Method for calculating effective water diversion amount of water injection well of ultra-deep fault control fracture-cavity oil reservoir

By drawing oil well energy indication curves and model calculations, the effective water transfer volume and water transfer rate from water injection wells to oil production wells are calculated in detail, which solves the general problem of water injection effect evaluation in the existing technology and achieves precise control of water injection effect and stable oil well production. .

CN118821384APending Publication Date: 2024-10-22CHINA PETROLEUM & CHEMICAL CORP +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202310430489.5
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2023-04-20
Publication Date
2024-10-22

AI Technical Summary

Technical Problem

Existing technology cannot effectively calculate the effective water transfer volume and water transfer rate of water injection wells in ultra-deep fault-controlled fracture-cavity reservoirs to each oil production well, resulting in a general evaluation of water injection effects and the inability to accurately control, affecting the stable production of oil wells and water injection utilization.

Method used

By drawing the oil well energy indication curve before and after water injection, the energy relationship function is determined, the cumulative oil production quality on the ground during the elastic flooding stage is estimated, the total water storage is calculated, and based on the effective water separation model and water separation rate model, the detailed calculation of the water injection well to production well is carried out Effective water separation volume and water separation rate.

Benefits of technology

It achieves accurate calculation of the dynamic effective water separation volume and water separation rate of each oil production well, improves the evaluation and parameter adjustment of water injection effect, and enhances the stable production capacity and water injection utilization rate of the oil well.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118821384A_ABST
    Figure CN118821384A_ABST
Patent Text Reader

Abstract

The invention provides an ultra-deep fault control fracture-cavity reservoir water injection well effective water diversion calculation method, which comprises the following steps: for a target producing well, drawing oil well energy indication curves before and after water injection, and determining an energy relation function corresponding to the oil well energy indication curves before water injection; according to the energy relation function, estimating the ground cumulative oil production mass in the elastic flooding stage corresponding to the pressure measuring points at different time after water injection; on the basis of the oil well energy indication curve after water injection, the ground cumulative oil production mass corresponding to the pressure measuring points at different time after water injection is determined, and the total water storage amount corresponding to the pressure measuring points at different time after water injection is calculated by combining the ground cumulative oil production mass at the elastic flooding stage; according to the total water storage amount corresponding to the pressure measuring points at different time after water injection, the effective water distribution amount and the effective water distribution rate from the water injection well to the target oil production well are calculated through the effective water distribution amount model and the effective water distribution rate model. According to the method, the effective water diversion amount and the effective water diversion rate from the water injection well to each producing well can be calculated in detail.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of oil reservoir engineering, and in particular to a method for calculating the effective water distribution of a water injection well in an ultra-deep fault-controlled fracture-cavity oil reservoir. Background Art

[0002] Ultra-deep fault-controlled fracture-cave reservoirs refer to target layers with a burial depth greater than 6,000 meters. The GZ Oilfield in the Tarim Basin is a typical ultra-deep fault-controlled fracture-cave reservoir. The average vertical depth of the completed wells is about 7,600 meters, and some wells have a vertical depth of more than 8,000 meters. The oil wells have entered T7 4 The depth below the interface (the seismic reflection interface of the top of the unified room formation in the Middle Ordovician, i.e. the top of the target layer) varies greatly, ranging from 45 to 480 m, with an average of 196 m; the formation pressure coefficient is 1.12 to 1.20, the average ground-saturation pressure difference is 52 MPa, the bottom well formation static temperature is 150 to 165 ° C, and the surface degassed crude oil viscosity at the formation temperature is 0.2 to 3 mPa·s; the bottom water is not active, and the water body multiple is less than 8 times. In the early stage of development, the GZ oilfield was produced by self-flowing. The development practice has proved that some wells have good connectivity and can form several connected well groups. The pressure and production of different wells in the same connected well group interfere with each other during production. However, due to various reasons such as weak natural energy, fast mining speed, and failure to replenish the formation energy in time in the early stage, the formation pressure of some well groups dropped rapidly, and local formations began to degas, which seriously affected the stable production of oil wells, and the annual decline rate of production was as high as 50% on average.

[0003] In order to replenish formation energy and restore oil well production capacity, GZ Oilfield has started large-scale water injection development since 2020. However, due to the serious formation deficit in the early stage, the injection volume of water injection wells was large in the early stage of water injection, and the production and pressure were restored, achieving certain results, proving that water injection is an effective development method for ultra-deep fault-controlled fracture-cavity reservoirs in the late stage of elastic flooding. However, as the injection volume of water injection wells continued to increase, some oil wells began to see water and water channeling occurred, seriously affecting the production capacity of oil wells.

[0004] Therefore, the present invention provides a method for calculating the effective water diversion volume of a water injection well in an ultra-deep fault-controlled fracture-cavity oil reservoir. Summary of the invention

[0005] In view of the shortcomings of the prior art, the present invention provides a method for calculating the effective water diversion of a water injection well in an ultra-deep fault-controlled fracture-cavity oil reservoir, the method comprising:

[0006] For the target oil production well, draw the energy indication curve of the oil well before and after water injection, and determine the energy relationship function corresponding to the energy indication curve of the oil well before water injection;

[0007] By using the energy relationship function, the accumulated oil production quality on the surface during the elastic flooding stage corresponding to the pressure measuring points at different times after water injection is estimated;

[0008] Based on the energy indicator curve of the oil well after water injection, the cumulative oil production on the ground corresponding to the pressure measuring points at different times after water injection is determined, and the total water storage corresponding to the pressure measuring points at different times after water injection is calculated in combination with the cumulative oil production on the ground during the elastic flooding stage;

[0009] According to the total water storage corresponding to the pressure measuring points at different times after water injection, the effective water distribution volume and effective water distribution rate from the injection well to the target oil production well are calculated through the effective water distribution volume model and the effective water distribution rate model.

[0010] According to one embodiment of the present invention, the energy relationship function corresponding to the energy indication curve of the oil well before water injection is determined by the following steps:

[0011] A coordinate system is constructed with the accumulated oil production on the surface as the horizontal coordinate and the bottom hole flow pressure or wellhead oil pressure as the vertical coordinate;

[0012] Based on the measured data of the target oil production well, the bottom hole flow pressure or wellhead oil pressure measured at different times before and after water injection and the corresponding surface cumulative oil production mass are marked on the coordinate system in the form of data points to form the energy indication curve of the oil well before and after water injection;

[0013] The energy relationship function is obtained by means of curve regression for the energy indication curve of the oil well before water injection.

