Three-dimensional water seepage prevention and control method for gully high fill engineering

Through three-dimensional anti-seepage design and graded pebble structure, the uneven settlement caused by lateral seepage of the slope body after the valley filling in the filling project is solved, ensuring the stability and economic benefits of the filling project.

CN118958345APending Publication Date: 2024-11-15XI AN JIAOTONG UNIV
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411326502.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-23
Publication Date
2024-11-15

AI Technical Summary

Technical Problem

The existing fill project ignores the lateral seepage problem of slope body after the grotto fill is completed, resulting in large-scale uneven settlement of the fill project, and the blind groove design is complex, high cost and poor durability.

Method used

Adopt a three-dimensional anti-seepage design. By determining the seepage location and path of the slope body, the graded pebble structure at the bottom of the trench is designed to ensure smooth water leakage, avoid artificially designed blind drainage ditches, and design lateral anti-seepage measures, combined with meteorological data and geological surveys. Make sure the filler is not wet with water.

Benefits of technology

It effectively solves the problem of uneven settlement caused by water seepage in the filling project, ensures the long-term and stable operation of the filling project, reduces costs and improves durability.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118958345A_ABST
    Figure CN118958345A_ABST
Patent Text Reader

Abstract

The invention belongs to the technical field of collapsible foundation reinforcement, and relates to a gully high-fill engineering three-dimensional water seepage prevention and control method which comprises the steps that the water seepage position of a slope is determined; determining the underground water seepage field condition of the filled valley, a possible water seepage path and the position of a specific exposure point; calculating the supplied rainfall, determining the actual catchment area of the stratum, basically determining the annual catchment amount of the slope stratum, and measuring the volume of lateral incoming water at different positions; determining the designed height and range of a slope body water seepage material layer; the graded broken stone thickness of the bottom of the valley is designed; a three-dimensional anti-seepage design method is adopted, the hidden danger of water seepage of the filling body is eliminated, it is ensured that the filling body is not threatened by surrounding water seepage, and the problem that after filling is completed, slope water seepage causes large-area differential settlement of a filling project, and project operation is difficult is effectively solved; therefore, the filling engineering quality is guaranteed, large-area differential settlement in the later period is avoided, and obvious economic benefits and social benefits are brought.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of collapsible foundation reinforcement and relates to a three-dimensional water seepage prevention and control method for a gully high fill project. Background Art

[0002] The three-dimensional anti-seepage technology of fill body is based on the correct understanding of the environmental changes caused by the filling in the valley area, and the consideration and design of the anti-seepage problem of the fill body with the concept of dynamic thinking. It is also based on the in-depth analysis of previous fill seepage cases and the study of water penetration mechanism, and accurately grasps the seepage problem induced by the change of the original valley environment caused by the filling. In addition, the concept of time scale is introduced into the anti-seepage design, focusing on the characteristics of slope seepage over a long span in the rainy season, and paying attention to the accumulation and time effect of seepage. When determining the possible seepage location, according to the lithology change of the slope, the difference in the permeability coefficient of the rock layer is used to determine the existence of the impermeable layer, and the possible infiltration path of the seepage in the slope is analyzed in combination with the distribution of the slope structure, and the possible seepage location of the slope is accurately determined. Combined with the historical meteorological data of the site, the maximum seepage volume is estimated, and on this basis, the layout and design of anti-seepage measures are considered.

[0003] However, currently, the design and specification requirements are usually focused on the collection and drainage of seepage water at the bottom of the ditch, and the seepage water on the slope is not considered. At the same time, the designers have insufficient understanding of the environmental changes caused by filling, especially in arid areas. The geological survey report surveys and surveys have confirmed that the valleys are dry all year round or the valleys with no groundwater are not correctly understood. They do not realize that the environmental changes caused by filling will lead to groundwater seepage on the slope after construction. Therefore, the lateral water inflow of the slope is basically ignored in the anti-seepage design of the valley filling body, which is also one of the main reasons for the frequent accidents after filling engineering.

[0004] Moreover, the existing blind ditch design draws on the architecture of building water supply and drainage, without considering the valley topography, rock properties, valley seepage and other characteristics. Water may not be able to flow smoothly into the pipeline. In addition, the blind ditch is complex to set up, costly, and has durability issues.

[0005] Therefore, a method is needed to solve the above technical problems by preventing large-scale uneven settlement of the filling project caused by water seepage in the slope after the filling is completed. Summary of the invention

[0006] Aiming at the problem of large-scale uneven settlement of the filling project due to water seepage in the slope after the filling is completed, the present invention has made systematic innovations in design concepts, cognition of water seepage in the filling project and specific setting of blind ditches. Commonly used graded pebbles are arranged in the form of paving. In order to make the seepage water flow out of the ditch bottom quickly and smoothly, the original slope surface is used to collect the seepage water, and the seepage water is allowed to flow out naturally along the ditch bottom. Only the water flow channel at the bottom of the ditch is properly dredged, and no drainage blind ditch is artificially designed. This better solves the anti-seepage problem around the filling and ensures the long-term safe operation of the filling project.

