Liftable double-rail type header area platform of LNG (Liquefied Natural Gas) filling ship and mobile operation method

By adopting a hoistable dual-track header area platform and a mobile operation method on the LNG bunkering ship, the problem of misaligned positioning of bunkering stations is solved, flexible bunkering operations are realized, the number and cost of platforms are reduced, and the bunkering range is increased. and equipment utilization.

CN118816092APending Publication Date: 2024-10-22RES INST 708 OF CHINA STATE SHIPBUILDING CORP
View PDF 6 Cites 0 Cited by

Patent Information

Application Number
CN202410856448.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-06-28
Publication Date
2024-10-22

AI Technical Summary

Technical Problem

The positioning of the filling stations of the LNG bunkering ship and the dual-fuel ship is not aligned, resulting in the inability to carry out LNG fuel bundling. The existing technology requires the setting up of multiple header area platforms to handle different ships, which increases the cost and complexity.

Method used

The hoistable double-track header area platform and mobile operation method are adopted. Through the liquid collection skid, skid slide, translation device, platform fixing device, translation power device and lifting device, the flexible translation and hoisting of the header area platform can be realized to adapt to different conditions. Location of filling stations.

Benefits of technology

The number of platforms in the header area is reduced, the filling range is expanded, the cost is reduced, the utilization of mooring parts is improved, equipment damage is avoided, and the operating process is simplified.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118816092A_ABST
    Figure CN118816092A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of LNG (liquefied natural gas) filling ships, in particular to a liftable double-rail type collecting pipe area platform of an LNG filling ship and a mobile operation method, and the liftable double-rail type collecting pipe area platform comprises a liquid collecting prying block 1 used for supporting a liquid collecting tank and a connecting hose support 11; the skid slide way 2 is used for supporting the translation device 3; the translation device 3 is used for supporting the liquid collection skid 1 and the lateral fastening platform 6; the platform fixing device 4 is used for fixing the position of the translation device 3 on the skid slide way 2; the translation power device is used for providing power for translation of the header area platform on the skid slide way 2; the translation power guide device is used for guiding the power provided by the translation power device to the header area platform; and the lifting device is used for lifting the header area platform from one group of skid slideways 2 to the other group of skid slideways 2. The number of collecting pipe area platforms of the LNG filling ship can be reduced, the filling ship type range is enlarged, and the utilization rate of mooring pieces is increased.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of an LNG gas bunkering ship, and in particular to a hoistable double-track manifold area platform of an LNG bunkering ship and a mobile operation method. Background Art

[0002] Under the influence of fierce competition in the global transportation industry, rising oil prices and rising calls for energy conservation and emission reduction, LNG energy, which is cheaper, more abundant and cleaner than oil, has gradually become one of the fastest growing energy sources in the world. The number of ships using LNG as fuel is also increasing. LNG bunkering ships are one of the important ways to supply LNG fuel to dual-fuel ships on the water. Using bunkering hoses to connect LNG bunkering ships and dual-fuel ships is one of the common ways of bunkering. Due to the ultra-low temperature of LNG and the complex environment of water bunkering, the installation of bunkering hoses on the ship and the docking of hoses between the two ships need to be paid special attention.

[0003] A manifold platform is usually set up on the LNG bunkering ship, and the filling pipe on the LNG bunkering ship is connected to the filling port of the filling station of the dual-fuel ship through a filling hose. In order to ensure the safety during the low-temperature filling process, the filling hose is generally not docked obliquely between the two ships, that is, the manifold platform on the LNG bunkering ship needs to be longitudinally aligned with the filling of the dual-fuel ship. This can: 1. Avoid interference between the filling hose and the mooring cable when the ship is to the ship; 2. Avoid the low-temperature LNG liquid dripping from the filling hose splashing on the fender used for ship-to-ship mooring, thereby damaging the fender; 3. In order to protect the hull outer plate from the splashing of low-temperature LNG liquid, water spray devices are usually set on the manifold platform and the next deck of the filling area of ​​the filling station. The longitudinal alignment can ensure that the coverage of the water spray device is as small as possible, thereby reducing costs. The ship-to-ship mooring method of the LNG bunkering ship and the dual-fuel ship is relatively fixed, and the positioning of the filling station on the dual-fuel ship sometimes cannot be aligned with the filling station on the LNG bunkering ship, resulting in the inability to refuel LNG fuel. Sometimes LNG bunkering vessels are equipped with two manifold platforms to cope with the positioning of bunkering stations for different dual-fuel vessels. Summary of the invention

