Predictive maintenance method for large-scale battery pack cluster of industrial energy storage system
Through the DQN algorithm and greedy strategy of deep reinforcement learning, the maintenance problems caused by the complexity and high dimensionality of large-scale battery pack clusters are solved, efficient predictive maintenance decisions are achieved, system reliability and operation and maintenance efficiency are significantly improved, and system reliability is reduced. Repair costs.
Patent Information
- Application Number
- CN202411357731.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-27
- Publication Date
- 2024-11-01
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
Large-scale battery pack clusters have complexity and high dimensionality in long-term operation, which leads to the inability of traditional maintenance methods to effectively extend service life and reduce maintenance costs, especially the challenges of finding the optimal maintenance strategy in multi-level system structures.
Using the DQN algorithm based on deep reinforcement learning, a degradation model of the battery pack cluster is established, and the system status and maintenance actions are learned and optimized through the deep Q network, and the optimal predictive maintenance strategy is generated, and the action optimization is combined with the greedy strategy ε-greedy , ensure maximum system reliability under limited maintenance costs.
It significantly improves the efficiency of maintenance decision-making, optimizes resource allocation, reduces maintenance costs, extends the service life of the battery pack cluster, enhances the reliability and flexibility of the system, reduces system downtime, and improves operation and maintenance efficiency.
Smart Images

Figure CN118886889A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to an intelligent management method for an energy storage system, and in particular to a predictive maintenance method for a large-scale battery cluster of an industrial energy storage system. Background Art
[0002] In today's industrial and energy fields, battery clusters, as core components of energy storage systems, are widely used in the storage and management of electric vehicles, smart grids, and renewable energy. With the growing demand for energy storage, the application scenarios of large-scale battery clusters are becoming more and more extensive. However, battery packs will gradually degrade during long-term operation, resulting in a decrease in the overall performance of the cluster system and increasing the complexity and cost of maintenance. Therefore, how to extend the service life of battery clusters, improve operational reliability, and reduce maintenance costs through effective maintenance decisions has become a key issue in current research.
[0003] Traditional maintenance methods are usually divided into post-failure maintenance (i.e. repairing equipment after it fails) and regular preventive maintenance (i.e. regular maintenance according to a predetermined schedule). Although these methods can ensure the stable operation of the system to a certain extent, they have obvious limitations: post-failure maintenance usually leads to a higher failure rate, increasing maintenance costs and system downtime; while regular preventive maintenance lacks specificity and may lead to over-maintenance or under-maintenance, and cannot effectively extend the life of the system.
[0004] In recent years, with the rise of predictive maintenance (PM), condition-based maintenance methods have become an effective solution. Through real-time monitoring and analysis of system operation data, predictive maintenance can diagnose potential problems before equipment fails, so that maintenance can be performed at the best time, minimizing unnecessary maintenance costs and avoiding major system failures.
[0005] In a large-scale battery cluster, the state of each battery cell may be different. The complexity and high dimensionality of the system make the predictive maintenance decision problem present the characteristics of non-deterministic polynomial difficulty (NP-hard). These complexities come from the multi-layer structure of the cluster system, that is, the three-level composition of battery clusters, clusters, and nodes. The degradation rate, remaining life, and maintenance cost of each battery cell are different, and the maintenance resources and budget are limited. Therefore, how to find the optimal maintenance strategy in the multi-level system structure is a very challenging problem.
[0006] With the rapid development of Deep Reinforcement Learning (DRL) technology, it has become possible to solve complex decision-making problems in high-dimensional state and action space. In particular, the Deep Q-Network (DQN) algorithm can effectively handle the mapping relationship between system state and action and optimize complex decision-making processes. In the application of predictive maintenance, the DQN algorithm can predict the impact of different maintenance strategies on system reliability by learning the system's historical operating data and current state information, and then select the optimal maintenance action, significantly improving the operating efficiency and reliability of the cluster system. Summary of the invention
[0007] In order to solve the above technical problems, the present invention proposes a large-scale battery cluster predictive maintenance method based on DQN deep reinforcement learning. By establishing a degradation model of the battery cluster and using the DQN algorithm to learn and optimize the system state and maintenance actions, the optimal predictive maintenance strategy can be generated under the premise of considering the maintenance cost and system reliability. The present invention can not only effectively process the high-dimensional state space and action space in the cluster system, but also improve the learning efficiency of the model through experience replay technology and reduce the computational burden in the decision-making process.
[0008] In order to achieve the above-mentioned purpose, the present invention adopts the following technical solutions: A predictive maintenance method for a large-scale battery cluster of an industrial energy storage system, the method comprising the following steps: 1) Establish a degradation model and node state feature tensor for the battery cluster, and use the deep DQN network algorithm to predict the remaining life (RUL) of each battery cell in the cluster to make maintenance decisions for each node; 2) Maintenance decision-making estimates the optimal value function Q of each maintenance action through the deep DQN network algorithm, uses the value function to predict the current and future states of the cluster, generates a set of probability distributions of maintenance actions, and selects the optimal maintenance strategy; 3) Based on the state feature tensor and current degradation state of the battery cluster, the greedy strategy ε-greedy is used to optimize actions to ensure that the cluster achieves maximum reliability recovery under limited maintenance costs.
[0009] Preferably, the maintenance decision process of the cluster system in step 1) includes the following steps: 1.1) Obtain the degradation information of each battery module from the cluster, and monitor the health status of each node in the cluster system through sensors to form an initial state feature tensor; 1.2) Map the health status of each battery module in the cluster system into the state space to form a three-layer state feature tensor of the battery unit, module and cluster as a whole; 1.3) Define the possible maintenance actions for each node, including no maintenance or replacement of battery cells, to form a corresponding action space, where each maintenance action is represented by a binary variable; 1.4) Evaluate the current state through the deep DQN network algorithm and estimate the value function Q*(s, a) of each maintenance action, where s is the current state and a is the possible maintenance action.