[0014] According to one embodiment of the present invention, the energy relationship function comprises:

[0015] p wf =kN p ρ o,s +b

[0016] p tub =kN p ρ o,s +b

[0017] Where: p wf is the bottom hole flowing pressure, MPa; p tub is the wellhead oil pressure, MPa; k is the slope of the curve corresponding to the energy relationship function; N p is the cumulative oil production volume on the ground, m 3 ρ o,s is the density of crude oil on the ground, kg / m 3 ; b is the intercept of the curve corresponding to the energy relationship function.

[0018] According to one embodiment of the present invention, the cumulative oil production on the surface of the elastic flooding stage corresponding to the pressure measuring points at different times after water injection is estimated by the following steps:

[0019] Based on the measured data of the target oil production well, the bottom hole flow pressure or wellhead oil pressure measured at different times after water injection is substituted into the energy relationship function as a known quantity to estimate the cumulative surface oil production quality during the elastic flooding stage.

[0020] According to one embodiment of the present invention, the total water storage corresponding to the pressure measuring points at different times after water injection is calculated by the following steps:

[0021] Subtracting the accumulated oil production on the ground corresponding to the pressure measuring points at different times after water injection from the accumulated oil production on the ground during the elastic flooding stage to calculate a first intermediate value;

[0022] The first intermediate value is multiplied by the formation crude oil volume coefficient to calculate a second intermediate value;

[0023] The second intermediate value is used as the dividend and the surface crude oil density is used as the divisor to calculate the total water storage volume corresponding to the pressure measuring points at different times after water injection.

[0024] According to one embodiment of the present invention, the effective water splitting volume model and the effective water splitting rate model are constructed by the following steps:

[0025] Based on the total water intrusion of oil wells, the total water inflow of oil wells, the cumulative surface water production of oil wells and the total leakage of oil wells, a total water storage model for calculating the total water storage of oil wells is constructed;

[0026] The difference between the total water inflow of the oil production well and the total leakage of the oil production well is defined as the effective water diversion from the water injection well to the oil production well;

[0027] Considering the characteristics of ultra-deep fault-controlled fracture-cavity reservoirs with no bottom water or weak water body, the total water intrusion of the oil production well is adjusted, and combined with the total water storage model, the effective water distribution model for calculating the effective water distribution from the water injection well to the oil production well is constructed;

[0028] The effective water diversion rate from the water injection well to the oil production well is defined as the ratio of the effective water diversion amount from the water injection well to the total water injection amount of the water injection well. Combined with the effective water diversion rate model, the effective water diversion rate model for calculating the effective water diversion rate from the water injection well to the oil production well is constructed.

[0029] According to one embodiment of the present invention, the effective water distribution model includes:

[0030]

[0031] The effective water separation rate model comprises:

[0032]

[0033] Where: W flow_in_eff is the effective water diversion from the injection well to the oil production well, m3 ; W is the total water storage volume of the oil well, m 3 ; W p is the cumulative surface water production of the oil well, m 3 ; B w is the formation water volume coefficient, m 3 / m 3 ; λ is the effective water diversion rate from the injection well to the oil production well; W inj is the total water injection volume of the injection well, m 3 .

[0034] According to one embodiment of the present invention, the effective water diversion amount and the effective water diversion rate from the water injection well to the target oil production well are calculated respectively by the following steps:

[0035] Taking the total water storage corresponding to the pressure measuring points at different times after water injection as a known quantity, combined with the cumulative water production on the surface of the oil production well and the formation water volume coefficient, the effective water distribution from the water injection well to the target oil production well is calculated through the effective water distribution model;

[0036] The total water storage corresponding to the pressure measuring points at different times after water injection is taken as a known quantity, combined with the cumulative surface water production of the oil well, the formation water volume coefficient, and the total water injection volume of the water injection well, the effective water distribution rate from the water injection well to the target oil production well is calculated through the effective water distribution rate model.

[0037] According to another aspect of the present invention, a storage medium is provided, which contains a series of instructions for executing the method steps as described in any one of the above.

[0038] According to another aspect of the present invention, there is also provided a device for calculating the effective water diversion of water injection wells in ultra-deep fault-controlled fracture-cavity oil reservoirs, which executes the method described in any one of the above items, and the device comprises:

[0039] A relationship function module is used to draw energy indication curves of the oil well before and after water injection for the target oil production well, and determine the energy relationship function corresponding to the energy indication curve of the oil well before water injection;

[0040] A cumulative oil production module, which is used to estimate the cumulative oil production mass on the ground during the elastic flooding stage corresponding to the pressure measuring points at different times after water injection through the energy relationship function;

[0041] A total water storage module is used to determine the cumulative oil production on the ground corresponding to the pressure measuring points at different times after water injection based on the energy indication curve of the oil well after water injection, and to calculate the total water storage corresponding to the pressure measuring points at different times after water injection in combination with the cumulative oil production on the ground during the elastic drive stage;

[0042] The effective water distribution module is used to calculate the effective water distribution volume and effective water distribution rate from the injection well to the target oil production well based on the total water storage volume corresponding to the pressure measuring points at different times after water injection, through the effective water distribution volume model and the effective water distribution rate model.

[0043] Compared with the prior art, the method for calculating the effective water distribution of water injection wells in ultra-deep fault-controlled fracture-cavity oil reservoirs provided by the present invention has the following advantages:

[0044] First, through research on relevant domestic and foreign literature, patent documents, etc., it is found that the existing technology does not involve the calculation of the effective water distribution volume from water injection wells to each oil production well, and the existing technology generally takes the well group as the research object to carry out a general evaluation of the water injection effect, and does not refine the effective water distribution volume and water distribution rate from water injection wells to each oil production well. The present invention takes each oil production well as the research object, based on the principle of material balance and water injection development mechanism, can calculate in detail the effective water distribution volume and effective water distribution rate from water injection wells to each oil production well, which is a step further in the evaluation of water injection effect.

[0045] Second, the effective water diversion volume and effective water diversion rate from the water injection well to each oil production well calculated by the present invention are dynamically changing. Based on data such as the bottom hole flow pressure (or wellhead oil pressure) and the accumulated oil production on the ground measured at different times, the effective water diversion volume and effective water diversion rate from the water injection well to the oil production well can be evaluated in real time, which can provide effective support for the adjustment of injection and production parameters in the mine.