[0004] In view of the above problems, a double-track manifold area platform for an LNG bunkering ship and a mobile operation method are provided to adapt to the positioning of bunkering stations for different dual-fuel ships.

[0005] In order to achieve the above-mentioned object, the technical solution of the present invention provides a double-track manifold area platform of an LNG bunkering ship and a mobile operation method, comprising:

[0006] Liquid collecting skid, used to support the liquid collecting tank and the connecting hose support;

[0007] A skid slideway is used to support the translation device;

[0008] The translation device is used to support the liquid collecting skid and the side fastening platform;

[0009] A platform fixing device, used for fixing the position of the translation device on the skid slide;

[0010] A translational power device, used to provide power for the manifold platform to translate on the skid slideway;

[0011] A translational power guiding device, used for guiding the power provided by the translational power device to the manifold platform;

[0012] The lifting device is used to lift the manifold platform from one set of the skid slides to another set of the skid slides.

[0013] Preferably, the skid slide is installed on the deck, with every 2 channel steels forming a group, baffles are provided on both sides of each channel steel, anchor bolt seats are evenly distributed on the decks on both outer sides, and there are multiple groups of skid slides on the entire ship.

[0014] Preferably, the side fastening platforms are installed on both sides of the liquid collecting skid, and the translation devices are provided under the side fastening platforms and the liquid collecting skid for translation on the skid slide.

[0015] Preferably, the liquid collecting skid is provided with the liquid collecting tank formed by angle steel and grille and the connecting hose support.

[0016] Preferably, the side fastening platform is equipped with cable piles, lifting eye plates and railings.

[0017] Preferably, the translation device can be fixed on the skid slideway by the platform fixing device.

[0018] Preferably, the translational power device guides power to the manifold area platform through a translational power guiding device to achieve translation of the platform. The translational power device adopts an existing mooring winch on the ship, and the translational power guiding device adopts a mooring cable, a cleat roller, and the cable pile.

[0019] Preferably, the lifting device lifts the manifold platform from one group of skid slides to another group of skid slides, and the lifting device adopts a hose crane already on board.

[0020] Preferably, when working in the same set of tracks, the following steps are mainly included:

[0021] Step 1, guiding the mooring cable from the mooring winch on one side of the header area platform through the cleat roller to the nearest side fastening platform;

[0022] Step 2, the cable passes through the railing, and the cable is wound around the cable pile on the side fastening platform using the figure eight winding method;

[0023] Step 3: The mooring winch on the other side of the platform in the header area executes steps 1 and 2;

[0024] Step 4: Remove all bolts and anchor bolts on the platform fixing devices;

[0025] Step 5: Start the mooring winches on both sides, pull on one side and release on the other side, so that the manifold platform can be translated to the designated position;

[0026] Step 6, slowly stop the mooring winches on both sides, keep the mooring lines taut, and tighten the bolts and anchor bolts on the platform fixing device;

[0027] Step 7, connect one end of the connecting hose to the bunkering hard pipe on the LNG bunkering ship, and install the other end to the connecting hose support on the manifold platform;

[0028] Step 8, remove the detachable railing, install the filling saddle, connect the filling hose to the connecting hose of the LNG bunkering ship, and connect the other end to the filling port of the dual-fuel ship filling station to complete the filling;

[0029] Step 9, disconnect the connection between the filling hose between the two ships, disconnect the connection between the connecting hose and the hard pipe of the LNG ship, remove the filling saddle, reinstall the detachable railing, loosen the mooring cable on the mooring pile, and use a mooring winch to retract the mooring cable onto the drum.

