Flower vase pier column steel bar binding method
By using anti-friction components and steel cage frames during the binding of vase pier columns, the problem of unstable friction and binding between the hanging rope and the steel cage is solved, and a higher construction quality and protective layer qualification rate are achieved.
Patent Information
- Application Number
- CN202411058663.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-02
- Publication Date
- 2024-11-01
AI Technical Summary
During the binding process of existing vase pier column steel bars, the hanging rope and the steel cage are prone to friction, resulting in unstable lifting, and the position of the steel bars is offset and the spacing is not standardized, affecting the construction quality and the protection layer qualification rate.
Anti-friction components are used to fit the hanger on the positioning plate, and the limit and precise adjustment are made through the steel cage frame and the positioning plate to ensure the accurate position and uniform spacing of the steel bars, and foam waterproof protection is used at the embedded ribs on the top of the pier. The sleeve prevents rust.
It improves the lifting stability and construction quality of the steel cage, reduces the friction of the rope, and ensures the accuracy of the steel bar binding position and the pass rate of the protective layer.
Smart Images

Figure CN118880744A_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of steel bar binding for vase piers and columns, and in particular relates to a steel bar binding method for vase piers and columns. Background Art
[0002] Application No. 202410332086.1 provides a circular reinforced concrete pier of an elevated bridge and a construction method. After the load-bearing pier columns are connected by I-shaped steel, a stable lateral support is provided. Then, a plurality of transverse steel bars are arranged around the I-shaped steel, and a plurality of transverse steel bars are framed with the I-shaped steel by rectangular stirrups. The rectangular stirrups are covered by a support formwork to form a pouring space. Concrete is poured in the pouring space to form a supporting beam. The main skeleton of the supporting beam is formed by I-shaped steel, and the transverse steel bars and rectangular stirrups are used to provide shear resistance and lateral load.
[0003] However, when lifting the pier column steel cage, it is necessary to lift both ends of the steel cage by a truck crane in order to adjust the inclination angle of the steel cage. However, during the lifting process, the steel cage shakes, which can easily cause contact and friction between the lifting rope and the steel cage, affecting the lifting stability and quality of the steel cage. In the construction process of some existing steel cage binding, there are problems such as loose steel binding, offset steel binding position, irregular steel binding spacing and low qualified rate of steel protection layer, which have poor practicality. Summary of the invention
[0004] In order to solve the problem of friction between the lifting rope and the steel cage in the above-mentioned prior art, the present invention provides a method for tying steel bars for vase piers, which adopts anti-friction components to achieve the effect of fitting the lifting rope with the anti-friction components. The specific technical scheme is: a method for tying steel bars for vase piers, characterized in that it includes the following steps: S1, assembling a steel cage frame, installing positioning plates at both ends of the frame after the frame is assembled, and positioning the main bars through the holes; S2, installing the upper row of main bars and connecting the main bars to the positioning plates; S3, preliminarily installing stirrups; S4, inserting the remaining main bars into the stirrups along the longitudinal direction, leaving long space at both ends; The degree is positioned by double-layer positioning tools at both ends; S5, install the transverse stirrups, install them in place from the side of the tire frame, and accurately adjust the stirrup spacing to firmly tie the stirrups to the main reinforcement; S6, check the pier column steel cage before overall hoisting and docking on site, and carry out anti-corrosion treatment on the embedded reinforcement on the pier top; S7, the straight section pier column steel cage is hoisted as a whole by a truck crane, the main hook of the truck crane hangs the lifting point of the double-layer positioning plate on the top of the steel cage, and the auxiliary hook hangs the lifting point of the double-layer positioning plate on the bottom of the steel cage. Before hoisting, make the hanging line fit with the anti-friction component on the positioning plate; S8, vase section steel bar installation; S9, tie the stirrups according to the preset stirrup spacing line.
