Stratum modeling method based on limited drilling data and Markov theory

Through Markov theory and Markov chain model, finite drilling data are used to model stratigraphically, which solves the objectivity and accuracy of the formation modeling technology, and realizes accurate prediction and noise of soil state on the geological survey site The process improves the stability and engineering practicality of the model.

CN118886181APending Publication Date: 2024-11-01DALIAN MARITIME UNIVERSITY
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202410915858.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-09
Publication Date
2024-11-01

AI Technical Summary

Technical Problem

The existing stratigraphic modeling technology lacks objectivity and accuracy when utilizing limited drilling data, making it difficult to effectively capture the complexity and uncertainty of the geological system, and has limited processing capabilities for noise and uncertainty, resulting in unstable model Sex and inaccuracy.

Method used

Using the method based on Markov theory, the soil state sequence and transfer matrix perpendicular to the ground are obtained by determining the two drilling positions of the site to be surveyed, and the optimal Walter constant and horizontal transfer probability matrix are calculated, using the Markov chain model. To predict soil state, only two drilling holes are needed to simulate geological uncertainty and improve the search efficiency of K value.

Benefits of technology

Accurate prediction of soil status on geological survey sites is achieved, the practicality of technical engineering is enhanced, the problem of insufficient noise and uncertainty processing capabilities is solved, and the stability and accuracy of the model are improved.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118886181A_ABST
    Figure CN118886181A_ABST
Patent Text Reader

Abstract

The invention discloses a stratigraphic modeling method based on limited drilling data and a Markov theory, and the method comprises the steps: determining two drilling positions of the ground surface of a site to be subjected to geological exploration, and obtaining a soil state sequence which corresponds to the drilling positions and is perpendicular to the ground downwards; obtaining a vertical transfer counting matrix of a soil body state which is vertical to the ground and downward at the drilling position, and determining an optimal waltt constant based on a Markov theory model; obtaining an optimal horizontal transition probability matrix according to the optimal Wartt constant; the soil body state of the first layer of grid units is obtained; then based on a two-dimensional Markov chain model theory, obtaining soil body states of all grid units in the rasterized site to be subjected to geological investigation; the soil body state prediction of the site to be subjected to geological investigation is completed. According to the method, the drilling information can be fully utilized to simulate the geological uncertainty, the optimal Waltt constant can be obtained only through two drilling holes, a large amount of drilling marking work is not needed, the searching efficiency of the optimal K value is improved, and the problems that in the prior art, the processing capacity for the noise and uncertainty of geological data is limited, and the processing efficiency is poor are solved. The instability and the inaccuracy of the model are possibly caused, and the practicability of technical engineering is enhanced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of geological simulation, and in particular to a stratum modeling method based on limited drilling data and Markov theory. Background Art

[0002] The application of stratigraphic modeling is very wide, such as 1. Oil industry: Markov model-based stratigraphic generation can help geologists and engineers simulate the structure and properties of the strata, thereby guiding oil and gas exploration and development activities. 2. Groundwater resource management: Markov stratigraphic generation models can also be applied to the field of groundwater resource management. By simulating the changes in groundwater flow and stratigraphic characteristics, it can help decision makers develop effective groundwater resource management strategies and ensure the sustainable use of groundwater resources.

[0003] Borehole exploration is one of the common methods for identifying stratigraphic information. The increase in the number of boreholes will significantly increase the exploration cost. Using limited borehole information to reconstruct and visualize stratigraphic formations is very attractive to engineers. Current stratigraphic generation technologies include traditional methods based on statistics and geological knowledge, as well as methods based on machine learning and artificial intelligence. The following are some common technologies and their possible defects:

[0004] 1. Statistical methods: These methods are usually based on geologists' understanding and experience of geological processes, and use statistical analysis to generate stratigraphic models. For example, random simulation, geological simulation, and random field models. The main drawbacks of these methods include: ① Limited by the experience and subjective judgment of geologists, they may lack objectivity and accuracy. ② It is difficult to capture the complexity and uncertainty of geological systems. ③ It usually requires a lot of manpower and time for model construction and verification.

[0005] 2. Machine learning-based methods: In recent years, with the development of machine learning and artificial intelligence, more and more studies have begun to explore the use of machine learning technology to generate stratigraphic models. These methods can use a large amount of geological data and stratigraphic information for training, and automatically learn geological patterns and laws. However, these methods also have some defects: ① For data that lacks labels, a lot of labeling work and high-quality data are required for training, and geological data are usually difficult to obtain and label. ② The ability to handle noise and uncertainty in geological data is limited, which may lead to instability and inaccuracy of the model. Most of the above technologies rely on a large amount of measured data and generally use variograms or autocovariance functions to describe the spatial structure of reservoir heterogeneity. Summary of the invention

[0006] A formation modeling method based on limited borehole data and Markov theory is proposed to overcome the above technical problems.

