Water conservancy and hydropower foundation pit excavation project management system and method based on spatio-temporal information data
Through the water conservancy and hydropower foundation pit excavation project management system based on spatiotemporal information data, the problem of insufficient data collection quality and lack of specifications has been solved, the foundation pit excavation operation data has been quickly organized and efficiently displayed, and the accuracy of engineering quantity calculation has been improved. accuracy and analysis efficiency, improving the effectiveness of project management.
Patent Information
- Application Number
- CN202410873099.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-01
- Publication Date
- 2024-10-29
- Estimated Expiration
- 2044-07-01
AI Technical Summary
Insufficient data collection quality, lack of specifications, and difficulties in collation and verification during foundation pit excavation construction of water conservancy and hydropower projects have resulted in low data management efficiency and quality, affecting the effectiveness of project management.
The water conservancy and hydropower foundation pit excavation project management system based on spatiotemporal information data includes a data processing module, a feature processing module, a project quantity calculation module, a data storage module, a real-scene staking module, a historical comparative analysis module and a historical playback module. Dimensional data and oblique photography data are processed for format processing, feature line optimization, engineering quantity calculation, real-scene staking, multi-dimensional statistical analysis and automatic screenshot carousel, and analysis reports and progress reports are generated.
It realizes the rapid sorting and efficient visual display of foundation pit excavation operation data, improves the integrity and consistency of data, ensures the accuracy and analysis efficiency of engineering quantity calculation, and improves the effectiveness of project management and acceptance guarantee.
Smart Images

Figure CN118863371A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of water conservancy and hydropower engineering, and in particular to a water conservancy and hydropower foundation pit excavation engineering management system and method based on spatiotemporal information data. Background Art
[0002] During the excavation of foundation pits for water conservancy and hydropower projects, the importance of data collection is often underestimated, resulting in increasingly prominent issues of data quality and integrity. This phenomenon is mainly manifested in the following aspects:
[0003] Insufficient data collection quality: During the construction period, data collection work is often neglected due to progress pressure. Although the technical threshold for data collection is not high, there are obvious randomness and omissions in the implementation process. This leads to a significant reduction in the integrity and accuracy of the collected data, and it is impossible to provide a reliable basis for subsequent engineering quantity accounting and analysis. During the project completion acceptance stage, the construction unit often finds it difficult to provide sufficient calculation data and supporting materials, which seriously affects the effective implementation of comprehensive analysis work.
[0004] Lack of data specifications: The standardization of historical data is prominent, mainly manifested in the arbitrariness of the collection parameter settings. This situation is usually closely related to the personal experience of the relevant rule makers and the lack of unified standards and specifications. Some projects failed to formulate or effectively implement data specifications in a timely manner in the early stages, resulting in uneven quality of results in the data production stage. This not only increases the complexity of later analysis work, but also requires additional data pre-processing, which greatly reduces the efficiency of data utilization.
[0005] Difficulties in data collation and verification: Even if some construction units conduct inspections according to data requirements, quantity calculation and statistical verification work still faces huge challenges. This work can usually only be performed after the contractor completes each settlement to ensure the integrity of the data. However, in reality, the contractor's active cooperation is generally low, which further exacerbates the difficulty of data collation and verification. This situation not only delays the data analysis process, but may also affect the timeliness and accuracy of project progress and quality management.
[0006] The existence of these problems has seriously affected the efficiency and quality of data management in foundation pit excavation operations of water conservancy and hydropower projects. It is urgent to improve them by formulating unified standards, strengthening data collection awareness, optimizing data processing procedures and other measures to improve the effectiveness of project management. Summary of the invention
[0007] In view of this, the present invention proposes a water conservancy and hydropower foundation pit excavation project management system and method based on spatiotemporal information data. In view of the fact that the management of existing oblique photography file data and various supporting materials is not emphasized during the foundation pit excavation operation of water conservancy and hydropower projects, and the high-precision conversion of design drawing coordinates is not realized, resulting in the inability to realize the superposition of the two-dimensional design drawings and three-dimensional images of the project, and the ground processing when the project performs the statistics and analysis of the engineering foundation pit operation volume, and then the construction design drawings cannot be correctly laid out in real scenes, thereby supporting the comprehensive analysis of the foundation pit excavation operation volume. Therefore, at the beginning of the engineering foundation pit excavation operation, a complete set of data collection, engineering data mapping, foundation pit excavation operation result calculation, query, comparison and other information are quickly sorted and collected and visualized, thereby solving the above problems.
[0008] The technical solution of the present invention is achieved in this way:
[0009] On the one hand, the present invention provides a water conservancy and hydropower foundation pit excavation project management system based on spatiotemporal information data, including:
[0010] A data processing module configured to process and convert the original two-dimensional data and the original oblique photography data to obtain three-dimensional spatiotemporal data and oblique photography data;
[0011] A feature processing module configured to establish a three-dimensional model based on the three-dimensional spatiotemporal data or the oblique photography data, and perform feature line processing in a semi-supervised manner to optimize the three-dimensional model;
[0012] A quantity calculation module configured to calculate the quantity of the foundation pit construction area based on the three-dimensional model;
[0013] The data storage module is configured to store all data in Json format;
[0014] A real scene layout module, which is configured to perform real scene layout processing on oblique photography data, including data mapping, data import and export, and editing;
[0015] The historical comparison and analysis module is configured to compare the oblique photography data of different periods, calculate the changes in the engineering quantity in different periods, conduct multi-dimensional statistical analysis, and generate analysis reports;
[0016] The historical playback module is configured to manage viewpoint information, perform automatic screenshots and image carousels, and generate a comic-strip-style project progress report.
[0017] On the basis of the above technical solution, preferably, the data processing module processes the original two-dimensional data and the original oblique photography data in the same manner, and the processing flow of the original two-dimensional data is:
[0018] S1: Get the original 2D data file;
[0019] S2: Call the interface program to read the group code and associated value of the file to obtain the group data;
[0020] S3: traverse and analyze the group data to determine whether the current group data is the end of the file or the analysis result is an error. If so, end the processing flow; if not, execute step S4;
[0021] S4: Identify the segment names of the group data, including the HEADER segment, CLASSES segment, TABLES segment, ENTITES segment, and OBJECTS segment;
[0022] S5: Obtaining the format information of the file according to the segment name recognition result, including the layer line type, coloring information, attribute information of the construction unit and the unit entity segment name;
[0023] S6: calling the interface program to sort out the format information of the file to obtain sorted two-dimensional data;
[0024] S7: Identify the source coordinate system of the two-dimensional data, define the target coordinate system, create source and target system objects, and set projection parameters;
[0025] S8: Create a converter based on the source coordinate system and the target coordinate system, perform coordinate transformation on each coordinate point of the two-dimensional data, and obtain three-dimensional spatiotemporal data.
