Manufacturing process of threaded smoke tube for boiler
Through scientific manufacturing steps and preferred solutions, the complex manufacturing process of threaded smoke pipes in the boiler is solved, the production efficiency and quality are improved, the accuracy and sealing performance of threaded smoke pipes are ensured, and the smoke leakage and energy loss are reduced. risk.
Patent Information
- Application Number
- CN202411063144.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-05
- Publication Date
- 2024-11-01
AI Technical Summary
The manufacturing process of threaded smoke pipes in boilers is complex, requiring accurate pressing depth and good surface quality to ensure the integrity of the threads and the smoothness of flue gas flow. At the same time, it is necessary to ensure accurate butt and reliable tightening during the assembly process to prevent smoke. Gas leakage and energy loss.
Scientific steps such as material acceptance and pressing test are adopted to determine the pressing depth, thread pressing, inspection, sawing and wool removal and assembly, and combined with preferred solutions such as asymmetric spiral structure and sealing groove design, ensure the accuracy and sealing performance of the threaded smoke pipe.
It significantly improves the production efficiency and quality of threaded smoke pipes, ensures the accuracy and stability of threaded smoke pipes, avoids production waste and rework, and reduces the risk of flue gas leakage and energy loss.
Smart Images

Figure CN118875658A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of boilers, in particular to a manufacturing process of a threaded smoke tube for a boiler. Background Art
[0002] Boilers are indispensable and important equipment in industrial production and civil heating. The stability of their performance and the level of thermal efficiency directly affect energy utilization efficiency and environmental protection. In the boiler system, the smoke pipe is the channel for the flow of flue gas. Its structural design and manufacturing quality have a significant impact on the overall performance of the boiler. Traditional smoke pipe designs mostly use smooth tube walls, but under the long-term effects of high temperature, high pressure and corrosive flue gas, the smooth tube wall is prone to wear, corrosion and dust accumulation, thus affecting the flow and heat transfer efficiency of the flue gas.
[0003] In order to overcome these problems, the boiler industry has begun to explore the use of threaded smoke pipe designs in recent years. By setting a spiral structure on the tube wall, the threaded smoke pipe can effectively enhance the turbulence of the flue gas and improve the heat transfer efficiency, while also helping to reduce dust accumulation and corrosion. However, the manufacturing process of the threaded smoke pipe is relatively complicated, requiring precise pressing depth and good surface quality to ensure the integrity of the thread and the smoothness of the flue gas flow. During the assembly process, it is necessary to ensure that the threaded smoke pipe and other related components are accurately docked and reliably fastened. At the same time, it is also necessary to pay attention to the control of sealing performance to prevent flue gas leakage and energy loss. Summary of the invention
[0004] The purpose of the present invention is to provide a manufacturing process for a threaded smoke tube for a boiler, so as to solve the problem that the manufacturing process of the threaded smoke tube proposed in the above background technology is relatively complicated, and requires precise pressing depth and good surface quality to ensure the integrity of the thread and the smoothness of the smoke flow. During the assembly process, it is necessary to ensure that the threaded smoke tube and other related components are accurately docked and reliably fastened. At the same time, it is also necessary to pay attention to the control of the sealing performance to prevent smoke leakage and energy loss.
[0005] To achieve the above object, the present invention provides a process for manufacturing a threaded smoke tube for a boiler, comprising the following manufacturing steps:
[0006] S1. Material acceptance: Acceptance of incoming steel pipe materials to ensure that they meet the requirements of GB3087 standard, and factory inspection in accordance with the provisions of NB / T10939. Only qualified materials can be used for production;
[0007] S2. Test pressing to determine the pressing depth. Before formal pressing, test pressing is performed to determine the feed amount of the pressing wheel under the thread pitch and thread height of the inner wall of the threaded smoke pipe required in the production drawing;
[0008] S3. Thread pressing: According to the parameters determined by the trial pressing, the formal thread pressing is carried out. During the pressing process, the forming wheel and the supporting wheel should be checked at any time. If any defects are found, they should be repaired or replaced in time. At the same time, in order to prevent the clamping end of the threaded smoke pipe from deforming, the inner support block of the corresponding specification should be placed in the pipe end in advance before clamping;
[0009] S4. Inspection: After the pressing is completed, the threaded pipes are inspected one by one, and the thread depth is checked using the inspection template to ensure that the pitch deviation is within the specified range. At the same time, the surface of the threaded pipe is checked to ensure that there are no defects such as cracks and wrinkles;
[0010] S5, sawing and removing rough materials, sawing and removing rough materials from the threaded smoke pipe according to the size of the materials;
[0011] S6, assembling, transferring the sawn threaded smoke pipe to the assembly workshop for assembly;
[0012] The manufacturing equipment for the manufacturing process of threaded smoke pipes for boilers includes acceptance platform, test pressing equipment, thread pressing equipment, inspection equipment, sawing equipment, and assembly equipment.
