The utility model belongs to the technical field of collapsible foundation reinforcement, and relates to a three-dimensional
water seepage prevention and treatment structure for gully high-fill
engineering, which comprises an original slope body, a fill body, a gully, a plurality of staggered underground soil
layers and opposite water-resisting
layers which penetrate through the
ground level of the original slope body along the height direction, and isolation
cushion layers which are attached to the gully and are arranged at the bottom and the side direction of the gully, the filling body and the original slope body are isolated on the inner side and the outer side of the isolation
cushion layer through the isolation
cushion layer. The isolation cushion layer sequentially comprises a cushion soil layer, a
fine grain layer and a coarse grain layer in the thickness direction from inside to outside. The three-dimensional anti-seepage structure is adopted, the hidden danger of
water seepage of the filling body is eliminated, it is guaranteed that the filling body is not threatened by surrounding
water seepage, and the problem that after filling is completed, slope water seepage causes large-area differential settlement of a filling project, and project operation is difficult is effectively solved; therefore, the quality of a filling project is guaranteed, and large-area differential settlement in the later period is avoided.