[0026] Based on the above technical solution, preferably, the process of feature line processing is:
[0027] A1. Import high-precision DEM data as reference terrain, display and compare the characteristic lines with the reference terrain, and identify and adjust abnormal points in the characteristic lines based on the reference terrain;
[0028] A2. Correct the 3D model according to the adjusted feature lines and verify the corrected 3D model. If all points are close to the ground, the correction is completed and the optimized 3D model is output. If there are still points that are not close to the ground, return to step A1 for further adjustment.
[0029] Based on the above technical solution, preferably, the process of engineering quantity calculation is:
[0030] B1. Determine whether to draw the foundation pit construction area according to the scene. If yes, execute step B2. If no, execute step B3.
[0031] B2. Select a drawing method, which is polygon or rectangle. Use the drawing method to draw the foundation pit construction area, determine the maximum and minimum elevations of the foundation pit construction area, and determine whether it is in edit mode. If so, perform elevation correction and then execute step B4. If not, directly execute step B4.
[0032] B3, import the excavation surface data, read the foundation pit construction area, and determine whether it is in edit mode. If so, determine the maximum and minimum elevations of the foundation pit construction area and execute step B4. If not, directly execute step B4;
[0033] B4. Configure the parameters of the calculation algorithm and input the information of the 3D model;
[0034] B5. Calculate the engineering quantity of the foundation pit construction area, where the engineering quantity is quantified and calculated based on the volume enclosed by the boundary of the foundation pit construction area.
[0035] Based on the above technical solution, preferably, step B5 includes:
[0036] B51. Draw polygons according to the boundary of the foundation pit construction area and divide the polygons into Thiessen polygons;
[0037] B52. Combined with DEM data, the foundation pit construction area is divided into triangular grids to obtain multiple grid units;
[0038] B53, traverse each grid unit and calculate the engineering quantity of the grid unit according to the DEM data, including the surface area of the working surface, the excavation volume and the filling volume;
[0039] B54. Add up the cut volume and fill volume, and take the sum of the surface areas of all grid cells as the total surface area;
[0040] B55. For each Thiessen polygon, determine all the grid cells it contains, and add up the excavation volume, fill volume and surface area as the engineering quantity of the Thiessen polygon;
[0041] B56. Output the overall project volume of the foundation pit construction area.
[0042] Based on the above technical solution, preferably, step B53 includes:
[0043] B531. The grid unit is approximately a triangular prism, which is composed of a triangular prism and a quadrangular pyramid. The base of the triangular prism is a triangle with an area of S, and the top of the quadrangular pyramid is a ground triangle with the elevation values of its three vertices being a, b, and c respectively.
[0044] B532. Set the design elevation to h and calculate the elevation difference between the three vertices and the design elevation:
[0045] Δh1=ah
[0046] Δh2=bh
[0047] Δh3=ch
[0048] B533. Calculate the average elevation difference Δh based on the elevation difference between the three vertices and the design elevation avg :
[0049] Δh avg =(Δh1+Δh2+Δh3) / 3
[0050] B534. Calculate the volume V of the grid cell based on the average elevation difference and area S:
[0051] V=S×Δh avg
[0052] B535. Determine whether V is the excavation volume or the filling volume:
[0053] If Δh avg >0, V is positive, which represents the excavation volume;
[0054] If Δh avg <0, then V is negative, which represents the fill volume.
[0055] On the basis of the above technical solution, preferably, in the real scene layout module, the process of mapping the oblique photography data is as follows:
[0056] C1. Open the image layer of the oblique photography data and the DXF file containing the design graphics at the same time, and read the graphic elements in the file;
[0057] C2. Read the preset projection configuration information from the system configuration to keep the coordinate system consistent;
[0058] C3, determine whether to perform ground processing, if so, adjust the elevation of the graphic elements according to the image layer, if not, set all graphic elements to a unified absolute elevation;
[0059] C4. Determine whether there are opening faces and road line signs. If so, use the existing signs as attribute data. If not, add new opening faces and road line signs as attribute data.
[0060] C5. Generate a data list of graphic elements and attribute data;
[0061] C6. Upload the data list to the system or export it to the local computer:
[0062] If uploaded to the system, the data list will be saved in the data storage module;
[0063] If exported to local, the data list will be exported as a GeoJSON format file.
[0064] On the basis of the above technical solution, preferably, in the real scene lofting module, the process of data import, export and editing is as follows:
[0065] D1. Open the image layer of oblique photography data;
[0066] D2. Read the data list in the data storage module online, or import the data list in GeoJSON format file;
[0067] D3, processing the data list according to user needs, if the user needs to edit the elements, then executing step D4, if the user needs to upload part of the data, then executing step D5, if the user needs to selectively export, then executing step D6, if the user needs to process after export, then executing step D7;
[0068] D4. According to user needs, the selected graphic element is adjusted for interference points and then replaced and saved, or the selected graphic element is set as an opening surface, or the selected graphic element is set as a road line;
[0069] D5. Upload part of the data in the data list according to user needs;
[0070] D6. According to user needs, export the data list as a whole, or select target graphic elements to export, or select and export images on the image layer;
[0071] D7. After exporting the data list, locate, show, hide, edit or delete it according to user needs.
[0072] On the basis of the above technical solution, preferably, in step D4, the process of adjusting the interference point is:
[0073] D41, select a graphic element as an original interference element, draw an interference surface based on the original interference element, and use the data points on the interference surface as interference points;
[0074] D42, modeling based on the interference points as an interference model;
[0075] D43, obtaining the elevation of the location in the interference model;
[0076] D44. Compare the elevation of the location with the DEM data to determine whether the interference point needs to be calibrated. If necessary, calibrate the interference point and return to step D42. If not, output the interference point as a new interference element, update the graphic element and replace and save it.
