Time display device

By designing the inclined timing track and ball delivery mechanism in the popular science exhibit device, combined with the guide ball and ball blocking components, the dynamic display of the timing ball is realized, which solves the problem of insufficient stimulation of interest in the existing device, demonstrates the ingenious layout of the mechanical mechanism, and achieves more Good scientific education effect.

CN118865798AActive Publication Date: 2024-10-29HEFEI & EXHIBITION TECH

Patent Information

Application Number
CN202410898819.8
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-05
Publication Date
2024-10-29
Estimated Expiration
2044-07-05

AI Technical Summary

Technical Problem

Existing timing science exhibition devices have limited effectiveness in stimulating public scientific interest and enlightening scientific knowledge, and lack innovation and attraction.

Method used

A time display device is designed, which uses an inclined distribution timing track and a ball delivery mechanism. It realizes the distribution and release of the timing balls through the ball guide assembly and the ball blocking and release assembly to display the time. It adopts a mechanical structure layout and does not require system program control. The automation of the device and the clever display of the mechanical mechanism are increased.

Benefits of technology

It achieves a more novel and effective time display, stimulates the public's scientific interest, achieves better scientific enlightenment effects, and demonstrates the operation of the timing mechanism through the ingenious layout of the mechanical structure, enhancing the appeal of popular science education.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118865798A_ABST
    Figure CN118865798A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of science popularization exhibits, in particular to a time display device. The device comprises at least two timing tracks which are obliquely distributed and a ball conveying mechanism which continuously conveys one timing ball to the timing tracks at equal time difference, the timing tracks are arranged from top to bottom in sequence, and the number of the timing balls stored in the timing tracks represents the time unit number of the current timing tracks. The ball inlet end of each timing track is provided with a ball guide assembly used for distributing timing balls, the uppermost or lowermost timing track serves as a priority track for preferentially distributing the timing balls to the ball guide assembly, the vertical direction from the priority track to the adjacent timing track serves as the advance direction, and when the number of the timing balls in the priority track reaches the set number, the timing balls are distributed to the priority track. And the timing balls extend to the timing tracks of which the number of the first timing balls distributed to the advanced direction does not reach the set number. On the basis of reasonable structure and accurate and reliable action, the public science interest is further stimulated, and finally a better scientific enlightenment effect is achieved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of popular science exhibits, in particular to a time display device. Background Art

[0002] Popular science exhibits are scientific and vivid, and can display scientific knowledge in a vivid and vivid way. Popular science exhibits are often displayed in science and technology museums, science and education museums, etc. Through permanent and short-term exhibitions of popular science exhibits, participation, experience, interactive exhibits and auxiliary display methods, with the purpose of stimulating scientific interest and enlightening scientific concepts, popular science education is provided to the public.

[0003] The display of timekeeping science exhibits is conducive to the public's understanding of the value of time. Most of the existing timekeeping demonstration devices only enlarge the existing clock-type timers for exhibition. For example, the Chinese patent publication number CN211928899U, entitled "A clock science demonstration device", uses a simulated mechanical clock and uses transparent acrylic to display the internal mechanical mechanism of the clock. However, since this type of timing structure is relatively conventional in the existing technology, the public's desire to explore it is relatively low, and the effect of stimulating the public's scientific interest and enlightening science is average. Summary of the invention

[0004] In order to avoid and overcome the technical problems existing in the prior art, the present invention provides a time display device, which, on the basis of reasonable structure and precise and reliable operation, further stimulates the public's interest in science and ultimately achieves a better effect of enlightening science.

[0005] To achieve the above object, the present invention provides the following technical solutions:

[0006] A time display device comprises a timing track with an inclined distribution and a ball feeding mechanism for continuously feeding a timing ball toward the timing track with equal time difference, wherein the timing track is arranged as at least two timing tracks arranged in sequence from top to bottom, and the number of timing balls stored in the timing track represents the number of time units of the current timing track, and a ball guide assembly for distributing timing balls is provided at the goal end of the timing track, wherein the top or bottom timing track is used as a priority track to which the ball guide assembly preferentially distributes timing balls, and the vertical direction from the priority track to its adjacent timing track is an advanced direction, and when the number of timing balls on the priority track reaches a set number, the timing balls are distributed to the first timing track in the advanced direction whose number of timing balls does not reach the set number, and thereafter, all timing balls are released from the timing track whose number of timing balls reaches the set number.

[0007] As a further solution of the present invention: the timing track is configured as an hour track, a minute tens track and a minute units track which are sequentially arranged from top to bottom, the ball delivery end of the ball delivery mechanism is connected to the ball guide assembly via the ball delivery track, the ball guide assembly comprises a first ball guide groove and a second ball guide groove which can be sequentially arranged along the timing ball conveying direction and can swing around a horizontal axis perpendicular to the length direction of the timing track, the first ball guide groove and the second ball guide groove constitute a ball guide bridge connecting the hour track and the ball delivery track, the first ball guide groove and the second ball guide groove both have a broken bridge state and a bridged bridge state forming the ball guide bridge, and when the first ball guide groove in the ball guide bridge is in a broken bridge state, the ball delivery track is connected to the minute units track, and when the first ball guide groove and the second ball guide groove are in a bridged bridge state and a broken bridge state respectively, the ball delivery track is connected to the minute tens track.

[0008] As a further solution of the present invention: the ball guide assembly also includes a ball guide power mechanism for driving the first ball guide groove and the second ball guide groove to swing, the ball guide power mechanism includes a first drive wheel and a second drive wheel driven by a gear transmission group and performing synchronous rotation around the same horizontal axis, a first drive rod and a second drive rod that can be lifted and slid in a vertical direction are respectively arranged directly above the outer edges of the first drive wheel and the second drive wheel, six inner grooves are evenly distributed on the outer edge of the first drive wheel, and under normal circumstances, the outer edge of the first drive wheel abuts against the first drive rod to keep it rising, so that the first ball guide groove is in a broken bridge state, and rotates in any inner groove When it reaches directly below the first driving rod, the first driving rod descends so that the first ball guide groove is in a bridging state; the outer edge of the second driving wheel is provided with a top block corresponding to five inner grooves therein, and under normal circumstances, the outer edge of the second driving wheel abuts the second driving rod and keeps descending, so that the second ball guide groove rotates to the bridging state, and when any top block rotates to directly below the second driving rod, it pushes the second driving rod to rise, so that the second ball guide groove rotates to the broken bridge state; the first driving wheel and the second driving wheel are driven by a gear transmission group connected to the servo motor, and the time for driving the first driving wheel and the second driving wheel to rotate one circle at a uniform speed is 1 hour.

