Method, device, equipment and medium for estimating flood control storage capacity of dry-type tailings pond

By determining the candidate tailing area and estimated stacking order in the tailing area of ​​the tailing pond, simulating the stacking process, and calculating the flood control capacity of the tailing pond, the problem of inaccurate storage capacity estimates in the existing technology is solved. Improve flood control capabilities and safety and stability during the flood season.

CN118886569BActive Publication Date: 2024-12-13BEIJING MINING & METALLURGICAL TECH GRP CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411355581.0
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-09-27
Publication Date
2024-12-13
Estimated Expiration
2044-09-27

AI Technical Summary

Technical Problem

The estimate of the tailings pond capacity in the pre-flood flood control calculation in the existing technology is inaccurate, which makes it difficult to accurately determine the flood control parameters during the flood season, affecting the safety management of tailings ponds.

Method used

A flood volume estimate method for dry-type storage tailings ponds is proposed. By determining the candidate tailings and the estimated stacking order in the tailings ponds, the stacking process is simulated, and the tailings of each candidate are calculated. The volume and height of the pile tailings of the area are used to calculate the estimated flood adjustment storage capacity using the discrete longitudinal section and the current elevation table, and finally obtain the final estimated storage capacity.

Benefits of technology

It improves the accuracy of flood control capacity estimates, ensures the flood control capacity and safety and stability of tailings ponds during the flood season, and provides reliable storage capacity predictions suitable for expected plans.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118886569B_ABST
    Figure CN118886569B_ABST
Patent Text Reader

Abstract

The embodiment of the present invention discloses a method, device, equipment and medium for estimating the flood control storage capacity of a dry-type tailings pond, which relates to the field of mine safety. The method includes: determining candidate tailing areas and estimated stacking order according to tailings pond information, calculating the estimated tailings volume corresponding to each candidate tailing area; simulating the stacking of each candidate tailing area according to the estimated stacking order and the estimated tailings volume, obtaining the selected tailing area and its stacking process height; discretizing the longitudinal section of each selected tailing area after stacking into multiple equidistant elevation segments; calculating the estimated flood control storage capacity of each selected tailing area at the stacking process height according to the acquisition order of each selected tailing area, the volume of the equidistant elevation segment corresponding to each selected tailing area and the current elevation flood control storage capacity table, and obtaining the final estimated flood control storage capacity according to the estimated flood control storage capacity of the stacking process height in each selected tailing area. In this way, the estimated flood control storage capacity suitable for the expected plan can be obtained.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of mine safety, and in particular to a method, device, equipment and medium for estimating the flood control storage capacity of a dry-type tailings storage pond. Background Art

[0002] Determining the flood control parameters of tailings ponds during the flood season through flood control calculations before the flood season is an important technical means for the safety management of tailings ponds and ensuring the safety of tailings ponds during the flood season. At present, flood control calculations before the flood season are mainly based on the actual topographic maps before the flood season and the actual data of online monitoring before the flood season, which has the problem of inaccurate flood control storage capacity. Summary of the invention

[0003] In view of this, the purpose of the present invention is to overcome the deficiencies in the prior art and to provide a method, device, equipment and medium for estimating the flood control storage capacity of a dry storage tailings pond, so as to solve the problem of inaccurate estimation of the flood control storage capacity.

[0004] The present invention provides the following technical solutions:

[0005] In the first aspect, the present invention proposes a method for estimating the flood control storage capacity of a dry-type tailings pond, the method comprising: determining at least one candidate tail row area and an estimated stacking order of each candidate tail row area in each tail row area of ​​the tailings pond according to tailings pond information, and calculating the estimated tailings volume corresponding to each candidate tail row area according to spatial parameters of each candidate tail row area, wherein the tailings pond information comprises current status information, design information and tail row information; simulating the stacking of each candidate tail row area according to the estimated stacking order and the estimated tailings volume, and obtaining at least one selected tail row area and its stacking process height during the simulated stacking process; discretizing the longitudinal section of each selected tail row area after stacking into a plurality of equidistant elevation segments; calculating the estimated flood control storage capacity of the stacking process height in each selected tail row area according to the acquisition order of each selected tail row area, the volume of the equidistant elevation segments corresponding to each selected tail row area and the current elevation flood control storage capacity table, and obtaining the final estimated flood control storage capacity based on the estimated flood control storage capacity of the stacking process height in each selected tail row area.

[0006] In a second aspect, the present invention proposes a flood control storage capacity estimation device for a dry tailings pond, the device comprising: a determination module for determining at least one candidate tail area and an estimated stacking order of each candidate tail area in each tail area of ​​the tailings pond according to tailings pond information, and calculating an estimated stacking tailings volume corresponding to each candidate tail area according to spatial parameters of each candidate tail area, wherein the tailings pond information includes current status information, design information and tailings information; a stacking module for stacking each candidate tail area according to the estimated stacking order and the estimated stacking tailings volume. The method comprises the following steps: performing simulated stacking and obtaining at least one selected tail area and its stacking process height in the simulated stacking process; a discretization module is used to discretize the longitudinal section of each selected tail area after stacking into multiple equidistant elevation segments; an estimation module is used to calculate the estimated flood control storage capacity of the stacking process height in each selected tail area according to the acquisition sequence of each selected tail area, the volume of the equidistant elevation segments corresponding to each selected tail area and the flood control storage capacity table of the current elevation, and obtain the final estimated flood control storage capacity according to the estimated flood control storage capacity of the stacking process height in each selected tail area.

[0007] In a third aspect, the present invention proposes a computer device including a memory and a processor, wherein the memory stores a computer program, and when the computer program is executed by the processor, the method for estimating the flood control storage capacity of a dry storage tailings pond as in the first aspect is implemented.

[0008] In a fourth aspect, the present invention proposes a computer-readable storage medium storing a computer program, which, when executed by a processor, implements the method for estimating the flood control storage capacity of a dry storage tailings pond as in the first aspect.

[0009] The present invention discloses a method, device, equipment and medium for estimating flood control storage capacity of a dry-type tailings pond. Candidate tail discharge areas are determined from the tail discharge areas of the tailings pond according to the current status information, design information and tail discharge information of the tailings pond, and simulated stacking of the candidate tail discharge areas is performed according to the tailings pond information, so as to determine the selected tail discharge areas required in the tailings pond plan and the stacking information of the selected tail discharge areas after the planned stacking, and then the flood control storage capacity is estimated according to the selected tail discharge areas and their stacking information, so as to obtain the estimated flood control storage capacity suitable for the expected plan. BRIEF DESCRIPTION OF THE DRAWINGS

[0010] In order to more clearly illustrate the technical solution of the present invention, the following is a brief introduction to the drawings required for use in the embodiments. It should be understood that the following drawings only illustrate certain embodiments of the present invention and should not be regarded as limiting the scope of protection of the present invention. In each of the drawings, similar components are numbered similarly.