[0077] On the other hand, the present invention also provides a method for managing water conservancy and hydropower foundation pit excavation projects based on spatiotemporal information data, the method being applied to any of the above-mentioned systems, the method comprising the following steps:
[0078] Processing and converting the original two-dimensional data and the original oblique photography data to obtain three-dimensional spatiotemporal data and oblique photography data;
[0079] A 3D model is established based on 3D spatiotemporal data or oblique photography data, and feature line processing is performed in a semi-supervised manner to optimize the 3D model;
[0080] Manage the files of oblique photography data, define the scope lines and viewing angles of the above-ground engineering parts, calculate the engineering quantities of the foundation pit excavation construction area in each period based on the 3D model, and generate engineering quantity reports;
[0081] Carry out real-scene layout processing on oblique photography data, including data mapping, data import and export, and editing;
[0082] Compare oblique photography data from different periods, calculate changes in engineering quantities in different periods, conduct multi-dimensional statistical analysis, and generate analysis reports;
[0083] Manage viewpoint information, take automatic screenshots and image carousels, and generate comic-strip-style project progress reports;
[0084] All data is stored in Json format.
[0085] The system of the present invention has the following beneficial effects compared with the prior art:
[0086] (1) For foundation pit excavation operations of water conservancy and hydropower projects, it can realize the rapid collection and collection of information such as calculation, query, and comparison of the work volume results of multiple single and multiple foundation pit working faces, as well as the efficient visualization of the results, providing accurate result data and analysis report materials for the project;
[0087] (2) In combination with the construction characteristics of foundation pit excavation operations in water conservancy and hydropower engineering, a comprehensive analysis method including foundation pit oblique photography construction layout, construction workload analysis, historical comparison, and historical playback function groups is established to standardize the standardization of oblique photography data, and establish a unified data processing mechanism for data from various data sources. Ultimately, under the condition of unified data standards, the purpose of automatic and efficient comprehensive analysis and auditing is achieved. Compared with the traditional working mode, the present invention can effectively improve the effectiveness and accuracy of analysis data and improve the analysis efficiency of water conservancy and hydropower excavation design, providing effective guarantee for the smooth acceptance of foundation pit excavation operations in water conservancy and hydropower engineering;
[0088] (3) By automatically identifying and processing data in different segments, including HEADER, CLASSES, TABLES, ENTITES, and OBJECTS segments, the integrity and consistency of the data are ensured. In particular, the coordinate conversion step greatly improves the accuracy of 3D spatiotemporal data by automatically identifying the source coordinate system and defining the target coordinate system, and creating a converter for precise conversion. This automated process not only reduces human errors, but also significantly shortens data processing time, laying a solid data foundation for subsequent 3D model construction and engineering quantity calculation;
[0089] (4) By importing high-precision DEM data as reference terrain, the system can automatically identify and adjust abnormal points in the feature lines. This method not only improves processing efficiency, but also ensures the accuracy of the processing results. Especially under complex terrain conditions, this method can effectively capture terrain features and improve the accuracy of the three-dimensional model. The iterative verification mechanism further ensures the quality of the model and ensures that all points are in a ground-closed state; (5) Through Thiessen polygon division and triangular mesh division, the system can accurately calculate the engineering quantity under complex terrain. The calculation method of approximate triangular prism is adopted, which takes into account the irregularity of the surface and can more accurately calculate the excavation and filling volumes. This method can not only provide the overall engineering quantity, but also refine the engineering quantity of each Thiessen polygon, providing strong data support for refined management and cost control. In addition, the system can automatically distinguish between excavation and filling, which is of great significance for earthwork balance and construction plan formulation. This refined calculation method greatly improves the accuracy of engineering quantity estimation, helps to improve project management efficiency, reduce construction costs, and optimize resource allocation. BRIEF DESCRIPTION OF THE DRAWINGS
[0090] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0091] Figure 1 It is a system framework diagram of the present invention;
[0092] Figure 2 is a data processing flow chart of the present invention;
[0093] Figure 3 It is the engineering quantity calculation flow chart of the present invention;
[0094] Figure 4 A schematic diagram of a grid unit of the present invention;
[0095] Figure 5 It is a data flow chart of the present invention;
[0096] Figure 6 Data import, export and editing flow chart for the present invention;
[0097] Figure 7 It is a diagram of the method steps of the present invention. DETAILED DESCRIPTION
[0098] The following will be combined with the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0099] Explanation of some terms in this invention:
[0100] 1. Horse trail
[0101] It is usually a temporary road paved with solid materials (such as concrete, masonry, etc.) to withstand the movement and transportation of vehicles and personnel. It needs to meet certain standards and specifications, including width, flatness, slope, etc., to meet the construction process requirements and ensure the smooth flow of materials and equipment.
[0102] 2. Slope
[0103] Slope refers to the artificial slope formed by excavation or filling construction of construction projects or municipal projects, or the natural slope that affects the safety and stability of buildings (structures).
[0104] 3. Excavation volume
[0105] Calculate the volume of the protruding part between the "base plane" and the ground surface.
[0106] 4. Filling volume
[0107] Calculate the volume of the missing part between the "Base Plane" and the "Bottom of the Wall" to fill it.
[0108] 5. BIM Model
[0109] Building Information Modeling (BIM) is a multi-dimensional (three-dimensional space, time, cost, safety, etc.), digital, and operational engineering information model. It enables all parties involved in the construction project to work together at all stages of the project, share project information, and make relevant decisions on the project throughout the entire life cycle.
[0110] 6. Oblique photography
[0111] A technology that acquires ground information by carrying multiple sensors on the same flying platform and simultaneously collecting images from one vertical angle and four inclined angles (i.e. a total of five different angles).
[0112] See also Figure 1 First, the present invention provides a water conservancy and hydropower foundation pit excavation project management system based on spatiotemporal information data, including:
[0113] A data processing module configured to process and convert the original two-dimensional data and the original oblique photography data to obtain three-dimensional spatiotemporal data and oblique photography data;
[0114] A feature processing module configured to establish a three-dimensional model based on the three-dimensional spatiotemporal data or the oblique photography data, and perform feature line processing in a semi-supervised manner to optimize the three-dimensional model;
[0115] A quantity calculation module configured to calculate the quantity of the foundation pit construction area based on the three-dimensional model;
[0116] The data storage module is configured to store all data in Json format;
[0117] A real scene layout module, which is configured to perform real scene layout processing on oblique photography data, including data mapping, data import and export, and editing;
[0118] The historical comparison and analysis module is configured to compare the oblique photography data of different periods, calculate the changes in the engineering quantity in different periods, conduct multi-dimensional statistical analysis, and generate analysis reports;
[0119] The historical playback module is configured to manage viewpoint information, perform automatic screenshots and image carousels, and generate a comic-strip-style project progress report.
