Time-of-use electricity price optimization method of incremental electricity distribution and sale operator and terminal

By constructing a two-stage optimization scheduling model and column and constraint generation algorithm, the problems of operational risks and high user costs of incremental distribution operators when formulating time-sharing electricity prices are solved, and the effect of reducing operational risks and electricity consumption costs is achieved.

CN118886933AActive Publication Date: 2024-11-01STATE GRID FUJIAN POWER ELECTRIC CO ECONOMIC RESEARCH INSTITUTE +1
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202410833589.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-06-26
Publication Date
2024-11-01
Estimated Expiration
2044-06-26

AI Technical Summary

Technical Problem

Incremental distribution operators find it difficult to formulate time-sharing electricity price strategies in the power market, resulting in high operational risks and high user costs.

Method used

Build a two-stage optimization scheduling model for incremental distribution operators, combine risk measurement and user electricity cost minimization model, use column and constraint generation algorithms to solve, and formulate time-sharing electricity price optimization strategies.

Benefits of technology

It effectively reduces the operating risks of power sales operators and the electricity costs of users, proposes an economical and reasonable time-sharing electricity price strategy, and improves market efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118886933A_ABST
    Figure CN118886933A_ABST
Patent Text Reader

Abstract

The invention discloses a time-of-use electricity price optimization method and terminal for an incremental power distribution and sale operator, and the method comprises the steps: constructing a time-of-use electricity price optimization upper-layer model for maximizing the profit of the incremental power distribution and sale operator, and introducing a conditional risk value into a target function to measure the risk, thereby facilitating the proposal of a more economic and reasonable time-of-use electricity price optimization strategy; constructing a lower-layer model for minimizing the power consumption cost of the user and maximizing the power consumption satisfaction profit; on the basis of the upper-layer model and the lower-layer model, constructing an incremental power distribution and sale operator two-stage distribution robust optimization scheduling model, and adopting a column sum constraint generation algorithm (Camp; according to the method, the operation risk of an electricity selling operator can be effectively reduced, and the expenditure cost of a user is reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of time-of-use electricity price optimization, and in particular to a time-of-use electricity price optimization method and terminal for an incremental distribution and sales electricity operator. Background Art

[0002] With the accelerated construction of new power systems and the deepening reform of the power system, the power grid structure and power system are undergoing profound changes. In this change, emerging entities such as electric vehicles, distributed power sources, integrated systems of source, grid, load and storage, and energy storage technologies have emerged in large numbers, further enriching the types of participants in the power market. At present, as a link between diversified power markets and users, the core profit model of power sales operators is to purchase electricity from the upper market and resell it to end users. In order to maximize operating profits, incremental distribution and sales operators must make optimized decisions in both power purchase and power sales. In the current competitive power retail market environment, incremental distribution and sales operators are in urgent need of designing reasonable pricing strategies to improve user experience and attract consumers. When consumers make energy choices, cost and living comfort are the two main considerations. Nowadays, consumers are increasingly aware of the importance of managing energy consumption patterns in the best way. Time-of-use electricity prices are widely used in retail packages between power sales operators and users. It not only helps to respond to the demand-side management of power grid operators, but also encourages users to optimize their electricity consumption behavior according to different electricity prices during peak and valley periods. This pricing model forms a new paradigm for supply and demand interaction, which helps multiple parties in the energy supply chain achieve a win-win situation. Therefore, how to scientifically and reasonably formulate time-of-use electricity price strategies has become a key issue facing incremental distribution and sales operators and the power market. Summary of the invention

[0003] The technical problem to be solved by the present invention is to provide a time-of-use electricity price optimization method and terminal for incremental distribution and sales operators, which can effectively reduce the operating risks of power sales operators and reduce user expenditure costs.

