A smart hydropower plant online monitoring and status early warning method

By combining the weather forecasting system and risk assessment formula, real-time monitoring and early warning of the status of hydropower plants is achieved, the problem of risk prediction in the existing technology is solved, and the safety management efficiency of the intelligent hydropower control and management system is improved.

CN118823990BActive Publication Date: 2024-11-22HUANENG LANCANG RIVER HYDROPOWER CO LTD

Patent Information

Application Number
CN202411307789.5
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-09-19
Publication Date
2024-11-22
Estimated Expiration
2044-09-19

AI Technical Summary

Technical Problem

The existing intelligent water and electricity control management system cannot combine external prediction information to make risk prediction during the monitoring process, resulting in low safety management efficiency.

Method used

Through online monitoring and status warning methods, combined with the weather forecasting system, the status of the hydropower plant is predicted and analyzed, and the risk assessment formula and early warning module are used to compare real-time data, and an early warning is issued when the threshold exceeds the threshold.

Benefits of technology

It improves the safety management efficiency of the intelligent hydropower control and management system, enhances the monitoring and prediction capabilities of the operating status of the hydropower plant, and ensures higher safety and usage prospects.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118823990B_ABST
    Figure CN118823990B_ABST
Patent Text Reader

Abstract

The present invention discloses a method for online monitoring and status warning of a smart hydropower plant, which relates to the field of intelligent hydropower control and management. The method for online monitoring and status warning includes: collecting and uploading basic information data of the water storage area of ​​the hydropower plant in advance to the system; filtering and retaining the sensor data in the information collected in step S1, and performing data standardization processing; predicting the change of weather information in the plant area based on meteorological data, calculating the maximum water storage capacity of the power plant, the comprehensive load status, and performing risk assessment analysis based on the above-collected information data; setting thresholds for risk assessment parameters, and performing data synchronization interconnection with the early warning module; performing real-time data comparison between the risk assessment parameters and the early warning module data, and issuing an early warning if the threshold is exceeded, otherwise, there is no alarm information data prompt. The present invention evaluates the current state and the predicted state of the hydropower plant in combination with weather forecasts, improves safety management efficiency, and reduces water storage risks.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention belongs to the technical field of intelligent hydropower control management, and specifically relates to an online monitoring and status early warning method for a smart hydropower plant. Background Art

[0002] The intelligent hydropower control and management system is an intelligent system that integrates advanced technology and management concepts. It can help users achieve remote control, monitoring and management of hydropower equipment to improve the utilization efficiency and management level of the equipment. The characteristics of the intelligent hydropower control and management system are: highly intelligent, the system adopts advanced artificial intelligence technology and sensor technology, which can automatically identify and analyze the operating status of the equipment, realize automatic control and intelligent management, remote control, the system can realize remote control of hydropower equipment through the network, and users can monitor and operate the equipment anytime and anywhere, versatility: the system can not only realize the control of hydropower equipment, but also perform data collection, analysis and processing to help users achieve precise management, easy to operate, the system adopts a user-friendly interface design and operation method, and users can easily operate and manage.

[0003] The existing intelligent hydropower control and management system can only process and analyze existing data during the monitoring process, and cannot combine external prediction information to predict risks, which makes the safety management efficiency of the intelligent hydropower control and management system low. Summary of the invention

[0004] In view of the shortcomings of the prior art, the present invention provides a method for online monitoring and status warning of a smart hydropower plant, which has the advantage of being able to predict and analyze the status in combination with a weather forecast system, thereby making the safety management efficiency of the intelligent hydropower control and management system higher.

[0005] To achieve the above purpose, the present invention provides the following technical solutions: a method for online monitoring and status early warning of a smart hydropower plant, the method comprising:

[0006] S1: Collect and upload basic information data of the hydropower plant's water storage area to the system in advance;

[0007] S2: Filter and retain the sensor data in the information collected in step S1, and perform data standardization processing;

[0008] S3: Predict the weather information changes in the plant area based on meteorological data, upload it to the weather forecast information database, calculate the maximum water storage capacity and comprehensive load status of the power plant, and conduct risk assessment analysis based on the above collected information data;

[0009] Among them, weather forecast is performed in S3 to obtain the precipitation data threshold, and risk assessment is performed in combination with the load status. The risk assessment formula is:

[0010] ,

[0011] in is the risk index, is the weight for predicting precipitation, For the The predicted precipitation amount is is the weight of the load state, For the The load status value of the first test;

[0012] S4: setting a threshold for the risk assessment parameter, and synchronously setting an alarm data threshold for the early warning module, and interconnecting the risk assessment parameter with the early warning module;

[0013] S5: Perform real-time data comparison between risk assessment parameters and early warning module data. If the threshold is exceeded, an early warning will be issued. Otherwise, there will be no alarm information data prompt.