[0010] As a preferred method, a cluster of H×M×N is established, and its maintenance decision is described by the maintenance strategy PMS as follows: PMS=[PMS 1 ,PMS 2 ,…,PMS h ,…, PMS H ] (1.1) Where PMS h is a cluster c h The strategy matrix is described as: (1.2) Each element pms of the maintenance strategy matrix (h,m,n) There are only two states, 0-normal state, 1-repair and replacement state; then: (1.3) The initial state feature tensor of the cluster is expressed as: S=[S 1 rec ,S 2 rec ,…,S h rec ,…,S H rec ] (1.4) Each element in the vector is a h The initial state characteristics are expressed as: (1.5) In the formula, the matrix element is the node n (h,m,n) The initial state of the cluster; after the cluster runs for a period of time, the state of the node is calculated according to formula (1.3); The state feature tensor of the cluster after node degradation is expressed as: S fad =[S 1 fad ,S 2 fad ,…,S h fad ,…,S H fad ] (1.6) The vector elements are for each cluster c h The degraded state characteristics are expressed as: (1.7) The element is the node n (h,m,n) The state after degradation; Cost can be related to variable pms (h,m,n) The cluster reliability after predictive maintenance is related to the cluster state feature tensor S at this time. mai Related; the predictive maintenance problem is expressed as: (1.8) Among them C T is the expected total cost; R S is the reliability of the cluster, C thr is the cost threshold; the expected total cost of the cluster C T Calculated by: (1.9) Among them, C h For cluster c h Cost, C (h,m,n) For node n (h,m,n) cost.
[0011] Preferably, the input of the deep DQN network algorithm is the feature tensor of the current state of the cluster, which describes the degradation state, remaining life (RUL) and maintenance history of each battery module; the output is the optimal value Q value of the maintenance action of each node, which is used to predict the cluster reliability and total maintenance cost under different maintenance schemes.
[0012] As a preferred method, the deep DQN network algorithm performs function approximation on the optimal value function Q, and the optimal value function Q is expressed as: (1.10); R t represents the reward at time t, γ represents the discount factor, π represents the behavior strategy, s represents the state, a represents the action, S t represents the observation result of the state at time t, A t represents the action performed at time t; During the policy iteration process, the updated loss function is expressed as: (1.11) where γ represents the discount factor; θ i represents the network parameters of DQN in the i-th PI process; θ i -represents the network parameters of the target DQN in the i-th PI process; the network parameters of the target DQN are set to the network parameters of the i-1th PI process, θ i - =θ i-1 ; Q(s,a,θ i ) represents the approximate value function based on deep neural network, θ i represents the parameters of the neural network; (s,a,r,s ’ )~U(D) represents the experience data of the DQN agent, s represents the current state, a represents the current action, s ’ Indicates the state at the next moment, a ’ Indicates the next action.
[0013] Preferably, the deep DQN network algorithm adopts a convolutional neural network (CNN) structure to process the high-dimensional state characteristics of the battery pack cluster and trains historical decision data through experience replay technology.
[0014] Preferably, the experience replay technique comprises the following steps: Design a DQN optimal value function Q for function approximation and randomly initialize the network parameters θ o , defines its input and output information; the input of DQN is a cluster system state feature matrix s t =[S t ,S1]: At time t, the H×M×N-order state matrix composed of all clusters and their nodes in the cluster system is recorded as: S t =[S 1 t ,S 2 t ,…,S h t ,…,S H t ] (1.12) Where S t h represents the cluster c at time t h The state characteristics are expressed as: (1.13) The element in the formula is the node n at time t (h,m,n) Status; The output of DQN is the optimal estimate of the value function Q*(s,a); (1.10) In the predictive maintenance decision-making process, the maintenance state probability π and the final reward value r are obtained through the ε-greedy algorithm, and then the experience data set e is generated.t =(s t ,a t ,r t ,s t+1 ), based on the experience replay technique, the neural network parameters θ are trained using the gradient descent method.
[0015] Preferably, the optimization of maintenance actions adopts a greedy strategy (ε-greedy), which allows the agent to randomly select actions with probability ε to prevent falling into local optimal solutions, and selects the optimal maintenance action estimated by the current value function with probability 1-ε.
[0016] Preferably, the reliability assessment of the battery cluster adopts a multi-cluster redundancy model. Each cluster is composed of multiple clusters, and each cluster contains multiple nodes. The nodes are connected according to the series-parallel model. When some nodes fail, the cluster maintains operation through a redundant mechanism. The deep DQN network algorithm model is used to continuously evaluate the remaining availability of the cluster to determine the optimal maintenance time and maintenance strategy.
[0017] Preferably, the maintenance strategy of the battery cluster is generated through multiple iterative optimizations, each iteration evaluating the performance recovery of the cluster by executing a series of maintenance actions, and continuously improving the decision-making ability of the deep DQN network based on these evaluation results.
[0018] Due to the adoption of the above technical solution, the present invention solves the problem of efficient predictive maintenance of large-scale battery clusters in long-term operation by using deep Q network (DQN) and reinforcement learning technology, significantly improves the efficiency of maintenance decision-making, optimizes resource allocation, reduces maintenance costs, and effectively enhances the reliability and flexibility of the system. The details are as follows: 1. Improve decision-making efficiency and optimize maintenance strategies: By introducing the deep Q network (DQN) algorithm, the present invention can make efficient predictive maintenance decisions for complex large-scale battery clusters in high-dimensional state space and action space. DQN can quickly generate the optimal maintenance strategy by learning and optimizing the degradation state of the system, significantly improving decision-making efficiency and avoiding the computational bottleneck problem caused by traditional methods when facing complex systems. This efficiency improvement enables the system to achieve real-time maintenance strategy adjustments in actual operation, ensuring the reliability and availability of the system.
[0019] 2. Dynamically allocate maintenance resources to reduce maintenance costs: The present invention uses the DQN algorithm to evaluate the value of each maintenance action, comprehensively considers the degradation status of different nodes, maintenance costs and their impact on the overall reliability of the system, and ensures that the system benefits are maximized within a limited maintenance budget. Compared with traditional fixed maintenance schedules or excessive maintenance strategies, the DQN algorithm can dynamically adjust the allocation of maintenance resources according to the real-time operating status of the system, effectively avoiding resource waste and significantly reducing maintenance costs. In addition, the system can give priority to repairing battery cells that are severely degraded and have a greater impact on the overall system, further improving the accuracy and rationality of resource use.
[0020] 3. Enhance system reliability and extend cluster life: By continuously monitoring and learning the health status of each node in the battery cluster, the present invention can perform maintenance tasks at the most appropriate time, thereby avoiding serious failures during system operation. By adopting a greedy strategy (ε-greedy) to optimize maintenance actions, the present invention can maximize the reliability of the system globally and maintain the efficient working state of the cluster during the long-term operation stage. The final effect is to significantly extend the service life of the battery cluster, reduce downtime caused by node failure, and ensure high availability of the system.
