Wastewater treatment plant interconnection and intercommunication routing decision method
By establishing and optimizing the sewage treatment plant connectivity model, using recursive spanning tree and genetic algorithm, combining multi-objective decision model and decision tree algorithm, the construction cost and maintenance difficulty problems in the routing design between sewage treatment plants are solved, and the optimal Interconnection plan between sewage treatment plants.
Patent Information
- Application Number
- CN202411167188.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-23
- Publication Date
- 2024-11-01
AI Technical Summary
The existing joint scheduling technology of sewage treatment plants is difficult to achieve optimal routing design among multiple sewage treatment plants, especially when considering construction costs and maintenance difficulties, resulting in problems such as excessive length of pipeline networks and excessive special nodes.
By obtaining the information of the sewage treatment plant to be connected, identifying the China Unicom needs, establishing the China Unicom model of the sewage treatment plant, calculating and screening the optimal model, using recursive spanning tree algorithm and genetic algorithm, combining multi-objective decision model and decision tree algorithm, optimizing pipeline paths To achieve the interconnection of the shortest pipe network length and the minimum special nodes.
The optimal interconnection between different sewage treatment plants is achieved, taking into account construction costs and maintenance difficulties, and a routing strategy that meets China Unicom's needs is designed to ensure the shortest pipeline length and the fewest special nodes.
Smart Images

Figure CN118886150A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of sewage treatment, and in particular to a routing decision method for interconnecting sewage treatment plants. Background Art
[0002] With the development of urban construction, each region has the problem of mismatched influent loads of sewage treatment plants, for example, some plants are operating beyond their scale, while others are not reaching their designed scale; at the same time, regional rainfall caused by climate change will cause a sharp increase in the treatment pressure of a single sewage treatment plant. Interconnecting sewage treatment plants means connecting the sewage treatment systems of various areas in the city to an interconnected state, dispatching the flow of sewage, and reasonably allocating sewage treatment tasks to solve the tense situation of sewage treatment in some areas, and comprehensively improving the resilience of the sewage treatment plant cluster in the region.
[0003] The existing sewage treatment plant joint dispatching technology focuses on the integrated operation of a single sewage treatment plant within the pollution range or the sewage dispatching method between adjacent sewage treatment plants. However, when designing the routes for interconnection of several sewage treatment plants in a region, different factors need to be considered in the face of different needs; and during construction, construction costs and maintenance difficulties also need to be considered. Therefore, a technical solution is needed that can design a routing strategy that meets the interconnection needs, minimize the length of the pipe network, minimize special nodes such as crossing rivers, and achieve interconnection between different sewage treatment plants with the best solution. Summary of the invention
[0004] To achieve the above objectives, the present application provides a method for interconnecting sewage treatment plants and making routing decisions, comprising the following steps:
[0005] Obtain information on the sewage treatment plants to be connected and identify the connection requirements; the connection requirements include: geographical division and efficiency division;
[0006] Arrange the connecting pipeline path for any two sewage treatment plants to be connected, determine the path length l of the connecting pipeline, different node types and corresponding quantities, wherein the node types include: common node c, special node s;
[0007] Establish a sewage treatment plant interconnection model, each interconnection model contains a complete interconnection path;
[0008] Calculate the characteristics of the interconnected model of all sewage treatment plants;
[0009] The optimal model is obtained from the interconnected models of all the sewage treatment plants.
[0010] The information of the sewage treatment plants to be connected constitutes a set V, which is expressed as: V = {V1, V2, ... Vn}, where n is the number of sewage treatment plants to be connected;
[0011] The interconnected pipeline paths constitute a set E, expressed as E = {E1, E2, ...Ei...En}, each set Ei represents a interconnection scheme for interconnecting different sewage treatment plants, expressed as: E = {(Va, Vb, l, c, s) | Va, Vb∈V}, where: l is the length of the sewage pressure pipe, c is a common node, and s is a special node. The on-site construction method of the special node s is the node c of the trenchless buried pipe, including crossing the existing railway, highway, river crossing node, and crossing the existing pipeline node.