[0011] Figure 1 A schematic diagram of a process of estimating the flood control storage capacity of a dry-type tailings pond proposed in this embodiment is shown;

[0012] Figure 2 Another schematic flow chart of the method for estimating flood control storage capacity of a dry tailings storage pond proposed in this embodiment is shown;

[0013] Figure 3 A schematic diagram of a dry tailings storage pond proposed in this embodiment is shown;

[0014] Figure 4 Another schematic flow chart of the method for estimating the flood control storage capacity of the dry-type tailings storage pond proposed in this embodiment is shown;

[0015] Figure 5 Another schematic flow chart of the method for estimating the flood control storage capacity of the dry-type tailings storage pond proposed in this embodiment is shown;

[0016] Figure 6 A schematic diagram showing a longitudinal partition cross-section of the rolling and piling area proposed in this embodiment;

[0017] Figure 7 A comparative schematic diagram of the flood control reservoir capacity proposed in this embodiment is shown;

[0018] Figure 8 A structural schematic diagram of a flood control storage capacity estimation device for a dry-type tailings storage pond proposed in this embodiment is shown.

[0019] Description of the accompanying drawings: 301-sub-dam area; 302-rolling area; 303-slag discharge area; 304-flood control and water accumulation area; 800-flood control storage capacity estimation device for dry storage tailings pond; 801-determination module; 802-stacking module; 803-discrete module; 804-estimation module. DETAILED DESCRIPTION

[0020] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all the embodiments.

[0021] The components of the embodiments of the present invention generally described and shown in the drawings herein may be arranged and designed in a variety of different configurations. Therefore, the following detailed description of the embodiments of the present invention provided in the drawings is not intended to limit the scope of the claimed invention, but merely represents selected embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative work are within the scope of protection of the present invention.

[0022] Hereinafter, the terms "including", "having" and their cognates, which may be used in various embodiments of the present invention, are intended only to indicate specific features, numbers, steps, operations, elements, components or combinations of the foregoing items, and should not be understood as first excluding the existence of one or more other features, numbers, steps, operations, elements, components or combinations of the foregoing items or adding the possibility of one or more features, numbers, steps, operations, elements, components or combinations of the foregoing items.

[0023] Furthermore, the terms “first”, “second”, “third”, etc. are merely used for distinguishing descriptions and are not to be understood as indicating or implying relative importance.

[0024] Unless otherwise defined, all terms (including technical terms and scientific terms) used herein have the same meanings as those generally understood by those skilled in the art to which the various embodiments of the present invention belong. Terms (such as those defined in generally used dictionaries) will be interpreted as having the same meanings as the contextual meanings in the relevant technical field and will not be interpreted as having idealized meanings or overly formal meanings unless clearly defined in the various embodiments of the present invention.

[0025] Example 1

[0026] The disclosed embodiment provides a method for estimating the flood control storage capacity of a dry-type tailings pond, which is used to solve the problem of inaccurate estimation of the flood control storage capacity.

[0027] See also Figure 1 This embodiment proposes a method for estimating the flood control storage capacity of a dry tailings pond, which includes steps S101 to S104. Each step is described in detail below.

[0028] Step S101, determining at least one candidate tail area and an estimated stacking order of each candidate tail area in each tail area of ​​the tailings pond according to the tailings pond information, and calculating the estimated stacking tailings volume corresponding to each candidate tail area according to the spatial parameters of each candidate tail area.

[0029] In this embodiment, as the tailings in the tailings pond are continuously discharged and accumulated, the storage capacity of the tailings pond will gradually decrease. If the height of the sub-dam remains unchanged, the higher the height of the pile in the reservoir, the less the remaining flood control storage capacity, and the weaker the ability to cope with extreme weather such as heavy rain. Therefore, when estimating the flood control storage capacity, it is necessary to fully consider the impact of the height of the pile in the reservoir on safety and stability.

[0030] First, the tailing position of the tailings pond needs to be determined. Specifically, at least one candidate tailing area that needs to be built in each tailing area of ​​the tailings pond is determined according to the tailings pond information, and the estimated building order of each candidate tailing area.

[0031] Exemplarily, if there are tail regions A, B, C, and D, and tail regions A and D are determined as candidate tail regions from each tail region in turn, the estimated stacking order of candidate tail region A is the first, and the estimated stacking order of candidate tail region D is the second.

[0032] At the same time, after determining a candidate tail area, it is necessary to calculate the estimated tailings volume required for the candidate tail area according to the spatial parameters of the candidate tail area. After the estimated tailings volume of the candidate tail area is calculated, the estimated tailings volume can also be used to determine the next candidate tail area.

[0033] Among them, the tailings discharge area generally includes the tailings storage area and the flood control and accumulation area; the tailings pond information includes the current information of the tailings pond, the design information of the tailings pond and the tailings discharge information of the tailings pond. Generally, the current information includes the current topographic map of the tailings pond and the current measured data of the tailings pond, the design information is the design stacking process and attached drawings of the tailings pond, and the tailings discharge information is the tailings discharge operation plan of the tailings pond. The spatial parameters of the candidate tailing discharge area include the current spatial parameters of the candidate tailing discharge area and the design spatial parameters that the candidate tailing discharge area needs to achieve. The combination of the two can calculate the tailings volume required for the simulated stacking of the candidate tailing discharge area.

[0034] Step S102, simulate the stacking of each candidate tailing area according to the estimated stacking sequence and the estimated stacking tailings volume, and obtain at least one selected tailing area and its stacking process height during the simulated stacking process.

[0035] In this embodiment, simulated stacking is performed on each candidate tail area according to the estimated stacking sequence and estimated stacking tailings volume of each candidate tail area, and at least one selected tail area and its stacking process height in the simulated stacking process are obtained.

[0036] Among them, the selected tail area is the candidate tail area where tailings are piled during the simulated stacking process, and the stacking process height is the tailings stacking height of the selected tail area during the simulated stacking process. Therefore, there can be multiple stacking process heights in the selected tail area.

[0037] Step S103, discretizing the longitudinal section of each selected row tail area after stacking into a plurality of equidistant elevation segments.

[0038] In this embodiment, the longitudinal sections of each selected row tail area after stacking are discretized into a plurality of equidistant elevation segments. The longitudinal sections of each selected row tail area after stacking may have irregular shapes, so it is necessary to partition and discretize the elevation segments according to the actual shapes of the longitudinal sections.

[0039] Step S104, calculates the estimated flood control storage capacity of the stacking process height in each selected tail area according to the acquisition order of each selected tail area, the volume of the corresponding equidistant elevation segments of each selected tail area and the current elevation flood control storage capacity table, and obtains the final estimated flood control storage capacity based on the estimated flood control storage capacity of the stacking process height in each selected tail area.

[0040] In this embodiment, according to the acquisition order of each selected tail area, the estimated flood control storage capacity of each selected tail area at the height of the stacking process is calculated in turn according to the volume of the corresponding equidistant elevation segment of each selected tail area and the current elevation flood control storage capacity table, and the estimated flood control storage capacity of the height of the stacking process in the last selected tail area is used as the final estimated flood control storage capacity. Among them, the current elevation flood control storage capacity table is the capacity before any stacking or transformation. In this way, by estimating the tail stacking of the tail area of ​​the tailings pond according to the tailings pond data, and estimating the flood control storage capacity according to the estimated tail stacking data and elevation discretization, the accuracy of the final estimated flood control storage capacity can be ensured.