[0007] The present invention can well solve the lateral seepage problem of the original valley slope of high fill. By setting up three-dimensional anti-seepage measures, the lateral seepage of the slope is transported to the bottom of the ditch to prevent the fill body from being soaked by water, thereby ensuring the stability of the fill project and completely solving the anti-seepage problem of the fill body.

[0008] The technical solution adopted by the present invention to solve the technical problem is: a three-dimensional water seepage prevention and control method for gully high fill engineering, comprising the following steps:

[0009] Step S1: determine the seepage position of the slope;

[0010] Step S2: Determine the groundwater infiltration field conditions, possible infiltration paths and specific outcrop locations in the valley after filling;

[0011] Step S3: Calculate the rainfall received for recharge, determine the actual catchment area of ​​the stratum, basically determine the annual catchment of the slope stratum, and measure the volume of lateral water at different locations;

[0012] Step S4: Determine the height and range of the slope seepage material layer design;

[0013] Step S5: Design the thickness of graded gravel at the bottom of the valley.

[0014] Preferably, the step S1 of determining the slope seepage position specifically includes:

[0015] Vertical direction: Determine the existence of a relative impermeable layer based on the layered permeability coefficient of the slope strata. Obtain the permeability coefficient data of each rock stratum through the indoor experimental method of the layered permeability coefficient of the stratum. The permeability coefficient of the stratum is distinguished by the order of 10ˉ2 to determine whether there is an impermeable layer. If the permeability coefficient of the lower stratum is less than that of the upper stratum by 10ˉ2, the layer is considered to be an impermeable layer.

[0016] Alternatively, the existence of aquicludes can be determined by lithological differences, with mudstone and muddy shale both being aquicludes;

[0017] Horizontal direction: Determine the possible water outlet locations on the slope based on the distribution of faults and fissures. Tensile faults and vertical fissures are both locations of lateral water inflow, and broken zones where mudstone and mud cement are developed are locations where water seepage is exposed.

[0018] Preferably, the step S2 specifically includes:

[0019] Step S2-1, according to the geological survey report of the filling area, the basic geological conditions are understood, and the basic geological conditions include: stratum distribution, lithology characteristics, permeability characteristics, fault and fracture development;

[0020] Step S2-2: hydrogeological survey to understand the occurrence conditions, water level dynamics, and recharge and discharge relationship of groundwater;

[0021] Step S2-3, obtaining the groundwater infiltration field conditions, possible infiltration paths and specific outcrop locations of the valley after filling.

[0022] Preferably, the step S3 specifically includes:

[0023] Step S3-1, calculating the rainfall receiving recharge based on meteorological data and the exposed area of ​​the slope stratum after filling, and the calculation of the catchment area is not limited to the vicinity of the filling;

[0024] Step S3-2, determining the actual catchment area of ​​the stratum based on the regional hydrological data, and basically determining the annual catchment of the slope stratum;

[0025] Step S3-3, measuring the volume of lateral water at different positions;

[0026] Step S3-4, the amount of water that infiltrates and recharges groundwater is Pr=P×α, where Pr is the amount of water that infiltrates and recharges groundwater, P is the precipitation, and α is the precipitation infiltration recharge coefficient. α is between 0 and 1, and has different values ​​in different regions.

[0027] Preferably, the step S4 specifically includes:

[0028] Step S4-1, determining the seepage height: according to the groundwater level and the seepage path, determine the maximum height that the seepage may reach, consider the rainfall intensity and frequency, and the drainage capacity of the slope, and comprehensively determine the design height of the seepage material layer;

[0029] Step S4-2, determine the seepage range: Combined with the geological survey results, determine the diffusion range of the seepage in the slope, consider the permeability of the slope and rainfall intensity factors, reasonably delineate the area affected by the seepage, and comprehensively determine the design range of the seepage material layer;

[0030] Step S4-3, the permeable material layer is laid to cover the seepage points in the fill as a principle to ensure that the seepage of the slope after filling cannot enter the fill body, and the width of the permeable material layer should be thickened in the area near the permeable fault.

[0031] Preferably, in step S5, according to the amount of water, 25# and 30# aggregates are selected for the bottom, and the bottom thickness is not less than 50 cm. 17# aggregates are selected for the second layer of crushed stone, and the thickness is not less than 50 cm. The aggregate material is hard stone and is not easily weathered when exposed to water. The thickness of the lateral anti-seepage stone wall is not less than 1 meter, and the aggregate grading is designed as 25#. The layout of the lateral anti-seepage stone wall follows the slope shape.