[0046] Other features and advantages of the present invention will be described in the following description, and partly become apparent from the description, or understood by practicing the present invention. The purpose and other advantages of the present invention can be realized and obtained by the structures particularly pointed out in the description, claims and drawings. BRIEF DESCRIPTION OF THE DRAWINGS

[0047] The accompanying drawings are used to provide a further understanding of the present invention and constitute a part of the specification. Together with the embodiments of the present invention, they are used to explain the present invention and do not constitute a limitation of the present invention. In the accompanying drawings:

[0048] Figure 1 A flowchart showing the steps of a method for calculating effective water diversion of a water injection well in an ultra-deep fault-controlled fracture-cavity oil reservoir according to an embodiment of the present invention is shown;

[0049] Figure 2 An oil well energy indication curve diagram before and after water injection according to an embodiment of the present invention is shown;

[0050] Figure 3 A schematic diagram showing a method for calculating effective water diversion of a water injection well in an ultra-deep fault-controlled fracture-cavity oil reservoir according to an embodiment of the present invention is shown;

[0051] Figure 4It shows the plane distribution diagram of injection and production wells of FQ well group in GZ ultra-deep fault-controlled fracture-cavity oil reservoir according to one embodiment of the present invention;

[0052] Figure 5 shows an energy indication curve diagram of FQ-2 before and after water injection of FQ-1 according to an embodiment of the present invention;

[0053] Figure 6 A graph showing the effective water diversion amount and effective water diversion rate from FQ-1 to FQ-2 according to an embodiment of the present invention is shown;

[0054] Figure 7 A graph showing the effective water diversion amount and effective water diversion rate from FQ-1 to FQ-3 according to one embodiment of the present invention is shown.

[0055] In the accompanying drawings, the same reference numerals are used for the same components. In addition, the accompanying drawings are not drawn according to the actual scale. DETAILED DESCRIPTION

[0056] In order to make the objectives, technical solutions and advantages of the present invention more clear, the embodiments of the present invention are further described in detail below with reference to the accompanying drawings.

[0057] In 2015, Sinopec made progress in oil and gas exploration in the Tarim Basin and discovered an ultra-deep fault-controlled fracture-cave reservoir with a target layer buried at a depth of about 7,400 meters, which opened the prelude to the rolling exploration and development of ultra-deep (greater than 6,000 meters) fault-controlled fracture-cave reservoirs in China (Significance and Prospects of Discovery of Super-deep Carbonate Fault-karst Oil and Gas Reservoirs in Shunbei, Tarim Basin, Jiao Fangzheng, Petroleum and Natural Gas Geology, 2018). The ultra-deep fault-controlled fracture-cave reservoir in the Tarim Basin is a special fracture-cave carbonate reservoir with fault-controlled karst characteristics. The deep and large strike-slip fault zone has a control effect on the storage, accumulation and enrichment of the Ordovician carbonate rock. After being subjected to multiple stages of structural compression and tension, the carbonate rock of the Middle and Lower Ordovician developed a certain scale of fracture zone along the deep fault zone. The development and formation of the fracture-cave reservoir body are affected by fault fragmentation and dissolution. Oil and gas mainly migrate vertically and fill into reservoirs along the deep and large faults that pass through the source. In the plane, the strike-slip faults are strip-shaped, mainly developed in the northeast and northwest directions, with a width of 0.1 to 5 km. Due to the difference in tectonic action, the strike-slip faults are segmented and can generally be divided into three fault styles: compression, tension and pure strike-slip. The seismic response characteristics, fracture-cavity combination patterns, reservoir scale, reservoir properties, etc. of different sections are quite different. Vertically, Tongyuan deep and large faults and high-angle fractures are very developed, and the reservoir is funnel-shaped, that is, the number of fracture-cavity reservoirs in the shallow part is large and the scale is large, while the fracture-cavity reservoirs in the deeper part are developed overall. The upper and lower fracture-cavity reservoirs are connected by faults and fractures, and the vertical connectivity is very good, and there is a certain degree of separation in some parts.

[0058] In order to improve the current situation of GZ Oilfield (i.e., as the injection volume of water injection wells continues to increase, some oil wells begin to see water, water breakthrough occurs, and the oil well production capacity is seriously affected), and to improve the water injection efficiency and oil well production capacity, the present invention proposes two new concepts applied to reservoir development, namely, "effective water diversion" and "effective water diversion rate". In the present invention, effective water diversion refers to the ground volume of net effective injected water that truly plays a role in oil displacement, breakthrough, reserve mobilization, and pressure increase from the injection water of water injection wells to the oil production wells, minus the water loss at the oil production wells, and the unit is cubic meters. In the present invention, the ratio of the effective water diversion volume of water injection wells to the oil production wells to the total water injection volume of water injection wells is called the effective water diversion rate.

[0059] It should be noted that the effective water diversion and effective water diversion rate mentioned in the present invention are not similar to or the same as the concept of water diversion used in hydraulics. Specifically, the "water diversion" mentioned in hydraulics literature (Research on the evolution of river channels and water diversion changes in the Sankou water system in the Dongting Lake area, Chen Bang, Changsha University of Science and Technology, 2019) refers to the diversion of the river channel.

[0060] At present, the term "water distribution" has not appeared in the field of oil and gas reservoir development. There has been no systematic research on how to calculate the effective water distribution of water injection wells, and there is no report in the literature. However, the term "water distribution" is often used in mining practice, and the water distribution from water injection wells to oil production wells is often used to evaluate the water injection effect of the well group and guide the adjustment of injection and production parameters.

[0061] In the prior art, in terms of water injection effect evaluation: there are many methods and indicators for evaluating water injection effect. Commonly used water injection effect evaluation indicators include daily oil production, production decline rate, pressure, water content increase rate, water storage rate, etc. (Evaluation of Water Injection Effect of Carbonate Fracture-cave Reservoirs in Tahe District 6-7, Lai Siyu, Chengdu University of Technology, 2014). These indicators reflect the effectiveness of water injection from different angles. For example, the increase in daily oil production and formation pressure, the decrease in production decline rate and water content increase rate directly reflect the effectiveness of water injection. However, these indicators cannot explain the reasons for the good or bad water injection effect, nor can they quantitatively explain why the water injection effect changes. The concept of "effective water diversion from water injection wells to oil production wells" proposed in the present invention can better explain these problems.

[0062] In the prior art, in terms of injection-production parameter adjustment, the injection-production parameters were adjusted mainly by optimizing the underground injection-production ratio of the well group (i.e., the volume ratio of the underground injection volume of all water injection wells in the well group to the underground production volume of all oil production wells) to achieve injection-production balance. However, the injection-production ratio is usually an indicator for the well group, that is, the entire well group is regarded as a whole, ignoring the differences between oil wells and injection-production wells, including differences in oil well production capacity, physical properties around the wells, and connectivity between wells. This is a general adjustment. For example, in the same injection-production well group, some oil wells may see water, while others may produce stably. If the general adjustment is still made with reference to the injection-production ratio, it is impossible to ensure that the development effect of each oil production well is optimal. The method for calculating the effective water distribution of water injection wells in ultra-deep fault-controlled fracture-cavity oil reservoirs provided by the present invention can clearly determine the effective water distribution of water injection wells to each oil production well, and accurately control the effective water distribution by optimizing the injection-production pressure difference. On the one hand, each oil production well can achieve the best development effect and realize "on-demand distribution" of injected water. On the other hand, it can also improve the utilization rate of injected water and reduce the loss of injected water.

