Construction method for assisting surface layer drainage of basement pre-buried drainage pipe

By pre-embedding of drainage pipes in the basement and combining the design of the underlying structure and support components, the problem of poor drainage caused by insufficient surface layer thickness is solved, and the stable inclination and sealing of the drainage pipes are achieved, ensuring smooth drainage in the basement.

CN118880992APending Publication Date: 2024-11-01THE THIRD CONSTR CO LTD OF CHINA CONSTR THIRD ENG BUREAU +2
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411264033.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-10
Publication Date
2024-11-01

AI Technical Summary

Technical Problem

Due to the thin thickness of the basement surface layer, it is difficult to meet the inclination needs of the drainage pipe, resulting in poor drainage.

Method used

A construction method for assisting surface drainage of pre-embedded drainage pipes in the basement is adopted, including laying transverse drainage pipes and communicating with vertical downsplash pipes. After pouring the bottom concrete, the bottom structure with a thickness of more than 30cm is formed to ensure the inclination of the drainage pipes and pass through the supporting components. The and side gear assembly prevents pipe deviation and improves sealing.

Benefits of technology

It effectively avoids the protrusion of the drainage pipe, ensures smooth drainage, facilitates height adjustment and prevents the pipe from shifting during the pouring process, and improves the sealing between the drainage pipes.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118880992A_ABST
    Figure CN118880992A_ABST
Patent Text Reader

Abstract

The invention relates to the field of basement surface layer construction, in particular to a construction method for assisting surface layer drainage through a basement pre-buried drainage pipe, which comprises the following steps: S1, pipeline laying: laying a transverse drainage pipe, inclining the transverse drainage pipe according to a designed inclination, and fixedly communicating a plurality of vertical downpipes on the transverse drainage pipe; s2, bottom layer concrete is poured into the foundation, and the upper surface of the bottom layer concrete is higher than the transverse drainage pipes and lower than upper pipe openings of the vertical downpipes; s3, the bottom layer concrete is cured until the bottom layer concrete is solidified, a bottom layer structure is formed, and the thickness of the bottom layer structure is larger than 30 cm; and S4, upper-layer concrete is poured on the surface of the bottom-layer structure, and the upper surface of the upper-layer concrete is lower than an upper pipe opening of the vertical downpipe. The drainage device has the effect of improving drainage smoothness.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the field of basement surface construction, and in particular to a construction method for auxiliary surface drainage of a basement using pre-buried drainage pipes. Background Art

[0002] Basements are often used for parking and storing goods. In order to ensure smooth drainage of the basement, it is usually necessary to set a certain slope on the surface of the basement. The thickness of the slope is usually 10cm at the highest point and 5cm at the lowest point, so that the surface of the basement forms a certain height difference to facilitate the drainage of water on the surface of the surface.

[0003] In some basements, in order to further improve the drainage efficiency, vertical downpipes and horizontal drain pipes are usually buried in the surface layer. The drain pipes are buried in the surface layer and usually have a certain slope. One end of the downpipe is connected to the drain pipe, and the other end extends to the surface of the surface layer so that the water in the surface layer can be discharged into the drain pipe through the downpipe.

[0004] However, in the above-mentioned burial method, since the thickness of the surface layer is usually thin, it is difficult to meet the inclination requirement of the drainage pipe. Therefore, it is an urgent problem to provide a basement construction method that can meet the inclination requirement of the drainage pipe to make the surface layer drainage smoother. Summary of the invention

[0005] In order to improve the smoothness of drainage, the present application provides a construction method for auxiliary surface drainage of a basement using pre-buried drainage pipes.

[0006] The present application provides a construction method for auxiliary surface drainage of a basement pre-buried drainage pipe, which adopts the following technical solution: A construction method for auxiliary surface drainage of a basement pre-buried drainage pipe comprises the following steps: S1: Pipeline Laying: Lay horizontal drainage pipes, tilt them according to the designed slope, and connect multiple vertical downpipes on the horizontal drainage pipes; S2: pouring bottom concrete into the foundation, the upper surface of the bottom concrete is higher than the horizontal drainage pipe and lower than the upper pipe opening of the vertical downpipe; S3: Curing the bottom concrete until the bottom concrete solidifies to form a bottom structure with a thickness of more than 30 cm; S4: Pour an upper layer of concrete on the surface of the underlying structure, wherein the upper surface of the upper layer of concrete is lower than the upper pipe opening of the vertical downpipe.