[0041] It should be noted that the current flood control storage capacity corresponding to different elevations can be automatically calculated by the three-dimensional model software based on the lowest elevation around the flood discharge facilities in the current information of the tailings pond or the lowest elevation in the reservoir, and based on the preset water level step, or the current flood control storage capacity corresponding to different elevations can be approximately obtained by calculating the contour area of ​​the reservoir area corresponding to different elevations. Among them, the starting point of the current elevation in the current elevation flood control storage capacity table is the elevation of the lowest point in the reservoir in the current topographic map, and the highest point of the current elevation in the current elevation flood control storage capacity table is the elevation of the planned sub-dam in the tailings discharge operation plan.

[0042] See also Figure 2 In a specific embodiment, step S101 includes steps S1011 to S1021, and each step is described in detail below.

[0043] Step S1011, obtaining the current dam top elevation and the spatial parameters of each tail area according to the current information and the design information, and obtaining the total tail plan amount according to the tail information.

[0044] In this embodiment, the current dam top elevation is obtained from the current status information of the tailings pond. and the spatial parameters of each tailing area, and obtain the total tailing plan according to the tailing information in the tailing operation plan of the tailing pond Among them, the spatial parameters of the tail area include width data, height data, elevation data and slope ratio data.

[0045] Step S1012, determining the target sequence according to the design information.

[0046] It should be noted that the design information mainly refers to the tailings storage process. For example, if the tailing order of the design storage process in the design information is A, B, D, C area, then the target order is ABDC order.

[0047] See also Figure 3 , for example, for a four-sided dry storage tailings pond, the tailings pond includes a sub-dam area 301 and a tailings discharge area (a rolling area 302, a slag discharge area 303 and a flood control water accumulation area 304), and the designed storage process sequence is the rolling area 302, the slag discharge area 303 and the flood control water accumulation area 304, so the target sequence is the sequence of the rolling area, the slag discharge area and the flood control water accumulation area.

[0048] Step S1013, determining the i-th tail area to be determined from each tail area according to the target order, i≥1.

[0049] In this embodiment, the i-th tail area to be determined is determined from each tail area according to the target order, i≥1. The tail area to be determined is the object to be determined in the process of determining the candidate tail area. For example, if the target order is the order of rolling area, slag discharge area and flood control and water accumulation area, the first tail area to be determined is the rolling area, the second tail area to be determined is the slag discharge area, and the third tail area to be determined is the flood control and water accumulation area.

[0050] Step S1014, obtaining the target lowest point elevation of the ith tail area to be determined according to the current dam top elevation and the spatial parameters of the ith tail area to be determined.

[0051] In this embodiment, the target lowest point elevation of the ith tail area to be determined is calculated according to the current dam top elevation and the spatial parameters of the ith tail area to be determined.

[0052] Step S1015, obtaining the current lowest point elevation of the i-th tail area to be determined according to the current status information.

[0053] In this embodiment, the current lowest point elevation of the i-th tailings area to be determined is obtained according to the current information in the tailings pond current map.

[0054] Step S1016: if the target lowest point elevation is greater than the current lowest point elevation, the i-th tail area to be determined is taken as the j-th candidate tail area, j≥1; and the estimated tailings volume of the j-th candidate tail area is calculated according to the spatial parameters of the j-th candidate tail area.

[0055] In this embodiment, if the target lowest point elevation of the i-th to-be-determined tail area is greater than its current lowest point elevation, the i-th to-be-determined tail area is taken as the j-th candidate tail area. If there are two candidate tail areas at this time, j is 3 at this time; if the candidate tail area has not been determined at this time, j is 1 at this time. At the same time, the estimated tailings volume of the j-th candidate tail area is calculated based on the current lowest point elevation and target lowest point elevation of the j-th candidate tail area and other spatial parameters.

[0056] Step S1017, if the target lowest point elevation is less than or equal to the current lowest point elevation, then executing the step of determining the (i+1)th tail area to be determined from each candidate tail area according to the target order.

[0057] In this embodiment, if the target lowest point elevation of the i-th tail area to be determined is less than or equal to its current lowest point elevation, a step of determining the i+1-th tail area to be determined from each candidate tail area is performed according to the target order.

[0058] Step S1018, determining the tailings volumes and values ​​of the estimated tailings volumes corresponding to the 1st to jth candidate tailings areas.

[0059] In this embodiment, when the jth candidate tail region is obtained, the sum of the tailings volumes of the estimated tailings volumes corresponding to the first to jth candidate tail regions is determined. For example, when the second candidate tail region is obtained, the sum of the tailings volumes of the estimated tailings volume A corresponding to the first candidate tail region and the estimated tailings volume B corresponding to the second candidate tail region is determined.

[0060] Step S1019, if the tailings volume and value are less than the total tailings plan, a step of determining the i+1th tailing area to be determined from each tailing area according to the target sequence is executed.

[0061] In this embodiment, if the tailings volume and value are less than the planned tailings discharge total amount M, the process goes to step S1013 to perform a determination step on the i+1th tailings discharge area to be determined.

[0062] Step S1020, if the tailings volume and value is greater than or equal to the total tailings plan, then stop executing the step of determining the i+1th tailing area to be determined from each tailing area according to the target sequence.

[0063] In this embodiment, if the tailings volume and value is greater than or equal to the total tailings discharge plan M, the judgment step for the i+1th tailings discharge area to be judged is terminated, and no other candidate tailings discharge areas are determined. This is because the currently determined candidate tailings discharge areas and their estimated tailings volumes can meet the total tailings discharge plan in the tailings discharge plan.

[0064] Step S1021: The order of the candidate tail regions is used as the estimated stacking order.

[0065] In this embodiment, the order in which the candidate tail regions are obtained is used as the estimated stacking order. For example, if the candidate tail regions A and D are obtained in sequence, the estimated stacking order is the order of AD.

[0066] In a specific embodiment, the method further includes: if the sum of the tailings volumes of the estimated tailings volumes corresponding to all candidate tailings discharge areas is less than the total tailings discharge plan, then the sub-dam area of ​​the tailings pond is used as the initial tailings discharge area.

[0067] In this embodiment, if there are G tailing areas to be determined, the Gth tailing area to be determined is determined as the pth candidate tailing area, and the sum of the estimated tailing volumes corresponding to the 1st to pth candidate tailing areas is less than the total tailing plan, the sub-dam area of ​​the tailings pond is used as the initial tailing area. In this way, by increasing the tailing construction in the sub-dam area, the storage capacity of the future tailings pond can be more accurately reflected.

[0068] See also Figure 4 In a specific embodiment, step S102 includes steps S401 to S403, and each step is described in detail below.

[0069] Step S401, obtaining the designed sub-dam building height according to the design information, simulating the building of the initial tailing area according to the designed sub-dam building height, and determining the initial building tailings volume corresponding to the initial tailing area after the building.