[0032] The beneficial effects of the present invention are:

[0033] The present invention is based on the actual situation of changes in the environment of the fill valley, adopts a three-dimensional anti-seepage design method, eliminates the hidden danger of water seepage in the fill body, ensures that the fill body is not threatened by water seepage all around, and effectively avoids the problem of large-scale uneven settlement of the fill project caused by slope seepage after the completion of the fill, which causes difficulties in the operation of the project; therefore, the present invention ensures the quality of the fill project, avoids large-scale uneven settlement in the later stage, and brings obvious economic and social benefits. BRIEF DESCRIPTION OF THE DRAWINGS

[0034] Figure 1 It is a flow chart of a three-dimensional water seepage prevention method for gully high fill engineering of the present invention;

[0035] Figure 2 is a cross-sectional schematic diagram of the present invention;

[0036] Figure 3 It is a schematic diagram of the grading of the bottom of the valley of the present invention. DETAILED DESCRIPTION

[0037] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the relevant technologies in the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0038] refer to Figures 1 to 3 The gully fill body three-dimensional anti-seepage engineering design method of this embodiment includes the following steps:

[0039] 1. Determine the seepage location of the slope.

[0040] Vertical direction:

[0041] Ⅰ: Determine the existence of a relative impermeable layer based on the layered permeability coefficient of the slope strata. In this embodiment, the permeability coefficient data of each rock stratum is obtained through an indoor experimental method of the layered permeability coefficient of the strata. The method includes:

[0042] ① Collect rock samples, use a double-tube or triple-tube core sampler, and use a drilling machine to take core samples to reduce disturbance to the samples and ensure the integrity and representativeness of the samples. Collect core samples from each stratum and ensure that they are sealed and preserved as soon as possible after sampling to prevent the samples from losing water or being contaminated during transportation. Use a core cutter to cut the core samples into experimental samples of specified sizes. The size of the sample is 5 cm in diameter and about 10 cm in height for permeability coefficient determination. Soak the cut samples in deionized water to ensure that the samples are fully saturated. The time for saturation treatment depends on the porosity and permeability of the sample, usually 24-48 hours.

[0043] ②Permeability coefficient test. The experimental instruments used in this experiment are constant head permeameter and variable head permeameter. The constant head permeameter is used to test samples with higher permeability (such as sandstone). It is suitable for samples with better permeability and can continuously supply water and maintain a constant head difference. The variable head permeameter is used to test samples with lower permeability (such as mudstone). It is suitable for samples with poor permeability. The permeability coefficient is calculated by measuring the change of head over time. The permeability test system includes a water source, a constant pressure device, a pressure gauge, a flow meter, and a time measurement device to ensure the precise control of water flow and pressure during the experiment. The saturated sample is installed in the permeameter to ensure good sealing between the sample and the instrument to prevent lateral seepage from affecting the experimental results; then select a constant head or variable head permeameter according to the permeability of the sample, and set the initial head difference and water flow direction. When conducting a constant head experiment, a constant head difference is continuously applied to the sample, the water flow and time passing through the sample are recorded, and the permeability coefficient is calculated according to Darcy's law. When conducting a variable head experiment, the change of head over time is recorded, and the permeability coefficient is calculated by the formula. For low osmotic pressure samples, it may take longer to reach steady state.

[0044] Finally, in order to ensure the accuracy of the data, multiple experiments should be conducted on each sample, and the average value should be taken as the final permeability coefficient. The permeability coefficient k is calculated based on Darcy's law:

[0045]

[0046] Where Q is the amount of water passing through the sample; L is the length of the sample; A is the cross-sectional area of ​​the sample; ΔH is the head difference; and t is the seepage time. Compare the permeability coefficients of the samples in each layer and find the permeability coefficient between 10 -2 If the permeability of the lower layer is 10 less than that of the upper layer, -2 This layer is considered as an impermeable layer.

[0047] ③ Verification experiment. Repeat the permeability test on the suspected aquiclude to verify the consistency of the results. Measure the porosity, density and clay content of the sample to further verify the effectiveness of the aquiclude.

[0048] Ⅱ: The existence of aquiclude can also be determined by differences in lithology. Mudstone and mudstone shale are both aquicludes.

[0049] Horizontal direction:

[0050] Determine the possible water outlet location of the slope based on the distribution of faults and fissures, and record the occurrence of rock formations, the location, azimuth, inclination and other parameters of faults and fissures through on-site geological mapping. Tensile faults usually show obvious dislocation and tension of rock formations. Tensile fractures may exist on the fault plane, and fault mud or debris may be filled locally. Tensile faults have a steeper inclination and are usually excellent channels for groundwater.