[0012] The sewage treatment plant interconnection model constitutes a set T, which is expressed as: T = {T1, T2...Ti}, where i is the number of interconnection route plans.
[0013] Furthermore, when establishing the sewage treatment plant interconnection model, the following steps are included:
[0014] Construct an undirected graph G = (V, E) containing all sewage treatment plants;
[0015] Construct the Laplacian matrix M(G), where M(G) = D(G) - A(G), the degree matrix D(G) and the adjacency matrix A(G);
[0016] Among them, the degree matrix D (G) is a diagonal matrix that satisfies:
[0017] Adjacency Matrix A (G) is a |V|×|V| matrix, and:
[0018] Adjacency Matrix A (G) If there is an edge between node i and node j, A ij =1, otherwise A ij =0;
[0019] Laplacian Matrix
[0020] Calculate the number of connectable models that can be generated; use a recursive spanning tree algorithm to obtain all connectable models T.
[0021] Among them, the characteristics of the sewage treatment plant interconnection model include: length L, the number of interconnected nodes C, the number of special nodes S, the average value of design scale P and the average value of water inflow P1;
[0022] Among them, the length of each interconnection model is L(Ti)=∑l;
[0023] The number of connected nodes is: C(Ti) = ∑c;
[0024] The data of special nodes are: S(Ti)=∑s;
[0025] The average value of the design scale is: P(Ti) = ∑p / n;
[0026] The average water inflow P1 is: P1(Ti)=∑p1 / n.
[0027] Furthermore, the sewage treatment plant interconnection model preferably obtains a decision after traversing the characteristics of the sewage treatment plant interconnection model through a preset decision tree algorithm;
[0028] The decision tree includes multiple leaf nodes, and each leaf node includes a sewage treatment plant interconnection model;
[0029] The features are sorted according to their values to obtain the optimal model.
[0030] Furthermore, before traversing the characteristics of the sewage treatment plant interconnection model, the sewage treatment plant interconnection model is screened according to the interconnection requirements, including the following steps:
[0031] Establish a multi-objective decision-making model F,
[0032] A genetic algorithm is used to solve the sewage treatment plant interconnection model.
[0033] Among them, when the interconnection demand is geographical division, the multi-objective decision model F is used to select the strategy with the shortest sewage pressure pipe length and the lowest construction cost, which is expressed as:
[0034] Among them, K1 is the pipeline engineering cost, K2 is the common node cost, K3 is the special node cost, and K4 is the special node quantity limit threshold;
[0035] When the interconnection requirement is performance partitioning, the multi-objective decision model F is expressed as:
[0036] Among them, K1 is the pipeline project cost, K2 is the ordinary node cost, K3 is the special node cost, K4 is the special node quantity limit threshold, P is the design scale average value, and P1 is the water inlet average value.
[0037] According to the present invention, different factors can be weighed according to different interconnection needs, and a routing strategy that meets the interconnection needs can be designed while taking into account construction costs and maintenance difficulties. This can minimize the length of the pipeline network and minimize special nodes such as crossing rivers, thereby achieving interconnection between different sewage treatment plants with the optimal solution. BRIEF DESCRIPTION OF THE DRAWINGS
[0038] Figure 1 It is a step diagram of a routing decision method for interconnecting sewage treatment plants provided according to an embodiment of the present invention. DETAILED DESCRIPTION
[0039] The specific implementation of the present invention is described in detail below with reference to the accompanying drawings.
[0040] The specific steps of the route decision method for interconnecting sewage treatment plants provided by the present invention are as follows: Figure 1 As shown, the following steps are included:
[0041] Step S100: Obtain information of the sewage treatment plant to be connected and identify the connection requirements;
[0042] In the present invention, the sewage treatment plants to be connected in the design area are first screened, and the information of the sewage treatment plants to be connected forms a set V, which is expressed as: V = {V1, V2, ... Vn}, where n is the number of sewage treatment plants to be connected;
[0043] The sewage treatment plants to be connected refer to those whose water inflow scale does not reach the designed scale or exceeds the designed scale.