[0007] By adopting the above technical solution, in the present application, the transverse drainage pipe is buried in the underlying structure. Since the thickness of the underlying structure is relatively thick, it can meet the inclination requirements of the transverse drainage pipe. Therefore, after the upper structure is cast on the underlying structure, the transverse drainage pipe can be prevented from protruding to the surface of the upper structure, thereby ensuring the smoothness of drainage.

[0008] Optionally, the vertical downpipe is overlapped on the foundation through a support assembly, and the support assembly includes: Base; a support seat, the vertical downpipe being overlapped on the support seat; and Two connecting rods are arranged in sequence in the first direction, and one of the base and the support seat is fixedly connected to the connecting rod, and the other is rotatably connected to the connecting rod; one of the connecting rods is threadedly connected to the other connecting rod, and the threaded rotation axis of the connecting rod is parallel to the first direction.

[0009] By adopting the above technical solution, when the height of the transverse drain pipe needs to be adjusted, the support height of the transverse drain pipe by the support seat can be changed by simply rotating the two connecting rods relative to each other.

[0010] Optionally, the support seat is provided with a side stop assembly, and the transverse drain pipe is provided with side stop assemblies on both sides of its length direction, and the side stop assembly includes: A side baffle, one end of which is connected to the support seat, and the transverse drainage pipe is clamped between the side baffles on both sides.

[0011] By adopting the above technical solution, the side baffles on both sides can prevent the transverse drainage pipe from deviating to the side, and can prevent the transverse drainage pipe from moving during the pouring of concrete.

[0012] Optionally, the side baffle assembly further includes a first telescopic rod, wherein the telescopic direction of the first telescopic rod is parallel to the third direction; one end of the first telescopic rod is fixedly connected to the support seat, and the other end of the first telescopic rod is fixedly connected to the side baffle.

[0013] By adopting the above technical solution, the first telescopic rod can change the distance between the side baffle plate and the transverse drain pipe during the extension and retraction process; before placing the transverse drain pipe, the distance between the side baffle plates on both sides is enlarged to facilitate placing the transverse drain pipe on the support seat; after the transverse drain pipe is in place, the distance between the side baffle plates on both sides is reduced, and the transverse drain pipe can be clamped by the side baffle plates on both sides to reduce the movement of the transverse drain pipe.

[0014] Optionally, a drainage hole is formed on the peripheral wall of the horizontal drainage pipe away from the support seat, a connecting ring is fixedly connected to one end of the vertical drainage pipe, a plug is fixedly connected to the inner circumference of the connecting ring, and when the plug is inserted into the drainage hole, the plug connects the horizontal drainage pipe and the vertical drainage pipe.

[0015] By adopting the above technical solution, inserting the insert pipe into the downpipe can reduce the shaking of the vertical downpipe and improve the sealing between the vertical downpipe and the horizontal drainage pipe.

[0016] Optionally, the connecting ring is fixedly connected with a flexible sealing ring near the end wall of the insert pipe, and when the insert pipe is inserted into the transverse drain pipe, the flexible sealing ring is clamped between the connecting ring and the pipe wall of the transverse drain pipe.

[0017] By adopting the above technical solution, the provided flexible sealing ring can further improve the sealing between the horizontal drain pipe and the vertical downpipe.

[0018] Optionally, a straightening assembly is provided on the vertical downpipe, and the straightening assembly comprises: A plug-in connector having a plug-in end, the plug-in connector is connected to the vertical downpipe; the plug-in connector is detachably connected to the downpipe, and a plug-in hole is provided at one end of the side baffle plate close to the vertical downpipe, the plug-in hole is used for inserting the plug-in end; When the plug-in end is plugged into the plug-in hole, the transverse drainage pipe is clamped between the side baffles on both sides.

[0019] By adopting the above technical solution and inserting the connector into the connector hole, the vertical downpipe can be prevented from tilting.

[0020] Optionally, a guide plate is fixedly connected to the side baffle, and the guide plate is fixedly connected to a side of the side baffle close to the transverse drain pipe; The guide plate has a guide surface, and the guide surface is located at a side of the guide plate away from the transverse drain pipe; The guide surface is inclined toward a side close to the central axis of the horizontal drain pipe in the direction from the horizontal drain pipe to the vertical downpipe; The guide surface is smoothly connected to the inner wall of one end of the plug hole close to the transverse drain pipe.