[0005] Preferably, the steel cage frame comprises:
[0006] A base, wherein the number of the bases is multiple and the multiple bases are arranged in parallel;
[0007] Brackets, two brackets are symmetrically installed at both ends of the base;
[0008] Ear plate, the top end of the bracket is equipped with an ear plate;
[0009] An upper edge main reinforcement hanging piece, wherein the upper edge main reinforcement hanging piece is connected between the tops of the two ear plates;
[0010] A lower edge main reinforcement hanging piece, wherein the top of the base is provided with a lower edge main reinforcement hanging piece, and the lower edge main reinforcement hanging piece is located below the upper edge main reinforcement hanging piece;
[0011] Side edge main reinforcement hanging pieces, a plurality of side edge main reinforcement hanging pieces are arranged on the surface of the ear plate along the up and down directions, and the side edge main reinforcement hanging pieces on both sides are symmetrically arranged.
[0012] Preferably, the S1 is specifically:
[0013] S1.1, the main reinforcement is fixed on the positioning plate with a conical nut to ensure that the main reinforcement is in the center of the positioning plate hole;
[0014] S1.2, the middle position of the main reinforcement is mainly determined by the slots on the binding jig. Bolt holes are reserved on the columns of the steel bar binding jig for fixing the positioning jig.
[0015] Preferably, S3 is specifically:
[0016] S3.1, install external stirrups around the main reinforcement;
[0017] S3.2, Install vertical internal stirrups.
[0018] Preferably, S4 is specifically:
[0019] S4.1, the positioning plate is a double-layer positioning steel plate, which is formed by processing 2cm thick steel plate, and the top steel bar positioning tooling is made of steel;
[0020] S4.2, adjust the position of the main reinforcement by adjusting the conical nut to ensure its accurate position.
[0021] Preferably, S6 specifically includes:
[0022] S6.1. Install 4cm thick C40 plum blossom-shaped spacers on the sides of the pier reinforcement cage, with a quantity of no less than 6 per square meter, arranged in a plum blossom shape;
[0023] S6.2, the spacer and the steel bar are firmly tied together, and the wire ends of the tying do not enter the concrete cover;
[0024] S6.3. Before the on-site hoisting and docking of the pier column reinforcement cage, the position, quantity and tightness of the pads shall be checked. If they meet the requirements, the embedded reinforcement on the pier top shall be protected with a foam waterproof protective cover to prevent the reinforcement from rusting.
[0025] Preferably, the S7 is specifically:
[0026] S7.1, the positioning plate and the hoisting frame adopt two layers of steel positioning plates, with a truss set in the middle of the positioning plate, and the positioning plate is welded as a whole through the truss;
[0027] S7.2, during hoisting, the long and short joints of the steel bars are fixed to the positioning plate and the hoisting frame by means of positioning nuts and locking nuts;
[0028] S7.3, use the truck crane to lift the steel cage. When the steel cage is 4 to 5 meters above the ground, continue to lift the main hook and slowly lower the auxiliary hook. Lift the main hook until the steel cage is perpendicular to the ground, release the auxiliary hook, and the steel cage is flipped.
[0029] S7.4, after the steel cage is hoisted as a whole to the top of the 0.5m pier column steel cage pre-buried in the cap, the bottom positioning plate of the pier column steel cage is removed, and the whole section of the pier column steel cage is connected to the 0.5m cast pier column steel bar with a straight threaded sleeve;
[0030] S7.5, when connecting the threads, rotate the main reinforcement of the steel cage to align them. After the alignment is completed, tighten the straight thread sleeve downwards to complete the overall connection of the steel cage.
[0031] Preferably, four lifting ears and two anti-friction components are installed at the opposite ends of the two positioning plates, the four lifting ears are respectively located at the four corners of the surface of the positioning plates, and the two anti-friction components are adapted to the two lifting ears on one side of the lifting.
[0032] Preferably, the anti-friction component comprises:
[0033] A mounting seat, the mounting seat is fixedly arranged on the surface of the positioning plate;
[0034] Side grooves, the inner walls on both sides of the mounting seat are provided with side grooves;
[0035] A slide bar, wherein a slide bar is arranged in the side groove along the vertical direction;
[0036] A slider is slidably mounted on the outer wall of the slide rod, and the slider is slidably connected in the side groove;
[0037] A spring is provided between the slider and the inner wall of the side groove, and the spring is sleeved on the outer side of the slide rod;
[0038] A connecting rod, wherein a connecting rod is provided between the two sliding blocks;
[0039] A roller is rotatably mounted on the outer wall of the connecting rod, and the roller is fitted with the suspension rope.