[0044] On this basis, the interconnection requirements are determined. The interconnection requirements are used for subsequent interconnection zoning. Specifically, the interconnection requirements include: geographical zoning, performance zoning;
[0045] Geographical zoning refers to: interconnected zoning based on the distribution of sewage treatment plants. For example, if sewage treatment plants are relatively concentrated in the north-south / east-west direction of the study area, several relatively concentrated sewage treatment plants can be divided into the same interconnected area based on their geographical locations;
[0046] Efficiency zoning refers to interconnected zoning based on the operation of sewage treatment plants. For example, if the sewage treatment plants in the study area have influent water volume that does not reach the design scale or the influent concentration exceeds the design scale, they can be divided into the same interconnected zone.
[0047] Step S110: Arrange the pipeline path for any two sewage treatment plants to be connected, and draw the route for connecting the sewage treatment plants.
[0048] In this step, according to the sewage treatment plants to be connected and their basic information, the pipeline path layout design between any two sewage treatment plants is carried out. For n sewage treatment plants to be connected, there are a total of Interconnecting pipeline paths.
[0049] The basic data of the sewage treatment plant include topographic maps, underground pipeline layout maps, design scale and other information, which can be used to determine the direction (route) of the interconnecting pipelines.
[0050] In this step, the length l of each interconnected pipeline path, different node types and their corresponding quantities are identified. Among them, the node types include: ordinary nodes c, special nodes s. Among them, special nodes s refer to: nodes c whose on-site construction method is trenchless buried pipes, including but not limited to crossing existing railways (highways, etc.), crossing river nodes, and crossing existing pipeline nodes. The costs of such nodes in construction and maintenance are different from those of ordinary nodes. In practical applications, the number of such nodes needs to be minimized.
[0051] In this step, the interconnected pipeline paths constitute a set E, expressed as E = {E1, E2, ...En}, and: Ei = {(Va, Vb, l, c, s) | Va, Vb∈V}, where: l is the length of the sewage pressure pipe, c is a common node, and s is a special node.
[0052] Each set Ei represents a interconnection scheme for interconnecting different sewage treatment plants.
[0053] Step S120: Establishing a sewage treatment plant interconnection model, each interconnection model includes a complete interconnection path;
[0054] In this step, based on the principle that "wastewater from any sewage treatment plant can be connected to the remaining n-1 sewage treatment plants through the arranged pipeline path", the Kirchhoff matrix tree is used to establish the sewage treatment plant interconnection model T. Relying on the interconnection model T, the route and direction of free transfer of sewage from the sewage treatment plant can be designed to ensure the effectiveness of the interconnection design.
[0055] The sewage treatment plant interconnection model T is expressed as: T = {T1, T2...Ti}, where i is the number of interconnection route plans.
[0056] When establishing a sewage treatment plant interconnection model, the following steps are included:
[0057] Construct an undirected graph G = (V, E) containing all sewage treatment plants;
[0058] Construct the Laplacian matrix M(G), where M(G) = D(G) - A(G), the degree matrix D(G) and the adjacency matrix A(G);
[0059] Among them, the degree matrix D (G) is a diagonal matrix that satisfies:
[0060] Adjacency Matrix A (G) is a |V|×|V| matrix, and:
[0061] Adjacency Matrix A (G) If there is an edge between node i and node j, A ij =1, otherwise Aij =0;
[0062] Laplacian Matrix
[0063] Calculate the number of connected models that can be generated: transform the matrix M (G) Delete any row and column to get M' (G) And calculate the determinant, the result is the number of connected models;
[0064] A recursive spanning tree algorithm is used to obtain all interconnection models T. Among them, any interconnection model Ti is composed of interconnection pipeline paths in the set E, denoted as Ti = {e1, e2, ..., en-1}, where ej∈E.