[0021] By adopting the above technical solution, during the process of inserting the connector into the plug-in hole, the guide surface can guide the sliding of the connector, and while facilitating the insertion of the connector into the plug-in hole, it can push the side baffles on both sides to move toward each other to clamp the horizontal drain pipe.

[0022] Optionally, a locking assembly is provided on the side baffle, and the locking assembly includes: a wedge block, the wedge block being slidably connected to the side baffle along a third direction; the wedge block being located on a side of the guide surface away from the transverse drain pipe; and A compression spring, one end of which is fixedly connected to the wedge block, and the other end of which is fixedly connected to the side baffle, wherein the expansion and contraction direction of the compression spring is parallel to the first direction; and the compression spring, in a compressed state in which the deformation can be recovered, has a force to drive the wedge block to move toward one side of the transverse drain pipe; The plug-in connector is provided with a locking hole for the wedge-shaped block to be inserted into. When the wedge-shaped block is inserted into the locking hole, the flexible sealing ring is in an extruded state.

[0023] By adopting the above technical solution, during the process of inserting the connector into the plug-in hole, the wedge block is moved toward the side away from the horizontal drain pipe. After the connector is in place, the wedge block is released. The wedge block can move into the locking hole under the push of the compression spring. While fixing the connector, it can squeeze the flexible sealing ring to improve the sealing performance.

[0024] Optionally, the straightening assembly further comprises: A rotating inner ring, the rotating inner ring is coaxially rotatably connected to the outer periphery of the vertical downpipe; and A rotating outer ring, the rotating outer ring is sleeved on the outer circumference of the rotating inner ring and is threadedly connected to the rotating inner ring, and the plug-in component is fixedly connected to the rotating outer ring; The end of the rotating inner ring away from the transverse drain pipe extends to a side of the rotating outer ring away from the transverse drain pipe.

[0025] By adopting the above technical solution, when it is necessary to adjust the position of the connector in the length direction of the vertical downpipe, that is, when it is necessary to change the height of the connector, the height of the connector can be changed by simply rotating the rotating inner ring along the vertical downpipe.

[0026] In summary, the present application includes at least one of the following beneficial technical effects: 1. This application can prevent the horizontal drainage pipe from protruding to the surface of the upper structure, thereby ensuring smooth drainage; 2. This application can facilitate the adjustment of the height of the horizontal drain pipe; 3. During the concrete pouring process, it can prevent the horizontal drainage pipes and vertical downpipes from moving. BRIEF DESCRIPTION OF THE DRAWINGS

[0027] Figure 1 It is a schematic diagram of the overall structure of an embodiment of the present application; Figure 2is a schematic structural diagram of a support assembly and a side stop assembly in an embodiment of the present application; Figure 3 It is a schematic structural diagram of a vertical downpipe in an embodiment of the present application; Figure 4 is a schematic structural diagram of a guide plate in an embodiment of the present application; Figure 5 is a cross-sectional view of a side baffle in an embodiment of the present application; Figure 6 is a schematic diagram of the structure of the locking assembly in an embodiment of the present application; Figure 7 It is a structural schematic diagram of the righting assembly in an embodiment of the present application.

[0028] Explanation of the reference numerals in the accompanying drawings: 1. horizontal drain pipe; 11. downspout; 2. vertical downspout; 21. connecting ring; 22. insert; 23. flexible sealing ring; 3. supporting assembly; 31. base; 32. supporting seat; 321. arc groove; 33. connecting rod; 34. boosting rod; 35. second telescopic rod; 4. side baffle assembly; 41. side baffle plate; 411. plug-in hole; 412. guide hole; 413. L-shaped support; 42. first telescopic rod; 5. straightening assembly; 51. connector; 511. locking hole; 512. second wedge surface; 52. rotating inner ring; 53. rotating outer ring; 6. guide plate; 61. guide surface; 7. locking assembly; 71. wedge block; 711. first wedge surface; 72. compression spring; 73. third telescopic rod. DETAILED DESCRIPTION

[0029] The following is combined with Figure 1-7 This application is described in further detail.