[0014] Preferably, in step S1, basic information data of the water storage area of ​​the hydropower plant is collected and uploaded to the system in advance, including: extracting data on the maximum allowable water level and minimum ecological flow of the hydropower plant, determining monitoring parameters based on the basic information of the hydropower plant and risk assessment results, and obtaining corresponding sensor data.

[0015] Preferably, the sensor data in the collected information in step S1 is screened and retained, and data standardization is performed, including:

[0016] Collect sensor signals, amplify, filter and isolate sensor signals;

[0017] Convert the conditioned analog signal into a digital signal;

[0018] The collected data is transmitted to the central monitoring system through wired and wireless networks. A buffer is set in the data collection system. The data standardization processing formula is:

[0019] ,

[0020] in For the standardized data, is the original data, is the mean of the original data, is the standard deviation of the original data.

[0021] Preferably, the weather forecast includes: collecting historical and real-time meteorological data, analyzing the rainfall prediction model of the meteorological department, and uploading the data information obtained by the analysis to the weather forecast information database in step S3.

[0022] Preferably, the comprehensive load status in step S3 includes:

[0023] Head calculation: Calculate the height difference between the turbine inlet and outlet;

[0024] Turbine efficiency: hydraulic efficiency, mechanical efficiency and generator efficiency;

[0025] Power generation calculation: Calculate the power generation of the hydropower plant using the following formula:

[0026] ,

[0027] in: is the power generation, is the density of water, is the acceleration due to gravity, It's the water head. It's traffic. is the combined efficiency of the turbine and generator.

[0028] Preferably, the comprehensive load state detection formula is:

[0029] ,

[0030] in, is the load state index, is the calculated value of the hydraulic head, is the turbine efficiency, is the power generation, is the number of detections.

[0031] Preferably, in step S4, a threshold is set for the risk assessment parameter, and data synchronization and interconnection are performed with the early warning module; including:

[0032] Collect historical data and real-time data, conduct data analysis, and determine the normal operating range of parameters based on the data analysis results;

[0033] Set parameter thresholds based on risk assessment and operating range;

[0034] Test the effectiveness of thresholds in real or simulated environments, adjust thresholds to optimize system performance, and apply thresholds to the system.

[0035] Preferably, a training model is created for the threshold values ​​of the parameters;

[0036] An independent validation set was used to evaluate the performance of the model, with the evaluation indicators being risk index and precipitation;

[0037] Parameter optimization: Adjust the model's hyperparameters based on the model's training results on the validation set.

[0038] Preferably, issuing an early warning in the S5 step includes: sending early warning information to the operator's mobile and fixed terminals, setting the early warning information sending instruction to the highest authority, and all previous risk assessment information data will be uploaded to the plant's main control terminal for operators to view real-time data, early warning status and historical records.

[0039] Compared with the prior art, the present invention has the following beneficial effects:

[0040] This application combines weather forecasts to evaluate the current status of the hydropower plant and the predicted status, which can make the safety management efficiency of the intelligent hydropower control and management system higher and bring better usage prospects and commercial value. BRIEF DESCRIPTION OF THE DRAWINGS

[0041] Figure 1 It is a flow chart of the steps of the present invention. DETAILED DESCRIPTION

[0042] Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in the field without making any creative work shall fall within the scope of protection of the present invention.

