Multi-dimensional demand perception scheduling method and system for multi-tenant intelligent calculation tasks

By employing a multi-dimensional demand-aware scheduling method for multi-tenant intelligent computing tasks and utilizing a heuristic evaluation function F for task deployment, the scheduling challenge of multi-tenant intelligent computing tasks in a heterogeneous cloud environment is solved. This enables a comprehensive measurement of execution time, cost, and user satisfaction, providing high-quality customized services.

CN118885265APending Publication Date: 2024-11-01NAT UNIV OF DEFENSE TECH
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410894603.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-04
Publication Date
2024-11-01

Smart Images

  • Figure CN118885265A_ABST
    Figure CN118885265A_ABST
Patent Text Reader

Abstract

The invention discloses a multi-dimensional demand perception scheduling method and system for a multi-tenant intelligent calculation task. The method comprises the following steps: preprocessing a to-be-scheduled task in a task queue to estimate execution time E and efficiency sensitivity ES of the to-be-scheduled task on a certain GPU (Graphics Processing Unit); and adopting a heuristic evaluation function F constructed based on the deadline of the task to be scheduled, the economic cost, the execution time E of the task to be scheduled on a certain GPU and the efficiency sensitivity ES, performing heuristic search on the preprocessed task through the heuristic evaluation function F to obtain an optimal deployment scheme, and deploying the task to each heterogeneous GPU. The method aims at solving the problem that the multi-tenant intelligent calculation task scheduling search space is too large and is difficult to converge, the multi-dimensional requirements of multiple tenants are met, high-quality scheduling is conducted on the intelligent calculation tasks, and the purpose of balancing and meeting the deadline, the completion time and the economic cost is achieved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to a scheduling technology for cloud computing tasks, and in particular to a multi-dimensional demand-aware scheduling method and system for multi-tenant computing tasks. Background Art

[0002] In recent years, with the emergence and popularity of large-model artificial intelligence, the demand for intelligent computing tasks represented by deep learning training tasks in cloud computing environments has grown rapidly. Due to the huge demand and the characteristics of intelligent computing tasks that are different from conventional tasks, new scheduling strategies and algorithms need to be proposed for intelligent computing tasks. In order to ensure the smooth completion of intelligent computing tasks and improve tenant satisfaction, how to perceive the needs of multiple tenants, comprehensively consider the execution time, cost and other scheduling factors of intelligent computing tasks, and provide high-quality customized scheduling services for different tenants has become a problem to be solved.

[0003] Most existing studies on intelligent computing task scheduling consider running tasks on homogeneous, i.e., multiple, similar GPUs. This significantly reduces the difficulty of scheduling, because the execution time and overhead of a task on one type of GPU are determined. However, in real production environments, tasks often need to be scheduled on multiple heterogeneous GPUs. Different types of GPUs not only affect the execution time of tasks, but also have different overheads. The performance gap between professional-level GPUs and entry-level GPUs can even be as much as ten times. Correspondingly, the overhead, i.e., the rental unit price, is not at the same level. As for intelligent computing task scheduling in cloud-based heterogeneous environments, existing methods are also difficult to take into account the multi-dimensional needs of multiple tenants for intelligent computing tasks. They usually only consider meeting deadlines, reducing task completion time, and reducing economic costs. They lack consideration of user needs and do not have the ability to comprehensively consider multiple scheduling goals for scheduling.

[0004] To schedule independent training tasks to multiple heterogeneous GPUs, improve scheduling quality and user satisfaction, it is crucial to examine user needs. Different users have different requirements for efficiency, cost and deadlines, and customized services need to be provided to users to ensure the relative fairness of scheduling. There are three main difficulties in further scheduling intelligent computing tasks: First, the inherent heterogeneity of training tasks. Different deep learning tasks perform differently on different GPUs, and there is no strict linear relationship with the paper performance of GPUs, making it difficult to estimate the execution time of intelligent computing tasks on different GPUs; second, multi-dimensional scheduling goals, lack of comprehensive measurement methods between meeting deadlines, task completion time, and economic costs; third, too large scheduling search space. There are 24 different deployment methods for only three tasks scheduled to two different GPUs. Too large a search space will cause the search algorithm to easily fall into local optimality. How to schedule multi-tenant intelligent computing tasks in a more scientific and reasonable manner in a cloud-based heterogeneous environment has become a key technical issue that needs to be solved urgently. Summary of the invention