[0009] As a further solution of the present invention: the rod bodies of the first driving rod and the second driving rod are sleeved with guide sleeve blocks fixed to the timing track, the tops of the first driving rod and the second driving rod are horizontally bent, and the bending sections of the first driving rod and the second driving rod are respectively provided with the first driving long hole and the second driving long hole whose hole lengths are horizontally distributed, the axes of the first driving long hole and the second driving long hole are parallel to the swinging axes of the first ball guide groove and the second ball guide groove, and the first transmission column and the second transmission column, which are axially inserted into the first driving long hole and the second driving long hole, are respectively fixed on the first ball guide groove and the second ball guide groove.

[0010] As a further solution of the present invention: it also includes a ball blocking and releasing assembly, which includes a ball blocking and releasing rod that slides perpendicular to the timing track, and the ball blocking and releasing rod constrains the timing ball within the timing track. The ball blocking and releasing rod is driven by a ball releasing power group, and moves away from the timing track within a set time to release all timing balls in the timing track.

[0011] As a further solution of the present invention: the ball blocking and releasing assembly also includes a fixed seat and a rocking rod that swings around a first horizontal axis on the fixed seat, the rocking path of the rocking rod is parallel to the cross-section of the timing track, the rocking rod is in an L-shaped structure, and the vertical section of the rocking rod is connected to the ball blocking and releasing rod, and a cam that cooperates with the rocking rod is rotatably matched on a second horizontal axis on the fixed seat that is parallel to the first horizontal axis, and the flange portion of the cam abuts against the horizontal section of the rocking rod to make the rocking rod swing and drive the ball blocking and releasing rod to slide away from the timing track; an elastic member is connected between the horizontal section of the rocking rod and the fixed seat, and when the flange portion is separated from the horizontal end of the rocking rod, the elastic member drives the rocking rod to reset and swing, so that the ball blocking and releasing rod is reset to the timing track; the ball blocking power drive assembly also includes a gear set for driving the cam to rotate.

[0012] As a further solution of the present invention: a guide sleeve plate fixed to the timing track is sleeved on the body of the ball blocking and releasing rod, a transmission long hole arranged vertically along the length direction of the hole is provided on the vertical section of the rocker arm, the axis of the transmission long hole is parallel to the first horizontal axis, and a transmission slide column axially inserted into the transmission long hole is fixed on the ball blocking and releasing rod.

[0013] As a further solution of the present invention: the ball blocking and releasing rods are arranged to be used in three groups in cooperation with the hour track, the minute tens track and the minute units track, and the ball blocking power drive components are arranged to be used in three groups in cooperation with the three groups of ball blocking and releasing rods, wherein the gear groups of the three groups of ball blocking power drive components are all driven by servo motors, and the transmission ratio between the three groups of gear groups corresponding to the hour track, the minute tens track and the minute units track respectively is 72:6:1, and the time for the minute tens track to rotate one circle is 1 hour.

[0014] As a further solution of the present invention: it also includes a ball receiving track, which has a scoring end for receiving the timing ball released by the timing track, and the ball receiving track also has a ball outlet end for supplying the timing ball to the ball feeding mechanism.

[0015] As a further solution of the present invention: the ball delivery mechanism includes a vertically arranged ball delivery cylinder, the lower part of the side wall of the ball delivery cylinder is provided with a ball entry port connected to the ball outlet end of the ball collecting track, the upper part of the side wall of the ball delivery cylinder is provided with a ball outlet port, the ball outlet port constitutes the ball outlet end connected to the ball delivery track, the internal coaxial rotation of the ball delivery cylinder is matched with a spiral conveying rod for conveying the timing ball to the ball outlet port, the spiral conveying rod is driven by a gear power group connected to the servo motor, and the time for the spiral conveying rod to rotate one circle is 1 minute.

[0016] Compared with the prior art, the present invention has the following beneficial effects:

[0017] 1. The time display is realized by loading and releasing the timing ball on the timing track. Compared with the traditional pointer timing mechanism, it is more novel and more effective in stimulating the public's interest in science, and ultimately achieving a better effect of enlightening science.

[0018] 2. By utilizing the first driving wheel and the second driving wheel to rotate synchronously at a uniform speed, the first ball guide groove and the second ball guide groove in the ball guide assembly can be driven to switch to different states, thereby respectively allocating the timing ball to the hour track, the minute tens track and the minute units track. The mechanical structure layout method is adopted, and there is no need to control the rotation of the first ball guide groove and the second ball guide groove separately through the system program, which further demonstrates the ingenious arrangement of the mechanical mechanism.

[0019] 3. The three ball-blocking and ball-releasing rods are driven to release or block the three gear groups of the timing ball to rotate synchronously. By setting the transmission ratio between the three gear groups, different ball-blocking and ball-releasing rods can be driven to release the ball at specific time points. The mechanical structure layout eliminates the need to control the movement of the ball-blocking and ball-releasing rods separately through the system program, further demonstrating the ingenious arrangement of the mechanical mechanism.

[0020] 4. A ball collection track is provided to realize the recycling of the timing ball, ensuring the overall automatic operation of the device. BRIEF DESCRIPTION OF THE DRAWINGS

[0021] Figure 1 It is a structural schematic diagram of the present invention.

[0022] Figure 2 It is a schematic diagram of the three-dimensional structure of the timing track in the present invention.

[0023] Figure 3 It is a schematic diagram of the three-dimensional rear view structure of the timing track in the present invention.

[0024] Figure 4 for Figure 3 Schematic diagram of the local enlarged structure at point A.

[0025] Figure 5It is a schematic diagram of the structure of the first driving wheel and the second driving wheel in the present invention.

[0026] Figure 6 It is a structural schematic diagram of the ball blocking and releasing assembly in the present invention.