[0051] The distribution of different tensile faults is related to the position of the slope. When they are parallel or nearly parallel, groundwater usually flows laterally along the fault plane and outcrops in the low-lying part of the slope. The water outlet is usually located in a lower place on the upper wall (the rising side) of the fault. In this case, the anti-seepage design should focus on the low-lying area on the upper wall of the fault. In a specific implementation case, a tensile fault parallel to the slope was found in a hillside. Geological mapping shows that the fault may form a groundwater outcrop in the low-lying area at the bottom of the hillside. Based on this information, the anti-seepage design needs to consider setting up lateral anti-seepage measures in the low-lying area at the bottom of the slope, such as anti-seepage walls or diversion ditches; when the tensile fault passes through the slope vertically or obliquely, the groundwater flows laterally along the fault plane and may outcrop where the fault passes through the slope. In this case, the water outlet is usually near the footwall (the sinking side) of the fault. Special attention should be paid to the intersection of the fault and the slope, which is the most likely area for groundwater seepage. In a specific implementation case, a tensile fault was found on the slope that was oblique to the slope surface. On-site observations showed that groundwater flowed along the fault surface and emerged at the intersection of the faults in the middle of the slope. In order to prevent lateral seepage, effective anti-seepage measures should be set up at the water outlet location.

[0052] Vertical fissures usually present vertical or nearly vertical crack structures. The degree of development, width and type of filling of the fissures have a great influence on the flow of groundwater. Unfilled fissures or fissures with only a small amount of filling are usually the main channels for lateral water inflow. In areas with dense fissure development, groundwater flows laterally along the vertical fissure system and emerges in low-lying areas where the fissures converge. The water outflow location is mostly located at the intersection of the fissure development area or the low-lying area. For this case, the anti-seepage design should focus on these intersections or the low-lying areas of the fissure-dense area. In a specific implementation case, a vertical fissure-dense area was found in the middle of a slope, where the fissures were upright and intersected with each other. The results of the seepage test showed that this intersection was the main outburst location of groundwater. In the anti-seepage design, it should be considered to set up anti-seepage diversion measures below the intersection of the fissures or in the low-lying areas of the slope. Although isolated vertical fissures are not as significant as dense areas, if the fissures run through the slope and connect with the aquifer, they may also become local seepage channels. The water outlet is usually below the fracture or at the foot of the slope. In a specific implementation case, an isolated vertical fracture was found on the slope, and lithology analysis showed that the fracture penetrated an underground aquifer. Since the fracture is located in the middle of the slope and extends downward to the foot of the slope, an anti-seepage barrier needs to be set near the foot of the slope in the anti-seepage design to prevent water from flowing into the lower part of the slope through the fracture.

[0053] Broken zones where mudstone and mud cement are developed are the locations where water seeps out. Mudstone is usually the main component of the aquiclude due to its low permeability. However, in the mudstone broken zone, mud cement is subjected to tensile stress or tectonic movement, which may form channels with higher permeability. The identification of these broken zones can be completed through on-site core observation, geological mapping and microscopic lithofacies analysis. In a specific implementation case, an obvious broken zone was found in the mudstone layer in the valley. Lithofacies analysis showed that mud cement was developed in the broken zone, and there were many cracks, which were easy to become seepage channels. After field surveys, it was found that groundwater was exposed at the intersection of the broken zone and the slope. The anti-seepage design needs to reinforce the broken zone, such as grouting or setting up an anti-seepage isolation layer. If the mud cement in the broken zone is highly developed and in contact with the groundwater source, the water may flow along these softer and more permeable channels and be exposed downstream of the broken zone or on the slope. Usually, the water outlet is located in the area where the slope and the broken zone meet. In the specific implementation case, the geological radar detection of slope interruption showed that the broken zone with developed mud cement extended along the slope. After hydrological analysis, it was confirmed that the broken zone was an important seepage channel, and the water flow was exposed below the slope. When designing anti-seepage measures, it is necessary to set up anti-seepage curtains or other blocking measures along the broken zone to prevent groundwater from seeping out of the broken zone.

[0054] 2. Determine the groundwater infiltration field conditions, possible seepage paths and specific outcrop locations in the valley after filling.

