Concrete beam steel bar three-dimensional modeling method and system based on priority placeholder algorithm
Through the method based on the priority occupancy algorithm, the problem of unreasonable spatial arrangement of steel bars in the creation of a three-dimensional model of concrete beam steel bars in BIM modeling is solved, accurate and efficient steel bar model creation is achieved, and modeling efficiency is improved.
Patent Information
- Application Number
- CN202410828931.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-25
- Publication Date
- 2024-10-25
AI Technical Summary
When existing BIM modeling software creates a three-dimensional model of concrete beam steel bars, it is difficult to automatically consider the relationship between different beam spans, different beam segments, and different parts of the steel bars, resulting in unreasonable spatial layout of steel bars, waste or errors, and reducing modeling efficiency. .
Using a method based on the priority occupancy algorithm, we select concrete beam segments, determine beam span information, determine interfering components, count longitudinal steel bar vacancies, build a priority occupancy algorithm model, and arrange longitudinal steel bars and stirrups to ensure accurate spatial placement of steel bars. Characteristically, the steel bar model is created span by span and segment by segment.
Based on the connection method of multi-span beam steel bars and the relationship between stirrups and longitudinal correlation layout, an accurate three-dimensional steel bar model can be created at one time, which improves the modeling efficiency and reduces the need for steel bar position adjustment.
Smart Images

Figure CN118839484A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of three-dimensional modeling of building structure BIM models, and in particular to a method and system for three-dimensional modeling of concrete beams and steel bars based on a priority occupancy algorithm. Background Art
[0002] The first step in building digitalization is to establish an accurate and detailed building BIM model. Subsequent digital quantity calculation, digital management, digital construction, and digital operation and maintenance are all based on this model. Therefore, it is very important to establish an accurate and detailed building BIM model, and the creation of a three-dimensional steel bar model has always been one of the difficulties in BIM modeling.
[0003] There are also existing software that attempts to model steel bars, such as the modeling process for M-shaped node steel bars, but the process currently relies on 3DE software and is not yet practical. BIM also attempts to model steel bars, but it only focuses on the positioning and connection of longitudinal steel bars on the cross section, and does not explain the rest of the content, especially the key points and difficulties of three-dimensional steel bar modeling of beam steel bars, that is, the connection method of multi-span beam steel bars, the relationship between stirrups and longitudinal arrangement, etc.
[0004] That is, in the existing BIM modeling software, the modeling of concrete beam reinforcement is mainly based on the requirements of specifications and atlases to create a standardized three-dimensional reinforcement model, which cannot automatically consider the impact of the relationship between different beam spans, different beam sections, and different parts of the reinforcement on the reinforcement space layout during actual construction, resulting in unnecessary waste and even errors. To ensure the accuracy of the reinforcement BIM model, modelers are often required to manually adjust the position or layout of the reinforcement, which greatly reduces the modeling efficiency.
[0005] Especially when the reinforcement connection method of multi-span beams and the relationship between stirrups and longitudinal arrangements are complex, the model cannot be presented or is distorted due to the large amount of calculation. Summary of the invention
[0006] The technical problem to be solved by this application is to provide a three-dimensional modeling method for concrete beam reinforcement based on a priority occupancy algorithm. Through this method, in the process of creating concrete beam reinforcement, according to the requirements of the design specifications and atlas, on the basis of considering the relationship between reinforcements in different beam spans, different beam sections, and different parts, the longitudinal reinforcement and stirrups of a single-span beam or a multi-span beam can be created at one time. This method can well consider the spatial layout of the reinforcement of the concrete beam, ensure the accuracy of the three-dimensional modeling of the reinforcement, and the created reinforcement basically does not need secondary adjustment to meet the requirements, which greatly improves the efficiency of reinforcement modeling.
[0007] In order to solve the above technical problems, the present invention adopts the following technical solutions:
[0008] A method for three-dimensional modeling of reinforced concrete beams based on a priority occupation algorithm, characterized by comprising the following steps:
[0009] Step 1: On the created 3D BIM model, select the concrete beam segment for which reinforcement needs to be created and determine the beam span information;
[0010] Step 2: Select the beam segment according to the beam span information, and filter out all beams, columns and shear walls of the floor to which the beam segment belongs;
[0011] Step 3: Starting from the first span beam, determine other beam segments, columns or shear walls that interfere with the current beam, and record the geometric shape data, spatial positioning and structural properties of the corresponding interfering components;
[0012] Step 4: Define or configure the reinforcement information of each span beam according to the beam span;
[0013] Step 5: Count the maximum number of top steel bars and the maximum number of bottom steel bars of each span beam respectively, and use this as a basis to calculate the vacancies of longitudinal steel bars and their position coordinates on the cross section of each span beam;
[0014] Step 6: According to the number of stirrups of each span beam, determine the vacancies of the longitudinal reinforcement associated with the stirrups according to the principle of equal division and record them;
[0015] Step 7: Construct a longitudinal reinforcement priority occupation algorithm model based on two priority relationships;
[0016] Step 8: Arrange the longitudinal reinforcement of each span according to the longitudinal reinforcement priority occupation algorithm model or determine the reinforcement arrangement position according to the priority of the longitudinal reinforcement and the reinforcement space;
[0017] Step 9: Starting from the first span, according to the priority occupation algorithm, determine the occupation of the longitudinal reinforcement at the start end, mid-span and end end of the span, until the last span.