[0030] The present application embodiment discloses a construction method for auxiliary surface drainage of a basement pre-buried drainage pipe. Figure 1 The construction method of pre-buried drainage pipe in the basement to assist surface drainage includes the following steps: S1: Pipeline Laying: Reference Figure 1 , laying a horizontal drainage pipe 1, and tilting the horizontal drainage pipe 1 according to the designed slope, and fixing and connecting a plurality of vertical downpipes 2 on the horizontal drainage pipe 1; S2: pouring bottom concrete into the foundation, wherein the upper surface of the bottom concrete is higher than the horizontal drainage pipe 1 and lower than the upper pipe opening of the vertical downpipe 2; S3: Curing the bottom concrete until the bottom concrete solidifies to form a bottom structure. If the thickness of the bottom structure is greater than 30 cm, the transverse drainage pipe 1 can be buried obliquely in the bottom; thus, the height of the bottom structure can be used to bury the transverse drainage pipe 1, providing a sufficient height difference for the inclination of the transverse drainage pipe 1; S4: pouring the upper layer of concrete on the underlying structure, the upper surface of the upper layer of concrete is lower than the upper pipe opening of the vertical downpipe 2. Since the transverse drain pipe 1 is buried in the underlying structure, and the thickness of the underlying structure is usually about 30 cm, it has enough height for the transverse drain pipe 1 to tilt; and, in the process of pouring the upper layer of concrete, since the vertical downpipe 2 is fixed on the transverse drain pipe 1, and the transverse drain pipe 1 is fixed to the underlying structure, therefore, in the process of pouring the upper layer of concrete, the vertical downpipe 2 can be effectively prevented from shifting, and the verticality of the vertical downpipe 2 can be ensured; after the upper layer of concrete is solidified, the part of the vertical downpipe 2 extending above the surface of the upper structure is cut off, so that the water can flow smoothly into the vertical downpipe 2.

[0031] Reference Figure 1 and Figure 2 In order to further prevent the horizontal drain pipe 1 and the vertical downpipe 2 from deviating during the pouring of the bottom concrete and the upper concrete, in some embodiments of the present application, the horizontal drain pipe 1 is overlapped on the foundation through the support assembly 3, and the support assembly 3 includes a base 31, a support seat 32 and two connecting rods 33 distributed in sequence in a first direction. The explanation of the first direction is as follows: when the horizontal drain pipe 1 is laid on the foundation according to the designed inclination and the vertical downpipe 2 is placed vertically, the first direction is the vertical direction; The base 31 is fixed to the foundation by expansion screws, and the support seat 32 is used to support the transverse drainage pipe 1. In order to prevent the transverse drainage pipe 1 from slipping on the support seat 32, in some embodiments of the present application, an arc groove 321 is formed on the upper surface of the support seat 32 along the second direction, and the curvature of the arc groove 321 is adapted to the curvature of the transverse drainage pipe 1; the second direction is the axial direction of the transverse drainage pipe 1; The connecting rod 33 is connected between the base 31 and the support base 32 to support the support base 32 to the base 31; among the two connecting rods 33, any connecting rod 33 is a cylindrical structure with a thread on the inner wall, and the other connecting rod 33 is a round rod structure with a thread on the outer peripheral wall. The two connecting rods 33 are threadedly adapted to be connected, and when the two connecting rods 33 are rotated relative to each other, the total length of the two connecting rods 33 in the connected state can be changed; either the support base 32 and the base 31 is fixedly connected to one of the connecting rods 33, and the other is rotatably connected to the other connecting rod 33, and the rotation axis is parallel to the first direction; as a preference, the connecting rod 33 with an internal thread in the present disclosure is rotatably connected to the base 31, and the connecting rod 33 with an external thread is fixedly connected to the support base 32; in order to facilitate the rotation of the connecting rod 33 connected to the base 31, a force rod 34 is fixed on the outer peripheral wall of the connecting rod 33 connected to the base 31, and the force rod 34 is perpendicular to the first direction; In order to enable the support seat 32 to move along the first direction relative to the base 31 during the rotation of the two connecting rods 33, a second telescopic rod 35 is further provided between the base 31 and the support seat 32. The telescopic direction of the second telescopic rod 35 is parallel to the first direction. One end of the second telescopic rod 35 is fixedly connected to the base 31, and the other end is fixedly connected to the support seat 32. When laying the transverse drainage pipe 1, first fix the base 31 to the ground with expansion screws, then overlap the transverse drainage pipe 1 on the support seat 32. When the height of the transverse drainage pipe 1 needs to be adjusted, just rotate the force rod 34 so that the force rod 34 drives the connecting rod 33 to rotate. During the relative rotation of the two connecting rods 33, since the second telescopic rod 35 has a guiding effect on the support seat 32 and the base 31, the height of the support seat 32 can be adjusted during the rotation of the force rod 34.

