Engineering construction project design data management system

By using AI technology to classify and manage access to design data, the system addresses the security deficiencies of existing systems, achieving efficient and secure design data management and improving the overall efficiency and security of engineering construction projects.

CN118886679APending Publication Date: 2024-11-01XIONGAN URBAN PLANNING & DESIGN RES INST CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411220984.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-02
Publication Date
2024-11-01

AI Technical Summary

Technical Problem

Existing design data management systems lack security and cannot effectively distinguish the importance of large amounts of data, resulting in a heavy workload and low efficiency.

Method used

AI recognition technology is used for data classification. Combined with data storage, data sorting and user management modules, and through access control and data scoring mechanisms, intelligent management and secure storage of design materials are achieved.

Benefits of technology

It improved the security and efficiency of the design data management system, ensured rapid access and management of important data, reduced labor costs and resource consumption, and enhanced the overall work efficiency and security of engineering construction projects.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118886679A_ABST
    Figure CN118886679A_ABST
Patent Text Reader

Abstract

The invention provides an engineering construction project design data management system. The engineering construction project design data management system comprises a user management module, and a data storage module, a data sorting module and a data management module which are connected with the user management module, the data sorting module and the data management module are both connected with the data storage module; the classification module is used for automatically identifying to-be-input data by utilizing an AI identification technology to obtain classified data, the data storage module is used for storing the classified data, and the data sorting module is used for sorting the latest archiving time of the data in the data storage module and storing the sorted data in the data storage module. The data management module is used for uploading design data and querying project information and project attachment information, and the user management module is used for opening a permission account and monitoring the permission account; the permission account is used for accessing the design data in the data storage module. The problem that in the prior art, a summarized design data management system is insufficient in safety is solved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of data management, and in particular to a design data management system for an engineering construction project. Background Art

[0002] The existing design data management system involves all aspects of the design line, including design start, scheme design, preliminary design, construction coordination and other aspects of the design data. The design data management system can effectively manage and protect these data to avoid data loss, damage and leakage. However, the current design data management system has the problem of insufficient security, and when faced with a large amount of data, the data management system cannot distinguish the important data. A large amount of data is mixed together. If all data is encrypted with the same level of security during use, it will lead to a large workload and low efficiency of the system. If the security protection is reduced, the security will be reduced. Summary of the invention

[0003] In order to overcome the deficiencies of the prior art, the purpose of the present invention is to provide a design data management system for engineering construction projects, which solves the problem of insufficient security of the prior art summary design data management system.

[0004] To achieve the above object, the present invention provides the following solutions:

[0005] A design data management system for engineering construction projects, comprising:

[0006] A user management module and a data storage module, a data sorting module and a data management module all connected to the user management module;

[0007] The data sorting module and the data management module are both connected to the data storage module;

[0008] The classification module is used to use AI recognition technology to automatically identify the input data to obtain classified data, the data storage module is used to store the classified data, the data sorting module is used to sort the data in the data storage module by the most recent archiving time, the data management module is used to upload design data and query project information and project attachment information, the user management module is used to open an authorization account and monitor the authorization account; the authorization account is used to access the design data in the data storage module.

[0009] Preferably, the data management module includes:

[0010] A data upload submodule, a project attachment submodule and a project information submodule, all of which are connected to the user management module;

[0011] The data upload submodule is used to upload the design data to the data storage module, the project attachment submodule is used to query the project attachment information of the design data, and the project information submodule is used to query the project information of the design data, wherein the design data includes: project start-up data, scheme design data, preliminary design data, construction design briefing data, construction coordination data, design scheme summary data and target data.

[0012] Preferably, the user management module includes:

[0013] Account opening submodule and account monitoring submodule;

[0014] The account opening submodule is used for adding a new permission account, and the account monitoring submodule is used for monitoring the newly added permission account.

[0015] Preferably, it also includes:

[0016] The application interface module is connected to the user management module and is used to provide multiple interfaces and verify the request instructions for accessing the interfaces; the interface is used to receive external request instructions.

[0017] Preferably, the application interface module includes:

[0018] An external interface submodule, an account verification submodule and an alarm submodule, all of which are connected to the user management module;

[0019] The external interface submodule is used to provide multiple interfaces, the account verification submodule is used to verify the request instructions connected to each external interface, and the alarm submodule is used to issue an alarm.