[0018] Step 10: Starting from the starting end of the first span beam, according to the longitudinal reinforcement occupation situation of this part, starting from the first occupying reinforcement, create the beam longitudinal reinforcement one by one, one section by one, and one span by one, until the last longitudinal reinforcement at the end of the last span beam;
[0019] Step 11: Determine the position of the combined stirrup positioning center line on the beam center line based on the stirrup spacing, diameter, and stirrup form of each span beam;
[0020] Step 12: According to the form of combined stirrups, calculate the offset distance of the center line of the double-legged outer stirrup, double-legged inner stirrup or single-legged inner stirrup relative to the center line of the combined stirrup;
[0021] Step 13: Draw the outer and inner stirrups of the beam based on the spaces associated with the stirrups, the stirrup diameter, and the offset distance of the stirrups along the beam axis.
[0022] In the above technical solution, in steps one and two, the user needs to provide a BIM model and corresponding component information to determine the beam span based on the beam segment.
[0023] In the above technical solution, in step three, the components associated with the beam span are searched through interference to determine the end information of the beam span, thereby providing data for the subsequent anchoring of the longitudinal reinforcement at the beam end.
[0024] In the above technical solution, in step 4, the user is required to define the continuous beam's through-length reinforcement, additional longitudinal reinforcement, stirrups and frame reinforcement information according to the beam span.
[0025] In the above technical solution, in step five, the data obtained in the above steps are used to count the maximum number of longitudinal reinforcements at the top and bottom of each span beam, and the longitudinal reinforcement vacancies and their coordinates are calculated based on the number of longitudinal reinforcements, beam width, protective layer thickness, stirrup diameter and longitudinal reinforcement diameter, in preparation for subsequent longitudinal reinforcement occupancy.
[0026] In the above technical solution, in step six, the steel bar vacancies obtained in step five (i.e., the vacancies have not yet been arranged with longitudinal reinforcement) are used to mark the steel bar vacancies associated with the stirrups according to the number of stirrups in the beam and the principle of equal division.
[0027] In the above technical solution, in step seven, the priority of longitudinal reinforcement placement is determined according to the relationship of "through-length longitudinal reinforcement > additional longitudinal reinforcement > frame reinforcement", and the priority of longitudinal reinforcement vacancies is determined according to the relationship of "corner vacancies > vacancies associated with stirrups > ordinary vacancies".
[0028] In the above technical solution, in step eight, the steel bar arrangement position is determined according to the priority of the longitudinal bars and steel bar vacancies, that is, the longitudinal steel bar priority occupation algorithm.
[0029] In the above technical solution, in step nine, the starting position and the ending position of the longitudinal reinforcement of the beam are calculated according to the longitudinal reinforcement position results of different parts of each span beam obtained in step eight.
[0030] In the above technical solution, in step ten, the longitudinal reinforcement of the beam is drawn according to the starting and ending positions of the longitudinal reinforcement of the beam obtained in step nine and the X and Y coordinates of the reinforcement relative to the beam section in accordance with the requirements of the standard drawing set.
[0031] In the above technical solution, in step eleven, the position of the combined stirrup positioning center line on the beam center line is calculated based on the stirrup spacing, diameter, and stirrup form of each span beam, providing data for the subsequent arrangement of stirrups along the beam axis.
[0032] In the above technical solution, in step twelve, according to the characteristics of the beam stirrup arrangement, the offset distance of the center line of the double-limb outer hoop, double-limb inner hoop or single-limb inner hoop in the combined stirrup relative to the center line of the combined stirrup is determined to determine the exact position of each stirrup along the beam axis.
[0033] In the above technical solution, in step thirteen, the stirrup outline is determined by the X and Y coordinates of the vacant space associated with the stirrup, and the position of the center line of each stirrup along the axis is determined according to the results of steps eleven and twelve. Through offset copying, the double-legged external stirrups, double-legged internal stirrups or single-legged internal stirrups of the beam are drawn separately according to the requirements of the standard drawing set.
[0034] At the same time, based on the above method, the present invention also provides a system, or electronic device, or storage medium for implementing the above method, in which a computer program is stored, and when the program is executed, the above method steps are implemented.
