Temporary communication transition method in power transmission line construction

By disconnecting communication optical cables during transmission line construction and setting up temporary optical cables for temporary communication transition, the problem of communication interruption during construction is solved, uninterrupted communication is achieved, and the upgrade and improvement of the grid structure is facilitated.

CN118869062APending Publication Date: 2024-10-29STATE NUCLEAR ELECTRIC POWER PLANNING DESIGN & RES INST CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411141584.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-20
Publication Date
2024-10-29

AI Technical Summary

Technical Problem

During the construction of transmission lines, some communication optical cables cannot be interrupted. How to ensure the normal operation of communications during construction, especially during the construction of new optical cables, is difficult to achieve uninterrupted communication with existing technology.

Method used

By breaking the communication optical cable of the transmission line, a free breaking point is formed, and the temporary optical cable is arranged along the temporary communication path, and the end point of the temporary optical cable is connected to the breaking point to realize the temporary communication transition until the temporary optical cable is removed and connected after the construction is completed New fiber optic cable.

Benefits of technology

It achieves uninterrupted communication during the construction of transmission lines, meets the requirements for continuous communication, facilitates the upgrade and improvement of the grid structure, and reduces construction costs.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118869062A_ABST
    Figure CN118869062A_ABST
Patent Text Reader

Abstract

The invention provides a temporary communication transition method in power transmission line construction, and the method comprises the steps: cutting off a communication optical cable of a power transmission line, and enabling the communication optical cable to form a free first cut-off point and a free second cut-off point; determining a temporary communication path between the first breaking point and the second breaking point; arranging a temporary optical cable along the temporary communication path, connecting a first end of the temporary optical cable with the first breaking point, and connecting a second end of the temporary optical cable with the second breaking point; and after the construction is completed, dismantling the temporary optical cable, connecting the first breaking point with the first newly-built optical cable, and connecting the second breaking point with the second newly-built optical cable. According to the temporary communication transition method in the power transmission line construction, temporary communication transition can be performed between the first breaking point and the second breaking point by using the temporary optical cable, so that uninterrupted communication during the power transmission line construction period is realized, and the requirement of continuous communication is met.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present disclosure relates to the technical field of uninterrupted communication, and in particular to a temporary communication transition method in power transmission line construction. Background Art

[0002] In order to continuously adapt to economic development, transmission lines often use the method of disconnecting old lines to improve the regional grid structure. In addition, during the construction of new optical cables, the communication optical cables in the disconnected lines need to be interrupted. However, some communication optical cables in the disconnected lines are crucial in regional communications and cannot be interrupted. So, how to ensure the normal operation of communication optical cables during construction? A temporary communication transition method in transmission line construction is proposed. Summary of the invention

[0003] The present disclosure aims to solve one of the technical problems in the related art at least to some extent.

[0004] To this end, the purpose of the present disclosure is to provide a temporary communication transition method in transmission line construction.

[0005] To achieve the above-mentioned purpose, the present disclosure provides a temporary communication transition method in the construction of a transmission line, comprising: disconnecting the communication optical cable of the transmission line, and making the communication optical cable form a free first disconnection point and a second disconnection point; determining a temporary communication path between the first disconnection point and the second disconnection point; arranging a temporary optical cable along the temporary communication path, and connecting the first end of the temporary optical cable to the first disconnection point, and connecting the second end of the temporary optical cable to the second disconnection point; when the construction is completed, removing the temporary optical cable, and connecting the first disconnection point to a first newly built optical cable, and connecting the second disconnection point to a second newly built optical cable.

[0006] Optionally, arranging the temporary optical cable along the temporary communication path includes: arranging a first temporary support frame on the straight path of the temporary communication path, and erecting the straight segment of the temporary optical cable on the first temporary support frame in a vertical direction; arranging a second temporary support frame on the corner path of the temporary communication path, and erecting the corner segment of the temporary optical cable on the second temporary support frame in a horizontal direction.

[0007] Optionally, arranging the temporary optical cable along the temporary communication path includes: arranging a first suspension point supported in a vertical direction at the top of the first temporary support frame, and hanging the straight section of the temporary optical cable on the first suspension point in the vertical direction; arranging a first tension hanging point supported in a horizontal direction at the top of the second temporary support frame, and hanging the corner section of the temporary optical cable on the first tension hanging point in the horizontal direction.

[0008] Optionally, arranging temporary optical cables along the temporary communication path includes: vertically installing the transmitting optical cable and the receiving optical cable of the straight section on both sides of the first temporary support frame respectively; and horizontally installing the transmitting optical cable and the receiving optical cable of the corner section on both sides of the second temporary support frame respectively.

[0009] Optionally, arranging the temporary optical cable along the temporary communication path includes: burying a first base on a straight path of the temporary communication path, and setting the first temporary support frame on the first base; burying a second base on a corner path of the temporary communication path, and setting the second temporary support frame on the second base; wherein the diameter of the second base is larger than the diameter of the first base.