[0020] Preferably, the data uploading submodule includes:

[0021] A project startup data upload unit, a scheme design data upload unit, a preliminary design data upload unit, a construction design briefing data upload unit, a construction coordination data upload unit, a design scheme summary data upload unit and a target data upload unit, all of which are connected to the data storage module;

[0022] The project startup data uploading unit is used to upload the project startup data to the data storage module, the scheme design data uploading unit is used to upload the scheme design data to the data storage module, the preliminary design data uploading unit is used to upload the preliminary design data to the data storage module, the construction design briefing data uploading unit is used to upload the construction design briefing data to the data storage module, the construction coordination data uploading unit is used to upload the construction coordination data to the data storage module, the design scheme summary data uploading unit is used to upload the design scheme summary data to the data storage module, and the target data uploading unit is used to upload the target data to the data storage module.

[0023] Preferably, the data storage module comprises:

[0024] A data scoring submodule, a unidirectional storage submodule, and a bidirectional storage submodule, all of which are connected to the user management module;

[0025] The data scoring submodule is used to score the classified data to obtain information data for each score segment, and divide the information data for each score segment into primary data and secondary data according to a preset score threshold; the unidirectional storage submodule is used to perform unidirectional storage on the primary data, and the bidirectional storage submodule is used to perform bidirectional storage on the secondary data.

[0026] Preferably, the data scoring submodule includes:

[0027] a score evaluation unit, a score threshold setting unit, and a division unit;

[0028] The score evaluation unit is used to perform score evaluation on the classified data to obtain information data of each score segment, the score threshold setting unit is used to manually input the score threshold, and the division unit is used to divide the information data of each score segment into primary data and secondary data according to the input score threshold.

[0029] According to the specific embodiments provided by the present invention, the present invention discloses the following technical effects:

[0030] The present invention provides a design data management system for engineering construction projects, comprising: a user management module and a data storage module, a data sorting module and a data management module all connected to the user management module; the data sorting module and the data management module are both connected to the data storage module; the data storage module is used to store classified data, the data sorting module is used to sort the data in the data storage module by the most recent archiving time, the data management module is used to upload design data and query project information and project attachment information, the user management module is used to open an authority account and monitor the authority account; the authority account is used to access the design data in the data storage module, and the present invention improves the security of the data management system by monitoring the authority account. BRIEF DESCRIPTION OF THE DRAWINGS

[0031] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative labor.

[0032] Figure 1 A schematic diagram of the structure of a construction project design data management system provided by an embodiment of the present invention;

[0033] Figure 2 A screening schematic diagram provided for an embodiment of the present invention;

[0034] Figure 3 A schematic diagram of project classification provided by an embodiment of the present invention;

[0035] Figure 4 A schematic diagram of data uploading provided in an embodiment of the present invention;

[0036] Figure 5 A schematic diagram of uploading data during the design startup phase provided by an embodiment of the present invention;

[0037] Figure 6 A schematic diagram of uploading data in the solution design stage and the preliminary design stage provided in an embodiment of the present invention;

[0038] Figure 7 A schematic diagram of uploading data during the construction drawing design and design briefing stages provided by an embodiment of the present invention;

[0039] Figure 8 A schematic diagram of uploading data during the construction coordination phase provided by an embodiment of the present invention;

[0040] Fig. 9A schematic diagram of uploading data in the project design summary stage provided by an embodiment of the present invention;

[0041] Fig.10 A schematic diagram for viewing attachments provided in an embodiment of the present invention;

[0042] Fig.11 A schematic diagram for viewing basic project information provided by an embodiment of the present invention;

[0043] Fig.12 A schematic diagram of viewing a project tree provided in an embodiment of the present invention;

[0044] Fig.13 A schematic diagram of a user management module provided in an embodiment of the present invention;

[0045] Fig.14 A schematic diagram of a database provided by an embodiment of the present invention.

[0046] Description of reference numerals:

[0047] 1-User management module, 2-Data storage module, 3-Data sorting module, 4-Data management module, 5-Classification module. DETAILED DESCRIPTION

[0048] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0049] The purpose of the present invention is to provide a design data management system for an engineering construction project, which solves the problem of insufficient security of the prior art summary design data management system.