[0004] In order to solve the above technical problems, the technical solution adopted by the present invention is:

[0005] A time-of-use electricity price optimization method for an incremental power distribution operator comprises the following steps:

[0006] Combined with risk measurement, an upper-level model for time-of-use electricity price optimization is constructed to maximize the profit of incremental distribution and sales operators;

[0007] Construct a lower-level model that minimizes user electricity costs and maximizes electricity satisfaction benefits;

[0008] The upper model and the lower model are combined to construct a two-stage optimization scheduling model for incremental distribution and sales operators, and a column and constraint generation algorithm is used to solve the two-stage optimization scheduling model to obtain a time-of-use electricity price optimization strategy.

[0009] In order to solve the above technical problems, another technical solution adopted by the present invention is:

[0010] A time-of-use electricity price optimization terminal for an incremental power distribution and sales operator comprises a memory, a processor and a computer program stored in the memory and executable on the processor. When the processor executes the computer program, each step of the above-mentioned time-of-use electricity price optimization method for an incremental power distribution and sales operator is implemented.

[0011] The beneficial effects of the present invention are: constructing an upper-level model for time-of-use electricity price optimization that maximizes the profits of incremental distribution and sales operators, and introducing conditional risk value in the objective function to measure the risk, so as to facilitate the proposal of a more economical and reasonable time-of-use electricity price optimization strategy; constructing a lower-level model that minimizes the user's electricity cost and maximizes the electricity satisfaction benefit; on the basis of the upper and lower-level models, constructing a two-stage distributed robust optimization scheduling model for incremental distribution and sales operators, and using the column and constraint generation algorithm (C&CG) to solve the model, which can effectively reduce the operating risks of power sales operators and reduce user expenditure costs. BRIEF DESCRIPTION OF THE DRAWINGS

[0012] Figure 1 It is a flow chart of a time-of-use electricity price optimization method of an incremental distribution and sales electricity operator according to an embodiment of the present invention;

[0013] Figure 2 A schematic diagram of a time-of-use electricity price optimization terminal of an incremental distribution and sales electricity operator according to an embodiment of the present invention;

[0014] Figure 3 Schematic diagram of a two-stage optimization scheduling model according to an embodiment of the present invention.

[0015] Description of labels:

[0016] 1. A time-of-use electricity price optimization terminal for an incremental power distribution operator; 2. A memory; 3. A processor. DETAILED DESCRIPTION

[0017] In order to explain the technical content, achieved objectives and effects of the present invention in detail, the following is an explanation in combination with the implementation modes and the accompanying drawings.

[0018] Please refer to Figure 1 The embodiment of the present invention provides a time-of-use electricity price optimization method for an incremental distribution and sales operator, comprising the steps of:

[0019] Combined with risk measurement, an upper-level model for time-of-use electricity price optimization is constructed to maximize the profit of incremental distribution and sales operators;

[0020] Construct a lower-level model that minimizes user electricity costs and maximizes electricity satisfaction benefits;

[0021] The upper model and the lower model are combined to construct a two-stage optimization scheduling model for incremental distribution and sales operators, and a column and constraint generation algorithm is used to solve the two-stage optimization scheduling model to obtain a time-of-use electricity price optimization strategy.

[0022] From the above description, it can be seen that the beneficial effects of the present invention are: constructing an upper-level model for time-of-use electricity price optimization that maximizes the profits of incremental distribution and sales operators, and introducing conditional risk value in the objective function to measure the risk, so as to facilitate the proposal of a more economical and reasonable time-of-use electricity price optimization strategy; constructing a lower-level model that minimizes user electricity costs and maximizes electricity satisfaction benefits; on the basis of the upper and lower models, constructing a two-stage distributed robust optimization scheduling model for incremental distribution and sales operators, and using the column and constraint generation algorithm (C&CG) to solve the model, which can effectively reduce the operating risks of power sales operators and reduce user expenditure costs.