[0030] Preferably, when working in different groups of tracks, the following steps are mainly included:

[0031] Step 1, using four lifting wire ropes to connect the four lifting eye plates with the hook of the hose crane;

[0032] Step 2, loosen all the bolts and anchor bolts on the platform fixing devices;

[0033] Step 3, using the hose crane to hoist the manifold platform onto another set of skid slideways;

[0034] Step 4, using steps 1, 2, and 3 of the operating method when operating within the same set of tracks;

[0035] Step 5, releasing the connection between the lifting wire rope and the lifting eye plate;

[0036] Step 6, using steps 5, 6, 7, 8, and 9 of the operating method when operating within the same set of tracks, the position of the manifold platform on another set of the skid slides is adjusted, fixed, and filled.

[0037] Compared with the prior art, the present invention has the following beneficial effects:

[0038] 1. After some dual-fuel ships are moored ship-to-ship with LNG bunkering ships, the bunkering station layout on them cannot be aligned with the LNG bunkering ship's manifold area, which exceeds the bunkering range of the LNG bunkering ship. By adopting this invention, LNG bunkering can be carried out within the range of each set of skid slideways, and multiple sets of skid slideways can be arranged within the lifting radius of the hose crane, further increasing the bunkering range of the LNG bunkering ship and increasing the number of ship types that can be bunkered by the LNG bunkering ship.

[0039] 2. Some LNG bunkering ships will be equipped with multiple manifold platforms to cope with different dual-fuel ships. The use of this invention can reduce the number of manifold platforms and save costs for ship owners.

[0040] 3. The existing mooring winch on the ship is used as the translational power source, which greatly reduces the cost of the invention compared with adding a new hydraulic pump station. At the same time, the transmission mechanism can also use the existing mooring cable, increasing the utilization rate of the mooring parts.

[0041] 4. The existing hose crane on the ship is used as the lifting power source, which greatly reduces the cost of the invention compared with adding a new hydraulic pump station, and also increases the utilization rate of the hose crane.

[0042] 5. The translational force first acts on the side fastening platform. The structure of the side fastening platform can be thickened and strengthened separately, thus ensuring the lightness of the liquid collecting skid. If the traction force of the mooring winch is too large due to improper operation during translation, the side fastening platform will be damaged first, which can play an isolation role and avoid damage to the equipment on the liquid collecting skid. BRIEF DESCRIPTION OF THE DRAWINGS

[0043] Figure 1 It is a side view of a double-track manifold area platform that can be hoisted for an LNG bunkering ship of the present invention;

[0044] Figure 2 This is a front view of a double-track manifold area platform that can be hoisted for an LNG bunkering ship according to the present invention;

[0045] Figure 3 A top view of a double-track manifold area platform that can be hoisted for an LNG bunkering ship according to the present invention;

[0046] Figure 4 It is a side view of a node of the platform fixing device 4;

[0047] Figure 5 A method for moving a double-track manifold platform of an LNG bunkering ship is provided, and a top view of step 1 of operating within the same set of tracks;

[0048] Figure 6A method for moving a double-track manifold platform of an LNG bunkering ship is provided, and a top view of step 2 of operating within the same set of tracks;

[0049] Figure 7 A method for moving a double-track manifold platform of an LNG bunkering ship is provided, and a top view of step 3 of the operation within the same set of tracks;

[0050] Figure 8 A method for moving a double-track manifold platform of an LNG bunkering ship is provided, and a front view of step 4 of working within the same set of tracks;

[0051] Fig. 9 A method for moving a double-track manifold platform of an LNG bunkering ship is provided, and a top view of step 5 of the operation within the same set of tracks;

[0052] Fig.10 A method for moving a double-track manifold platform of an LNG bunkering ship is provided, and a front view of step 6 of operating within the same set of tracks;

[0053] Fig.11 A method for moving a double-track manifold platform of an LNG bunkering ship is provided, and a top view of step 7 of working within the same set of tracks;