[0050] In order to make the above-mentioned objects, features and advantages of the present invention more obvious and easy to understand, the present invention is further described in detail below with reference to the accompanying drawings and specific embodiments.

[0051] like Figure 1 As shown, the present invention provides a construction project design data management system, comprising:

[0052] A user management module 1 and a data storage module 2, a classification module 5, a data sorting module 3 and a data management module 4, all of which are connected to the user management module 1;

[0053] The data sorting module 3 and the data management module 4 are both connected to the data storage module 2;

[0054] The classification module is used to use AI recognition technology to automatically identify the input data to obtain classified data. The data storage module is used to store the classified data. The data sorting module 3 is used to sort the data in the data storage module 2 by the most recent archiving time. The data management module 4 is used to upload design data and query project information and project attachment information. The user management module 1 is used to open an authorization account and monitor the authorization account; the authorization account is used to access the design data in the data storage module 2.

[0055] Specifically, AI semantic recognition technology is used to classify design data. AI can help the system automatically identify important information in design data, such as project name, key requirements, related personnel, etc., and then classify the design data based on this information. Through AI semantic recognition, the system can accurately identify the importance of the data, quickly and effectively summarize and organize the data; use intelligent analysis technology to analyze the correlation between design data. Through technologies such as machine learning and data mining, the system can discover the correlation between design data and classify them accordingly. For example, the system can classify the design data according to similar features or correlation between them, so that the relevant data can be effectively integrated and managed; store the classified data in the system, and establish a corresponding data management mechanism. The system can store the data in the corresponding folders or databases according to the importance and relevance of the design data, so that users can access and manage these data more conveniently. At the same time, the system can also provide search and recommendation functions to help users quickly find the required data.

[0056] Specifically, through time sorting, users can quickly find and access the latest data. In engineering construction projects, the latest design data may have higher reference value or urgency, so time sorting can facilitate users to quickly obtain these data; time sorting can help users better perform version control. By placing the latest data in front, users can clearly understand the history of data changes, making it easier to compare and manage different versions of data.

[0057] Specifically, the computer hardware where the system is installed should be able to support operating systems such as Microsoft Windows XP, Microsoft Windows 7, Microsoft Windows 10, and Microsoft Windows 11.

[0058] Specifically, all the relevant resources of this system are cloud resources, and the data storage module 2 has its own independent elastic cloud host, elastic IP and database. Elastic Cloud Server (CT-ECS) is an elastic computing service, which consists of CPU, memory, image, and cloud hard disk. It is a computing server that can be obtained at any time, is ready to use, and can be elastically expanded.

[0059] Specifically, the homepage of the engineering construction project design data management provides a list of all projects and displays basic information of the projects. At the same time, multiple search and screening methods can be performed by project name, project construction unit, project leader, project start time, etc., and statistical forms of screened projects can be exported.

[0060] Figure 2 The options in the box can filter projects by project start and completion time. Click "Sort by Most Recent Archive Time" on the right side of the filter box to change the time sorting method. The default is to sort from recent to distant. Click to change to sort from distant to recent.

[0061] Furthermore, the data management module 4 includes:

[0062] A data upload submodule, a project attachment submodule and a project information submodule, all of which are connected to the user management module 1;

[0063] The data upload submodule is used to upload the design data to the data storage module 2, the project attachment submodule is used to query the project attachment information of the design data, and the project information submodule is used to query the project information of the design data, wherein the design data includes: project start-up data, scheme design data, preliminary design data, construction design briefing data, construction coordination data, design scheme summary data and target data.

[0064] Furthermore, the data uploading submodule includes:

[0065] A project startup data upload unit, a scheme design data upload unit, a preliminary design data upload unit, a construction design briefing data upload unit, a construction coordination data upload unit, a design scheme summary data upload unit and a target data upload unit, all of which are connected to the data storage module 2;

[0066] The project startup data uploading unit is used to upload the project startup data to the data storage module 2, the scheme design data uploading unit is used to upload the scheme design data to the data storage module 2, the preliminary design data uploading unit is used to upload the preliminary design data to the data storage module 2, the construction design briefing data uploading unit is used to upload the construction design briefing data to the data storage module 2, the construction coordination data uploading unit is used to upload the construction coordination data to the data storage module 2, the design scheme summary data uploading unit is used to upload the design scheme summary data to the data storage module 2, and the target data uploading unit is used to upload the target data to the data storage module 2.