[0055] ⑴According to the geological survey report of the filling area, understand the basic geological conditions such as stratum distribution, lithology characteristics, permeability characteristics, fault and fissure development. First, determine the stratum structure and lithology distribution in the filling area through the geological survey report. The stratum distribution can reveal the thickness, occurrence and relationship of different underground rock layers, which is the basis for determining the groundwater infiltration path. Drawing geological profiles and comparative analysis can show the distribution, thickness, occurrence and relationship of underground strata in detail. Obtain core samples from each borehole and their analysis results, including information such as the depth, type, thickness, porosity, etc. of the rock layer. Record the geological characteristics of the samples, including the color, structure, texture, etc. of the rock. Determine the line to draw the profile (usually through the line connecting the boreholes or other geological features). Mark the depth data of each borehole on the profile, and draw the position of each rock layer according to the actual depth. Then, based on the borehole data, draw the outline of each rock layer on the profile, and mark the thickness and boundary of the rock layer. Finally, mark the name, thickness, type, color and other information of each rock layer to ensure that the characteristics of different rock layers are clearly displayed. Collect profiles of different boreholes and their related data to ensure that detailed information of all boreholes is included. Display the profiles of different boreholes side by side to facilitate the comparison of stratigraphic differences between different boreholes. Mark the stratigraphic differences between different boreholes on the comparison chart, such as changes in thickness, changes in rock type, etc. Compare the stratigraphic sequence of different boreholes to identify the continuity and change trend of the strata; analyze the structural relationship of the strata in different boreholes, such as whether there are faults, folds and other factors that affect the distribution of strata; identify the change trend of rock strata, such as changes in rock thickness, rock inclination, etc., and infer the groundwater infiltration path.

[0056] Analyze the permeability of each lithology layer and identify which layers are permeable layers (such as sandstone and conglomerate) and which are impermeable layers (such as mudstone and shale). The distribution of permeable layers and impermeable layers directly affects the flow path and infiltration field characteristics of groundwater. Record the number, size, orientation and extension of faults and fissures. In particular, tensile faults and vertical fissures are usually the main lateral flow channels for groundwater due to their good water conductivity.

[0057] ⑵ Collect or conduct hydrogeological surveys to understand the occurrence conditions, water level dynamics, recharge and discharge relationships of groundwater. The occurrence conditions of groundwater are related to geological conditions, hydrogeological characteristics and water quality characteristics: water level dynamics are obtained through water level measurement, and the actual water level affected by factors such as precipitation and water withdrawal is measured regularly through monitoring to understand the changes in groundwater levels. Recharge can penetrate into the groundwater layer through the soil to increase groundwater reserves. Or surface water bodies such as rivers, lakes, and wetlands penetrate into the groundwater layer. Groundwater is discharged to the surface in the form of springs and river outcrops. Or activities such as pumping and water withdrawal cause the groundwater level to drop, reducing groundwater reserves. The balance between groundwater recharge and discharge determines the sustainable use of groundwater.

[0058] Finally, the groundwater infiltration field conditions, possible seepage paths and specific outcrop locations of the valley after filling were obtained.

[0059] 3. Calculate the rainfall received based on meteorological data and the exposed area of ​​the slope strata after filling. The calculation of the catchment area is not limited to the vicinity of the fill. The actual catchment area of ​​the strata should be determined based on regional hydrological data, the annual catchment volume of the slope strata should be basically determined, and the volume of lateral water at different locations should be calculated.

[0060] The peak flow formula is Qp=ψ×Sp×F, where Qp is the design peak flow (m3 / s); ψ is the runoff coefficient; Sp is the hourly rainfall intensity (mm / h); and F is the catchment area (m2).

[0061] ① Calculate the amount of rainfall receiving recharge

[0062] First determine the exposed area after filling. After the filling project is completed, use measurement tools (such as total station, GPS, etc.) to measure the exposed area after filling. Then determine the actual exposed area of ​​the filling area based on the engineering design drawings or topographic maps. If there are detailed terrain change data on the drawings, these data can be used directly to calculate the exposed area. Secondly, collect rainfall data provided by the meteorological station, including rainfall intensity (Sp) and total rainfall. Use rainfall intensity and exposed area to calculate the amount of rainfall received by the filling area.

[0063] Received rainfall = rainfall intensity (Sp) × exposed area (F)

[0064] The rainfall intensity Sp is usually expressed in mm / h, and the exposed area F is expressed in m 2 express.

[0065] ②Calculate the catchment area

[0066] By consulting regional hydrological data, we can obtain information about precipitation, topography, and geology in the area. The calculation is not limited to the vicinity of the fill, but also includes the catchment area of ​​the entire area. GIS technology can be used to make more accurate calculations of the catchment area. Use regional maps to analyze the boundaries of the catchment area and calculate the area of ​​the entire catchment area. Determine the catchment area through the basin division method, distribute the precipitation to each part of the basin, and calculate the actual catchment area.

[0067] ③Basically determine the annual water collection capacity of the slope strata

[0068] The annual water volume is calculated by the total rainfall and the water catchment area:

[0069] Annual water catchment = total annual rainfall × catchment area

[0070] And considering the groundwater recharge efficiency and stratum characteristics, the annual water collection volume is adjusted to obtain the actual groundwater recharge volume.