[0120] Specifically, in one embodiment of the present invention, the data processing module processes the original two-dimensional data and the original oblique photography data in the same manner. Figure 2 As shown in the figure, the processing flow of the original two-dimensional data is:
[0121] S1: Get the original 2D data file;
[0122] S2: Call the interface program to read the group code and associated value of the file to obtain the group data;
[0123] S3: traverse and analyze the group data to determine whether the current group data is the end of the file or the analysis result is an error. If so, end the processing flow; if not, execute step S4;
[0124] S4: Identify the segment names of the group data, including the HEADER segment, CLASSES segment, TABLES segment, ENTITES segment, and OBJECTS segment;
[0125] S5: Obtaining the format information of the file according to the segment name recognition result, including the layer line type, coloring information, attribute information of the construction unit and the unit entity segment name;
[0126] S6: calling the interface program to sort out the format information of the file to obtain sorted two-dimensional data;
[0127] S7: Identify the source coordinate system of the two-dimensional data, define the target coordinate system, create source and target system objects, and set projection parameters;
[0128] S8: Create a converter based on the source coordinate system and the target coordinate system, perform coordinate transformation on each coordinate point of the two-dimensional data, and obtain three-dimensional spatiotemporal data.
[0129] Specifically, this embodiment designs a graphic conversion engine. In the data production and export stage, the key fields are designed in detail. According to the key data required for measurement operations, such as slope data, horse road data, and opening surface data, the foundation pit excavation operation data is exported in a unified data format according to the construction dam section area. After identifying the segment names of the HEADER segment, CLASSES segment, TABLES segment, ENTITES segment, and OBJECTS segment, the layer line type, coloring information, attribute information of the construction unit, and the unit entity segment name of the current data can be known. In the above manner, a time-space information data with a sorted and standardized format can be obtained.
[0130] Let's take a specific example to illustrate:
[0131] First, the graphic conversion interface is designed to support a variety of common 2D data formats, such as DXF, DWG, and SHP. After selecting the file, the system will perform a preliminary verification to check the integrity and readability of the file to ensure that the file is not damaged and the format is correct. If the file verification fails, the system will prompt the user to reselect a valid file.
[0132] According to the selected file format, the system will call the corresponding file reading interface. For example, for DXF files, the DXF parsing library is used. The system will read the file content line by line and identify the group code and corresponding value of each data group. This information will be temporarily stored in a data structure in memory, such as a list or dictionary, for subsequent processing. During the reading process, the system will record the basic structural information of the file to prepare for subsequent paragraph recognition.
[0133] When traversing the group data, two aspects are mainly checked during the traversal process: one is to determine whether the file end mark is encountered, and the other is to check whether there are obvious errors or abnormal values in the data. If the file end mark is encountered or a serious error is found, the system will immediately stop processing and give a corresponding prompt. Otherwise, the system will continue to execute the subsequent steps.
[0134] A dictionary containing various segment names (such as HEADER, CLASSES, TABLES, ENTITIES, and OBJECTS) is predefined. Then, the group data is traversed to identify the start and end positions of these predefined segments. Whenever a segment name identifier is encountered, the system records the starting position of the segment and classifies the subsequent data into the segment until the next segment name identifier or the end of the file is encountered. In this way, the original data is classified into different segments.
[0135] Parse each segment identified in S4 separately. Extract the layer line type information from the HEADER segment; obtain the shading information from the TABLES segment; extract the attribute information of the construction unit from the ENTITIES segment; and obtain the unit entity segment name from the OBJECTS segment. This information will be organized into a structured format, such as a dictionary or a specialized data class, to facilitate subsequent processing and query. In this step, special attention should be paid to key data related to the quantity calculation, such as slope data, bridleway data, and opening surface data.
[0136] Based on the format information extracted from S5, a new data structure is created to store the sorted 2D data. This process includes reorganization and standardization of the data. Redundant information is then removed, leaving only the key data necessary for subsequent engineering quantity calculation and analysis. The data is organized into a unified format for subsequent processing. In addition, the data needs to be sorted and organized according to the construction dam section area.
[0137] Analyze the coordinate system information in the HEADER segment and identify the source coordinate system of the original data. If it cannot be directly identified, use the default coordinate system. Then, define the target coordinate system, such as selecting a common geographic coordinate system. Set the detailed parameters of the source coordinate system and the target coordinate system, including the ellipsoid, projection mode, central meridian, etc.
[0138] Use a coordinate transformation library (such as PROJ.4) to create a coordinate transformer. This transformer is based on the source and target coordinate system parameters defined in S7. Then, traverse each coordinate point in the combed 2D data. For each point, the system calls the transformer to perform coordinate transformation, converting the original coordinates to the coordinates in the target coordinate system. The transformed coordinates are stored as a new 3D spatiotemporal data structure together with the original attribute information.
[0139] Specifically, in one embodiment of the present invention, the process of feature line processing is:
[0140] A1. Import high-precision DEM data as reference terrain, display and compare the characteristic lines with the reference terrain, and identify and adjust abnormal points in the characteristic lines based on the reference terrain;
[0141] Specifically, import high-precision DEM (digital elevation model) data to ensure that its accuracy and coverage meet project requirements. Import existing feature line data, which represent key contours in the project, such as excavation boundaries, fill boundaries, etc.
[0142] Use 3D visualization tools to display DEM and feature line data simultaneously. Use different colors or styles to distinguish DEM and feature lines for easy visual comparison.
[0143] Compare the elevation of each point on the feature line with the elevation of the corresponding DEM location. Set a threshold and mark the points where the elevation difference exceeds the threshold as potential outliers.
[0144] For the marked outlier points, the elevation of the outlier points is adjusted according to the DEM data.
[0145] A2. Correct the 3D model according to the adjusted feature lines and verify the corrected 3D model. If all points are close to the ground, the correction is completed and the optimized 3D model is output. If there are still points that are not close to the ground, return to step A1 for further adjustment.
[0146] Update the relevant parts of the 3D model based on the adjusted feature lines. Verify that all key points in the corrected model are in a ground-attached state. Calculate the vertical distance between each point and the DEM surface, and mark the points that are beyond the allowable error range.
[0147] If all points are close to the ground (i.e., the deviation from the DEM is within an acceptable range), the correction is considered successful. Output the optimized 3D model, including the updated feature lines and related terrain data. If there are still points that are not close to the ground, the system will mark them. Return to step A1 and make adjustments to these points that do not meet the standard.