[0013] As a preferred solution of the present invention, the threaded smoke pipe comprises a tube body, a tube wall of the tube body is provided with a spiral structure, and tube sheets are installed at both ends of the tube body.
[0014] As a preferred solution of the present invention, a sealing groove is provided at the outer wall of the tube sheet close to the tube body, a sealing ring is installed in the sealing groove, and a clamping assembly is installed at the tube body close to the sealing ring.
[0015] As a preferred embodiment of the present invention, a threaded end is provided at the outer end of the tube body, and the clamping assembly includes a threaded ring, which is threadedly connected to the threaded end, an annular groove is provided on one side of the threaded ring, a spring is provided inside the annular groove, an annular pressure plate is installed at the outer end of the spring, and the outer wall of the annular pressure plate is pressed against the sealing ring.
[0016] As a preferred solution of the present invention, the spiral structure includes an outer spiral groove located on the outer wall of the tube body and an inner spiral protrusion located on the inner wall of the tube body.
[0017] As a preferred embodiment of the present invention, the inner wall of the outer spiral groove is an arc-shaped structure, and the outer wall of the inner spiral protrusion is an arc-shaped structure. The groove width of the outer spiral groove gradually changes from one end of the tube body to the other end, forming a gradual structure to enhance the flow performance of the smoke pipe under specific conditions. The height of the inner spiral protrusion changes periodically along the axial direction of the tube body to form a wavy structure to increase the turbulence effect inside the smoke pipe and improve the heat exchange efficiency. The outer wall of the annular pressure plate is provided with an anti-slip texture to increase the friction between the sealing ring and ensure the sealing effect. Positioning flanges are also provided at both ends of the tube body for matching with the positioning grooves on the tube plate during installation to ensure accurate positioning and stable assembly of the threaded smoke pipe. A drainage hole is provided at the bottom of the sealing groove for discharging moisture or impurities that may accumulate in the sealing groove to keep the sealing environment dry and clean. The spiral angles between the outer spiral groove and the inner spiral protrusion are different to form an asymmetric spiral structure to further optimize the flow path of the flue gas, reduce resistance and improve thermal efficiency.
[0018] As a preferred embodiment of the present invention, the method for determining the pressing depth by trial pressing in step S2 is as follows:
[0019] S21. Determine the target thread pitch and inner wall thread height according to the production drawing;
[0020] S22. Use a small section of steel pipe material for preliminary test pressing to roughly understand the deformation of the material under given conditions, adjust the position and feed rate of the pressing wheel, observe how the steel pipe material forms threads, and record the pressing depth;
[0021] S23. Based on the results of the preliminary pressure test, gradually increase or decrease the feed rate of the pressing wheel to seek the best thread forming effect. After each parameter adjustment, detailed records are made, including pressing depth, thread morphology, and surface quality.
[0022] S24. Use measuring tools to accurately measure the pressed thread depth and other geometric dimensions, compare the measurement results with the requirements on the production drawings, evaluate whether they meet the specifications, and observe and record whether there are cracks and wrinkles on the surface of the steel pipe;
[0023] S25. Analyze the results of the test pressing and optimize the parameters according to the evaluation data. If the thread depth is too shallow or too deep, it is necessary to adjust the feed rate of the pressing wheel or replace the pressing wheel of different sizes. If there are defects on the surface of the steel pipe, it is necessary to check the machine tool status, steel pipe material or adjust the pressing speed;
[0024] S26. After determining a set of relatively ideal pressing parameters, repeat the test pressing several times to verify the stability of the results. If the results of multiple test pressings meet the requirements, then this set of parameters can be determined as the official pressing depth parameters.