[0010] Optionally, arranging the temporary optical cable along the temporary communication path includes: arranging adjacent first cement poles and second cement poles on a straight path of the temporary communication path, and setting a first reinforcement frame between the first cement poles and the second cement poles to form the first temporary support frame; arranging adjacent third cement poles and fourth cement poles on a corner path of the temporary communication path, and setting a second reinforcement frame between the third cement poles and the fourth cement poles to form the second temporary support frame.

[0011] Optionally, the temporary communication transition method includes: disconnecting the communication optical cable on a first pole tower and a second pole tower of the transmission line, and forming a free first breaking point of the communication optical cable on the first pole tower, and a free second breaking point on the second pole tower; installing the first end of the temporary optical cable on the first pole tower and connecting it to the first breaking point, and installing the second end of the temporary optical cable on the second pole tower and connecting it to the second breaking point.

[0012] Optionally, the temporary communication transition method includes: arranging a second suspension point supported in the vertical direction or a second tension hanging point supported in the horizontal direction in the middle of the first pole tower, and hanging the first end of the temporary optical cable on the second suspension point in the vertical direction or on the second tension hanging point in the horizontal direction; arranging a third suspension point supported in the vertical direction or a third tension hanging point supported in the horizontal direction in the middle of the second pole tower, and hanging the second end of the temporary optical cable on the third suspension point in the vertical direction or on the third tension hanging point in the horizontal direction.

[0013] Optionally, the temporary communication transition method includes: respectively installing the transmitting optical cable and the receiving optical cable at the first end of the temporary optical cable on both sides of the first pole tower; and respectively installing the transmitting optical cable and the receiving optical cable at the second end of the temporary optical cable on both sides of the second pole tower.

[0014] Optionally, the temporary communication transition method includes: disconnecting the optical fiber composite overhead ground wire OPGW cable of the transmission line, and making the OPGW cable form the first free breaking point and the second breaking point; arranging an all-dielectric self-supporting optical cable ADSS cable along the temporary communication path, and connecting the first end of the ADSS cable to the first breaking point, and connecting the second end of the ADSS cable to the second breaking point.

[0015] The technical solution provided by the present disclosure may have the following beneficial effects:

[0016] By disconnecting the communication optical cable of the transmission line and making the communication optical cable form a free first disconnection point and a second disconnection point, the construction disconnection requirements of the transmission line can be met, thereby facilitating the upgrading and improvement of the grid structure; and, by arranging a temporary optical cable along a temporary communication path, and connecting the first end of the temporary optical cable to the first disconnection point, and the second end of the temporary optical cable to the second disconnection point, a temporary communication transition can be made between the first disconnection point and the second disconnection point using a temporary optical cable, thereby achieving uninterrupted communication during the construction of the transmission line, thereby meeting the requirements of continuous communication.

[0017] Additional aspects and advantages of the present disclosure will be given in part in the following description and in part will be obvious from the following description or learned through practice of the present disclosure. BRIEF DESCRIPTION OF THE DRAWINGS

[0018] The above and / or additional aspects and advantages of the present disclosure will become apparent and easily understood from the following description of the embodiments in conjunction with the accompanying drawings, in which:

[0019] Figure 1 It is a flow chart of a temporary communication transition method in power transmission line construction proposed in one embodiment of the present disclosure;

[0020] Figure 2 It is a structural schematic diagram of a temporary communication path in a temporary communication transition method in transmission line construction proposed in an embodiment of the present disclosure;

[0021] Figure 3 It is a structural schematic diagram of a first temporary support frame in a temporary communication transition method in power transmission line construction proposed in an embodiment of the present disclosure;

[0022] Figure 4 It is a structural schematic diagram of a second temporary support frame in a temporary communication transition method in power transmission line construction proposed in an embodiment of the present disclosure;

[0023] Figure 5 It is a structural schematic diagram of the first tower in the temporary communication transition method in the construction of a transmission line proposed in one embodiment of the present disclosure;

[0024] Figure 6 It is a structural schematic diagram of a second tower in a temporary communication transition method in transmission line construction proposed in an embodiment of the present disclosure;

[0025] As shown in the figure: 1, the first breakpoint, 2, the second breakpoint;

[0026] 3. Temporary communication path, 301, straight path, 302, corner path;

[0027] 4. Temporary optical cable;

[0028] 5. first temporary support frame, 501. first cement pole, 502. second cement pole, 503. first reinforcement frame;

[0029] 6. Second temporary support frame, 601. Third cement pole, 602. Fourth cement pole, 603. Second reinforcement frame;

[0030] 7. The first hanging point, 8. The first tension hanging point, 9. The first base, 10. The second base, 11. The first tower, 12. The second tower, 13. The second hanging point, 14. The third tension hanging point. DETAILED DESCRIPTION

[0031] Embodiments of the present disclosure are described in detail below, examples of which are shown in the accompanying drawings, wherein the same or similar reference numerals throughout represent the same or similar elements or elements having the same or similar functions. The embodiments described below with reference to the accompanying drawings are exemplary and are only used to explain the present disclosure, and are not to be construed as limitations of the present disclosure. On the contrary, the embodiments of the present disclosure include all changes, modifications, and equivalents that fall within the spirit and connotation of the appended claims.

