sectional forms of the stiffening ribs 32 are also straight-shaped, L-shaped, T-shaped and cross-shaped.
[0059] In this embodiment, an L-shaped reinforcement member 3 is used as an example to match an L-shaped special-shaped column 1. The stiffening ribs 32 are arranged in pairs, and are located on both sides of the same web of the T-shaped steel 12; and each end of the steel beam 2 is equipped with two pairs of stiffening ribs 32, and the arrangement position of each pair of stiffening ribs 32 is the same height as the corresponding steel beam flange 22.
[0060] In the steel tube concrete special-shaped column structure of this embodiment, a stiffening rib 32 is arranged at the same height as the steel beam flange 22 on the inner side of the special-shaped column 1, which can optimize the load transfer path and enhance the stiffness and strength of the node domain. However, considering that the intersection of the stiffening rib 32 and the steel tube 11 is prone to steel tube tearing, it needs to be strengthened.
[0061] Specifically, for the circular steel tube concrete, a sleeve 31 is provided at the intersection of the stiffening rib 32 and the steel tube 11, and the sleeve 31 is sleeved over the steel tube 11. This allows the force to be directly transferred from the stiffening rib 32 to the sleeve 31, and then the load is transferred to the core steel tube concrete node part through the sleeve 31. This method can prevent the steel tube 11 from being directly subjected to the normal load, thereby improving its safety.
[0062] Of course, for rectangular or square steel tube concrete, the end of the stiffening rib 32 can be flush with the rectangular steel tube, and a force transmission connecting steel plate can be set on the side. The steel plate can directly transfer the load of the steel beam flange 22 to the side of the rectangular steel tube, instead of allowing the tube side intersecting with the stiffening rib 32 to bear the normal load.
[0063] In the steel tube concrete special-shaped column structure of this embodiment, the proposed beam-column connection node completely eliminates the on-site welding connection and adopts full bolt connection to achieve the rigid connection between beam and column; in addition, through the setting of the reinforcing member 3, the sleeve 31 drives the steel tube concrete to bear the force as a whole, and realizes the efficient transmission of the bending moment of the steel beam. At the same time, it also avoids the connection method of setting a reinforcing ring on the outside of the steel tube concrete, reduces the cross-sectional width of each component at the beam-column node, and increases the use space inside the building.
[0064] Example 2
[0065] In order to avoid the reduction of mechanical properties of the beam-column node domain caused by excessive residual stress of factory welding, in this embodiment, the stiffening rib 32 and the sleeve 31 are directly made into steel castings. The use of integral steel castings has the following two main advantages: 1) Each part of the casting is a whole, which can significantly reduce the impact of welding of small parts on its internal stress; 2) When the casting and the prefabricated TO special-shaped column are welded in the factory, the number and length of welds are small, which significantly improves the performance of the node domain. At the same time, the welding deformation of the casting and the TO special-shaped column caused by welding stress is small, and the difficulty of deformation correction and on-site installation is small.
[0066] In addition, the height of the sleeve 31 at the node should be higher than the height of the top surface of the steel beam flange to avoid welding in the node area. At the same time, the sleeve 31 should be set throughout the length to ensure the effective transmission of the bending moment at the beam end.
[0067] Specifically in this embodiment, the sleeve 31 has the same wall thickness as the steel pipe 11, the thickness of the stiffening rib 32 is the same as the thickness of the steel beam flange 22, and the steel strength grade is Q345. The end of the sleeve 31 exceeds the end of the steel beam flange 22 by 0.35D, where D is the outer diameter of the steel pipe 11. According to the finite element analysis results, when the end of the sleeve 31 exceeds the end of the steel beam flange 22 by more than 0.35D, the column will yield before the node under the action of the bending moment, meeting the seismic requirements of the node.
[0068] The finite element analysis of the beam-column joint is carried out. Figure 6 , Figure 7 As shown. Strengthening the node in the above manner can reduce the stress level in the node area. When the wall thickness of the casing 31 is equivalent to that of the steel pipe 11, the pipe fitting will not be torn. In contrast, the Mises stress of the steel pipe in the upper and lower parts of the node area is relatively large, which can be reduced by locally increasing the wall thickness during prefabrication or using an inner ring plate.