[0035] The beneficial effects of this application are:
[0036] The invention discloses a three-dimensional modeling method and system for concrete beam reinforcement based on a priority occupation algorithm. The beam span information and the association relationship between the beam segment and other components are determined according to the beam segment selected by the user; the user is required to define the reinforcement information of each span beam according to the beam span; the longitudinal reinforcement space is determined according to the reinforcement situation of each span beam; the steel bar position at the starting end, middle span, and end end of different beam spans is determined according to the position order of the full-length longitudinal reinforcement -> additional longitudinal reinforcement -> frame reinforcement and the position of the angle reinforcement -> space associated with the stirrup -> ordinary space; according to the steel bar position result, the starting and ending positions of each longitudinal reinforcement of the beam are determined, and the longitudinal reinforcement of the beam is drawn by span and section; according to the position result of the stirrup associated with the longitudinal reinforcement, the outer and inner stirrups of the beam are drawn by span and section.
[0037] Compared with the prior art, the method and system of the present invention can comprehensively consider the relationship between the steel bars of different beam spans, different beam sections, and different parts during the creation of concrete beam reinforcement, and create the longitudinal reinforcement and stirrups of single-span beams or multi-span beams at one time.
[0038] Secondly, the present invention can well consider the spatial layout of the steel bars in concrete beams, ensure the accuracy of the three-dimensional modeling of the steel bars, and the created steel bars basically do not require secondary adjustments to meet the requirements, which greatly improves the efficiency of steel bar modeling.
[0039] Compared with the current modeling technology, the present invention cleverly solves the key and difficult points of three-dimensional steel bar modeling of beam reinforcement through a priority placeholder algorithm, namely, the problem of increased complexity of the model framework caused by the connection method of multi-span beam reinforcement, the associated arrangement relationship between stirrups and the longitudinal direction, etc., thereby ensuring modeling efficiency and accuracy. BRIEF DESCRIPTION OF THE DRAWINGS
[0040] In order to more clearly illustrate the technical solutions of the embodiments of the present application, the drawings required for use in the embodiments will be briefly introduced below. It should be understood that the following drawings only show certain embodiments of the present application and therefore should not be regarded as limiting the scope. For ordinary technicians in this field, other related drawings can be obtained based on these drawings without paying creative work.
[0041] Figure 1 It is the overall flow chart of the concrete beam reinforcement three-dimensional modeling method of the present invention.
[0042] Figure 2 It is a flow chart for calculating the vacancies of longitudinal reinforcement bars in the beam of the present invention.
[0043] Figure 3 It is a schematic diagram of the vacant space of the longitudinal reinforcement of the beam of the present invention.
[0044] Figure 4 It is a flow chart of the longitudinal reinforcement priority occupying algorithm of the present invention.
[0045] Figure 5 It is a schematic diagram of longitudinal reinforcement arrangement in longitudinal reinforcement vacancies of the present invention.
[0046] Figure 6 It is a flow chart of drawing longitudinal reinforcement of the present invention.
[0047] Figure 7 It is a flow chart for calculating the distribution position of the center line of the stirrup group along the axis line of the present invention.
[0048] Figure 8 It is a schematic diagram of the distribution width of the stirrup group along the axis of the present invention.
[0049] Fig. 9 It is a flow chart of stirrup drawing of the present invention.
[0050] Fig.10 It is a schematic diagram of stirrup drawing of the present invention. DETAILED DESCRIPTION
[0051] In order to make the purpose, technical solution and advantages of the embodiments of the present application clearer, the technical solution in the embodiments of the present application will be clearly and completely described below in conjunction with the drawings in the embodiments of the present application. Obviously, the described embodiments are part of the embodiments of the present application, rather than all the embodiments. The components of the embodiments of the present application described and shown in the drawings here can be arranged and designed in various different configurations.
[0052] Therefore, the following detailed description of the embodiments of the present application provided in the accompanying drawings is not intended to limit the scope of the present application for which protection is sought, but merely represents selected embodiments of the present application. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in the field without creative work are within the scope of protection of the present application.
[0053] It should be noted that similar reference numerals and letters denote similar items in the following drawings, and therefore, once an item is defined in one drawing, further definition and explanation thereof is not required in subsequent drawings.
[0054] In the description of the present application, it should be noted that the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer", etc. indicate positions or positional relationships based on the positions or positional relationships shown in the accompanying drawings, or the positions or positional relationships in which the product of the application is usually placed when in use. They are only for the convenience of describing the present application and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific position, be constructed and operated in a specific position, and therefore cannot be understood as a limitation on the present application. In addition, the terms "first", "second", "third", etc. are only used to distinguish the description, and cannot be understood as indicating or implying relative importance.
[0055] In addition, the terms "horizontal", "vertical", "overhanging" and the like do not mean that the components are required to be absolutely horizontal or overhanging, but can be slightly tilted. For example, "horizontal" only means that its direction is more horizontal than "vertical", and does not mean that the structure must be completely horizontal, but can be slightly tilted.
