Saline-alkali soil concealed conduit health maintenance method, electronic equipment, medium and product

Through ultrasonic signal detection and target flushing route optimization, the abnormal accumulation problem in saline-alkali land concealed pipes can be solved, and the timeliness and efficiency of healthy maintenance of saline-alkali land concealed pipes can be achieved, and the soil improvement effect can be ensured.

CN118881971AActive Publication Date: 2024-11-01SHIJIAZHUANG INST OF AGRI MODERNIZATION CHINESE ACAD OF SCI
View PDF 7 Cites 0 Cited by

Patent Information

Application Number
CN202411032116.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-30
Publication Date
2024-11-01
Estimated Expiration
2044-07-30

AI Technical Summary

Technical Problem

The salt discharge pipelines in saline-alkali land are susceptible to erosion and accumulation of salt, causing pipeline damage, affecting the soil improvement effect, and the existing technology is difficult to detect and resolve abnormal accumulation in the pipeline in a timely manner, resulting in untimely or excessive maintenance.

Method used

Ultrasonic signals are used to detect abnormal accumulation inside the pipeline, determine the target flushing route and standard flushing parameters, realize real-time detection and precise flushing, avoid blind flushing, and improve maintenance efficiency and accuracy.

Benefits of technology

Through ultrasonic signal detection, timely discover abnormalities in the pipeline, improve the timeliness and efficiency of healthy maintenance of saline-alkali concealed pipes, avoid blind or excessive maintenance, ensure the accuracy and efficiency of the flushing process, and extend the life of the pipeline.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118881971A_ABST
    Figure CN118881971A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of pipeline health maintenance, in particular to a saline-alkali soil concealed conduit health maintenance method, electronic equipment, a medium and a product. The method comprises the steps that a pipeline ultrasonic signal of a to-be-maintained pipeline is acquired, and abnormal accumulation information in the to-be-maintained pipeline is determined based on the pipeline ultrasonic signal; the abnormal accumulation information comprises an abnormal accumulation position and an abnormal accumulation size; determining a corresponding target flushing route and a standard accumulation flushing parameter according to the abnormal accumulation information; and flushing the to-be-maintained pipeline according to the target flushing route and the standard accumulation flushing parameters. According to the invention, abnormity in the saline-alkali soil concealed conduit can be found in time.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of pipeline health maintenance, and in particular to a method, electronic equipment, medium and product for maintaining the health of underground pipelines in saline-alkali land. Background Art

[0002] Saline-alkali land refers to land with excessive soluble salts in the soil. These salts have a significant inhibitory effect on plant growth. High salt content will increase soil osmotic pressure, thereby affecting the plant's absorption of water, which may cause plant physiological drought or even death. When improving saline-alkali land, it is generally chosen to lay salt drainage pipes at a certain depth underground in the saline-alkali land. Using the law of water and salt migration of "salt comes with water and salt goes with water", salt and excess water in the soil are collected and discharged through salt drainage pipes, effectively reducing soil salt content, improving the soil environment, and creating favorable conditions for plant growth.

[0003] However, due to the high salt content in the soil of saline-alkali land, the salt drainage pipes laid at a certain depth underground may be damaged due to erosion, especially for materials that are not resistant to corrosion. In addition, salt accumulation may occur in the salt drainage pipes. After the salt accumulates in the salt drainage pipes, it is easy to form scale, which will not only reduce the flow area in the pipes, but also increase the water flow resistance. Long-term accumulation may cause damage to the pipe structure due to compression. Therefore, in the process of improving saline-alkali land, the health of the salt drainage pipes is particularly critical. Summary of the invention

[0004] In order to facilitate the timely discovery of abnormalities in underground pipes in saline-alkali land and to carry out health maintenance of laid pipelines, the present application provides a health maintenance method, electronic equipment, medium and product for underground pipes in saline-alkali land.

[0005] In the first aspect, the present application provides a method for maintaining the health of underground pipes in saline-alkali land, which adopts the following technical solution: A method for maintaining the health of underground pipes in saline-alkali land, comprising: Acquire a pipeline ultrasonic signal of the pipeline to be maintained, and determine abnormal accumulation information in the pipeline to be maintained based on the pipeline ultrasonic signal, wherein the abnormal accumulation information includes an abnormal accumulation position and an abnormal accumulation size; Determine a corresponding target flushing route and standard accumulation flushing parameters according to the abnormal accumulation information; The pipeline to be maintained is flushed according to the target flushing route and the standard accumulation flushing parameters.

[0006] By adopting the above technical scheme, ultrasonic signals are used to facilitate real-time detection of the inside of the pipeline to be maintained, so as to timely discover abnormal accumulation in the pipeline, thereby improving the timeliness and efficiency of the healthy maintenance of the underground pipes in saline-alkali land. In addition, when there is abnormal accumulation in the pipeline, the corresponding abnormal accumulation position and abnormal accumulation size can be determined by analyzing the ultrasonic signals. Based on the abnormal accumulation information, accurate data support is provided for subsequent pipeline inspection and maintenance work, avoiding blind flushing or excessive maintenance. The target flushing route and standard accumulation flushing parameters that are compatible with the abnormal accumulation information are used to flush the pipeline to be maintained, so as to improve the accuracy and flushing efficiency of the flushing process, and realize healthy maintenance of the laid pipeline by timely discovering and resolving abnormal accumulation in the pipeline.

[0007] In a possible implementation, determining a corresponding flushing route according to the abnormal accumulation information includes: According to the abnormal accumulation position in the abnormal accumulation information, determining at least one initial flushing route corresponding to the abnormal accumulation position, the initial flushing route being a flushing route passing through the abnormal accumulation position; Identify the cornering feature information contained in each initial flushing route, where the cornering feature information includes the number of corners and the cornering size corresponding to each corner; According to the cornering characteristic information corresponding to each initial flushing route, a simulated flushing pipeline model corresponding to each initial flushing route is determined, and based on the flushing fluid volume corresponding to the standard accumulation flushing parameter and the simulated flushing pipeline model corresponding to each initial flushing route, the flushing parameters at the abnormal accumulation position are simulated to obtain the simulated flushing parameters of each initial flushing route, wherein the simulated flushing parameters include a simulated flushing area and a simulated flushing pressure; Based on the simulated flushing parameters corresponding to each initial flushing route and the standard accumulation flushing parameters corresponding to the abnormal accumulation information, a target flushing route is determined from at least one initial flushing route, and the parameter matching value between the simulated flushing parameters corresponding to the target flushing route and the standard accumulation flushing parameters is the highest.