[0148] In actual construction, due to interference from factors such as bridges, there are deviations in the automatic picking of model locations. Directly using it for subsequent calculations is not in compliance with the specifications and requires manual processing of the model. This embodiment semi-automatically picks up and replaces the dirty data (mainly elevation data) of the corresponding points to ensure that all endpoints of the excavation surface are in a ground-contact state.
[0149] Specifically, Figure 3 As shown, in one embodiment of the present invention, the process of engineering quantity calculation is:
[0150] B1. Determine whether to draw the foundation pit construction area according to the scene. If yes, execute step B2. If no, execute step B3.
[0151] B2. Select a drawing method, which is polygon or rectangle. Use the drawing method to draw the foundation pit construction area, determine the maximum and minimum elevations of the foundation pit construction area, and determine whether it is in edit mode. If so, perform elevation correction and then execute step B4. If not, directly execute step B4.
[0152] B3, import the excavation surface data, read the foundation pit construction area, and determine whether it is in edit mode. If so, determine the maximum and minimum elevations of the foundation pit construction area and execute step B4. If not, directly execute step B4;
[0153] B4. Configure the parameters of the calculation algorithm and input the information of the 3D model;
[0154] B5. Calculate the engineering quantity of the foundation pit construction area, where the engineering quantity is quantified and calculated based on the volume enclosed by the boundary of the foundation pit construction area.
[0155] Specifically, the scene is divided into manually drawing a single face or importing a CAD excavation face. In this embodiment, the rectangular drawing method is mainly designed for the actual shape of the material yard or the slag yard. The bottom edge of the rectangular drawing is different from the bottom edge preset of the polygonal drawing method. The reason is that the rectangle is drawn in the three-dimensional engine. All the edges generated by pulling the box are polygons that have been reconstructed afterwards. The four corner points cannot be determined at the beginning. The user can set the orientation of the bottom edge by adjusting the map orientation to due north and selecting the corresponding drop-down box option next to it.
[0156] In this embodiment, step B5 includes:
[0157] B51. Draw polygons according to the boundary of the foundation pit construction area and divide the polygons into Thiessen polygons;
[0158] B52. Combined with DEM data, the foundation pit construction area is divided into triangular grids to obtain multiple grid units;
[0159] B53, traverse each grid unit and calculate the engineering quantity of the grid unit according to the DEM data, including the surface area of the working surface, the excavation volume and the filling volume;
[0160] B54. Add up the cut volume and fill volume, and take the sum of the surface areas of all grid cells as the total surface area;
[0161] B55. For each Thiessen polygon, determine all the grid cells it contains, and add up the excavation volume, fill volume and surface area as the engineering quantity of the Thiessen polygon;
[0162] B56. Output the overall project volume of the foundation pit construction area.
[0163] Wherein, step B53 comprises:
[0164] B531. The grid unit is approximately a triangular prism, which is composed of a triangular prism and a quadrangular pyramid. The base of the triangular prism is a triangle with an area of S, and the top of the quadrangular pyramid is a ground triangle with the elevation values of its three vertices being a, b, and c respectively.
[0165] B532. Set the design elevation to h and calculate the elevation difference between the three vertices and the design elevation:
[0166] Δh1=ah
[0167] Δh2=bh
[0168] Δh3=ch
[0169] B533. Calculate the average elevation difference Δh based on the elevation difference between the three vertices and the design elevation avg :
[0170] Δh avg =(Δh1+Δh2+Δh3) / 3
[0171] B534. Calculate the volume V of the grid cell based on the average elevation difference and area S:
[0172] V=S×Δh avg
[0173] B535. Determine whether V is the excavation volume or the filling volume:
[0174] If Δh avg >0, V is positive, which represents the excavation volume;
[0175] If Δh avg <0, then V is negative, which represents the fill volume.
[0176] In actual engineering, due to the limitations of measurement and calculation accuracy, Δh avg =0 is extremely unlikely to occur. If it does occur, the corresponding grid cell will be ignored and not calculated.
[0177] In this embodiment, the structure of the grid unit is as follows: Figure 4 As shown, when calculating the engineering quantity, the polygon is divided into an infinite number of very small triangles, and then each small triangle is traversed to determine whether each triangle should be dug out or filled.
[0178] Specifically, in this embodiment, the elevation values of a, b, and c are pixel elevations extracted from oblique photography, and the calculated V has a certain objectivity. The design elevation (h) refers to the final ground height specified in the engineering design drawings.
[0179] Specifically, Figure 5As shown, in one embodiment of the present invention, in the real scene layout module, the process of mapping the oblique photography data is as follows:
[0180] C1. Open the image layer of the oblique photography data, and at the same time open the DXF file containing the design drawing, and read the graphic elements in the file; graphic elements are points, lines, surfaces, etc.
[0181] C2. Read the preset projection configuration information from the system configuration to keep the coordinate system consistent;
[0182] C3, determine whether to perform ground processing, if so, adjust the elevation of the graphic elements according to the image layer, if not, set all graphic elements to a unified absolute elevation;
[0183] If you choose to process close to the ground, extract elevation information from the oblique photography image, interpolate the corresponding elevation value from the image for each node of the CAD graphic element, update the Z value of the CAD graphic element, and achieve a close to the ground effect.
[0184] If the ground-attached processing is not performed, an interface is provided for the user to input a uniform absolute elevation value, and the Z value of all graphic elements is set to the uniform elevation.
[0185] C4. Determine whether there are opening faces and road line signs. If so, use the existing signs as attribute data. If not, add new opening faces and road line signs as attribute data.
[0186] Analyze CAD graphic elements and automatically identify openings and road lines. Check whether there are predefined identifiers or attributes to represent openings and road lines.
[0187] If there are signs, extract them and convert them into structured attribute data. Design the attribute data schema, including information such as type (opening surface / road line), ID, length, etc.
[0188] Provide interactive tools to let users manually mark open faces and road lines if no identifiers exist. Automatically generate unique identifiers and allow users to enter additional information.
[0189] Associate the identification information with the corresponding graphic elements to establish a one-to-one mapping relationship.
[0190] C5. Generate a data list of graphic elements and attribute data;
[0191] Design a unified data structure that contains the geometric information and attribute data of the graphic elements. Use a suitable data format, such as GeoJSON or a custom JSON structure. Traverse all CAD graphic elements and convert them to the selected data structure format. Include processing of geometry types such as points, lines, and surfaces. Associate previously processed attribute data such as opening surfaces and road line markings with the geometric data. Create a list containing all processed data.