[0043] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0044] according to Figure 1 As shown, the present invention provides a technical solution: a method for online monitoring and status early warning of a smart hydropower plant, the method comprising:

[0045] S1: Collect and upload basic information data of the hydropower plant's water storage area to the system in advance;

[0046] S2: Filter and retain the sensor data in the information collected in step S1, and perform data standardization processing;

[0047] S3: Predict the weather information changes in the plant area based on meteorological data, upload it to the weather forecast information database, calculate the maximum water storage capacity and comprehensive load status of the power plant, and conduct risk assessment analysis based on the above collected information data;

[0048] Among them, weather forecast is performed in S3 to obtain the precipitation data threshold, and risk assessment is performed in combination with the load status. The risk assessment formula is:

[0049] ,

[0050] in is the risk index, is the weight for predicting precipitation, For the The predicted precipitation amount is is the weight of the load state, For the The load status value of the first test;

[0051] S4: setting a threshold for the risk assessment parameter, and synchronously setting an alarm data threshold for the early warning module, and interconnecting the risk assessment parameter with the early warning module;

[0052] S5: Perform real-time data comparison between risk assessment parameters and early warning module data. If the threshold is exceeded, an early warning will be issued. Otherwise, there will be no alarm information data prompt.

[0053] Among them, in step S1, the basic information data of the water storage area of ​​the hydropower plant is collected and uploaded to the system in advance, including: visiting the official websites of relevant water conservancy management departments and hydropower companies. These websites will provide data on the operation information of the hydropower plant, water level management policies and ecological flow requirements, and use the search function provided by the website to search for keywords such as "maximum allowable water level of hydropower plant" and "minimum ecological flow", so as to extract data on the maximum allowable water level and minimum ecological flow of the hydropower plant, determine the monitoring parameters according to the basic information of the hydropower plant and the risk assessment results, and obtain the corresponding sensor data.

[0054] The atmospheric dynamics model is used to predict the weather. The Navier-Stokes equations describe the air flow movement in the atmosphere, including factors such as air pressure, temperature, and humidity, and are solved by numerical methods.

[0055] Thermodynamic equations are used to simulate the movement and changes of water vapor in the atmosphere, the heat transfer and phase change processes in the atmosphere, including the evaporation and condensation of water, to simulate the movement and changes of water vapor in the atmosphere. Based on the time series of historical meteorological data, statistical methods are used to analyze and predict future rainfall conditions. The relationship between precipitation and other meteorological variables is modeled, and precipitation is predicted by fitting regression equations. The complex relationship between input data is learned through connections between multiple layers of neurons to predict future precipitation conditions. The meteorological department may choose different models or combine them according to specific needs and actual conditions to improve the accuracy and reliability of rainfall forecasts. Training and forecasting are carried out through a large amount of observation data and computing resources, and continuous verification and improvement are carried out to adapt to changing meteorological conditions.

[0056] The relationship between precipitation and other meteorological variables including but not limited to temperature, humidity and air pressure is modeled, and precipitation is predicted by fitting regression equations.

[0057] By studying the layout of the hydropower plant, including reservoirs, dams, water inlets, water diversion systems, turbines, generators, transformers and transmission lines, the key parameters affecting the operation of the hydropower plant are determined. The current specific analysis is the water storage area. By evaluating the maximum allowable water level and minimum ecological flow of the hydropower plant, analyzing the characteristics of the turbines and generators, and determining their operating parameters and maintenance requirements, the parameters that need to be monitored are determined based on the operating characteristics of the hydropower plant and the results of risk assessment. According to the parameters that need to be monitored, the type of sensor is selected, and the data acquisition system and communication network are designed to ensure that the sensor data can be accurately and real-time transmitted to the monitoring center.

[0058] The characteristics of turbines and generators include:

[0059] Turbine characteristics:

[0060] Efficiency curve: The efficiency curve of a turbine describes its efficiency performance under different flow and head conditions. Generally, a turbine has the best efficiency under a certain range of head and flow;

[0061] Starting characteristics: The starting characteristics of a turbine describe the performance of the turbine during starting, including starting time, starting speed and starting capacity;

[0062] Speed ​​regulation characteristics: The speed regulation characteristics of a turbine describe how the turbine adjusts its output power and speed under different load requirements;

[0063] Stability: The stability of a turbine describes its operating stability under various operating conditions, including stability under varying water levels and load conditions;

[0064] Generator characteristics:

[0065] Rated power and rated voltage: The rated power of a generator refers to its designed output power, and the rated voltage refers to the output voltage at rated power;

[0066] Voltage Regulation Characteristics: The voltage regulation characteristics of a generator describe how the generator adjusts the output voltage to maintain stability under different load and fault conditions;

[0067] Frequency regulation characteristics: The frequency regulation characteristics of a generator describe how the generator adjusts the output frequency to maintain stability under different load conditions;

[0068] Overload capacity: The overload capacity of a generator describes its ability to withstand loads exceeding the rated value for a short period of time.