[0063] By reviewing the current status of existing technologies, the applicant found that the difficulty in calculating the effective water distribution of water injection wells in ultra-deep fault-controlled fracture-cavity reservoirs lies in the following two aspects:

[0064] (1) The dynamic changes in well connectivity after water injection in ultra-deep fault-controlled fracture-cavity reservoirs make the calculation of water distribution very complicated. Ultra-deep fault-controlled fracture-cavity reservoirs have very developed fractures of different scales. During the high-pressure water injection process, some fractures open, changing the reservoir structure and physical properties, directly affecting the well connectivity, resulting in variable water injection paths, and the injected water is easily lost to other well groups. There are multiple water injection wells that distribute water to one oil production well, which affects the calculation of the effective water distribution of the water injection wells.

[0065] (2) The effective water diversion from water injection wells to oil production wells changes dynamically, which is related to formation pressure, cumulative oil production, water injection volume, and production volume. Currently, a method for calculating the effective water diversion from water injection wells has not been established.

[0066] In summary, since the existing technology has not systematically studied the problem of effective water diversion of water injection wells, the present invention establishes a method for calculating the effective water diversion of water injection wells based on the actual situation of ultra-deep fault-controlled fracture-cavity oil reservoirs in the Tarim Basin, providing technical guidance for dynamic analysis of such oil reservoirs, evaluation of water injection effects, and adjustment of injection-production parameters.

[0067] Figure 1 A flowchart of the steps of a method for calculating the effective water diversion volume of a water injection well in an ultra-deep fault-controlled fracture-cavity oil reservoir according to an embodiment of the present invention is shown.

[0068] like Figure 1 As shown, in step S101, for the target oil production well, energy indication curves of the oil well before and after water injection are drawn, and the energy relationship function corresponding to the energy indication curve of the oil well before water injection is determined.

[0069] In one embodiment, the energy relationship function corresponding to the energy indication curve of the oil well before water injection is determined through steps S1011-S1013.

[0070] In step S1011, the surface cumulative oil production mass is used as the horizontal coordinate, and the bottom hole flow pressure or wellhead oil pressure is used as the vertical coordinate to construct a coordinate system. Specifically, when drawing the oil well energy indication curve, the present invention takes into account that the actual measured static pressure data is generally less, so the bottom hole flow pressure or wellhead oil pressure change is used to approximate the formation static pressure change. In one embodiment, Figure 2 As shown, a coordinate system is constructed with the cumulative surface oil production mass (the product of the cumulative surface oil production volume and the surface crude oil density) as the horizontal coordinate and the bottom hole flowing pressure or the wellhead oil pressure as the vertical coordinate.

[0071] In step S1012, based on the measured data of the target oil production well, the bottom hole flow pressure or wellhead oil pressure measured at different times before and after water injection and the corresponding surface cumulative oil production mass are marked on the coordinate system in the form of data points to form the oil well energy indication curve before and after water injection. Specifically, Figure 2 As shown in the figure, the bottom hole flowing pressure or wellhead oil pressure measured at different times before and after water injection and the corresponding surface cumulative oil production mass are marked as data points on the coordinate system to form the energy indicator curve of the oil well before and after water injection.

[0072] In step S1013, the energy indication curve of the oil well before water injection is used to obtain the energy relationship function by means of curve regression. Specifically, the ultra-deep fault-controlled fracture-cavity reservoir is in the elastic drive stage before water injection, and its energy indication curve is a straight line. After water injection, the energy indication curve becomes flat. Figure 2 As shown in FIG. 1 , for the energy indication curve of the oil well before water injection, the linear relationship function between the bottom hole flowing pressure or the wellhead oil pressure and the accumulated oil production quality on the ground is obtained by regression, which is used as the energy relationship function.

[0073] In one embodiment, the energy relationship function comprises:

[0074] p wf =kN p ρ o,s +b

[0075] p tub =kN p ρ o,s +b

[0076] Where: p wf is the bottom hole flowing pressure, MPa; p tub is the wellhead oil pressure, MPa; k is the slope of the curve corresponding to the energy relationship function; N p is the cumulative oil production volume on the ground, m 3 ρo,s is the density of crude oil on the ground, kg / m 3 ; b is the intercept of the curve corresponding to the energy relationship function.

[0077] like Figure 1 As shown, in step S102, the cumulative oil production mass on the surface during the elastic flooding stage corresponding to the pressure measuring points at different times after water injection is estimated through the energy relationship function.

[0078] In one embodiment, step S102 includes: based on the measured data of the target oil production well, substituting the bottom hole flow pressure or wellhead oil pressure measured at different times after water injection as a known quantity into the energy relationship function to estimate the cumulative oil production quality on the surface during the elastic drive stage. Specifically, based on the linear relationship function corresponding to the energy indicator curve of the oil well during the elastic drive stage, the cumulative oil production quality on the surface during the elastic drive stage corresponding to the pressure measuring points at different times after water injection is estimated, that is, the cumulative oil production quality on the surface during the elastic drive stage N p ρo, s =(p test -b) / k, where p test It is the bottom hole flowing pressure or wellhead oil pressure of the oil well obtained by testing at different times after water injection, MPa.

[0079] like Figure 1 As shown, in step S103, based on the energy indication curve of the oil well after water injection, the cumulative surface oil production corresponding to the pressure measuring points at different times after water injection is determined, and combined with the cumulative surface oil production during the elastic drive stage, the total water storage corresponding to the pressure measuring points at different times after water injection is calculated.

[0080] In one embodiment, the total water storage volume corresponding to the pressure measuring points at different times after water injection is calculated through steps S1031-S1033.

[0081] In step S1031, the cumulative oil production on the surface corresponding to the pressure measuring points at different times after water injection and the cumulative oil production on the surface during the elastic drive stage are subtracted to calculate the first intermediate value. Specifically, based on the energy indicator curve of the oil well after water injection, the cumulative oil production on the surface corresponding to the pressure measuring points at different times N is obtained. p ρ o,s(test) , minus the cumulative oil production N at the elastic flooding stage corresponding to the pressure measuring points at different times after water injection p ρ o,s =(p test -b) / k, calculate the first intermediate value N p ρ o,s(test) -(p test -b) / k.