[0032] like Figure 1 and Figure 2 As shown, the embodiment of the present disclosure proposes a temporary communication transition method in power transmission line construction, including:

[0033] S1: disconnect the communication optical cable of the transmission line and make the communication optical cable form a free first disconnection point 1 and a second disconnection point 2;

[0034] S2: Determine a temporary communication path 3 between the first breaking point 1 and the second breaking point 2;

[0035] S3: Arrange a temporary optical cable 4 along the temporary communication path 3, and connect a first end of the temporary optical cable 4 to the first break point 1, and connect a second end of the temporary optical cable 4 to the second break point 2;

[0036] S4: When the construction is completed, the temporary optical cable 4 is removed, and the first break point 1 is connected to the first newly built optical cable, and the second break point 2 is connected to the second newly built optical cable.

[0037] It can be understood that by disconnecting the communication optical cable of the transmission line and making the communication optical cable form a free first disconnection point 1 and a second disconnection point 2, the construction disconnection requirements of the transmission line can be met, thereby facilitating the upgrade and improvement of the grid structure; and, by arranging a temporary optical cable 4 along the temporary communication path 3, and connecting the first end of the temporary optical cable 4 to the first disconnection point 1, and the second end of the temporary optical cable 4 to the second disconnection point 2, the temporary optical cable 4 can be used for temporary communication transition between the first disconnection point 1 and the second disconnection point 2, thereby realizing uninterrupted communication during the construction of the transmission line, thereby meeting the requirements of continuous communication.

[0038] It should be noted that the transmission line has transmission conductors, grounding conductors and communication optical cables. The transmission conductors and grounding conductors are used for power transmission in the transmission line. The communication optical cables, also known as communication optical fibers, are used for optical communications in the transmission line. When the transmission lines need to be upgraded and renovated, all the transmission lines need to be disconnected. Specifically, after the transmission conductors and grounding conductors are disconnected, power cannot be transmitted, and after the communication optical cables are disconnected, optical signals cannot be transmitted. Among them, the communication optical cables of some transmission lines are crucial in regional communications and cannot be interrupted.

[0039] Therefore, the method of this embodiment utilizes the temporary optical cable 4 arranged along the temporary communication path 3 to establish communication between the first break point 1 and the second break point 2, and when the construction is completed, the temporary optical cable 4 is removed, and the first break point 1 and the first newly built optical cable are connected, and the second break point 2 and the second newly built optical cable are connected, so that the first newly built optical cable and the second newly built optical cable are connected to the communication station together to realize a new communication path, thereby realizing the temporary communication transition of the communication optical cable, and being able to ensure the normal operation of the communication during the construction of the first newly built optical cable and the second newly built optical cable, which has practical benefits in engineering applications.

[0040] The connection method between the first end of the temporary optical cable 4 and the first breaking point 1, as well as the connection method between the second end of the temporary optical cable 4 and the second breaking point 2 can be set according to actual needs, and there is no limitation to this. For example, the optical cable can be switched between the first end of the temporary optical cable 4 and the first breaking point 1, as well as between the second end of the temporary optical cable 4 and the second breaking point 2 through devices such as junction boxes and junction seats.

[0041] The specific types of the first newly built optical cable and the second newly built optical cable can be set according to actual needs and are not limited to this. For example, the first newly built optical cable and the second newly built optical cable are optical cables with the same structure as the communication optical cable. For example, the communication optical cable is an OPGW (Optical fiber composite overhead ground wire) optical cable, then the first newly built optical cable and the second newly built optical cable are also OPGW optical cables. That is to say, after the construction is completed, communication is also carried out between the first break point 1 and the second break point 2 through two OPGW optical cables.

[0042] Among them, the transmission line composed of transmission wires, grounding wires and communication optical cables can be installed and arranged in sequence through multiple poles and towers. Similarly, the temporary optical cable 4 can be temporarily supported by multiple temporary support frames. During the disconnection construction of the transmission line, the selection of the temporary communication path 3 cannot affect the normal construction of the transmission line. At the same time, the temporary communication path 3 should choose the shortest route to ensure uninterrupted communication of the communication optical cable with low cost. As a result, it is inevitable that a straight path 301 and a corner path 302 will appear in the temporary communication path 3. For the straight path 301 and the corner path 302, different temporary support frames should be selected to achieve stable installation of the temporary optical cable 4.

[0043] like Figure 2 As shown, in some embodiments, arranging a temporary optical cable 4 along the temporary communication path 3 includes:

[0044] Arrange a first temporary support frame 5 on the straight path 301 of the temporary communication path 3, and erect the straight section of the temporary optical cable 4 on the first temporary support frame 5 in the vertical direction;

[0045] A second temporary support frame 6 is arranged on the corner path 302 of the temporary communication path 3, and the corner section of the temporary optical cable 4 is erected on the second temporary support frame 6 in a horizontal direction.

[0046] It can be understood that by arranging the first temporary support frame 5 on the straight path 301 of the temporary communication path 3, and erecting the straight segment of the temporary optical cable 4 on the first temporary support frame 5 in the vertical direction, the straight segment of the temporary optical cable 4 on the straight path 301 of the temporary communication path 3 is stably arranged; by arranging the second temporary support frame 6 on the corner path 302 of the temporary communication path 3, and erecting the corner segment of the temporary optical cable 4 on the second temporary support frame 6 in the horizontal direction, the corner segment of the temporary optical cable 4 on the corner path 302 of the temporary communication path 3 is stably arranged.