[0023] Furthermore, the upper-level model of time-of-use electricity price optimization for maximizing the profit of incremental distribution and sales operators is constructed in combination with risk measurement, including:

[0024] Construct the objective function of the upper model for time-of-use electricity price optimization:

[0025] max F=γF EXP -(1-γ)C CVaR

[0026] In the formula, F EXP represents the expected operating income of the incremental distribution operator, C CVaR represents the risk value of system operating conditions, (1-γ) represents the risk preference coefficient, γ represents the proportion of expected cost in system operating cost, and F represents the incremental profit of distribution and sales operators;

[0027] Among them, max F EXP =M-C 1 -C 2 -C 3 ;

[0028] In the formula, M represents the incremental electricity sales revenue of the distribution and sales operator, C 1 represents the electricity purchase cost in the medium and long term market and the spot market, C 2 represents the incremental distribution area distributed generation return cost, C 3 represents the configuration and daily operating cost of the energy storage system;

[0029] Power balance constraints, new energy output constraints, energy storage system operation constraints and electricity price constraints are set for the upper model of the time-of-use electricity price optimization.

[0030] From the above description, it can be seen that the risks of incremental distribution and sales operators mainly come from price uncertainty in the upper-level market, unstable load, and volatility in the output of power sources such as wind and solar power. Therefore, using CVaR conditional value at risk to characterize risk losses can propose a more economical and reasonable time-of-use electricity price optimization strategy.

[0031] Furthermore, a lower-level model for optimizing time-of-use electricity prices is constructed to minimize user electricity costs and maximize electricity satisfaction benefits, including:

[0032] Construct the objective function of the lower model:

[0033] minf=C L +C H +C bess +C pv -M CP

[0034] In the formula, C L represents the load electricity cost, C H represents the comfort cost, C bess , C pv Represents energy storage and user photovoltaic cost expenditure, M CP It indicates the benefits of electricity satisfaction;

[0035]

[0036] In the formula, represents the load adjustment amount after the user responds to the time-of-use electricity price at time t, and α and β represent the load adjustment satisfaction coefficient;

[0037]

[0038] In the formula, a cut 、b cut Indicates the interruptible load compensation factor, represents the load interruption amount at time t; represents the load reduction state variable at time t. When the load is reduced otherwise

[0039] From the above description, it can be seen that the electricity satisfaction benefit is calculated by the load reduction status, load interruption amount and load compensation coefficient. Therefore, based on the premise of user satisfaction, the lower-level model is established with the goal of minimizing the user's electricity cost, which further improves the rationality of the subsequent time-of-use electricity price optimization strategy generation.

[0040] Furthermore, a two-stage optimization scheduling model for incremental power distribution and sales operators is constructed by combining the upper model and the lower model, including:

[0041] The time-of-use electricity price output by the upper model is input into the lower model, and the electricity consumption plan output by the lower model is input into the upper model to construct a two-stage optimization scheduling model for incremental distribution and sales operators.

[0042] Furthermore, a two-stage optimization dispatch model for incremental distribution and sales operators is constructed, including:

[0043]

[0044] In the formula, x represents the time period, level and energy storage operation plan of the electricity price in the first stage optimization; y represents all continuous decision variables in the second stage optimization, including the charging and discharging power of the energy storage battery at each moment, the amount of load interruption or transfer; are the coefficient vectors of x and y respectively; U represents the set of prediction error random variables in the model;

[0045] F EXP represents the expected operating income of the incremental distribution operator, C CVaR represents the risk value of system operating conditions, (1-γ) represents the risk preference coefficient, γ represents the proportion of expected cost in system operating cost, C L represents the load electricity cost, C H represents the comfort cost, C bess , C pv Represents energy storage and user photovoltaic cost expenditure, M CP Indicates the benefits of electricity consumption satisfaction.