[0069] According to the finite element calculation results, during the design, the stiffening rib 32 and the sleeve 31 are key load-bearing components. To ensure their safety during service, the thickness of the stiffening rib 32 should not be greater than the thickness of the sleeve 31, that is, t 加劲肋 ≦t 套管 , so as to ensure that the sleeve 31 is not prone to local tearing under the tensile force along the longitudinal direction of the stiffening rib 32.
[0070] Among them, the determination of the wall thickness of the casing 31 should take into account the influence of four key factors: the outer wall thickness of the core steel tube concrete, the thickness of the stiffening ribs, the node domain height, and the core concrete strength, that is, t 套管 =α1α2α3t 钢管 , where α1, α2 and α3 represent the influence coefficients of stiffening rib thickness, node domain height and core concrete strength respectively. Stiffening rib thickness is an important parameter affecting the failure mode and failure load of steel tubes in the node domain. The ratio of stiffening rib thickness to the outer steel tube wall thickness of the core steel tube concrete is t 加劲肋 / t 外钢管 is the basic independent variable of the calculation formula of the influence coefficient, that is, α1=A*(t 加劲肋 / t 外钢管 ), the coefficient A should be determined based on the regression analysis of test data, and can be taken as 1 when there is a lack of test data. Similarly, the calculation method of α2 and α3 is determined based on the common node domain height and concrete strength, that is, α2 = B*(h 节点域 / 300), α3=C*(fc / 30), coefficients B and C should be determined based on regression analysis of test data, and can be taken as 1 when there is a lack of test data. 节点域 and fc are the node domain height and the 28-day axial compressive strength of the core concrete, respectively. The denominators 300 and 30 are the commonly used node height and concrete strength for dimensionless height and strength. It should be noted that in actual projects, the main beam height is usually higher than 300mm (that is, the node domain height is higher than 300mm). This value varies with the span and is roughly between 300 and 1000mm. In order to steadily promote the engineering application of this node and its structural system, a safe choice is 300mm.
[0071] Example 3
[0072] The steel tube concrete special-shaped column structure of this embodiment, on the basis of the above embodiment, further provides a vertical connection node 4 between TO special-shaped columns, and the vertical connection node 4 mainly includes the connection of the inner core steel tube concrete (steel tube 11) and the connection of the outer T-shaped steel 12. Of course, the vertical connection node 4 needs to be staggered with the beam-column node.
[0073] Among them, for the TO special-shaped columns, internal hot-rolled ribbed steel bars are used and concrete is poured for connection. For the connection between the T-shaped steels 12 outside the special-shaped columns, holes can be punched on the T-shaped steels 12, combined with high-strength bolts and spliced cover plates, and connected in a full bolt connection manner.
[0074] Specifically, refer to Figure 9-11 As shown, the steel pipe 11 is provided with an annular rib 41 and a connecting steel bar 42. The annular rib 41 is arranged on the inner wall of the steel pipe 11 and is close to the end of the steel pipe 11. There are a plurality of connecting steel bars 42 distributed in an annular manner, one end of which is located in the steel pipe 11 and the other end extends out of the steel pipe 11 for connecting another steel pipe 11. After the concrete 13 is poured, when the steel pipe concrete is subjected to tension, the annular rib 41 plays an anchoring role for the connecting steel bars 42.
[0075] The annular rib 41 is preferably a steel tube rib, and a variety of cross-sectional forms may be selected, such as T-shaped steel, channel steel, solid circular / rectangular steel rod, etc.
[0076] In the steel tube concrete column structure of this embodiment, the inner core steel tube concrete part is connected by internally provided connecting steel bars 42 and poured with concrete. The key to achieving strong connection such as tensile strength is whether the steel tube 11 has sufficient anchoring effect on the internally provided connecting steel bars 42.
[0077] According to the previous refined finite element analysis, the anchoring force is transmitted by setting the ring rib 41 at the inner end of the steel pipe 11, so that the shear force between the two can be effectively transmitted, thereby enhancing the anchoring force of the connecting steel bar 42. The specific force mechanism can be referred to Fig.13 .
[0078] To further improve the anchoring effect, the steel pipe 11 is preferably made of a material with a surface friction coefficient of not less than 0.5, such as a threaded steel pipe. For cold-bent / hot-bent straight-seam welded steel pipes, sandblasting (shot) can also be performed on the plate before the bending process to increase the friction coefficient, thereby achieving the best anchoring effect.