[0007] In order to achieve the above object, the technical solution of the present invention is:

[0008] A formation modeling method based on limited drilling data and Markov theory includes the following steps:

[0009] S1: Determine two drilling positions on the surface of the site to be geologically surveyed, and rasterize the site to be geologically surveyed in a direction perpendicular to the ground downward through the two drilling positions to obtain a soil state sequence perpendicular to the ground downward corresponding to the drilling positions;

[0010] The rasterized geological survey site includes Ny grid cells in the direction perpendicular to the ground and downward, and Nx grid cells in the horizontal direction along the ground surface.

[0011] S2: According to the soil state sequence vertically downward from the ground corresponding to the drilling position, a vertical transfer count matrix of the soil state vertically downward from the ground at the drilling position is obtained to obtain a vertical transfer probability matrix of the soil state vertically downward from the ground at the drilling position

[0012] S3: According to the vertical transfer count matrix of soil state, based on the Markov theory model, determine the optimal Walter constant;

[0013] S4: according to the optimal Walter constant and the vertical transfer count matrix, an optimal horizontal transfer probability matrix is ​​obtained; according to the first element of the soil state sequence and based on the one-dimensional Markov chain model theory, the soil state transfer probability in the first layer grid unit in the site to be geologically surveyed after rasterization is obtained to obtain the soil state of the first layer grid unit;

[0014] S5: According to the soil state and vertical transfer probability matrix of the first-layer grid cells, based on the two-dimensional Markov chain model theory, the soil state transfer probability of all grid cells in the site to be geologically surveyed after rasterization is obtained to obtain the soil state of all grid cells in the site to be geologically surveyed after rasterization; complete the soil state prediction of the site to be geologically surveyed.

[0015] Furthermore, the method for determining the optimal Walter constant is as follows:

[0016] S31: Determine a set of values ​​of the Walter constant;

[0017] S32: according to the Walter constant in the set of Walter constant values ​​and the vertical transfer count matrix of the soil state, a horizontal transfer count matrix of the soil state is obtained to obtain a horizontal transfer probability matrix of the soil state, and then a main diagonal vector of the horizontal transfer probability matrix of the soil state is obtained;

[0018] S33: According to the horizontal transfer probability matrix of the soil state and the vertical transfer probability matrix of the soil state, based on the Markov chain theoretical model, a horizontal transfer probability matrix of the complete stratum of the site to be geologically surveyed is obtained to obtain the main diagonal vector of the horizontal transfer probability matrix of the complete stratum;

[0019] S34: obtaining a difference D between the main diagonal vectors of the horizontal transfer probability matrix of the soil state and the main diagonal vectors of the horizontal transfer probability matrix of the complete stratum;

[0020] S35: Sort the difference D between the main diagonal vector of the horizontal transfer probability matrix of the soil state corresponding to the g-th, g=1, 2, ..., G Walter constant in the set of Walter constant values ​​and the main diagonal vector of the horizontal transfer probability matrix of the complete stratum from large to small, and obtain a new sequence D′=(D′1, ..., d′ g ,…D′ G );

[0021] Among them, D′ g is the gth element in the new sequence; D′ G is the Gth element in the new sequence, that is, the smallest element in the new sequence; G is the total number of the selected Walter constants; g is the index number of the selected Walter constant;

[0022] S36: Order D op =D′ G +ε, obtain D′ g With D op The relative distance RD is calculated to obtain the minimum relative distance; then the Walter constant corresponding to the minimum relative distance is the optimal Walter constant.

[0023] Furthermore, in S32, the method for obtaining the main diagonal vector of the horizontal transfer probability matrix of the soil state is as follows:

[0024] First, according to the vertical transfer count matrix of the soil state, the horizontal transfer count matrix of the soil state is obtained as follows:

[0025]

[0026] Where: represents the horizontal transfer count matrix from the lth soil state to the kth soil state; K represents the selected Walter constant;

[0027] Then we get:

[0028]

[0029] Where: Expressed as The sum of the row elements of nh express Function to add the elements of the nth row of a matrix; s nh express The sum of the elements in the nth row of ;

[0030] Secondly, the horizontal transition probability matrix of the soil state is obtained as follows:

[0031]

[0032] Where: represents the horizontal transition probability matrix from the lth soil state to the kth soil state; K represents the selected Walter constant;

[0033] Then, the main diagonal vector of the horizontal transfer probability matrix of the soil state is:

[0034]

[0035] Where: For the matrix The main diagonal vector of .

[0036] Furthermore, the difference D between the main diagonal vectors of the horizontal transfer probability matrix of the soil state and the main diagonal vectors of the horizontal transfer probability matrix of the complete stratum is obtained as follows:

[0037]

[0038] Where: The horizontal transition probability matrix representing the complete stratum transitioning from the lth soil state to the kth soil state; For the matrix The main diagonal vector of ; l and k represent the index number of the soil state of the borehole, and n is the total number of soil states of the borehole.