[0046] From the above description, it can be seen that users follow the time-of-use electricity prices implemented by the incremental distribution and sales operators, and adjust their own electricity consumption plans through demand response, etc. The two-layer optimization of the time-of-use electricity prices of the incremental distribution and sales operators considering the influence of uncertain factors can be modeled as a two-stage robust optimization problem: the first stage optimization model is responsible for solving the operator's operating strategy problem, mainly for the worst case of uncertain factors to give the corresponding operation benefit maximization strategy, and its decision variables are the time period and level of electricity prices; the second stage optimization model is responsible for solving the user's electricity consumption plan problem, mainly by changing the value of the load demand random variable to determine the situation that can maximize the operating benefit, and its decision variables are the energy storage battery charging and discharging power at each moment, and the load interruption or transfer amount.

[0047] Please refer to Figure 2 Another embodiment of the present invention provides a time-of-use electricity price optimization terminal for an incremental distribution and sales power operator, comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein the processor implements the various steps of the above-mentioned time-of-use electricity price optimization method for an incremental distribution and sales power operator when executing the computer program.

[0048] The above-mentioned time-of-use electricity price optimization method and terminal of an incremental power distribution and sales operator of the present invention are suitable for effectively reducing the operating risks of power sales operators and reducing user expenditure costs. The following is an explanation through specific implementation methods:

[0049] Embodiment 1

[0050] Please refer to Figure 1 and Figure 3 , a time-of-use electricity price optimization method for an incremental power distribution operator, comprising the steps of:

[0051] S1. Combined with risk measurement, an upper-level model for time-of-use electricity price optimization is constructed to maximize the profit of incremental distribution and sales operators.

[0052] Specifically, the incremental distribution and sales operator in this embodiment refers to the operator that integrates the wind and solar units and energy storage devices in the region, interacts with the large power grid, formulates a sales strategy, and meets the electricity needs of users in the region. The economic dispatch model target of the incremental distribution and sales operator takes into account the uncertainty of market prices, power output, and load, and the risk loss cost is described in the model:

[0053] max F=γF EXP -(1-γ)C CVaR

[0054] In the formula, F EXP represents the expected operating income of the incremental distribution operator, C CVaR represents the risk value of system operating conditions, (1-γ) represents the risk preference coefficient, γ represents the proportion of expected cost in system operating cost, and F represents the incremental profit of distribution and sales operators;

[0055] Among them, max F EXP =M-C 1 -C 2 -C 3 ;

[0056] In the formula, M represents the incremental electricity sales revenue of the distribution and sales operator, C 1 represents the electricity purchase cost in the medium and long term market and the spot market, C 2 represents the incremental distribution area distributed generation return cost, C 3 Represents the configuration and daily operating cost of the energy storage system.

[0057]

[0058] In the formula, x t P represents the time-of-use electricity price for different time periods set by the incremental distribution and sales operator. t It represents the total electricity demand in the incremental distribution and sales area during time period t.

[0059]

[0060] Incremental distribution and sales operators participate in medium- and long-term market transactions through bilateral negotiations or centralized bidding based on the predicted load curve of users in their area to form a transaction price ρ b and transaction volume Q b t ; k is a binary variable with a value of ±1. When the value is 1, it means that the electricity sales operator needs to purchase electricity from the spot market, and the transaction price is the electricity price ρ s and transaction volume Q s t When the value is -1, it means selling electricity to the spot market.

[0061]

[0062] ρ pv , wt are the on-grid electricity prices of photovoltaic and wind power in the incremental distribution area, The predicted output of photovoltaic and wind turbines respectively.

[0063]

[0064] C 3 The main considerations are the charging and discharging conversion costs and daily operation and maintenance costs of the energy storage devices of the power sales operators, among which: Respectively represent the charging power and discharging power of the energy storage device, C BESS The operation and maintenance cost of the energy storage device; Indicates the operation and maintenance cost of energy storage charging state conversion, They respectively represent the conversion of the energy storage device to charging and to discharging.

[0065] The constraints include the following:

[0066] (1) Power balance constraints

[0067]

[0068] The incremental power distribution area must maintain a balance between the real-time power it interacts with users and the real-time power it interacts with the upper-level power grid and distributed power sources.

