Stress balance and vibration-reduction disaster-preventing high bridge pier structure of highway high and steep slope and construction method

A technology for high and steep slopes and high bridge piers, which is applied in the direction of foundation structure engineering, excavation, bridges, etc., and can solve the problem of failure to properly solve the impact of slope soil pressure on the action of pile foundations and high bridge piers, incomplete understanding of action characteristics, ecological damage, etc. question

Active Publication Date: 2019-03-22
CHINA FIRST HIGHWAY ENG +1
View PDF8 Cites 9 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

However, accidents caused by the failure of anti-sliding structures and the instability of pile-based high bridge piers are frequent. At the same time, the construction of anti-sliding piles and other structures cannot avoid the excavation of the hillside, which seriously damages the ecology and does no

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Stress balance and vibration-reduction disaster-preventing high bridge pier structure of highway high and steep slope and construction method
  • Stress balance and vibration-reduction disaster-preventing high bridge pier structure of highway high and steep slope and construction method
  • Stress balance and vibration-reduction disaster-preventing high bridge pier structure of highway high and steep slope and construction method

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0033] Such as figure 1 Shown, the high steep slope stress balance of the present invention and vibration reduction and disaster prevention prestressed anchor cable pile foundation high pier structure and construction method are composed of left pile foundation 1, left pier 2, right pile foundation 3, right pier 4. Inner arch tie beam 5, prestressed anchor cable 6, vibration damping rubber pad 7.

[0034] Such as figure 1 As shown, the left pile foundation 1 and the right pile foundation 3 are located below the rock and soil layer of the slope, the pile ends of the left pile foundation 1 and the right pile foundation 3 are all located on the bearing layer in the mountain, and the pile top is located at There are 9 places on the slope surface interface. At the slope surface interface 9, the left pile foundation 1 and the left pier 2, the right pile foundation 3 and the right pier 4 are connected as a whole through integrated pouring of reinforced concrete, and the pile cores ...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

PropertyMeasurementUnit
Thicknessaaaaaaaaaa
Login to view more

Abstract

The invention discloses a stress balance and vibration-reduction disaster-preventing high bridge pier structure of a highway high and steep slope and a construction method. Through pre-stressed anchorcables (6), a horizontal thrust effect of a slope body on the open-air pile-foundation high bridge pier structure is eliminated; through inner arch system beams (5), prestress and slope horizontal thrust disperse acting stress of the pile-foundation high bridge pier structure; through vibration-reduction rubber gaskets (7), the flexibility of the bridge pier structure is improved, and structure ineffectiveness and slope disasters, caused by vibration, of the pile-foundation bridge pier structure and the slope body are reduced. The construction method includes the steps that materials are prepared and made, a pile foundation is constructed, drilling is conducted, the inner arch system beams (5) are constructed, and casting tensioning of the pre-stressed anchor cables (6) and bridge pier constructing are conducted, and the construction method is simple. The stress balance and vibration-reduction disaster-preventing high bridge pier structure of the highway high and steep slope and the construction method have broad application prospects for reinforcement, vibration reduction, disaster prevention and others of the pile-foundation high bridge pier structure of the high and steep slopeof transportation infrastructure in ravine terrains of a mountainous area.

Description

technical field [0001] The invention relates to the field of slope retaining and high bridge pier bridge engineering, in particular to a high bridge pier structure and construction method for high and steep highway slope stress balance, vibration reduction and disaster prevention prestressed anchor cable pile foundation. Background technique [0002] The pile foundation and pier structure of highway bridges has good applicability in the construction of transportation infrastructure in mountainous areas with large terrain fluctuations, especially in the dense vertical and horizontal areas of ravines and hills. In recent years, with the increase of investment in infrastructure and the improvement and improvement of the theoretical and technological level of my country's construction industry, pile-based high bridge pier structures located on various rock geological slopes have emerged continuously, and at the same time, due to slope failures, The engineering accidents caused by...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
IPC IPC(8): E01D19/00E01D19/02E02D27/12E02D17/20E01D21/00
CPCE01D19/00E01D19/02E01D21/00E02D17/20E02D27/12
Inventor 乔瑞军江翮高鹏飞余亦勤杨果林张沛然
Owner CHINA FIRST HIGHWAY ENG
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products