[0079] In order to reduce the influence of the welding accuracy of the ring rib 41 in the factory on the on-site construction, a certain welding space needs to be reserved. It is recommended to arrange the ring rib 41 about 30 mm away from the end of the steel pipe 11.
[0080] At the same time, in order to minimize the volume of concrete above the ring rib and its damage (under earthquake loads, tensile damage is likely to occur, while the concrete below the ring rib is mainly under pressure, which can effectively exert the performance of concrete materials), according to the previous theoretical and experimental research of the inventors, the distance between the position of the ring rib 41 and the end of the steel pipe 11 should be less than 0.3l R Among them, l Ris the steel bar anchorage length, where the anchorage length refers to the depth of the connecting steel bar 42 located in a single steel pipe 11.
[0081] In addition, the spacing between the connecting steel bar 42 and the ring rib 41 should not be greater than the difference between the anchor length of the steel bar and the depth of the ring rib 41. The reason is that the transmission of the anchoring force is mainly transmitted by the shear force between the concrete units and the pressure between the upper and lower units. The maximum direction of the combined force of the above two is 45 degrees. At this time, the spacing between the connecting steel bar 42 and the ring rib 41 is just equal to the difference between the anchor length of the steel bar and the depth of the ring rib 41. When the distance between the connecting steel bar 42 and the ring rib 41 exceeds this value, the anchoring force cannot be effectively transmitted, and local shear failure will occur in the concrete inside the node.
[0082] refer to Fig.12 As shown, the web and wing plates of the T-shaped steel 12 are provided with assembly holes. After the upper and lower layers of the T-shaped steel 12 are aligned, they are connected by connecting the cover plate 45 and the fastener 46. After the upper and lower layers of the T-shaped steel 12 are aligned and fastened, the upper and lower sections of the core steel tube concrete are also in an aligned state. Among them, the fastener 46 is preferably a high-strength bolt.
[0083] A steel tube concrete-filled special-shaped column structure of the present embodiment has a connection with the inner core steel tube concrete by providing a ring rib 41 and a connecting steel bar 42 in the steel tube, and can be prefabricated in a factory; compared with traditional connection nodes, on-site welding operations are completely avoided, thereby improving assembly efficiency; at the same time, after pouring and curing, when the steel tube concrete is subjected to tension, the ring rib 41 anchors the connecting steel bar 42, thereby ensuring the connection strength at the connection node.
[0084] The outer T-shaped steels 12 are connected by full bolt connection, which also does not require on-site welding, thereby improving assembly efficiency. In addition, the connection between the T-shaped steels 12 not only ensures the strength of the butt joint, but also helps the core steel tube concrete to be positioned during construction.
[0085] The inventors conducted a refined finite element modeling analysis on the vertical connection nodes of this embodiment to evaluate its mechanism and impact on this type of connection nodes. The total number of entity elements in the model is about 150,000, which can more accurately reflect the mechanical properties of the node. The analysis results are as follows: Figure 14-16 shown.
[0086] Depend on Fig.14 It can be seen that after the steel tube rib reinforcement connection is set at the end of the steel tube 11, the concrete damage is significantly reduced; at the same time, the hysteresis curve is relatively full ( Fig.15 ), indicating that this type of node has a strong ability to dissipate seismic energy.
[0087] In addition, according to the model analysis results, when the diameter of the connecting steel bar 42 exceeds 22mm, the hysteresis curve will show obvious "pinching" phenomenon ( Fig.16 ), significantly reducing the energy dissipation capacity of the node, so it is recommended that the diameter of the steel bar should not exceed 22mm. The reason for this "pinching" phenomenon is that under the premise of equal reinforcement ratio, excessive steel bar size will lead to a reduction in the number of steel bars, and the steel bar-concrete bond slip effect around a single steel bar is significant, and the bond stress is significantly increased, making the concrete around the steel bar prone to damage, reducing the overall energy dissipation capacity of the node, so the hysteresis curve "pinches".
[0088] Example 4
[0089] In order to facilitate the positioning of the connecting steel bar 42 and ensure that the connecting steel bar 42 has sufficient stability when pouring concrete, this embodiment further improves the specific structure of the vertical connecting node 4 on the basis of Embodiment 3.