[0056] In the description of this application, it should also be noted that, unless otherwise clearly specified and limited, the terms "set", "install", "connect", and "connect" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two elements. For ordinary technicians in this field, the specific meanings of the above terms in this application can be understood according to specific circumstances.
[0057] In the present application, unless otherwise clearly specified and limited, a first feature being "above" or "below" a second feature may include that the first and second features are in direct contact, or may include that the first and second features are not in direct contact but are in contact through another feature between them. Moreover, a first feature being "above", "above" and "above" a second feature includes that the first feature is directly above and obliquely above the second feature, or simply indicates that the first feature is higher in level than the second feature. A first feature being "below", "below" and "below" a second feature includes that the first feature is directly below and obliquely below the second feature, or simply indicates that the first feature is lower in level than the second feature.
[0058] The features and performance of the present application are further described in detail below in conjunction with the embodiments.
[0059] Example 1
[0060] The models in the implementation process are created using 3DE, a PLM modeling platform software released by Dassault Systèmes.
[0061] The above invention can be implemented by computer programming language. The following example is explained by using C++ language in Visual Studio 2019. The specific implementation steps are as follows (see Figure 1 ):
[0062] Step 1: In the constructed structural BIM model, select the horizontal straight rectangular beam segment for which the 3D steel bar BIM model is to be created, and determine the beam span information based on the selected beam segment;
[0063] Step 1.1: Select the first beam segment as the reference and extract the center line of the beam segment as the reference axis of the beam span;
[0064] Step 1.2: Based on the reference axis, remove the beam segments whose center lines are not on the reference axis;
[0065] Step 1.3 Rearrange the beam segments according to the coordinates of the centerline midpoints on the reference axis;
[0066] Step 1.4: Starting from the first beam segment, find the next beam segment directly connected to the end of the beam segment;
[0067] If found in step 1.5, record that the current beam segment and the next beam segment belong to the same span beam, and use the end of the next beam segment as the search end, and repeat step 1.4;
[0068] If the beam span is not found in step 1.6, the search for the current beam span is terminated, and the beam span information is recorded, including the beam segments, beam span length, beam cross section, material, etc. that constitute the beam span;
[0069] Step 1.7 Repeat steps 1.4 to 1.6 until all beam segments are found;
[0070] Step 2: According to the selected beam segment, filter out all beams, columns and shear walls of the floor to which the beam segment belongs;
[0071] Step 2.1 According to the selected beam segment, obtain the floor where the beam segment is located;
[0072] Step 2.2 According to the floor, obtain all beams, columns and shear walls belonging to the floor from the floor components and record them;
[0073] Step 3: Obtain the beams, columns or shear walls that interfere with the ends of each span beam, and record the geometric shape data, spatial positioning and structural properties of the corresponding interfering components;
[0074] Step 3.1 Obtain the components of the beams, columns and shear walls of the current floor that interfere with the beams of each span through interference checking;
[0075] Step 3.2: According to the intersection point between the interference component and the center line of the beam, determine whether the interference component is located at the starting end or the ending end of the beam, and calculate the geometric dimension length of the interference component in the direction of the center line of the beam;
[0076] Step 3.3 Record the geometric shape data, spatial positioning, and structural properties of the interfering components, such as material grade, seismic grade, etc.;
[0077] Step 4: Define the reinforcement information of each span beam according to the beam span;
[0078] Step 4.1 For the selected multi-span continuous beam, define the continuous beam's full-length positive reinforcement and full-length negative reinforcement;
[0079] Step 4.2: For each span beam, define the frame reinforcement, additional positive reinforcement, additional negative reinforcement and stirrup information of the beam span;
[0080] Step 5: Count the maximum number of top and bottom steel bars in each span, and use this as a basis to calculate the vacancies and position coordinates of the longitudinal steel bars on the cross section of the beam (see Figure 2 , Figure 3 );
[0081] Step 5.1 Count the number of negative reinforcements at the starting end, mid-span, and end of the i-th span beam, and calculate it as And calculate the maximum number of negative reinforcement roots in the i-th span
[0082] Step 5.2 Count the maximum number of negative reinforcements in the continuous beam n is the number of spans of the continuous beam;
[0083] Step 5.3 Refer to the method of steps 5.1 to 5.2 to count the maximum number of positive reinforcements in the continuous beam
