Plant-level multi-unit scheduling and control method containing digital twinning and boundary condition quantification

Through digital twin and boundary condition quantization technology, a multi-unit scheduling model was established, which solved the complexity and uncertainty of multi-unit scheduling and control of thermal power plants, realized load scheduling and equipment optimization, and improved the economy and environmental protection of thermal power plants. sex.

CN118889386APending Publication Date: 2024-11-01HANGZHOU YINGJI POWER TECH CO LTD
View PDF 0 Cites 7 Cited by

Patent Information

Application Number
CN202410918639.1
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-10
Publication Date
2024-11-01

AI Technical Summary

Technical Problem

Multi-unit scheduling and control of thermal power plants faces complexity and uncertainty in the context of power market reform and new energy access, and traditional manual experience is difficult to maximize economic benefits and energy conservation and consumption reduction.

Method used

Digital twin and boundary condition quantization methods are adopted to establish a multi-unit digital twin model, dynamic boundary condition quantization, simulation calculation and optimization scheduling, load scheduling strategies are formulated, equipment operation parameters are optimized, and plant-level optimization and scheduling control are formed.

Benefits of technology

The accuracy and economicality of the scheduling model are improved, and the energy-saving and economical operation of thermal power plants is achieved, adapting to load changes, optimizing coal consumption and environmental protection.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118889386A_ABST
    Figure CN118889386A_ABST
Patent Text Reader

Abstract

The invention discloses a plant-level multi-unit scheduling and control method containing digital twinning and boundary condition quantification. The method comprises the following steps: establishing a thermal power plant multi-unit digital twinning model; performing dynamic boundary condition quantification of plant-level optimization scheduling; establishing a plant-level multi-unit multi-mode coal consumption prediction model; optimizing a plant-level multi-unit operation combination mode by taking the minimum coal consumption of the plant-level multi-unit as a target; on the basis of a multi-unit optimal operation combination mode, according to a dynamic boundary condition quantification result, under the condition that an electrical load scheduling instruction and heat supply network supply and demand dynamic balance are met, a plant-level multi-unit optimal scheduling model is established with plant-level economy, environmental protection performance and rapid responsiveness optimization as targets; and on the basis of the multi-unit load optimal scheduling strategy, setting a multi-unit load control target, and according to the multi-unit load control target and the real-time monitored data index, establishing an equipment-level optimal control model to obtain operation control parameters of plant-level equipment.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention belongs to the technical field of dispatching and controlling of thermal power plants, and in particular relates to a plant-level multi-unit dispatching and control method including digital twins and boundary condition quantification. Background Art

[0002] With the continuous development of the power industry, especially the reform of the power market and the application of new technologies, the dispatching and control of multiple units in thermal power plants are facing many problems. For example, the power market has introduced a competitive mechanism, and thermal power plants need to flexibly adjust their power generation according to the price signals of the power market to maximize the economic benefits of the plant level, and thermal power plants participate in the auxiliary service market to carry out peak load regulation operations to obtain additional income; in addition, the large-scale access of new energy has increased the uncertainty and volatility of the power system.

[0003] Therefore, the dispatching and control of multiple units in a thermal power plant is complex and changeable, and the operating modes and unit characteristics of each unit are also different. It is difficult to deal with it by simply using traditional manual experience dispatching methods. There is a lack of quantitative analysis methods and scientific guidance, and it is difficult to achieve energy-saving and economical dispatching and control of multiple units at the plant level. How to quantitatively analyze the dynamic boundary conditions and uncertainty factors of the dispatching and control of multiple units at the plant level, and use a combination of simulation modeling, artificial intelligence technology and big data analysis to integrate the dispatching and control of multiple units at the plant level and improve the economic benefits of the plant level is an urgent problem to be solved.

[0004] Based on the above technical problems, it is necessary to design a new plant-level multi-unit scheduling and control method containing digital twins and boundary condition quantification. Summary of the invention

[0005] The technical problem to be solved by the present invention is to overcome the shortcomings of the prior art and provide a plant-level multi-unit scheduling and control method containing digital twins and boundary condition quantification, which can calculate the plant-level economic, environmental protection and rapid response goals according to the quantified results of dynamic boundary conditions, formulate plant-level multi-unit load scheduling strategies, meet the power load scheduling instructions and the unit operation optimization scheduling of the dynamic balance of supply and demand of the heat network, improve the accuracy of the plant-level scheduling model, and realize energy-saving, economical and efficient operation of thermal power plants. In addition, by establishing an equipment-level optimization control model, it can guide the operating control parameters of each unit equipment and achieve the load control target assigned to each unit. Through plant-level optimization scheduling and equipment-level optimization control, plant-level optimization and scheduling control are integrated.