[0069] (2) Constraints on new energy output

[0070]

[0071] In the formula, Respectively represent the upper limits of photovoltaic and wind power output power.

[0072] (3) Energy storage system operation constraints

[0073]

[0074] In the formula, respectively represent the charging capacity constraint of the energy storage system, the upper and lower limit constraints of the charging power, the charging and discharging state constraint, and the battery charge state constraint. are the charge / discharge power of the battery respectively; are the maximum values ​​of the charge / discharge power of the battery respectively; are the charge / discharge efficiency of the battery respectively; Cap is the rated capacity of the battery; Indicates the charge and discharge capacity and state of charge of the energy storage system; SOC min , SOC max Indicates the maximum and minimum charge states of the energy storage system.

[0075] (4) Electricity price constraints

[0076]

[0077] Where, T f , T p , T g They represent peak time, normal time and valley time respectively, x f 、x p 、x g Respectively represent the electricity prices corresponding to peak time, normal time and valley time; x min 、x max They respectively represent the upper and lower limits of the peak-valley electricity price ratio to avoid the peak-valley inversion.

[0078] In addition, the risks of incremental power distribution operators mainly come from price uncertainty in the upper market, unstable load, and volatility of wind and solar power output. In this embodiment, the CVaR conditional risk value is used to characterize risk losses, thereby proposing a more economical and reasonable time-of-use electricity price customization strategy. Compared with VaR, CVaR can better characterize tail risks and improve the level of risk assessment. The loss of incremental power distribution operators can be expressed as the power purchase cost in a certain scenario minus the expected value of the power purchase cost. It is assumed that under the condition of confidence σ, the operator's power purchase loss does not exceed a certain maximum loss value C VaRσ , then its loss exceeds C VaRσ The expected loss C CVaR It can be expressed as:

[0079]

[0080] In the formula, C VaRσ That is, the maximum possible loss of the incremental distribution and sales operator under the confidence level σ, C CVaR For losses exceeding C VaRσ k is the number of scenarios, p(k) is the probability of scenario k occurring; C EXPis the expected electricity purchase cost.

[0081] Introducing variables ξ and ν(k), the objective function is transformed into:

[0082]

[0083] S2. Construct a lower-level model that minimizes users’ electricity costs and maximizes electricity satisfaction benefits.

[0084] Specifically, the lower-level model takes the minimum total cost of users as the objective function. Users are integrated producers and consumers, including power sources such as energy storage and household photovoltaics. The loads are composed of fixed loads, transferable loads, and interruptible loads. Users can reduce their own electricity costs by adjusting the loads in each period. The objective function for constructing the lower-level model is:

[0085] minf=C L +C H +C bess +C pv -M CP

[0086] In the formula, C L represents the load electricity cost, C H represents the comfort cost, C bess , C pv Represents energy storage and user photovoltaic cost expenditure, M CP It indicates the benefits of electricity satisfaction;

[0087]

[0088] Where P L The power consumption in period t after the user participates in demand response;

[0089]

[0090] In the formula, represents the load adjustment amount after the user responds to the time-of-use electricity price at time t, and α and β represent the load adjustment satisfaction coefficient;

[0091]

[0092] In the formula, a cut 、b cut Indicates the interruptible load compensation factor, represents the load interruption amount at time t; represents the load reduction state variable at time t. When the load is reduced otherwise

[0093] S3. Combining the upper model with the lower model, constructing a two-stage optimization scheduling model for incremental power distribution and sales operators, and using a column and constraint generation algorithm to solve the two-stage optimization scheduling model to obtain a time-of-use electricity price optimization strategy.

[0094] The time-of-use electricity price output by the upper model is input into the lower model, and the electricity consumption plan output by the lower model is input into the upper model to construct a two-stage optimization scheduling model for incremental distribution and sales operators.