[0069] In the water storage area of ​​the hydropower plant, sensors are installed at the locations of turbines, generators and transformers to monitor parameters in real time. The wired network transmits the data collected by the sensors to the data center. Data collection can be carried out in real time to ensure timely monitoring of various parameters of the hydropower plant. The collected data is stored in a database or data warehouse for organization and management. A visual interface or user interface is developed to intuitively display real-time monitoring data and status warning information to users in the form of charts, curves and maps. Users can understand the operating status of the hydropower plant in real time through the interface and take timely measures to adjust and optimize it.

[0070] The types of sensors include:

[0071] Water level sensor: used to monitor the water level in the turbine reservoir or waterway to ensure that the turbine has sufficient water supply;

[0072] Pressure sensor: used to monitor the water pressure at the inlet and outlet of the turbine to evaluate the working status and performance of the turbine;

[0073] Speed ​​sensor: used to monitor the speed of the turbine rotor to ensure that the turbine operates within a safe range;

[0074] Vibration sensors: used to monitor the vibration level of the generator to detect possible mechanical failure or imbalance;

[0075] Temperature sensor: used to monitor the temperature of the generator to ensure the normal operation of the generator and avoid overheating;

[0076] Current sensor: used to monitor the output current of the generator to evaluate the load condition and performance of the generator;

[0077] Temperature sensor: used to monitor the temperature of the transformer to ensure normal operation of the transformer and avoid overheating;

[0078] Oil level sensor: used to monitor the oil level of transformer insulating oil to evaluate the insulation status of the transformer;

[0079] Pressure sensor: used to monitor the internal gas or oil pressure of the transformer to evaluate the sealing and operating status of the transformer.

[0080] Based on the established prediction model, the operating status of the hydropower plant is monitored and predicted. Once an abnormal situation or early warning signal is found, an alarm message is sent to relevant personnel in a timely manner so that corresponding response measures can be taken to prevent accidents. The operating data of the hydropower plant is continuously collected, analyzed and processed, and the performance of the monitoring system and the accuracy of the early warning model are continuously optimized. Through continuous improvement and optimization, the operating efficiency and safety of the hydropower plant are improved.

[0081] In step S5, specific rules for triggering warnings are defined. These rules can be based on thresholds, statistical analysis, and machine learning models. The warning analysis engine is responsible for real-time analysis of monitoring data and features to determine whether the warning rules are met. When the analysis engine determines that the warning conditions are met, the warning signal is triggered. It is responsible for sending warning information to relevant personnel or systems, such as through email, text messages, application notifications, etc., providing an intuitive user interface for operators to view real-time data, warning status, and historical records, storing monitoring data, warning records, and user information, training and evaluating warning models to improve the accuracy of warnings, automatically generating warning reports, including information such as warning time, cause, and impact, managing user permissions, user preference settings, etc., maintaining and upgrading the system to ensure stable operation of the system, recording system operations and warning events for post-audit and analysis, collecting user feedback for improving the warning system, and formulating disaster recovery plans to deal with system failures or data loss. Cloud services are used for data storage, computing, and analysis to improve the flexibility and scalability of the system. Through these components, the warning system can monitor key parameters in real time, identify potential problems in a timely manner, and notify relevant personnel to take action, thereby improving the security and reliability of the system.

[0082] According to the monitoring characteristics, select the corresponding sensor, use the data acquisition card to collect the sensor signal, amplify, filter and isolate the sensor signal, convert the conditioned analog signal into a digital signal, and transmit the collected data to the central monitoring system through wired and wireless networks. Set a buffer in the data acquisition system to prevent data loss, normalize the data, scale the data to a unified range, such as 0 to 1 or -1 to 1, and then perform data standardization processing. The data standardization processing formula is:

[0083] ,

[0084] in For the standardized data, is the original data, is the mean of the original data, is the standard deviation of the original data.