[0008] By adopting the above technical scheme, it is convenient to quickly screen out multiple flushing routes that can pass through the abnormal accumulation location through the abnormal accumulation location. Since the salt discharge pipes may be in a connected state, there may be multiple flushing routes passing through the abnormal accumulation location. The number of turns and the size of turns contained in each flushing route may be different, but the impact of different numbers of turns and sizes of turns on the flushing effect may also be different. Therefore, a simulated flushing pipeline model corresponding to each initial flushing route is established, and each simulated flushing pipeline model is predicted and simulated, so as to improve the initial flushing route and the flushing route that is more suitable for the abnormal accumulation situation. Finally, based on the parameter matching value, the target flushing route that best meets the standard requirements is determined, so as to improve the effectiveness and rate of the flushing process.

[0009] In a possible implementation, after flushing the pipeline to be maintained according to the target flushing route and the standard accumulation flushing parameters, the method further includes: Acquire flushing receipt information, where the flushing receipt information is a receipt pipeline ultrasonic signal after the pipeline to be maintained is flushed; When there are abnormal features in the ultrasonic signal of the return pipe, obtaining a radiographic image of the target flushing route, and performing feature recognition on the radiographic image; When crack features exist in the radiographic image, a maintenance signal is generated according to the abnormal position corresponding to the crack features.

[0010] By adopting the above technical solution, after flushing the pipeline to be maintained, the flushing effect can be evaluated by returning the pipeline ultrasonic signal. If the expected effect is not achieved, the X-ray image in the pipeline can be analyzed to determine whether there are cracks in the pipeline, so as to prevent pipeline leakage, etc., and when crack characteristics exist, maintenance signals are generated in time according to the abnormal position, so that maintenance personnel can quickly and accurately locate the crack position, thereby reducing the time and cost of manual inspection, and further improving the overall efficiency of the pipeline maintenance process.

[0011] In a possible implementation, when there are multiple abnormal locations, the method further includes: Acquire historical drainage data within a first preset time period, wherein the historical drainage data includes drainage flow and drainage pressure; Based on the historical drainage data, determine the drainage load value corresponding to each abnormal position at each abnormal moment, and based on the preset load cloud map and the drainage load value corresponding to each abnormal moment, determine the load cloud map corresponding to each abnormal position at each abnormal moment; Superimposing the load cloud diagrams corresponding to each abnormal position within the first preset time period to obtain a superimposed load cloud diagram corresponding to each abnormal position; Identify the superimposed information in each superimposed load cloud map, and determine the abnormal level corresponding to each abnormal position based on the mapping relationship between each superimposed information and the abnormal level, the superimposed information includes the superimposed overlapping area size and the superimposed color depth; According to the abnormality level corresponding to each abnormal position, the maintenance priority corresponding to each abnormal position is determined, and a maintenance signal corresponding to each abnormal position is generated based on the maintenance priority.

[0012] By adopting the above technical solution, when there are multiple abnormal positions, the stress conditions of each abnormal position during the drainage process can be analyzed by analyzing the historical drainage data, and it is also convenient to analyze the abnormal changes of each position in the future. According to the analysis results, it is convenient to reasonably allocate maintenance resources to ensure that the maintenance resources can be effectively allocated. In addition, by generating a superimposed load cloud map corresponding to each abnormal position, in addition to determining the maintenance priority of each abnormal position, it is also convenient for maintenance personnel to intuitively understand the abnormal distribution of each abnormal position.

[0013] In a possible implementation, when there is no crack feature in the radiographic image, the method further includes: Acquire historical flushing receipt information corresponding to a second preset time period, and determine a change rate of the abnormal feature within the second preset time period according to the historical flushing receipt information; Determining the abnormality type of the abnormal feature according to the change rate within the second preset time period, the abnormality type including viscosity abnormality and accumulation abnormality; When the abnormality type is viscosity abnormality, the flushing water temperature is adjusted, and based on the adjusted flushing water temperature, the target flushing route and the standard accumulation flushing parameters, the pipeline to be maintained is flushed for the second time.

[0014] By adopting the above technical solution, if the reason for the poor flushing effect after flushing the pipeline to be maintained is not due to leakage in the pipeline, the historical flushing receipt information can be analyzed to further determine the cause of the abnormality. Since different abnormality types may correspond to different response strategies, by determining the abnormality type and then determining a secondary flushing strategy based on the abnormality type, it is not only convenient to effectively clean the sticky substances in the pipeline, but also to avoid incomplete maintenance or excessive flushing due to improper flushing parameters.

[0015] In one possible implementation, the method further includes: During the secondary flushing of the pipeline to be maintained, local flushing receipt information corresponding to the abnormal accumulation position is obtained in real time; When a preset salt block feature appears in the local flushing receipt information, the flushing water temperature corresponding to the secondary flushing stage is reduced to a preset water temperature; Based on the preset water temperature, the target flushing route and the standard accumulation flushing parameters, the pipeline to be maintained is flushed for a second time.

[0016] By adopting the above technical scheme, through real-time detection of local flushing receipt information during the secondary flushing process, it is convenient to check the secondary flushing effect at the abnormal accumulation position. Since the temperature is increased when the secondary flushing is performed on the abnormal accumulation position with abnormal viscosity type, the flushing water temperature is adjusted in time according to the flushing effect, which is convenient to reduce unnecessary waste of resources during the secondary flushing process.

[0017] In a second aspect, the present application provides an electronic device, which adopts the following technical solution: An electronic device, comprising: at least one processor; Memory; At least one application, wherein the at least one application is stored in a memory and configured to be executed by at least one processor, and the at least one application is configured to: execute the above-mentioned saline-alkali land concealed pipe health maintenance method.

[0018] In a third aspect, the present application provides a computer-readable storage medium, which adopts the following technical solution: A computer-readable storage medium includes: a computer program that can be loaded by a processor and executed by the above-mentioned saline-alkali land concealed pipe health maintenance method.

[0019] In a fourth aspect, the present application provides a computer program product, which adopts the following technical solution: A computer program product includes a computer program, which implements the above-mentioned saline-alkali land concealed pipe health maintenance method when executed by a processor.