[0082] In step S1032, the first intermediate value is multiplied by the formation crude oil volume coefficient to calculate the second intermediate value. p ρo,s(test) -(p test -b) / k and formation crude oil volume coefficient B o Do the multiplication and calculate the second intermediate value [N p ρ o,s(test) -(p test -b) / k]B o .

[0083] In step S1033, the second intermediate value is used as the dividend and the surface crude oil density is used as the divisor to calculate the total water storage corresponding to the pressure measuring points at different times after water injection. p ρ o,s(test) -(p test -b) / k]B o As the dividend, take the density of crude oil on the ground ρ o,s As the divisor, the total water storage W corresponding to the pressure measuring points at different times after water injection is calculated.

[0084] In one embodiment, in step S103, the total water storage volume W corresponding to the pressure measuring points at different times after water injection is calculated by the following expression:

[0085]

[0086] like Figure 1 As shown, in step S104, according to the total water storage corresponding to the pressure measuring points at different times after water injection, the effective water diversion volume and the effective water diversion rate from the water injection well to the target oil production well are calculated respectively through the effective water diversion volume model and the effective water diversion rate model.

[0087] In one embodiment, an effective water diversion amount model and an effective water diversion rate model are constructed through steps S1041 - S1044 .

[0088] In step S1041, a total water storage model for calculating the total water storage of oil wells is constructed based on the total water influx of oil wells, the total water inflow of oil wells, the cumulative water production of oil wells on the surface, and the total leakage of oil wells. Specifically, taking each oil well as the research object, the total water storage is equal to the sum of the total water influx and the total water inflow minus the cumulative water production of the oil well, minus the total leakage, that is:

[0089] W=W e +W flow_in B w -W p B w -W flow_out B w (1)

[0090] Where W is the total water storage (underground volume), m 3 ; W eis the total water intrusion (underground volume), m 3 ; W flow_in The total water volume (surface volume) from the injection well to the oil production well, also known as the total water volume in the oil production well control area, m 3 ; W p is the cumulative surface water production of the oil well, m 3 ; W flow_out is the total leakage volume (surface volume) in the oil well control area, m 3 ; B w is the formation water volume coefficient, m 3 / m 3 .

[0091] In step S1042, the difference between the total water inflow of the oil production well and the total leakage of the oil production well is defined as the effective water diversion from the water injection well to the oil production well. Specifically, in the process of water injection development of ultra-deep fault-controlled fracture-cavity oil reservoirs, the present invention pays more attention to the effective water diversion from the water injection well to the oil production well, that is, the surface volume of the net effective injected water that really plays a role in oil displacement, leakage, reserve utilization, and pressure increase from the water injection well to the oil production well. For oil production wells, the total leakage needs to be deducted from the total water inflow, that is:

[0092] W flow_in_eff =W flow_in -W flow_out (2)

[0093] Where W flow_in_eff is the effective water diversion from the injection well to the oil production well, m 3 .

[0094] Combining equation (1) and equation (2), the expression of effective water diversion from water injection well to oil production well can be obtained as:

[0095]

[0096] In step S1043, considering the characteristics of the ultra-deep fault-controlled fracture-cavity reservoir with no bottom water or weak water body, the total water intrusion of the oil production well is adjusted, and combined with the total water storage model, an effective water diversion model for calculating the effective water diversion from the water injection well to the oil production well is constructed. Specifically, in the present invention, considering that the ultra-deep fault-controlled fracture-cavity reservoir has no bottom water or weak water body, it can be approximately considered that there is no bottom water intrusion during the water injection development process, that is, W e =0, then after adjusting formula (3), we can get the effective water distribution model:

[0097]

[0098] In step S1044, the ratio of the effective water diversion from the water injection well to the oil production well to the total water injection from the water injection well is defined as the effective water diversion rate from the water injection well to the oil production well. Combined with the effective water diversion model, an effective water diversion rate model for calculating the effective water diversion rate from the water injection well to the oil production well is constructed. Specifically, based on equation (4), the effective water diversion rate expression can be established as:

[0099]

[0100] Where: W flow_in_eff is the effective water diversion from the injection well to the oil production well, m 3 ; W is the total water storage volume of the oil well, m 3 ; W p is the cumulative surface water production of the oil well, m 3 ; B w is the formation water volume coefficient, m 3 / m 3 ; λ is the effective water diversion rate from the injection well to the oil production well; W inj is the total water injection volume of the injection well, m 3 .

[0101] In one embodiment, steps S1045 - S1046 are used to calculate the effective water diversion volume and effective water diversion rate from the water injection well to the target oil production well.

[0102] In step S1045, the total water storage corresponding to the pressure measuring points at different times after water injection is used as a known quantity, combined with the cumulative surface water production of the oil production well and the formation water volume coefficient, and the effective water distribution model is used to calculate the effective water distribution from the water injection well to the target oil production well. Specifically, based on the calculation of the total water storage corresponding to the pressure measuring points at different times after water injection, the effective water distribution from the water injection well to the oil production well is calculated according to equation (4).

[0103] In step S1046, the total water storage corresponding to the pressure measuring points at different times after water injection is used as a known quantity, combined with the cumulative surface water production of the oil production well, the formation water volume coefficient, and the total water injection volume of the water injection well, the effective water diversion rate from the water injection well to the target oil production well is calculated through the effective water diversion rate model. Specifically, based on the total water storage corresponding to the pressure measuring points at different times after water injection, the effective water diversion rate from the water injection well to the oil production well is calculated according to equation (5).

[0104] The present invention relates to a method for calculating the effective water diversion from a water injection well to an oil production well in an ultra-deep fault-controlled fracture-cavity oil reservoir, which is closely related to water injection effect evaluation, quantitative water injection, injection-production parameter adjustment, etc. A method for calculating the effective water diversion from a water injection well to an oil production well in an ultra-deep fault-controlled fracture-cavity oil reservoir is proposed to evaluate the size and proportion of the effective water diversion from a water injection well to an oil production well, thereby providing technical support for dynamic analysis of such oil reservoirs, water injection effect evaluation, injection-production parameter adjustment, etc.

[0105] Figure 3 A schematic diagram of a method for calculating effective water diversion of a water injection well in an ultra-deep fault-controlled fracture-cavity oil reservoir according to an embodiment of the present invention is shown.