[0054] Fig.12 A method for moving a double-track manifold platform of an LNG bunkering ship is provided, and a top view of step 8 of operating within the same set of tracks;

[0055] Fig.13 A method for moving a double-track manifold platform of an LNG bunkering ship is provided, and a top view of step 9 of operating within the same set of tracks;

[0056] Fig.14 A method for moving a double-track manifold platform of an LNG bunkering ship is provided, and a front view of step 1 of operating in different sets of tracks;

[0057] Fig.15 A method for moving a double-track manifold platform of an LNG bunkering ship is provided, and a front view of step 2 of working in different sets of tracks;

[0058] Fig.16 A method for moving a double-track manifold platform of an LNG bunkering ship is shown, with a front view of step 3 of operating within different sets of tracks.

[0059] Figure numerals: 1. Liquid collecting skid; 2. Skid slide; 3. Translation device; 4. Platform fixing device; 5. Deck; 6. Side fastening platform; 7. Cable pile; 8. Railing; 9. Angle steel support; 10. Grille; 11. Connecting hose support; 12. Connecting hose; 13. Mooring cable; 14. Mooring winch; 15. Removable railing; 16. Filling hard pipe; 17. Claw roller; 18. Filling hose; 19. Filling saddle; 20. Lifting eye plate; 21. Hose hoist; 22. Lifting wire rope. DETAILED DESCRIPTION

[0060] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0061] The embodiment of the present invention discloses a double-track manifold area platform that can be hoisted for an LNG bunkering ship and a mobile operation method. The double-track manifold area platform that can be hoisted includes:

[0062] The liquid collecting skid 1 is used to support the connecting hose support 11 and the liquid collecting tank and is made of stainless steel;

[0063] The side fastening platform 6 is used to support the cable pile 7 and the lifting eye plate 20 and is made of stainless steel;

[0064] The skid slide 2 is fixed on the deck 5 and is made of channel steel and stainless steel;

[0065] A translation device 3, used for translation on the skid slide 2;

[0066] The platform fixing device 4 is used to fix the position of the manifold area platform on the skid slide 2 and is made of stainless steel;

[0067] The translation power device is used to provide power for the translation of the header area platform on the skid slide 2, using the mooring winches 14 on both sides of the header area platform;

[0068] A lifting device for lifting the manifold platform from one set of skid slides 2 to another set of skid slides 2, using a hose crane 21 at the center of the ship;

[0069] Furthermore, the connecting hose support 11 on the liquid collecting skid 1 is used to support the connecting hose 12, which is made of stainless steel. One end of the connecting hose 12 is connected to the filling hard pipe 16 on the LNG bunkering ship; the liquid collecting tank on the liquid collecting skid 1 is composed of an angle steel support 9 and a grille 10 laid on the angle steel, which is made of stainless steel; the liquid collecting skid 1 is installed on the translation device 3, and both sides are connected to the side fastening platform 6; the translation device 3 includes a pulley and an axle; the pulley is made of Teflon or other anti-static materials; the axle is made of stainless steel.

[0070] Furthermore, there are two groups of side fastening platforms 6, which are respectively installed on both sides of the liquid collecting skid 1 and installed on the translation device 3; the side fastening platform 6 is provided with a cable pile 7 made of stainless steel; the side fastening platform 6 is provided with two lifting eye plates 20 made of stainless steel; the outer side of the side fastening platform 6 is provided with a railing 8 made of stainless steel.

[0071] Furthermore, each set of skid slides 2 is composed of two channel steels, in which the pulleys can slide, and the entire ship can have multiple sets of skid slides 2; baffles are set at both ends of the channel steels, which are made of stainless steel; multiple sets of translation devices 3 are distributed on the skid slides 2, and the translation devices 3 can translate on the skid slides 2; the translation devices 3 support the liquid collection skid 1 and the side fastening platform 6 thereon.