[0070] In this embodiment, the design sub-dam stacking height is obtained according to the design information in the tailings pond design file, and the initial tailing area is simulated according to the design sub-dam stacking height, and the initial tailing volume corresponding to the initial tailing area after stacking is determined. At this time, the initial tailing area is the selected tailing area.

[0071] Step S402, determining the remaining tailings volume according to the total tailings discharge plan and the initial tailings volume.

[0072] In this embodiment, the difference between the total tailings discharge plan volume and the initial tailings volume is taken as the remaining tailings volume.

[0073] Step S403, based on the remaining tailings volume, the estimated stacking order and the estimated tailings volume corresponding to each candidate tail area, simulate the stacking of each candidate tail area to obtain at least one selected tail area and its stacking process height from the initial tail area and each candidate tail area.

[0074] In this embodiment, the tailings corresponding to the remaining tailings volume are simulated for each candidate tail area according to the estimated stacking order and the estimated tailings volume corresponding to each candidate tail area. In this simulated stacking process, the selected tail area for simulated stacking can be determined from each candidate tail area; and the stacking process height of each selected tail area can be obtained.

[0075] It should be noted that if the estimated tailings volumes of candidate tailing areas A, B, C, and D are 50, 60, 40, and 30, respectively, and the remaining tailings volume is 140, and the estimated stacking order is A, B, C, and D, then in the simulated stacking process, the remaining tailings of 140 are simulated stacked in the candidate tailing area A according to a volume of 50, and the remaining 90 tailings continue to be simulated stacked in the candidate tailing area B according to a volume of 60, and the remaining 30 tailings continue to be simulated stacked in the candidate tailing area C, and the remaining tailings volume is 0. At this time, the tailing areas are selected as the initial tailing areas and the candidate tailing areas A, B, and C.

[0076] In a specific embodiment, step S102 also includes: if the sum of the estimated tailings volumes corresponding to all candidate tail areas is greater than or equal to the total tail plan amount, then simulating the construction of each candidate tail area according to the total tail plan amount, the estimated construction order and the estimated tailings volumes corresponding to each candidate tail area; taking each candidate tail area as a selected tail area, and obtaining the construction process height of each selected tail area during the simulated construction process.

[0077] In this embodiment, if there are G tail areas to be determined, the Gth tail area to be determined is determined as the pth candidate tail area, and the sum of the tailings volumes of the estimated tailings volumes corresponding to the 1st to pth candidate tail areas is greater than or equal to the total tail area plan, then according to the estimated stacking order and the estimated tailings volumes corresponding to each candidate tail area, the tailings corresponding to the total tail area plan are used to simulate the stacking of each candidate tail area. At this time, each candidate tail area is selected as a tail area, and the stacking process height of each selected tail area in the simulated stacking process is obtained respectively.

[0078] See also Figure 5 In a specific embodiment, step S104 includes steps S1041 to S1045, and each step is described in detail below.

[0079] Step S1041, traversing N selected tail regions in sequence according to the order in which each selected tail region is obtained, where N≥1.

[0080] In this embodiment, all selected tail regions (N selected tail regions, N≥1) are traversed in sequence according to the order in which each selected tail region is acquired.

[0081] Step S1042, when traversing to the kth selected tail area, take at least one elevation segment that is smaller than the height of the stacking process among all equidistant elevation segments corresponding to the kth selected tail area as the elevation segment to be processed, 1≤k≤N; and calculate the sum of the volumes of all the elevation segments to be processed to obtain the sum value of the elevation segment volume.

[0082] In this embodiment, when traversing to the kth selected tail area, among all the equidistant elevation segments corresponding to the kth selected tail area, at least one elevation segment below the stacking process height in the kth selected tail area is taken as the elevation segment to be processed; and the sum of the volumes of all the elevation segments to be processed is calculated according to the shapes of each elevation segment to be processed to obtain the sum value of the elevation segment volume.

[0083] Step S1043, if k=1, the flood control storage capacity corresponding to the height of the stacking process in the kth selected tail area is determined according to the current elevation flood control storage capacity table; if k>1, the flood control storage capacity corresponding to the height of the stacking process in the kth selected tail area is determined according to the estimated flood control storage capacity corresponding to the k-1th selected tail area.

[0084] In this embodiment, if the current traversal is to the first selected tail area, the flood control storage capacity corresponding to the height of the stacking process in the first selected tail area is queried by difference in the current elevation flood control storage capacity table; if the current traversal is to the kth selected tail area, and k>1, the flood control storage capacity corresponding to the height of the stacking process in the k-1th selected tail area is queried by difference in the estimated flood control storage capacities corresponding to different stacking process heights in the k-1th selected tail area.

[0085] Step S1044, taking the difference between the flood control reservoir capacity and the volume sum of the elevation segments as the estimated flood control reservoir capacity corresponding to the height of the stacking process in the kth selected tail area.

[0086] In this embodiment, the flood control reservoir capacity corresponding to the height of the stacking process in the kth selected tail area is subtracted from the volume and value of the equidistant elevation segments below the height of the stacking process to obtain the estimated flood control reservoir capacity corresponding to the height of the stacking process in the kth selected tail area.

[0087] It should be noted that this process is a gradual deduction process, and each time the deduction is the part of the water storage capacity that has lost due to stacking or transformation. Through such calculations, it can be ensured that the remaining flood control storage capacity of the tailings pond can be accurately known at any stage, so as to reasonably plan and manage the water storage and use of the tailings pond in the future.

[0088] Step S1045, taking the estimated flood control storage capacity corresponding to the height of the stacking process in the Nth selected row tail area as the final estimated flood control storage capacity.

[0089] In this embodiment, the estimated flood control storage capacity corresponding to the height of the stacking process in the last selected tail area will no longer be reduced due to subsequent tailings stacking. The estimated flood control storage capacity corresponding to the height of the stacking process in the last selected tail area will be used as the final estimated flood control storage capacity. The final estimated flood control storage capacity at this time is the remaining storage capacity available for flood control after all planned stacking activities of the tailings pond are completed.

[0090] For example, for the sub-dam, compaction area, slag discharge area and flood control water accumulation area of ​​the four-sided dry storage tailings pond, when the first tailings discharge area to be determined is the compaction area, based on the existing dam top elevation h Calculate the target lowest point elevation of the rolling area based on the spatial parameters of the rolling area The calculation formula is as follows: , where is the width of the rolling area in the rolling area space parameters, It is the slope ratio of the rolling area in the spatial parameters of the rolling area.

[0091] Furthermore, if the target lowest point elevation of the rolling area is Greater than the current lowest elevation of the rolling area , then the judgment will be turned to the second tail area (slag discharge area) to be judged. If the target lowest point elevation of the rolling area is Greater than the current lowest elevation of the rolling area , the rolling area is taken as the candidate tailing area; and the volume of tailings piled corresponding to the rolling area is calculated , and determine the volume of tailings corresponding to the rolling area Is it greater than the total amount of the tail plan? ; If the volume of tailings piled corresponding to the rolling area If the tailing volume M is greater than or equal to the total tailing volume, then the candidate tailing area is only the rolling area, and the judgment of other tailing areas to be judged is stopped; if the tailing volume corresponding to the rolling area is If it is less than the total tailings plan M, the judgment will be transferred to the second tailings area to be judged (slag discharge area). Among them, the volume of tailings piled corresponding to the rolling area is The calculation formula is: , where It is the length of the rolling area in the rolling area space parameters.