[0039] Furthermore, the relative distance calculation formula is as follows:

[0040] RD=|D′ g -D op |

[0041] Among them, D′ g is the gth element in the new sequence; D op is the intermediate calculation parameter; ε represents the set stop threshold; |D′ g -D op | represents D′ g -D op The absolute value of .

[0042] Furthermore, the vertical transition probability matrix of the soil state at the drilling position perpendicular to the ground is obtained as follows:

[0043] Get the vertical transfer count matrix of soil state:

[0044]

[0045] have to:

[0046]

[0047] Then the vertical transfer probability matrix of soil state is obtained as follows:

[0048]

[0049] Where: Represents the vertical transfer count matrix from the lth soil state to the kth soil state; represents the vertical transition probability matrix from the lth soil state to the kth soil state; v represents the vertical direction perpendicular to the ground downward; l, k both represent the index number of the soil state of the borehole, l, k∈1,2,…,n; n is the total number of soil states of the borehole; Indicates the vertical transfer count from the nth soil state to the second soil state; express A vector of the sum of the row elements of a matrix; sum 1v express Function to add the elements of the first row of a matrix; sum nv express Function to add the elements of the nth row of a matrix; s nv express The sum of the elements in the nth row of .

[0050] Furthermore, it also includes S6: setting a plurality of observation boreholes on the line connecting the two borehole positions on the surface of the site to be geologically surveyed, so as to obtain the soil state corresponding to the observation boreholes and perpendicular to the ground; and then obtaining the borehole accuracy index to evaluate the soil state of all grid cells in the site to be geologically surveyed after rasterization;

[0051] The drilling accuracy index is obtained as follows:

[0052]

[0053] Where: I b Represents the drilling accuracy index; N b,i is the number of soil states that are consistent with the observation drilling grid at the site to be surveyed after rasterization; m is the number of drilling holes.

[0054] Furthermore, the method further includes S7: visualizing the stratum soil state of the site to be geologically surveyed according to the rasterized soil state of all grid cells in the site to be geologically surveyed.

[0055] Beneficial effects: The present invention provides a stratigraphic modeling method based on limited drilling data and Markov theory. By determining two drilling positions on the surface of a site to be geologically surveyed, the site to be geologically surveyed is gridded in a direction perpendicular to the ground downward through the two drilling positions, and a soil state sequence perpendicular to the ground downward corresponding to the drilling positions is obtained; thereby, a vertical transfer count matrix of the soil state perpendicular to the ground downward of the drilling positions is obtained, and based on a Markov theory model, an optimal Walter constant is determined; based on the optimal Walter constant and the vertical transfer count matrix, an optimal horizontal transfer probability matrix is ​​obtained; further, the soil state transfer probability in the first layer of grid cells in the gridded site to be geologically surveyed is obtained to obtain the soil state of the first layer of grid cells; then, based on the two-dimensional Markov chain model theory, the soil state transfer probability of all grid cells in the gridded site to be geologically surveyed is obtained to obtain the soil state of all grid cells in the gridded site to be geologically surveyed; and the soil state prediction of the site to be geologically surveyed is completed. The present invention can make full use of drilling information to simulate geological uncertainty. The optimal Walter constant can be obtained through only two drilling holes without a large amount of drilling marking work, thereby improving the search efficiency of the optimal K value, solving the problem of limited processing ability of the existing technology for the noise and uncertainty of geological data, which may lead to instability and inaccuracy of the model, and enhancing the practicality of technical engineering. BRIEF DESCRIPTION OF THE DRAWINGS

[0056] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the following briefly introduces the drawings required for use in the embodiments or the description of the prior art. Obviously, the drawings described below are some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative labor.

[0057] Figure 1 The present invention is a flow chart of the formation modeling method;

[0058] Figure 2 A schematic diagram of a two-dimensional geological profile and a drill hole discrete grid in an embodiment of the present invention;

[0059] Figure 3 A schematic diagram of a soil transfer counting matrix acquisition process in an embodiment of the present invention;

[0060] Figure 4It is a schematic diagram of a formation visualization platform of a Markov chain model in an embodiment of the present invention. DETAILED DESCRIPTION

[0061] In order to make the purpose, technical solution and advantages of the embodiments of the present invention clearer, the technical solution in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0062] This embodiment introduces a formation modeling method based on limited drilling data and Markov theory, as follows Figure 1 As shown, the following steps are included:

[0063] S1: Determine two drilling positions on the surface of the site to be geologically surveyed, and rasterize the site to be geologically surveyed in a direction perpendicular to the ground downward through the two drilling positions to obtain a soil state sequence perpendicular to the ground downward corresponding to the drilling positions;

[0064] The rasterized geological survey site includes Ny grid cells in the direction perpendicular to the ground and downward, and Nx grid cells in the horizontal direction along the ground surface.