[0025] As a preferred embodiment of the present invention, the method of thread pressing in step S3 is as follows:
[0026] S31. According to the production drawings and the parameters determined by the test pressing, set the pressing parameters of the machine tool, including the feed amount and speed of the pressing wheel;
[0027] S32. Place the qualified steel pipe in the appropriate position of the pressing equipment to ensure that the axis of the steel pipe is consistent with the movement direction of the pressing wheel;
[0028] S33, start the machine tool, so that the pressing wheel starts pressing according to the set parameters;
[0029] S34. During the pressing process, regularly check the wear of the forming wheel and the supporting wheel. If any defects are found, they should be repaired or replaced in time.
[0030] S35. When the steel pipe is completely pressed to form threads that meet the requirements, stop the machine tool, take out the pressed threaded pipe, and conduct a preliminary appearance inspection to ensure that there are no obvious defects.
[0031] 9. The manufacturing process of threaded smoke pipe for boiler according to claim 1, characterized in that: the method of sawing and removing the rough material in step S5 is as follows:
[0032] S51. Use a measuring tool to measure the threaded pipe to determine the exact position to be sawed, and use a marking tool to clearly mark the sawing line on the threaded pipe to ensure the accuracy and consistency of the sawing;
[0033] S52, fix the marked threaded smoke pipe on the sawing equipment to ensure that it is firmly fixed and will not slide, adjust the parameters of the sawing equipment to adapt to the material and specifications of the steel pipe, start the sawing equipment, and saw along the marked sawing line;
[0034] S53. After sawing is completed, check the sawing surface of the threaded smoke pipe to ensure that it is flat, smooth and free of cracks.
[0035] As a preferred embodiment of the present invention, the method of sawing and removing the rough material in step S6 is as follows:
[0036] S61. Carefully inspect the end face, threads and other parts of the threaded smoke pipe to ensure that there are no defects or dirt;
[0037] S62. According to the assembly drawings and production requirements, connect the threaded smoke pipe with other related parts;
[0038] S63. Add sealing gaskets or apply sealants to the joint parts as needed to ensure sealing performance. Use appropriate bolts and nuts to fasten the joint parts together. Pay attention to controlling the tightening torque to avoid damaging the threads or causing over-tightening or over-loosening.
[0039] S64. Carefully check the assembled threaded smoke pipe assembly to confirm that all parts are installed correctly and tightened securely.
[0040] Compared with the prior art, the present invention has the following beneficial effects:
[0041] 1. In the manufacturing process of the threaded smoke tube for the boiler, the production efficiency and quality of the threaded smoke tube are significantly improved through the combination of refined manufacturing steps and optimal solutions. In the key steps of material acceptance, test pressing to determine the pressing depth, thread pressing, inspection, sawing and removing rough materials, and assembly, scientific and effective methods and measures are adopted to ensure the accuracy and stability of the threaded smoke tube.
[0042] 2. In the manufacturing process of the threaded smoke tube for the boiler, the present invention strictly follows the relevant standards in the material acceptance link, ensuring the quality of the incoming steel tube materials and laying a solid foundation for subsequent production. In the step of trial pressing to determine the pressing depth, the optimal pressing parameters were found through multiple attempts and adjustments, ensuring the formation of the thread and the integrity of the tube wall, and avoiding possible waste and rework in the production process.
[0043] 3. In the manufacturing process of the threaded smoke pipe for the boiler, during the thread pressing process, the present invention checks the wear of the forming wheel and the supporting wheel at any time, discovers and handles defects in time, and ensures the accuracy and surface quality of the thread. At the same time, in order to prevent the clamping end of the threaded smoke pipe from deforming, the present invention cleverly uses an internal support block for support, which effectively avoids the deformation problem during the clamping process.