[0027] Figure 7 It is a structural schematic diagram of the ball delivery mechanism in the present invention.

[0028] Figure 8 It is a schematic diagram of the internal structure of the ball feeding cylinder in the present invention.

[0029] Fig. 9 It is a schematic diagram of the connection structure between the ball delivery track and the ball delivery mechanism in the present invention.

[0030] In the figure: 10, ball delivery mechanism; 11, ball delivery gear; 111, shaft; 12, ball delivery bevel gear; 13, ball delivery cylinder; 131, ball outlet; 132, ball inlet; 14, spiral conveying rod; 141, spiral rod gear; 20, ball collection track; 30, ball delivery track; 31, enclosure; 40, timing track; 41, hour track; 42, minute tens track; 43, minute units track; 50, ball blocking and ball release assembly; 51, ball blocking and ball release rod; 511, transmission slide column; 52, guide sleeve; 53, fixed seat; 54, swing rod; 541, transmission long hole; 55, protrusion; 56, cam; 57, gear set; 58, elastic member; 60, ball guide assembly; 61, first Ball guide groove; 611, first drive rod; 6111, first drive long hole; 612, first transmission column; 613, first drive wheel; 6131, inner groove; 62, second ball guide groove; 621, second drive rod; 6211, second drive long hole; 622, second transmission column; 623, second drive wheel; 6231, top block; 63, gear transmission group; 64, guide sleeve block; 70, ball distribution mechanism; 71, outer shell; 72, ball guide track; 73, upper track; 74, binary ball distribution block; 741, primary ball distribution groove; 742, secondary ball distribution groove; 75, baffle; 76, lower track; 80, falling ball collection bucket; 90, servo motor; 91, driving gear. DETAILED DESCRIPTION

[0031] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0032] For ease of understanding, the specific structure and working mode of the present invention are further described below in conjunction with the accompanying drawings:

[0033] The specific structure of the present invention refers to Figure 1-9 As shown, its main structure includes an inclined timing track 40 and a ball delivery mechanism 10 that continuously delivers a timing ball to the timing track 40 with equal time difference. The timing tracks 40 are set to be arranged in sequence from top to bottom, and the number of timing balls stored in the timing track 40 represents the number of time units of the current timing track 40. A ball guide assembly 60 for distributing timing balls is provided between the goal end of the timing track 40 and the track end of the ball delivery track 30. The top or bottom timing track 40 is the priority track for the ball guide assembly 60 to preferentially distribute the timing balls. The vertical direction from the priority track to its adjacent timing track 40 is the advancement direction. When the number of timing balls on the priority track reaches the set number, the timing balls are distributed to the first timing track 40 along the advancement direction where the number of timing balls does not reach the set number. Thereafter, the timing track 40 where the number of timing balls reaches the set number releases all the timing balls. The display of time is realized by loading and releasing the timing balls on the timing track 40. Compared with the traditional pointer timing mechanism, it is more novel and more effective to stimulate the public's interest in science, and ultimately achieve a better effect of enlightening science.

[0034] For example, the timing tracks 40 can be set to two, two distributed up and down, the time unit indicated by the upper timing track 40 is hours, and the set number of timing balls stored is 12 or 24, and the time unit indicated by the lower timing track 40 is minutes, and the set number of timing balls stored is 59; in this embodiment, the time difference of the ball feeding mechanism 10 supplying the timing balls to the ball feeding track 30 is 30 seconds, but because one of the timing balls transported to the ball feeding track 30 twice will be centrifugal and derailed, the time interval between the timing balls sent into the ball guide assembly 60 is one minute; initially, timing balls are set on both timing tracks 40, and the ball guide assembly 60 preferentially distributes the timing balls to the lower timing track 40. When the number of timing balls on the lower timing track 40 reaches 59, the time is 0 hours and 59 minutes, and the timing balls thereafter are distributed to the upper timing track 40, and all timing balls are released from the lower timing track 40, and the time is 1 hour and 0 minutes, thereby realizing the timing of time. Of course, in this embodiment, the time unit represented by the lower timing track 40 can also be set to ten minutes, and the set number of timing balls stored is 5. In addition, the timing track 40 receives a timing ball every ten minutes; initially, timing balls are set on both timing tracks 40, and the ball guide assembly 60 preferentially allocates the timing balls to the lower timing track 40. When the number of timing balls on the lower timing track 40 reaches 5, the time is 0 hours and 50 minutes. The subsequent timing balls are allocated to the upper timing track 40, and the lower timing track 40 releases all timing balls, and the time is 1 hour and 0 minutes.

[0035] Of course, in actual implementation, the timing track 40 can be provided with other various numbers, and the timing can be realized according to the number of balls on the timing track 40. In the following, for the embodiment in which the timing track 40 is set to 3, the ball guide assembly 60 for implementing the distribution of the timing ball and the ball blocking and releasing assembly 50 for performing the timing ball blocking and releasing operations on the timing track 40 are further described.

[0036] In this embodiment, if Figure 2 As shown, the timing track 40 is arranged to be an hour track 41, a minute tens track 42 and a minute units track 43 arranged in sequence from top to bottom. The time unit represented by the hour track 41 is hour, and the number of timing balls stored therein is set to 12; the time unit represented by the minute tens track 42 is ten minutes, and the number of timing balls stored therein is set to 5; the time unit represented by the minute units track 43 is minute, and the number of timing balls stored therein is set to 9. In this embodiment, the time interval for the ball guide assembly 60 to continuously receive the timing balls is one minute.

[0037] like Figure 2-4 As shown, the ball guide assembly 60 is connected to the ball supply mechanism 10 through the inclined ball delivery track 30, and the ball guide assembly 60 can receive the timing ball at the track end of the ball delivery track 30. The ball guide assembly 60 includes a first ball guide groove 61 and a second ball guide groove 62 that can be arranged in sequence along the timing ball delivery direction and can swing around a horizontal axis perpendicular to the length direction of the timing track 40. The first ball guide groove 61 and the second ball guide groove 62 form a ball guide bridge connecting the hour track 41 and the ball delivery track 30, that is, when the ball guide bridge is connected, the timing ball delivered by the ball delivery track 30 will be distributed to the hour track 41. In addition, the first ball guide groove 61 and the second ball guide groove 62 both have a broken bridge state and a bridging state to form a ball guide bridge, and when the first ball guide groove 61 in the ball guide bridge is in the broken bridge state, the ball delivery track 30 is connected to the minute units digit track 43, and the timing ball delivered by the ball delivery track 30 will be distributed to the minute units digit track 43; when the first ball guide groove 61 and the second ball guide groove 62 are in the bridging state and the broken bridge state respectively, the ball delivery track 30 is connected to the minute tens digit track 42, and the timing ball delivered by the ball delivery track 30 will be distributed to the minute tens digit track 42.