[0040] Preferably, the S8 is specifically:
[0041] S8.1, the steel cage of the pier column of the vase section is prefabricated on site using a vertical frame;
[0042] S8.2, after the vase segment enveloping ladder cage is erected, the vase segment reinforcement cage is hoisted as a whole, and the arc-shaped main reinforcement is connected to the standard segment main reinforcement using a single threaded sleeve.
[0043] Preferably, the S9 is specifically:
[0044] S9.1, according to the preset steel bar position line, tie from bottom to top;
[0045] S9.2, stirrups are arranged perpendicular to the main reinforcement, and the corners of the stirrups are tied at the intersections with the main reinforcement. The intersections of the main reinforcement and the non-corner parts of the stirrups are tied in a staggered pattern;
[0046] S9.3, after the stirrups are tied, install the pads, the number of which shall not be less than 6 per m2.
[0047] Compared with the prior art, the method for tying steel bars of a vase pier column of the present invention has the following beneficial effects:
[0048] 1. The steel bar binding method for the vase pier column uses a steel cage frame and a positioning plate to limit the main reinforcement, and sets hanging pieces in four directions to avoid the displacement of the steel bar binding position and control the steel bar binding spacing; the embedded reinforcement on the pier top is protected by a foam waterproof protective cover to prevent the steel bar from rusting and improve the qualified rate of the steel bar protective layer;
[0049] 2. By setting anti-friction components on the positioning plate, the lifting rope and the roller are in close contact during the lifting process of the steel cage, avoiding friction between the lifting rope and the positioning plate or the end of the steel cage, thereby improving the quality of the steel cage and the service life of the lifting rope. BRIEF DESCRIPTION OF THE DRAWINGS
[0050] Figure 1 One of the process flow charts of the method for tying steel bars of a vase pier provided by the present invention;
[0051] Figure 2 The second process flow chart of the method for tying steel bars of a vase pier provided by the present invention;
[0052] Figure 3 The third process flow chart of the method for tying steel bars of a vase pier provided by the present invention;
[0053] Figure 4The fourth process flow chart of the method for tying steel bars of a vase pier provided by the present invention;
[0054] Figure 5 The fifth process flow chart of the method for tying steel bars of a vase pier provided by the present invention;
[0055] Figure 6 The sixth process flow chart of the method for tying steel bars of a vase pier provided by the present invention;
[0056] Figure 7 The seventh process flow chart of the method for tying steel bars of a vase pier provided by the present invention;
[0057] Figure 8 The eighth process flow chart of the method for tying steel bars of a vase pier provided by the present invention;
[0058] Fig. 9 A schematic diagram of the structure of the tire frame provided by the present invention;
[0059] Fig.10 A schematic front view of a positioning plate provided by the present invention;
[0060] Fig.11 A schematic side view of a positioning plate provided by the present invention;
[0061] Fig.12 A schematic diagram of the structure of the anti-friction component provided by the present invention;
[0062] in, Figures 9 to 12 The reference numerals and component names are: 1. base, 2. bracket, 3. ear plate, 4. upper edge main reinforcement hanging plate, 5. lower edge main reinforcement hanging plate, 6. side edge main reinforcement hanging plate, 7. positioning plate, 8. truss, 9. lifting ear, 10. anti-friction component, 101. mounting seat, 102. side groove, 103. sliding rod, 104. slider, 105. spring, 106. connecting rod, 107. roller. DETAILED DESCRIPTION
[0063] The following is a combination of specific implementation cases and attached Figure 1-Figure 12 The present invention is further described, but the present invention is not limited to these embodiments. The present invention provides a technical solution: a method for tying steel bars of a vase pier, characterized in that it comprises the following steps:
[0064] S1, assemble the steel cage frame. After the frame is assembled, install the positioning plates 7 at both ends of the frame, and the main reinforcement passes through the holes for positioning;
[0065] S2, install the upper row of main reinforcement and connect the main reinforcement with the positioning plate;
[0066] S3, preliminary installation of stirrups;
[0067] S4, insert the remaining main reinforcement into the stirrups longitudinally, and position the reserved length at both ends through the double-layer positioning tooling at both ends;
[0068] S5, install the transverse stirrups from the side of the tire frame, accurately adjust the stirrup spacing, and tie the stirrups to the main reinforcement firmly;
[0069] S6, inspection before on-site hoisting and docking of the pier column reinforcement cage, and anti-corrosion treatment of the embedded reinforcement on the pier top;
[0070] S7, the straight section pier column reinforcement cage is hoisted as a whole using a truck crane, the main hook of the truck crane is hung on the lifting point of the double-layer positioning plate on the top of the reinforcement cage, and the auxiliary hook is hung on the lifting point of the double-layer positioning plate on the bottom of the reinforcement cage, and the suspension wire is fitted with the anti-friction component 10 on the positioning plate 7 before hoisting;
[0071] S8, installation of steel bars for vase segments;
[0072] S9, tie the stirrups according to the preset stirrup spacing line.