[0065] Specifically, when constructing any upper foundation (such as high-rise buildings, roads, bridges, etc.), it is necessary to clarify the distribution of the bottom strata, and the common method to understand the distribution of strata is to conduct geological surveys in the area, that is, to use drilling technology to drill holes in a certain area for sampling. Since the soil samples obtained by drilling are distributed along the depth, that is, the vertical direction of the strata. Subsequently, based on the basic parameters such as cohesion, friction angle, water content, liquid limit, etc. measured in the laboratory for the soil samples obtained at the drilling location, the basic information of the soil samples along the vertical direction of the strata is obtained. Then, according to the national standard - GBT50145-2007 "Engineering Classification Standard for Soil", the soil state of these soil samples (such as silt, clay, sand, weathered rock, etc.) is determined. At this time, all soil states along the vertical direction under the borehole at a certain location are determined, that is, the soil state sequence: such as [silt, silt, silt, clay, silt, sand, sand, weathered rock, weathered rock]. Figure 3 , that is, each grid cell represents a soil state.

[0066] Specifically, in this embodiment, the method of rasterizing the strata of the site to be geologically surveyed is a conventional technology in the field, and the strata to be two-dimensionalized are grid discretized into Ny×Nx, where Ny and Nx are the total number of grid units divided vertically and horizontally, respectively ( Figure 2 ).

[0067] S2: According to the soil state sequence vertically downward from the ground corresponding to the drilling position, a vertical transfer count matrix of the soil state vertically downward from the ground at the drilling position is obtained to obtain a vertical transfer probability matrix of the soil state vertically downward from the ground at the drilling position

[0068] Specifically, the soil state sequence corresponding to the drilling position vertically downward from the ground is a sequence of the site soil state corresponding to each grid unit in the direction vertically downward from the drilling position. By statistically analyzing the soil state sequence S(m) of the drilling hole m, the vertical transfer count matrix of the soil state of each drilling hole m is calculated. Vertical transition probability matrix of soil state Since the vertical transfer probability is obtained from the information of the borehole itself, the total number of vertical grid divisions is the only factor affecting the vertical transfer probability. Among them, the vertical transfer count matrix of borehole m is calculated And the vertical transition probability matrix The method used is the existing technology in the field. For example, in this embodiment, the vertical transfer count matrix Method of calculation: When the soil state sequence is known, for example, the soil state sequence under borehole 1 is S(1) = [silt, silt, silt, clay, silt, sand, sand, weathered rock, weathered rock], the number of soil states under borehole 1 is determined by Ny. The larger Ny is, the greater the accuracy of the stratum segmentation, that is, the better the effect of simulating the stratum.

[0069] like Figure 3 As shown in the figure, the number of times the silt at the first position is transferred to the silt at the second position is 1, as shown in the figure below:

[0070] Preferably, the vertical transition probability matrix of the soil state at the drilling position perpendicular to the ground is obtained as follows:

[0071] Get the vertical transfer count matrix of soil state:

[0072]

[0073] have to:

[0074]

[0075] Then the vertical transfer probability matrix of soil state is obtained as follows:

[0076]

[0077] Where: Represents the vertical transfer count matrix from the lth soil state to the kth soil state; represents the vertical transition probability matrix from the lth soil state to the kth soil state; v represents the vertical direction perpendicular to the ground downward; l, k both represent the index number of the soil state of the borehole, l, k∈1,2,…,n; n is the total number of soil states of the borehole; Indicates the vertical transfer count from the nth soil state to the second soil state; express A vector of the sum of the row elements of a matrix; sum 1v express Function to add the elements of the first row of a matrix; sum nv express Function to add the elements of the nth row of a matrix;

[0078] Specifically, this embodiment uses the transfer count matrix of the soil state corresponding to the boreholes located on both sides and the vertical transfer probability matrix of the soil state as the basis for subsequent analysis, and the matrices corresponding to the other middle boreholes are used as the measurement of uncertain observation boreholes to verify the accuracy of modeling after modeling.

[0079] S3: According to the vertical transfer count matrix of soil state, based on the Markov theory model, determine the optimal Walter constant;

[0080] Specifically, since the value of the Walter constant K is related to the generation of the lateral transfer probability, the soil state of each grid unit also changes accordingly. Therefore, the Walter constant K has a certain relationship with the probability of different soil states. The traditional method of determining the optimal K value is to traverse the custom K value: K = {K1, K2, ..., K g ,…,K G}, G is the total number of values ​​of K; K g Indicates the value of the Walter constant for the gth time; establishes a relationship with the likelihood function of the intermediate observation borehole, which is completed by selecting the index of the maximum likelihood value. However, this calculation method does not have good applicability.