[0047] Therefore, through the temporary support of the first temporary support frame 5 and the second temporary support frame 6, the temporary optical cable 4 can be stably arranged on the temporary communication path 3 and can also adapt to the direction of the temporary communication path 3, making the arrangement of the temporary optical cable 4 more flexible and convenient.

[0048] It should be noted that the first temporary support frame 5 is used to support the temporary optical cable 4 on the straight path 301 of the temporary communication path 3. Since there is only supporting force in the vertical direction on the straight path 301, the straight section of the temporary optical cable 4 is erected on the first temporary support frame 5 along the vertical direction, which can meet the stable arrangement of the temporary optical cable 4. The specific type of the first temporary support frame 5 can be set according to actual needs and is not limited to this.

[0049] The second temporary support frame 6 is used to support the temporary optical cable 4 on the corner path 302 of the temporary communication path 3. Since the corner path 302 not only has a supporting force in the vertical direction, but also has a supporting force in the turning direction, the corner section of the temporary optical cable 4 is horizontally erected on the second temporary support frame 6, which can ensure the stable arrangement of the temporary optical cable 4. The specific type of the second temporary support frame 6 can be set according to actual needs and is not limited to this.

[0050] Among them, the supporting point of the second temporary support frame 6 is located on the turning side of the temporary optical cable 4. Specifically, when the corner section of the temporary optical cable 4 turns to the left, the supporting point of the second temporary support frame 6 is located on the left side of the temporary optical cable 4; when the corner section of the temporary optical cable 4 turns to the right, the supporting point of the second temporary support frame 6 is located on the right side of the temporary optical cable 4.

[0051] like Figure 3 and Figure 4 As shown, in some embodiments, arranging a temporary optical cable 4 along the temporary communication path 3 includes:

[0052] A first hanging point 7 supported in the vertical direction is arranged on the top of the first temporary support frame 5, and the straight section of the temporary optical cable 4 is hung on the first hanging point 7 in the vertical direction;

[0053] A first tension hanging point 8 supported in the horizontal direction is arranged on the top of the second temporary supporting frame 6 , and the corner section of the temporary optical cable 4 is hung on the first tension hanging point 8 in the horizontal direction.

[0054] It can be understood that by arranging the first hanging point 7 supported in the vertical direction on the top of the first temporary support frame 5, and hanging the straight segment of the temporary optical cable 4 in the vertical direction on the first hanging point 7, the straight segment of the temporary optical cable 4 can be stably mounted on the first temporary support frame 5 using the first hanging point 7, thereby achieving stable arrangement of the straight segment in the temporary optical cable 4 on the straight path 301 in the temporary communication path 3.

[0055] By arranging a first tension hanging point 8 supported in a horizontal direction on the top of the second temporary support frame 6, and hanging the corner section of the temporary optical cable 4 in a horizontal direction on the first tension hanging point 8, the corner section of the temporary optical cable 4 can be stably mounted on the second temporary support frame 6 using the first tension hanging point 8, thereby achieving stable arrangement of the corner section in the temporary optical cable 4 on the corner path 302 in the temporary communication path 3.

[0056] It should be noted that the first hanging point 7 is used to support the straight segment of the temporary optical cable 4 in the vertical direction. The specific type of the first hanging point 7 can be set according to actual needs and is not limited to this. For example, the first hanging point 7 is a support structure that is close to an L-shape, and one end of the first hanging point 7 is arranged at the top of the first temporary support frame 5 in the horizontal direction, and the other end of the first hanging point 7 is arranged and hung with the straight segment of the temporary optical cable 4 in the vertical direction.

[0057] The first tension hanging point 8 supports the corner section of the temporary optical cable 4 along the horizontal direction. The specific type of the first tension hanging point 8 can be set according to actual needs and is not limited to this. For example, the first tension hanging point 8 is a support structure close to an "I" shape, and one end of the first tension hanging point 8 is horizontally arranged on the top of the second temporary supporting frame 6, and the other end of the first tension hanging point 8 is arranged and hung with the corner section of the temporary optical cable 4 along the horizontal direction.

[0058] In some embodiments, arranging the temporary optical cable 4 along the temporary communication path 3 includes:

[0059] The transmitting optical cable and the receiving optical cable of the straight section are respectively erected on both sides of the first temporary support frame 5 in the vertical direction;

[0060] The transmitting optical cable and the receiving optical cable of the corner section are respectively erected on both sides of the second temporary support frame 6 in the horizontal direction.

[0061] It can be understood that by erecting the straight segment of the transmitting optical cable and the receiving optical cable on both sides of the first temporary support frame 5 in the vertical direction, the force on the first temporary support frame 5 is more balanced, thereby achieving stable support of the straight segment of the temporary optical cable 4 by the first temporary support frame 5, thereby ensuring stable optical communication of the temporary optical cable 4.