[0044] 4. In the manufacturing process of the threaded smoke tube for the boiler, the present invention inspects the threaded smoke tubes one by one in the inspection link to ensure that each smoke tube meets the production requirements and has no defects such as cracks and wrinkles. The step of sawing and removing the rough material is also carefully designed and implemented to ensure the accuracy and consistency of sawing, so that the size of the threaded smoke tube is more accurate.
[0045] 5. In the manufacturing process of the threaded smoke pipe for the boiler, in the assembly link, the present invention accurately docks the threaded smoke pipe with other related components according to the assembly drawings and production requirements, and takes appropriate sealing measures to ensure the sealing performance and fastening reliability after assembly. The effective implementation of this step not only improves the assembly efficiency, but also greatly reduces the risk of flue gas leakage and energy loss. BRIEF DESCRIPTION OF THE DRAWINGS
[0046] Figure 1 It is a schematic diagram of the overall structure of the present invention;
[0047] Figure 2 It is a schematic diagram of the local structure of the tube body in the present invention;
[0048] Figure 3 It is a structural schematic diagram of the pressing assembly in the present invention;
[0049] Figure 4 It is a schematic diagram of the end structure of the tube body in the present invention;
[0050] Figure 5 It is a structural schematic diagram of the tube sheet in the present invention;
[0051] Figure 6 It is a schematic diagram of the use of the present invention;
[0052] Figure 7 It is a schematic diagram of the structure of the manufacturing equipment in the present invention.
[0053] The meaning of each number in the figure is:
[0054] 1. Pipe body; 101. Flange; 2. Tube sheet; 21. Drain hole; 3. Spiral structure; 31. External spiral groove; 32. Internal spiral protrusion; 33. Threaded end; 4. Sealing ring; 5. Clamping assembly; 51. Threaded ring; 511. Annular groove; 52. Spring; 53. Annular pressure plate; 6. Boiler; 7. Acceptance platform; 8. Trial pressing equipment; 9. Thread pressing equipment; 10. Inspection equipment; 11. Sawing equipment; 12. Assembly equipment. DETAILED DESCRIPTION
[0055] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0056] The present invention provides a manufacturing process for a threaded smoke tube for a boiler, such as Figure 1-Figure 7 As shown, the manufacturing steps include the following:
[0057] S1. Material acceptance: Acceptance of incoming steel pipe materials to ensure that they meet the requirements of GB3087 standard, and factory inspection in accordance with the provisions of NB / T10939. Only qualified materials can be used for production;
[0058] S2. Test pressing to determine the pressing depth. Before formal pressing, test pressing is performed to determine the feed amount of the pressing wheel under the thread pitch and thread height of the inner wall of the threaded smoke pipe required in the production drawing;
[0059] S3. Thread pressing: According to the parameters determined by the trial pressing, the formal thread pressing is carried out. During the pressing process, the forming wheel and the supporting wheel should be checked at any time. If any defects are found, they should be repaired or replaced in time. At the same time, in order to prevent the clamping end of the threaded smoke pipe from deforming, the inner support block of the corresponding specification should be placed in the pipe end in advance before clamping;
[0060] S4. Inspection: After the pressing is completed, the threaded pipes are inspected one by one, and the thread depth is checked using the inspection template to ensure that the pitch deviation is within the specified range. At the same time, the surface of the threaded pipe is checked to ensure that there are no defects such as cracks and wrinkles;
[0061] S5, sawing and removing rough materials, sawing and removing rough materials from the threaded smoke pipe according to the size of the materials;
[0062] S6, assembling, transferring the sawn threaded smoke pipe to the assembly workshop for assembly;
[0063] The manufacturing equipment of the manufacturing process of the threaded smoke pipe for a boiler includes an acceptance platform 7, a test pressing device 8, a thread pressing device 9, an inspection device 10, a sawing device 11, and an assembly device 12.
[0064] In this embodiment, the threaded smoke pipe includes a pipe body 1 , a spiral structure 3 is arranged on the pipe wall of the pipe body 1 , and tube sheets 2 are installed at both ends of the pipe body 1 .