[0021] 4. Strong adaptability and flexible response to dynamic changes in the system: Since the DQN algorithm has the ability of self-learning and optimization, the present invention can adapt to the dynamic changes in the state of the battery cluster during operation and automatically adjust the maintenance strategy. Whether there is a sudden failure of certain nodes in the battery cluster or changes in the operating conditions of the system, DQN can make the best decision based on real-time data to maintain efficient operation of the system. This adaptability gives the present invention a clear advantage when facing complex and dynamically changing cluster systems, and is particularly suitable for long-term industrial energy storage systems.
[0022] 5. Reduce system downtime and improve operation and maintenance efficiency: By optimizing the selection of each maintenance action, the present invention can effectively reduce the number of unnecessary maintenance times and system downtime. Compared with the traditional regular preventive maintenance method, the present invention reduces unnecessary maintenance operations and improves the overall operation and maintenance efficiency of the system while ensuring system reliability. Especially when the battery cluster is large in scale, the reduction in maintenance frequency not only improves the operation and maintenance efficiency, but also reduces the workload of the operation and maintenance team and the frequency of use of maintenance equipment.
[0023] 6. Intelligent experience replay technology improves model performance: This invention introduces experience replay technology and uses historical decision data as training samples to continuously optimize the performance of the DQN model. By continuously learning from past maintenance experience, DQN can quickly improve the accuracy of maintenance strategies and reduce the computational complexity in maintenance decisions. This intelligent learning method greatly enhances the system's ability to cope with complex maintenance tasks, making the maintenance process more efficient. BRIEF DESCRIPTION OF THE DRAWINGS
[0024] Figure 1 Pipeline model in DQN-based predictive maintenance decision-making method.
[0025] Figure 2 Agent-Environment architecture diagram for predictive maintenance of cluster systems based on the DQN method.
[0026] Figure 3 Battery cluster reliability and maintenance costs.
[0027] Figure 4 Battery Pack (1,1) The remaining life distribution of each LRM in .
[0028] Figure 5 Learning curve of DQN for predictive maintenance.
[0029] Figure 6 Reliability curve of battery cluster under different maintenance strategies. DETAILED DESCRIPTION
[0030] The following is a clear and complete description of the technical solutions in the embodiments of the present invention in conjunction with the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0031] Description of the predictive maintenance problem of large-scale battery cluster systems in industrial energy storage systems Basic assumptions of the predictive maintenance problem The cluster system predictive maintenance decision problem of the present invention considers that the cluster includes H clusters and each cluster consists of M×N nodes. The optimization goal of the predictive maintenance problem is the performance reliability level of the cluster, the constraint is the maintenance cost, and the control variable is the maintenance strategy. From the nature of the decision variables, this problem is integer programming using binary variables. For each cluster, the number of strategies is 2 H ; For the entire cluster, the total number of strategies is 2 HMN , so this problem is an NP-hard problem.
[0032] The present invention considers the following assumptions: (1) For predictive maintenance of cluster systems, the temporal dynamic characteristics of the cluster are mainly considered, with an emphasis on the state of nodes and their degradation rules over time during the cluster operation phase. The reliability evaluation at the cluster level is then analyzed, and finally maintenance decision planning is carried out at the cluster-cluster-node levels.
[0033] (2) The degradation state of all nodes in each cluster is used as input. Different nodes have different degradation states because they operate under different working conditions. The node degradation state at the initial time t0 can be observed. The operation and maintenance management of the cluster system can track and manage the evolution of its degradation state through components equipped with fault prediction and health management (PHM) functions. Among the existing methods, data-driven, model-based, and a combination of the two fault prediction methods can predict the node degradation state.
[0034] (3) The nodes considered in the present invention are all key components of each cluster in the cluster. Considering that all nodes in the cluster are connected in series and parallel, if a series node fails, the cluster will not be able to work normally. If all nodes of a parallel module fail, the cluster will not be able to work normally. Therefore, the reliability model of a single cluster is regarded as a series-parallel model. In the actual operation of the cluster system, it usually operates in a multi-cluster form, and the entire cluster system will have a certain redundancy design. Therefore, in the present invention, the reliability model of the cluster system is also regarded as a multi-cluster K / H redundancy model to simplify the reliability evaluation problem of the cluster system. The model requires that at least K of the H clusters in the cluster work normally during their operation phase.
[0035] (4) The maintenance method for each node is to replace spare parts. The state of the node after maintenance can be regarded as the same as the state of a new device. Therefore, the life of the replaced node can be regarded as the failure interval time (Time to Failure, TTF) of the node. In other words, the failure probability of the replaced node is close to 0.
[0036] (5) Consider that each cluster consists of M×N nodes of different types, and the maintenance cost of nodes of the same type in different clusters is the same.
[0037] (6) There is sufficient reserve of spare parts in the spare parts cluster for maintenance.
[0038] Objectives, constraints and variables of predictive maintenance decision-making problem For the cluster system object under study, we focus on the three-level time dynamic clusters and establish a cluster set C to describe the clusters of H clusters. Consider each cluster c h(h=1,2,…,H) consists of M×N nodes in a certain order and internal connections between nodes. Therefore, the predictive maintenance of cluster systems involves three decision levels, including node, cluster and cluster levels. The constraint is cost, the optimization goal is the reliability of the cluster, and the variable is the maintenance status of the node.
[0039] The goal of the predictive maintenance decision problem is to maximize reliability recovery under limited maintenance costs. For these three levels, the problem should be solved at the node level. The basic decision variable is the cluster c h Middle Node n (h,m,n) Predictive maintenance status pms (h,m,n) (h=1,2,…,H;m=1,2,…,M;n=1,2,…,N). Therefore, when pms (h,m,n) =1, the node is subjected to predictive maintenance. (h,m,n) = 0, no predictive maintenance task is performed on the node. Consider a cluster of H×M×N, whose maintenance decision can be described by the maintenance strategy PMS as follows: Where PMS h is a cluster c h The strategy matrix can be described as: (1.2) Each element pms of the maintenance strategy matrix (h,m,n) There are only two states (0-normal state, 1-repair and replacement state), then: (1.3) The initial state feature tensor of the cluster can be expressed as: S=[S 1 rec ,S 2 rec ,…,S h rec ,…,S H rec ](1.4) Each element in the vector is a h The initial state characteristics can be expressed as: (1.5) In the formula, the matrix element is the node n (h,m,n) The initial state of the cluster. After the cluster runs for a period of time, the state of the node can be calculated according to formula (1.2). The state feature tensor of the cluster after node degradation can be expressed as: S fad =[S 1 fad ,S 2fad ,…,S h fad ,…,S H fad ] (1.6) The vector elements are for each cluster c h The degraded state characteristics can be expressed as: (1.7) The element is the node n (h,m,n) The degraded state.