[0081] Preferably, the method for determining the optimal Walter constant K* is as follows:

[0082] S31: Determine a set of Walter constant values; specifically, the set of Walter constant values ​​is a custom K value based on experience: K = {K1, K2, ..., K g ,…,K G}, where K g is the g-th Walter constant in the set of Walter constant values; G is the total number of the selected Walter constants; g is the index number of the selected Walter constant;

[0083] S32: according to the Walter constant in the set of Walter constant values ​​and the vertical transfer count matrix of the soil state, a horizontal transfer count matrix of the soil state is obtained to obtain a horizontal transfer probability matrix of the soil state, and then a main diagonal vector of the horizontal transfer probability matrix of the soil state is obtained;

[0084] Preferably, in S32, the method for obtaining the main diagonal vector of the horizontal transfer probability matrix of the soil state is as follows:

[0085] First, according to the vertical transfer count matrix of the soil state, the formula for obtaining the horizontal transfer count matrix of the soil state is as follows:

[0086]

[0087] Where: represents the horizontal transfer count matrix from the lth soil state to the kth soil state; K represents the selected Walter constant;

[0088] Then we get:

[0089]

[0090] Where: Expressed as The sum of the row elements of nh express Function to add the elements of the nth row of a matrix; s nh express The sum of the elements in the nth row of ;

[0091] Secondly, the horizontal transition probability matrix of the soil state is obtained as follows:

[0092]

[0093] Where: represents the horizontal transition probability matrix from the lth soil state to the kth soil state; K represents the selected Walter constant;

[0094] Then, the main diagonal vector of the horizontal transfer probability matrix of the soil state is:

[0095]

[0096] Where: For the matrix The main diagonal vector of .

[0097] Specifically, in the embodiment of the present invention, there are 4 soil states at the drilling position. Therefore, the horizontal transfer count matrix of the soil state obtained is:

[0098]

[0099] Then we get:

[0100]

[0101] The horizontal transition probability matrix of the soil state is obtained as follows:

[0102]

[0103] Then, the main diagonal vector of the horizontal transfer probability matrix of the soil state is:

[0104]

[0105] S33: According to the horizontal transfer probability matrix of the soil state and the vertical transfer probability matrix of the soil state, based on the Markov chain theoretical model, a horizontal transfer probability matrix of the complete stratum of the site to be geologically surveyed is obtained to obtain the main diagonal vector of the horizontal transfer probability matrix of the complete stratum;

[0106] Specifically, based on the Markov chain theoretical model, a method for obtaining a horizontal transition probability matrix of a complete stratum of a site to be geologically surveyed is an existing technology in the field and will not be elaborated in detail here.

[0107] S34: obtaining a difference D between the main diagonal vectors of the horizontal transfer probability matrix of the soil state and the main diagonal vectors of the horizontal transfer probability matrix of the complete stratum;

[0108] Preferably, the difference D between the main diagonal vectors of the horizontal transfer probability matrix of the soil state and the main diagonal vectors of the horizontal transfer probability matrix of the complete formation is obtained as follows:

[0109]

[0110] Where: The horizontal transition probability matrix representing the complete stratum transitioning from the lth soil state to the kth soil state; For the matrix The main diagonal vector of ; l, k both represent the index number of the soil state of the borehole, and n is the total number of soil states of the borehole;

[0111] Specifically, in this embodiment, assuming that the total number of soil states obtained from known boreholes is 4 (n=4), the horizontal transfer probability of the complete stratum soil state is as follows:

[0112]

[0113] Where: p 11It is expressed as the probability of transition from the first soil state to the first state. The other expressions are similar. The main diagonal value is:

[0114]

[0115] S35: Sort the difference D between the main diagonal vector of the horizontal transfer probability matrix of the soil state corresponding to the g-th, g=1, 2, ..., G Walter constant in the set of Walter constant values ​​and the main diagonal vector of the horizontal transfer probability matrix of the complete stratum from large to small to obtain a new sequence D′=(D′1, ..., D′ g ,…D′ G );

[0116] Among them, D′ g is the gth element in the new sequence; D′ G is the Gth element in the new sequence, that is, the smallest element in the new sequence; G is the total number of the selected Walter constants; g is the index number of the selected Walter constant;

[0117] S35: Sort the difference D between the main diagonal vector of the horizontal transfer probability matrix of the soil state corresponding to each Walter constant in the set of Walter constant values ​​and the main diagonal vector of the horizontal transfer probability matrix of the complete stratum from large to small to obtain a new sequence D′=

[0118] (D′1,…,D′ g ,…D′ G ), where D′ g is the gth element in the new sequence; D′ G is the Gth element in the new sequence, that is, the smallest element in the new sequence; G is the total number of the selected Walter constants; g is the index number of the selected Walter constant;