[0067] Specifically, Figure 3 As shown in the figure, the project is divided into three levels. The first-level project is the entire project, the second-level project is the different divisions or phased construction projects of the entire project, and the phase project is the different bidding sections of the second-level project. In the project information management interface, click Figure 3 Click "View" under the "Operation" option on the right side of the corresponding project on the homepage to enter the corresponding project information management interface. It is divided into three sub-sections: "Information Upload", "Project Attachment", and "Project Basic Information".

[0068] Furthermore, Figure 4 As shown, the whole project process is divided into six stages: project initiation stage, scheme design stage, preliminary design stage, construction design and design briefing, construction stage coordination, design scheme summary, and seven sections of other relevant materials. Project information of the corresponding stage can be uploaded here.

[0069] like Figure 5 As shown, during the design start-up phase, the project start-up materials that need to be uploaded include the design plan, investment plan (including feasibility study report), design contract, design task book and briefing.

[0070] like Figure 6 As shown, when uploading scheme design materials and preliminary design materials, for the scheme design stage and preliminary design stage, you need to upload three documents: department review opinion form, expert review materials, and company decision-making documents of the corresponding stage.

[0071] like Figure 7 As shown, when uploading the construction design briefing materials, corresponding to the construction drawing design and design briefing stage, four materials need to be uploaded: department review opinion form, construction drawing review report, drawing review and design record sheet, and BIM model technical briefing.

[0072] like Figure 8 As shown, when uploading construction coordination materials, corresponding to the construction drawing stage coordination stage, two items of information need to be uploaded: the list of on-site designers and the design service site record sheet.

[0073] like Fig. 9 As shown, when uploading the design solution summary information, corresponding to the project design summary stage, the project design summary report needs to be uploaded.

[0074] Furthermore, Fig.10 As shown, you can view the project attachments in seven sections, which are previously uploaded in the data upload interface: project start-up phase, scheme design phase, preliminary design phase, construction design and design briefing, construction phase coordination, design scheme summary and other relevant materials.

[0075] like Fig.11 As shown, the basic information interface of the project can be used to register, change and view the basic information table of the project, including the name of the bidding section, bidding section code, construction unit, group project status, project type, linear engineering project (land occupation type), project area, area, sector, source of funds, planned investment (10,000 yuan), start time, completion time, supervisor, project leader, national key project, design unit contact person, design unit contact phone number, and design unit unit.

[0076] Specifically, Fig.12 As shown in the project tree interface, by clicking "View" under the "Project Tree" option on the right side of the corresponding sub-project on the homepage, you can enter the construction phases and time nodes of all sub-projects under the overall project to which the corresponding sub-project belongs. Fig.12 The three legends in the upper left corner represent completed, in progress and not yet implemented.

[0077] Furthermore, the user management module 1 includes:

[0078] Account opening submodule and account monitoring submodule;

[0079] The account opening submodule is used for adding a new permission account, and the account monitoring submodule is used for monitoring the newly added permission account.

[0080] Specifically, Fig.13 As shown, the user management module 1 can view the permission information of all accounts under its jurisdiction and modify its own account password according to the user's authority. Due to the high level of system confidentiality, the account cannot be applied for by itself. You can enter the user management interface through the administrator account, click Add User in the upper left corner, and add a new account. It also has a search function. The administrator can search through the search bar at the top of the page to retrieve the many accounts under his jurisdiction.

[0081] Furthermore, Fig.14 As shown, the system also includes a database, which serves as a knowledge base for engineering project design and data management, and uploads various project management methods and other rules and regulations. It provides search tools.

[0082] Furthermore, it also includes:

[0083] The application interface module is connected to the user management module 1 and is used to provide multiple interfaces and verify the request instructions for accessing the interfaces; the interface is used to receive external request instructions.

[0084] Furthermore, the application interface module includes:

[0085] An external interface submodule, an account verification submodule and an alarm submodule, all of which are connected to the user management module 1;

[0086] The external interface submodule is used to provide multiple interfaces, the account verification submodule is used to verify the request instructions connected to each external interface, and the alarm submodule is used to issue an alarm.

[0087] Specifically, the request information of the request instruction is verified to determine whether the source of the information is a prohibited source. If not, it is further determined whether the account password of the request information is the account password opened by the administrator of this system. If so, the verification is passed. If one of the two verifications fails, the alarm module will alarm.