[0062] By horizontally arranging the transmitting optical cable and receiving optical cable of the corner section on both sides of the second temporary support frame 6, the force on the second temporary support frame 6 is more balanced, thereby achieving stable support of the corner section of the temporary optical cable 4 by the second temporary support frame 6, thereby ensuring stable optical communication of the temporary optical cable 4.

[0063] It should be noted that the temporary optical cable 4 includes: a transmitting optical cable and a receiving optical cable, that is, the first end, the second end, the straight section and the corner section of the temporary optical cable 4 all have a transmitting optical cable and a receiving optical cable, and the transmitting optical cable and the receiving optical cable are arranged separately on both sides of the temporary support frame, so that the force on the temporary support frame can be more balanced, wherein, corresponding to the transmitting optical cable and the receiving optical cable, first suspension points 7 are set on both sides of the first temporary support frame 5, and first tension points 8 are set on both sides of the second temporary support frame 6, that is, the first temporary support frame 5 is equipped with the transmitting optical cable and the receiving optical cable through the two first suspension points 7, and the second temporary support frame 6 is equipped with the transmitting optical cable and the receiving optical cable through the two first tension points 8.

[0064] like Figure 3 and Figure 4 As shown, in some embodiments, arranging a temporary optical cable 4 along the temporary communication path 3 includes:

[0065] A first base 9 is buried on the straight path 301 of the temporary communication path 3, and a first temporary support frame 5 is arranged on the first base 9;

[0066] A second base 10 is buried on the corner path 302 of the temporary communication path 3, and a second temporary support frame 6 is arranged on the second base 10;

[0067] The diameter of the second base 10 is greater than the diameter of the first base 9 .

[0068] It can be understood that by burying the first base 9 on the straight path 301 of the temporary communication path 3 and setting the first temporary support frame 5 on the first base 9, the first temporary support frame 5 can be stably arranged on the straight path 301 of the temporary communication path 3 using the first base 9, thereby ensuring that the first temporary support frame 5 stably supports the straight segment of the temporary optical cable 4, thereby ensuring stable optical communication of the temporary optical cable 4.

[0069] By burying the second base 10 on the corner path 302 of the temporary communication path 3 and setting the second temporary support frame 6 on the second base 10, the second temporary support frame 6 can be stably arranged on the corner path 302 of the temporary communication path 3 using the second base 10, thereby ensuring the second temporary support frame 6 to stably support the corner section of the temporary optical cable 4, thereby ensuring stable optical communication of the temporary optical cable 4.

[0070] It should be noted that the first base 9 is used to be buried on the straight path 301 to stably support the first temporary support frame 5. The specific type of the first base 9 can be set according to actual needs and is not limited to this. For example, the first base 9 can be a concrete foundation cast in the ground of the straight path 301.

[0071] The second base 10 is used to be buried in the corner path 302 to stably support the second temporary support frame 6. The specific type of the second base 10 can be set according to actual needs and is not limited to this. For example, the second base 10 can be a concrete foundation cast in the ground of the straight path 301.

[0072] Among them, since the second temporary support frame 6 not only has a supporting force in the vertical direction, but also has a supporting force in the turning direction, the second temporary support frame 6 needs to provide a greater bearing capacity than the first temporary support frame 5. In this embodiment, the diameter of the second base 10 is set to be larger than the diameter of the first base 9, so that the second base 10 has a greater supporting bearing capacity, thereby ensuring that the second temporary support frame 6 stably supports the corner section of the temporary optical cable 4.

[0073] like Figure 3 and Figure 4 As shown, in some embodiments, arranging a temporary optical cable 4 along the temporary communication path 3 includes:

[0074] Arrange adjacent first cement poles 501 and second cement poles 502 on the straight path 301 of the temporary communication path 3, and set a first reinforcement frame 503 between the first cement poles 501 and the second cement poles 502 to form a first temporary support frame 5;

[0075] Adjacent third cement poles 601 and fourth cement poles 602 are arranged on the corner path 302 of the temporary communication path 3 , and a second reinforcement frame 603 is provided between the third cement poles 601 and the fourth cement poles 602 to form a second temporary support frame 6 .

[0076] It can be understood that by arranging the adjacent first cement poles 501 and the second cement poles 502 on the straight path 301 of the temporary communication path 3, and setting the first reinforcement frame 503 between the first cement poles 501 and the second cement poles 502, the first cement poles 501, the second cement poles 502 and the first reinforcement frame 503 form a first temporary support frame 5 that is close to an "H" shape, so that the first temporary support frame 5 has a higher strength support structure, thereby ensuring that the first temporary support frame 5 stably supports the straight segment of the temporary optical cable 4.

[0077] By arranging adjacent third cement poles 601 and fourth cement poles 602 on the corner path 302 of the temporary communication path 3, and setting a second reinforcement frame 603 between the third cement poles 601 and the fourth cement poles 602 to form a second temporary support frame 6, the third cement poles 601, the fourth cement poles 602 and the second reinforcement frame 603 form a second temporary support frame 6 that is close to an "H" shape, so that the second temporary support frame 6 has a higher strength support structure, thereby ensuring that the second temporary support frame 6 stably supports the corner section of the temporary optical cable 4.