[0092] Furthermore, when judging the second tail discharge area (slag discharge area), based on the current dam top elevation h Calculate the target lowest elevation of the slag discharge area based on the spatial parameters of the slag discharge area The calculation formula is as follows: , where is the width of the slag discharge area in the slag discharge area space parameters, It is the slope ratio of the slag discharge area in the spatial parameters of the slag discharge area.

[0093] Furthermore, if the target lowest point elevation of the slag discharge area is Greater than the current lowest elevation of the slag discharge area , then the judgment will be transferred to the third tail area to be judged (flood control water accumulation area). Greater than the current lowest elevation of the slag discharge area , then the slag discharge area is taken as the candidate tailings discharge area; and the volume of tailings piled corresponding to the slag discharge area is calculated , and determine the volume of tailings corresponding to the slag discharge area The volume of tailings piled corresponding to the rolling area Is the sum of the values ​​greater than the total amount of the tail plan? ; If the volume of tailings piled in the slag discharge area is The volume of tailings piled corresponding to the rolling area The sum of ) is greater than or equal to the total tailing plan M, then the candidate tailing areas are only the rolling area and the slag discharge area, and the judgment of other tailing areas to be judged is stopped. At this time, the estimated stacking order is the rolling area and the slag discharge area; if the tailings volume corresponding to the slag discharge area The volume of tailings piled corresponding to the rolling area The sum of ) is less than the total tailings plan M, then the judgment will be transferred to the third tailings area to be judged (flood control and accumulation area). Among them, the volume of tailings piled corresponding to the slag discharge area is The calculation formula is: , where It is the length of slag discharge area in the slag discharge area space parameters.

[0094] Furthermore, when judging the third tail area to be judged (flood control and accumulation area), the target lowest point elevation of the slag discharge area is Subtract the step height to get the target lowest point elevation of the flood control and waterlogging area .

[0095] Furthermore, if the target lowest point elevation of the floodplain is adjusted Greater than the current lowest elevation of the flood control waterlogging area , then there is no need to perform tail discharge for the third tail discharge area (flood control waterlogging area). Greater than the current lowest elevation of the flood control waterlogging area , the flood control waterlogging area is taken as the candidate tailing area; and the volume of tailings piled corresponding to the flood control waterlogging area is calculated , and determine the volume of tailings piled corresponding to the flood control and accumulation area , the volume of tailings piled corresponding to the slag discharge area The volume of tailings piled corresponding to the rolling area Is the sum of the values ​​greater than the total amount of the tail plan? ; If the volume of tailings piled up in the flood control area , the volume of tailings piled corresponding to the slag discharge area The volume of tailings piled corresponding to the rolling area The sum of ) is greater than or equal to the total tailings volume M, then the estimated order of stacking in the candidate slag discharge area is the rolling area, slag discharge area and flood control water accumulation area; if the tailings volume corresponding to the flood control water accumulation area is , the volume of tailings piled corresponding to the slag discharge area The volume of tailings piled corresponding to the rolling area The sum of ) is less than the total tailings discharge plan M, the sub-dam area of ​​the tailings pond is used as the initial tailings discharge area. At this time, the estimated stacking order of the candidate slag discharge area is still the rolling area, slag discharge area and flood control water accumulation area, but the simulated stacking order in the subsequent simulation stacking process is the sub-dam area, rolling area, slag discharge area and flood control water accumulation area. Among them, the tailings volume corresponding to the flood control water accumulation area is The calculation formula is: , where It is the length of the flood control waterlogging area in the spatial parameters of the flood control waterlogging area.

[0096] Furthermore, if the selected tail area is the sub-dam area, rolling area, slag discharge area and flood control water accumulation area in sequence, the selected tail area after each construction is divided into zones and discretized. Specifically, for the construction area of ​​the sub-dam area, it is discretized into multiple equidistant elevation segments with the same height difference from the dam bottom to the dam top; for the construction areas of the rolling area and the slag discharge area, the longitudinal section is divided into multiple different calculation areas, and each area is longitudinally discretized into multiple equidistant elevation segments with the same height difference; the flood control water accumulation area is discretized into multiple equidistant elevation segments with the same height difference from the reservoir bottom to the top of the flood control water accumulation area. Among them, please refer to Figure 6 The compacted area after piling can be divided into areas ①, ②, and ③ according to horizontal lines.

[0097] For example, the construction area of ​​the sub-dam and the construction area of ​​the flood control and water accumulation area are discretized longitudinally, with a height difference of 0.1m in each elevation segment; the rolling area is divided into three calculation areas, and the slag discharge area is divided into four calculation areas, and each area is discretized into equidistant elevation segments.

[0098] Furthermore, for the sub-dam area, the longitudinal section area of ​​each equidistant elevation segment is calculated according to the trapezoidal section calculation formula; the volume of each equidistant elevation segment is obtained by multiplying the longitudinal section area of ​​each equidistant elevation segment by the sum of the lengths of the dam axis; the sum of the volumes of all elevation segments below the stacking process height is calculated; the flood control storage capacity corresponding to the stacking process height is obtained by looking up or interpolating from the list of existing elevation flood control storage capacity; the estimated flood control storage capacity corresponding to the stacking process height is deducted from the sum of the volumes of all elevation segments below the stacking process height from the flood control storage capacity corresponding to the stacking process height; and the elevation-estimated flood control storage capacity list 1 is formed according to the estimated flood control storage capacity corresponding to different stacking process heights.

[0099] Furthermore, for the rolling area, the area of ​​each equidistant elevation segment longitudinal section is calculated using the area calculation formulas of trapezoidal section, triangular section, etc. according to the shape of each partition; the length of the rolling area is calculated according to the following formula: , where is the length of the dam axis. For a dry-stack tailings pond with four sides, L is the total length of the dam axis on all four sides, in meters. is the total length of the rolling area, unit (m); The distance from the midpoint of the compaction area to the dam axis, in meters; the volume of each equidistant elevation segment is obtained by multiplying the longitudinal section area of ​​each equidistant elevation segment by the total length of the compaction area; the sum of the volumes of all elevation segments below the stacking process height is calculated; the flood control storage capacity corresponding to the stacking process height is obtained by checking or interpolating from the elevation-estimated flood control storage capacity list 1; the estimated flood control storage capacity corresponding to the stacking process height is obtained by subtracting the sum of the volumes of all elevation segments below the stacking process height from the flood control storage capacity corresponding to the stacking process height. The elevation-estimated flood control storage capacity list 2 is obtained based on the estimated flood control storage capacity corresponding to different stacking process heights.