[0106] like Figure 3 As shown in the figure, taking the oil production well as the research object, the effective water distribution model from the water injection well to the oil production well is first established:

[0107] (Not considering the intrusion of edge and bottom water)

[0108] like Figure 3 As shown, the energy indication curve of the oil well before and after water injection is drawn, and the cumulative oil production quality of the elastic drive stage corresponding to the pressure measuring points at different times after water injection is calculated based on it:

[0109] (p test -b) / k

[0110] like Figure 3 As shown in the figure, calculate the total water storage corresponding to the pressure measuring points at different times after water injection:

[0111]

[0112] like Figure 3 As shown, finally, based on the total water storage corresponding to the pressure measuring points at different times after water injection, the effective water distribution model is used to calculate the effective water distribution from the water injection well to the oil production well.

[0113] The method for calculating the effective water distribution of a water injection well in an ultra-deep fault-controlled fracture-cavity oil reservoir provided by the present invention can also be used in conjunction with a computer-readable storage medium, on which a computer program is stored, and the computer program is executed to run the method for calculating the effective water distribution of a water injection well in an ultra-deep fault-controlled fracture-cavity oil reservoir. The computer program can run computer instructions, and the computer instructions include computer program codes, which can be in source code form, object code form, executable file, or some intermediate form, etc.

[0114] Computer-readable storage media may include: any entity or device that can carry computer program code, recording media, USB flash drives, mobile hard disks, magnetic disks, optical disks, computer memory, read-only memory (ROM), random access memory (RAM), electrical carrier signals, telecommunication signals, and software distribution media, etc.

[0115] It should be noted that the content contained in computer-readable storage media can be appropriately increased or decreased based on the requirements of legislation and patent practices in the jurisdiction. For example, in some jurisdictions, based on legislation and patent practices, computer-readable storage media do not include electrical carrier signals and telecommunications signals.

[0116] According to another aspect of the present invention, a device for calculating the effective water distribution of water injection wells in ultra-deep fault-controlled fracture-cavity oil reservoirs is provided, which executes a method for calculating the effective water distribution of water injection wells in ultra-deep fault-controlled fracture-cavity oil reservoirs. The device comprises: a relationship function module, a cumulative oil production module, a total water storage module, and an effective water distribution module.

[0117] The relationship function module is used to draw the energy indication curves of the oil wells before and after water injection for the target oil production wells, and determine the energy relationship function corresponding to the energy indication curves of the oil wells before water injection. The cumulative oil production module is used to estimate the cumulative oil production mass on the ground in the elastic drive stage corresponding to the pressure measuring points at different times after water injection through the energy relationship function. The total water storage module is used to determine the cumulative oil production mass on the ground corresponding to the pressure measuring points at different times after water injection based on the energy indication curves of the oil wells after water injection, and calculate the total water storage corresponding to the pressure measuring points at different times after water injection in combination with the cumulative oil production mass on the ground in the elastic drive stage. The effective water distribution module is used to calculate the effective water distribution volume and effective water distribution rate from the water injection well to the target oil production well based on the total water storage corresponding to the pressure measuring points at different times after water injection through the effective water distribution volume model and the effective water distribution rate model.

[0118] In order to calculate the effective water diversion from water injection wells to oil production wells in ultra-deep fault-controlled fracture-cavity oil reservoirs, the present invention proposes a method for calculating the effective water diversion. Taking each oil production well as the research object, an effective water diversion control equation is established. Based on the energy indicator curve of the oil production well before and after water injection, the linear relationship function of the energy indicator curve before water injection is regressed to estimate the cumulative oil production on the surface of the elastic drive stage corresponding to the pressure measuring points at different times after water injection, and the total water storage, effective water diversion and effective water diversion rate corresponding to the pressure measuring points at different times after water injection are calculated. The present invention can evaluate in detail the effective water diversion and water diversion rate from water injection wells to oil production wells at different times, and can provide effective support for the adjustment of injection and production parameters in the mine.

[0119] In one embodiment, a case application is carried out using the FQ well group of the GZ ultra-deep fault-controlled fracture-cave oil reservoir in the Tarim Basin as an example.

[0120] There are three wells in the FQ well group, FQ-1 for water injection, FQ-2 and FQ-3 for oil production. The wells are distributed as follows: Figure 4 The previous development showed that the water body of the FQ well group was weak, and the impact of bottom water invasion could be approximately ignored. The cumulative oil production and measured bottom flow pressure data of FQ-2 and FQ-3 at different times are shown in Tables 1 and 2. According to the PVT test results, the volume coefficient of the formation crude oil in the FQ-2 well was calculated to be about 2.6m 3 / m 3 , the density of ground crude oil is 0.7960g / cm 3 The volume coefficient of the FQ-3 well formation crude oil is about 2.25m 3 / m 3 , the density of ground crude oil is 0.7978g / cm 3, the formation water volume coefficient is about 1.0m 3 / m 3 Considering that the calculation method of effective water diversion from water injection wells to different oil production wells is the same, in this embodiment, the calculation of effective water diversion from FQ-1 to FQ-2 is taken as an example for detailed description, and the calculation method and steps of effective water diversion from FQ-1 to FQ-3 are similar.

[0121] Table 1 The cumulative oil production and measured bottom hole pressure data of FQ-2 at different times

[0122]

[0123]

[0124] Table 2 The cumulative oil production and measured bottom hole pressure data of FQ-3 at different times

[0125] time Cumulative oil production (10,000 tons) Measured bottom hole flow pressure (MPa) 2018 / 11 / 11 4.45 58.87 2019 / 1 / 24 4.83 55.91 2019 / 4 / 10 5.19 52.41 2019 / 6 / 13 5.47 49.16 2019 / 8 / 11 5.70 48.14 2019 / 11 / 8 5.98 46.49 2020 / 3 / 25 6.37 41.50 2020 / 4 / 24 6.45 42.43 2020 / 10 / 15 6.77 44.75 2020 / 11 / 13 7.13 42.47 2020 / 12 / 30 7.98 39.91 2021 / 1 / 16 8.28 39.21 2021 / 2 / 25 8.95 38.18 2021 / 3 / 18 9.28 37.80 2021 / 4 / 4 9.55 37.28 2021 / 4 / 25 9.91 36.31 2021 / 5 / 24 10.41 35.08 2021 / 6 / 3 10.57 34.66 2021 / 7 / 3 11.06 33.92 2021 / 8 / 24 11.88 33.10

[0126] Step 1: Establish the effective water diversion control equation from the water injection well to the oil production well in the ultra-deep fault-controlled fracture-cavity reservoir. According to the content of the present invention, the effective water diversion expression from the FQ-1 water injection well to the FQ-2 oil production well can be directly written as:

[0127]

[0128] Step 2: Draw the energy indication curve of the oil well before and after water injection, and regress the linear relationship function of the energy indication curve before water injection. According to the measured bottom hole pressure and surface cumulative oil production data at different times, draw the energy indication curve of FQ-1 before and after water injection and FQ-2, and regress the linear relationship function of the energy indication curve before water injection. wf =-5.3984N p ρ o,s +151.8419, such as Figure 5 shown.