[0119] S36: Order D op =D′ G +ε, obtain D′ g With D op The relative distance RD is calculated to obtain the minimum relative distance; then the Walter constant corresponding to the minimum relative distance is the optimal Walter constant;

[0120] RD=|D′ g -D op |

[0121] Among them, D′ G is the minimum value in D′;

[0122] Specifically, since there is a one-to-one correspondence between D and K, the smallest D′ g With Dop The Walter constant corresponding to the distance is the optimal Walter constant;

[0123] Specifically, in this embodiment, the stopping threshold ε is set to 0.01, and the difference D between the main diagonal vector of the horizontal transfer probability matrix of the soil state and the main diagonal vector of the horizontal transfer probability matrix of the complete stratum is sorted from large to small to obtain D′=(D′1,…,D′ g ,…D′ G ), get the elements in D′ and D op The relative distance between them, the Walter constant corresponding to the element with the smallest relative distance is the optimal Walter constant.

[0124] S4: according to the optimal Walter constant and the vertical transfer count matrix, an optimal horizontal transfer probability matrix is ​​obtained; according to the first element of the soil state sequence, that is, the soil state of the first layer grid unit corresponding to the drilling position, and based on the one-dimensional Markov chain model theory, the soil state transfer probability in the first layer grid unit in the site to be geologically surveyed after rasterization is obtained to obtain the soil state of the first layer grid unit;

[0125] Specifically, substituting the value of the optimal Walter constant into equation (6) can determine the optimal horizontal transfer probability of the formation:

[0126] S5: According to the soil state and vertical transfer probability matrix of the first-layer grid cells, based on the two-dimensional Markov chain model theory, the soil state transfer probability of all grid cells in the site to be geologically surveyed after rasterization is obtained to obtain the soil state of all grid cells in the site to be geologically surveyed after rasterization; complete the soil state prediction of the site to be geologically surveyed.

[0127] Specifically, Figure 2 It can be seen that the task of the Markov chain is to predict the state of the entire formation based on the information of the two boreholes on the boundary.

[0128] Preferably, the method further comprises S6: setting a plurality of observation boreholes on a line connecting two of the borehole positions on the surface of the site to be geologically surveyed, so as to obtain soil conditions perpendicular to the ground and downward corresponding to the observation boreholes; and then obtaining a borehole accuracy index to evaluate the soil conditions of all grid cells in the site to be geologically surveyed after rasterization;

[0129] The drilling accuracy index is obtained as follows:

[0130]

[0131] Where: I bRepresents the drilling accuracy index; N b,i is the number of soil states of the site to be surveyed after rasterization that is consistent with the observation borehole grid; m is the number of observation boreholes; i is the index number of the observation borehole.

[0132] Specifically, in this embodiment, the method of rasterizing the strata of the site to be geologically surveyed is a conventional technology in the field. After the strata of the site are two-dimensionalized, a set of boreholes is obtained: Borehole_m = {B1, B2, B3, B4, B5, B6, B7} (m = 1, 2, ..., 7), wherein B1, B2, B3, B4, B5, B6, B7 are borehole 1, borehole 2, borehole 3, borehole 4, borehole 5, borehole 6, and borehole 7 respectively; a set of corresponding borehole positions is obtained: pos_m = {pos_1, pos_2, pos_3, pos_4, pos_5, pos_6, pos_7}, wherein pos_1, pos_2, pos_3, pos_4, pos_5, pos_6, pos_7 are the borehole positions of borehole 1, borehole 2, borehole 3, borehole 4, borehole 5, borehole 6, and borehole 7 respectively. pos_m is a set of borehole positions; m is the index number of the drill hole; the boreholes on both sides are used to model the entire formation, and the other middle borehole is used as an observation borehole to verify the accuracy of the modeling after modeling.

[0133] Then, the stratum to be two-dimensionalized is grid discretized into Ny×Nx, where Ny and Nx are the total number of grid units divided vertically and horizontally, respectively. Figure 2 ). At the same time, the basic information of geological drilling survey at each drilling location is presented as a soil state sequence S(m) = {S1(m), S2(m),…, S ny (m),…,S Ny (m)}, ny=1,2,…,Ny is the index number of the soil grid unit perpendicular to the ground; S(m) is the soil state sequence of borehole m; S ny (m) is the nyth soil state of borehole m;

[0134] Specifically, when the matlab program is implemented in the above method, the calculated results are shown in Tables 1 and 2. Table 1 is a drilling scheme for selecting soil state sequences obtained by different numbers of drilling holes as the initial vertical transfer probability; Table 2 is an accuracy index corresponding to different drilling schemes, where the brackets are the soil state prediction accuracy of the existing method for completing the formation modeling by selecting the index of the maximum likelihood value. It can be seen from the table that the prediction accuracy of the scheme of this embodiment is higher than that of the prior art.