[0073] As a preferred embodiment, further, the steel cage frame includes:
[0074] A base 1, wherein the number of the bases 1 is multiple and the multiple bases 1 are arranged in parallel;
[0075] Bracket 2: Two brackets 2 are symmetrically installed at both ends of the base 1;
[0076] Ear plate 3, an ear plate 3 is installed on the top of the bracket 2;
[0077] An upper edge main reinforcement hanging piece 4 is connected between the tops of the two ear plates 3;
[0078] The lower edge main reinforcement hanging piece 5 is provided at the top of the base 1, and the lower edge main reinforcement hanging piece 5 is located below the upper edge main reinforcement hanging piece 4;
[0079] Side edge main reinforcement hanging pieces 6: A plurality of side edge main reinforcement hanging pieces 6 are arranged on the surface of the ear plate 3 along the up and down directions, and the side edge main reinforcement hanging pieces 6 on both sides are symmetrically arranged.
[0080] As a preferred solution, further, S1 is specifically:
[0081] S1.1, the main reinforcement is fixed on the positioning plate with a conical nut to ensure that the main reinforcement is in the center of the positioning plate hole;
[0082] S1.2, the middle position of the main reinforcement is mainly determined by the slots on the binding jig. Bolt holes are reserved on the columns of the steel bar binding jig for fixing the positioning jig.
[0083] As a preferred solution, further, S3 is specifically:
[0084] S3.1, install external stirrups around the main reinforcement;
[0085] S3.2, Install vertical internal stirrups.
[0086] As a preferred solution, further, S4 is specifically:
[0087] S4.1, the positioning plate 7 is a double-layer positioning steel plate, which is formed by processing a 2 cm thick steel plate, and the top steel bar positioning tooling is made of section steel;
[0088] S4.2, adjust the position of the main reinforcement by adjusting the conical nut to ensure its accurate position.
[0089] As a preferred solution, further, S6 is specifically:
[0090] S6.1. Install 4cm thick C40 plum blossom-shaped spacers on the sides of the pier reinforcement cage, with a quantity of no less than 6 per square meter, arranged in a plum blossom shape;
[0091] S6.2, the spacer and the steel bar are firmly tied together, and the wire ends of the tying do not enter the concrete cover;
[0092] S6.3, before the on-site hoisting and docking of the pier column reinforcement cage, the position, quantity and tightness of the pads shall be checked. If they meet the requirements, the embedded reinforcement on the pier top shall be protected with a foam waterproof protective cover to prevent the reinforcement from rusting; the standard length of the pier column reinforcement is 4m and the weight is 4.9t. Two 10t truck cranes are used to lift it in the reinforcement yard, and a special hanger is set up. After lifting, it is placed on a flat steel bar transport vehicle and transported to the site; a 50t truck crane is used on-site to hoist the pier column reinforcement cage as a whole and dock it with the 0.5m pier column reinforcement cage embedded in the foundation.