[0192] C6. Upload the data list to the system or export it to the local computer:
[0193] If uploaded to the system, the data list will be saved in the data storage module; and the data will be organized and indexed in the data storage module.
[0194] If exported to local, the data list will be exported as a GeoJSON format file.
[0195] Specifically, Figure 6 As shown, in one embodiment of the present invention, in the real scene lofting module, the process of data importing, exporting and editing is as follows:
[0196] D1. Open the image layer of oblique photography data;
[0197] D2. Read the data list in the data storage module online, or import the data list in GeoJSON format file; parse the GeoJSON file and convert the GeoJSON data into the internal data structure.
[0198] D3. Process the data list according to user needs. If the user needs are for element editing, execute step D4; if the user needs are for partial uploading, execute step D5; if the user needs are for selective export, execute step D6; if the user needs are for post-export processing, execute step D7; specifically, display the user operation interface, implement conditional judgment logic, and jump to the corresponding processing flow according to the user's selection.
[0199] D4. According to user needs, the selected graphic element is adjusted for interference points and then replaced and saved, or the selected graphic element is set as an opening surface, or the selected graphic element is set as a road line;
[0200] The process of interference point adjustment is:
[0201] D41, select a graphic element as an original interference element, draw an interference surface based on the original interference element, and use the data points on the interference surface as interference points;
[0202] D42, modeling based on the interference points as an interference model;
[0203] Use an interpolation algorithm (such as Kriging) to create a continuous surface based on the interference points. Generate a 3D mesh model to represent the interference area.
[0204] D43, obtaining the elevation of the location in the interference model;
[0205] Identify the points on the interference model and extract the elevation information of these points.
[0206] D44. Compare the elevation of the location with the DEM data to determine whether the interference point needs to be calibrated. If necessary, calibrate the interference point and return to step D42. If not, output the interference point as a new interference element, update the graphic element and replace and save it.
[0207] Automatically compare the elevation of the location with the DEM data. Set a threshold to determine whether calibration is needed. If calibration is required, provide automatic and manual calibration options. Update graphic elements and save the changes.
[0208] D5. Upload part of the data in the data list according to user needs; develop a multi-selection tool to allow users to select the data items to be uploaded. Implement block upload and support large file processing. Display upload progress and status.
[0209] D6. According to user needs, export the data list as a whole, or select target graphic elements to export, or select and export images on the image layer;
[0210] 1. Provide an option to export all data in one click. 2. Develop a selection tool that allows the user to specify the graphical elements to be exported. 3. Implement an interactive area selection tool. Identify all the elements within the selected area.
[0211] D7. After exporting the data list, locate, show, hide, edit or delete it according to user needs.
[0212] Specifically, the positioning function enables quick positioning of specified elements; the display and hiding function provides display / hide control at the layer or element level; the editing function enables geometric shape modification; the deletion function provides single or batch deletion of elements, as well as a confirmation mechanism and undo option for deletion operations.
[0213] In this embodiment, data import, export and editing, based on the editing function, support the modification of the exported standard GeoJSON format files, and support the following functions: 1) customized export of unified elevation layer of foundation pit horse trails, 2) customized export of foundation pit slopes, 3) export of foundation pit working surfaces, and 4) export of foundation pit road lines.
[0214] Specifically, in one embodiment of the present invention, the historical comparison and analysis module is a function that uses oblique images of different time periods to calculate data such as excavation and filling volume, excavation / filling area, maximum / minimum elevation, and excavation / filling height of each construction site on the ground. By providing the foundation pit excavation reference surface and the opening line of the construction range, the calculation and preservation of parameters such as the foundation pit excavation workload, area, height, maximum and minimum elevation of any selected area of oblique photography layer data are provided. This function supports the calculation and statistical analysis of parameters such as foundation pit workload in different construction sites and different time intervals. This function can be used to efficiently export report information, effectively improving the efficiency of collecting, processing, and analyzing reporting information on foundation pit excavation workload.
[0215] Specifically, in one embodiment of the present invention, the historical playback module is for the playback of historical images of a certain key area, showing the image changes of the water conservancy and hydropower foundation pit excavation project, providing image data of different periods and different parts, showing the construction image, and forming a comprehensive analysis function of the project progress report. In this functional design, it is necessary to meet the following requirements: 1) save the viewpoint information list for the viewpoint and range of the pre-specified position, 2) provide automatic screenshots of the excavation surface under oblique photography for different dates, generate image sets according to the specifications of this software and upload them to the specified location of the server for storage, 3) provide an image carousel interface, the user selects the project location and start and end time, and can perform image carousel, 4) provide a comic report display / output function, the user first selects the location, start and end time, and displays the image screenshots in batches on the screen, and supports exporting to various report documents or report table files, so as to meet the user's use needs in the comprehensive statistical analysis scenario.
[0216] Specifically, in one embodiment of the present invention, the data storage module uses Json as the data sharing and communication method for this module and multiple modules. The scalability of Json's fields can ensure the best NoSQL storage, laying the foundation for storing the data available for comprehensive statistical analysis after drawing in MongoDB; in addition, the uniqueness of Json's Key can ensure that the stored graphic elements are not repeated; Json can store the three major categories of scene graphic attributes, calculation results, and rendering parameters, ensuring the error-free and omission-free loading of the comprehensive statistical analysis function group.
[0217] Also, see Figure 7 The present invention also provides a water conservancy and hydropower foundation pit excavation project management method based on spatiotemporal information data, the method is applied to any of the above-mentioned systems, and the method comprises the following steps:
[0218] Processing and converting the original two-dimensional data and the original oblique photography data to obtain three-dimensional spatiotemporal data and oblique photography data;
[0219] A 3D model is established based on 3D spatiotemporal data or oblique photography data, and feature line processing is performed in a semi-supervised manner to optimize the 3D model;
[0220] Manage the files of oblique photography data, define the scope lines and viewing angles of the above-ground engineering parts, calculate the engineering quantities of the foundation pit excavation construction area in each period based on the 3D model, and generate engineering quantity reports;
[0221] Carry out real-scene layout processing on oblique photography data, including data mapping, data import and export, and editing;
[0222] Compare oblique photography data from different periods, calculate changes in engineering quantities in different periods, conduct multi-dimensional statistical analysis, and generate analysis reports;
[0223] Manage viewpoint information, take automatic screenshots and image carousels, and generate comic-strip-style project progress reports;
[0224] All data is stored in Json format.