[0100] Furthermore, for the slag discharge area, the calculation steps for the sum of the volumes of all elevation sections below the stacking process height in the slag discharge area are the same as those for the rolling area. The flood control reservoir capacity corresponding to the stacking process height is obtained by querying or interpolating from the elevation-estimated flood control reservoir capacity list 2; the estimated flood control reservoir capacity corresponding to the stacking process height is deducted from the sum of the volumes of all elevation sections below the stacking process height, which is the estimated flood control reservoir capacity corresponding to the stacking process height. According to the estimated flood control reservoir capacity corresponding to different stacking process heights, the elevation-estimated flood control reservoir capacity list 3 is obtained.

[0101] Furthermore, for the flood control water storage area, the calculation steps for the sum of the volumes of all elevation sections below the stacking process height in the flood control water storage area are the same as those for the sub-dam area. The flood control storage capacity corresponding to the stacking process height is obtained by querying or interpolating from the elevation-estimated flood control storage capacity list 3; the estimated flood control storage capacity corresponding to the stacking process height is deducted from the sum of the volumes of all elevation sections below the stacking process height from the flood control storage capacity corresponding to the stacking process height. The elevation-estimated flood control storage capacity list 4 is obtained based on the estimated flood control storage capacity corresponding to different stacking process heights.

[0102] Furthermore, the elevation-estimated flood control storage capacity list 4 is used as the final estimated flood control storage capacity of the four-sided dry storage tailings pond. Figure 7 shown.

[0103] In a specific embodiment, the method also includes: based on the water balance formula, calculating the maximum flood level of the tailings pond according to the tailings pond flood process, discharge process and estimated flood control storage capacity; calculating the flood operation control parameters according to the maximum flood level; and calculating the normal operation control parameters according to the flood operation control parameters.

[0104] In this embodiment, the flood control parameters include normal operation control parameters (flood control height, reservoir water level control, flood control width control, flood regulation height control, and average storage slope ratio control, etc.) and flood operation control parameters (safety overheight and minimum flood control width, etc.).

[0105] Specifically, the tailings pond flood process is calculated based on the tailings pond design documents and the current situation information in the current situation map. , calculate the tailings pond discharge process based on the tailings pond flood discharge system parameters The highest flood level of the tailings pond is calculated based on the water balance formula according to the tailings pond flood process, discharge process and estimated flood control storage capacity.

[0106] It should be noted that when calculating the water consumption balance formula, the discharge flow at the beginning of the period is and the estimated flood control storage capacity at the beginning of the period Adjust water level from If the lowest point in the reservoir is lower than the inlet elevation of the flood discharge structure in the reservoir, the water level will be adjusted. Take the elevation of the flood discharge structure inlet; if the lowest point in the reservoir is higher than the elevation of the flood discharge structure inlet, the water level should be adjusted. Take the lowest point elevation in the warehouse. Depend on Through the drainage process Obtained by lookup or interpolation. Depend on It can be obtained through checking or interpolation of the final estimated flood control reservoir capacity.

[0107] Furthermore, the flood operation control parameters, safety superelevation and minimum flood control width are calculated through the highest flood level. The calculation formulas for safety superelevation and minimum flood control width are as follows:

[0108] ;

[0109]

[0110] In the formula, is the planned dam elevation, unit (m); is the highest flood level, unit (m); is the safety margin value, unit (m); is the safety super height, unit (m); is the minimum flood control width, unit (m); is the elevation of the highest point in the rolling area, unit (m); The highest point elevation of the flood-adjusting area, unit (m); is the average slope ratio in the reservoir; is the distance between the flood control and accumulation area and the inner slope angle of the sub-dam, unit (m); , and The meanings are the same as before, namely the sub-dam width, upstream slope ratio and downstream slope ratio of the dam body.

[0111] Furthermore, by comparing the relevant specifications and design documents, the flood operation safety superelevation and the minimum flood control width are determined. The calculation formula is as follows:

[0112]

[0113]

[0114] In the formula, and They are safety overheight required by the specification and design, in meters. and They are the flood control widths required by the specification and design, in meters. is the flood operation safety overheight, unit (m); Minimum flood protection width for flood operation, m.

[0115] Furthermore, the flood control height for normal operation of the tailings pond, the elevation of the water inlet of the flood discharge structure, the flood control width, the flood control height and the average stockpile slope ratio are determined according to the flood operation safety superelevation, the minimum flood control width and the highest flood level. The calculation formula is as follows:

[0116] , , ,

[0117]

[0118] In the formula, is the flood control height, unit (m); is the flood control height, unit (m); To control the elevation of the water inlet of the flood discharge structure, unit (m); To control the flood control width, unit (m); To control the average stockpile slope ratio, the other symbols have the same meanings as before.

[0119] Demonstratively, the calculated highest flood level is 22.22m. Further calculations show that the safe overheight of the tailings pond during flood operation is 3.58m, and the minimum flood control width is 159.2m. During normal operation, the flood control height is 4.78m, and the elevation of the water inlet of the flood discharge structure is controlled at 21.02m. The flood control width is controlled at 159.2m, and the average stockpile slope ratio is controlled at 3%.

[0120] The flood control storage capacity estimation method for a dry-type tailings pond proposed in the present embodiment determines a candidate tail discharge area from the tail discharge area of ​​the tailings pond according to the current status information, design information and tail discharge information of the tailings pond, and simulates the stacking of the candidate tail discharge area according to the tailings pond information, thereby determining the selected tail discharge area required in the tailings pond plan and the stacking information of the selected tail discharge area after the planned stacking, and then estimates the flood control storage capacity based on the selected tail discharge area and its construction information, so as to obtain the estimated flood control storage capacity suitable for the expected plan.

[0121] Example 2

[0122] In addition, the present disclosure provides a flood control storage capacity estimation device 800 for a dry tailings storage pond, see Figure 8 , the device comprises:

[0123] A determination module 801 is used to determine at least one candidate tail area and an estimated stacking order of each candidate tail area in each tail area of ​​the tailings pond according to the tailings pond information, and calculate the estimated stacking tailings volume corresponding to each candidate tail area according to the spatial parameters of each candidate tail area, wherein the tailings pond information includes current status information, design information and tailings information;

[0124] A stacking module 802 is used to simulate the stacking of each candidate tailing area according to the estimated stacking sequence and the estimated tailings volume, and obtain at least one selected tailing area and its stacking process height during the simulated stacking process;

[0125] Discrete module 803, used for discretizing the longitudinal section of each selected row tail area after stacking into a plurality of equidistant elevation segments;

[0126] The estimation module 804 is used to calculate the estimated flood control storage capacity of the stacking process height in each selected tail area according to the acquisition order of each selected tail area, the volume of the equidistant elevation segments corresponding to each selected tail area and the current elevation flood control storage capacity table, and obtain the final estimated flood control storage capacity based on the estimated flood control storage capacity of the stacking process height in each selected tail area.