[0093] As a preferred solution, further, the S7 is specifically:
[0094] S7.1, the positioning plate 7 and the hanging frame adopt upper and lower layers of steel positioning plates, a truss 8 is arranged in the middle of the positioning plate 7, and the positioning plate 7 is welded as a whole through the truss 8;
[0095] S7.2, during hoisting, the long and short joints of the steel bars are fixed to the positioning plate 7 and the hoisting frame by means of positioning nuts and locking nuts;
[0096] S7.3, use the truck crane to lift the steel cage. When the steel cage is 4 to 5 meters above the ground, continue to lift the main hook and slowly lower the auxiliary hook. Lift the main hook until the steel cage is perpendicular to the ground, release the auxiliary hook, and the steel cage is flipped.
[0097] S7.4, after the steel cage is hoisted as a whole to the top of the 0.5m pier column steel cage pre-buried in the cap, the bottom positioning plate of the pier column steel cage is removed, and the whole section of the pier column steel cage is connected to the 0.5m cast pier column steel bar with a straight threaded sleeve;
[0098] S7.5, when connecting the threads, rotate the main reinforcement of the steel cage to align them. After the alignment is completed, tighten the straight thread sleeve downwards to complete the overall connection of the steel cage.
[0099] As a preferred solution, further, four lifting ears 9 and two anti-friction components 10 are installed at the opposite ends of the two positioning plates 7, and the four lifting ears 9 are respectively located at the four corners of the surface of the positioning plate 7, and the two anti-friction components 10 are adapted to the two lifting ears 9 on one side of the lifting.
[0100] As a preferred solution, further, the anti-friction component 10 includes:
[0101] A mounting seat 101, the mounting seat 101 is fixedly arranged on the surface of the positioning plate 7;
[0102] Side grooves 102, both inner walls of the mounting seat 101 are provided with side grooves 102;
[0103] Sliding rod 103, a sliding rod 103 is arranged in the side groove 102 along the vertical direction;
[0104] A slider 104 is slidably mounted on the outer wall of the slide bar 103, and the slider 104 is slidably connected in the side groove 102;
[0105] Spring 105: A spring 105 is provided between the slider 104 and the inner wall of the side groove 102, and the spring 105 is sleeved on the outer side of the slide bar 103;
[0106] A connecting rod 106 is provided between the two sliders 104;
[0107] The roller 107 is rotatably mounted on the outer wall of the connecting rod 106, and the roller 107 is in close contact with the suspension rope.
[0108] As a preferred solution, further, the S8 is specifically:
[0109] S8.1, the steel cage of the pier column of the vase section is prefabricated on site using a vertical frame;
[0110] S8.2, after the vase segment enveloping ladder cage is erected, the vase segment reinforcement cage is hoisted as a whole, and the arc-shaped main reinforcement is connected to the standard segment main reinforcement using a single threaded sleeve.
[0111] As a preferred solution, further, the S9 is specifically:
[0112] S9.1, according to the preset steel bar position line, tie from bottom to top;
[0113] S9.2, stirrups are arranged perpendicular to the main reinforcement, and the corners of the stirrups are tied at the intersections with the main reinforcement. The intersections of the main reinforcement and the non-corner parts of the stirrups are tied in a staggered pattern;
[0114] S9.3, after the stirrups are tied, install the pads, the number of which shall not be less than 6 per m2.
[0115] The positioning plates, trusses and lifting ears of this case are existing technologies, and any positioning plates, trusses and lifting ears can be used as long as they meet the requirements of this case.
[0116] Working principle: The electrical components appearing in this application are all externally connected to the power supply and control switch when in use. After the present invention is installed, first check the installation and fixation of the present invention as well as the safety protection, and then it can be used; when in use, first assemble the tire frame, and after the tire frame is assembled, install the positioning plates 7 at both ends of the tire frame, and the main reinforcement is fixed on the positioning plate 7 with a conical nut to ensure that the main reinforcement is in the center of the hole in the positioning plate 7. The middle positioning of the main reinforcement is mainly carried out by the card slot on the binding jig. Bolt holes are reserved on the columns of the steel bar binding jig for fixing the positioning jig.