[0038] Specifically, the structure for executing the rotational drive of the first ball guide groove 61 and the second ball guide groove 62 in the ball guide assembly 60 is as follows: Figure 4 and Figure 5The ball guide assembly 60 also includes a ball guide power mechanism for driving the first ball guide groove 61 and the second ball guide groove 62 to swing, the ball guide power mechanism includes a first driving wheel 613 and a second driving wheel 623 driven by a gear transmission group 63 and performing synchronous rotation around the same horizontal axis, a first driving rod 611 and a second driving rod 621 which can be lifted and slid in the vertical direction are respectively arranged above the outer edges of the first driving wheel 613 and the second driving wheel 623, and six inner grooves 6131 are evenly distributed around the outer edge of the first driving wheel 613. Under normal conditions, the outer edge of the first driving wheel 613 abuts the first driving rod 611 and keeps rising, so that the first ball guide groove 61 is in a broken bridge state, and when any inner groove 6131 rotates to just below the first driving rod 611, the first driving rod 611 descends, so that the first ball guide groove 61 is in a bridging state; the outer edge of the second driving wheel 623 is provided with a top block 6231 corresponding to five of the inner grooves 6131 one by one, and under normal conditions, the outer edge of the second driving wheel 623 abuts the second driving rod 621 and keeps descending, so that the second ball guide groove 62 rotates to a bridging state, and when any top block 6231 rotates to just below the second driving rod 621, the second driving rod 621 is pushed to rise, so that the second ball guide groove 62 rotates to a broken bridge state; the first driving wheel 613 and the second driving wheel 623 are driven by a gear transmission group 63 connected to the servo motor 90, and the time it takes to drive the first driving wheel 613 and the second driving wheel 623 to rotate one circle is 1 hour.

[0039] When the current time represented by the timing track 40 is 0 hours and 0 minutes, the state of the ball guide power mechanism is the initial state. According to the explanation of the above-mentioned small ball timing distribution rule, in the initial state, the first ball guide groove 61 and the second ball guide groove 62 both have a broken bridge state and a bridge state to form a ball guide bridge, that is, the timing ball is allocated to the hour track 41. At this time, the number of timing balls on all timing tracks 40 reaches the set number, and all timing tracks 40 release all timing balls. Therefore, in this state, one of the inner grooves 6131 on the first driving wheel 613 that does not correspond to the top block 6231 is located directly below the first driving rod 611. At this time, the first driving rod 611 descends, and the first ball guide groove 61 is in a bridge state. The outer edge of the second driving wheel 623 abuts the second driving rod 621 to keep descending, so that the second ball guide groove 62 rotates to the bridge state.

[0040] After that, the first driving wheel 613 and the second driving wheel 623 start to rotate at a constant speed. During the rotation process, the inner groove 6131 separates from the first driving rod 611, and the outer edge of the first driving wheel 613 abuts against the first driving rod 611, so that the first driving rod 611 keeps rising, so that the first ball guide groove 61 is in a broken bridge state. In this state, the ball delivery track 30 is connected to the minute digit track 43, and the timing ball delivered by the ball delivery track 30 will be distributed to the minute digit track 43.

[0041] Since the time for the first driving wheel 613 and the second driving wheel 623 to rotate at a constant speed for one circle is 1 hour, and the number of the inner grooves 6131 is six evenly distributed around the outer edge of the first driving wheel 613, the time interval for adjacent inner grooves 6131 to rotate to the bottom of the first driving rod 611 is 10 minutes. Therefore, at the time node of 0:10, the inner groove 6131 adjacent to the inner groove 6131 in the initial state rotates to directly below the first driving rod 611, and the first ball guide groove 61 is in the bridging state again; and the top block 6231 corresponding to the inner groove 6131 rotates to directly below the second driving rod 621, pushing the second driving rod 621 to rise, so that the second ball guide groove 62 rotates to the broken bridge state; in this state, when the first ball guide groove 61 and the second ball guide groove 62 are in the bridging state and the broken bridge state respectively, the ball delivery track 30 is connected to the minute tens digit track 42, and the timing ball delivered by the ball delivery track 30 will be distributed to the minute tens digit track 42, that is, a timing ball is added to the minute tens digit track 42. Similarly, as the first driving wheel 613 and the second driving wheel 623 continue to move and rotate, the ball delivery track 30 is connected to the minute digit track 43, and when the next adjacent inner groove 6131 rotates to just below the first driving rod 611, the ball delivery track 30 is connected to the minute tens digit track 42 again, and finally when the first driving wheel 613 and the second driving wheel 623 rotate to the initial state again, the ball delivery track 30 is connected to the hour track 41 to add a timing ball on the hour track 41, that is, the current time is 1 hour and 0 minutes.

[0042] For other embodiments where the number of timing tracks 40 is not three, such as when the number of timing tracks 40 is set to two, only the first ball guide groove 61 and the first driving wheel 613 need to be provided, and the inner groove 6131 is related to the time units represented by the two timing tracks 40 and the time for the first driving wheel 613 to rotate one circle. For example, the time unit represented by the upper timing track 40 is hours, the time unit represented by the lower timing track 40 is ten minutes, and the time for the first driving wheel 613 to rotate one circle is 1 hour, and only one inner groove 6131 is provided. The logic is the same as above when the timing track 40 is other embodiments, and they will not be listed one by one here.

[0043] Of course, the rotation of the first ball guide groove 61 and the second ball guide groove 62 can also be executed by a controller controlling an electric actuator such as a motor or an electric cylinder at a preset time, but since it is impossible to demonstrate the ingenious arrangement of the mechanical mechanism, it can be implemented as an alternative implementation method.