[0020] In summary, the present application includes at least one of the following beneficial technical effects: Ultrasonic signals are used to facilitate real-time detection of the inside of the pipeline to be maintained, so that abnormal accumulation in the pipeline can be discovered in time, thereby improving the timeliness and efficiency of the pipeline health maintenance process. In addition, when abnormal accumulation exists in the pipeline, the corresponding abnormal accumulation position and abnormal accumulation size can be determined by analyzing the ultrasonic signal. Based on the abnormal accumulation information, accurate data support is provided for subsequent pipeline inspection and maintenance work, avoiding blind flushing or excessive maintenance. The target flushing route and standard accumulation flushing parameters that are compatible with the abnormal accumulation information are used to flush the pipeline to be maintained, so as to improve the accuracy and efficiency of the flushing process, and realize healthy maintenance of the laid pipeline by timely discovering and resolving abnormal accumulation in the pipeline.

[0021] If the reason for the poor flushing effect of the pipeline to be maintained is not due to leakage, the historical flushing receipt information can be analyzed to further determine the cause of the abnormality. Since different abnormality types may have different corresponding response strategies, by determining the abnormality type and then determining a secondary flushing strategy based on the abnormality type, it is not only convenient to effectively clean the sticky substances in the pipeline, but also to avoid incomplete maintenance or excessive flushing due to improper flushing parameters. BRIEF DESCRIPTION OF THE DRAWINGS

[0022] Figure 1 It is a flow chart of a method for maintaining the health of a saline-alkali land underground pipe in an embodiment of the present application; Figure 2 It is a flowchart of a maintenance priority determination method in an embodiment of the present application; Figure 3 It is a structural schematic diagram of an electronic device in an embodiment of the present application. DETAILED DESCRIPTION

[0023] The following is combined with Figure 1-3 This application is described in further detail.

[0024] After reading this specification, those skilled in the art may make non-creative modifications to this embodiment as needed, but such modifications are protected by patent law as long as they are within the scope of the claims of this application.

[0025] In order to make the purpose, technical solution and advantages of the embodiments of the present application clearer, the technical solution in the embodiments of the present application will be clearly and completely described below in conjunction with the drawings in the embodiments of the present application. Obviously, the described embodiments are part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of this application.

[0026] It should be noted that in the optional embodiments of the present application, the object information and other related data involved, when the embodiments in the present application are applied to specific products or technologies, need to obtain the permission or consent of the object, and the collection, use and processing of the relevant data need to comply with the relevant laws, regulations and standards of the relevant countries and regions. In other words, if the embodiments of the present application involve data related to the object, it needs to be obtained with the authorization and consent of the object, the authorization and consent of the relevant departments, and in compliance with the relevant laws, regulations and standards of the country and region. If personal information is involved in the embodiments, the acquisition of all personal information needs to obtain the consent of the individual. If sensitive information is involved, the separate consent of the information subject needs to be obtained. The embodiments also need to be implemented with the authorization and consent of the object.

[0027] Specifically, the embodiment of the present application provides a method for maintaining the health of a saline-alkali land underground pipe, which is executed by an electronic device, which can be a server or a terminal device, wherein the server can be an independent physical server, or a server cluster or distributed system composed of multiple physical servers, or a cloud server that provides cloud computing services. The terminal device can be a smart phone, a tablet computer, a laptop computer, a desktop computer, etc., but is not limited thereto. The terminal device and the server can be directly or indirectly connected via wired or wireless communication, which is not limited in the embodiment of the present application.

[0028] refer to Figure 1 , Figure 1 1 is a flow chart of a saline-alkali land concealed pipe health maintenance method in an embodiment of the present application, the method comprising steps S110 to S130, wherein: Step S110: Acquire the pipeline ultrasonic signal of the pipeline to be maintained, and determine the abnormal accumulation information in the pipeline to be maintained based on the pipeline ultrasonic signal, wherein the abnormal accumulation information includes the abnormal accumulation position and the abnormal accumulation size.

[0029] Specifically, the pipeline to be maintained is a pipeline that requires health maintenance. It can be an underground drainage and salt removal pipe or an underground salt leaching drainage and salt removal pipe. The underground drainage and salt removal pipe is laid between 1.2-1.5 meters underground, with a spacing of 8 meters. It is used to control the groundwater level to prevent salt return, and also has the function of draining water and salt. The underground salt leaching drainage and salt removal pipe is laid between 0.5-0.6 meters underground, with a spacing of 3-4 meters. It is used to drain water and salt when flooding and leaching salt. Under the condition of a certain amount of leaching water, the drainage and salt removal pipe can facilitate the full leaching of soil salt above 0.5 meters, thereby effectively leaching and discharging the salt to ensure the crop planting conditions in the cultivated layer.

[0030] The ultrasonic transmitter can be controlled by the host computer to emit ultrasonic waves of a preset frequency. After the ultrasonic waves propagate in the pipeline to be maintained, the ultrasonic receivers arranged on both sides of the pipeline can receive the signals and upload the received signals to the electronic equipment. Since the solubility of salt may be affected by temperature and fluid flow rate during the salt discharge process, when the temperature drops or the flow rate of the fluid in the salt discharge pipeline drops, the salt is more likely to deposit on the pipeline wall, thereby gradually forming salt blocks. In addition, in some cases, chemical reactions in the salt discharge pipeline may also lead to the formation of salt blocks. For example, when different types of salt exist in the salt discharge pipeline, chemical reactions may occur between different types of salt to generate new salts. When the new salts have lower solubility, they are easily deposited in the salt discharge pipeline to form salt blocks. Timely flushing of the accumulated salt blocks generated in the salt discharge pipeline is convenient for reducing the risk of corrosion of the salt discharge pipeline. Therefore, it is particularly important to timely discover abnormal accumulation information in the pipeline during the health maintenance of the salt discharge pipeline.

[0031] Among them, ultrasound has good directionality and penetration. When ultrasound propagates in a pipeline, if it encounters objects of different density or sound group frame, such as accumulated salt blocks in the pipeline, reflection, refraction or absorption will occur. These phenomena will cause the intensity, phase and propagation time of the ultrasonic signal propagating in the pipeline to change. By analyzing the changes in the ultrasonic signal, abnormal accumulation information in the pipeline can be identified. For example, when the ultrasonic wave propagating in the pipeline encounters accumulated salt blocks, part of the ultrasonic wave will be received by the ultrasonic receiving device on both sides of the pipeline, while the other part may continue to propagate after penetrating the accumulated salt blocks. Therefore, the abnormal accumulation information can be determined by the intensity and time delay of the pipeline ultrasonic signal, and the abnormal accumulation size is the size of the accumulated salt blocks.

[0032] Step S120: determining a corresponding target flushing route and standard accumulation flushing parameters according to the abnormal accumulation information.