[0065] Specifically, a sealing groove is provided on the outer wall of the tube sheet 2 close to the tube body 1 , a sealing ring 4 is installed in the sealing groove, and a pressing assembly 5 is installed on the tube body 1 close to the sealing ring 4 .
[0066] Furthermore, a threaded end 33 is provided at the outer end of the tube body 1, and the clamping assembly 5 includes a threaded ring 51, which is threadedly connected to the threaded end 33, and an annular groove 511 is provided on one side of the threaded ring 51, and a spring 52 is provided inside the annular groove 511, and an annular pressure plate 53 is installed at the outer end of the spring 52, and the outer wall of the annular pressure plate 53 is pressed against the sealing ring 4.
[0067] Furthermore, the spiral structure 3 includes an outer spiral groove 31 located on the outer wall of the tube body 1 and an inner spiral protrusion 32 located on the inner wall of the tube body 1 .
[0068] Furthermore, the inner wall of the outer spiral groove 31 is an arc-shaped structure, and the outer wall of the inner spiral protrusion 32 is an arc-shaped structure. The groove width of the outer spiral groove 31 gradually changes from one end of the tube body 1 to the other end, forming a gradual structure to enhance the flow performance of the smoke pipe under specific conditions. The height of the inner spiral protrusion 32 changes periodically along the axial direction of the tube body 1 to form a wavy structure to increase the turbulence effect inside the smoke pipe and improve the heat exchange efficiency. The outer wall of the annular pressure plate 53 is provided with an anti-slip texture to increase the friction between the sealing ring 4 and ensure the sealing effect. Positioning flanges 101 are also provided at both ends of the tube body 1 for matching with the positioning grooves on the tube sheet 2 during installation to ensure accurate positioning and stable assembly of the threaded smoke pipe. A drainage hole 21 is provided at the bottom of the sealing groove for discharging moisture or impurities that may accumulate in the sealing groove to keep the sealing environment dry and clean. The spiral angles between the outer spiral groove 31 and the inner spiral protrusion 32 are different to form an asymmetric spiral structure to further optimize the flow path of the flue gas, reduce resistance, and improve thermal efficiency.
[0069] It is worth noting that Figure 6 As shown, a plurality of threaded smoke tubes are installed in the boiler 6 at equal intervals.
[0070] Furthermore, the method for determining the pressing depth by pilot pressing in step S2 is as follows:
[0071] S21. Determine the target thread pitch and inner wall thread height according to the production drawing;
[0072] S22. Use a small section of steel pipe material for preliminary test pressing to roughly understand the deformation of the material under given conditions, adjust the position and feed rate of the pressing wheel, observe how the steel pipe material forms threads, and record the pressing depth;
[0073] S23. Based on the results of the preliminary pressure test, gradually increase or decrease the feed rate of the pressing wheel to seek the best thread forming effect. After each parameter adjustment, detailed records are made, including pressing depth, thread morphology, and surface quality.
[0074] S24. Use measuring tools to accurately measure the pressed thread depth and other geometric dimensions, compare the measurement results with the requirements on the production drawings, evaluate whether they meet the specifications, and observe and record whether there are cracks and wrinkles on the surface of the steel pipe;
[0075] S25. Analyze the results of the test pressing and optimize the parameters according to the evaluation data. If the thread depth is too shallow or too deep, it is necessary to adjust the feed rate of the pressing wheel or replace the pressing wheel of different sizes. If there are defects on the surface of the steel pipe, it is necessary to check the machine tool status, steel pipe material or adjust the pressing speed;
[0076] S26. After determining a set of relatively ideal pressing parameters, repeat the test pressing several times to verify the stability of the results. If the results of multiple test pressings meet the requirements, then this set of parameters can be determined as the official pressing depth parameters.