[0044] In addition, the connection structures of the first driving rod 611 and the second driving rod 621 and the first ball guide groove 61 and the second ball guide groove 62 are as follows: Figure 4 The first driving rod 611 and the second driving rod 621 are sleeved with a guide sleeve block 64 fixed to the timing track 40 to enable the first driving rod 611 and the second driving rod 621 to slide stably along the vertical axis. In addition, the tops of the first driving rod 611 and the second driving rod 621 are horizontally bent, and the bending sections of the first driving rod 611 and the second driving rod 621 are respectively provided with the first driving long hole 6111 and the second driving long hole 6211 whose hole lengths are distributed horizontally, the axes of the first driving long hole 6111 and the second driving long hole 6211 are parallel to the swing axes of the first ball guide groove 61 and the second ball guide groove 62, and the first ball guide groove 61 and the second ball guide groove 62 are respectively fixed with the first transmission column 612 and the second transmission column 622 which are axially inserted into the first driving long hole 6111 and the second driving long hole 6211, and the first transmission column 612 and the second transmission column 622 are respectively pushed to move by the hole walls of the first driving long hole 6111 and the second driving long hole 6211 to respectively drive the first ball guide groove 61 and the second ball guide groove 62 to rotate. Of course, in actual implementation, on the basis of retaining the guide sleeve 64, the first driving rod 611 and the second driving rod 621 can also adopt the method of connecting the floating joints in the existing timing to the first ball guide rotating groove 61 and the second ball guide rotating groove 62 respectively. Taking the first driving rod 611 as an example, the two ends of the floating joint are respectively hinged to the top of the first driving rod 611 and the side wall of the first ball guide rotating groove 61, and the hinge axis is parallel to the rotation axis of the first ball guide rotating groove 61.

[0045] Ball blocking and ball releasing assembly 50 Figure 2 and Figure 6 As shown, the ball blocking and releasing assembly 50 includes a ball blocking and releasing rod 51 that slides perpendicular to the timing track 40. The ball blocking and releasing rod 51 constrains the timing ball within the timing track 40. The ball blocking and releasing rod 51 is driven by a ball releasing power group and moves away from the timing track 40 within a set time to release all timing balls in the timing track 40.

[0046] Specifically, the ball blocking and releasing assembly 50 further includes a fixed seat 53 and a swing rod 54 that swings around a first horizontal axis on the fixed seat 53, and the swing path of the swing rod 54 is parallel to the cross section of the timing track 40. The swing rod 54 is L-shaped, and the vertical section of the swing rod 54 is connected to the ball blocking and releasing rod 51. A cam 56 that cooperates with the swing rod 54 is rotatably matched on a second horizontal axis on the fixed seat 53 that is parallel to the first horizontal axis. The flange portion of the cam 56 abuts against the horizontal section of the swing rod 54 to make the swing rod 54 swing, and drives the ball blocking and releasing rod 51 to slide away from the timing track 40, that is, release all the timing balls on the timing track 40. In addition, an elastic member 58 is connected between the horizontal section of the swing rod 54 and the fixing seat 53. When the flange portion is separated from the horizontal end of the swing rod 54, that is, after the timing ball on the timing track 40 is released, the elastic member 58 drives the swing rod 54 to reset and swing, so that the ball-blocking and ball-releasing rod 51 is reset to the timing track 40 and continues to be used to block the timing ball on the timing track 40. The ball-blocking power drive assembly also includes a gear set 57 for driving the cam 56 to rotate.

[0047] In order to better implement the rotation of the above-mentioned rocker arm 54, a protrusion 55 is provided at the bottom of the horizontal section of the rocker arm 54. The protrusion 55 is configured as a roller parallel to the axis of the first horizontal axis. The roller rotates around its own axis and is engaged with the bottom of the horizontal section of the rocker arm 54. The roller and the outer wall of the cam 56 roll and rub against each other, thereby reducing the friction between the rocker arm 54 and the cam 56.

[0048] In addition, in order to further ensure the ball blocking effect of the swing rod 54, a guide sleeve 52 for horizontal sliding guide of the ball blocking and releasing rod 51 is fixed on the timing track 40. The connection between the ball blocking and releasing rod 51 and the swing rod 54 is that a transmission long hole 541 is set at the top of the vertical section of the swing rod 54, and the axial direction of the transmission long hole 541 is parallel to the first horizontal axis; a transmission slide column 511 axially inserted into the transmission long hole 541 is fixed on the ball blocking and releasing rod 51, and during the swinging process of the swing rod 54, the wall of the transmission long hole 541 in the swing rod 54 pushes the transmission slide column 511 to move, so as to push the ball blocking and releasing rod 51 to slide back and forth perpendicular to the timing track 40.

[0049] In the embodiment where the timing track 40 is set as the hour track 41, the minute tens track 42 and the minute units track 43, the ball blocking and releasing rods 51 are set as three groups used in cooperation with the hour track 41, the minute tens track 42 and the minute units track 43, and the ball blocking power drive components are set as three groups used in cooperation with the three groups of ball blocking and releasing rods 51. Among them, the gear groups 57 of the three groups of ball blocking power drive components are all driven by the servo motor 90, and the transmission ratio between the three groups of gear groups 57 corresponding to the hour track 41, the minute tens track 42 and the minute units track 43 is 72:6:1, and the time for the minute tens track 42 to rotate one circle is 1 hour, thereby achieving that the time intervals for releasing the timing ball by the ball blocking and releasing rods 51 at the hour track 41, the minute tens track 42 and the minute units track 43 are: 12 hours, 1 hour, and 10 minutes respectively.

[0050] Of course, the movement of the ball blocking and releasing rod 51 can also be executed by a controller controlling an electric actuator such as a motor or an electric cylinder at a preset time, but since it is impossible to demonstrate the ingenious arrangement of the mechanical mechanism, it is implemented as an alternative implementation.

[0051] It is worth mentioning that the time display device can also be used in conjunction with the following mechanical energy conversion demonstration device.