[0085] The data collection: collect historical and real-time meteorological data, clean and pre-process the collected data, analyze the rainfall prediction model of the meteorological department, and conduct risk assessment in combination with the load status. The risk assessment formula is:

[0086] ,

[0087] in is the risk index, is the weight for predicting precipitation, For the The predicted precipitation amount is is the weight of the load state, For the The load status value of the first test;

[0088] When the risk index approaches the set threshold, an early warning report will be issued.

[0089] The load status includes:

[0090] Head calculation: Calculate the height difference between the turbine inlet and outlet;

[0091] Turbine efficiency: hydraulic efficiency, mechanical efficiency and generator efficiency;

[0092] Power generation calculation: Calculate the power generation of the hydropower plant using the following formula:

[0093] ,

[0094] in: is the power generation, is the density of water, is the acceleration due to gravity, It's the water head. It's traffic. is the total efficiency of the turbine and generator;

[0095] Equipment operating status: Consider the operating status of the hydropower plant equipment and whether any units are undergoing maintenance or overhaul;

[0096] Real-time monitoring and adjustment: Monitor the operating status of hydropower plants in real time and make adjustments based on changes in grid demand and hydrological conditions.

[0097] The load state detection formula is:

[0098] ,

[0099] in, is the load state index, is the calculated value of the hydraulic head, is the turbine efficiency, is the power generation, is the number of detections.

[0100] Perform parameter identification, collect sufficient historical data and real-time data, analyze the data to understand the normal operating range, volatility, trend and periodicity of the parameters, determine the normal operating range of the parameters based on the data analysis results, assess the risks and consequences of exceeding the normal operating range, set the thresholds of the parameters based on the risk assessment and operating range, test the effectiveness of the thresholds in actual or simulated environments, perform sensitivity analysis, adjust the thresholds to optimize system performance based on the test results and sensitivity analysis, apply the thresholds to the system, and continuously monitor their effects, establish a feedback mechanism, collect feedback from users and the system in order to continuously optimize the thresholds.

[0101] The steps of the online monitoring and status warning method are as follows: first, analyze the operating characteristics and monitoring requirements of the hydropower plant, select the parameters that need to be monitored, collect sensor data in real time, and perform preprocessing. Then, predict future weather. If it is about to rain, conduct a rainfall assessment, detect the maximum water storage capacity of the power plant, and the comprehensive load status. Based on the above collected information data, conduct a risk assessment and analysis. If not, directly evaluate the load status, and then set thresholds for the parameters. When the monitored parameters exceed these thresholds, the system will trigger the warning module. Finally, according to the monitoring data and analysis results, an early warning will be automatically issued.

[0102] Formulate early warning and alarm strategies: formulate corresponding early warning and alarm strategies according to the characteristics and operation conditions of the equipment, set appropriate thresholds and warning lines, and trigger early warnings or alarms once abnormal conditions are detected or exceed the set range;

[0103] Establish an effective notification mechanism: Ensure that an effective notification mechanism is established to send early warning and alarm information to relevant personnel in a timely manner. Various communication channels can be used, such as SMS, email, mobile phone apps, etc., to ensure that the information can be delivered in a timely manner;

[0104] Training relevant personnel: Train the operators and maintenance personnel of the hydropower plant to make them understand the use of the monitoring system and the alarm response process so that they can handle the alarm information in a timely and correct manner;

[0105] Regularly maintain and update the system: Regularly maintain and update the monitoring system to ensure its normal operation and data accuracy. As technology develops, update the system in a timely manner to improve the accuracy and efficiency of monitoring and prediction.

[0106] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device.