[0072] Furthermore, the deck 5 is provided with anchor bolt fixing seats on both outer sides of each channel steel, which are made of stainless steel, and the anchor bolt fixing seats on each side are installed at equal intervals; a removable railing 15 made of stainless steel is provided on the side of the deck 5; the distance between the translation devices 3 on the skid slide 2 is an integer multiple of the spacing between the anchor bolt fixing seats; the platform fixing device 4 uses eye plates, angle steels, anchor bolts, bolts, and nuts, which are made of stainless steel.

[0073] Furthermore, the translational power device is a mooring winch 14 originally used for mooring on both sides of the manifold platform, which uses a mooring cable 13 and a clevis roller 17 to guide the power to the cable pile 7 on the side fastening platform 6.

[0074] See also Figures 1 to 16 As shown, in an embodiment of the present invention, a double-track manifold area platform that can be hoisted for an LNG bunkering ship and a mobile operation method are shown, including a liquid collecting skid 1, a skid slide 2, a translation device 3, a platform fixing device 4, a deck 5, a side fastening platform 6, a cable pile 7, a railing 8, an angle steel support 9, a grille 10, a connecting hose support 11, a connecting hose 12, a mooring cable 13, a mooring winch 14, a detachable railing 15, a filling hard pipe 16, a cleat roller 17, a filling hose 18, a filling saddle 19, a lifting eye plate 20, a hose hanger 21, and a lifting wire rope 22.

[0075] Specifically, the liquid collecting skid 1 is used to support the connecting hose support and the liquid collecting tank, and the side fastening platforms 6 are installed on both sides thereof, and the side fastening platforms 6 are installed with cable piles 7 and lifting eye plates 20; the liquid collecting skid 1 and the side fastening platform 6 are both installed on the translation device 3, which can be translated on the skid slide 2 and fixed by the platform fixing device 4; the translation power device adopts the existing mooring winch 14 of the ship, and guides the power to the manifold area platform through the translation power guiding device; the lifting device adopts the existing hose crane 21 of the ship to lift the manifold area platform from one group of skid slides 2 to another group of skid slides 2. The present invention can reduce the number of manifold area platforms of LNG bunkering ships, increase the range of bunkering ship types, and improve the utilization rate of mooring parts.

[0076] The translation device 3 is used to support the liquid collecting skid 1. The translation device 3 is arranged on the skid slide 2 and can be translated thereon. The translation device 3 can be fixed by the platform fixing device 4. The liquid collecting skid 1 is provided with side fastening platforms 6 on both sides. The translation device 3 is arranged under the side fastening platforms 6 and can be fixed by the platform fixing device 4.

[0077] Furthermore, the skid slide 2 is composed of a group of 2 channel steels, and there are multiple groups of skid slides 2 in the whole ship. There are anchor bolt seats on the outer sides of each channel steel; baffles are set at both ends of the skid slide 2 to limit the translation range.

[0078] Furthermore, a detachable railing 15 is provided on the side of the liquid collecting skid 1 ; a liquid collecting tank composed of an angle steel support 9 and a grid 10 and a connecting hose support 11 are provided on the liquid collecting skid 1 .

[0079] Furthermore, the platform fixing device 4 is composed of an eye plate, an angle steel, an anchor bolt, a bolt, and a nut. One end can be connected to the anchor bolt seat on the liquid collecting skid 1, and the other end can be connected to the translation device 3 to play a fixing role; a cable pile 7 is installed on the side fastening platform 6, and a lifting eye plate 20 and a railing 8 are installed on the outside.

[0080] Furthermore, the mooring winch 14 transmits the translational force to the mooring pile 7 on the side fastening platform 6 through the mooring cable 13 and the cleat roller 17 .

[0081] Furthermore, the filling hard pipe 16 on the filling ship is connected to the connecting hose support 11 on the liquid collecting skid 1 through the connecting hose 12; the filling hose 18 is connected to the connecting hose 12 through the filling saddle 19 for filling.

[0082] Furthermore, the hose crane 21 lifts the platform onto another set of skid slideways 2 via the lifting wire rope 22 .