[0032] Reference Figure 2 In order to reduce the deviation of the transverse drainage pipe 1 during the pouring of the bottom concrete, in some embodiments of the present application, a side baffle assembly 4 is provided on the support seat 32, and the side baffle assembly 4 includes a side baffle plate 41 connected to the support seat 32. The transverse drainage pipe 1 is provided with side baffle assemblies 4 on both sides of its own length direction. Specifically, the side baffle plates 41 on both sides of the transverse drainage pipe 1 are spaced apart in the third direction, that is, the transverse drainage pipe 1 is sandwiched between the side baffle plates 41 on both sides in the third direction; the explanation about the third direction is as follows: when the first direction is the vertical direction, the third direction is the horizontal direction and perpendicular to the axis of the transverse drainage pipe 1; after the transverse drainage pipe 1 is placed on the support seat 32, the deviation of the transverse drainage pipe 1 can be reduced under the blocking effect of the side baffle plates 41 on both sides; In some embodiments of the present application, the side baffle assembly 4 further includes a first telescopic rod 42, one end of the first telescopic rod 42 is fixedly connected to the support seat 32, and the other end is fixedly connected to the side baffle 41, and the telescopic direction of the first telescopic rod 42 is parallel to the third direction. In the present disclosure, at least two first telescopic rods 42 are provided between each side baffle 41 and the support seat 32 to prevent relative rotation between the side baffle 41 and the support seat 32; Before installing the transverse drain pipe 1 , first move the side baffles 41 on both sides toward the side away from each other to increase the distance between the side baffles 41 on both sides in the third direction, so that the transverse drain pipe 1 can be more conveniently overlapped on the support seat 32 .

[0033] Reference Figure 3 Regarding the connection method of the vertical downpipe 2 and the horizontal drainage pipe 1: a connecting ring 21 is coaxially fixedly connected to one end of the vertical downpipe 2, the inner circumference of the connecting ring 21 extends to the inner circumference of the vertical downpipe 2, and a plug 22 is coaxially fixedly connected to the side of the connecting ring 21 facing away from the vertical downpipe 2, and the outer diameter of the plug 22 is smaller than the outer diameter of the vertical downpipe 2; A water drop hole 11 is provided at the top of the horizontal drain pipe 1 for inserting the insert pipe 22. When the insert pipe 22 is inserted into the water drop hole 11, the insert pipe 22 contacts the inner wall of the water drop hole 11 to reduce water leakage between the insert pipe 22 and the inner wall of the water drop hole 11. In order to further prevent water leakage, some embodiments of the present application also include a flexible sealing ring 23, which is sleeved on the outer periphery of the insert pipe 22. After the insert pipe 22 is inserted into the drain hole 11, the flexible sealing ring 23 is clamped between the connecting ring 21 and the outer peripheral wall of the transverse drainage pipe 1, and the inner peripheral wall of the flexible sealing ring 23 is in contact with the outer peripheral wall of the insert pipe 22, one end of the flexible sealing ring 23 is in contact with the connecting ring 21, and the other end is in contact with the outer peripheral wall of the transverse drainage pipe 1.