[0033] Specifically, since the connected salt drainage pipe network ensures that the salt in different locations can be effectively discharged, even if a section of the salt drainage pipe fails or needs maintenance, the sinking salt in the corresponding area can be discharged through other salt drainage pipes. In addition, the connected salt drainage pipe network facilitates unified maintenance and management, such as regular inspection and repair, etc. Therefore, different salt drainage pipes are connected. When the number of salt drainage pipes is large, the salt drainage pipes laid underground in a certain area can form a salt drainage pipe network. Therefore, when it is necessary to flush the abnormal accumulation location, there may be multiple flushing routes passing through the abnormal accumulation location, and the target flushing route is one of the flushing routes passing through the abnormal accumulation location.

[0034] The standard accumulation flushing parameters correspond to the abnormal accumulation size. The standard accumulation flushing parameters include but are not limited to the flushing area and flushing pressure, wherein the flushing area is the cross-sectional area of ​​the salt discharge pipe during the flushing process. The flushing area corresponds to the flushing flow rate. A larger flushing area means that a larger flushing flow rate is required to cover the abnormal accumulation position. The larger the flushing area, the larger the coverage area at the abnormal accumulation position, and the better the corresponding flushing effect. The flushing area can be determined based on the flushing flow rate. The flushing pressure is the pressure generated by the fluid on the inner wall of the pipe during the flushing process. It can be collected by a pressure sensor installed on the outside of the pipe and uploaded to an electronic device. Different accumulated salt blocks may have different thicknesses. Therefore, before flushing the abnormal accumulation position, the flushing area and flushing pressure are set according to the abnormal accumulation size to facilitate improving the flushing effect. The thickness of the accumulated salt block can be determined according to the abnormal accumulation size.

[0035] Step S130: flushing the pipeline to be maintained according to the target flushing route and standard accumulation flushing parameters.

[0036] Specifically, the flushing fluid volume is set according to the determined standard accumulation flushing parameters, and then the flushing equipment is started to flush the pipeline to be maintained according to the target flushing route, so as to clean up the accumulated salt blocks at the abnormal accumulation position, wherein the flushing equipment includes a flushing pump, a nozzle and a pipe connector, and the flushing fluid can be set based on the standard accumulation flushing parameters by adjusting the flushing equipment. The flushing fluid can be water in the integrated accumulation pool, and a salt water desalination device is installed in the integrated accumulation pool, which can realize the recycling of elution water resources in saline-alkali land.

[0037] For the embodiments of the present application, ultrasonic signals are used to facilitate real-time detection of the interior of the pipeline to be maintained, so that abnormal accumulation in the pipeline can be discovered in time, thereby facilitating the improvement of timeliness and efficiency in the process of pipeline health maintenance. In addition, when abnormal accumulation exists in the pipeline, the corresponding abnormal accumulation position and abnormal accumulation size can be determined by analyzing the ultrasonic signals. Based on the abnormal accumulation information, accurate data support can be provided for subsequent pipeline inspection and maintenance work, thereby avoiding blind flushing or excessive maintenance. The pipeline to be maintained is flushed using a target flushing route and standard accumulation flushing parameters that match the abnormal accumulation information, thereby improving the accuracy and efficiency of the flushing process, and achieving healthy maintenance of the laid pipeline by promptly discovering and resolving abnormal accumulation in the pipeline.

[0038] Furthermore, in order to improve the effectiveness and speed of the flushing process, the corresponding flushing route is determined according to the abnormal accumulation information, which may specifically include: According to the abnormal accumulation position in the abnormal accumulation information, at least one initial flushing route corresponding to the abnormal accumulation position is determined, and the initial flushing route is a flushing route passing through the abnormal accumulation position.

[0039] Specifically, the initial flushing route can be determined based on the abnormal accumulation location and salt discharge pipeline layout. Figure 1 At the same time, the salt discharge pipeline layout diagram includes multiple salt discharge pipelines, pipeline directions, connection points and valve positions, etc. The salt discharge pipeline layout diagram can be determined by relevant staff according to the actual pipeline laying situation and uploaded to the electronic device. The specific content of the salt discharge pipeline layout diagram is not specifically limited in the embodiment of the present application. When determining the initial flushing route, the abnormal accumulation position can be determined as a necessary point, and then the necessary point and the salt discharge pipeline layout diagram are imported into the route recognition model to obtain at least one initial flushing route passing through the necessary point. The route recognition model can be obtained after training with a large amount of sample data. A large amount of sample data is a route map containing different flushing routes and manual annotations of each flushing route. The specific training process is not specifically limited in the embodiment of the present application, as long as at least one initial flushing route passing through the abnormal accumulation position can be identified according to the salt discharge pipe network layout diagram.

[0040] The cornering characteristic information contained in each initial flushing route is identified, where the cornering characteristic information includes the number of corners and the cornering size corresponding to each corner.

[0041] Specifically, when determining the bend characteristic information contained in each initial flushing route, it can be determined from the salt drainage pipeline layout diagram according to the route identification corresponding to each initial flushing route. The salt drainage pipeline layout diagram contains the bend characteristic information corresponding to each pipeline, which can be uploaded by relevant staff according to the actual laying situation. Since the bend characteristic information may affect the flushing efficiency, when the flushing route contains more bends or larger bend sizes, the flushing speed may be reduced, which may cause the fluid to be transmitted in the salt drainage pipeline to the abnormal accumulation location. The flushing force weakens, thereby reducing the flushing effect. In addition, more bends and larger bend sizes may also increase the complexity of the flushing operation. For example, it may take longer time and more flushing fluid to flush the abnormal accumulation at the abnormal accumulation location. Therefore, when determining the target flushing route from at least one initial flushing route, it is necessary to consider and analyze the bend characteristic information of each initial flushing route.

[0042] According to the turning characteristic information corresponding to each initial flushing route, the simulated flushing pipeline model corresponding to each initial flushing route is determined, and the flushing parameters at the abnormal accumulation location are simulated based on the flushing fluid volume corresponding to the standard accumulation flushing parameters and the simulated flushing pipeline model corresponding to each initial flushing route to obtain the simulated flushing parameters of each initial flushing route. The simulated flushing parameters include simulated flushing area and simulated flushing pressure.

[0043] Specifically, different bend characteristic information corresponds to different simulated flushing pipeline models. Since the bend characteristic information corresponding to different initial flushing routes can reflect the actual situation of the pipeline corresponding to the current initial flushing route, the accuracy is higher when the simulated flushing pipeline model corresponding to each initial flushing route is determined based on the bend characteristic information corresponding to each initial flushing route. Different standard accumulation flushing parameters correspond to different flushing fluid quantities, but since different initial flushing routes contain different bend characteristic information, the same flushing fluid quantity achieves different flushing effects in different initial flushing pipelines. By simulating the simulated flushing pipeline corresponding to each initial flushing route based on the determined flushing fluid quantity, it is easy to intuitively understand the flushing effects that different initial flushing routes may achieve. The simulated flushing parameters include simulated flushing area and simulated flushing pressure, that is, when the simulated flushing pipeline model corresponding to the initial flushing route is simulated using the determined flushing fluid quantity, the simulated flushing parameters corresponding to the abnormal accumulation position.