[0225] Specifically, a specific embodiment is used for illustration:
[0226] 1. Data Processing
[0227] First, the original two-dimensional data and the original oblique photography data are obtained. The original two-dimensional data and the original oblique photography data are processed in the same way. Take the processing of the original two-dimensional data as an example:
[0228] Read the group code and associated value of the file to obtain the group data. Perform traversal analysis on the group data to identify the file structure. Perform segment name recognition, including HEADER, CLASSES, TABLES, ENTITES, and OBJECTS segments. Extract format information, such as layer line type, shading information, construction unit attribute information, etc. Sort the format information to obtain sorted two-dimensional data. Identify the source coordinate system, define the target coordinate system, and set the projection parameters. Create a coordinate converter and perform conversion on each coordinate point to obtain three-dimensional spatiotemporal data.
[0229] 2.3D model establishment and optimization
[0230] Next, a 3D model is built based on the 3D spatiotemporal data or oblique photography data, and feature line processing is performed:
[0231] Import high-precision DEM data as reference terrain. Compare feature lines with reference terrain, identify and adjust abnormal points. Correct the 3D model according to the adjusted feature lines. Verify the corrected model to ensure that all points are close to the ground. If necessary, repeat the adjustment process until the requirements are met. Output the optimized 3D model.
[0232] 3. Quantity Calculation and Management
[0233] Define the foundation pit construction area: select the drawing method (polygon or rectangle) or import the excavation surface data according to the scene; determine the maximum and minimum elevations of the foundation pit construction area. Configure the calculation algorithm parameters and enter the 3D model information. Calculate the engineering quantity: divide the foundation pit construction area into Thiessen polygons; divide the triangle grid based on DEM data; calculate the engineering quantity of each grid unit (surface area, excavation volume, fill volume); cumulatively calculate the total engineering quantity and the engineering quantity of each Thiessen polygon. Generate an engineering quantity report.
[0234] 4. Real scene layout processing
[0235] Data map: open the image layer and DXF file of oblique photography data; unify the coordinate system; perform ground processing or set a unified absolute elevation; process the opening surface and road line identification; generate a data list and upload or export it. Data import, export and editing: read or import data lists; perform feature editing, partial upload, selective export or post-export processing according to user needs; adjust interference points.
[0236] V. Historical Comparative Analysis
[0237] Collect oblique photography data from different periods. Compare and analyze data from different periods: calculate changes in engineering volume; conduct multi-dimensional statistical analysis (such as progress, efficiency, cost, etc.). Generate analysis reports, including charts, trend analysis, etc.
[0238] 6. Visualization of project progress
[0239] Manage viewpoint information: define key viewing angles and observation points; set viewpoint switching order and time interval. Automatic screenshot: automatically capture scene images according to the set viewpoint information; set screenshot resolution and format. Image carousel: organize captured images in chronological order; set carousel effect and duration. Generate comic book-style project progress report: combine carousel images with project progress data; add text descriptions and progress indicators; generate visual progress reports.
[0240] 7. Data Storage
[0241] Convert all processed data into JSON format. Design JSON structure, including metadata, geometry data, attribute data, etc. Implement data serialization and deserialization. Establish data index to optimize query efficiency. Implement data version control and backup mechanism.
[0242] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the protection scope of the present invention.
Claims
1. A water conservancy and hydropower foundation pit excavation project management system based on spatiotemporal information data, characterized in that: include: A data processing module configured to process and convert the original two-dimensional data and the original oblique photography data to obtain three-dimensional spatiotemporal data and oblique photography data; A feature processing module configured to establish a three-dimensional model based on the three-dimensional spatiotemporal data or the oblique photography data, and perform feature line processing in a semi-supervised manner to optimize the three-dimensional model; A quantity calculation module configured to calculate the quantity of the foundation pit construction area based on the three-dimensional model; The data storage module is configured to store all data in Json format; A real scene layout module, which is configured to perform real scene layout processing on oblique photography data, including data mapping, data import and export, and editing; The historical comparison and analysis module is configured to compare the oblique photography data of different periods, calculate the changes in the engineering quantity in different periods, conduct multi-dimensional statistical analysis, and generate analysis reports; The historical playback module is configured to manage viewpoint information, perform automatic screenshots and image carousels, and generate a comic-strip-style project progress report.
2. The water conservancy and hydropower foundation pit excavation project management system based on spatiotemporal information data as claimed in claim 1, characterized in that: The data processing module processes the original two-dimensional data and the original oblique photography data in the same way. The processing flow of the original two-dimensional data is as follows: S1: Get the original 2D data file; S2: Call the interface program to read the group code and associated value of the file to obtain the group data; S3: traverse and analyze the group data to determine whether the current group data is the end of the file or the analysis result is an error. If so, end the processing flow; if not, execute step S4; S4: Identify the segment names of the group data, including the HEADER segment, CLASSES segment, TABLES segment, ENTITES segment, and OBJECTS segment; S5: Obtaining the format information of the file according to the segment name recognition result, including the layer line type, coloring information, attribute information of the construction unit and the unit entity segment name; S6: calling the interface program to sort out the format information of the file to obtain sorted two-dimensional data; S7: Identify the source coordinate system of the two-dimensional data, define the target coordinate system, create source and target system objects, and set projection parameters; S8: Create a converter based on the source coordinate system and the target coordinate system, perform coordinate transformation on each coordinate point of the two-dimensional data, and obtain three-dimensional spatiotemporal data.
3. The water conservancy and hydropower foundation pit excavation project management system based on spatiotemporal information data as claimed in claim 1, characterized in that: The process of feature line processing is: A1. Import high-precision DEM data as reference terrain, display and compare the characteristic lines with the reference terrain, and identify and adjust abnormal points in the characteristic lines based on the reference terrain; A2. Correct the 3D model according to the adjusted feature lines and verify the corrected 3D model. If all points are close to the ground, the correction is completed and the optimized 3D model is output. If there are still points that are not close to the ground, return to step A1 for further adjustment.
4. The water conservancy and hydropower foundation pit excavation project management system based on spatiotemporal information data as claimed in claim 1, characterized in that: The process of engineering quantity calculation is: B1. Determine whether to draw the foundation pit construction area according to the scene. If yes, execute step B2. If no, execute step B3. B2. Select a drawing method, which is polygon or rectangle. Use the drawing method to draw the foundation pit construction area, determine the maximum and minimum elevations of the foundation pit construction area, and determine whether it is in edit mode. If so, perform elevation correction and then execute step B4. If not, directly execute step B4. B3, import the excavation surface data, read the foundation pit construction area, and determine whether it is in edit mode. If so, determine the maximum and minimum elevations of the foundation pit construction area and execute step B4. If not, directly execute step B4; B4. Configure the parameters of the calculation algorithm and input the information of the 3D model; B5. Calculate the engineering quantity of the foundation pit construction area, where the engineering quantity is quantified and calculated based on the volume enclosed by the boundary of the foundation pit construction area.