[0129] Step 3: Estimate the cumulative surface oil production in the elastic flooding stage corresponding to the pressure measuring points at different times after water injection. Estimate the cumulative surface oil production in the elastic flooding stage of FQ-2 corresponding to the pressure measuring points at different times after water injection of FQ-1, as shown in Table 3.

[0130] Table 3 Estimation of cumulative oil production at the surface of FQ-2 elastic flooding stage corresponding to pressure measurement points at different times after FQ-1 water injection

[0131]

[0132] Step 4: Calculate the total water storage volume corresponding to the pressure measuring point FQ-2 at different times after water injection in FQ-1. Based on the accumulated oil production at the elastic flooding stage corresponding to the pressure measuring points at different times after water injection, The total water storage volume corresponding to the pressure measuring point FQ-2 at different times after the water injection of FQ-1 is calculated. The results are shown in Table 4.

[0133] Table 4 Calculation results of total water storage in FQ-2 corresponding to pressure measurement points at different times after FQ-1 water injection

[0134]

[0135] Step 5: Calculate the effective water diversion volume and diversion rate from water injection wells to oil production wells. Based on the total water storage volume, combined with the cumulative water production of oil production wells and the cumulative water injection volume of water injection wells, the effective water diversion volume and diversion rate from FQ-1 to FQ-2 can be calculated. The results are shown in Table 5 and Figure 6 shown.

[0136] Table 5 Calculation results of effective water diversion volume and water diversion rate from FQ-1 to FQ-2

[0137]

[0138]

[0139] Similarly, the effective water diversion amount and water diversion rate from FQ-1 to FQ-3 can be calculated. The results are shown in Table 6 and Figure 7 shown.

[0140] Table 6 Calculation results of effective water diversion volume and water diversion rate from FQ-1 to FQ-3

[0141]

[0142] In summary, the method for calculating the effective water diversion of water injection wells in ultra-deep fault-controlled fracture-cavity oil reservoirs provided by the present invention has the following advantages compared with the prior art:

[0143] First, through research on relevant domestic and foreign literature, patent documents, etc., it is found that the existing technology does not involve the calculation of the effective water distribution volume from water injection wells to each oil production well, and the existing technology generally takes the well group as the research object to carry out a general evaluation of the water injection effect, and does not refine the effective water distribution volume and water distribution rate from water injection wells to each oil production well. The present invention takes each oil production well as the research object, based on the principle of material balance and water injection development mechanism, can calculate in detail the effective water distribution volume and effective water distribution rate from water injection wells to each oil production well, which is a step further in the evaluation of water injection effect.

[0144] Second, the effective water diversion volume and effective water diversion rate from the water injection well to each oil production well calculated by the present invention are dynamically changing. Based on data such as the bottom hole flow pressure (or wellhead oil pressure) and the accumulated oil production on the ground measured at different times, the effective water diversion volume and effective water diversion rate from the water injection well to the oil production well can be evaluated in real time, which can provide effective support for the adjustment of injection and production parameters in the mine.

[0145] It should be understood that the embodiments disclosed in the present invention are not limited to the specific structures, processing steps or materials disclosed herein, but should be extended to equivalent substitutions of these features understood by ordinary technicians in the relevant field. It should also be understood that the terms used herein are only used for the purpose of describing specific embodiments and are not meant to be limiting.

[0146] In the description of the present invention, unless otherwise specified, "plurality" means two or more than two; the orientations or positional relationships indicated by the terms "upper", "lower", "left", "right", "inner", "outer", "front end", "rear end", "head", "tail", etc. are based on the orientations or positional relationships shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operate in a specific orientation, and therefore cannot be understood as limiting the present invention. In addition, the terms "first", "second", "third", etc. are only used for descriptive purposes and cannot be understood as indicating or implying relative importance.

[0147] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "connected" and "connection" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0148] Certain terms are used throughout the present invention document to indicate specific system components. As those skilled in the art will recognize, different names can usually be used to indicate the same components, so the present invention document is not intended to distinguish those components that are only different in name but not in function. In the present invention document, the terms "comprise", "include" and "have" are used in an open form, and therefore should be interpreted as meaning "including but not limited to...". In addition, the terms "substantially", "substantially" or "approximately" that may be used in this article relate to the tolerances of the corresponding terms accepted by the industry. The term "coupling" as may be used in this article includes direct coupling and indirect coupling via other components, elements, circuits, or modules, wherein for indirect coupling, the components, elements, circuits, or modules between them do not change the information of the signal but can adjust its current level, voltage level, and / or power level. Inferred coupling (for example, one of the elements is coupled to another element by inference) includes direct and indirect coupling between two elements in the same way as "coupling".

[0149] The "one embodiment" or "embodiment" mentioned in the specification means that the specific features, structures or characteristics described in conjunction with the embodiment are included in at least one embodiment of the present invention. Therefore, the phrases "one embodiment" or "embodiment" appearing in various places throughout the specification do not necessarily refer to the same embodiment.

[0150] The embodiments of the present invention are given for the purpose of illustration and description, and are not intended to be exhaustive or to limit the invention to the disclosed forms. Many modifications and variations will be apparent to those of ordinary skill in the art. The embodiments are selected and described in order to better illustrate the principles and practical applications of the present invention and to enable those of ordinary skill in the art to understand the present invention and thereby design various embodiments with various modifications suitable for specific uses.

[0151] Although the embodiments disclosed in the present invention are as above, the contents described are only embodiments adopted for facilitating the understanding of the present invention and are not intended to limit the present invention. Any technician in the technical field to which the present invention belongs can make any modifications and changes in the form and details of the implementation without departing from the spirit and scope disclosed in the present invention, but the patent protection scope of the present invention shall still be subject to the scope defined in the attached claims.

Claims

1. A method for calculating the effective water diversion of water injection wells in ultra-deep fault-controlled fracture-cavity oil reservoirs, characterized in that: The method comprises: For the target oil production well, draw the energy indication curve of the oil well before and after water injection, and determine the energy relationship function corresponding to the energy indication curve of the oil well before water injection; By using the energy relationship function, the accumulated oil production quality on the surface during the elastic flooding stage corresponding to the pressure measuring points at different times after water injection is estimated; Based on the energy indicator curve of the oil well after water injection, the cumulative oil production on the ground corresponding to the pressure measuring points at different times after water injection is determined, and the total water storage corresponding to the pressure measuring points at different times after water injection is calculated in combination with the cumulative oil production on the ground during the elastic flooding stage; According to the total water storage corresponding to the pressure measuring points at different times after water injection, the effective water distribution volume and effective water distribution rate from the injection well to the target oil production well are calculated through the effective water distribution volume model and the effective water distribution rate model.