[0034] Reference Figure 4 In order to improve the firmness of the connection between the vertical downpipe 2 and the horizontal drain pipe 1, in some embodiments of the present application, a straightening assembly 5 is provided on the vertical downpipe 2, and the straightening assembly 5 includes a plug-in connector 51 with a plug-in terminal, and one end of the plug-in connector 51 with a plug-in terminal is plugged into the side baffle 41, and the other end is directly or indirectly connected to the vertical downpipe 2; the horizontal drain pipe 1 is provided with a plug-in connector 51 on both sides of its length direction; A plug-in hole 411 for accommodating the plug-in component 51 is provided at the top of the side baffle 41. When the plug-in components 51 on both sides are plugged into the plug-in holes 411 on both sides, the transverse drain pipe 1 is clamped between the side baffles 41 on both sides. In order to facilitate the insertion of the connector 51 into the side baffle 41, in some embodiments of the present application, a guide plate 6 is fixedly connected to the top of the side baffle 41, and the guide plate 6 has a guide surface 61. The guide surface 61 is located on the side of the guide plate 6 away from the transverse drain pipe 1, and the guide surface 61 is smoothly connected to the inner wall of the plug-in hole 411 close to the transverse drain pipe 1; for the convenience of description, the plane formed by the central axis of the transverse drain pipe 1 and the central axis of the vertical downpipe 2 is named as the central reference plane, and in the direction from the transverse drain pipe 1 to the vertical downpipe 2, the guide surface 61 is inclined toward one side of the central reference plane; when there is a spacing between the side baffle 41 and the transverse drain pipe 1 in the third direction, the vertical downpipe 2 is moved downward, and after the connector 51 contacts the guide surface 61, the side baffle 41 will be pushed to contact the transverse drain pipe 1 by pushing the guide plate 6.

[0035] Reference Figure 5 and Figure 6 In order to fix the connector 51 to the side baffle 41, in some embodiments of the present application, a locking assembly 7 is provided on the side baffle 41, and the locking assembly 7 includes a wedge block 71, a compression spring 72 and a third telescopic rod 73; The wedge block 71 is slidably connected to the side baffle 41 along the third direction. In the present disclosure, a guide hole 412 is formed along the third direction on the side of the side baffle 41 away from the transverse drain pipe 1, and the guide hole 412 is connected to the plug hole 411; the wedge block 71 is penetrated by the guide hole 412 and can slide along the third direction under the guidance of the inner wall of the guide hole 412; an L-shaped support 413 is fixedly connected to the side of the side baffle 41 away from the transverse drain pipe 1, one end of the third telescopic rod 73 is fixedly connected to the L-shaped support 413, and the other end of the third telescopic rod 73 is fixedly connected to the L-shaped support 413. The third telescopic rod 73 is fixedly connected to the wedge block 71 at one end, and the telescopic direction of the third telescopic rod 73 is parallel to the third direction. While the third telescopic rod 73 guides the wedge block 71, it can prevent the wedge block 71 from rotating in the guide hole 412; the compression direction of the compression spring 72 is parallel to the third direction, and one end of the compression spring 72 is fixedly connected to the L-shaped support 413, and the other end is fixedly connected to the wedge block 71; the compression spring 72 has a force to drive the wedge block 71 to move toward one side of the horizontal drain pipe 1 in a compressed state where the deformation can be restored; The wedge block 71 has a first wedge surface 711, and the first wedge surface 711 is located on a side of the wedge block 71 close to the transverse drain pipe 1; in the direction from the vertical downpipe 2 to the transverse drain pipe 1, the first wedge surface 711 is inclined toward the central reference plane; A locking hole 511 for inserting the wedge block 71 is provided on one side of the plug-in connector 51 away from the central reference plane; when the plug-in connector 51 is in the locking position, the plug-in connector 51 is inserted into the locking hole 511, and the flexible sealing ring 23 is in an extruded state by the connecting ring 21 and the transverse drain pipe 1; When installing the vertical downpipe 2, it is only necessary to insert the plug 22 into the downpipe hole 11, and the vertical downpipe 2 will drive the connector 51 to move into the connector hole 411. During this process, the connector 51 will push the side baffles 41 on both sides to move to clamp the horizontal drain pipe 1. At the same time, the connector 51 will also push the wedge block 71 to move toward the side away from the central reference plane. Then, when the locking hole 511 of the connector 51 moves to the wedge block 71, the wedge block 71 will slide into the locking hole 511 under the push of the compression spring 72 to fix the connector 51 to the side baffle 41. The bottom wall of the connector 51 is a second wedge surface 512, and the second wedge surface 512 is parallel to the first wedge surface 711. When the compression spring 72 is in a normal state, the first wedge surface 711 is completely located in the connector hole 411. During the downward movement of the connector 51, the first wedge surface 711 is pushed by the second wedge surface 512 to move toward the side away from the transverse drain pipe 1; when the locking hole 511 moves to the wedge block 71 with the connector 51, the compression spring 72 will push the wedge block 71 to move so that the first wedge surface 711 is completely inserted into the locking hole 511, thereby preventing the connector 51 from detaching from the side baffle 41.