[0090] refer to Fig. 9 As shown, an end plate 43 is provided at the end of the connecting steel bar 42. During assembly, the end of the end plate 43 is pressed against the inner wall of the steel pipe 11 to achieve positioning of the connecting steel bar 42 and ensure its verticality.
[0091] The inner side of the connecting steel bar 42 is also provided with an annular erecting steel bar 44, and the erecting steel bar 44 is provided in multiple groups along the length direction of the connecting steel bar 42. That is, through the provision of the erecting steel bar 44, multiple connecting steel bars 42 are combined into a whole, which can be prefabricated as a whole in the factory, thereby further saving the construction time on site.
[0092] Since the plurality of connecting steel bars 42 are connected into a whole ring by the erecting steel bars 44, it is not necessary to position each connecting steel bar 42 individually, but only the entire connecting steel bar ring needs to be positioned as a whole. In other words, as long as the end of a part of the end plate 43 can abut against the inner wall of the steel pipe 11, the verticality of the entire connecting steel bar 42 can be ensured.
[0093] Specifically in this embodiment, refer to Fig.11 As shown, the end plate 43 includes a long end plate 431 and a short end plate 432, and the long end plate 431 and the short end plate 432 are arranged alternately. By setting the long end plate 431 and the short end plate 432, not only the anchoring force of the connecting steel bar 42 can be improved, but also the connecting steel bar 42 can be positioned to ensure its verticality.
[0094] In addition, in order to prevent the connection steel bar 42 from moving downward due to the impact of concrete during the pouring process, in this embodiment, a support rib (not shown in the figure) is provided on the outer side of the connection steel bar 42, and the connection steel bar 42 is hung on the ring rib 41 through the support rib, so that the connection steel bar 42 can be effectively supported.
[0095] A steel tube concrete special-shaped column structure of the present embodiment, through the common limitation of the connecting steel bars 42 by the end plates 43, the frame steel bars 44 and the supporting bars, not only ensures the verticality of the connecting steel bars 42, but also increases the stability of the connecting steel bars 42, and can effectively prevent the displacement of the connecting steel bars due to the scouring of concrete during the pouring of concrete, thereby affecting the final connection effect.
[0096] Example 5
[0097] refer to Fig.17 As shown, in order to further facilitate the positioning of the core steel tube concrete, a positioning flange 47 is provided on the outer side of the end of the steel tube 11, and the positioning flanges 47 can also be connected by high-strength bolts.
[0098] Compared with the traditional direct connection with flanges, the flange in this embodiment does not require much space and only plays a role in positioning and bearing construction loads during the construction process. After the concrete is poured and maintained to reach the design strength, the tension / bending moment is mainly borne by the combined effect of the internal steel bars and the external steel pipes, thereby reducing the requirements for the mechanical properties of the flange part nodes, reducing the space occupied by the nodes, reducing the amount of steel used, and reducing the cost of the connection nodes.
[0099] In addition, in order to further reduce the space occupied by the node, the flange can also be removed after the maintenance is completed. Of course, the setting of the positioning flange 47 in this embodiment and whether to perform the later removal operation can be selected according to actual construction requirements.
[0100] In summary, the present invention provides a steel tube concrete special-shaped column structure, in which the column components are a combination of T-steel and steel tube concrete: the core steel tube concrete mainly bears the pressure, and the T-steel is used to expand the cross-sectional size of the column, so that the cross-sectional width of each component (i.e. the core steel tube concrete and the outer T-steel part) is relatively small under the premise of having sufficient bending resistance. The smaller cross-sectional width allows the column components to be hidden in the wall, increasing the indoor usable space and enhancing the flexibility of the layout of the house and the placement of indoor furniture. From the perspective of the force mechanism, the cross-sectional area of the proposed column component is reasonable, and the division of labor of the bending / compression parts is clear, which greatly plays the advantages of the easy expansion of the steel section and the high bearing capacity and high rigidity of the steel tube concrete cross-sectional area, so that it uses less steel and has lower cost than traditional composite structural components. On this basis, a vertical connection node between columns and a beam-column node form matching the above-mentioned structural system are proposed, which ensures a high assembly rate of the node system while giving it better mechanical properties and integrity. Finally, a new type of special-shaped column structure with superior seismic resistance, small amount of steel, good integrity, high assembly rate, large usable space and flexible structural layout was obtained, which promoted the high-quality development of the construction industry.