[0095] Specifically, users follow the time-of-use electricity prices implemented by the incremental distribution and sales operators, and adjust their own electricity consumption plans through demand response and other means. The two-layer optimization of the time-of-use electricity prices of the incremental distribution and sales operators considering the influence of uncertain factors can be modeled as a two-stage robust optimization problem: the first stage optimization model is responsible for solving the operator's operating strategy problem, mainly to give the corresponding operation benefit maximization strategy for the worst case of uncertain factors, and its decision variables are the time period and level of electricity prices; the second stage optimization model is responsible for solving the user's electricity consumption plan problem, mainly by changing the value of the load demand random variable to determine the situation that can maximize the operation benefit, and its decision variables are the energy storage battery charging and discharging power at each moment, and the load interruption amount or transfer amount. Two-stage robust optimization model As follows:

[0096]

[0097]

[0098] In the formula, x represents the time period, level and energy storage operation plan of the electricity price in the first stage optimization; y represents all continuous decision variables in the second stage optimization, including the charging and discharging power of the energy storage battery at each moment, the amount of load interruption or transfer; are the coefficient vectors of x and y respectively; U represents the collection of prediction error random variables in the model.

[0099] The inner optimization problem in the second stage is converted into a single-level linear programming problem through dual transformation and then solved. It can be obtained:

[0100]

[0101] Where: is the Lagrange multiplier vector corresponding to the inequality constraint, b 2 are the coefficient vector and intercept of x respectively.

[0102] The robust optimization model It can be transformed into solving the following formula:

[0103]

[0104] Optimizing time-of-use electricity prices is a complex problem because it involves multiple variables, such as electricity price period, electricity price level, and electricity consumption. This problem not only involves multiple variables, but also is a non-convex optimization problem with complementary constraints. To solve this problem, we adopted the C&CG (column and constraint generation) split idea to build the overall framework of the algorithm. Our method first uses the idea of ​​master-slave iteration to decompose the original complex problem into a main problem and a sub-problem, and solves these two problems alternately. In each iteration of the algorithm, the optimization of the main problem and the sub-problem is included. The optimization of the sub-problem is mainly to solve the minimization of electricity cost. The optimized target information will be fed back to the main problem in the form of C&CG cuts, so that a new round of problems will be generated and then continue to be solved. In this way, we can gradually approach the optimal solution, thereby effectively solving this non-convex optimization problem with multiple variables and complementary constraints.

[0105] Embodiment 2

[0106] Please refer to Figure 2 A time-of-use electricity price optimization terminal 1 for an incremental distribution and sales power operator includes a memory 2, a processor 3, and a computer program stored in the memory 2 and executable on the processor 3. When the processor 3 executes the computer program, each step of a time-of-use electricity price optimization method for an incremental distribution and sales power operator of embodiment 1 is implemented.

[0107] In summary, the present invention provides a time-of-use electricity price optimization method and terminal for incremental distribution and sales operators, constructs an upper-level model for time-of-use electricity price optimization that maximizes the profit of incremental distribution and sales operators, and introduces conditional risk value in the objective function to measure the risk, so as to facilitate the proposal of a more economical and reasonable time-of-use electricity price optimization strategy; constructs a lower-level model that minimizes user electricity costs and maximizes electricity satisfaction benefits; on the basis of the upper and lower models, constructs a two-stage distributed robust optimization scheduling model for incremental distribution and sales operators, and adopts the column and constraint generation algorithm (C&CG) to solve the model, which can effectively reduce the operating risks of power sales operators and reduce user expenditure costs.

[0108] The above descriptions are merely embodiments of the present invention and are not intended to limit the patent scope of the present invention. Any equivalent transformations made using the contents of the present invention's specification and drawings, or directly or indirectly applied in related technical fields, are also included in the patent protection scope of the present invention.