[0084] Step 5.4 Take the maximum number of negative reinforcements in the continuous beam and the maximum number of positive ribs The larger value of
[0085] Step 5.5 According to the beam section width b, height h, protective layer thickness c, stirrup diameter d st , longitudinal reinforcement diameter d and N max , calculate the X coordinate of the longitudinal reinforcement according to the principle of equal spacing, that is, the empty coordinate relative to the local coordinate system of the beam section;
[0086] Step 5.5.1 Y coordinate of the beam reinforcement space: y bot =-0.5h+c+d st +0.5d, Y coordinate of the negative reinforcement space of the beam: y up =0.5h-c-d st -0.5d;
[0087] Step 5.5.2 Calculate the distribution spacing of the center of the beam longitudinal reinforcement vacancy in the width direction, Δ = (b-2(c+d st )-d) / ((N max -1);
[0088] Step 5.5.3 X coordinate of the vacant position of the i-th longitudinal reinforcement of the beam, x i =-0.5(b-2(c+d st )-d)+(i-1)*Δ;
[0089] Step 6: According to the number of stirrups in each span beam, determine the vacancies of the longitudinal reinforcements associated with the stirrups according to the principle of equal division;
[0090] Step 6.1 Get the number of stirrups for the i-th span beam:
[0091] Step 6.2 Refer to step 5.5, according to the beam section width b, protective layer thickness c, stirrup diameter d st as well as Calculate the positioning coordinates X corresponding to each stirrup in the beam width direction limb ;
[0092] Step 6.3 According to the positioning coordinate X of the stirrup along the beam width direction limb The relationship with the coordinate X of the vacant position of the longitudinal reinforcement, i.e. the principle of minimum distance, determines the vacant position of the longitudinal reinforcement associated with the stirrup and records it;
[0093] Step 7: Determine the priority of longitudinal reinforcement occupancy as follows: full-length longitudinal reinforcement > additional longitudinal reinforcement > frame reinforcement; determine the priority of longitudinal reinforcement vacancies as follows: corner vacancies > vacancies associated with stirrups > ordinary vacancies;
[0094] Step 8: Arrange the longitudinal reinforcement of each span according to the longitudinal reinforcement priority algorithm (see Figure 4 , Figure 5 );
[0095] Step 8.1 Select the longitudinal reinforcement of the continuous beam according to the priority order of the reinforcement and fill the vacant longitudinal reinforcement space of each span beam;
[0096] Step 8.2 According to the priority of occupancy, the full-length longitudinal reinforcement takes priority to occupy the empty space of the corner reinforcement, and the reinforcement occupancy information is recorded;
[0097] Step 8.3 If there are still full-length steel bars that have not been arranged after the longitudinal bars are arranged in the corner spaces, continue to arrange the full-length longitudinal steel bars;
[0098] Step 8.3.1 Based on the occupancy priority, the remaining full-length steel bars shall take priority in occupying the empty spaces associated with the stirrups;
[0099] Step 8.3.2 If the number of remaining full-length bars is less than the number of vacancies associated with stirrups;
[0100] Step 8.3.2.1 Refer to step 5.5 and calculate the X coordinates of the remaining longitudinal reinforcement according to the principle of equal spacing;
[0101] Step 8.3.2.2 Arrange the remaining longitudinal reinforcements based on the relationship between the vacant space coordinates associated with the stirrups and the X-coordinates of the remaining longitudinal reinforcements, i.e., the minimum distance principle, and record the reinforcement occupancy information;
[0102] Step 8.3.3 If the number of remaining full-length steel bars is greater than or equal to the number of vacancies associated with stirrups;
[0103] Step 8.3.3.1 Arrange longitudinal reinforcement in each empty space associated with stirrups and record the reinforcement occupancy information;
[0104] Step 8.3.3.2 If there are still longitudinal reinforcements that have not been arranged, they will be arranged to occupy the common spaces last according to the priority of the spaces;
[0105] Step 8.3.3.3 If the number of remaining full-length steel bars == the number of common spaces, then each common space is equipped with longitudinal steel bars;
[0106] Step 8.3.3.4 If the number of remaining full-length steel bars is less than the number of common vacancies, refer to the methods of Steps 8.3.2.1 to 8.3.2.2 to arrange the longitudinal steel bars;
[0107] After completing the arrangement of the full-length reinforcement in step 8.4, the next step is to arrange the additional longitudinal reinforcement according to the reinforcement priority. The arrangement method refers to step 8.3;
[0108] After completing the additional reinforcement arrangement in step 8.5, the last step is to arrange the frame reinforcement according to the reinforcement priority. The arrangement method is similar to step 8.3.
[0109] Step 8.6 For locations where no longitudinal reinforcement is arranged, record them as reinforcement vacancies;
[0110] Step 9: Starting from the starting end of the first span, according to the priority occupation algorithm of step 8, determine the occupation of the longitudinal reinforcement at the starting end, mid-span and end of each span until the last span.