[0083] When working within the same set of tracks, the mobile working method mainly includes the following steps:

[0084] Step 1, guide the mooring cable 13 from the mooring winch 14 on one side of the header platform to the nearest side fastening platform 6 through the cleat roller 17;

[0085] Step 2, the cable passes through the railing 8, and is wound around the cable pile 7 on the side fastening platform 6 using the figure eight winding method;

[0086] Step 3, the mooring winch 14 on the other side of the header platform performs steps 1 and 2;

[0087] Step 4, loosen the bolts and anchor bolts on all platform fixing devices 4;

[0088] Step 5, start the mooring winches 14 on both sides, pull on one side and release on the other side, so that the manifold platform moves horizontally to the designated position;

[0089] Step 6, slowly stop the mooring winches 14 on both sides, keep the mooring line 13 taut, and tighten the bolts and anchor bolts on the platform fixing device 4;

[0090] Step 7, connect one end of the connecting hose 12 to the filling hard pipe 16 on the LNG bunkering ship, and install the other end to the connecting hose support 11 on the manifold platform;

[0091] Step 8, remove the detachable railing 15, install the filling saddle 19, connect the filling hose 18 to the connecting hose 12 of the LNG filling ship, and connect the other end to the filling port of the dual-fuel ship filling station to complete the filling;

[0092] Step 9, disconnect the connection of the filling hose 18 between the two ships, disconnect the connection between the LNG ship connecting hose 12 and the hard pipe, remove the filling saddle 19, reinstall the detachable railing 15, loosen the mooring cable 13 on the mooring pile 7, and use the mooring winch 14 to retract the mooring cable 13 onto the drum.

[0093] In addition, another set of skid slides 2, detachable rails 15 and anchor bolts are arranged on the LNG bunkering ship, and the lifting device adopts the hose crane 21 originally used for lifting the hose in the ship; when working in different sets of tracks, the mobile operation method mainly includes the following steps:

[0094] Step 1, using four lifting wire ropes 22 to connect four lifting eye plates 20 with the hooks of the hose hanger 21;

[0095] Step 2, loosen the bolts and anchor bolts on all platform fixing devices 4;

[0096] Step 3, use a hose crane 21 to hoist the manifold platform onto another set of skid slideways 2;

[0097] Step 4, use steps 1, 2, and 3 when working within the same set of tracks;

[0098] Step 5, releasing the connection between the wire rope and the lifting eye plate 20;

[0099] Step 6, use steps 5, 6, 7, 8, and 9 when working in the same set of tracks to adjust, fix and fill the position of the manifold platform on another set of skid slides 2.

[0100] Finally, it should be noted that the above is only a preferred embodiment of the present invention and is not intended to limit the present invention. Although the present invention has been described in detail with reference to the aforementioned embodiments, it is still possible for those skilled in the art to modify the technical solutions described in the aforementioned embodiments, or to make equivalent substitutions for some of the technical features therein. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the protection scope of the present invention.

Claims

1. A double-track manifold platform for LNG bunkering ship, characterized in that: include: A liquid collecting skid (1) for supporting the liquid collecting tank and the connecting hose support (11); A skid slideway (2) for supporting the translation device (3); The translation device (3) is used to support the liquid collecting skid (1) and the side fastening platform (6); A platform fixing device (4) for fixing the position of the translation device (3) on the skid slideway (2); A translational power device, used for providing power for the manifold platform to translate on the skid slideway (2); A translational power guiding device, used for guiding the power provided by the translational power device to the manifold platform; The lifting device is used to lift the manifold platform from one set of the skid slideways (2) to another set of the skid slideways (2).

2. The double-track manifold platform for LNG bunkering ship according to claim 1, characterized in that: The skid slide (2) is installed on the deck (5), with two channel steels forming a group. Baffles are provided on both sides of each channel steel. Anchor bolt seats are evenly distributed on the deck (5) on both sides. There are multiple groups of skid slides (2) on the entire ship.

3. The double-track manifold platform for LNG bunkering ship according to claim 2, characterized in that: The side fastening platforms (6) are installed on both sides of the liquid collecting skid (1), and the translation devices (3) are provided under the side fastening platforms (6) and the liquid collecting skid (1) for translation on the skid slideway (2).