[0088] Furthermore, the data storage module includes:

[0089] A data scoring submodule, a unidirectional storage submodule, and a bidirectional storage submodule, all of which are connected to the user management module;

[0090] The data scoring submodule is used to score the classified data to obtain information data for each score segment, and divide the information data for each score segment into primary data and secondary data according to a preset score threshold; the unidirectional storage submodule is used to perform unidirectional storage on the primary data, and the bidirectional storage submodule is used to perform bidirectional storage on the secondary data.

[0091] Furthermore, the data scoring submodule includes:

[0092] a score evaluation unit, a score threshold setting unit, and a division unit;

[0093] The score evaluation unit is used to perform score evaluation on the classified data to obtain information data of each score segment, the score threshold setting unit is used to manually input the score threshold, and the division unit is used to divide the information data of each score segment into primary data and secondary data according to the input score threshold.

[0094] Specifically, the score evaluation includes: Data feature extraction: First, feature extraction is performed on the data in the design materials. Features such as keywords and frequencies can be extracted from text data, or visual or sound features such as pixel values ​​and color histograms can be extracted from multimedia data such as images and audio.

[0095] Data labeling: In order to train a machine learning model, it is necessary to manually label a portion of the data with its category or importance level. These labels can serve as the "standard answers" for model learning.

[0096] Train the machine learning model: Choose a suitable machine learning algorithm, such as support vector machine (SVM), random forest, deep learning neural network, etc., to train the scoring model. The model will learn the relationship between features and labeled data to predict the score of unlabeled data.

[0097] Cross-validation: To verify the accuracy and generalization ability of the model, the trained model can be evaluated using techniques such as cross-validation. This can help determine whether the model can accurately predict the scores of the design data.

[0098] Set score threshold: According to the verification results and system requirements, set an appropriate score threshold. Data with a score higher than this threshold will be considered important and will be input into the one-way storage module for storage.

[0099] Real-time scoring and updating: To maintain the accuracy of the model, data needs to be continuously monitored and the scoring model needs to be updated. The scoring model can be trained periodically or as needed to adapt to new data characteristics and requirements.

[0100] Specifically, if design data with a high encryption level is involved, it will be stored unidirectionally. The data stored unidirectionally is readable only and is not allowed to be modified or extracted. The data stored bidirectionally can be exported or modified within the system.

[0101] More specifically, the one-way storage submodule is set as a divisible blockchain module, and the classified importance data is stored in blocks according to the classified data.

[0102] The beneficial effects of the present invention are as follows:

[0103] (1) Through digital and intelligent management methods, it helps to promote the widespread application of information technology in the field of engineering construction and promote the development of informatization construction.

[0104] (2) Traditional paper management methods consume a lot of resources and paper. Digital management methods can save a lot of resources, reduce paper consumption, and thus reduce environmental pollution.

[0105] (3) Digital and intelligent management can effectively improve the efficiency of design data storage and retrieval, shorten construction period and execution time, and improve overall work efficiency.

[0106] (4) Under digital and intelligent management methods, the design data can be version managed, archived and backed up, etc., effectively ensuring the integrity and security of the design data and helping to promote sustainable development.

[0107] (5) Digital and intelligent management methods will help standardize the storage, retrieval and management of design data and promote the improvement of the standardization level of the engineering construction industry.

[0108] (6) Under the digital and intelligent management mode, intelligent decision-making support can be provided to assist the engineering construction department to make better decisions and improve the efficiency and quality of decision-making.

[0109] (7) Digital and intelligent management can reduce staff workload and work intensity, saving labor costs.

[0110] (8) Traditional paper management requires a lot of storage space, while digital management can save a lot of storage space costs

[0111] (9) Digital and intelligent management methods can make the flow of design data between different departments more convenient and efficient, thereby reducing logistics costs.

[0112] (10) Digital and intelligent management can avoid the cost losses caused by human errors such as typos and file loss.

[0113] (11) Digital and intelligent management methods can realize multi-role and multi-dimensional collaborative management, thereby improving resource utilization efficiency and comprehensive benefits.

[0114] (12) Digital and intelligent management methods can improve management level and competitiveness due to their efficiency and convenience, thereby obtaining more business opportunities and profits.