[0078] It should be noted that the first cement pole 501, the second cement pole 502 and the first reinforcement frame 503 are used to constitute the first temporary support frame 5. The first cement pole 501 and the second cement pole 502 play a main supporting role, and the first reinforcement frame 503 is used to play an auxiliary reinforcement role. The specific types of the first cement pole 501, the second cement pole 502 and the first reinforcement frame 503 can be set according to actual needs, and there is no limitation on this. For example, the first cement pole 501 and the second cement pole 502 are respectively configured with a first base 9. Specifically, the bottom of the first cement pole 501 is set in the ground through a first foundation, and the bottom of the second cement pole 502 is set in the ground through another first foundation. The first reinforcement frame 503 is a bracket structure. The first reinforcement frame 503 is set between the middle part of the first cement pole 501 and the middle part of the second cement pole 502. The two first suspension points 7 are respectively set at the top of the first cement pole 501 and the top of the second cement pole 502.

[0079] The third cement pole 601, the fourth cement pole 602 and the second reinforcement frame 603 are used to constitute a second temporary support frame 6. The third cement pole 601 and the fourth cement pole 602 play a main supporting role, and the second reinforcement frame 603 is used to play an auxiliary reinforcement role. The specific types of the third cement pole 601, the fourth cement pole 602 and the second reinforcement frame 603 can be set according to actual needs, and there is no limitation on this. For example, the third cement pole 601 and the fourth cement pole 602 are respectively configured with a second base 10. Specifically, the bottom of the third cement pole 601 is set in the ground through a second foundation, and the bottom of the fourth cement pole 602 is set in the ground through another second foundation. The second reinforcement frame 603 is a bracket structure. The second reinforcement frame 603 is set between the middle part of the third cement pole 601 and the middle part of the fourth cement pole 602. The two first tension hanging points 8 are respectively set at the top of the third cement pole 601 and the top of the fourth cement pole 602.

[0080] like Figure 2 As shown, in some embodiments, the temporary communication transition method includes:

[0081] Disconnect the communication optical cable on the first pole tower 11 and the second pole tower 12 of the transmission line, and form a free first disconnection point 1 on the first pole tower 11 and a free second disconnection point 2 on the second pole tower 12;

[0082] The first end of the temporary optical cable 4 is mounted on the first pole tower 11 and connected to the first disconnection point 1 , and the second end of the temporary optical cable 4 is mounted on the second pole tower 12 and connected to the second disconnection point 2 .

[0083] It can be understood that by mounting the first end of the temporary optical cable 4 on the first pole tower 11 and connecting it to the first breaking point 1, and mounting the second end of the temporary optical cable 4 on the second pole tower 12 and connecting it to the second breaking point 2, the first end of the temporary optical cable 4 can be hung and supported by the first pole tower 11, and the second end of the temporary optical cable 4 can be hung and supported by the second pole tower 12, thereby ensuring the stable connection between the first end of the temporary optical cable 4 and the first breaking point 1, and the stable connection between the second end of the temporary optical cable 4 and the second breaking point 2, thereby ensuring the stable optical communication of the temporary optical cable 4.

[0084] It should be noted that the first tower 11 and the second tower 12 are both used to support the installation of transmission lines. Disconnecting the transmission lines on the first tower 11 and the second tower 12 not only makes the transmission line disconnection operation simpler and more convenient, but also facilitates the construction of temporary optical cables 4 to achieve efficient temporary communications.

[0085] like Figure 5 and Figure 6 As shown, in some embodiments, the temporary communication transition method includes:

[0086] A second hanging point 13 supported in the vertical direction or a second tension hanging point (not shown in the figure) supported in the horizontal direction is arranged in the middle of the first tower 11, and the first end of the temporary optical cable 4 is hung on the second hanging point 13 in the vertical direction or on the second tension hanging point in the horizontal direction;

[0087] A third hanging point (not shown in the figure) supported in the vertical direction or a third tension hanging point 14 supported in the horizontal direction is arranged in the middle of the second tower 12, and the second end of the temporary optical cable 4 is hung on the third hanging point in the vertical direction or on the third tension hanging point 14 in the horizontal direction.

[0088] It can be understood that by arranging the second hanging point 13 supported in the vertical direction or the second tension hanging point supported in the horizontal direction in the middle of the first pole tower 11, and hanging the first end of the temporary optical cable 4 on the second hanging point 13 in the vertical direction or on the second tension hanging point in the horizontal direction, the first end of the temporary optical cable 4 can be stably erected in the middle of the first pole tower 11 by using the second hanging point 13 or the second tension hanging point; by arranging the third hanging point supported in the vertical direction or the third tension hanging point 14 supported in the horizontal direction in the middle of the second pole tower 12, and hanging the second end of the temporary optical cable 4 on the third hanging point in the vertical direction or on the third tension hanging point 14 in the horizontal direction, the second end of the temporary optical cable 4 can be stably erected in the middle of the second pole tower 12 by using the third hanging point or the third tension hanging point 14. Thus, the stable arrangement of the temporary optical cable 4 on the first pole tower 11 and the second pole tower 12 is achieved, thereby ensuring the stable optical communication of the temporary optical cable 4.