2. A method for calculating effective water diversion of water injection wells in ultra-deep fault-controlled fracture-cavity oil reservoirs according to claim 1, characterized in that: The energy relationship function corresponding to the energy indication curve of the oil well before water injection is determined by the following steps: A coordinate system is constructed with the accumulated oil production on the surface as the horizontal coordinate and the bottom hole flow pressure or wellhead oil pressure as the vertical coordinate; Based on the measured data of the target oil production well, the bottom hole flow pressure or wellhead oil pressure measured at different times before and after water injection and the corresponding surface cumulative oil production mass are marked on the coordinate system in the form of data points to form the energy indication curve of the oil well before and after water injection; The energy relationship function is obtained by means of curve regression for the energy indication curve of the oil well before water injection.

3. A method for calculating effective water diversion of water injection wells in ultra-deep fault-controlled fracture-cavity oil reservoirs according to claim 1 or 2, characterized in that: The energy relationship function comprises: p wf =kN p ρ o,s +b p tub =kN p ρ o,s +b Where: p wf is the bottom hole flowing pressure, MPa; p tub is the wellhead oil pressure, MPa; k is the slope of the curve corresponding to the energy relationship function; N p is the cumulative oil production volume on the ground, m 3 ; ρ o,s is the density of crude oil on the ground, kg / m 3 ; b is the intercept of the curve corresponding to the energy relationship function.

4. A method for calculating effective water diversion of water injection wells in ultra-deep fault-controlled fracture-cavity oil reservoirs according to any one of claims 1 to 3, characterized in that: The following steps are used to estimate the cumulative oil production at the elastic flooding stage corresponding to the pressure measuring points at different times after water injection: Based on the measured data of the target oil production well, the bottom hole flow pressure or wellhead oil pressure measured at different times after water injection is substituted into the energy relationship function as a known quantity to estimate the cumulative surface oil production quality during the elastic flooding stage.

5. A method for calculating effective water diversion of water injection wells in ultra-deep fault-controlled fracture-cavity oil reservoirs according to any one of claims 1 to 4, characterized in that: The total water storage corresponding to the pressure measuring points at different times after water injection can be calculated by the following steps: Subtracting the accumulated oil production on the ground corresponding to the pressure measuring points at different times after water injection from the accumulated oil production on the ground during the elastic flooding stage to calculate a first intermediate value; The first intermediate value is multiplied by the formation crude oil volume coefficient to calculate a second intermediate value; The second intermediate value is used as the dividend and the surface crude oil density is used as the divisor to calculate the total water storage volume corresponding to the pressure measuring points at different times after water injection.

6. A method for calculating effective water diversion of water injection wells in ultra-deep fault-controlled fracture-cavity oil reservoirs according to any one of claims 1 to 5, characterized in that: The effective water splitting volume model and the effective water splitting rate model are constructed by the following steps: Based on the total water intrusion of oil wells, the total water inflow of oil wells, the cumulative surface water production of oil wells and the total leakage of oil wells, a total water storage model for calculating the total water storage of oil wells is constructed; Define the difference between the total water inflow of the oil production well and the total leakage of the oil production well as the effective water diversion from the water injection well to the oil production well; Considering the characteristics of ultra-deep fault-controlled fracture-cavity reservoirs with no bottom water or weak water body, the total water intrusion of the oil production well is adjusted, and combined with the total water storage model, the effective water distribution model for calculating the effective water distribution from the water injection well to the oil production well is constructed; The effective water diversion rate from the water injection well to the oil production well is defined as the ratio of the effective water diversion amount from the water injection well to the total water injection amount of the water injection well. Combined with the effective water diversion rate model, the effective water diversion rate model for calculating the effective water diversion rate from the water injection well to the oil production well is constructed.

7. A method for calculating effective water diversion of water injection wells in ultra-deep fault-controlled fracture-cavity oil reservoirs according to any one of claims 1 to 6, characterized in that: The effective water distribution model comprises: The effective water separation rate model comprises: Where: W flow_in_eff is the effective water diversion from the injection well to the oil production well, m 3 ; W is the total water storage volume of the oil well, m 3 ; W p is the cumulative surface water production of the oil well, m 3 ; B w is the formation water volume coefficient, m 3 / m 3 ; λ is the effective water diversion rate from the injection well to the oil production well; W inj is the total water injection volume of the injection well, m 3 .

8. A method for calculating effective water diversion of water injection wells in ultra-deep fault-controlled fracture-cavity oil reservoirs according to any one of claims 1 to 7, characterized in that: The effective water diversion volume and effective water diversion rate from the water injection well to the target oil production well are calculated by the following steps: Taking the total water storage corresponding to the pressure measuring points at different times after water injection as a known quantity, combined with the cumulative water production on the surface of the oil production well and the formation water volume coefficient, the effective water distribution from the water injection well to the target oil production well is calculated through the effective water distribution model; The total water storage corresponding to the pressure measuring points at different times after water injection is taken as a known quantity, combined with the cumulative surface water production of the oil well, the formation water volume coefficient, and the total water injection volume of the water injection well, the effective water distribution rate from the water injection well to the target oil production well is calculated through the effective water distribution rate model.

9. A storage medium, characterized in that: It contains a series of instructions for executing the method steps as claimed in any one of claims 1 to 8.

10. A device for calculating effective water distribution of water injection wells in ultra-deep fault-controlled fracture-cavity oil reservoirs, characterized in that: The method according to any one of claims 1 to 8 is performed, wherein the device comprises: A relationship function module is used to draw energy indication curves of the oil well before and after water injection for the target oil production well, and determine the energy relationship function corresponding to the energy indication curve of the oil well before water injection; A cumulative oil production module, which is used to estimate the cumulative oil production mass on the ground during the elastic flooding stage corresponding to the pressure measuring points at different times after water injection through the energy relationship function; A total water storage module is used to determine the cumulative oil production on the ground corresponding to the pressure measuring points at different times after water injection based on the energy indication curve of the oil well after water injection, and to calculate the total water storage corresponding to the pressure measuring points at different times after water injection in combination with the cumulative oil production on the ground during the elastic drive stage; The effective water distribution module is used to calculate the effective water distribution volume and effective water distribution rate from the injection well to the target oil production well based on the total water storage volume corresponding to the pressure measuring points at different times after water injection, through the effective water distribution volume model and the effective water distribution rate model.