[0040] In addition, the cost can be related to the variable pms (h,m,n) The cluster reliability after predictive maintenance is related to the cluster state feature tensor S at this time. mai Therefore, the predictive maintenance problem can be expressed as: (1.8) Among them C T is the expected total cost. S is the reliability of the cluster, C thr is the cost threshold. The expected total cost of the cluster is C T It can be calculated as follows: (1.9) Among them, C h For cluster c h Cost, C (h,m,n) For node n (h,m,n) In addition, a cluster reliability evaluation model is established to calculate the reliability R S .
[0041] Constraints of the predictive maintenance decision problem C T With decision variables s (h,m,n) It is a linear relationship and easy to calculate. However, the cluster reliability R S and the cluster state feature tensor S mai The relationship between the decision variables is complex and nonlinear. (h,m,n) Depends on node n (h,m,n) For the degenerate state feature tensor S fad , if in the decision process for each group of maintenance strategy PMS decision variables s (h,m,n) Total maintenance cost C T and cluster reliability R S If the verification is not done, the computational efficiency will be very low and the computational load will be too large.
[0042] Maintenance decision-making method DQN Algorithm Principle In the field of artificial intelligence, with the introduction of DQN-based reinforcement learning methods, it has become possible to solve decision-making problems in high-dimensional state space and action space. The key to the DQN method is to use a deep neural network DQN to estimate the value function, and then perform policy iteration (PI) based on the idea of Q-learning until a DQN agent with efficient and stable decision-making capabilities is trained. The DQN agent can generate highly accurate, efficient, and low-cost decision-making solutions for situation-based maintenance decision-making problems in high-dimensional state space and action space. The basic algorithm principle of DQN is to use a deep neural network as DQN based on the idea of Q-learning to approximate the optimal value function Q. The optimal value function Q can be expressed as: , (1.10) R t represents the reward at time t, γ represents the discount factor, π represents the behavior strategy, s represents the state, a represents the action, S t represents the observation result of the state at time t, A t represents the action performed at time t; In addition, during the policy iteration process, the updated loss function can be expressed as: (1.11) where γ represents the discount factor; θ i represents the network parameters of DQN in the i-th PI process; θ i - represents the network parameters of the target DQN in the i-th PI process; the network parameters of the target DQN are set to the network parameters of the i-1th PI process, θ i - =θ i-1 ; Q(s,a,θ i ) represents the approximate value function based on deep neural network, θ i represents the parameters of the neural network; (s,a,r,s ’ )~U(D) represents the experience data of the DQN agent, s represents the current state, a represents the current action, s ’ Indicates the state at the next moment, a ’Represents the action at the next moment. For the predictive maintenance problem of cluster systems, RL uses information about the node state to select the optimal action in the state-action space to maximize the expected reliability under limited resources. The state-action space of the predictive maintenance problem represents the mapping relationship between the state characteristics of the cluster system and the maintenance action. Agent-environment interaction is a mathematically idealized form used to describe the reinforcement learning framework for learning from interaction to achieve the best maintenance strategy. The project management decision maker or learner is called the project management agent. During the reinforcement learning process, the predictive maintenance agent continuously interacts with the simulation environment, which includes all the contents simulated outside the predictive maintenance agent. The predictive maintenance agent selects maintenance behaviors, and then the simulation environment responds to these behaviors, presents new cluster system situations to the predictive maintenance agent, and evaluates the rewards that the predictive maintenance agent seeks to maximize through its behavior selection. After the learning process, the predictive maintenance agent working process takes the actual state of the cluster system as input and outputs the optimal predictive maintenance strategy. Taking the above factors into consideration, the present invention proposes a project management framework based on reinforcement learning, which includes a realistic working process and a simulated learning process. More specifically, the predictive maintenance agent interacts with the simulation environment at each step in a series of discrete time steps (t=1,2,…,T). At each time step t, the predictive maintenance agent receives the cluster system S from the simulation environment. t , then according to S t Choose an action. After executing one time step, the agent receives a numerical reward r for its behavior (t+1) , and in the new S t Keep searching.
[0043] Predictive maintenance decision-making based on DQN The predictive maintenance decision-making problem of cluster systems is of great significance for the operation and maintenance of cluster systems under the condition of system performance degradation during long-term operation. The difficulty of the problem lies in the imbalance of maintenance benefits of heterogeneous systems and components, the selectivity of the degree of system and component repair, the high impact of system and component repair timing on cluster performance recovery, and the overall NP-hard characteristics of the problem.
[0044] In view of the research content of predictive maintenance considering system degradation and unbalanced benefits, this paper regards it as the problem of determining the probability of maintenance states of multiple elements in the maintenance matrix and intends to solve it through a maintenance decision method based on DQN. By training a CNN neural network model f θ, approximate the optimal value function Q, provide an estimate of the value function Q, and evaluate the current cluster system maintenance state feature X; then based on DQN's estimate of the value function Q, a maintenance state probability π is obtained through the ε-greedy algorithm, and then the optimal maintenance action a of the current cluster maintenance state feature is generated * ; After executing a series of optimal maintenance actions, the cluster system performance recovers to a set threshold, and a predictive maintenance decision process (PMDP) is completed. A series of optimal maintenance actions constitute a complete maintenance strategy. After completing a PMDP, a set of maintenance decision experience data is obtained. Multiple sets of maintenance decision data constitute the current experience data set. CNN is trained based on this experience data set to provide a better value function estimate for the next PMDP.
[0045] In the above DQN-based predictive maintenance decision method, ε-greedy can be regarded as an efficient policy improvement operation; PMDP obtains the reward value r by executing the optimal maintenance action output by ε-greedy each time and evaluating the final maintenance status of the cluster system. This process can be regarded as an efficient policy evaluation operation. The reinforcement learning idea in the predictive maintenance decision method is mainly reflected in the policy iteration process of cyclically executing the above two operations: the CNN network parameters θ provide a more accurate estimate of the value function Q through learning and training; the new network parameters provide a better basis for searching the optimal maintenance action for the next policy iteration process.
[0046] The DQN-based predictive maintenance decision-making method of the present invention includes the following two core ideas: experience replay technology of the predictive maintenance decision-making process, and predictive maintenance strategy iteration based on DQN.
[0047] Experience replay technology for predictive maintenance decision-making process First, we need to design a DQN optimal value function Q for function approximation, randomly initialize the network parameters θ0, and define its input and output information.