[0071] ④ Calculate the volume of lateral water at different locations

[0072] Q p =ψ×S p ×F

[0073] Q p is the design peak flow (m 3 / s), ψ is the runoff coefficient (usually depends on the permeability of the surface and vegetation cover, etc.), S p is the hourly rainfall intensity (mm / h), F is the catchment area (m 2 ). The runoff coefficient ψ is determined based on geological surveys and soil type, and common runoff coefficients range from 0.3 to 0.7.

[0074] Calculate the lateral water flow at different locations: Calculate the volume of lateral water flow based on the catchment area and rainfall intensity at different locations. Adjust the F value and S in the formula p value to adapt to the actual conditions of different locations.

[0075] 4. Determine the height and range of the slope seepage material layer design.

[0076] ① Seepage height design: Measure the groundwater level through drilling and monitoring wells, and record the changes in groundwater levels in different seasons and rainfall conditions. Determine the highest groundwater level that may be reached based on historical groundwater level data; use a groundwater flow model (such as MODFLOW) to simulate the flow path of groundwater, consider the flow direction, speed and permeability characteristics of groundwater, calculate the path that groundwater may pass through the slope, and determine the area affected by seepage; obtain regional rainfall intensity data, including rainfall frequency and intensity, and calculate the amount of seepage under different rainfall conditions. Evaluate the drainage capacity of the slope, including the drainage system, permeability and seepage rate of the slope. Determine the design height of the seepage layer based on the groundwater level, seepage path, rainfall intensity and drainage capacity. The seepage height should usually be higher than the maximum possible groundwater level to prevent seepage from entering the fill.

[0077] ② Design of seepage range: Collect geological survey data, including soil type, rock structure and geological structure. Record data such as permeability and porosity in the slope. According to the geological survey results, determine the diffusion range of seepage in the slope, calculate the area of ​​seepage diffusion, and make adjustments based on the permeability of the soil and the rock structure; evaluate the permeability of the slope, including the permeability of the soil and the permeability characteristics of the rock layer, and determine the permeability of different areas in the slope. Consider the impact of rainfall intensity on the diffusion of seepage, calculate the diffusion range of seepage according to rainfall intensity, and delineate the area affected by seepage based on permeability, rainfall intensity and geological survey results.

[0078] ③ Design of seepage material layer: Find out the possible exposure points of water seepage in the fill body. When designing the seepage material layer, ensure that these exposure points are covered in the seepage material layer. Determine the thickness and width of the seepage material layer to ensure that water cannot enter the fill body. The thickness of the seepage material layer should be higher than the possible maximum seepage height. Identify the permeable fault area based on the geological survey results. These areas are usually highly permeable and require special attention. In the area near the permeable fault, increase the width and thickness of the permeable material layer to effectively prevent water seepage. Ensure that the design of the permeable material layer can handle the amount of water seepage in the permeable fault area.

[0079] 5. Design the thickness of graded gravel at the bottom of the valley. According to the amount of water, the bottom can be selected from 25# and 30# granular materials, with a thickness of no less than 50cm. The second layer of gravel is graded with 17# granular materials, with a thickness of 50cm. The granular material is hard stone and is not easily weathered when exposed to water. The thickness of the lateral anti-seepage stone wall is considered to be 1 meter, and the granular material is designed as 25#. The layout of the lateral anti-seepage stone wall follows the shape of the slope. During the construction process, the thickness of the stone wall is not easy to accurately grasp, and it is not less than 1 meter as a principle.

[0080] ① Design objectives of gravel layer:

[0081] (1) Anti-seepage function: prevent groundwater flow and infiltration, and protect the fill from water erosion.

[0082] (2) Support function: Provide a stable foundation, support the superstructure, and prevent settlement and displacement.

[0083] ② Design layering

[0084] The material selection for the bottom gravel layer: 25# and 30# graded gravel. The particle size range of 25# gravel is larger, which is suitable for the main load-bearing and anti-seepage functions at the bottom. The particle size of 30# gravel is smaller, which enhances the adhesion between layers and improves the anti-seepage performance. The thickness of the bottom gravel layer should be no less than 50cm, and hard and water-resistant and chemically resistant stones should be selected to ensure long-term stability.

[0085] The second crushed stone layer should be made of 17# crushed stone. Smaller particle size is conducive to increasing the filling effect between layers and further improving the anti-seepage ability. The crushed stone layer is 50cm thick, the same as the bottom layer, and hard stone should be used to avoid weathering.