[0115] (13) The security of the data involved is improved through the one-way input of the data storage module and the monitoring and verification of the request instructions.

[0116] (14) The collaborative efficiency of the management system is improved through multiple external interfaces.

[0117] The various embodiments in this specification are described in a progressive manner, and each embodiment focuses on the differences from other embodiments. The same or similar parts between the various embodiments can be referenced to each other.

[0118] The principles and implementation methods of the present invention are described in this article using specific examples. The description of the above embodiments is only used to help understand the method and core idea of ​​the present invention. At the same time, for those skilled in the art, according to the idea of ​​the present invention, there will be changes in the specific implementation methods and application scope. In summary, the content of this specification should not be understood as limiting the present invention.

Claims

1. A construction project design data management system, characterized in that: include: A user management module and a data storage module, a data sorting module, a classification module and a data management module all connected to the user management module; The data sorting module, classification module and data management module are all connected to the data storage module; The classification module is used to use AI recognition technology to automatically identify the input data to obtain classified data, the data storage module is used to store the classified data, the data sorting module is used to sort the data in the data storage module by the most recent archiving time, the data management module is used to upload design data and query project information and project attachment information, the user management module is used to open an authorization account and monitor the authorization account; the authorization account is used to access the design data in the data storage module.

2. A construction project design data management system according to claim 1, characterized in that: The data management module comprises: A data upload submodule, a project attachment submodule and a project information submodule, all of which are connected to the user management module; The data upload submodule is used to upload the design data to the data storage module, the project attachment submodule is used to query the project attachment information of the design data, and the project information submodule is used to query the project information of the design data, wherein the design data includes: project start-up data, scheme design data, preliminary design data, construction design briefing data, construction coordination data, design scheme summary data and target data.

3. The engineering construction project design data management system according to claim 1, characterized in that: The user management module comprises: Account opening submodule and account monitoring submodule; The account opening submodule is used for adding a new permission account, and the account monitoring submodule is used for monitoring the newly added permission account.

4. The engineering construction project design data management system according to claim 1, characterized in that: Also includes: An application interface module, connected to the user management module, for providing multiple interfaces and verifying request instructions for accessing the interfaces; The interface is used to receive external request instructions.

5. The engineering construction project design data management system according to claim 1, characterized in that: The application interface module comprises: An external interface submodule, an account verification submodule and an alarm submodule, all of which are connected to the user management module; The external interface submodule is used to provide multiple interfaces, the account verification submodule is used to verify the request instructions connected to each external interface, and the alarm submodule is used to issue an alarm.

6. The engineering construction project design data management system according to claim 2, characterized in that: The data upload submodule includes: A project startup data upload unit, a scheme design data upload unit, a preliminary design data upload unit, a construction design briefing data upload unit, a construction coordination data upload unit, a design scheme summary data upload unit and a target data upload unit, all of which are connected to the data storage module; The project startup data uploading unit is used to upload the project startup data to the data storage module, the scheme design data uploading unit is used to upload the scheme design data to the data storage module, the preliminary design data uploading unit is used to upload the preliminary design data to the data storage module, the construction design briefing data uploading unit is used to upload the construction design briefing data to the data storage module, the construction coordination data uploading unit is used to upload the construction coordination data to the data storage module, the design scheme summary data uploading unit is used to upload the design scheme summary data to the data storage module, and the target data uploading unit is used to upload the target data to the data storage module.

7. The engineering construction project design data management system according to claim 1, characterized in that: The data storage module comprises: A data scoring submodule, a unidirectional storage submodule, and a bidirectional storage submodule, all of which are connected to the user management module; The data scoring submodule is used to score the classified data to obtain information data for each score segment, and divide the information data for each score segment into primary data and secondary data according to a preset score threshold; the unidirectional storage submodule is used to perform unidirectional storage on the primary data, and the bidirectional storage submodule is used to perform bidirectional storage on the secondary data.

8. The engineering construction project design data management system according to claim 7, characterized in that: The data scoring submodule includes: a score evaluation unit, a score threshold setting unit, and a division unit; The score evaluation unit is used to perform score evaluation on the classified data to obtain information data of each score segment, the score threshold setting unit is used to manually input the score threshold, and the division unit is used to divide the information data of each score segment into primary data and secondary data according to the input score threshold.