[0127] Optionally, the determination module 801 is also used to obtain the current dam top elevation and the spatial parameters of each tail area according to the current information and the design information, and obtain the total tail plan according to the tail information; determine the target order according to the design information; determine the i-th tail area to be determined from each tail area according to the target order, i≥1; obtain the target lowest point elevation of the i-th tail area to be determined according to the current dam top elevation and the spatial parameters of the i-th tail area to be determined; obtain the current lowest point elevation of the i-th tail area to be determined according to the current information; if the target lowest point elevation is greater than the current lowest point elevation, then the i-th tail area to be determined is used as the j-th candidate tail area, j≥1; and calculate the estimated tailings volume of the j-th candidate tail area according to the spatial parameters of the j-th candidate tail area; if the target lowest point elevation is less than or equal to the current lowest point elevation, execute the step of determining the i+1-th tail area to be determined from each tail area according to the target order; and the order of each candidate tail area is used as the estimated stacking order.

[0128] Optionally, determination module 801 is also used to determine the tailings volume and value of the estimated tailings volume corresponding to the 1st to jth candidate tail-end areas; if the tailings volume and value are less than the total tail-end plan amount, the step of determining the i+1th tail-end area to be determined from each tail-end area according to the target order is executed; if the tailings volume and value are greater than or equal to the total tail-end plan amount, the step of determining the i+1th tail-end area to be determined from each tail-end area according to the target order is stopped.

[0129] Optionally, the determination module 801 is further configured to use the sub-dam area of ​​the tailings pond as the initial tailings discharge area if the sum of the tailings volumes of the estimated tailings volumes corresponding to all candidate tailings discharge areas is less than the total tailings discharge plan;

[0130] The stacking module 802 is also used to obtain the designed sub-dam stacking height according to the design information, simulate the stacking of the initial tail area according to the designed sub-dam stacking height, and determine the initial stacking tailings volume corresponding to the initial tail area after stacking; determine the remaining stacking tailings volume according to the total tailings plan and the initial stacking tailings volume; simulate the stacking of each candidate tail area according to the remaining stacking tailings volume, the estimated stacking sequence and the estimated stacking tailings volume corresponding to each candidate tail area, so as to obtain at least one selected tail area and its stacking process height from the initial tail area and each candidate tail area.

[0131] Optionally, the stacking module 802 is also used to simulate the stacking of each candidate tail area according to the total tail plan amount, the estimated stacking order and the estimated tailings volume corresponding to each candidate tail area if the sum of the estimated stacking tailings volumes corresponding to all candidate tail areas is greater than or equal to the total tail plan amount; take each candidate tail area as a selected tail area, and obtain the stacking process height of each selected tail area during the simulated stacking process.

[0132] Optionally, the estimation module 804 is further used to traverse N selected tail areas in sequence according to the acquisition order of each selected tail area, N≥1; when traversing to the kth selected tail area, at least one elevation segment that is less than the height of the stacking process among all equidistant elevation segments corresponding to the kth selected tail area is used as the elevation segment to be processed, 1≤k≤N; and the sum of the volumes of all the elevation segments to be processed is calculated to obtain the sum of the elevation segment volumes; if k=1, the flood control storage capacity corresponding to the height of the stacking process in the kth selected tail area is determined according to the current elevation flood control storage capacity table; if k>1, the flood control storage capacity corresponding to the height of the stacking process in the kth selected tail area is determined according to the estimated flood control storage capacity corresponding to the k-1th selected tail area; the difference between the flood control storage capacity and the sum of the elevation segment volumes is used as the estimated flood control storage capacity corresponding to the height of the stacking process in the kth selected tail area; the estimated flood control storage capacity corresponding to the height of the stacking process in the Nth selected tail area is used as the final estimated flood control storage capacity.

[0133] Optionally, the device includes a calculation module for calculating the maximum flood level of the tailings pond based on a water balance formula, according to the tailings pond flood process, discharge process and estimated flood control storage capacity; calculating flood operation control parameters based on the maximum flood level; and calculating normal operation control parameters based on the flood operation control parameters.

[0134] Optionally, the determination module 801 is further used to obtain the current water level elevation of the tailings pond according to the current information; and obtain the current elevation flood control reservoir capacity table according to the current water level elevation and the current dam top elevation.

[0135] The device provided in the embodiment of the present disclosure can execute the steps of the method for estimating the flood control storage capacity of the dry storage tailings pond provided in Example 1, which will not be described again to avoid repetition.

[0136] Example 3

[0137] In addition, the embodiment of the present disclosure provides a computer device, including a memory and a processor, the memory stores a computer program, and when the computer program is executed by the processor, the method for estimating the flood control storage capacity of a dry storage tailings pond of Example 1 is implemented. The device provided by the embodiment of the present disclosure can execute the steps of the method for estimating the flood control storage capacity of a dry storage tailings pond provided in Example 1, and will not be described again to avoid repetition.

[0138] Example 4

[0139] The disclosed embodiment provides a computer-readable storage medium storing a computer program. When the computer program is executed by a processor, the method for estimating the flood control storage capacity of a dry-type tailings pond of the embodiment 1 is implemented.

[0140] In this embodiment, the computer-readable storage medium may be a read-only memory (ROM), a random access memory (RAM), a magnetic disk or an optical disk, etc. The computer-readable storage medium provided in this embodiment can implement the method for estimating the flood control storage capacity of the dry storage tailings pond provided in Example 1, and will not be described in detail here to avoid repetition.

[0141] In all examples shown and described herein, any specific value should be interpreted as being merely exemplary and not limiting, and therefore, other examples of the exemplary embodiments may have different values. It should be noted that similar reference numerals and letters represent similar items in the following figures, and therefore, once an item is defined in one figure, it does not need to be further defined and explained in subsequent figures. The above embodiments only express several implementation methods of the present invention, and their descriptions are more specific and detailed, but they cannot be understood as limiting the scope of the present invention. It should be pointed out that, for those of ordinary skill in the art, without departing from the concept of the present invention, several variations and improvements can also be made, and these all belong to the protection scope of the present invention.

Claims

1. A method for estimating flood control storage capacity of a dry tailings pond, characterized in that: The method comprises: Determine at least one candidate tailing area and an estimated stacking order of each candidate tailing area in each tailing area of ​​the tailings pond according to the tailings pond information, and calculate the estimated stacking tailings volume corresponding to each candidate tailing area according to the spatial parameters of each candidate tailing area, wherein the tailings pond information includes current status information, design information and tailings information; Simulate the stacking of each candidate tailing area according to the estimated stacking sequence and the estimated stacking tailings volume, and obtain at least one selected tailing area and its stacking process height during the simulated stacking process; Discrete the longitudinal section of each selected row tail area after stacking into a plurality of equidistant elevation segments; Calculate the estimated flood control storage capacity at the height of the stacking process in each selected tail area according to the acquisition order of each selected tail area, the volume of the equidistant elevation segment corresponding to each selected tail area and the flood control storage capacity table at the current elevation, and obtain the final estimated flood control storage capacity according to the estimated flood control storage capacity at the height of the stacking process in each selected tail area; The method of simulating the stacking of each candidate tailing area according to the estimated stacking sequence and the estimated stacking tailings volume, and obtaining at least one selected tailing area and its stacking process height in the simulated stacking process, comprises: If the sum of the estimated tailings volumes corresponding to all the candidate tail areas is greater than or equal to the total tail plan, then simulate the tailings construction for each candidate tail area according to the total tail plan, the estimated construction sequence and the estimated tailings volumes corresponding to each candidate tail area; Each of the candidate tail regions is used as the selected tail region, and the stacking process height of each of the selected tail regions in the simulated stacking process is obtained respectively.