[0052] Mechanical energy demonstration device such as Fig. 9 As shown in FIG. 1 , the main structure of the mechanical energy demonstration device is the ball delivery track 30 in the time display device and the ball distribution mechanism 70 which alternately delivers the timing ball supplied by the ball delivery mechanism 10 to the upper part of the ball delivery track 30 with the first gravity potential energy and the second gravity potential energy. Figure 1 In the gyration structure shown, the first gravitational potential energy is smaller than the second gravitational potential energy, so the kinetic energy converted by the timing ball sent into the upper part of the ball delivery track 30 by the first gravitational potential energy and sliding to the ball delivery track 30 is smaller than the kinetic energy converted by the timing ball sent into the upper part of the ball delivery track 30 by the second gravitational potential energy and sliding to the ball delivery track 30; specifically, when the timing ball sent into the upper part of the ball delivery track 30 by the first gravitational potential energy slides to the tail of the ball delivery track 30, it cannot deviate from the track because of its small kinetic energy converted, so it will directly follow the gyration trajectory of the tail of the ball delivery track 30 and be discharged from the track end of the ball delivery track 30. When the timing ball sent into the upper part of the ball delivery track 30 by the second gravitational potential energy slides to the tail of the ball delivery track 30, it will centrifugally derail at the gyration structure of the ball delivery track 30 because of its large kinetic energy, thereby realizing an intuitive demonstration of the conversion between different gravitational potential energies and kinetic energies.

[0053] Specifically, the first gravitational potential energy and the second gravitational potential energy are alternately fed into the ball distribution mechanism 70 on the upper portion of the ball feeding track 30 as shown in FIG. Fig. 9As shown, the ball-distributing mechanism 70 comprises a housing 71 fixed to the ball-delivering track 30, an upper track 73 fixed to the housing 71 and connected to the ball-supplying end of the ball-delivering mechanism 10, and a lower track 76 fixed to the housing 71 and distributed below the upper track 73. A binary ball-distributing rotating block 74 is arranged inside the housing 71 between the upper track 73 and the lower track 76. The binary ball-distributing rotating block 74 can rotate around a horizontal axis perpendicular to the ball-delivering track 30. The top two sides of the binary ball-distributing rotating block 74 are respectively provided with a primary ball-distributing groove 741 and a secondary ball-distributing groove 742. When the binary ball-distributing rotating block 74 is rotated to the extreme positions on both sides, the primary ball-distributing groove 741 and the secondary ball-distributing groove 742 are respectively docked with the ball-distributing end of the upper track 73. In the initial state, taking the limited docking of the first-level ball distribution groove 741 with the upper track 73 as an example, when the first-level ball distribution groove 741 receives the timing ball, it will push the binary ball distribution rotating block 74 to rotate to the side of the first-level ball distribution groove 741. At this time, the second-level ball distribution groove 742 is docked with the ball outlet end of the upper track 73, and the timing ball is transported from the ball guide track 72 to the ball delivery track 30 along the ball delivery direction of the upper track 73, that is, it can be regarded as the timing ball being directly sent into the ball delivery track 30 under the gravitational potential energy on the upper track 73. After that, since the secondary ball-dividing groove 742 is connected to the ball outlet end of the upper track 73 at this time, the next timing ball sent by the ball-delivering mechanism 10 will be delivered to the secondary ball-dividing groove 742. Similarly, when the secondary ball-dividing groove 742 receives the timing ball, it will push the binary ball-dividing rotating block 74 to rotate toward the secondary ball-dividing groove 742, and then make the primary ball-dividing groove 741 connect to the ball outlet end of the upper track 73; and the timing ball will collide with the baffle 75 in the opposite direction of the ball-delivering direction of the upper track 73, converting the kinetic energy of the timing ball after movement into elastic potential energy in the collision process. It can be reduced and transported to the lower track 76, and finally transported to the ball delivery track 30 by the lower track 76. Since the lower track 76 is lower than the upper track 73, the gravitational potential energy sent from the lower track 76 to the ball delivery track 30 is relatively small. In addition, since the kinetic energy converted from the gravitational potential energy is mostly converted into elastic potential energy in the collision during the transportation from the upper track 73 to the lower track 76, that is, there is a large kinetic energy consumption. Therefore, the power of the timing ball transported from the lower track 76 to the tail end of the ball delivery track 30 is less than the kinetic energy of the timing ball transported from the upper track 73 to the tail end of the ball delivery track 30.In this embodiment, the rotation of the binary ball-dividing rotating block 74 after receiving the ball is cleverly utilized, so that the secondary ball-dividing groove 742 and the primary ball-dividing groove 741 of the binary ball-dividing rotating block 74 are respectively switched to dock with the ball-delivering track 30, thereby transporting the timing ball to the upper part of the ball-delivering track 30 with different gravitational potential energies, and utilizing the difference in kinetic energy finally converted by the timing ball transported to the tail end of the ball-delivering track 30 to realize two sets of demonstration states of the timing ball moving along the trajectory of the ball-delivering track 30 and moving away from the ball-delivering track 30; the mechanical mechanism of the demonstration device is cleverly arranged, the structure is stable and can realize alternating demonstration continuously, which can effectively stimulate the public's interest in science and ultimately achieve a better effect of enlightening science.

[0054] On the basis of the above, in order to further realize the recycling of the timing ball, the automation level of the time display device can be improved. Figure 1 As shown, the time display device also includes a ball receiving track 20, which has a scoring end for receiving the timing ball released by the timing track 40, and the ball receiving track 20 also has a ball outlet end for supplying the timing ball to the ball feeding mechanism 10.

[0055] In addition, in order to automatically recover the timing ball that deviates from the ball delivery track 30 in the mechanical energy conversion demonstration device, as Figure 1 As shown, a falling ball collection bucket 80 connected to the ball collection track 20 is fixed inside the rotating structure of the ball delivery track 30, and a fence 31 is provided at the outer edge of the rotating structure of the ball delivery track 30 to collide the timing ball derailed at the rotating structure into the falling ball collection bucket 80. The setting of the fence 31, combined with the mechanical energy conversion demonstration device, can also realize the collision ring between the timing ball and the fence 31, and the conversion demonstration between kinetic energy and elastic potential energy, which can more effectively stimulate the public's interest in science and ultimately achieve a better effect of enlightening science.