[0111] Step 10: Starting from the first span beam, create the longitudinal reinforcement of the beam one by one, one section at a time, and one span at a time until all the longitudinal reinforcement is drawn (see Figure 6 );
[0112] Step 10.1 Taking the i-th span as an example, examine the j-th steel bar position at the starting end of the i-th span. If the current position is empty, that is, no longitudinal reinforcement is arranged, then examine the j+1 steel bar position;
[0113] Step 10.2: If the current position has longitudinal reinforcement but the reinforcement has been drawn, then examine the j+1 reinforcement position;
[0114] Step 10.3 If there are longitudinal reinforcements in the current placeholder and the reinforcements have not been drawn, calculate the starting position of the reinforcements along the longitudinal direction according to the relevant requirements of the code and atlas, and examine the position of the jth placeholder reinforcement in the i-th span;
[0115] Step 10.4 If the jth position corresponding to the i-th span is not reinforced, or is reinforced but has a diameter different from the diameter of the investigated reinforcement, that is, the reinforcement is cut off or connected to other reinforcements, then calculate the current reinforcement end position according to the relevant requirements of the code and atlas;
[0116] Step 10.5 If the jth position corresponding to the i-th span is provided with steel bars, and the diameter of the steel bars is the same as the steel bars under examination, the steel bars are connected, and the position of the jth position steel bars at the end of the i-th span is examined;
[0117] Step 10.6 If the jth position corresponding to the end of the i-th span is not reinforced, or is reinforced but has a diameter different from the diameter of the current reinforcement, calculate the current reinforcement end position according to the relevant requirements of the code and atlas;
[0118] Step 10.7 If the j-th position corresponding to the end of the i-th span is provided with steel bars, and the diameter of the steel bars is the same as the steel bars under examination, then the position of the j-th position steel bars at the start end of the i+1-th span is examined;
[0119] Step 10.8 If the jth span corresponding to the starting end of the i+1th span is not reinforced, or is reinforced but has a diameter different from the diameter of the current reinforcement under consideration, that is, the reinforcement under consideration is anchored at the end, then calculate the end position of the current reinforcement according to the relevant requirements of the code and atlas;
[0120] Step 10.9: If the jth occupancy corresponding to the starting end of the i+1th span is provided with a steel bar, and the diameter of the steel bar is the same as that of the steel bar under examination, that is, the steel bar is stretched through, then repeat steps 10.3 to 10.8 until the end end of the steel bar under examination is found;
[0121] Step 10.10 Calculate the three-dimensional coordinates of the starting and ending points of the steel bar relative to the overall model based on the local X and Y coordinates of the steel bar position and the starting and ending positions of the steel bar along the beam axis:
[0122] Step 10.11 Draw the current steel bar according to the requirements of the specification drawing set based on the steel bar end truncation, connection or anchorage information and the starting and ending positions of the steel bar;
[0123] Step 10.12 records the current steel bar drawing status to the corresponding steel bar placeholder information to avoid repeated modeling from the steel bar;
[0124] Step 10.13 Repeat steps 10.1 to 10.12 until all longitudinal reinforcements are drawn;
[0125] Step 11: According to the beam stirrup spacing Δ st , diameter d st , stirrup form, determine the position of the stirrup positioning center line along the beam axis (see Figure 7 , Figure 8 );
[0126] Step 11.1 Calculate the clear span l of each span beam separately n ;
[0127] Step 11.2 Calculate the combined stirrup distribution width b based on the number of stirrups in the beam st ;
[0128] Step 11.2.1 For double stirrups, the combined stirrup distribution width b st =2d st ;
[0129] Step 11.2.2 For three-legged stirrups, the combined stirrup distribution width b st =3d st ;
[0130] Step 11.2.3 For four-legged stirrups and above, the combined stirrup distribution width b st =4d st ;
[0131] Step 11.3 According to the beam stirrup spacing Δ st , diameter d st , Clear span of beam n , distribution width b st , calculate the distribution position of the center line of the composite stirrups of each beam span along the beam axis;
[0132] Step 11.3.1 Calculate the distribution range l of the center line of the composite stirrup along the beam axis st = l n -50*2-b st , where 50 is the distance from the edge of the stirrup to the edge of the beam;
[0133] Step 11.3.2 For beam spans with fixed stirrup spacing, according to the steel bar distribution range l st , stirrup spacing Δ st , calculate the distribution position of the center line of the combined stirrups of each span along the beam axis;
[0134] Step 11.3.2.1 Calculate the number of stirrups n for the i-th span beam st =ceil(l st / Δ st )+1, ceil() is the rounding up function;
[0135] Step 11.3.2.2 Calculate the actual combined stirrup centerline spacing Δ′ st = l st / (n st -1);
[0136] Step 11.3.2.3 Calculate the centerline position of the jth set of stirrups in the i-th span beam, P ij =P i +50+0.5b st +(j-1)*Δ′ st , where P i is the position of the starting end of the i-th span beam relative to the starting end of the i-th span beam;