[0117] Then install the upper row of main bars in the positioning grooves of the upper edge main bar hanger 4. After the upper row of main bars are installed, the outer stirrups are symmetrically installed around the main bars according to the limiting grooves of the upper edge main bar hanger 4, the lower edge main bar hanger 5 and the side edge main bar hanger 6, and then the vertical inner stirrups are installed, with two groups of inner stirrups on each side; then the remaining main bars are inserted into the stirrups longitudinally, and the reserved length at both ends is positioned by double-layer positioning tooling at both ends, and the double-layer positioning steel plates are formed by 2 cm thick steel plates; the top steel bar positioning tooling is made of steel sections, and the position of the main bars can be adjusted by adjusting the conical nuts to ensure accurate positioning; when all the main bars are installed, install two groups of transverse stirrups along the vertical direction, install them in place from the side of the tire frame, and accurately adjust the stirrup spacing to firmly tie the stirrups to the main bars.
[0118] 4cm thick C40 plum blossom-shaped pads are installed on the sides of the pier column reinforcement cage, with a number of not less than 6 / ㎡ and arranged in a plum blossom shape. During installation, ensure that the pads do not cross the entire cross-section of the concrete protective layer; the pads are firmly tied to the steel bars, and the tied wire heads do not enter the concrete protective layer; before the overall on-site lifting and docking of the pier column reinforcement cage, the position, quantity and tightness of the pads should be checked, and those that do not meet the requirements should be dealt with in a timely manner; the embedded reinforcement on the pier top is protected by a foam waterproof protective cover to prevent the steel bars from rusting.
[0119] The main hook of the automobile crane hangs the four lifting ears 9 of the double-layer positioning plate 7 on the top of the steel cage, and the auxiliary hook hangs the lifting ears 9 of the double-layer positioning plate 7 on the bottom of the steel cage. Before lifting, align and fit the lifting rope in the lifting direction with the roller 107. During lifting, the lifting rope squeezes the roller 107, so that the roller 107 drives the slider 104 to slide on the slide bar 103, and the slider 104 squeezes the spring 105 to move the position of the roller 107. As the steel cage shakes, the lifting rope drives the roller 107 to rotate to reduce damage to the lifting rope; when the steel cage is lifted 4 to 5 meters from the ground, continue to lift the main hook, and slowly lower the auxiliary hook, lift the main hook until the steel cage is perpendicular to the ground, release the auxiliary hook, and the steel cage is flipped.
[0120] After the steel cage is hoisted as a whole to the top of the 0.5m pier column steel cage embedded in the foundation, the bottom positioning plate 7 of the pier column steel cage is removed, and the whole section of the pier column steel cage is connected to the 0.5m cast pier column steel bar with a straight thread sleeve; during the connection process, the starting position of the thread of the straight thread head must be at the same position to ensure that the gap between the thread heads meets the requirements; since the stirrups of the componentized steel cage are tied, the top positioning plate 7 is positioned with a conical nut, so when connecting the thread teeth, the main reinforcement of the steel cage is rotated for alignment. After the alignment is completed, the straight thread sleeve is tightened downward to complete the overall connection of the steel cage.
[0121] Then use the car crane to lift the vase section pier column steel cage to the steel cage as a whole, and connect it with the standard section main reinforcement through the arc main reinforcement using a single threaded sleeve; finally, tie the stirrups according to the drawn stirrup spacing line; tie them in sequence from bottom to top according to the drawn reinforcement position line; the stirrups should be perpendicular to the main reinforcement, the corners of the stirrups and the intersections with the main reinforcement should be tied, and the intersections of the main reinforcement and the non-corner parts of the stirrups should be tied in a plum blossom pattern. After the stirrups are tied, install the pads.
[0122] It is obvious to those skilled in the art that the present invention is not limited to the details of the above-mentioned exemplary embodiments, and that the present invention can be implemented in other specific forms without departing from the spirit or essential features of the present invention; therefore, no matter from which point of view, the embodiments should be regarded as exemplary and non-restrictive, and the scope of the present invention is limited by the appended claims rather than the above description, and therefore it is intended to include all changes within the meaning and scope of the equivalent elements of the claims within the present invention; any figure mark in the claims should not be regarded as limiting the claims involved.