[0107] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. A smart hydropower plant online monitoring and status early warning method, characterized in that: Online monitoring and status warning methods include: S1: Collect and upload basic information data of the hydropower plant's water storage area to the system in advance; S2: Filter and retain the sensor data in the information collected in step S1, and perform data standardization processing; S3: Predict the weather information changes in the plant area based on meteorological data, upload it to the weather forecast information database, calculate the maximum water storage capacity and comprehensive load status of the power plant, and conduct risk assessment analysis based on the above collected information data; Among them, weather forecast is performed in S3 to obtain the precipitation data threshold, and risk assessment is performed in combination with the load status. The risk assessment formula is: , in is the risk index, is the weight for predicting precipitation, For the The predicted precipitation amount is is the weight of the load state, For the The load status value of the first test; S4: setting a threshold for the risk assessment parameter, and synchronously setting an alarm data threshold for the early warning module, and interconnecting the risk assessment parameter with the early warning module; S5: Compare the risk assessment parameters with the data of the early warning module in real time, and issue an early warning if the threshold is exceeded. Otherwise, there will be no alarm information data prompt; The weather forecast includes: collecting historical and real-time meteorological data, analyzing the rainfall prediction model of the meteorological department, and uploading the data information obtained by the analysis to the weather forecast information database in step S3; The comprehensive load status in step S3 includes: Head calculation: Calculate the height difference between the turbine inlet and outlet; Turbine efficiency: hydraulic efficiency, mechanical efficiency and generator efficiency; Power generation calculation: Calculate the power generation of the hydropower plant using the following formula: , in: is the amount of electricity generated, is the density of water, is the acceleration due to gravity, It's the water head. It's traffic. is the total efficiency of the turbine and generator; Wherein, the comprehensive load state detection formula is: , in, is the load state index, is the calculated value of the hydraulic head, is the turbine efficiency, is the power generation, is the number of detections.

2. The method for online monitoring and status early warning of a smart hydropower plant according to claim 1 is characterized in that: In step S1, basic information data of the water storage area of ​​the hydropower plant is collected and uploaded to the system in advance, including: extracting data on the maximum allowable water level and minimum ecological flow of the hydropower plant, determining monitoring parameters based on the basic information of the hydropower plant and risk assessment results, and obtaining corresponding sensor data.

3. The method for online monitoring and status early warning of a smart hydropower plant according to claim 2 is characterized in that: The sensor data in the information collected in step S1 is screened and retained, and the data is standardized, including: Collect sensor signals, amplify, filter and isolate sensor signals; Convert the conditioned analog signal into a digital signal; The collected data is transmitted to the central monitoring system through wired and wireless networks. A buffer is set in the data collection system. The data standardization processing formula is: , in For the standardized data, is the original data, is the mean of the original data, is the standard deviation of the original data.

4. The method for online monitoring and status early warning of a smart hydropower plant according to claim 1 is characterized in that: Step S4 sets thresholds for risk assessment parameters and performs data synchronization interconnection with the early warning module; including: Collect historical data and real-time data, conduct data analysis, and determine the normal operating range of parameters based on the data analysis results; Set parameter thresholds based on risk assessment and operating range; Test the effectiveness of thresholds in real or simulated environments, adjust thresholds to optimize system performance, and apply thresholds to the system.

5. The method for online monitoring and status early warning of a smart hydropower plant according to claim 4 is characterized in that: Create a training model for the threshold values ​​of the parameters; An independent validation set was used to evaluate the performance of the model, with the evaluation indicators being risk index and precipitation; Parameter optimization: Adjust the model's hyperparameters based on the model's training results on the validation set.

6. The method for online monitoring and status early warning of a smart hydropower plant according to claim 1 is characterized in that: The issuing of the warning in the S5 step includes: sending the warning information to the operator's mobile and fixed terminals, setting the warning information sending instruction to the highest authority, and uploading all previous risk assessment information data to the plant's main control terminal for the operator to view real-time data, warning status and historical records.

Citation Information

Patent Citations

  • Hydropower station drainage basin dividing and face rainfall monitoring method based on GIS

    CN103729692A

  • Small hydroelectric generating set considered day-ahead predication for provincial supply load in geographic survey range

    CN107769268A

  • Calculation method for wind-light-water load complementary characteristics of runoff type small hydropower station area lacking measurement

    CN113052469A

  • Cascade hydropower station load optimization scheduling method, device, equipment and medium

    CN115439027A

  • Fire early warning system based on electrical informatization

    CN118587833A

Cited By

  • Data analysis processing method and system based on hydraulic power plant intelligent early warning

    CN121009394A