[0101] The present invention and its embodiments are described schematically above, and the description is not restrictive. The drawings show only one embodiment of the present invention, and the actual structure is not limited thereto. Therefore, if a person skilled in the art is inspired by it and designs a structural method and an embodiment similar to the technical solution without creativity without departing from the purpose of the invention, they shall all fall within the protection scope of the present invention.
Claims
1. A steel tube concrete special-shaped column structure, comprising a special-shaped column (1) and a steel beam (2), characterized in that: The special-shaped column (1) comprises a steel pipe (11) and a plurality of T-shaped steels (12) arranged along the peripheral wall of the steel pipe (11); The steel beam (2) is connected to the flange bolts of the T-shaped steel (12) via a connecting plate (21), and a reinforcing member (3) is provided at the connection node between the two; The reinforcing member (3) comprises a sleeve (31) and a stiffening rib (32) arranged on the sleeve (31); wherein the sleeve (31) is fixedly sleeved on the steel pipe (11), the side surface of the stiffening rib (32) is connected to the web of the T-shaped steel (12), and the end portion thereof is connected to the wing plate of the T-shaped steel (12).
2. The steel tube concrete special-shaped column structure according to claim 1, characterized in that: The stiffening ribs (32) are arranged in pairs and are located on both sides of the web of the T-shaped steel (12); and each end of the steel beam (2) is equipped with two groups of stiffening ribs (32), and the arrangement position of each group of stiffening ribs (32) is the same height as the corresponding steel beam flange (22).
3. The steel tube concrete special-shaped column structure according to claim 2, characterized in that: The end of the sleeve (31) extends beyond the end of the steel beam flange (22) by 0.35D, wherein D is the outer diameter of the steel pipe (11).
4. The steel tube concrete special-shaped column structure according to claim 3, characterized in that: The wall thickness of the sleeve (31) is the same as that of the steel pipe (11), and the thickness of the stiffening rib (32) is the same as that of the steel beam flange (22).
5. The steel tube concrete special-shaped column structure according to claim 4, characterized in that: The thickness of the stiffening rib (32) is not greater than the wall thickness of the sleeve (31).
6. A steel tube concrete special-shaped column structure according to any one of claims 1 to 5, characterized in that: The special-shaped columns (1) are connected in the vertical direction via a vertical connection node (4), and the vertical connection node (4) comprises a ring rib (41), a connection steel bar (42) and a connection cover plate (45); There are a plurality of connecting steel bars (42) distributed in a ring shape, one end of which is located inside the steel pipe (11) and the other end of which extends outside the steel pipe (11) for connecting to another steel pipe (11); The annular rib (41) is arranged on the inner wall of the steel tube (11). After the pouring is completed, when the steel tube concrete is subjected to tensile force, the annular rib (41) plays an anchoring role for the connecting steel bars (42); The connecting cover plate (45) is used to connect the T-shaped steel (12).
7. The steel tube concrete special-shaped column structure according to claim 6, characterized in that: An end plate (43) is provided at the end of the connecting steel bar (42), and the end plate (43) includes a long end plate (431) and a short end plate (432), wherein the end of the long end plate (431) is in contact with the inner wall of the steel pipe (11).
8. The steel tube concrete special-shaped column structure according to claim 7, characterized in that: An annular frame steel bar (44) is arranged in the space surrounded by the plurality of connecting steel bars (42), and the frame steel bars (44) are arranged in a plurality of groups along the length direction of the connecting steel bars (42).
9. The steel tube concrete special-shaped column structure according to claim 8, characterized in that: Support ribs are provided on the outer sides of the connecting steel bars (42), and the connecting steel bars (42) are positioned on the ring ribs (41) through the support ribs.
Citation Information
Patent Citations
Connecting joint for outer sleeve pipe type concrete filled steel tubular column and steel girder end plate
CN105649215A
Central steel pipe type section steel irregular column
CN109763604A
Cross beam column and building body
CN204898892U
Connection structure of dysmorphism steel column and beam column
CN207700389U
Pre-embedded steel plate assembly post-pouring concrete beam-column joint
CN215406537U