The invention discloses a stress balance and vibration-reduction disaster-preventing high bridge
pier structure of a highway high and
steep slope and a construction method. Through pre-stressed anchorcables (6), a horizontal thrust effect of a slope body on the open-air
pile-foundation high bridge
pier structure is eliminated; through inner arch
system beams (5), prestress and slope horizontal thrust disperse acting stress of the
pile-foundation high bridge
pier structure; through vibration-reduction rubber gaskets (7), the flexibility of the bridge pier structure is improved, and structure ineffectiveness and slope disasters, caused by vibration, of the
pile-foundation bridge pier structure and the slope body are reduced. The construction method includes the steps that materials are prepared and made, a pile foundation is constructed, drilling is conducted, the inner arch
system beams (5) are constructed, and
casting tensioning of the pre-stressed anchor cables (6) and bridge pier constructing are conducted, and the construction method is simple. The stress balance and vibration-reduction disaster-preventing high bridge pier structure of the highway high and
steep slope and the construction method have broad application prospects for reinforcement, vibration reduction, disaster prevention and others of the pile-foundation high bridge pier structure of the high and steep slopeof
transportation infrastructure in
ravine terrains of a mountainous area.