[0036] Reference Figure 7Since part of the horizontal drain pipe 1 may be deformed, after the vertical downpipe 2 is inserted into the horizontal drain pipe 1, there may be a gap between the flexible sealing ring 23 and the horizontal drain pipe 1 in the first direction, or after the flexible sealing ring 23 is squeezed to the limit, the wedge block 71 is located above the locking hole 511, resulting in the inability to lock the plug-in 51; for this reason, in some embodiments of the present application, the straightening assembly 5 further includes a rotating inner ring 52 and a rotating outer ring 53; The rotating inner ring 52 is coaxially rotatably connected to the outer peripheral wall of the vertical downpipe 2. A specific implementation method may be to set a bearing between the rotating inner ring 52 and the outer peripheral wall of the vertical downpipe 2 to realize the rotation of the rotating inner ring 52 along the vertical downpipe 2. The rotating axis of the rotating inner ring 52 along the vertical downpipe 2 is parallel to the first direction. The rotating outer ring 53 is sleeved on the outer peripheral wall of the rotating inner ring 52, and the rotating outer ring 53 is threadedly connected to the rotating inner ring 52. An extension rod is fixedly connected between the connector 51 and the rotating outer ring 53. The end of the rotating inner ring 52 away from the horizontal drain pipe 1 extends in the first direction to the end of the rotating outer ring 53 away from the horizontal drain pipe 1, so that a person can hold the end of the rotating inner ring 52 away from the horizontal drain pipe 1. After holding the rotating inner ring 52, the height of the rotating outer ring 53 can be changed by rotating the rotating inner ring 52 along the vertical downpipe 2, thereby adjusting the height of the connector 51.

[0037] The above are all preferred embodiments of the present application, and the protection scope of the present application is not limited thereto. Therefore, any equivalent changes made according to the structure, shape, and principle of the present application should be included in the protection scope of the present application.

Claims

1. A construction method for auxiliary surface drainage of a basement pre-buried drainage pipe, characterized in that: The steps include: S1: Pipeline Laying: Laying a transverse drainage pipe (1), tilting the transverse drainage pipe (1) according to a designed slope, and fixing and connecting a plurality of vertical downpipes (2) on the transverse drainage pipe (1); S2: pouring bottom concrete into the foundation, wherein the upper surface of the bottom concrete is higher than the horizontal drainage pipe (1) and lower than the upper pipe opening of the vertical downpipe (2); S3: Curing the bottom concrete until the bottom concrete solidifies to form a bottom structure with a thickness of more than 30 cm; S4: pouring an upper layer of concrete on the surface of the bottom structure, wherein the upper surface of the upper layer of concrete is lower than the upper pipe opening of the vertical downpipe (2).

2. The construction method of a basement pre-buried drainage pipe auxiliary surface drainage according to claim 1 is characterized in that: The vertical downpipe (2) is overlapped on the foundation via a support assembly (3), and the support assembly (3) comprises: Base (31); A support seat (32), the vertical downpipe (2) being overlapped on the support seat (32); and Two connecting rods (33) are arranged in sequence in a first direction, one of the base (31) and the supporting seat (32) is fixedly connected to the connecting rod (33), and the other is rotatably connected to the connecting rod (33); one of the connecting rods (33) is threadedly connected to the other connecting rod (33), and the threaded rotation axis of the connecting rod (33) is parallel to the first direction.

3. The construction method of the basement pre-buried drainage pipe auxiliary surface drainage according to claim 2 is characterized in that: The support seat (32) is provided with a side stop assembly (4), and the transverse drainage pipe (1) is provided with a side stop assembly (4) on both sides of the transverse drainage pipe (1) in the length direction thereof, respectively. The side stop assembly (4) comprises: A side baffle (41), one end of the side baffle (41) is connected to the support seat (32), and the transverse drainage pipe (1) is sandwiched between the side baffles (41) on both sides.