Claims

1. A time-of-use electricity price optimization method for incremental power distribution operators, characterized in that: Includes steps: Combined with risk measurement, an upper-level model for time-of-use electricity price optimization is constructed to maximize the profit of incremental distribution and sales operators; Construct a lower-level model that minimizes user electricity costs and maximizes electricity satisfaction benefits; The upper model and the lower model are combined to construct a two-stage optimization scheduling model for incremental distribution and sales operators, and a column and constraint generation algorithm is used to solve the two-stage optimization scheduling model to obtain a time-of-use electricity price optimization strategy.

2. A time-of-use electricity price optimization method for an incremental power distribution operator according to claim 1, characterized in that: Combined with risk measurement, the upper-level model of time-of-use electricity price optimization for maximizing the profit of incremental distribution and sales operators is constructed, including: Construct the objective function of the upper model for time-of-use electricity price optimization: max F=γF EXP -(1-c)C CVaR In the formula, F EXP represents the expected operating income of the incremental distribution operator, C CVaR represents the risk value of system operating conditions, (1-γ) represents the risk preference coefficient, γ represents the proportion of expected cost in system operating cost, and F represents the incremental profit of distribution and sales operators; Among them, max F EXP =M-C1-C2-C3; In the formula, M represents the electricity sales revenue of the incremental power distribution operator, C1 represents the power purchase cost in the medium and long-term market and the spot market, C2 represents the return cost of distributed power generation in the incremental power distribution area, and C3 represents the daily cost of energy storage system configuration and operation; Power balance constraints, new energy output constraints, energy storage system operation constraints and electricity price constraints are set for the upper model of the time-of-use electricity price optimization.

3. The time-of-use electricity price optimization method for an incremental power distribution operator according to claim 1 is characterized in that: Construct a lower-level model for time-of-use electricity price optimization that minimizes user electricity costs and maximizes electricity satisfaction benefits, including: Construct the objective function of the lower model: minf=C L +C H +C bess +C pv -M CP In the formula, C L represents the load electricity cost, C H represents the comfort cost, C bess , C pv Represents energy storage and user photovoltaic cost expenditure, M CP It indicates the benefits of electricity satisfaction; In the formula, represents the load adjustment amount after the user responds to the time-of-use electricity price at time t, and α and β represent the load adjustment satisfaction coefficient; In the formula, a cut 、b cut Indicates the interruptible load compensation factor, represents the load interruption amount at time t; represents the load reduction state variable at time t. When the load is reduced otherwise 4. The time-of-use electricity price optimization method for an incremental power distribution operator according to claim 1 is characterized in that: Combining the upper model and the lower model, a two-stage optimization scheduling model for incremental power distribution and sales operators is constructed, including: The time-of-use electricity price output by the upper model is input into the lower model, and the electricity consumption plan output by the lower model is input into the upper model to construct a two-stage optimization scheduling model for incremental distribution and sales operators.

5. A time-of-use electricity price optimization method for an incremental power distribution operator according to claim 4, characterized in that: A two-stage optimization dispatch model for incremental distribution and sales operators is constructed, including: In the formula, x represents the time period, level and energy storage operation plan of the electricity price in the first stage optimization; y represents all continuous decision variables in the second stage optimization, including the charging and discharging power of the energy storage battery at each moment, the amount of load interruption or transfer; are the coefficient vectors of x and y respectively; U represents the set of prediction error random variables in the model; F EXP represents the expected operating income of the incremental distribution operator, C CVaR represents the risk value of system operating conditions, (1-γ) represents the risk preference coefficient, γ represents the proportion of expected cost in system operating cost, C L represents the load electricity cost, C H represents the comfort cost, C bess , C pv Represents energy storage and user photovoltaic cost expenditure, M CP Indicates the benefits of electricity consumption satisfaction.