[0056] On the basis of the above, the ball delivery mechanism 10 is as follows Figure 1 , Figure 7 and Figure 8As shown, the ball delivery mechanism 10 includes a vertically arranged ball delivery cylinder 13, the lower part of the side wall of the ball delivery cylinder 13 is provided with a ball inlet 132 connected to the ball outlet end of the ball receiving track 20, and the upper part of the side wall of the ball delivery cylinder 13 is provided with a ball outlet 131, which is connected to the ball guide assembly 60 through the ball delivery track 30. The internal coaxial rotation of the ball delivery cylinder 13 is matched with a screw conveying rod 14 for conveying the timing ball to the ball outlet 131, and the screw conveying rod 14 is driven by a gear power group connected to the servo motor 90, and the time for the screw conveying rod 14 to rotate one circle is 30 seconds. Of course, in actual implementation, the time display device can also be used alone without combining with the mechanical energy conversion demonstration device. If the time display device is used alone, the time for the screw conveying rod 14 to rotate one circle is the same as the time unit of the priority track in the timing track 40. For example, in the above embodiment, the time unit of the priority track is minutes, and the time for the screw conveying rod 14 to rotate one circle is 1 minute.

[0057] It is worth mentioning that in the present application, the servo motor 90 for controlling the rotation of the screw conveying rod 14, the first driving wheel 613, the second driving wheel 623 and the cam 56 is the same. Figure 3 As shown, a driving gear 91 is coaxially fixed on the output shaft of the servo motor 90, and the driving gear 91 meshes with one of the gear sets 57. In addition, a gear linkage mechanism is provided between the gear set 57 that drives the cam 56 to rotate and the gear transmission set 63 that drives the first driving wheel 613 and the second driving wheel 623. The gear linkage mechanism can be used to control the transmission ratio of the gear set 57 and the gear transmission set 63 to a desired ratio. Figure 7 As shown, a screw gear 141 is coaxially fixed to the lower end of the screw conveying rod 14, and a shaft 111 radially penetrates the side wall of the ball delivery cylinder 13, as shown in FIG. Figure 3 As shown, a ball-feeding bevel gear 12 meshing with the screw rod gear 141 is coaxially fixed to one end of the shaft 111, and a ball-feeding gear 11 meshing with the driving gear 91 is coaxially fixed to the other end. The transmission ratio between the screw rod gear 141 and the driving gear 91 can be controlled to a desired ratio by the ball-feeding bevel gear 12 and the ball-feeding gear 11 at both ends of the shaft 111. The drive method of a servo motor 90 can effectively ensure the precise coordination between the transmission structures, thereby ensuring the accuracy of the timing of the time display device.

[0058] Of course, it is obvious to those skilled in the art that the present invention is not limited to the details of the exemplary embodiments described above, but also includes the same or similar structures that can be implemented in other specific forms without departing from the spirit or essential features of the present invention. Therefore, no matter from which point of view, the embodiments should be regarded as exemplary and non-limiting, and the scope of the present invention is defined by the appended claims rather than the above description, and it is intended that all changes falling within the meaning and scope of the equivalent elements of the claims are included in the present invention. Any reference numerals in the claims should not be regarded as limiting the claims involved.

[0059] In addition, it should be understood that although the present specification is described according to implementation modes, not every implementation mode contains only one independent technical solution. This description of the specification is only for the sake of clarity. Those skilled in the art should regard the specification as a whole. The technical solutions in each embodiment may also be appropriately combined to form other implementation modes that can be understood by those skilled in the art.

[0060] The techniques, shapes, and structural parts not described in detail in the present invention are all well-known techniques.

Claims

1. A time display device, characterized in that: The invention comprises a timing track (40) which is distributed in an inclined manner and a ball delivery mechanism (10) which continuously delivers a timing ball to the timing track (40) with equal time difference. The timing track (40) is arranged as at least two timing tracks arranged in sequence from top to bottom, and the number of timing balls stored in the timing track (40) represents the number of time units of the current timing track (40). A ball guide assembly (60) for distributing timing balls is provided at the goal end of the timing track (40). The top or bottom timing track (40) is used as a priority track to which the ball guide assembly (60) preferentially distributes timing balls. The vertical direction from the priority track to its adjacent timing track (40) is an advanced direction. When the number of timing balls on the priority track reaches a set number, the timing balls are distributed to the first timing track (40) in the advanced direction whose number of timing balls does not reach the set number. Thereafter, the timing track (40) whose number of timing balls reaches the set number releases all timing balls.

2. A time display device according to claim 1, characterized in that: The timing track (40) is configured to be an hour track (41), a minute tens track (42) and a minute units track (43) arranged in sequence from top to bottom. The ball delivery end of the ball delivery mechanism (10) is connected to a ball guide assembly (60) via the ball delivery track (30). The ball guide assembly (60) comprises a first ball guide rotating groove (61) and a second ball guide rotating groove (62) which can be arranged in sequence along the timing ball delivery direction and can swing around a horizontal axis perpendicular to the length direction of the timing track (40). The first ball guide rotating groove (61) and the second ball guide rotating groove (62) 62) constitutes a ball guide bridge connecting the hour track (41) and the ball delivery track (30), the first ball guide groove (61) and the second ball guide groove (62) both have a broken bridge state and a bridged bridge state to form the ball guide bridge, and when the first ball guide groove (61) in the ball guide bridge is in the broken bridge state, the ball delivery track (30) is connected to the minute units track (43), and when the first ball guide groove (61) and the second ball guide groove (62) are in the bridged bridge state and the broken bridge state respectively, the ball delivery track (30) is connected to the minute tens track (42).