[0044] Based on the simulated flushing parameters corresponding to each initial flushing route and the standard accumulation flushing parameters corresponding to the abnormal accumulation information, a target flushing route is determined from at least one initial flushing route, and the parameter matching value between the simulated flushing parameters corresponding to the target flushing route and the standard accumulation flushing parameters is the highest.

[0045] Specifically, if the matching value between the simulated flushing parameters at the abnormal accumulation position and the standard accumulation flushing parameters is higher during the simulated flushing process, the initial flushing route corresponding to the simulated flushing parameters can realize the cleaning of the abnormal accumulation at the abnormal accumulation position. Different simulated flushing parameters correspond to different flushing effects. If the simulated flushing parameters corresponding to a certain initial flushing route are much higher than the standard accumulation flushing parameters, then using the initial flushing route to flush the abnormal accumulation position may cause a waste of resources; if the simulated flushing parameters corresponding to a certain initial flushing route are originally lower than the standard accumulation flushing parameters, then using the initial flushing route to flush the abnormal accumulation position may result in poor flushing effect. Therefore, by matching the simulated flushing parameters corresponding to each initial flushing route with the standard accumulation flushing parameters, the parameter matching value between the simulated flushing parameters corresponding to each initial flushing route and the standard accumulation flushing parameters is determined. The higher the parameter matching value, the closer the simulated flushing parameters are to the standard accumulation flushing parameters. The initial flushing route with the highest parameter matching value is determined as the target flushing route, which is convenient for reducing the waste of flushing resources while ensuring the flushing effect.

[0046] Furthermore, in order to improve the overall effect of the pipeline maintenance process, after flushing the pipeline to be maintained according to the target flushing route and the standard accumulation flushing parameters, it also includes: The flushing receipt information is obtained, which is the ultrasonic signal of the receipt pipeline after the pipeline to be maintained is flushed; when there are abnormal features in the ultrasonic signal of the receipt pipeline, the radiographic image of the target flushing route is obtained, and the features of the radiographic image are identified; when there are crack features in the radiographic image, a maintenance signal is generated according to the abnormal position corresponding to the crack features.

[0047] Specifically, when the flushing completion instruction is detected, the ultrasonic signal of the receipt pipeline is obtained, wherein the method of obtaining the ultrasonic signal of the receipt pipeline can refer to the method of obtaining the pipeline ultrasonic signal in the above embodiment, which will not be described in detail here. By analyzing the ultrasonic signal of the receipt pipeline, it is convenient to test the flushing effect. Since continuous flushing may waste a large amount of flushing fluid, and continuous flushing may cause excessive wear to the salt discharge pipeline itself, the flushing effect will be evaluated after completing one flushing to determine whether a second flushing is required. When the ultrasonic information of the receipt pipeline does not contain abnormal features, it indicates that the flushing effect is good and no secondary flushing is required; when the ultrasonic information of the receipt pipeline contains abnormal features, it indicates that the flushing effect is not good and secondary cleaning may be required. The abnormal feature can be an abnormal accumulation block feature. The method used to identify whether there is an abnormal feature in the ultrasonic signal of the receipt pipeline can refer to the method of identifying whether the pipeline ultrasonic signal contains abnormal accumulation information in the above embodiment, which will not be described in detail here.

[0048] Obtain the radiographic image corresponding to the target flushing route, that is, obtain the content image of the pipeline corresponding to the target flushing route. The structure and defects inside the pipeline can be inspected using radiographic detection technology. Different thicknesses of salt discharge pipeline materials correspond to different applicable radiation sources. For example, X-rays are suitable for thinner pipeline materials, while gamma rays (such as cobalt-60 or iridium-192) are suitable for thicker pipeline materials. After selecting a suitable radiation source, aim the radiation source at the pipeline opening corresponding to the target flushing route, and let the radiation pass through the pipeline. After passing through the pipeline, the radiation will be captured by the radiation detector to form a radiation image. The method of obtaining the radiation image is not specifically limited in the embodiment of this application and can be set by relevant technical personnel.

[0049] After the X-ray image is determined, the internal structure or defects of the pipeline can be identified by performing feature recognition on the X-ray image. The contrast difference in the X-ray image can reflect the density difference of the material inside the pipeline. The crack features inside the pipeline usually show a different contrast from the surrounding materials. For example, the display contrast corresponding to the crack feature is different from the display contrast corresponding to the pipeline bubble. The display contrast of each part in the X-ray image can be used to determine whether there is a crack feature in the pipeline. The method of feature recognition of radiation effects is not described here. As long as the crack feature can be included in the X-ray image, the crack feature can be accurately identified. After the crack feature is determined, it can be marked in the X-ray image, and the position of the abnormal feature in the target flushing route can be determined based on the marked position. The generated maintenance signal contains the specific position of the abnormal feature, so that maintenance personnel can quickly and accurately locate the crack position, thereby reducing the time and cost of manual inspection, and further improving the overall efficiency of the pipeline maintenance process.

[0050] Furthermore, when there are multiple abnormal locations, the method provided by the present application further includes steps S1 to S5, such as Figure 2 As shown, where: Step S1: Acquire historical drainage data within a first preset time period, where the historical drainage data includes drainage flow and drainage pressure.

[0051] Specifically, when there are multiple abnormal locations, it is necessary to evaluate the abnormal situation of each abnormal location in order to determine the maintenance priority corresponding to each abnormal location, so as to facilitate the priority allocation of maintenance resources to the abnormal locations that pose the most direct threat to the safety of the salt drainage pipeline. The first preset time period is the time period corresponding to the first flushing. The specific duration is not specifically limited in the embodiment of the present application and can be determined according to the actual flushing duration. The historical drainage data contains the drainage flow and drainage pressure corresponding to each area inside the pipeline within the first preset time period at each time, which can be collected by sensors arranged on both sides of the pipeline and uploaded to the electronic device.

[0052] Step S2: Based on historical drainage data, determine the drainage load value corresponding to each abnormal position at each abnormal moment, and based on the preset load cloud map and the drainage load value corresponding to each abnormal moment, determine the load cloud map corresponding to each abnormal position at each abnormal moment.