[0005] Technical problem to be solved by the present invention: In view of the above-mentioned problems in the prior art, a multi-dimensional demand-aware scheduling method and system for multi-tenant intelligent computing tasks are provided. The present invention aims to solve the problem that the search space for scheduling multi-tenant intelligent computing tasks is too large and difficult to converge, meet the multi-dimensional needs of multiple tenants, and perform high-quality scheduling of intelligent computing tasks, so as to achieve the purpose of balancing the three scheduling goals of deadline, completion time, and economic cost.

[0006] In order to solve the above technical problems, the technical solution adopted by the present invention is: A multi-dimensional demand-aware scheduling method for multi-tenant intelligent computing tasks, comprising: Step S101: pre-process the tasks to be scheduled in the task queue to estimate the execution time of the tasks to be scheduled on a certain GPU. E and efficiency sensitivity ES ; Step S102, using a time-based method based on the deadline of the task to be scheduled, the economic cost, and the execution time of the task to be scheduled on a certain GPU E and efficiency sensitivity ES The constructed heuristic evaluation function F , the preprocessing task is evaluated by a heuristic evaluation function F Conduct heuristic search for the optimal deployment solution; Step S103, deploying the optimal deployment solution to each heterogeneous GPU.

[0007] Optionally, when preprocessing the tasks to be scheduled in the task queue in step S101, the function expression of the tasks to be scheduled is: , In the above formula, is the task to be scheduled in the task queue. ~ They are the 1st to Nth tasks to be scheduled, and the information contained in any task to be scheduled includes the training model category and the number of model iterations. I , Deadline D and cost sensitivity CS , where the training model category and model iteration number I is the parameter of the intelligent computing task, cost sensitivity CS The value is 0 ~ 1 range, the higher the value, the more users value economic costs.

[0008] Optionally, in step S101, the execution time of the task to be scheduled on a certain GPU is estimated E The function expression is: , In the above formula, E B The time for the first few iterations of cold start training for this training model category, I is the number of model iterations, I B is the number of cold start iterations, t s The time required for a single iteration after the iteration time of the training model category stabilizes.

[0009] Optionally, in step S101, the efficiency sensitivity is calculated ES The function expression is: , In the above formula, CS is the cost sensitivity of the task to be scheduled.

[0010] Optionally, in step S102, based on the execution time of the task to be scheduled on a certain GPU E and efficiency sensitivity ES The constructed heuristic evaluation function F The function expression is: , In the above formula, is the preset comprehensive cost function, is the heuristic cost, is the heuristic cost of GPU load, and: , In the above formula, Q is the set of tasks to be scheduled. Any task to be scheduled in the set of tasks to be scheduled; The execution time of the task to be scheduled on a GPU E The mean of D is the deadline; is the cost factor; ES is efficiency sensitivity; is the average price of GPU; CS For cost sensitivity; , In the above formula, For GPU collection, g For any GPU in the GPU set, C g For GPU The sum of the comprehensive cost functions of the above operations, is the comprehensive cost function of the GPU The mean of , M is the number of GPUs: , In the above formula, Represents GPU A job on is the task waiting time, is the target GPU unit price, is the penalty factor, is the task delay time, and has: , , In the above formula, is the average price of GPU; is the number of GPUs; is the number of tasks to be scheduled.

[0011] Optionally, the function expression of the preset comprehensive cost function is: , , , , In the above formula, is the comprehensive cost function, For delay cost, For time cost, For economic costs, For the job queue, ES is the efficiency sensitivity, CS is the cost sensitivity of the task to be scheduled, is the penalty factor, is the task delay time, is the cost factor, is the execution time of the task to be scheduled on a GPU, is the task waiting time, is the target GPU unit price.