[0077] Furthermore, the thread pressing method in step S3 is as follows:
[0078] S31. According to the production drawings and the parameters determined by the test pressing, set the pressing parameters of the machine tool, including the feed amount and speed of the pressing wheel;
[0079] S32. Place the qualified steel pipe in the appropriate position of the pressing equipment to ensure that the axis of the steel pipe is consistent with the movement direction of the pressing wheel;
[0080] S33, start the machine tool, so that the pressing wheel starts pressing according to the set parameters;
[0081] S34. During the pressing process, regularly check the wear of the forming wheel and the supporting wheel. If any defects are found, they should be repaired or replaced in time.
[0082] S35. When the steel pipe is completely pressed to form threads that meet the requirements, stop the machine tool, take out the pressed threaded pipe, and conduct a preliminary appearance inspection to ensure that there are no obvious defects.
[0083] Furthermore, the method of sawing and removing the rough material in step S5 is as follows:
[0084] S51. Use a measuring tool to measure the threaded pipe to determine the exact position to be sawed, and use a marking tool to clearly mark the sawing line on the threaded pipe to ensure the accuracy and consistency of the sawing;
[0085] S52, fix the marked threaded smoke pipe on the sawing equipment to ensure that it is firmly fixed and will not slide, adjust the parameters of the sawing equipment to adapt to the material and specifications of the steel pipe, start the sawing equipment, and saw along the marked sawing line;
[0086] S53. After sawing is completed, check the sawing surface of the threaded smoke pipe to ensure that it is flat, smooth and free of cracks.
[0087] Furthermore, the method of sawing and removing the rough material in step S6 is as follows:
[0088] S61. Carefully inspect the end face, threads and other parts of the threaded smoke pipe to ensure that there are no defects or dirt;
[0089] S62. According to the assembly drawings and production requirements, connect the threaded smoke pipe with other related parts;
[0090] S63. Add sealing gaskets or apply sealants to the joint parts as needed to ensure sealing performance. Use appropriate bolts and nuts to fasten the joint parts together. Pay attention to controlling the tightening torque to avoid damaging the threads or causing over-tightening or over-loosening.
[0091] S64. Carefully check the assembled threaded smoke pipe assembly to confirm that all parts are installed correctly and tightened securely.
[0092] The above shows and describes the basic principles, main features and advantages of the present invention. Those skilled in the art should understand that the present invention is not limited by the above embodiments. The above embodiments and descriptions are only preferred examples of the present invention and are not intended to limit the present invention. Without departing from the spirit and scope of the present invention, the present invention may have various changes and improvements, which fall within the scope of the present invention. The scope of protection of the present invention is defined by the attached claims and their equivalents.
Claims
1. A manufacturing process for a threaded smoke tube for a boiler, characterized in that: The manufacturing steps include: S1. Material acceptance: acceptance of incoming steel pipe materials; S2, test pressing to determine the pressing depth; S3. Thread pressing: According to the parameters determined by the trial pressing, the formal thread pressing is carried out. During the pressing process, the forming wheel and the supporting wheel should be checked at any time. If any defects are found, they should be repaired or replaced in time. S4. Inspection: After the pressing is completed, the threaded smoke pipes are inspected one by one; S5, sawing and removing rough materials, sawing and removing rough materials from the threaded smoke pipe according to the size of the materials; S6, assembling, transferring the sawn threaded smoke pipe to the assembly workshop for assembly; The threaded smoke pipe comprises a pipe body (1), a spiral structure (3) is provided on the pipe wall of the pipe body (1), and tube plates (2) are installed at both ends of the pipe body (1). The tube sheet (2) is provided with a sealing groove at an outer wall close to the tube body (1), a sealing ring (4) is installed in the sealing groove, and a pressing assembly (5) is installed at a position close to the sealing ring (4) of the tube body (1); The manufacturing equipment of the manufacturing process of the threaded smoke pipe for a boiler comprises an acceptance platform (7), a test pressing device (8), a thread pressing device (9), an inspection device (10), a sawing device (11), and an assembly device (12).
2. The manufacturing process of the threaded smoke pipe for a boiler according to claim 1, characterized in that: The outer end of the tube body (1) is provided with a threaded end (33), and the clamping assembly (5) includes a threaded ring (51), the threaded ring (51) is threadedly connected to the threaded end (33), one side of the threaded ring (51) is provided with an annular groove (511), a spring (52) is provided inside the annular groove (511), and an annular pressure plate (53) is installed at the outer end of the spring (52), and the outer wall of the annular pressure plate (53) is pressed against the sealing ring (4).