4. A construction method for auxiliary surface drainage of a basement pre-buried drainage pipe according to claim 3, characterized in that: The side baffle assembly (4) further comprises a first telescopic rod (42), wherein the telescopic direction of the first telescopic rod (42) is parallel to the third direction; one end of the first telescopic rod (42) is fixedly connected to the support seat (32), and the other end is fixedly connected to the side baffle (41).

5. The construction method of auxiliary surface drainage of a basement pre-buried drainage pipe according to claim 4 is characterized in that: The circumferential wall of the horizontal drainage pipe (1) away from the support seat (32) is provided with a water drop hole (11); one end of the vertical water drop pipe (2) is fixedly connected to a connecting ring (21); the inner circumference of the connecting ring (21) is fixedly connected to an insert pipe (22); when the insert pipe (22) is inserted into the water drop hole (11), the insert pipe (22) connects the horizontal drainage pipe (1) and the vertical water drop pipe (2).

6. The construction method of auxiliary surface drainage of a basement pre-buried drainage pipe according to claim 5 is characterized in that: The connecting ring (21) is fixedly connected with a flexible sealing ring (23) near the end wall of the insert pipe (22); when the insert pipe (22) is inserted into the transverse drainage pipe (1), the flexible sealing ring (23) is clamped between the connecting ring (21) and the pipe wall of the transverse drainage pipe (1).

7. A construction method for auxiliary surface drainage of a basement pre-buried drainage pipe according to claim 6, characterized in that: The vertical downpipe (2) is provided with a straightening assembly (5), and the straightening assembly (5) comprises: A plug-in connector (51) having a plug-in end, the plug-in connector (51) being connected to the vertical downpipe (2); the plug-in connector (51) being detachably connected to the downpipe, and a plug-in hole (411) being provided at one end of the side baffle (41) close to the vertical downpipe (2), the plug-in hole (411) being used for inserting the plug-in end; When the plug-in end is plugged into the plug-in hole (411), the transverse drainage pipe (1) is clamped between the side baffles (41) on both sides.

8. The construction method of auxiliary surface drainage of basement pre-buried drainage pipes according to claim 7 is characterized in that: A guide plate (6) is fixedly connected to the side baffle (41), and the guide plate (6) is fixedly connected to a side of the side baffle (41) close to the transverse drain pipe (1); The guide plate (6) has a guide surface (61), and the guide surface (61) is located on a side of the guide plate (6) away from the transverse drain pipe (1); The guide surface (61) is inclined toward a side close to the central axis of the transverse drainage pipe (1) in the direction from the transverse drainage pipe (1) to the vertical downpipe (2); The guide surface (61) is smoothly transitionally connected to the inner wall of one end of the plug hole (411) close to the transverse drain pipe (1).

9. A construction method for auxiliary surface drainage of a basement pre-buried drainage pipe according to claim 8, characterized in that: The side baffle (41) is provided with a locking assembly (7), and the locking assembly (7) comprises: a wedge block (71), the wedge block (71) being slidably connected to the side baffle (41) along a third direction; the wedge block (71) being located on a side of the guide surface (61) away from the transverse drain pipe (1); and a compression spring (72), one end of the compression spring (72) being fixedly connected to the wedge block (71) and the other end of the compression spring (72) being fixedly connected to the side baffle (41), the expansion and contraction direction of the compression spring (72) being parallel to the first direction; the compression spring (72) having a force to drive the wedge block (71) to move toward one side of the transverse drainage pipe (1) in a compressed state capable of recovering its deformation; The plug-in connector (51) is provided with a locking hole (511) for the wedge-shaped block (71) to be inserted into. When the wedge-shaped block (71) is inserted into the locking hole (511), the flexible sealing ring (23) is in an extruded state.

10. A construction method for auxiliary surface drainage of a basement with pre-buried drainage pipes according to any one of claims 7 to 9, characterized in that: The straightening assembly (5) further comprises: A rotating inner ring (52), the rotating inner ring (52) is coaxially rotatably connected to the outer periphery of the vertical downpipe (2); and A rotating outer ring (53), the rotating outer ring (53) is sleeved on the outer circumference of the rotating inner ring (52) and is threadedly connected to the rotating inner ring (52), and the plug-in component (51) is fixedly connected to the rotating outer ring (53); The end of the rotating inner ring (52) away from the transverse drain pipe (1) extends to the side of the rotating outer ring (53) away from the transverse drain pipe (1).