4. The double-track manifold platform for LNG bunkering ship according to claim 3, characterized in that: The liquid collecting skid (1) is provided with the liquid collecting tank formed by angle steel and a grille (10) and the connecting hose support (11).

5. The double-track manifold platform for LNG bunkering ship according to claim 4, characterized in that: A cable bollard (7), a lifting eye plate (20) and a handrail (8) are installed on the side fastening platform (6).

6. The double-track manifold platform for LNG bunkering ship according to claim 5, characterized in that: The translation device (3) can be fixed on the skid slideway (2) via the platform fixing device (4).

7. The double-track manifold platform for LNG bunkering ship according to claim 6, characterized in that: The translational power device guides power to the manifold platform through the translational power guiding device to achieve translation of the platform. The translational power device uses a mooring winch (14) already on board the ship. The translational power guiding device uses a mooring cable (13), a cleat roller (17), and the mooring pile (7).

8. The double-track manifold platform for LNG bunkering ship according to claim 7, characterized in that: The lifting device lifts the collecting area platform from one group of skid slideways (2) to another group of skid slideways (2), and the lifting device adopts the hose crane (21) already on board.

9. The mobile operation method of the double-track manifold platform of the LNG bunkering ship according to claim 8 is characterized in that: When working within the same set of tracks, the main steps include: Step 1, guiding the mooring cable (13) from the mooring winch (14) on one side of the header platform through the cleat roller (17) to the nearest side fastening platform (6); Step 2, the cable passes through the handrail (8), and is wound around the cable pile (7) on the side fastening platform (6) using a figure eight winding method; Step 3, the mooring winch (14) on the other side of the header platform executes steps 1 and 2; Step 4, loosening all the bolts and anchor bolts on the platform fixing device (4); Step 5, starting the mooring winches (14) on both sides, pulling on one side and releasing on the other side, so that the manifold platform moves horizontally to the designated position; Step 6, slowly stop the mooring winches (14) on both sides, keep the mooring cables (13) in a taut state, and tighten the bolts and anchor bolts on the platform fixing device (4); Step 7, connecting one end of the connecting hose (12) to the filling hard pipe (16) on the LNG bunkering ship, and installing the other end to the connecting hose support (11) on the manifold platform; Step 8, remove the detachable railing (15), install the filling saddle (19), connect the filling hose (18) to the connecting hose (12) of the LNG bunkering ship, and connect the other end to the filling port of the dual-fuel ship filling station to complete the filling; Step 9, disconnect the connection between the filling hose (18) between the two ships, disconnect the connection between the connecting hose (12) and the hard pipe of the LNG ship, remove the filling saddle (19), reinstall the detachable railing (15), loosen the mooring cable (13) on the mooring bollard (7), and use the mooring winch (14) to retract the mooring cable (13) onto the drum.

10. The mobile operation method of the double-track manifold platform of the LNG bunkering ship according to claim 9, characterized in that: When working in different sets of tracks, the main steps include: Step 1, using four lifting wire ropes (22) to connect the four lifting eye plates (20) to the hook of the hose hanger (21); Step 2, loosening all the bolts and anchor bolts on the platform fixing device (4); Step 3, using the hose crane (21) to hoist the manifold platform onto another set of skid slideways (2); Step 4, using steps 1, 2, and 3 of the operating method when operating within the same set of tracks; Step 5, releasing the connection between the lifting wire rope (22) and the lifting eye plate (20); Step 6, using steps 5, 6, 7, 8, and 9 of the operating method when operating within the same set of tracks, the position of the manifold platform on another set of the skid slides (2) is adjusted, fixed, and filled.

Citation Information

Patent Citations

  • Remote well natural gas recovery device

    CN105927849A

  • LNG removes air entrainment system of ship gas station

    CN205716403U

  • Landing stage LNG supply system

    CN206221971U

  • LNG filling device with front platform

    CN213018875U

  • Integral translation device

    CN216763181U