[0135] Table 1 Drilling selection scheme

[0136]

[0137] Table 2 Accuracy index of different drilling schemes

[0138]

[0139] Preferably, the method further includes S7: visualizing the soil state of the strata of the site to be geologically surveyed according to the rasterized soil state of all grid cells in the site to be geologically surveyed.

[0140] Specifically, the analysis and visualization of multi-dimensional and complex geographic data (such as underground ground models) are crucial for the development of underground space and the design and construction of underground structures (such as tunnels, dams and slopes). This embodiment integrates and packages the above-mentioned improved Markov chain model, and visualizes the soil state of the strata of the site to be geologically surveyed according to the soil state of all grid cells in the site to be geologically surveyed after rasterization. The framework of the ground model that enables users to be immersive is as follows: Figure 4 .

[0141] The present embodiment provides a stratigraphic modeling method based on limited drilling data and Markov theory. Two drilling positions on the surface of a site to be geologically surveyed are determined, and the site to be geologically surveyed is gridded in a direction perpendicular to the ground downward through the two drilling positions to obtain a soil state sequence perpendicular to the ground downward corresponding to the drilling positions; thereby obtaining a vertical transfer count matrix of the soil state perpendicular to the ground downward at the drilling positions, and determining an optimal Walter constant based on a Markov theory model; obtaining an optimal horizontal transfer probability matrix based on the optimal Walter constant and the vertical transfer count matrix; further obtaining the soil state transfer probability in the first layer grid unit in the gridded site to be geologically surveyed to obtain the soil state of the first layer grid unit; then obtaining the soil state transfer probability of all grid units in the gridded site to be geologically surveyed based on the two-dimensional Markov chain model theory to obtain the soil state of all grid units in the gridded site to be geologically surveyed; and completing the soil state prediction of the site to be geologically surveyed. The present invention can make full use of drilling information to simulate geological uncertainty. The optimal Walter constant can be obtained through only two drilling holes without a large amount of drilling marking work, thereby improving the search efficiency of the optimal K value, solving the problem of limited processing ability of the existing technology for the noise and uncertainty of geological data, which may lead to instability and inaccuracy of the model, and enhancing the practicality of technical engineering.

[0142] This embodiment can make up for the defects of the inapplicability of the traditional K value determination method, improve the search efficiency of the optimal K value, and enhance the practicality of technical engineering. At the same time, this embodiment has a fully automated solution process, which will greatly improve the designer's grasp of geological information, and can also meet the designer's needs for visualization of the strata, and further enhance the ability to optimize the design of geological survey decisions.

[0143] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit it. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or replace some or all of the technical features therein with equivalents. However, these modifications or replacements do not cause the essence of the corresponding technical solutions to deviate from the scope of the technical solutions of the embodiments of the present invention.

Claims

1. A formation modeling method based on limited borehole data and Markov theory, characterized in that: The steps include: S1: Determine two drilling positions on the surface of the site to be geologically surveyed, and rasterize the site to be geologically surveyed in a direction perpendicular to the ground downward through the two drilling positions to obtain a soil state sequence perpendicular to the ground downward corresponding to the drilling positions; The rasterized geological survey site includes Ny grid cells in the direction perpendicular to the ground and downward, and Nx grid cells in the horizontal direction along the ground surface. S2: According to the soil state sequence vertically downward from the ground corresponding to the drilling position, a vertical transfer count matrix of the soil state vertically downward from the ground at the drilling position is obtained to obtain a vertical transfer probability matrix of the soil state vertically downward from the ground at the drilling position S3: According to the vertical transfer count matrix of soil state, based on the Markov theory model, determine the optimal Walter constant; S4: according to the optimal Walter constant and the vertical transfer count matrix, an optimal horizontal transfer probability matrix is ​​obtained; according to the first element of the soil state sequence and based on the one-dimensional Markov chain model theory, the soil state transfer probability in the first layer grid unit in the site to be geologically surveyed after rasterization is obtained to obtain the soil state of the first layer grid unit; S5: According to the soil state and vertical transfer probability matrix of the first-layer grid cells, based on the two-dimensional Markov chain model theory, the soil state transfer probability of all grid cells in the site to be geologically surveyed after rasterization is obtained to obtain the soil state of all grid cells in the site to be geologically surveyed after rasterization; complete the soil state prediction of the site to be geologically surveyed.