3. A time display device according to claim 2, characterized in that: The ball guide assembly (60) further comprises a ball guide power mechanism for driving the first ball guide rotating groove (61) and the second ball guide rotating groove (62) to swing, the ball guide power mechanism comprising a first driving wheel (613) and a second driving wheel (623) driven by a gear transmission group (63) and performing synchronous rotational motion around the same horizontal axis, a first driving rod (611) and a second driving rod (621) which can be lifted and slid in a vertical direction are respectively arranged directly above the outer edges of the first driving wheel (613) and the second driving wheel (623), the outer edge of the first driving wheel (613) is uniformly distributed with six inner grooves (6131) in the circumferential direction, under normal conditions, the outer edge of the first driving wheel (613) abuts against the first driving rod (611) to keep rising, so that the first ball guide rotating groove (61) is in a broken bridge state, and when any inner groove (6131) rotates to the position directly below the first driving rod (611), the first driving wheel (613) is lifted and lowered. , the first driving rod (611) descends so that the first ball guide groove (61) is in a bridging state; the outer edge of the second driving wheel (623) is provided with a top block (6231) corresponding to five inner grooves (6131) therein, and under normal conditions, the outer edge of the second driving wheel (623) abuts the second driving rod (621) and keeps descending so that the second ball guide groove (62) rotates to a bridging state, and when any top block (6231) rotates to the bottom of the second driving rod (621), the second driving rod (621) is pushed up so that the second ball guide groove (62) rotates to a broken bridge state; the first driving wheel (613) and the second driving wheel (623) are driven by a gear transmission group (63) connected to the servo motor (90), and the time it takes to drive the first driving wheel (613) and the second driving wheel (623) to rotate at a uniform speed for one circle is 1 hour.

4. A time display device according to claim 3, characterized in that: The rod bodies of the first driving rod (611) and the second driving rod (621) are sleeved with guide sleeve blocks (64) fixed to the timing track (40); the tops of the first driving rod (611) and the second driving rod (621) are horizontally bent, and the bending sections of the first driving rod (611) and the second driving rod (621) are respectively provided with a first driving long hole (6111) and a second driving long hole (6211) whose hole lengths are horizontally distributed; the axes of the first driving long hole (6111) and the second driving long hole (6211) are parallel to the swing axes of the first ball guide groove (61) and the second ball guide groove (62); the first ball guide groove (61) and the second ball guide groove (62) are respectively fixed with a first transmission column (612) and a second transmission column (622) which are axially plugged into the first driving long hole (6111) and the second driving long hole (6211) respectively.

5. A time display device according to any one of claims 2 to 4, characterized in that: The device also includes a ball blocking and releasing assembly (50), which includes a ball blocking and releasing rod (51) that slides perpendicularly to the timing track (40), and the ball blocking and releasing rod (51) constrains the timing ball within the timing track (40). The ball blocking and releasing rod (51) is driven by a ball releasing power group, and moves away from the timing track (40) within a set time to release all the timing balls in the timing track (40).

6. A time display device according to claim 5, characterized in that: The ball blocking and releasing assembly (50) further comprises a fixed seat (53) and a swing rod (54) swinging around a first horizontal axis on the fixed seat (53), wherein the swing path of the swing rod (54) is parallel to the cross section of the timing track (40), the swing rod (54) is L-shaped, and the vertical section of the swing rod (54) is connected to the ball blocking and releasing rod (51), and a cam (56) cooperating with the swing rod (54) is rotatably provided on a second horizontal axis on the fixed seat (53) parallel to the first horizontal axis, and the flange portion of the cam (56) abuts against the swing rod ( The horizontal section of the swing rod (54) is connected to the fixing seat (53) to make the swing rod (54) swing and drive the ball blocking and releasing rod (51) to slide and deviate from the timing track (40); an elastic member (58) is connected between the horizontal section of the swing rod (54) and the fixing seat (53); when the flange portion and the horizontal end of the swing rod (54) are separated, the elastic member (58) drives the swing rod (54) to reset and swing, so that the ball blocking and releasing rod (51) is reset to the timing track (40); the ball blocking power drive assembly also includes a gear group (57) for driving the cam (56) to rotate.

7. A time display device according to claim 6, characterized in that: The rod body of the ball blocking and releasing rod (51) is sleeved with a guide sleeve (52) fixed to the timing track (40); the vertical section of the swing rod (54) is provided with a transmission long hole (541) arranged vertically along the length direction of the hole; the axis of the transmission long hole (541) is parallel to the first horizontal axis; and the ball blocking and releasing rod (51) is fixed with a transmission sliding column (511) axially inserted into the transmission long hole (541).

8. A time display device according to claim 6, characterized in that: The ball blocking and releasing rods (51) are arranged to be used in three groups in cooperation with the hour track (41), the minute tens track (42) and the minute units track (43), and the ball blocking power drive components are arranged to be used in three groups in cooperation with the three groups of ball blocking and releasing rods (51), wherein the gear groups (57) of the three groups of ball blocking power drive components are all driven by a servo motor (90), and the transmission ratio between the three groups of gear groups (57) respectively corresponding to the hour track (41), the minute tens track (42) and the minute units track (43) is 72:6:1, and the time for the minute tens track (42) to rotate one circle is 1 hour.

9. A time display device according to any one of claims 2 to 4, characterized in that: It also comprises a ball receiving track (20), wherein the ball receiving track (20) has a ball-incoming end for receiving a timing ball released by the timing track (40), and the ball receiving track (20) also has a ball-outgoing end for supplying the timing ball to the ball-delivering mechanism (10).

10. A time display device according to claim 9, characterized in that: The ball delivery mechanism (10) comprises a vertically arranged ball delivery cylinder (13), the lower part of the side wall of the ball delivery cylinder (13) is provided with a ball inlet (132) connected to the ball outlet end of the ball receiving track (20), the upper part of the side wall of the ball delivery cylinder (13) is provided with a ball outlet (131), the ball outlet (131) constitutes the ball outlet end connected to the ball delivery track (30), the inner coaxial rotation of the ball delivery cylinder (13) is matched with a screw conveying rod (14) for conveying the timing ball to the ball outlet (131), the screw conveying rod (14) is driven by a gear power group connected to the servo motor (90), and the time for the screw conveying rod (14) to rotate one circle is 1 minute.

Citation Information

Patent Citations

  • Rolling ball clock

    CN117746720A

  • Mechanical energy conversion demonstration device and time display device

    CN118781894A

  • Timing method based on time display device

    CN118859666A

  • Package intercepting device

    CN210762767U

  • Intelligent sterilization logistics system for PP bottled health drinks

    CN219468840U

Cited By

  • Mechanical energy conversion demonstration device and time display device

    CN118781894A

  • Mechanical energy conversion demonstration device and time display device

    CN118781894B