6. A time-of-use electricity price optimization terminal for an incremental power distribution operator, comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, characterized in that: When the processor executes the computer program, the following steps are implemented: Combined with risk measurement, an upper-level model for time-of-use electricity price optimization is constructed to maximize the profit of incremental distribution and sales operators; Construct a lower-level model that minimizes user electricity costs and maximizes electricity satisfaction benefits; The upper model and the lower model are combined to construct a two-stage optimization scheduling model for incremental distribution and sales operators, and a column and constraint generation algorithm is used to solve the two-stage optimization scheduling model to obtain a time-of-use electricity price optimization strategy.

7. A time-of-use electricity price optimization terminal for an incremental power distribution and sales operator according to claim 6, characterized in that: Combined with risk measurement, the upper-level model of time-of-use electricity price optimization for maximizing the profit of incremental distribution and sales operators is constructed, including: Construct the objective function of the upper model for time-of-use electricity price optimization: max F=γF EXP -(1-c)C CVaR In the formula, F EXP represents the expected operating income of the incremental distribution operator, C CVaR represents the risk value of system operating conditions, (1-γ) represents the risk preference coefficient, γ represents the proportion of expected cost in system operating cost, and F represents the incremental profit of distribution and sales operators; Among them, max F EXP =M-C1-C2-C3; In the formula, M represents the electricity sales revenue of the incremental power distribution operator, C1 represents the power purchase cost in the medium and long-term market and the spot market, C2 represents the return cost of distributed power generation in the incremental power distribution area, and C3 represents the daily cost of energy storage system configuration and operation; Power balance constraints, new energy output constraints, energy storage system operation constraints and electricity price constraints are set for the upper model of the time-of-use electricity price optimization.

8. The time-of-use electricity price optimization terminal of an incremental power distribution operator according to claim 6, characterized in that: Construct a lower-level model for time-of-use electricity price optimization that minimizes user electricity costs and maximizes electricity satisfaction benefits, including: Construct the objective function of the lower model: minf=C L +C H +C bess +C pv -M CP In the formula, C L represents the load electricity cost, C H represents the comfort cost, C bess , C pv Represents energy storage and user photovoltaic cost expenditure, M CP It indicates the benefits of electricity satisfaction; In the formula, represents the load adjustment amount after the user responds to the time-of-use electricity price at time t, and α and β represent the load adjustment satisfaction coefficient; In the formula, a cut 、b cut Indicates the interruptible load compensation factor, represents the load interruption amount at time t; represents the load reduction state variable at time t. When the load is reduced otherwise 9. A time-of-use electricity price optimization terminal for an incremental power distribution and sales operator according to claim 6, characterized in that: Combining the upper model and the lower model, a two-stage optimization scheduling model for incremental power distribution and sales operators is constructed, including: The time-of-use electricity price output by the upper model is input into the lower model, and the electricity consumption plan output by the lower model is input into the upper model to construct a two-stage optimization scheduling model for incremental distribution and sales operators.

10. A time-of-use electricity price optimization terminal for an incremental power distribution and sales operator according to claim 9, characterized in that: A two-stage optimization dispatch model for incremental distribution and sales operators is constructed, including: In the formula, x represents the time period, level and energy storage operation plan of the electricity price in the first stage optimization; y represents all continuous decision variables in the second stage optimization, including the charging and discharging power of the energy storage battery at each moment, the amount of load interruption or transfer; are the coefficient vectors of x and y respectively; U represents the set of prediction error random variables in the model; F EXP represents the expected operating income of the incremental distribution operator, C CVaR represents the risk value of system operating conditions, (1-γ) represents the risk preference coefficient, γ represents the proportion of expected cost in system operating cost, C L represents the load electricity cost, C H represents the comfort cost, C bess , C pv Represents energy storage and user photovoltaic cost expenditure, M CP Indicates the benefits of electricity consumption satisfaction.

Citation Information

Patent Citations

  • Electricity seller optimal electricity price decision making method in consideration of uncertainty

    CN108182507A

  • Risk-constrained Optimization of Virtual Power Plants in Pool and Future Markets

    US20220284458A1