[0012] Optionally, in step S102, the preprocessed task is evaluated by a heuristic evaluation function F The optimal deployment scheme for heuristic search includes: Step S201, taking a task from the pre-processed task set Q as the current task; Step S202, calculating the heuristic evaluation function of the scheduling scheme for scheduling the current task to any GPU F The value of and choose the heuristic evaluation function F The scheduling scheme with the smallest value of ; Step S203: select the heuristic evaluation function for the current task F The scheduling scheme with the smallest value is added to the optimal deployment scheme Nodes, and then the current task is deleted from the preprocessed task set Q; Step S204, determine whether the pre-processed task set Q is empty, if not, jump to step S201; otherwise, output the optimal deployment solution Nodes as the final optimal deployment solution.

[0013] In addition, the present invention also provides a multi-dimensional demand-aware scheduling system for multi-tenant intelligent computing tasks, including an interconnected microprocessor and a memory, wherein the microprocessor is programmed or configured to execute the multi-dimensional demand-aware scheduling method for the multi-tenant intelligent computing tasks.

[0014] In addition, the present invention also provides a computer-readable storage medium, which stores a computer program / instruction, and the computer program / instruction is programmed or configured to execute the multi-dimensional demand-aware scheduling method of the multi-tenant intelligent computing task through a processor.

[0015] In addition, the present invention also provides a computer program product, including a computer program / instructions, which are programmed or configured to execute the multi-dimensional demand-aware scheduling method of the multi-tenant intelligent computing tasks through a processor.

[0016] Compared with the prior art, the present invention has the following advantages: the multi-dimensional demand-aware scheduling method for multi-tenant intelligent computing tasks of the present invention will provide customized services for different users based on the results of user demand perception, comprehensively consider the three scheduling goals of meeting deadlines, task completion time, and economic costs, and complete the scheduling of intelligent computing tasks through a heuristic search algorithm. The heuristic evaluation function of the present invention F The parameters can be flexibly adjusted according to user needs to achieve the goal of balancing the three major scheduling goals of deadline, completion time, and economic cost, solve the problem that the search space of multi-tenant intelligent computing task scheduling is too large and difficult to converge, meet the multi-dimensional needs of multiple tenants, and perform high-quality scheduling of intelligent computing tasks in cloud heterogeneous environments to achieve the goal of balancing the three major scheduling goals of deadline, completion time, and economic cost. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] Figure 1 Schematic diagram of the basic flow of the method of the embodiment of the present invention.

[0018] Figure 2 Schematic diagram of the implementation principle of the method of the embodiment of the present invention.

[0019] Figure 3 Schematic diagram of the workflow of the scheduler in an embodiment of the present invention.

[0020] Figure 4 The figure is a schematic diagram of the workflow of the scheduler heuristically searching for the optimal deployment solution in an embodiment of the present invention. DETAILED DESCRIPTION

[0021] like Figure 1 As shown, this embodiment provides a multi-dimensional demand-aware scheduling method for multi-tenant intelligent computing tasks, including: Step S101: pre-process the tasks to be scheduled in the task queue to estimate the execution time of the tasks to be scheduled on a certain GPU. E and efficiency sensitivity ES ; Step S102, using a time-based method based on the deadline of the task to be scheduled, the economic cost, and the execution time of the task to be scheduled on a certain GPU E and efficiency sensitivity ES The constructed heuristic evaluation function F , the preprocessing task is evaluated by a heuristic evaluation function F Conduct heuristic search for the optimal deployment solution; Step S103, deploying the optimal deployment solution to each heterogeneous GPU.

[0022] In step S101 of this embodiment, when preprocessing the tasks to be scheduled in the task queue, the function expression of the tasks to be scheduled is: , In the above formula, is the task to be scheduled in the task queue. ~ They are the 1st to Nth tasks to be scheduled, and the information contained in any task to be scheduled includes the training model category and the number of model iterations. I , Deadline D and cost sensitivity CS , where the training model category and model iteration number I is the parameter of the intelligent computing task, cost sensitivity CS The value is 0 ~ 1 range, the higher the value, the more users value economic costs.