[0123] In the description of the present invention, the term "plurality" refers to two or more than two. Unless otherwise clearly defined, the orientation or positional relationship indicated by the terms "upper" and "lower" is based on the orientation or positional relationship shown in the drawings. It is only for the convenience of describing the present invention and simplifying the description, and does not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation. Therefore, it cannot be understood as a limitation on the present invention. The terms "connection", "installation", "fixation", etc. should be understood in a broad sense. For example, "connection" can be a fixed connection, a detachable connection, or an integral connection; it can be directly connected or indirectly connected through an intermediate medium. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0124] In the description of the present invention, the description of the terms "one embodiment", "some embodiments", "specific embodiments", etc. means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the present invention. In the present invention, the schematic representation of the above terms does not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described can be combined in any one or more embodiments or examples in a suitable manner.
[0125] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. For those skilled in the art, the present invention may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.
Claims
1. A method for tying steel bars for vase piers, characterized in that: The following steps are involved: S1, assembling the steel cage frame, after the frame is assembled, installing positioning plates (7) at both ends of the frame, and positioning the main reinforcement through the holes; S2, install the upper row of main reinforcement and connect the main reinforcement with the positioning plate; S3, preliminary installation of stirrups; S4, insert the remaining main reinforcement into the stirrups longitudinally, and position the reserved length at both ends through the double-layer positioning tooling at both ends; S5, install the transverse stirrups from the side of the tire frame, accurately adjust the stirrup spacing, and tie the stirrups to the main reinforcement firmly; S6, inspection before on-site hoisting and docking of the pier column reinforcement cage, and anti-corrosion treatment of the embedded reinforcement on the pier top; S7, the straight section pier column reinforcement cage is hoisted as a whole using a truck crane, the main hook of the truck crane is hung on the lifting point of the double-layer positioning plate at the top of the reinforcement cage, and the auxiliary hook is hung on the lifting point of the double-layer positioning plate at the bottom of the reinforcement cage, and before hoisting, the hanging wire is made to fit with the anti-friction component (10) on the positioning plate (7); S8, installation of steel bars for vase segments; S9, tie the stirrups according to the preset stirrup spacing line.
2. The method for tying steel bars of a vase pier according to claim 1, characterized in that: The steel cage frame comprises: A base (1), wherein the number of the bases (1) is multiple, and the multiple bases (1) are arranged in parallel; Brackets (2), two brackets (2) are symmetrically mounted at both ends of the base (1); An ear plate (3), the top end of the bracket (2) is provided with an ear plate (3); An upper edge main reinforcement hanging piece (4), wherein the upper edge main reinforcement hanging piece (4) is connected between the tops of the two ear plates (3); A lower edge main reinforcement hanging piece (5), wherein the top of the base (1) is provided with a lower edge main reinforcement hanging piece (5), and the lower edge main reinforcement hanging piece (5) is located below the upper edge main reinforcement hanging piece (4); Side edge main reinforcement hanging pieces (6), a plurality of side edge main reinforcement hanging pieces (6) are arranged on the surface of the ear plate (3) in the up and down directions, and the side edge main reinforcement hanging pieces (6) on both sides are symmetrically arranged.
3. The method for tying steel bars of a vase pier according to claim 1, characterized in that: The S1 is specifically: S1.1, the main reinforcement is fixed on the positioning plate with a conical nut to ensure that the main reinforcement is in the center of the positioning plate hole; S1.2, the middle position of the main reinforcement is mainly determined by the slots on the binding jig. Bolt holes are reserved on the columns of the steel bar binding jig for fixing the positioning jig.
4. The method for tying steel bars of a vase pier according to claim 1, characterized in that: The S3 is specifically: S3.1, install external stirrups around the main reinforcement; S3.2, Install vertical internal stirrups.
5. The method for tying steel bars of a vase pier according to claim 1, characterized in that: The S4 is specifically: S4.1, the positioning plate (7) is a double-layer positioning steel plate, which is formed by processing a 2 cm thick steel plate, and the top steel bar positioning tooling is made of section steel; S4.2, adjust the position of the main reinforcement by adjusting the conical nut to ensure its accurate position.
6. The method for tying steel bars of a vase pier according to claim 1, characterized in that: The S6 is specifically: S6.