[0137] Step 11.3.3 For the beam span with stirrups in the reinforced area and non-reinforced area, the stirrup distribution range l st According to the specification requirements, it is divided into encryption areas and non-encrypted area
[0138] Step 11.3.4 Refer to the method in step 11.3.2 to calculate the encryption area and non-encrypted areas The distribution position of the center line of the composite stirrups along the beam axis;
[0139] Step 12: Calculate the offset distance of the center line of the double-legged outer stirrup, double-legged inner stirrup or single-legged inner stirrup in the composite stirrups of the beam relative to the center line of the composite stirrup;
[0140] Step 12.1 If the beam stirrups consist of only one double-legged external stirrup, the offset distance of the external stirrup centerline relative to the combined stirrup centerline is
[0141] Step 12.2 If the beam stirrups consist of a double-legged outer stirrup and a single-legged inner stirrup, the offset distance of the outer stirrup centerline relative to the combined stirrup centerline is The offset distance of the positioning center line of the single-leg inner hoop relative to the positioning center line of the combined hoop
[0142] Step 12.3 If the beam stirrups include a double-legged outer stirrup, multiple double-legged inner stirrups, and a single-legged inner stirrup, the offset distance of the outer stirrup positioning centerline relative to the combined stirrup positioning centerline is The offset distance of the double-limb inner hoop positioning center line relative to the combined hoop positioning center line The offset distance of the positioning center line of the single-leg inner hoop relative to the positioning center line of the combined hoop
[0143] Step 13: Draw the outer and inner stirrups of the beam according to the space associated with the stirrups, the stirrup diameter, and the offset distance of the stirrups along the beam axis (see Fig. 9 , Fig.10 ).
[0144] Step 13.1, based on the vacancy information associated with the stirrups, determine the X and Y coordinates of the positioning point of the stirrups of the i-th span beam on the beam section;
[0145] Step 13.1.1 Determine the X and Y coordinates of the five positioning points of the double-legged outer hoop of the i-th span beam relative to the beam section axis system based on the position information of the longitudinal reinforcement at the corner;
[0146] Step 13.1.2 According to the vacancy information associated with the stirrups, search for the X and Y coordinates corresponding to the five positioning points of the double-legged external stirrups of the beam;
[0147] Step 13.1.3 Find the X and Y coordinates corresponding to the two positioning points of the single-leg inner stirrup according to the vacancy information associated with the stirrup;
[0148] Step 13.2: Arrange the stirrup positioning points in a counterclockwise order, taking the beam axis direction as the normal direction;
[0149] Step 13.3: Using the starting end section of the i-th span beam as the reference surface, convert the coordinates of the locating points of the stirrups on the beam section into three-dimensional spatial coordinates;
[0150] Step 13.4 For double-legged stirrups, consider the influence of stirrup ring interference and correct the three-dimensional coordinates of the stirrups;
[0151] Step 13.4.1 Offset the first stirrup location point by 0.5d along the normal direction of the beam section st , the second positioning point is offset by 0.25d along the normal direction st ;
[0152] Step 13.4.2 Offset the fifth stirrup location point along the beam section normal by -0.5d st , the fourth positioning point is offset along the normal direction by -0.25d st ;
[0153] Step 13.5: offset and copy the three-dimensional coordinates of the stirrups along the beam axis to obtain the coordinate information of all stirrups of the i-th span beam, and draw the stirrups of the beam according to the requirements of the specification and atlas;
[0154] Step 13.5.1 Position the coordinate P along the beam axis based on the center line of the combined stirrups ij , and the offset distance of the center line of the double-leg outer hoop relative to the center line of the combined hoop Calculate the positioning coordinates of the center line of the double-leg outer hoop of the beam along the axis of the beam
[0155] Step 13.5.2 Based on the three-dimensional coordinates of the double-legged outer hoop of the beam starting end section and the positioning coordinates of the center line of the double-legged outer hoop along the beam axis The 3D coordinates of all double-legged outer hoops copied to the beam span by offsetting along the beam axis;
[0156] Step 13.5.3 Draw the double-legged external hoops of the i-th span beam according to the bending requirements of the standard atlas for hoops;
[0157] Step 13.5.4 Repeat steps 13.5.1 to 13.5.3 to complete the drawing of the double-leg internal stirrups and single-leg internal stirrups of the beam.
[0158] Example 2
[0159] The system, electronic device, or storage medium used to implement the above method stores a computer program, and when the program is executed, the method steps of the above embodiment 1 are implemented.
[0160] The embodiments described above are part of the embodiments of the present application, rather than all of the embodiments. The detailed description of the embodiments of the present application is not intended to limit the scope of the present application for protection, but merely represents the selected embodiments of the present application. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present application.