[0053] Specifically, the drainage load value corresponding to each abnormal position at each abnormal moment is composed of two parts. The first drainage load value is the load value corresponding to the drainage flow rate. At the same position, the flushing area corresponding to different drainage flows is also different. The larger the flushing area, the larger the corresponding first drainage load value. There is an area correspondence between the flushing area and the first drainage load value. The area correspondence includes the first drainage load values ​​corresponding to different flushing areas. The specific content of the area correspondence is not specifically limited in the embodiments of this application, and can be adjusted or modified by relevant staff according to actual needs. Since the pipe diameter corresponding to the salt discharge pipe is fixed, the method of determining the flushing area according to the drainage flow rate and the pipe diameter is not repeated here.

[0054] The second drainage load value is the load value corresponding to the drainage pressure. The greater the drainage pressure, the greater the corresponding second drainage load value. The drainage pressure can be collected by pressure sensors arranged on both sides of the pipeline. There is a pressure correspondence between the drainage pressure and the second drainage load value. The pressure correspondence includes second drainage load values ​​corresponding to different drainage pressures. The specific content of the pressure correspondence is not specifically limited in the embodiments of the present application, and relevant technical personnel can adjust or modify it according to actual needs.

[0055] For any abnormal position, after determining the first drainage load value and the second drainage load value corresponding to the abnormal position at each abnormal moment, the drainage area corresponding to the first drainage load is converted into a cloud map area, and the converted cloud map area is determined at the corresponding position in the preset load cloud map, and then the corresponding pressure color depth is determined according to the second drainage load value. Different second drainage load values ​​correspond to different pressure color depths. The higher the second drainage load value, the darker the corresponding pressure color. Finally, the cloud map area is filled with color according to the pressure color depth determined by the second drainage load value to obtain the load cloud map corresponding to the abnormal position at a certain abnormal moment. Based on the above method, the load cloud map corresponding to each abnormal position at each abnormal moment can be obtained.

[0056] Among them, the preset load cloud map includes all pipelines to be maintained. When determining the load cloud maps corresponding to different abnormal locations at different abnormal times, the same preset load cloud map is used to facilitate subsequent load cloud map superposition.

[0057] Step S3: superimpose the load cloud diagrams corresponding to each abnormal position within the first preset time period to obtain a superimposed load cloud diagram corresponding to each abnormal position.

[0058] Specifically, by superimposing the load cloud maps corresponding to each abnormal position, it is convenient to intuitively display the drainage load received by the abnormal position in the first preset time period. Since the same preset load cloud map is used when determining the load cloud maps corresponding to the abnormal position at different abnormal moments, when superimposing the load cloud maps corresponding to different abnormal moments, a cloud map reference point can be determined from any load cloud map, and all load cloud maps are superimposed based on the cloud map reference point to obtain the superimposed load cloud map corresponding to the abnormal position. The superimposed load cloud map corresponding to each abnormal position can be obtained by adopting the above method.

[0059] Step S4: Identify the superimposed information in each superimposed load cloud map, and determine the abnormal level corresponding to each abnormal position based on the mapping relationship between each superimposed information and the abnormal level. The superimposed information includes the superimposed overlapping area size and the superimposed color depth.

[0060] Specifically, for any superimposed load cloud map, when identifying the superimposed information in the superimposed load cloud map, the overlapping areas corresponding to all different abnormal moments can be determined as target overlapping areas, and the size corresponding to the target overlapping areas can be determined as the overlapping area size, and the color depth corresponding to the target overlapping areas can be determined as the superimposed color depth. The superimposed overlapping area size and the superimposed color depth constitute the superimposed information. The superimposed information corresponding to each abnormal position can be obtained by using the method disclosed in the above embodiment.

[0061] The abnormality level mapping relationship includes abnormality levels corresponding to different overlay information, that is, abnormality levels corresponding to combinations of different overlay overlap area sizes and overlay color depths. The larger the overlay overlap area size and the deeper the overlay color depth, the higher the corresponding abnormality level. The specific content is not specifically limited in the embodiments of the present application and can be set by relevant technical personnel.

[0062] Step S5: Determine the maintenance priority corresponding to each abnormal position according to the abnormality level corresponding to each abnormal position, and generate a maintenance signal corresponding to each abnormal position based on the maintenance priority.

[0063] Specifically, the higher the abnormality level, the higher the corresponding maintenance priority. There is a corresponding relationship between the abnormality level and the maintenance priority. Based on the corresponding relationship, the maintenance priority corresponding to each abnormality level can be determined. After the maintenance priorities of all abnormal locations are determined, the corresponding maintenance signals are generated according to the maintenance priorities, so as to improve the standardization of the maintenance resource allocation process and ensure that the maintenance resources can be effectively allocated. In addition, by generating the superimposed load cloud map corresponding to each abnormal location, in addition to determining the maintenance priority of each abnormal location, it is also convenient for maintenance personnel to intuitively understand the abnormal distribution of each abnormal location.

[0064] Furthermore, when there is no crack feature in the radiographic image, the method provided in the embodiment of the present application further includes: Obtain historical flushing receipt information corresponding to the second preset time period, and determine the change rate of the abnormal characteristic within the second preset time period based on the historical flushing receipt information; determine the abnormal type of the abnormal characteristic based on the change rate within the second preset time period, and the abnormal types include viscosity abnormality and accumulation abnormality; when the abnormal type is viscosity abnormality, adjust the flushing water temperature, and based on the adjusted flushing water temperature, target flushing route and standard accumulation flushing parameters, perform a secondary flushing on the pipeline to be maintained.

[0065] Specifically, the second preset time period includes at least one flushing process, wherein the change rate of the abnormal feature within the second preset time period can be used to characterize the flushing effect, wherein when the change rate is higher than the preset change rate, it is characterized that the abnormal feature is in a changing state and is gradually being flushed, for example, the accumulated salt blocks are melting at the preset change rate; when the change rate is not higher than the preset change rate, it is characterized that the abnormal feature is not in a changing state, for example, the accumulated salt blocks are not melting with the flushing, and the specific reason may be that the accumulated salt blocks are large in size or the adhesion is too strong.