[0048] The input of DQN is a cluster system state feature matrix s t =[S t ,S1]: At time t, the H×M×N-order state matrix composed of all clusters and their nodes in the cluster system is recorded as: S t =[S 1 t ,S 2 t ,…,S h t ,…,S Ht ](1.12) Where S t h represents the cluster c at time t h The state characteristics can be expressed as: (1.13) The element in the formula is the node n at time t (h,m,n) status.
[0049] The output of DQN is the optimal estimate of the value function Q*(s,a). In the PMDP process, the repair state probability π and the final reward value r are obtained through the ε-greedy algorithm, and then the experience data set e is generated. t =(s t ,a t ,r t ,s t+1 ), based on the experience replay technique, the neural network parameters θ are trained using the gradient descent method. Figure 1 Describes the DQN-based predictive maintenance decision-making method, in which the neural network f θ In a PMDP sequential decision-making process, a pipeline model (computer terminology: a linear communication model for exchanging data) is generated to generate experience data sets.
[0050] Predictive maintenance strategy iteration based on DQN Based on the idea of Q-learning policy iteration, the above DQN is used to estimate the optimal value function Q*(s,a) to implement policy iteration, thereby designing the Agent-Environment architecture for predictive maintenance of cluster systems based on the DQN method, such as Figure 2 As shown in the figure. The core idea of this architecture is to complete the policy iteration through the interaction between the predictive maintenance agent and the simulation environment. The simulation environment can describe the degradation state of the cluster system during operation and evaluate its reliability, while the predictive maintenance agent is a decision maker that generates predictive maintenance plans. It can generate a series of maintenance actions by executing a PMDP process. When executing the PMDP process, the predictive maintenance agent uses the ε-greedy strategy to select each maintenance action based on the optimal estimate Q*(s,a) of the value function by DQN.
[0051] The Agent-Environment architecture for predictive maintenance of cluster systems based on the DQN method has the following main ideas of reinforcement learning: iteratively executing the PMDP process during the policy iteration process, such as Figure 2As shown in Figure 1. Each policy iteration process is an episode, which includes four steps: First, the simulation environment generates the initial degradation state of the cluster system. Then, the predictive maintenance agent executes the PMDP process to generate a series of maintenance actions. Each maintenance action is based on the DQN estimation of the optimal value function Q*(s,a), and then selected using the ε-greedy strategy. Next, the simulation environment uses the reliability evaluation method to evaluate the generated maintenance strategy and store the training samples e t =(s t ,a t ,r t ,s t+1 ) to the cache, and the maintenance strategy consists of a series of maintenance actions generated by the above PMDP process. Finally, DQN retrieves Mini-batch from the training sample data set and trains its network parameters based on the gradient descent method. The loss function is shown in (1.11). The new DQN will be used to estimate the optimal value function in the next policy iteration process.
[0052] In summary, the learning process is the interaction process between the predictive maintenance agent and the simulation environment, such as Figure 2 As shown in Figure 2. Each iteration of the predictive maintenance agent learning process includes four modules: input feature generation, PMDP, reliability evaluation and reward, and DQN learning training. First, the initial state features and LRU set are generated. Second, PMDP is performed to generate maintenance strategies. Third, the strategies are scored and the ResNet parameters θ are adjusted through batch training. i For the next iteration i+1, a new initial state feature and LRU-set are generated, and then PMDP uses the parameter θ i For the first iteration, PMDP uses a randomly initialized ResNet with parameters θ0.
[0053] (1) Input feature generation Before executing PMDP, the initial state feature tensor S1 is generated. The degraded health state feature tensor S is calculated according to (1.7) fad , then S1 can be expressed as follows: S 1= S fad (1.14) According to formula (1.9) and the total cost C T , the maintenance spare parts LRU set can be generated as follows: S LRU =[S 1 LRU ,S 2 LRU ,…,S tLRU ,…,S T LRU ](1.15) Where S t LRU is the state characteristic of LRUt.
[0054] At time t during PMDP, LRUt is applied to repair a degraded node. Each state feature tensor S t Reduce the dimension from H*M*N to H*MN; then, the input feature X can be generated t , which contains the current state feature S t and the initial state feature S1. At each time t, it is necessary to retain the initial state feature. On the one hand, by comparing the current state feature with the initial state feature, the degree of recovery of the cluster performance can be estimated. On the other hand, the difference between the current state feature tensor and the initial state feature tensor also covers the maintenance state pms of each node in the cluster as of time t. (h,m,n) Therefore, the current input feature X t is a 2*H*MN tensor, as follows: X t =[S t ,S1](1.16) (2) Maintenance decision-making process Initial input feature X1 and LRU set S LRU is the input of PMDP and the complete strategy is the output. The main steps of PMDP are as follows: 1) Action value function based on DQN At time t during the MDP, DQN takes X t As its input, and output maintenance action value v t . Value v t Is a normalization parameter, which estimates the current input feature X t A scalar evaluation of the reward. Figure 1 The DQN architecture is shown, which consists of convolutional layers with ReLU functions and fully connected layers. The DQN model can be expressed as: (1.17) Where DQN parameters θ (i-1) The adjustment was made during the previous iteration i-1. The initial network parameters θ0 are randomly initialized.
[0055] 2) Searching for maintenance actions based on the ε-greedy algorithm Based on the ε-greedy algorithm, the repair action value estimated by DQN is used to search for the repair action a t (h,m,n), indicating that the predictive maintenance task is selected at (h,m,n), that is, using LRU to replace node n (h,m,n) .
[0056] 3) Update input features In performing higher quality actions a t * =a t (h*,m*,n*) After that, the old node is replaced by LRU. After that, the state features of time step t+1 can be generated as follows: (1.18) Input feature X t+1 can be described as follows: X t+1 =[S t+1 ,S1] (1.19) 4) Check loop conditions If the LRU set is not empty, the process returns to the first step of PMDP. The MDP is completed at time step T.
[0057] 5) Calculate the recovery level of the cluster system According to formula (1.11), the reliability R can be calculated S (G f ≥W,S T ) to evaluate the recovery ability after PMDP.
[0058] 6) Generate a complete maintenance strategy By using a set of higher quality operations from the entire PMDP {a * 1, a * 2,…, a * T} to generate the complete policy.
[0059] (3) Rewards After completion, PMDP is evaluated and the final reward is given. The reward for each time step can be described as: (1.20) Where R S (G f ≥W,S T ) is the cluster reliability at time t.