Claims
1. A three-dimensional modeling method for concrete beam reinforcement based on a priority occupation algorithm, characterized in that The steps include: Step 1: On the created 3D BIM model, select the concrete beam segment for which reinforcement needs to be created and determine the beam span information; Step 2: Select the beam segment according to the beam span information, and filter out all beams, columns and shear walls of the floor to which the beam segment belongs; Step 3: Starting from the first span beam, determine other beam segments, columns or shear walls that interfere with the current beam, and record the geometric shape data, spatial positioning and structural properties of the corresponding interfering components; Step 4: Define the reinforcement information of each span beam according to the beam span; Step 5: Count the maximum number of top steel bars and the maximum number of bottom steel bars of each span beam respectively, and use this as a basis to calculate the vacancies of longitudinal steel bars and their position coordinates on the cross section of each span beam; Step 6: According to the number of stirrups of each span beam, determine the vacancies of the longitudinal reinforcement associated with the stirrups according to the principle of equal division and record them; Step 7: Construct a longitudinal reinforcement priority occupation algorithm model based on two priority relationships; Step 8: Arrange the longitudinal reinforcement of each span according to the longitudinal reinforcement priority occupation algorithm model or determine the reinforcement arrangement position according to the priority of the longitudinal reinforcement and the reinforcement space; Step 9: Starting from the first span, according to the priority occupation algorithm, determine the occupation of the longitudinal reinforcement at the start end, mid-span and end end of the span, until the last span. Step 10: Starting from the starting end of the first span beam, according to the longitudinal reinforcement occupation situation of this part, starting from the first occupying reinforcement, create the beam longitudinal reinforcement one by one, one section by one, and one span by one, until the last longitudinal reinforcement at the end of the last span beam; Step 11: Determine the position of the combined stirrup positioning center line on the beam center line based on the stirrup spacing, diameter, and stirrup form of each span beam; Step 12: According to the form of combined stirrups, calculate the offset distance of the center line of the double-legged outer stirrup, double-legged inner stirrup or single-legged inner stirrup relative to the center line of the combined stirrup; Step 13: Draw the outer and inner stirrups of the beam based on the spaces associated with the stirrups, the stirrup diameter, and the offset distance of the stirrups along the beam axis.
2. The method for three-dimensional modeling of reinforced concrete beams based on a priority occupation algorithm according to claim 1, characterized in that In steps one and two, the user needs to provide the BIM model and corresponding component information to determine the beam span based on the beam segment.
3. The method for three-dimensional modeling of concrete beam reinforcement based on priority occupation algorithm according to claim 1 is characterized in that In the step three, the components associated with the beam span are searched through interference to determine the end information of the beam span, thereby providing data for the subsequent anchoring of the longitudinal reinforcement bars at the beam ends.
4. The method for three-dimensional modeling of concrete beam reinforcement based on priority occupation algorithm according to claim 1 is characterized in that In the step 4, the user is required to define the continuous beam's through-length reinforcement, additional longitudinal reinforcement, stirrups, and frame reinforcement information according to the beam span.
5. The method for three-dimensional modeling of reinforced concrete beams based on a priority occupation algorithm according to claim 1, characterized in that In step five, the data obtained in the above steps are used to count the maximum number of longitudinal bars at the top and bottom of each span beam, and the longitudinal steel bar vacancies and their coordinates are calculated based on the number of longitudinal bars, beam width, protective layer thickness, stirrup diameter and longitudinal bar diameter, in preparation for subsequent longitudinal bar occupancy.
6. The method for three-dimensional modeling of reinforced concrete beams based on a priority occupation algorithm according to claim 1, characterized in that In the step six, the steel bar vacancies obtained in the step five are used to mark the steel bar vacancies associated with the stirrups according to the number of stirrups in the beam and the principle of the closest equal division.
7. The method for three-dimensional modeling of concrete beam reinforcement based on priority occupation algorithm according to claim 1, characterized in that In the step seven, the priority of longitudinal reinforcement placement is determined according to the relationship of "through-length longitudinal reinforcement > additional longitudinal reinforcement > frame reinforcement", and the priority of longitudinal reinforcement placement is determined according to the relationship of "corner space > space associated with stirrups > ordinary space".
8. The method for three-dimensional modeling of concrete beam reinforcement based on priority occupation algorithm according to claim 1, characterized in that In the step nine, the starting position and the ending position of the longitudinal reinforcement of the beam are calculated according to the longitudinal reinforcement position results of different parts of each span beam obtained in the step eight.
9. The method for three-dimensional modeling of reinforced concrete beams based on a priority occupation algorithm according to claim 1, characterized in that: In step thirteen, the stirrup outline is determined by the X and Y coordinates of the vacant space associated with the stirrup, and the position of each stirrup centerline along the axis is determined according to the results of steps eleven and twelve. By offset copying, double-legged external stirrups, double-legged internal stirrups or single-legged internal stirrups of the beam are drawn separately according to the requirements of the standard drawing set.
10. A concrete beam reinforcement three-dimensional modeling system based on a priority occupation algorithm, characterized in that Used to implement the method described in any one of claims 1 to 9 above.