[0066] Among them, when the abnormal features still exist after flushing, there are no crack features in the radiographic image, and the change rate is higher than the preset change rate, the abnormal type is characterized as abnormal accumulation; when the abnormal features still exist after flushing, there are no crack features in the radiographic image, and the change rate is not higher than the preset change rate, the abnormal type is characterized as abnormal viscosity. When the abnormal type is abnormal accumulation, it is only necessary to flush the abnormal features again, and there is no need to adjust the temperature of the flushing fluid. Since heating can increase the solubility of water, especially for certain types of salt, high-temperature water can accelerate the dissolution of salt, thereby softening the salt blocks, reducing their hardness and adhesion, and making the salt blocks easier to be flushed away. Therefore, when the abnormal type is abnormal viscosity, the flushing water temperature can be adjusted, and the pipeline to be maintained can be flushed for the second time based on the adjusted flushing water temperature, target flushing route and standard accumulation flushing parameters. In addition to facilitating the effective cleaning of viscous materials in the pipeline, it can also avoid incomplete maintenance or excessive flushing due to improper flushing parameters.

[0067] Furthermore, in order to reduce unnecessary waste of resources during the secondary flushing process, the method provided by the present application also includes: During the secondary flushing of the pipeline to be maintained, the local flushing receipt information corresponding to the abnormal accumulation position is obtained in real time; when the preset salt block feature appears in the local flushing receipt information, the flushing water temperature corresponding to the secondary flushing stage is reduced to the preset water temperature; based on the preset water temperature, target flushing route and standard accumulation flushing parameters, the pipeline to be maintained is flushed for the second time.

[0068] Specifically, during the secondary flushing of the pipeline to be maintained, the flushing fluid with adjusted flushing water temperature is not always used for flushing. Instead, it is necessary to observe the changes in abnormal characteristics in real time during the secondary flushing process. For example, it is necessary to observe the removal of accumulated salt blocks in real time. If the accumulated salt blocks begin to loosen or melt, the flushing water temperature of the flushing fluid can be lowered to the preset water temperature, that is, flushing is no longer performed using the adjusted flushing water temperature.

[0069] The preset salt block characteristics are loosening or melting, wherein the local flushing receipt information is the pipeline ultrasonic signal corresponding to the pipeline area where the abnormal characteristics are located. When the ultrasonic signal encounters an accumulated salt block, if the accumulated salt block is relatively compact, the reflected ultrasonic signal intensity will be relatively high and stable. However, if the accumulated salt block begins to loosen or melt, its internal structure may change, resulting in a decrease in the reflected signal intensity or instability. Therefore, when the preset salt block characteristics appear in the local flushing receipt information, the flushing water temperature can be lowered, and the flushing water temperature can be adjusted in time according to the flushing effect, so as to reduce unnecessary waste of resources during the secondary flushing process.

[0070] An electronic device is provided in an embodiment of the present application, such as Figure 3 As shown, Figure 3 The electronic device 300 shown includes: a processor 301 and a memory 303. The processor 301 and the memory 303 are connected, such as through a bus 302. Optionally, the electronic device 300 may also include a transceiver 304. It should be noted that in actual applications, the transceiver 304 is not limited to one, and the structure of the electronic device 300 does not constitute a limitation on the embodiments of the present application.

[0071] The processor 301 may be a CPU (Central Processing Unit), a general-purpose processor, a DSP (Digital Signal Processor), an ASIC (Application Specific Integrated Circuit), an FPGA (Field Programmable Gate Array) or other programmable logic devices, transistor logic devices, hardware components or any combination thereof. It may implement or execute various exemplary logic blocks, modules and circuits described in conjunction with the disclosure of this application. The processor 301 may also be a combination that implements computing functions, such as a combination of one or more microprocessors, a combination of a DSP and a microprocessor, etc.

[0072] The bus 302 may include a path to transmit information between the above components. The bus 302 may be a PCI (Peripheral Component Interconnect) bus or an EISA (Extended Industry Standard Architecture) bus. The bus 302 may be divided into an address bus, a data bus, a control bus, etc. For ease of representation, Figure 3 The fact that only one line is used in the diagram does not mean that there is only one bus or only one type of bus.

[0073] The memory 303 may be a ROM (Read Only Memory) or other types of static storage devices that can store static information and instructions, a RAM (Random Access Memory) or other types of dynamic storage devices that can store information and instructions, or an EEPROM (Electrically Erasable Programmable Read Only Memory), a CD-ROM (Compact Disc Read Only Memory) or other optical disk storage, optical disk storage (including compressed optical disk, laser disk, optical disk, digital versatile disk, Blu-ray disk, etc.), a magnetic disk storage medium or other magnetic storage device, or any other medium that can be used to carry or store the desired program code in the form of instructions or data structures and can be accessed by a computer, but is not limited thereto.

[0074] The memory 303 is used to store the application code for executing the solution of the present application, and the execution is controlled by the processor 301. The processor 301 is used to execute the application code stored in the memory 303 to implement the contents shown in the above method embodiment.

[0075] The electronic devices include, but are not limited to, mobile terminals such as mobile phones, laptop computers, digital broadcast receivers, PDAs (personal digital assistants), PADs (tablet computers), PMPs (portable multimedia players), vehicle-mounted terminals (such as vehicle-mounted navigation terminals), and fixed terminals such as digital TVs, desktop computers, etc. It can also be a server, etc. Figure 3 The electronic device shown is merely an example and should not bring any limitation to the functions and scope of use of the embodiments of the present application.

[0076] An embodiment of the present application provides a computer-readable storage medium, on which a computer program is stored. When the computer-readable storage medium is run on a computer, the computer can execute the corresponding content in the aforementioned method embodiment.

[0077] The embodiment of the present application provides a computer program product, which includes a computer program, which implements the method in any of the above embodiments when executed by a processor. Compared with the related art, the embodiment of the present application facilitates real-time detection of the inside of the pipeline to be maintained through ultrasonic signals, so as to timely discover abnormal accumulation in the pipeline, thereby facilitating the improvement of timeliness and efficiency in the process of pipeline health maintenance. In addition, when there is abnormal accumulation in the pipeline, the corresponding abnormal accumulation position and abnormal accumulation size can also be determined by analyzing the ultrasonic signal. Based on the abnormal accumulation information, it is convenient to provide accurate data support for subsequent pipeline inspection and maintenance work, avoiding blind flushing or excessive maintenance. The target flushing route and standard accumulation flushing parameters that are compatible with the abnormal accumulation information are used to flush the pipeline to be maintained, which is convenient to improve the accuracy and flushing efficiency of the flushing process, and realize the healthy maintenance of the laid pipeline by timely discovering and solving the abnormal accumulation in the pipeline.