[0089] It should be noted that the second suspension hanging point 13 and the second tension hanging point are used to hang the first end of the temporary optical cable 4. The specific types of the second suspension hanging point 13 and the second tension hanging point can be set according to actual needs and are not limited to this. For example, the second suspension hanging point 13 and the first suspension hanging point 7 have the same structure, which is a support structure close to an L-shape, and the second tension hanging point and the first tension hanging point 8 have the same structure, which is a support structure close to an "I" shape.

[0090] The third suspension hanging point and the third tension hanging point 14 are used for hanging the second end of the temporary optical cable 4. The specific types of the third suspension hanging point and the third tension hanging point 14 can be set according to actual needs and are not limited to this. For example, the third suspension hanging point and the first suspension hanging point 7 have the same structure, which is a support structure close to an L-shape, and the third tension hanging point 14 and the first tension hanging point 8 have the same structure, which is a support structure close to an "I" shape.

[0091] When the first tower 11 is used as a straight tower, a second suspension point 13 supported in the vertical direction is arranged in the middle of the first tower 11; when the first tower 11 is used as a corner tower, a second tension point supported in the horizontal direction is arranged in the middle of the first tower 11.

[0092] Correspondingly, when the second tower 12 is used as a straight tower, a third suspension point supported in the vertical direction is arranged in the middle of the second tower 12; when the second tower 12 is used as a corner tower, a third tension point 14 supported in the horizontal direction is arranged in the middle of the second tower 12.

[0093] In some embodiments, the temporary communication transition method includes:

[0094] The transmitting optical cable and the receiving optical cable of the first end of the temporary optical cable 4 are respectively installed on both sides of the first pole tower 11;

[0095] The transmitting optical cable and the receiving optical cable at the second end of the temporary optical cable 4 are respectively installed on both sides of the second pole tower 12.

[0096] It can be understood that by respectively installing the transmitting optical cable and the receiving optical cable of the first end of the temporary optical cable 4 on both sides of the first pole tower 11, the force on the first pole tower 11 is made more balanced, thereby achieving stable support of the first end of the temporary optical cable 4 by the first pole tower 11, thereby ensuring stable optical communication of the temporary optical cable 4.

[0097] By respectively installing the transmitting optical cable and the receiving optical cable at the second end of the temporary optical cable 4 on both sides of the second pole tower 12, the force on the second pole tower 12 is made more balanced, thereby achieving stable support of the second end of the temporary optical cable 4 by the second pole tower 12, thereby ensuring stable optical communication of the temporary optical cable 4.

[0098] It should be noted that arranging the transmitting optical cable and the receiving optical cable separately on both sides of the pole tower can make the force on the pole tower more balanced, wherein, corresponding to the transmitting optical cable and the receiving optical cable, second suspension points 13 or second tension hanging points are set on both sides of the first pole tower 11, and third suspension points or third tension hanging points 14 are set on both sides of the second pole tower 12. That is to say, the first pole tower 11 is equipped with the transmitting optical cable and the receiving optical cable through the two second suspension points 13 or the second tension hanging points, and the second pole tower 12 is equipped with the transmitting optical cable and the receiving optical cable through the two third suspension points or the third tension hanging points 14.

[0099] In some embodiments, the temporary communication transition method includes:

[0100] Disconnecting the OPGW optical cable of the transmission line and making the OPGW optical cable form a free first disconnection point 1 and a second disconnection point 2;

[0101] An ADSS (All Dielectric Self Supporting) optical cable is arranged along the temporary communication path 3, and a first end of the ADSS optical cable is connected to a first break point 1, and a second end of the ADSS optical cable is connected to a second break point 2.

[0102] It can be understood that by using the ADSS optical cable as the temporary optical cable 4 to cooperate with the disconnected OPGW optical cable for temporary communication transition, not only can uninterrupted communication be achieved during the construction of the transmission line, thereby meeting the requirements of continuous communication, but also the temporary communication transition method has a lower implementation cost.

[0103] It should be noted that although both OPGW optical cable and ADSS optical cable have the function of optical communication, OPGW optical cable also has functions such as lightning protection. Therefore, the cost of OPGW optical cable is higher than that of ADSS optical cable. Since only temporary communication needs to be established during construction, the lower-cost ADSS optical cable is more suitable for the communication transition of this embodiment.

[0104] In the description of the present disclosure, the terms "first", "second", etc. are used for descriptive purposes only and cannot be understood as indicating or implying relative importance. In addition, in the description of the present disclosure, unless otherwise specified, "plurality" means two or more.

[0105] Any process or method description in a flowchart or otherwise described herein may be understood to represent a module, segment or portion of code that includes one or more executable instructions for implementing the steps of a specific logical function or process, and the scope of the preferred embodiments of the present disclosure includes alternative implementations in which functions may not be performed in the order shown or discussed, including performing functions in a substantially simultaneous manner or in the reverse order depending on the functions involved, which should be understood by those skilled in the art to which the embodiments of the present disclosure belong.

[0106] In the description of this specification, the description with reference to the terms "one embodiment", "some embodiments", "example", "specific example", or "some examples" means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the present disclosure. In this specification, the schematic representation of the above terms does not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described may be combined in any one or more embodiments or examples in a suitable manner.