[0060] (4) Learning and training Based on the PMDP process and reliability evaluation and reward, the training samples are stored. t =(s t ,a t ,r t ,s t+1) to the training data set D. When DQN is learning and training, it first randomly and uniformly samples a Mini-batch from the training sample data set D: {(s, a, r, s′)}, where s′ represents the next state of s. The experience replay technique is used to train the DQN network parameters based on the gradient descent method. In the i-th PI process, the training goal of DQN is to adjust the network parameters θ i To minimize the mean-squared error (MSE) in the Bellman equation, the optimal target value will be replaced by the estimate of the target value, which is the network parameter θ in the previous PI process. i - DQN generation. Therefore, the loss function of the i-th PI process can be expressed as: (1.21) where g represents the discount factor; θ i represents the network parameters of DQN in the i-th PI process; θ i - represents the network parameters of the target DQN in the i-th PI process; the network parameters of the target DQN are set to the network parameters of the i-1th PI process, θ i - =θ i-1 ; Q(s,a,θ i ) represents the approximate value function based on deep neural network, θ i represents the parameters of the neural network; (s,a,r,s ’ )~U(D) represents the experience data of the DQN agent, s represents the current state, a represents the current action, s ’ Indicates the state at the next moment, a ’ represents the action at the next moment. After the learning and training is completed, the new DQN network parameters will be used to estimate the optimal value function in the next PI process. Generally, when the average action value and the MSE of DQN tend to be stable, the predictive maintenance agent can effectively support the generation of predictive maintenance strategies for UAV clusters under various degradation states and improve the state of the UAV cluster. In addition, the DQN that has completed the learning and training does not need to be trained again when planning the predictive maintenance management work during the operation of the UAV cluster. The training of DQN in each iteration of the learning process is based on Mini-batch sampling and uses the empirical data of PMDP. After training, DQN can improve the strength of PMDP in the next iteration i+1. When the MSE tends to be stable, the DQN is well trained, and the predictive maintenance agent can effectively support the maintenance decision-making of large-scale predictive maintenance problems and improve the state of the cluster system. In addition, DQN does not need to be trained again during the predictive maintenance management work.
[0061] After the predictive maintenance agent completes learning and training, it takes the input feature X of the real-world cluster system and the SLRU of the LRU set as input. Then, the predictive maintenance agent uses the LRU set SLRU to perform a series of maintenance actions. For each time step, the trained DQN uses the input feature X to predict the prior information, and then ε-greedy selects a higher reward action based on the prior information to repair a degraded node. Finally, a series of high-reward maintenance actions will produce a complete predictive maintenance strategy.
[0062] Predictive Maintenance Case Study Through the previous explanation, the present invention has proposed a predictive maintenance decision problem model for cluster systems during long-term operation, and provided a DQN maintenance decision algorithm based on reinforcement learning. This section takes a large-scale battery cluster for industrial energy storage systems as an example to analyze the predictive maintenance problem case, realize the generation of the optimal maintenance strategy, meet the performance improvement requirements, and effectively control the maintenance costs. The simulation results are analyzed and evaluated to verify the correctness of the maintenance decision algorithm proposed in the present invention and its engineering practical value.
[0063] Large-scale battery cluster case study Large-scale battery clusters for industrial energy storage systems play an important role in the stability of smart grids and are usually composed of recycled batteries from electric vehicles. Electric vehicle batteries are retired under different conditions and are usually recommended to be replaced when the remaining energy capacity is between 70% and 80%, but these capacities can be very uneven. Large batteries with different degrees of degradation will shorten the service life of large-scale battery clusters and lead to a large number of operation and maintenance activities. Currently, the operation and maintenance management of large-scale battery clusters can be enhanced by components equipped with PHM functions to track and manage the evolution of their health status (SOH). Although predictive maintenance activities are important in operation and maintenance management, there is still a lack of evidence on predictive maintenance issues for large-scale battery clusters. In addition, some important issues of large-scale battery clusters, such as cost, capacity, and reliability, are not considered simultaneously in existing predictive maintenance studies. The goal of predictive maintenance planning is to achieve a better state at a limited cost. Since one device must share maintenance resources with other devices in the cluster, a predictive maintenance plan should be developed at the cluster level. With the application of PHM, condition-based preventive maintenance has gradually replaced time-based preventive maintenance in industrial applications. Therefore, the preventive maintenance problem is a state-based cluster predictive maintenance problem with non-deterministic polynomial NP-hard characteristics. There are existing algorithms to solve the predictive maintenance problem, such as mixed integer programming, heuristic algorithms, system simulation methods, and knowledge-based methods. However, due to the increase in the size of battery clusters for industrial energy storage systems, existing methods will result in heavy computing time, regardless of the hardware. Therefore, the predictive maintenance problem is difficult to solve.
[0064] Consider a large-scale battery cluster consisting of 14 submodules, each submodule consisting of 10 battery packs, each battery pack consisting of 6 battery cells with predictable RUL, and each battery cell can be regarded as an LRM. Since the present invention is aimed at the long-term operation stage of the battery cluster, as the cumulative operation time of the battery cluster increases, the main consideration is the fatigue and wear of LRMs in the actual operation environment. Therefore, it is assumed that the RUL of all LRMs in the long-term operation stage follows a normal distribution (μ, σ 2 ), the parameters μ and σ of the normal distribution can be obtained based on the PHM method. In addition, the method proposed in the present invention is still applicable to LRMs whose RUL can be predicted to obey other degradation laws. For the 14×10×6 LRMs in the above-mentioned battery cluster, when analyzing its predictive maintenance problem based on the proposed algorithm framework, the simulation environment first randomly generates the RUL normal distribution parameters μ and σ of all LRMs. The parameters of some LRMs are given as shown in Table 1. The units of the data related to the running time of the battery cluster analyzed in the case part of the present invention are all hours.
[0065] Table 1 Remaining life distribution of LRM in battery cluster
[0066] Based on the remaining life distribution of 14×10×6 LRMs in the battery cluster generated by the simulation environment, the current battery cluster reliability can be calculated to be 99.856%. The current time τ=0 is used as the initial time of the cumulative operation of the battery cluster. The remaining life distribution during the cumulative operation of 300h is analyzed as follows: Figure 3 As shown, the cumulative running time analyzed by the present invention is the cumulative task time for multiple wave tasks of the battery group cluster.