[0086] ③Design of lateral anti-seepage stone wall

[0087] Prevent groundwater from affecting the stability of the fill through lateral infiltration, enhance the stability of the slope, and reduce water erosion.

[0088] The thickness of the anti-seepage stone wall is designed to be 1 meter, and the thickness of the stone wall is not less than 1 meter to ensure effective anti-seepage effect. Use 25# crushed stone, the larger particle size helps to improve the overall stability and anti-seepage performance of the stone wall. Arrange the anti-seepage stone wall according to the shape of the slope and actual needs, and arrange it along the side of the slope to ensure that it can effectively prevent water penetration. During the construction process, the actual thickness of the stone wall should be no less than 1 meter as a principle. Since the construction is difficult to control accurately, special attention should be paid to the actual control of the thickness during the construction process.

[0089] ④Specific design implementation

[0090] Gravel layer laying:

[0091] The bottom layer of crushed stone is first laid with 25# and 30# crushed stone, with a thickness of not less than 50cm. Ensure that the bottom layer of crushed stone is evenly distributed and avoid gaps. The second layer of crushed stone is laid with 50cm thick 17# crushed stone on the bottom layer of crushed stone, ensuring good bonding between the layers.

[0092] Construction of anti-seepage stone wall:

[0093] Arrange lateral anti-seepage stone walls according to the slope shape to ensure that all potential seepage paths are covered. During construction, pay attention to check the thickness of the stone wall to ensure that it is not less than 1 meter, and make adjustments if necessary.

[0094] Example

[0095] Embodiment 1: A coal mine resettlement project, the filling depth is 25 meters, the filling ditch is a natural gully composed of the main gully and the secondary gully, the gully slopes on both sides are broken rock layers, mostly mudstone and mud sandstone, the mudstone is covered with silty loess, and the filling material is also silt. The gully is a seasonal river, dry and waterless except in the rainy season, but the gully has a large catchment area, the catchment watershed is more than 100 meters high, and there is occasionally a small amount of seepage at the bottom of the gully. According to the topographic analysis, there is a possibility of seepage on both sides of the gully after filling, so a three-dimensional waterproof design is adopted. There is a fault approximately perpendicular to the gully at the rear edge of the fill, that is, at the confluence of the secondary gully and the main gully on the southeast side of the gully. The bottom of the secondary gully is higher than the fill level. The runoff in the rainy season will be directly discharged, and the infiltrated part will infiltrate into the main gully, that is, the fill body along the broken zone. Therefore, the diversion measures for seepage here are the focus of the three-dimensional anti-seepage of the fill body. Similarly, at the junction of bedrock and fill in the upstream of the gully, the bedrock is layered mudstone with developed fissures and different seepage locations, so vertical anti-seepage measures must be taken to ensure that no water seeps into the fill. The northwest side of the gully is a single ridge landform with a small rainwater catchment area, and the other side is a deep ditch with smooth drainage. Therefore, the anti-seepage design here only sets a seepage granular layer at the bottom of the gully.

[0096] Example 2: A high fill project of a valley airport is an ultra-high fill body with a maximum depth of 74 meters and a fill volume of more than 24 million cubic meters, involving multiple gullies. The upper part of the site is loess with a maximum thickness of more than 40 meters, and the lower part is mudstone and mud sandstone interlayers. The rock layer is generally inclined to the southeast, and the gully is waterless all year round. Through the analysis of the topography and landforms around the site, the lithology and hydrogeological characteristics of the strata, after the filling, the source of water seepage in the site is mainly in the argillaceous mudstone layer below the loess cover layer. Therefore, the vertical anti-seepage measures are mainly arranged on both sides of the gully slope where the mudstone is exposed. According to the distribution characteristics of the fault fracture zone of the site, there is a nearly north-south fracture zone in the middle of the fill depth. The fracture zone is gray-green thin mudstone, which is easily weathered when exposed to water. The thickness is more than 5-10 meters and has good water-proof performance. According to on-site analysis, this fracture zone is the largest seepage layer of the fill body and the key part of the anti-seepage of the entire fill project. The anti-seepage measures here adopt a strengthened design to increase the thickness of the granular layer to ensure that the seepage is quickly drained. The assessment of the possibility of seepage in this fracture zone is both critical and accurate, which was verified in the second rainy season of construction. After the thickness of the fill operation is greater than the height here, a large amount of seepage is found in the fracture zone, which verifies the necessity of three-dimensional anti-seepage design from the side.

[0097] In summary, the present invention adopts a three-dimensional anti-seepage design method based on the actual situation of changes in the fill valley environment to eliminate the hidden danger of water seepage in the fill body, ensure that the fill body is not threatened by water seepage on all sides, and effectively avoid the problem of large-scale uneven settlement of the fill project caused by slope seepage after the completion of the fill, which causes difficulties in the operation of the project; the present invention ensures the quality of the fill project, avoids large-scale uneven settlement in the later stage, and brings obvious economic and social benefits. Therefore, the present invention has broad application prospects.