3. The manufacturing process of the threaded smoke pipe for a boiler according to claim 1, characterized in that: The spiral structure (3) comprises an outer spiral groove (31) located on the outer wall of the tube body (1) and an inner spiral protrusion (32) located on the inner wall of the tube body (1).
4. The manufacturing process of the threaded smoke pipe for a boiler according to claim 3 is characterized in that: The inner wall of the outer spiral groove (31) is an arc-shaped structure, the outer wall of the inner spiral protrusion (32) is an arc-shaped structure, and the groove width of the outer spiral groove (31) gradually changes from one end of the tube body (1) to the other end, forming a gradual structure.
5. The manufacturing process of the threaded smoke pipe for a boiler according to claim 4, characterized in that: The height of the inner spiral protrusion (32) varies periodically along the axial direction of the tube body (1), forming a wave-shaped structure, and the outer wall of the annular pressure plate (53) is provided with an anti-slip texture.
6. The manufacturing process of the threaded smoke pipe for a boiler according to claim 5, characterized in that: Positioning flanges (101) are also provided at both ends of the tube body (1), and a drainage hole (21) is provided at the bottom of the sealing groove.
7. The manufacturing process of the threaded smoke tube for a boiler according to claim 1, characterized in that: The method for determining the pressing depth by pilot pressing in step S2 is as follows: S21. Determine the target thread pitch and inner wall thread height according to the production drawing; S22, use a small section of steel pipe material to carry out preliminary test pressing; S23. Based on the results of the preliminary pressure test, gradually increase or decrease the feed amount of the pressure wheel. S24. Use measuring tools to accurately measure the pressed thread depth and other geometric dimensions; S25, analyzing the results of the test compression, and optimizing the parameters according to the evaluation data; S26. After determining a set of ideal pressing parameters, repeat the test pressing several times to verify the stability of the results.
8. The manufacturing process of the threaded smoke pipe for a boiler according to claim 1, characterized in that: The method of thread pressing in step S3 is as follows: S31, parameters determined according to production drawings and test pressing; S32. Place the qualified steel pipes at the appropriate position of the pressing equipment; S33, start the machine tool; S34. During the pressing process, regularly check the wear of the forming wheel and the supporting wheel; S35. When the steel pipe is completely pressed to form threads that meet the requirements, stop the machine tool, take out the pressed threaded pipe, and conduct a preliminary appearance inspection to ensure that there are no obvious defects.
9. The manufacturing process of the threaded smoke tube for a boiler according to claim 1, characterized in that: The method of sawing and removing the rough material in step S5 is as follows: S51, using a measuring tool to measure the threaded smoke pipe to determine the exact position that needs to be sawed; S52, fixing the marked threaded cigarette pipe on the sawing equipment, and sawing along the marked sawing line; S53. After the sawing is completed, the sawing surface of the threaded smoke pipe is inspected.
10. The manufacturing process of the threaded smoke pipe for a boiler according to claim 1, characterized in that: The method of sawing and removing the rough material in step S6 is as follows: S61. Carefully inspect the end face, threads and other parts of the threaded smoke pipe; S62. According to the assembly drawings and production requirements, connect the threaded smoke pipe with other related parts; S63. Add sealing gaskets or apply sealant to the butt joints as needed, and use appropriate bolts and nuts to fasten the butt joints together; S64. Carefully inspect the assembled threaded smoke pipe assembly.
Citation Information
Patent Citations
Tobacco pipe for boiler with interior female thread
CN207515598U
Novel high-sealing-performance threaded connection structure of oil well pipe
CN212317881U
Threaded smoke tube for boiler
CN220153353U
Improvements in and relating to internal flues for steam boilers and in other flues and heated pipes
GB559236A
Heat transfer tube
JP1998002689A
Cited By
Energy-saving smoke tube preparation tool and preparation method
CN119870247A