[0078] It should be understood that, although the steps in the flowchart of the accompanying drawings are displayed in sequence as indicated by the arrows, these steps are not necessarily executed in sequence in the order indicated by the arrows. Unless otherwise specified herein, there is no strict order restriction on the execution of these steps, and they can be executed in other orders. Moreover, at least a part of the steps in the flowchart of the accompanying drawings may include multiple sub-steps or multiple stages, and these sub-steps or stages are not necessarily executed at the same time, but can be executed at different times, and their execution order is not necessarily sequential, but can be executed in turn or alternately with other steps or at least a part of the sub-steps or stages of other steps.

[0079] The above description is only a partial implementation method of the present application. It should be pointed out that for ordinary technicians in this technical field, several improvements and modifications can be made without departing from the principles of the present application. These improvements and modifications should also be regarded as the scope of protection of the present application.

Claims

1. A method for maintaining the health of underground pipes in saline-alkali land. It is characterized in that include: Acquire a pipeline ultrasonic signal of the pipeline to be maintained, and determine abnormal accumulation information in the pipeline to be maintained based on the pipeline ultrasonic signal, wherein the abnormal accumulation information includes an abnormal accumulation position and an abnormal accumulation size; Determine a corresponding target flushing route and standard accumulation flushing parameters according to the abnormal accumulation information; The pipeline to be maintained is flushed according to the target flushing route and the standard accumulation flushing parameters.

2. A method for maintaining the health of underground pipes in saline-alkali land according to claim 1, It is characterized in that Determining a corresponding flushing route according to the abnormal accumulation information includes: According to the abnormal accumulation position in the abnormal accumulation information, determining at least one initial flushing route corresponding to the abnormal accumulation position, the initial flushing route being a flushing route passing through the abnormal accumulation position; Identify the cornering feature information contained in each initial flushing route, where the cornering feature information includes the number of corners and the cornering size corresponding to each corner; According to the cornering characteristic information corresponding to each initial flushing route, a simulated flushing pipeline model corresponding to each initial flushing route is determined, and based on the flushing fluid volume corresponding to the standard accumulation flushing parameter and the simulated flushing pipeline model corresponding to each initial flushing route, the flushing parameters at the abnormal accumulation position are simulated to obtain the simulated flushing parameters of each initial flushing route, wherein the simulated flushing parameters include a simulated flushing area and a simulated flushing pressure; Based on the simulated flushing parameters corresponding to each initial flushing route and the standard accumulation flushing parameters corresponding to the abnormal accumulation information, a target flushing route is determined from at least one initial flushing route, and the parameter matching value between the simulated flushing parameters corresponding to the target flushing route and the standard accumulation flushing parameters is the highest.

3. A method for maintaining the health of underground pipes in saline-alkali land according to claim 1, It is characterized in that After flushing the pipeline to be maintained according to the target flushing route and the standard accumulation flushing parameters, the method further includes: Acquire flushing receipt information, where the flushing receipt information is a receipt pipeline ultrasonic signal after the pipeline to be maintained is flushed; When there are abnormal features in the ultrasonic signal of the return pipe, obtaining a radiographic image of the target flushing route, and performing feature recognition on the radiographic image; When crack features exist in the radiographic image, a maintenance signal is generated according to the abnormal position corresponding to the crack features.

4. A method for maintaining the health of underground pipes in saline-alkali land according to claim 3, It is characterized in that When there are multiple abnormal locations, it also includes: Acquire historical drainage data within a first preset time period, wherein the historical drainage data includes drainage flow and drainage pressure; Based on the historical drainage data, determine the drainage load value corresponding to each abnormal position at each abnormal moment, and based on the preset load cloud map and the drainage load value corresponding to each abnormal moment, determine the load cloud map corresponding to each abnormal position at each abnormal moment; Superimposing the load cloud diagrams corresponding to each abnormal position within the first preset time period to obtain a superimposed load cloud diagram corresponding to each abnormal position; Identify the superimposed information in each superimposed load cloud map, and determine the abnormal level corresponding to each abnormal position based on the mapping relationship between each superimposed information and the abnormal level, the superimposed information includes the superimposed overlapping area size and the superimposed color depth; According to the abnormality level corresponding to each abnormal position, the maintenance priority corresponding to each abnormal position is determined, and a maintenance signal corresponding to each abnormal position is generated based on the maintenance priority.

5. A method for maintaining the health of underground pipes in saline-alkali land according to claim 3, It is characterized in that When there is no crack feature in the radiographic image, the method further includes: Acquire historical flushing receipt information corresponding to a second preset time period, and determine a change rate of the abnormal feature within the second preset time period according to the historical flushing receipt information; Determining the abnormality type of the abnormal feature according to the change rate within the second preset time period, the abnormality type including viscosity abnormality and accumulation abnormality; When the abnormality type is viscosity abnormality, the flushing water temperature is adjusted, and based on the adjusted flushing water temperature, the target flushing route and the standard accumulation flushing parameters, the pipeline to be maintained is flushed for the second time.

6. A method for maintaining the health of underground pipes in saline-alkali land according to claim 5, It is characterized in that Also includes: During the secondary flushing of the pipeline to be maintained, local flushing receipt information corresponding to the abnormal accumulation position is obtained in real time; When a preset salt block feature appears in the local flushing receipt information, the flushing water temperature corresponding to the secondary flushing stage is reduced to a preset water temperature; Based on the preset water temperature, the target flushing route and the standard accumulation flushing parameters, the pipeline to be maintained is flushed for a second time.

7. An electronic device, It is characterized in that The electronic device includes: at least one processor; Memory; At least one application, wherein the at least one application is stored in a memory and configured to be executed by at least one processor, and the at least one application is configured to: execute a method for maintaining the health of a concealed pipe in saline-alkali land according to any one of claims 1-6.

8. A computer-readable storage medium, It is characterized in that include: A computer program is stored which can be loaded by a processor and executed according to any one of claims 1-6, which is a method for maintaining the health of underground pipes in saline-alkali land.

9. A computer program product, It is characterized in that It comprises a computer program, which, when executed by a processor, implements the steps of a method for maintaining the health of a concealed pipe in saline-alkali land according to any one of claims 1 to 6.

Citation Information

Patent Citations

  • Saline-alkali soil treatment method combining concealed pipe salt elimination and icing irrigation

    CN113728746A

  • Method for detecting deposited sulfur in high-sulfur natural gas conveying pipeline based on ultrasonic guided waves

    CN115032269A

  • Maintenance method, device and equipment for condenser of polymerization reaction and readable medium

    CN117116371A

  • Constant-flow drainage control method and device, electronic equipment and medium

    CN117666635A

  • Pipeline cleaning method, deposition removing body for cleaning pipeline and apparatus for cleaning pipeline by using the body

    JP2003326227A