1. Install 4cm thick C40 plum blossom-shaped spacers on the sides of the pier reinforcement cage, with a quantity of no less than 6 per square meter, arranged in a plum blossom shape; S6.2, the spacer and the steel bar are firmly tied together, and the wire ends of the tying do not enter the concrete cover; S6.
3. Before the on-site hoisting and docking of the pier column reinforcement cage, the position, quantity and tightness of the pads shall be checked. If they meet the requirements, the embedded reinforcement on the pier top shall be protected with a foam waterproof protective cover to prevent the reinforcement from rusting.
7. The method for tying steel bars of a vase pier according to claim 1, characterized in that: The S7 is specifically: S7.1, the positioning plate (7) and the hanging frame adopt an upper and lower two-layer steel bar positioning plate, a truss (8) is arranged in the middle of the positioning plate (7), and the positioning plate (7) is welded into a whole through the truss (8); S7.2, during hoisting, the long and short joints of the steel bars are fixed to the positioning plate (7) and the hoisting frame by means of positioning nuts and locking nuts; S7.3, use the truck crane to lift the steel cage. When the steel cage is 4 to 5 meters above the ground, continue to lift the main hook and slowly lower the auxiliary hook. Lift the main hook until the steel cage is perpendicular to the ground, release the auxiliary hook, and the steel cage is flipped. S7.4, after the steel cage is hoisted as a whole to the top of the 0.5m pier column steel cage pre-buried in the cap, the bottom positioning plate of the pier column steel cage is removed, and the whole section of the pier column steel cage is connected to the 0.5m cast pier column steel bar with a straight threaded sleeve; S7.5, when connecting the threads, rotate the main reinforcement of the steel cage to align them. After the alignment is completed, tighten the straight thread sleeve downwards to complete the overall connection of the steel cage.
8. The method for tying steel bars of a vase pier according to claim 7, characterized in that: Four lifting ears (9) and two anti-friction components (10) are installed at the opposite ends of the two positioning plates (7), the four lifting ears (9) are respectively located at the four corners of the surface of the positioning plates (7), and the two anti-friction components (10) are adapted to the two lifting ears (9) on one side of the lifting.
9. The method for tying steel bars of a vase pier according to claim 8, characterized in that: The anti-friction component (10) comprises: A mounting seat (101), wherein the mounting seat (101) is fixedly arranged on the surface of the positioning plate (7); Side grooves (102), the inner walls on both sides of the mounting seat (101) are provided with side grooves (102); A sliding rod (103), wherein the sliding rod (103) is arranged in the side groove (102) along the vertical direction; A slider (104), the outer wall of the slide bar (103) is slidably sleeved with the slider (104), and the slider (104) is slidably connected in the side groove (102); A spring (105), wherein a spring (105) is disposed between the slider (104) and the inner wall of the side groove (102), and the spring (105) is sleeved on the outer side of the slide bar (103); A connecting rod (106), wherein a connecting rod (106) is disposed between the two sliding blocks (104); A roller (107) is rotatably mounted on the outer wall of the connecting rod (106), and the roller (107) is fitted with the suspension rope.
10. The method for tying steel bars of a vase pier according to claim 1, characterized in that: The S8 is specifically: S8.1, the steel cage of the pier column of the vase section is prefabricated on site using a vertical frame; S8.2, after the vase segment enveloping ladder cage is erected, the vase segment reinforcement cage is hoisted as a whole, and the arc-shaped main reinforcement is connected to the standard segment main reinforcement using a single threaded sleeve.
11. The method for tying steel bars of a vase pier according to claim 1, characterized in that: The S9 is specifically: S9.1, according to the preset steel bar position line, tie from bottom to top; S9.2, stirrups are arranged perpendicular to the main reinforcement, and the corners of the stirrups are tied at the intersections with the main reinforcement. The intersections of the main reinforcement and the non-corner parts of the stirrups are tied in a staggered pattern; S9.3, after the stirrups are tied, install the pads, the number of which shall not be less than 6 per m2.
Citation Information
Patent Citations
Circular reinforced concrete pier for viaduct and construction method
CN118186922A