[0098] It should be emphasized that the above are only preferred embodiments of the present invention and do not limit the present invention in any form. Any simple modifications, equivalent changes and modifications made to the above embodiments based on the technical essence of the present invention are still within the scope of the technical solution of the present invention.

Claims

1. A three-dimensional water seepage prevention method for gully high fill engineering, characterized in that: The following steps are involved: Step S1: determine the seepage position of the slope; Step S2: Determine the groundwater infiltration field conditions, possible infiltration paths and specific outcrop locations in the valley after filling; Step S3: Calculate the rainfall received for recharge, determine the actual catchment area of ​​the stratum, basically determine the annual catchment of the slope stratum, and measure the volume of lateral water at different locations; Step S4: Determine the height and range of the slope seepage material layer design; Step S5: Design the thickness of graded gravel at the bottom of the valley.

2. A three-dimensional water seepage prevention method for gully high fill engineering according to claim 1, characterized in that: The step S1 of determining the slope seepage position specifically includes: Vertical direction: Determine the existence of a relative impermeable layer based on the layered permeability coefficient of the slope strata. Obtain the permeability coefficient data of each rock stratum through the indoor experimental method of the layered permeability coefficient of the stratum. The permeability coefficient of the stratum is distinguished by the order of 10ˉ2 to determine whether there is an impermeable layer. If the permeability coefficient of the lower stratum is less than that of the upper stratum by 10ˉ2, the layer is considered to be an impermeable layer. Alternatively, the existence of aquicludes can be determined by lithological differences, with mudstone and muddy shale both being aquicludes; Horizontal direction: Determine the possible water outlet locations on the slope based on the distribution of faults and fissures. Tensile faults and vertical fissures are both locations of lateral water inflow, and broken zones where mudstone and mud cement are developed are locations where water seepage is exposed.

3. A three-dimensional water seepage prevention method for gully high fill engineering according to claim 1, characterized in that: The step S2 specifically includes: Step S2-1, according to the geological survey report of the filling area, the basic geological conditions are understood, and the basic geological conditions include: stratum distribution, lithology characteristics, permeability characteristics, fault and fracture development; Step S2-2: hydrogeological survey to understand the occurrence conditions, water level dynamics, and recharge and discharge relationship of groundwater; Step S2-3, obtaining the groundwater infiltration field conditions, possible infiltration paths and specific outcrop locations of the valley after filling.

4. A three-dimensional water seepage prevention method for gully high fill engineering according to claim 1, characterized in that: The step S3 specifically includes: Step S3-1, calculating the rainfall receiving recharge based on meteorological data and the exposed area of ​​the slope stratum after filling, and the calculation of the catchment area is not limited to the vicinity of the filling; Step S3-2, determining the actual catchment area of ​​the stratum based on the regional hydrological data, and basically determining the annual catchment of the slope stratum; Step S3-3, measuring the volume of lateral water at different positions; Step S3-4, the amount of water that infiltrates and recharges groundwater is Pr=P×α, where Pr is the amount of water that infiltrates and recharges groundwater, P is the precipitation, and α is the precipitation infiltration recharge coefficient, and α takes a value between 0 and 1.

5. A three-dimensional water seepage prevention method for gully high fill engineering according to claim 1, characterized in that: The step S4 specifically includes: Step S4-1, determining the seepage height: according to the groundwater level and the seepage path, determine the maximum height that the seepage may reach, consider the rainfall intensity and frequency, and the drainage capacity of the slope, and comprehensively determine the design height of the seepage material layer; Step S4-2, determine the seepage range: Combined with the geological survey results, determine the diffusion range of the seepage in the slope, consider the permeability of the slope and rainfall intensity factors, reasonably delineate the area affected by the seepage, and comprehensively determine the design range of the seepage material layer; Step S4-3, the permeable material layer is laid to cover the seepage points in the fill as a principle to ensure that the seepage of the slope after filling cannot enter the fill body, and the width of the permeable material layer should be thickened in the area near the permeable fault.

6. A three-dimensional water seepage prevention method for gully high fill engineering according to claim 1, characterized in that: In step S5, according to the amount of water, 25# and 30# aggregates are selected for the bottom, and the bottom thickness is not less than 50 cm. The second layer of crushed stone is selected for 17# aggregates, and the thickness is not less than 50 cm. The aggregate material is hard stone; the thickness of the lateral anti-seepage stone wall is not less than 1 meter, and the aggregate grading is designed according to 25#. The layout of the lateral anti-seepage stone wall follows the slope shape.