[0023] The purpose of preprocessing the tasks to be scheduled in the task queue in step S101 is to perceive user needs, characterize them in the form of parameters, and estimate the approximate execution time of the tasks on each GPU.

[0024] Since different models have different running efficiencies on different GPUs, it is necessary to compare intelligent computing tasks based on public data and experimental data. Estimate the running time on different GPUs. Considering that the training task needs to go through a cold start and the iteration time is unstable in the initial operation, the time and number of iterations before the corresponding model iteration time stabilizes can be obtained by testing to reduce the estimation error. In step S101 of this embodiment, the execution time of the task to be scheduled on a certain GPU is estimated. E The function expression is: , In the above formula, E B The time for the first few iterations of cold start training for this training model category, I is the number of model iterations, I B is the number of cold start iterations, t s The time required for a single iteration after the iteration time of the training model category stabilizes.

[0025] According to the cost sensitivity CS in the task information submitted by the user, if the user focuses on the cost, the weight of the execution time is reduced during scheduling; if the user does not care about the cost, the weight of the execution time is increased during scheduling. ES The function expression is: , In the above formula, CS is the cost sensitivity of the task to be scheduled.

[0026] In order to achieve high-quality scheduling of intelligent computing tasks and balance the three major scheduling goals of deadline, completion time, and economic cost, this embodiment adopts heuristic search and designs a heuristic evaluation function determined by the remaining tasks and GPU load balancing. F Specifically, in step S102 of this embodiment, based on the execution time of the task to be scheduled on a certain GPU E and efficiency sensitivity ES The constructed heuristic evaluation function F The function expression is: , In the above formula, C is the preset comprehensive cost function, H 1 is the heuristic cost, H 2 is the heuristic cost of GPU load, Considering the possible cost of the remaining jobs allows the scheduling system to prepare for future changes in task load. The situation of the remaining jobs is of great reference value to the search process. At each step of the search, selecting nodes with the smallest remaining job cost to expand will improve the quality of the search results. The completion time of the remaining jobs can be estimated by the mean of the average execution time and the task deadline. The computational overhead can be estimated by the execution time and the average GPU price, and the heuristic cost is: , In the above formula, Q is the set of tasks to be scheduled. Any task to be scheduled in the set of tasks to be scheduled; The execution time of the task to be scheduled on a GPU E The mean of D is the deadline; is the cost factor; ES is efficiency sensitivity; is the average price of GPU; CS For cost sensitivity.

[0027] In order to evaluate the load balance of all GPUs, this embodiment adopts the standard deviation of GPU load. Since the more jobs executed on the same GPU, the higher the time cost, the optimization strategy hopes that the tasks can be distributed on the GPU as evenly as possible. We calculate the sum of the comprehensive cost functions of the existing jobs on each GPU and calculate the standard deviation of the GPU load. Consider M GPUs: , Then the sum of the comprehensive cost functions of the jobs on a single GPU g is: , In the above formula, j Represents GPU g A job on W is the task waiting time, is the target GPU unit price, is the penalty factor, Delay time for the task.

[0028] The mean value of GPU load (comprehensive cost function) is: , The standard deviation of GPU load and the heuristic cost of GPU load are: , In the above formula, For GPU collection, g For any GPU in the GPU set, C g For GPU g The sum of the comprehensive cost functions of the above operations, is the mean of the comprehensive cost function of GPU, and M is the number of GPUs.

[0029] The preset comprehensive cost function is used as an important scheduling basis. It provides customized scheduling services for users with different task requirements. The function expression of the preset comprehensive cost function in this embodiment is: , , , , In the above formula, is the comprehensive cost function, For delay cost, For time cost, For economic cost, For the job queue, ES is the efficiency sensitivity, CS is the cost sensitivity of the task to be scheduled, is the penalty factor, is the task delay time, is the cost factor, is the execution time of the task to be scheduled on a GPU, is the task waiting time, is the target GPU unit price.