2. A formation modeling method based on limited drilling data and Markov theory according to claim 1, characterized in that: The method to determine the optimal Walter constant is as follows: S31: Determine a set of values ​​of the Walter constant; S32: according to the Walter constant in the set of Walter constant values ​​and the vertical transfer count matrix of the soil state, a horizontal transfer count matrix of the soil state is obtained to obtain a horizontal transfer probability matrix of the soil state, and then a main diagonal vector of the horizontal transfer probability matrix of the soil state is obtained; S33: According to the horizontal transfer probability matrix of the soil state and the vertical transfer probability matrix of the soil state, based on the Markov chain theoretical model, a horizontal transfer probability matrix of the complete stratum of the site to be geologically surveyed is obtained to obtain the main diagonal vector of the horizontal transfer probability matrix of the complete stratum; S34: obtaining a difference D between the main diagonal vectors of the horizontal transfer probability matrix of the soil state and the main diagonal vectors of the horizontal transfer probability matrix of the complete stratum; S35: Sort the difference D between the main diagonal vector of the horizontal transfer probability matrix of the soil state corresponding to the g-th, g=1, 2, ..., G Walter constant in the set of Walter constant values ​​and the main diagonal vector of the horizontal transfer probability matrix of the complete stratum from large to small to obtain a new sequence D′=(D′1, ..., D′ g ,…D′ G ); Among them, D′ g is the gth element in the new sequence; D′ G is the Gth element in the new sequence, that is, the smallest element in the new sequence; G is the total number of the selected Walter constants; g is the index number of the selected Walter constant; S36: Order D op =D′ G +ε, obtain D′ and D op The relative distance RD is calculated to obtain the minimum relative distance; then the Walter constant corresponding to the minimum relative distance is the optimal Walter constant.

3. A formation modeling method based on limited drilling data and Markov theory according to claim 2, characterized in that: In S32, the method for obtaining the main diagonal vector of the horizontal transfer probability matrix of the soil state is as follows: First, according to the vertical transfer count matrix of the soil state, the horizontal transfer count matrix of the soil state is obtained as follows: Where: represents the horizontal transfer count matrix from the lth soil state to the kth soil state; K represents the selected Walter constant; Then we get: Where: Expressed as The sum of the row elements of nh express Function to add the elements of the nth row of a matrix; s nh express The sum of the elements in the nth row of ; Secondly, the horizontal transition probability matrix of the soil state is obtained as follows: Where: represents the horizontal transition probability matrix from the lth soil state to the kth soil state; K represents the selected Walter constant; Then, the main diagonal vector of the horizontal transfer probability matrix of the soil state is: Where: For the matrix The main diagonal vector of .

4. A formation modeling method based on limited drilling data and Markov theory according to claim 2, characterized in that: The difference D between the main diagonal vectors of the horizontal transfer probability matrix of the soil state and the main diagonal vectors of the horizontal transfer probability matrix of the complete stratum is as follows: Where: The horizontal transition probability matrix representing the complete stratum transitioning from the lth soil state to the kth soil state; For the matrix The main diagonal vector of ; l and k represent the index number of the soil state of the borehole, and n is the total number of soil states of the borehole.

5. A formation modeling method based on limited drilling data and Markov theory according to claim 2, characterized in that: The relative distance calculation formula is as follows: RD=|D′ g -D op | Among them, D′ g is the gth element in the new sequence; D op is the intermediate calculation parameter; ε represents the set stop threshold; |D′ g -D op | represents D′ g -D op The absolute value of .

6. A formation modeling method based on limited drilling data and Markov theory according to claim 1, characterized in that: The vertical transition probability matrix of the soil state perpendicular to the ground downward at the drilling position is obtained as follows: Get the vertical transfer count matrix of soil state: have to: Then the vertical transfer probability matrix of soil state is obtained as follows: Where: Represents the vertical transfer count matrix from the lth soil state to the kth soil state; represents the vertical transition probability matrix from the lth soil state to the kth soil state; v represents the vertical direction perpendicular to the ground downward; l, k both represent the index number of the soil state of the borehole, l, k∈1,2,…,n; n is the total number of soil states of the borehole; Indicates the vertical transfer count from the nth soil state to the second soil state; express A vector of the sum of the row elements of a matrix; sum 1v express Function to add the elements of the first row of a matrix; sum nv express Function to add the elements of the nth row of a matrix; s nv express The sum of the elements in the nth row of .

7. A formation modeling method based on limited drilling data and Markov theory according to claim 1, characterized in that: The method further comprises S6: setting a plurality of observation boreholes on a line connecting two of the borehole positions on the surface of the site to be geologically surveyed, so as to obtain soil conditions corresponding to the observation boreholes and perpendicular to the ground; and then obtaining a borehole accuracy index to evaluate the soil conditions of all grid cells in the site to be geologically surveyed after rasterization; The drilling accuracy index is obtained as follows: Where: I b Represents the drilling accuracy index; N b,i is the number of soil states that are consistent with the observation drilling grid at the site to be surveyed after rasterization; m is the number of drilling holes.

8. The formation modeling method based on limited drilling data and Markov theory according to claim 1, characterized in that: The method further includes S7: visualizing the soil state of the strata of the site to be geologically surveyed according to the rasterized soil state of all grid cells in the site to be geologically surveyed.

Citation Information

Cited By

  • Tunnel stratum modeling method and system based on multi-source feature driving and spatial constraint

    CN122528682A