5. The water conservancy and hydropower foundation pit excavation project management system based on spatiotemporal information data as claimed in claim 4, characterized in that: Step B5 includes: B51. Draw polygons according to the boundary of the foundation pit construction area and divide the polygons into Thiessen polygons; B52. Combined with DEM data, the foundation pit construction area is divided into triangular grids to obtain multiple grid units; B53, traverse each grid unit and calculate the engineering quantity of the grid unit according to the DEM data, including the surface area of the working surface, the excavation volume and the filling volume; B54. Add up the cut volume and fill volume, and take the sum of the surface areas of all grid cells as the total surface area; B55. For each Thiessen polygon, determine all the grid cells it contains, and add up the excavation volume, fill volume and surface area as the engineering quantity of the Thiessen polygon; B56. Output the overall project volume of the foundation pit construction area.
6. The water conservancy and hydropower foundation pit excavation project management system based on spatiotemporal information data as claimed in claim 5, characterized in that: Step B53 includes: B531. The grid unit is approximately a triangular prism, which is composed of a triangular prism and a quadrangular pyramid. The base of the triangular prism is a triangle with an area of S, and the top of the quadrangular pyramid is a ground triangle with the elevation values of its three vertices being a, b, and c respectively. B532. Set the design elevation to h and calculate the elevation difference between the three vertices and the design elevation: Δh1=ah Δh2=bh Δh3=ch B533. Calculate the average elevation difference Δh based on the elevation difference between the three vertices and the design elevation avg : Dh avg =(Δh1+Δh2+Δh3) / 3 B534. Calculate the volume V of the grid cell based on the average elevation difference and area S: V=S×Δh avg B535. Determine whether V is the excavation volume or the filling volume: If Δh avg >0, V is positive, which represents the excavation volume; If Δh avg <0, V is negative, which represents the fill volume.
7. The water conservancy and hydropower foundation pit excavation project management system based on spatiotemporal information data as claimed in claim 1, characterized in that: In the real scene layout module, the process of mapping the oblique photography data is as follows: C1. Open the image layer of the oblique photography data and the DXF file containing the design graphics at the same time, and read the graphic elements in the file; C2. Read the preset projection configuration information from the system configuration to keep the coordinate system consistent; C3, determine whether to perform ground processing, if so, adjust the elevation of the graphic elements according to the image layer, if not, set all graphic elements to a unified absolute elevation; C4. Determine whether there are opening faces and road line signs. If so, use the existing signs as attribute data. If not, add new opening faces and road line signs as attribute data. C5. Generate a data list of graphic elements and attribute data; C6. Upload the data list to the system or export it to the local computer: If uploaded to the system, the data list will be saved in the data storage module; If exported to local, the data list will be exported as a GeoJSON format file.
8. The water conservancy and hydropower foundation pit excavation project management system based on spatiotemporal information data as claimed in claim 7, characterized in that: In the real scene stakeout module, the process of data import, export and editing is as follows: D1. Open the image layer of oblique photography data; D2. Read the data list in the data storage module online, or import the data list in GeoJSON format file; D3, processing the data list according to user needs, if the user needs to edit the elements, then executing step D4, if the user needs to upload part of the data, then executing step D5, if the user needs to selectively export, then executing step D6, if the user needs to process after export, then executing step D7; D4. According to user needs, the interference points of the selected graphic elements are adjusted and then replaced and saved, or the selected graphic elements are set as opening surfaces, or the selected graphic elements are set as road lines; D5. Upload part of the data in the data list according to user needs; D6. According to user needs, export the data list as a whole, or select target graphic elements to export, or select and export images on the image layer; D7. After exporting the data list, locate, show, hide, edit or delete it according to user needs.
9. The water conservancy and hydropower foundation pit excavation project management system based on spatiotemporal information data as claimed in claim 8, characterized in that: In step D4, the process of adjusting the interference point is as follows: D41, select a graphic element as an original interference element, draw an interference surface based on the original interference element, and use the data points on the interference surface as interference points; D42, modeling based on the interference points as an interference model; D43, obtaining the elevation of the location in the interference model; D44. Compare the elevation of the location with the DEM data to determine whether the interference point needs to be calibrated. If necessary, calibrate the interference point and return to step D42. If not, output the interference point as a new interference element, update the graphic element and replace and save it.
10. A water conservancy and hydropower foundation pit excavation project management method based on spatiotemporal information data, characterized in that: The method is applied to the system according to any one of claims 1 to 9, and the method comprises the following steps: Processing and converting the original two-dimensional data and the original oblique photography data to obtain three-dimensional spatiotemporal data and oblique photography data; A 3D model is established based on 3D spatiotemporal data or oblique photography data, and feature line processing is performed in a semi-supervised manner to optimize the 3D model; Manage the files of oblique photography data, define the scope lines and viewing angles of the above-ground engineering parts, calculate the engineering quantities of the foundation pit excavation construction area in each period based on the 3D model, and generate engineering quantity reports; Carry out real-scene layout processing on oblique photography data, including data mapping, data import and export, and editing; Compare oblique photography data from different periods, calculate changes in engineering quantities in different periods, conduct multi-dimensional statistical analysis, and generate analysis reports; Manage viewpoint information, take automatic screenshots and image carousels, and generate comic-strip-style project progress reports; All data is stored in Json format.
Citation Information
Patent Citations
Urban three-dimensional integrated pipe network information management method
CN108416842A
Earthwork measurement and calculation system based on unmanned aerial vehicle surveying and mapping technology
CN110440759A
Rapid engineering calculation method and system for dome dam used in water conservancy and hydropower engineering, and medium
CN110990923A
Roadbed earthwork automatic quantity calculation method and platform based on oblique photography technology
CN114255270A
Method and system for measuring and calculating earthwork volume change of strip mine based on laser point cloud
CN116012613A
Cited By
Geological BIM modeling and engineering quantity calculation method based on point cloud sparse optimization
CN119850858A
Earthwork balancing method based on discrete elevation point and free-form surface creation technology
CN120338987A