[0030] To ensure that the task running time does not exceed the deadline as much as possible, we multiply the delay time of the task that exceeds the deadline by a large penalty factor (much larger than the number of tasks), which ensures that the deadline will be met when there are sufficient resources at the moment, so we can get: , .

[0031] Since we need to comprehensively consider the user's needs for efficiency and cost, that is, use a function to measure the quality of task scheduling, we need to unify the units of completion time and economic cost. Consider using money to measure time cost and set a cost factor To calculate the time cost, the longer the task takes to complete, the higher the cost.

[0032] , In the above formula, is the average price of GPU; M is the number of GPUs; N is the number of tasks to be scheduled.

[0033] like Figure 2 As shown, the multi-dimensional demand-aware scheduling method for multi-tenant intelligent computing tasks in this embodiment is specifically implemented as a method for embedding the scheduler of the intelligent computing center. Figure 3 As shown in the figure, when working, the user submits a task request to the intelligent computing center, and the task is stored in the task queue and waits for the scheduler to schedule. The scheduler preprocesses the task information, perceives the user's needs, characterizes them in the form of parameters, and estimates the approximate execution time of the task on each GPU. The scheduler customizes the comprehensive cost function based on the parameters as an important scheduling basis. Provide customized scheduling services for users with different task requirements. The scheduler performs heuristic search on a batch of preprocessed tasks through heuristic evaluation functions to obtain the optimal task deployment plan. The scheduler deploys the task to the infrastructure corresponding to the plan, and can execute the intelligent computing task through heterogeneous GPUs.

[0034] like Figure 4 As shown, in step S102 of this embodiment, the preprocessed task is evaluated by a heuristic evaluation function F The optimal deployment scheme for heuristic search includes: Step S201, taking a task from the preprocessed task set Q as the current task; generally speaking, the job queue J is all preprocessed tasks, so the preprocessed task set Q can be generated by assigning the job queue J to the preprocessed task set Q; Step S202, calculating the heuristic evaluation function of the scheduling scheme for scheduling the current task to any GPU F The value of and choose the heuristic evaluation function F The scheduling scheme with the smallest value of ; Step S203: select the heuristic evaluation function for the current task F The scheduling scheme with the smallest value is added to the optimal deployment scheme Nodes, and then the current task is deleted from the preprocessed task set Q; Step S204, determine whether the pre-processed task set Q is empty, if not, jump to step S201; otherwise, output the optimal deployment solution Nodes as the final optimal deployment solution. After the scheduling is completed, according to the correspondence between tasks and GPUs in the optimal deployment solution Nodes, the tasks are deployed to the corresponding GPUs and executed in sequence.

[0035] In summary, the multi-dimensional demand-aware scheduling method for multi-tenant intelligent computing tasks in this embodiment will provide customized services for different users based on the results of user demand perception, comprehensively consider the three scheduling goals of meeting deadlines, task completion time, and economic costs, and complete the scheduling of intelligent computing tasks through a heuristic search method. F The parameters can be flexibly adjusted according to the needs of users to achieve the purpose of balancing the three scheduling goals of deadline, completion time, and economic cost, solve the problem that the search space of multi-tenant intelligent computing task scheduling is too large and difficult to converge, meet the multi-dimensional needs of multiple tenants, and perform high-quality scheduling of intelligent computing tasks in cloud heterogeneous environments to achieve the purpose of balancing the three scheduling goals of deadline, completion time, and economic cost. The multi-dimensional demand-aware scheduling method for multi-tenant intelligent computing tasks in this embodiment utilizes a major feature of intelligent computing tasks compared to conventional tasks—the execution time is highly correlated with the number of iterations, and estimates the execution time of tasks on different GPUs. Characterize user needs, comprehensively consider the scheduling goals of meeting the deadline, task completion time, and task economic cost, and provide users with customized high-quality scheduling services.