[0067] Assume that predictive maintenance is required when the reliability of the battery cluster is less than 90%. Starting from τ=0, the reliability of the battery cluster is calculated for each increase of △τ=10h of continuous operation time. In practice, the value of △τ can be determined based on specific mission requirements and other factors. When the continuous operation time τ=80h, the reliability of the battery cluster is 89.273%. At this time, predictive maintenance is required. Calculate the reliability of all LRMs when τ=80h. (m,n,k) The failure probability F (m,n,k) , and then generate the initial degradation state tensor s0 of the battery pack cluster. In addition, the maintenance cost settings of the above 6 categories of LRM in the battery pack are shown in Table 2. Assume that the threshold for the total maintenance cost is C thr = 120,000 RMB. The maintenance cost of LRM and the total cost threshold of predictive maintenance can be set according to actual conditions.
[0068] Table 2 Maintenance cost of LRM in battery cluster <![CDATA[LRM1]]> <![CDATA[LRM2]]> <![CDATA[LRM3]]> <![CDATA[LRM4]]> <![CDATA[LRM5]]> <![CDATA[LRM6]]> 1500 1200 2200 2000 1100 1800 Table 3 Predictive maintenance strategy for battery cluster
[0069] For the above case, the proposed predictive maintenance agent generates a maintenance strategy, as shown in Table 3, which describes some maintenance actions in the maintenance strategy. The value 1 in the table indicates that the corresponding LRM needs to be repaired and replaced. Since the proposed DQN method regards the predictive maintenance decision problem as a sequential decision problem, each maintenance action in the maintenance strategy is generated in sequence. Figure 4 According to the time sequence of each maintenance action in the Agent generation process, the improvement of the reliability of the battery cluster and the increase of the cumulative maintenance cost are described. After completing the predictive maintenance, the reliability of the battery cluster is 99.572%, and the cumulative maintenance cost is 119100 RMB. When the predictive maintenance work is actually performed, multiple maintenance teams can be arranged to perform maintenance tasks simultaneously according to the maintenance strategy.
[0070] In the learning and training process of the predictive maintenance agent, the present invention uses a server equipped with four RTX2080TI-A11G graphics cards and an Inteli97980XE CPU. The DQN-based predictive maintenance agent and the battery cluster simulation operating environment are developed using the Python language in the Ubuntu system environment. The neural network model calls the TensorFlow and Keras tools. The entire training process starts with a completely randomly initialized DQN. The training process lasts for about 27 hours. The relevant hyperparameter settings are shown in Table 4.
[0071] Table 4 DQN hyper parameters variable describe Numeric capacity Experience pool capacity <![CDATA[10 7 ]]> lr Learning Rate 0.002 γ Discount Factor 0.9 ε Greediness coefficient 0.9 episodenumber Number of training rounds 10100 batchsize Batch training size 512 During the entire training process, the predictive maintenance agent executed a total of 10,100 episodes, and the thinking time required to generate each maintenance action was approximately 0.12 seconds. Figure 4 As shown in the figure, the thinking time for each maintenance action generated by the predictive maintenance agent after training is also about 0.12s. Figure 5 The figure depicts the average reward of the entire training process. The solid line represents the mean of the reward, and the shadow represents the standard deviation of the reward. It can be seen that the training has achieved convergence after about 5,000 episodes, and the mean reward curve is stable within a range and fluctuates within a small range. At this point, the predictive maintenance agent can already analyze the degradation state of the battery cluster during operation and generate an optimized maintenance strategy.
[0072] After the predictive maintenance agent completes its DQN learning and training, the multi-stage predictive maintenance task of the battery cluster in the long-term operation stage is analyzed. In addition, the present invention also applies heuristic game (HG) and Monte Carlo tree search (MCTS) to analyze the same problem. Consider the 14×10×6 battery cluster in the long-term operation stage to carry out predictive maintenance work according to its degradation state. Assume that the total maintenance cost threshold of each predictive maintenance work is C thr =120000RMB, the cluster reliability is calculated every 10h of cumulative running time. When the cluster reliability is lower than 90%, the DQN, MCTS and HG methods generate maintenance strategies respectively under the constraint of the total maintenance cost threshold. The simulation environment updates the cluster status according to the three maintenance strategies respectively, and then continues to enter the operation stage until the cluster reliability of each of the three methods is lower than 90% and then generates maintenance strategies again. In the above battery cluster simulation operation process, the change curve of cluster reliability with cumulative running time is as follows Figure 6As shown, it can be seen that the proposed DQN method can achieve better reliability recovery effect in each predictive maintenance work, and the battery cluster can maintain a better reliability level in the long-term operation stage, and the number of predictive maintenance work required to be deployed is also less. Since the total cost of deploying each predictive maintenance work is basically the same, the proposed DQN method can achieve better economic benefits in the predictive maintenance work of the battery cluster in the long-term operation stage.
[0073] The effectiveness of the proposed DQN deep reinforcement learning method is verified through the simulation test of the large-scale battery cluster example for industrial energy storage systems. Compared with the MCTS method and the heuristic game method, the DQN deep reinforcement learning method shows efficient and stable solution efficiency for predictive maintenance problems with high-dimensional state-action space. In addition, the DQN-based predictive maintenance agent can fully extract the degradation characteristic information of the battery pack and its battery cells in the large-scale battery cluster according to the PHM data, and generate a predictive maintenance strategy with better cluster reliability recovery effect. In addition, the proposed predictive maintenance agent can be independently run to generate strategies for specific problems, and can also be integrated and applied in the research of operation and maintenance digital twins. In the era of Industry 4.0, the application of operation and maintenance digital twins will not be a limitation. Digital twins will become more and more common and accurate in the future, and future research on predictive maintenance aims to apply the proposed DQN method to the digital twin of the cluster system to support related work of predictive maintenance management. A predictive maintenance method for large-scale battery clusters of industrial energy storage systems.
Claims
1. A predictive maintenance method for a large-scale battery cluster of an industrial energy storage system, characterized in that: The method comprises the following steps: 1) Establish a degradation model and node state feature tensor for the battery cluster, and use the deep DQN network algorithm to predict the remaining life (RUL) of each battery cell in the cluster to make maintenance decisions for each node; 2) Maintenance decision-making estimates the optimal value function Q of each maintenance action through the deep DQN network algorithm, uses the value function to predict the current and future states of the cluster, generates a set of probability distributions of maintenance actions, and selects the optimal maintenance strategy; 3) Based on the state feature tensor and current degradation state of the battery cluster, the greedy strategy ε-greedy is used to optimize actions to ensure that the cluster achieves maximum reliability recovery under limited maintenance costs.