[0107] Although the embodiments of the present disclosure have been shown and described above, it is to be understood that the above embodiments are exemplary and are not to be construed as limitations of the present disclosure. A person skilled in the art may change, modify, replace and vary the above embodiments within the scope of the present disclosure.

Claims

1. A temporary communication transition method in power transmission line construction, characterized in that: include: Disconnecting the communication optical cable of the power transmission line, and making the communication optical cable form a free first disconnection point and a second disconnection point; determining a temporary communication path between the first breaking point and the second breaking point; Arranging a temporary optical cable along the temporary communication path, and connecting a first end of the temporary optical cable to the first break point, and connecting a second end of the temporary optical cable to the second break point; When the construction is completed, the temporary optical cable is removed, and the first break point is connected to the first newly built optical cable, and the second break point is connected to the second newly built optical cable.

2. The temporary communication transition method in the construction of a power transmission line according to claim 1, characterized in that: The arranging of a temporary optical cable along the temporary communication path comprises: Arranging a first temporary support frame on the straight path of the temporary communication path, and erecting the straight section of the temporary optical cable on the first temporary support frame in a vertical direction; A second temporary support frame is arranged on the corner path of the temporary communication path, and the corner section of the temporary optical cable is erected on the second temporary support frame in a horizontal direction.

3. The temporary communication transition method in the construction of a power transmission line according to claim 2, characterized in that: The arranging of a temporary optical cable along the temporary communication path comprises: Arranging a first hanging point supported in a vertical direction on the top of the first temporary support frame, and hanging the straight section of the temporary optical cable in a vertical direction on the first hanging point; A first tension hanging point supported in the horizontal direction is arranged on the top of the second temporary supporting frame, and the corner section of the temporary optical cable is hung on the first tension hanging point in the horizontal direction.

4. The temporary communication transition method in the construction of a power transmission line according to claim 2, characterized in that: The arranging of a temporary optical cable along the temporary communication path comprises: The transmitting optical cable and the receiving optical cable of the straight section are respectively erected on both sides of the first temporary support frame in the vertical direction; The transmitting optical cable and the receiving optical cable of the corner section are respectively erected on both sides of the second temporary support frame in the horizontal direction.

5. The temporary communication transition method in the construction of a power transmission line according to claim 2, characterized in that: The arranging of a temporary optical cable along the temporary communication path comprises: burying a first base on the straight path of the temporary communication path, and setting the first temporary support frame on the first base; burying a second base on the corner path of the temporary communication path, and setting the second temporary support frame on the second base; Wherein, the diameter of the second base is greater than the diameter of the first base.

6. The temporary communication transition method in the construction of a power transmission line according to claim 2, characterized in that: The arranging of a temporary optical cable along the temporary communication path comprises: Arranging adjacent first cement poles and second cement poles on a straight path of the temporary communication path, and providing a first reinforcement frame between the first cement poles and the second cement poles to form the first temporary support frame; A third cement pole and a fourth cement pole are arranged adjacent to each other on a corner path of the temporary communication path, and a second reinforcement frame is provided between the third cement pole and the fourth cement pole to form the second temporary support frame.

7. The temporary communication transition method in power transmission line construction according to claim 1, characterized in that: The temporary communication transition method comprises: Disconnecting the communication optical cable on the first pole tower and the second pole tower of the transmission line, and forming a free first disconnection point of the communication optical cable on the first pole tower, and forming a free second disconnection point on the second pole tower; The first end of the temporary optical cable is mounted on the first pole tower and connected to the first disconnection point, and the second end of the temporary optical cable is mounted on the second pole tower and connected to the second disconnection point.

8. The temporary communication transition method in power transmission line construction according to claim 7, characterized in that: The temporary communication transition method comprises: Arrange a second hanging point supported in the vertical direction or a second tension hanging point supported in the horizontal direction in the middle of the first pole tower, and hang the first end of the temporary optical cable on the second hanging point in the vertical direction or on the second tension hanging point in the horizontal direction; A third hanging point supported in the vertical direction or a third tension hanging point supported in the horizontal direction is arranged in the middle of the second pole tower, and the second end of the temporary optical cable is hung on the third hanging point in the vertical direction or on the third tension hanging point in the horizontal direction.

9. The temporary communication transition method in power transmission line construction according to claim 7, characterized in that: The temporary communication transition method comprises: Installing the transmitting optical cable and the receiving optical cable at the first end of the temporary optical cable on both sides of the first pole tower respectively; The transmitting optical cable and the receiving optical cable at the second end of the temporary optical cable are respectively installed on both sides of the second pole tower.

10. The temporary communication transition method in power transmission line construction according to any one of claims 1 to 9, characterized in that: The temporary communication transition method comprises: Disconnecting the optical fiber composite overhead ground wire OPGW cable of the power transmission line, and making the OPGW cable form the first free disconnection point and the second free disconnection point; An all-dielectric self-supporting ADSS optical cable is arranged along the temporary communication path, and the first end of the ADSS optical cable is connected to the first breaking point, and the second end of the ADSS optical cable is connected to the second breaking point.