[0036] In addition, this embodiment also provides a multi-dimensional demand-aware scheduling system for multi-tenant intelligent computing tasks, including an interconnected microprocessor and a memory, and the microprocessor is programmed or configured to execute the multi-dimensional demand-aware scheduling method for the multi-tenant intelligent computing tasks.

[0037] In addition, this embodiment also provides a computer-readable storage medium, which stores a computer program / instruction, and the computer program / instruction is programmed or configured to execute the multi-dimensional demand-aware scheduling method of the multi-tenant intelligent computing task through a processor.

[0038] In addition, this embodiment also provides a computer program product, including a computer program / instructions, which are programmed or configured to execute the multi-dimensional demand-aware scheduling method of the multi-tenant intelligent computing task through a processor.

[0039] Those skilled in the art should understand that the embodiments of the present application can be provided as methods, systems, or computer program products. Therefore, the present application can take the form of a complete hardware embodiment, a complete software embodiment, or an embodiment combining software and hardware. Moreover, the present application can take the form of a computer program product implemented on one or more computer-readable storage media (including but not limited to disk storage, CD-ROM, optical storage, etc.) containing computer-usable program code. The present application is described with reference to the flowcharts and / or block diagrams of the methods, devices (systems), and computer program products according to the embodiments of the present application. It should be understood that each process and / or box in the flowchart and / or block diagram, as well as the combination of the processes and / or boxes in the flowchart and / or block diagram, can be implemented by computer program instructions. These computer program instructions can be provided to a processor of a general-purpose computer, a special-purpose computer, an embedded processor, or other programmable data processing device to produce a machine, so that the instructions executed by the processor of the computer or other programmable data processing device generate instructions for implementing the processes in the process Figure 1 A process or multiple processes and / or boxes Figure 1 These computer program instructions can also be stored in a computer-readable memory that can guide a computer or other programmable data processing device to work in a specific way, so that the instructions stored in the computer-readable memory produce a product including an instruction device, which implements the functions specified in the process. Figure 1 A process or multiple processes and / or boxes Figure 1 These computer program instructions can also be loaded onto a computer or other programmable data processing device, so that a series of operation steps are executed on the computer or other programmable device to produce a computer-implemented process, so that the instructions executed on the computer or other programmable device provide for implementing the process in the process. Figure 1 A process or multiple processes and / or boxes Figure 1 The steps for the functions specified in one or more boxes.

[0040] The above is only a preferred embodiment of the present invention, and the protection scope of the present invention is not limited to the above embodiments. All technical solutions under the concept of the present invention belong to the protection scope of the present invention. It should be pointed out that for ordinary technicians in this technical field, some improvements and modifications without departing from the principle of the present invention should also be regarded as the protection scope of the present invention.

Claims

1. A multi-dimensional demand-aware scheduling method for multi-tenant intelligent computing tasks, characterized in that: include: Step S101: pre-process the tasks to be scheduled in the task queue to estimate the execution time of the tasks to be scheduled on a certain GPU. E and efficiency sensitivity ES ; Step S102, using a time-based method based on the deadline of the task to be scheduled, the economic cost, and the execution time of the task to be scheduled on a certain GPU E and efficiency sensitivity ES The constructed heuristic evaluation function F , the preprocessing task is evaluated by a heuristic evaluation function F Conduct heuristic search for the optimal deployment solution; Step S103, deploying the optimal deployment solution to each heterogeneous GPU.

2. The multi-dimensional demand-aware scheduling method for multi-tenant intelligent computing tasks according to claim 1 is characterized in that: When preprocessing the tasks to be scheduled in the task queue in step S101, the function expression of the tasks to be scheduled is: , In the above formula, is the task to be scheduled in the task queue. ~ They are the 1st to Nth tasks to be scheduled, and the information contained in any task to be scheduled includes the training model category and the number of model iterations. I , Deadline D and cost sensitivity CS , where the training model category and model iteration number I is the parameter of the intelligent computing task, cost sensitivity CS The value is 0 ~ 1, the higher the value, the more users value economic costs.