[0065] Step S130: Calculate the characteristics of the interconnection model of all sewage treatment plants;
[0066] The characteristics of the interconnection model of each sewage treatment plant include: length L, number of interconnected nodes C, number of special nodes S, average design scale P and average water inflow P1;
[0067] Among them, the length of each interconnection model is L(Ti)=∑l;
[0068] The number of common nodes is: C(Ti) = ∑c;
[0069] The data of special nodes are: S(Ti)=∑s;
[0070] The average value of the design scale is: P(Ti) = ∑p / n;
[0071] The average water inflow P1 is: P1(Ti)=∑p1 / n.
[0072] Step S140: Obtaining the optimal model from the interconnected models of all sewage treatment plants.
[0073] First, the sewage treatment plant interconnection model is screened according to the interconnection requirements, including the following steps:
[0074] Establish a multi-objective decision-making model F;
[0075] When the interconnection demand is geographically divided, the multi-objective decision model F is used to select the strategy with the shortest sewage pressure pipe length and the lowest construction cost, which is expressed as:
[0076] Among them, K1 is the pipeline engineering cost, K2 is the common node cost, K3 is the special node cost, and K4 is the special node quantity limit threshold;
[0077] When the interconnection requirement is performance partitioning, the multi-objective decision model F is expressed as:
[0078] Among them, K1 is the pipeline project cost, K2 is the ordinary node cost, K3 is the special node cost, K4 is the special node quantity limit threshold, P is the design scale average value, and P1 is the water inlet average value.
[0079] After determining the multi-objective decision model F, a genetic algorithm is used to solve the sewage treatment plant interconnection model.
[0080] In the solution process, the decision scheme consisting of decision variables and objective function values is used as a chromosome to randomly generate an initial population Pn of N chromosomes.
[0081] Perform non-dominated sorting on the chromosomes in Pn, put all non-dominated chromosomes into the non-dominated set Z, and determine the size of the non-dominated set Z. If the size of the non-dominated set Z exceeds N, give priority to the dominated chromosomes with large crowding distance and put them into the non-dominated set Z. If the size of the non-dominated set Z is less than N, give priority to the dominated chromosomes with high fitness to enter the non-dominated set Z until the size of the non-dominated set Z is equal to N. The non-dominated set is the new population Pn+1.
[0082] Perform crossover and mutation on the chromosomes in Pn+1 to generate the offspring population Qn+1;
[0083] Determine whether the termination criteria are met. If so, output the optimal solution set. If not, merge Qn+1 and Pn+1 to form a new Pn, and then perform the relevant steps of non-dominated sorting of the chromosomes in Pn again.
[0084] When the set number of iterations is reached, the iteration stops.
[0085] After the sewage treatment plant interconnection model is screened according to the interconnection requirements, the characteristics of the sewage treatment plant interconnection model are traversed through a preset decision tree algorithm to obtain the optimal decision;
[0086] The decision tree includes multiple leaf nodes, and each leaf node includes a sewage treatment plant interconnection model;
[0087] The values of the features are sorted, and the best sewage treatment plant interconnection model is selected through the leaf node sorting results. In this step, the best sewage treatment plant interconnection model refers to the best sewage treatment plant interconnection path that comprehensively considers factors such as construction cost (pipeline length) and construction difficulty (special nodes).
[0088] Furthermore, the present invention also wants to visualize the optimal decision of the connection path of the sewage treatment plant.
[0089] The present invention provides a method for determining the optimal pipeline connection path between multiple sewage treatment plants based on the determined interconnection demand, comprehensively considering the pipeline length and cost factors, and ensuring that the interconnection demand can be met while ensuring the interconnection solution with the minimum total length and cost.
[0090] The above disclosures are only several specific embodiments of the present invention; however, the present invention is not limited thereto, and any changes that can be conceived by those skilled in the art should fall within the protection scope of the present invention.