2. The predictive maintenance method according to claim 1, characterized in that: The maintenance decision process of the cluster system in step 1) includes the following steps: 1.1) Obtain the degradation information of each battery module from the cluster, and monitor the health status of each node in the cluster system through sensors to form the initial state feature tensor; 1.2) Map the health status of each battery module in the cluster system into the state space to form a three-layer state feature tensor of the battery unit, module and cluster as a whole; 1.3) Define the possible maintenance actions for each node, including no maintenance or replacement of battery cells, to form a corresponding action space, where each maintenance action is represented by a binary variable; 1.4) Evaluate the current state through the deep DQN network algorithm and estimate the value function Q*(s,a) of each maintenance action, where s is the current state and a is the possible maintenance action.
3. The predictive maintenance method according to claim 2, characterized in that: A cluster of H×M×N is established, and its maintenance decision is described by the maintenance strategy PMS as follows: PMS=[PMS 1 ,PMS 2 ,…,PMS h ,…, PMS H ](1.1) Where PMS h is a cluster c h The strategy matrix is described as: (1.2) Each element pms of the maintenance strategy matrix (h,m,n) There are only two states, 0-normal state, 1-repair and replacement state; then: (1.3) The initial state feature tensor of the cluster is expressed as: S=[S 1 rec ,S 2 rec ,…,S h rec ,…,S H rec ](1.4) Where each element in the vector is each cluster c h The initial state characteristics are expressed as: (1.5) In the formula, the matrix element is the node n (h,m,n) The initial state of the cluster; after the cluster runs for a period of time, the state of the node is calculated according to formula (1.3); The state feature tensor of the cluster after node degradation is expressed as: S fad =[S 1 fad ,S 2 fad ,…,S h fad ,…,S H fad ](1.6) The vector elements are for each cluster c h The degraded state characteristics are expressed as: (1.7) The element is the node n (h,m,n) The state after degradation; Cost can be related to variable pms (h,m,n) The cluster reliability after predictive maintenance is related to the cluster state feature tensor S at this time. mai Related; the predictive maintenance problem is expressed as: (1.8) Among them C T is the expected total cost; R S is the reliability of the cluster, C thr is the cost threshold; the expected total cost of the cluster C T Calculated by: (1.9) Among them, C h is cluster c h Cost, C (h,m,n) For node n (h,m,n) cost.
4. The predictive maintenance method according to claim 3, characterized in that: The input of the deep DQN network algorithm is the feature tensor of the current state of the cluster, which describes the degradation state, remaining life RUL and maintenance history of each battery module; the output is the optimal value Q value of the maintenance action of each node, which is used to predict the cluster reliability and total maintenance cost under different maintenance schemes.
5. The predictive maintenance method according to claim 4, characterized in that: The deep DQN network algorithm approximates the optimal value function Q, which is expressed as: (1.10); R t represents the reward at time t, γ represents the discount factor, π represents the behavior strategy, s represents the state, a represents the action, S t represents the observation result of the state at time t, A t represents the action performed at time t; During the policy iteration process, the updated loss function is expressed as: (1.11); where γ represents the discount factor; θ i represents the network parameters of DQN in the i-th PI process; θ i - represents the network parameters of the target DQN in the i-th PI process; the network parameters of the target DQN are set to the network parameters of the i-1th PI process, θ i - =θ i-1 ; Q(s,a,θ i ) represents the approximate value function based on deep neural network, θ i represents the parameters of the neural network; (s,a,r,s ’ )~U(D) represents the experience data of the DQN agent, s represents the current state, a represents the current action, s ’ Indicates the state at the next moment, a ’ Indicates the next action.
6. The predictive maintenance method according to claim 2, characterized in that: The deep DQN network algorithm adopts the convolutional neural network (CNN) structure to process the high-dimensional state characteristics of battery pack clusters and trains historical decision data through experience replay technology.
7. The predictive maintenance method according to claim 6, characterized in that: The experience replay technique includes the following steps: Design a DQN optimal value function Q for function approximation and randomly initialize the network parameters θ o , defines its input and output information; the input of DQN is a cluster system state feature matrix s t =[S t ,S1]: At time t, the H×M×N-order state matrix composed of all clusters and their nodes in the cluster system is recorded as: S t =[S 1 t ,S 2 t ,…,S h t ,…,S H t ](1.12) Where S t h represents the cluster c at time t h The state characteristics are expressed as: (1.13) The element in the formula is the node n at time t (h,m,n) Status; The output of DQN is the optimal estimate of the value function Q*(s,a); (1.10) In the predictive maintenance decision-making process, the maintenance state probability π and the final reward value r are obtained through the greedy strategy ε-greedy, and then the experience data set e is generated. t =(s t ,a t ,r t ,s t+1 ), based on the experience replay technique, the neural network parameters θ are trained using the gradient descent method.
8. The predictive maintenance method according to claim 1, characterized in that: The optimization of maintenance actions adopts the greedy strategy ε-greedy, which allows the agent to randomly select actions with probability ε to prevent falling into the local optimal solution, and at the same time selects the optimal maintenance action estimated by the current value function with probability 1-ε.
9. The predictive maintenance method according to claim 1, characterized in that: The reliability assessment of the battery cluster adopts a multi-cluster redundancy model. Each cluster is composed of multiple clusters, and each cluster contains multiple nodes. The nodes are connected according to the series-parallel model. When some nodes fail, the cluster maintains operation through the redundancy mechanism; the remaining availability of the cluster is continuously evaluated through the deep DQN network algorithm model to determine the optimal maintenance time and maintenance strategy.
10. The predictive maintenance method according to claim 1, characterized in that: The maintenance strategy of the battery cluster is generated through multiple iterative optimizations. Each iteration evaluates the performance recovery of the cluster by executing a series of maintenance actions, and continuously improves the decision-making ability of the deep DQN network based on these evaluation results.
Citation Information
Patent Citations
Maintenance effect modeling method considering maintenance negative effect
CN110909442A
Cluster system preventive maintenance method based on deep reinforcement learning
CN113673721A
Adaptive network switching method and system and storage medium
CN114125962A
Distribution transformer economic operation and maintenance method based on reinforcement learning
CN116128153A
Mobile micro-grid energy supplement strategy optimization method and system
CN116683513A
Cited By
Cluster system intelligent operation and maintenance system based on reinforcement learning
CN119090492A
Efficiency evaluation method and device for intelligent operation and maintenance of cluster system
CN119127650A
Receiving end power grid response driving load shedding control method considering transient voltage recovery demand
CN119726757A