3. The multi-dimensional demand-aware scheduling method for multi-tenant intelligent computing tasks according to claim 2 is characterized in that: In step S101, the execution time of the task to be scheduled on a certain GPU is estimated E The function expression is: , In the above formula, The time for the first few iterations of cold start training for this training model category, is the number of model iterations, is the number of cold start iterations, The time required for a single iteration after the iteration time of the training model category stabilizes.

4. The multi-dimensional demand-aware scheduling method for multi-tenant intelligent computing tasks according to claim 1 is characterized in that: Step S101 calculates the efficiency sensitivity ES The function expression is: , In the above formula, CS is the cost sensitivity of the task to be scheduled.

5. The multi-dimensional demand-aware scheduling method for multi-tenant intelligent computing tasks according to claim 1 is characterized in that: In step S102, based on the execution time of the task to be scheduled on a certain GPU E and efficiency sensitivity ES The constructed heuristic evaluation function F The function expression is: , In the above formula, is the preset comprehensive cost function, is the heuristic cost, is the heuristic cost of GPU load, and: , In the above formula, Q is the set of tasks to be scheduled. Any task to be scheduled in the set of tasks to be scheduled; The execution time of the task to be scheduled on a GPU E The mean of D is the deadline; is the cost factor; ES is efficiency sensitivity; is the average price of GPU; CS For cost sensitivity; , In the above formula, For GPU collection, g For any GPU in the GPU set, C g For GPU The sum of the comprehensive cost functions of the above operations, is the comprehensive cost function of the GPU The mean of , M is the number of GPUs: , In the above formula, Represents GPU A job on is the task waiting time, is the target GPU unit price, is the penalty factor, is the task delay time, and has: , , In the above formula, is the average price of GPU; is the number of GPUs; The number of tasks to be scheduled.

6. The multi-dimensional demand-aware scheduling method for multi-tenant intelligent computing tasks according to claim 5 is characterized in that: The function expression of the preset comprehensive cost function is: , , , , In the above formula, is the comprehensive cost function, For delay cost, For time cost, For economic cost, For the job queue, ES is the efficiency sensitivity, CS is the cost sensitivity of the task to be scheduled, is the penalty factor, is the task delay time, is the cost factor, is the execution time of the task to be scheduled on a GPU, is the task waiting time, is the target GPU unit price.

7. The multi-dimensional demand-aware scheduling method for multi-tenant intelligent computing tasks according to claim 5 is characterized in that: In step S102, the preprocessed task is evaluated by a heuristic evaluation function. F The optimal deployment scheme for heuristic search includes: Step S201, taking a task from the pre-processed task set Q as the current task; Step S202, calculating the heuristic evaluation function of the scheduling scheme for scheduling the current task to any GPU F and choose a heuristic evaluation function F The scheduling scheme with the smallest value of ; Step S203: select the heuristic evaluation function for the current task F The scheduling scheme with the smallest value is added to the optimal deployment scheme Nodes, and then the current task is deleted from the preprocessed task set Q; Step S204, determine whether the pre-processed task set Q is empty, if not, jump to step S201; otherwise, output the optimal deployment solution Nodes as the final optimal deployment solution.

8. A multi-dimensional demand-aware scheduling system for multi-tenant intelligent computing tasks, comprising interconnected microprocessors and memories, characterized in that: The microprocessor is programmed or configured to execute the multi-dimensional demand-aware scheduling method for multi-tenant intelligent computing tasks as described in any one of claims 1 to 7.

9. A computer-readable storage medium having a computer program / instruction stored therein, characterized in that: The computer program / instruction is programmed or configured to execute the multi-dimensional demand-aware scheduling method for multi-tenant intelligent computing tasks described in any one of claims 1 to 7 through a processor.

10. A computer program product comprising a computer program / instructions, characterized in that The computer program / instruction is programmed or configured to execute the multi-dimensional demand-aware scheduling method for multi-tenant intelligent computing tasks described in any one of claims 1 to 7 through a processor.