Claims
1. A routing decision method for interconnection of sewage treatment plants, characterized in that: The following steps are involved: Obtain information on the sewage treatment plants to be connected and identify the connection requirements; The connectivity requirements include: geographical zoning, performance zoning; Arrange the connecting pipeline path for any two sewage treatment plants to be connected, determine the path length l of the connecting pipeline, different node types and corresponding quantities, wherein the node types include: common node c, special node s; Establish a sewage treatment plant interconnection model, each interconnection model contains a complete interconnection path; Calculate the characteristics of the interconnected model of all sewage treatment plants; The optimal model is obtained from the interconnected models of all the sewage treatment plants.
2. The routing decision method according to claim 1, characterized in that: The information of the sewage treatment plants to be connected constitutes a set V, which is expressed as: V = {V1, V2, ... Vn}, where n is the number of sewage treatment plants to be connected; The interconnected pipeline paths constitute a set E, expressed as E = {E1, E2, ...Ei...En}, and each set Ei represents a interconnection scheme for interconnecting different sewage treatment plants, expressed as: Ei={(Va,Vb,l,c,s)|Va,Vb∈V}, where: l is the length of the sewage pressure pipe, c is the ordinary node, and s is the special node.
3. The routing decision method according to claim 1, characterized in that: The sewage treatment plant interconnection model constitutes a set T, which is expressed as: T = {T1, T2...Ti}, where i is the number of interconnection route solutions.
4. The routing decision method according to claim 3, characterized in that: When establishing a sewage treatment plant interconnection model, the following steps are included: Construct an undirected graph G = (V, E) containing all sewage treatment plants; Construct the Laplacian matrix M(G), where M(G) = D(G) - A(G), the degree matrix D(G) and the adjacency matrix A(G); Among them, the degree matrix D (G) is a diagonal matrix that satisfies: Adjacency Matrix A (G) is a |V|×|V| matrix, and: Adjacency Matrix A (G) If there is an edge between node i and node j, A ij =1, otherwise A ij =0; Laplacian Matrix Calculate the number of connectable models that can be generated; use a recursive spanning tree algorithm to obtain all connectable models T.
5. The routing decision method according to claim 1, characterized in that: The characteristics of the interconnected model of all sewage treatment plants include: length L, number of interconnected nodes C, number of special nodes S, average design scale P and average water inflow P1; Among them, the length of each interconnection model is L(Ti)=∑l; The number of connected nodes is: C(Ti) = ∑c; The data of special nodes are: S(Ti)=∑s; The average value of the design scale is: P(Ti) = ∑p / n; The average water inflow P1 is: P1(Ti)=∑p1 / n.
6. The routing decision method according to claim 5, characterized in that: The sewage treatment plant interconnection model preferably obtains a decision after traversing the characteristics of the sewage treatment plant interconnection model through a preset decision tree algorithm; Wherein, the decision tree comprises a plurality of leaf nodes, and each leaf node comprises a sewage treatment plant interconnection model; The features are sorted according to their values to obtain the optimal model.
7. The routing decision method according to claim 6, characterized in that: Before traversing the characteristics of the sewage treatment plant interconnection model, the sewage treatment plant interconnection model is screened according to the interconnection requirements, including the following steps: Establish a multi-objective decision-making model F, A genetic algorithm is used to solve the sewage treatment plant interconnection model.
8. The routing decision method according to claim 7, characterized in that: When the interconnection demand is geographically divided, the multi-objective decision model F is used to select the strategy with the shortest sewage pressure pipe length and the lowest construction cost, which is expressed as: Among them, K1 is the pipeline engineering cost, K2 is the common node cost, K3 is the special node cost, and K4 is the special node quantity limit threshold; When the interconnection requirement is performance partitioning, the multi-objective decision model F is expressed as: Among them, K1 is the pipeline project cost, K2 is the ordinary node cost, K3 is the special node cost, K4 is the special node quantity limit threshold, P is the design scale average value, and P1 is the water inlet average value.
9. The routing decision method according to claim 1, characterized in that: The on-site construction method of the special node s is the node c of trenchless pipe burial, including nodes crossing existing railways, highways, and rivers, and nodes crossing existing pipelines.