2. The method for estimating flood control storage capacity of a dry tailings pond according to claim 1, characterized in that: The method of determining at least one candidate tail area and an estimated stacking order of each candidate tail area in each tail area of ​​the tailings pond according to the tailings pond information, and calculating the estimated stacking tailings volume corresponding to each candidate tail area according to the spatial parameters of each candidate tail area, includes: According to the current information and the design information, the current dam crest elevation and the spatial parameters of each tail area are obtained, and according to the tail information, the total tail plan amount is obtained; determining a target sequence according to the design information; Determine the i-th tail area to be determined from each tail area according to the target order, i≥1; Obtaining the target lowest point elevation of the i-th tail area to be determined according to the current dam top elevation and the spatial parameters of the i-th tail area to be determined; According to the current status information, the current lowest point elevation of the i-th tail area to be determined is obtained; If the target lowest point elevation is greater than the current lowest point elevation, the i-th tail area to be determined is taken as the j-th candidate tail area, j≥1; and the estimated tailings volume of the j-th candidate tail area is calculated according to the spatial parameters of the j-th candidate tail area; If the target lowest point elevation is less than or equal to the current lowest point elevation, the step of determining the i+1th tail area to be determined from each tail area according to the target order is executed; and the order of each candidate tail area is used as the estimated stacking order.

3. The method for estimating flood control storage capacity of a dry tailings pond according to claim 2, characterized in that: After calculating the estimated tailings volume of the j-th candidate tail area according to the spatial parameters of the j-th candidate tail area, the method further comprises: Determine the tailings volume and value of the estimated tailings volume corresponding to the first to jth candidate tailings areas; If the tailings volume and value are less than the total tailings plan, then executing the step of determining the i+1th tailing area to be determined from each tailing area according to the target sequence; If the tailings volume and value is greater than or equal to the total tailings plan amount, the step of determining the i+1th tailing area to be determined from each tailing area according to the target sequence is stopped.

4. The method for estimating flood control storage capacity of a dry tailings pond according to claim 1, characterized in that: The method further comprises: If the sum of the estimated tailings volumes corresponding to all the candidate tailings discharge areas is less than the total tailings discharge plan, the sub-dam area of ​​the tailings pond is used as the initial tailings discharge area; The method of simulating the stacking of each candidate tailing area according to the estimated stacking sequence and the estimated stacking tailings volume, and obtaining at least one selected tailing area and its stacking process height in the simulated stacking process, comprises: Acquire a designed sub-dam stacking height according to the design information, simulate stacking the initial tailings area according to the designed sub-dam stacking height, and determine an initial stacking tailings volume corresponding to the initial tailings area after stacking; Determine the remaining tailings volume according to the total tailings discharge plan and the initial tailings volume; According to the remaining tailings volume, the estimated stacking order and the estimated tailings volume corresponding to each candidate tail area, simulated stacking is performed on each candidate tail area to obtain at least one selected tail area and its stacking process height from the initial tail area and each candidate tail area.

5. The method for estimating flood control storage capacity of a dry tailings pond according to claim 4, characterized in that: The method of calculating the estimated flood control storage capacity of the stacking process height in each selected tail area according to the acquisition order of each selected tail area, the volume of the equidistant elevation segment corresponding to each selected tail area and the flood control storage capacity table of the current elevation, and obtaining the final estimated flood control storage capacity according to the estimated flood control storage capacity of the stacking process height in each selected tail area, includes: According to the acquisition order of each selected tail area, traverse N selected tail areas in sequence, where N≥1; When traversing to the kth selected tail area, at least one elevation segment smaller than the height of the stacking process among all the equidistant elevation segments corresponding to the kth selected tail area is taken as the elevation segment to be processed, 1≤k≤N; and the sum of the volumes of all the elevation segments to be processed is calculated to obtain the sum value of the elevation segment volume; If k=1, the flood control storage capacity corresponding to the stacking process height in the kth selected tail area is determined according to the current elevation flood control storage capacity table; if k>1, the flood control storage capacity corresponding to the stacking process height in the kth selected tail area is determined according to the estimated flood control storage capacity corresponding to the k-1th selected tail area; The difference between the flood control storage capacity and the volume sum of the elevation sections is used as the estimated flood control storage capacity corresponding to the height of the stacking process in the kth selected tail area; The estimated flood control storage capacity corresponding to the height of the stacking process in the Nth selected tail area is used as the final estimated flood control storage capacity.

6. The method for estimating flood control storage capacity of a dry tailings pond according to claim 1, characterized in that: The method further comprises: Based on the water balance formula, the highest flood level of the tailings pond is calculated according to the flood process, discharge process and estimated flood control storage capacity of the tailings pond; Calculate flood operation control parameters according to the highest flood level; The normal operation control parameters are calculated based on the flood operation control parameters.

7. A flood control storage capacity estimation device for a dry tailings storage pond, characterized in that: The device comprises: A determination module is used to determine at least one candidate tail area and an estimated stacking order of each candidate tail area in each tail area of ​​the tailings pond according to the tailings pond information, and calculate the estimated stacking tailings volume corresponding to each candidate tail area according to the spatial parameters of each candidate tail area, wherein the tailings pond information includes current status information, design information and tailings information; A stacking module, used for simulating the stacking of each candidate tailing area according to the estimated stacking sequence and the estimated stacking tailings volume, and obtaining at least one selected tailing area and its stacking process height during the simulated stacking process; A discrete module is used to discretize the longitudinal section of each selected row tail area after stacking into multiple equidistant elevation segments; An estimation module is used to calculate the estimated flood control storage capacity of the stacking process height in each selected tail area according to the acquisition order of each selected tail area, the volume of the equidistant elevation segment corresponding to each selected tail area and the flood control storage capacity table of the current elevation, and obtain the final estimated flood control storage capacity according to the estimated flood control storage capacity of the stacking process height in each selected tail area; The stacking module is also used to simulate the stacking of each candidate tail area according to the total tail plan amount, the estimated stacking order and the estimated tailings volume corresponding to each candidate tail area if the sum of the estimated stacking tailings volumes corresponding to all the candidate tail areas is greater than or equal to the total tail plan amount; use each candidate tail area as the selected tail area, and obtain the stacking process height of each selected tail area during the simulated stacking process.

8. A computer device, characterized in that: It comprises a memory and a processor, the memory stores a computer program, and when the computer program is executed by the processor, the method for estimating the flood control storage capacity of a dry storage tailings pond as described in any one of claims 1 to 6 is implemented.

9. A computer-readable storage medium, characterized in that: It stores a computer program, which, when executed by a processor, implements the method for estimating the flood control storage capacity of a dry storage tailings pond as described in any one of claims 1 to 6.