[0006] In order to solve the above technical problems, the technical solution of the present invention is:

[0007] The present invention provides a plant-level multi-unit scheduling and control method including digital twins and boundary condition quantification, comprising:

[0008] Based on the variable operating data of the multi-mode flexibility transformation units in the thermal power plant, a digital twin model of multiple units in the thermal power plant is established;

[0009] Quantify the dynamic boundary conditions for plant-level optimal scheduling, including thermal load forecasting, fuel price forecasting, renewable energy power generation forecasting, and power clearing price forecasting based on power market mechanisms;

[0010] Based on the digital twin model of multiple units in a thermal power plant, online simulation calculations are performed to analyze the coal consumption of multiple units in the thermal power plant under different electric load and thermal load combination ranges, different operation combination modes, and multi-dimensional factors affecting coal consumption, and a plant-level multi-unit multi-mode coal consumption prediction model is established;

[0011] With the goal of minimizing the coal consumption of multiple units at the plant level, the optimization of the operation combination mode of multiple units at the plant level is carried out to obtain the optimal operation combination mode of multiple units under different combination ranges of electrical load and thermal load;

[0012] On the basis of the optimal operation combination mode of multiple units and according to the quantitative results of dynamic boundary conditions, under the condition of meeting the electric load dispatching instructions and the dynamic balance of heat network supply and demand, with the goal of optimizing the plant-level economy, environmental protection and rapid response, a plant-level multi-unit optimization dispatching model is established, and the optimal load dispatching strategy of the plant-level multi-unit is output;

[0013] On the basis of the optimal dispatching strategy for multi-unit loads, multi-unit load control targets are set, and according to the multi-unit load control targets and real-time monitoring data indicators, an equipment-level optimization control model is established to obtain the operating control parameters of each plant-level equipment, which are then sent to the controller for execution and tracking of the execution status.

[0014] Furthermore, the multi-unit digital twin model of the thermal power plant is established based on the variable operating condition operation data of the multi-mode flexibility transformation units in the thermal power plant, which specifically includes:

[0015] Carry out multi-mode flexibility transformation of units in a thermal power plant, including high back pressure units, extraction steam units, cylinder cutting units, and light axis units; the thermal power plant includes multiple thermal power units, which take fuel as input and output electrical energy and thermal energy;

[0016] Use modeling simulation analysis software to build a mechanism model consistent with the structure of the thermal power plant heating system;

[0017] The variable operating condition data of the units in the thermal power plant under different load conditions and different heating modes are obtained, and the data are connected to the mechanism model after preprocessing. The model simulation results are identified and corrected to build a digital twin model of multiple units in the thermal power plant.

[0018] Furthermore, the power clearing price forecasting based on the power market mechanism specifically includes:

[0019] The process of setting up thermal power plants as market players to participate in the electricity market mechanism: the trading center publishes trading rules to various market participants, eligible power generators report their bidding information to the trading center in advance, and the trading center analyzes the information of both power generators and power users and conducts centralized clearing;

[0020] Obtain the multi-dimensional factors that affect the power clearing price of thermal power plants, including: historical power demand curve, power supply of each unit, power supply and demand coefficient, renewable energy power generation, renewable energy penetration rate, fuel price, power generator quotation, historical power clearing price, meteorological factors, and future renewable energy power generation forecast results and fuel price forecast results;

[0021] Calculate the weight coefficient of each factor affecting the electricity clearing price;

[0022] The similar day theory is used to analyze the multi-dimensional factors of historical days and days to be predicted, and several historical days with similar influencing factors to the days to be predicted are selected according to the weight coefficients. The multi-dimensional factors of historical days and the weight coefficients of each factor affecting the power clearing price, as well as the forecast error of renewable energy power generation, the forecast error of fuel prices, and the forecast error of power demand caused by meteorological factors are used as the training set of the power clearing price forecast model.

[0023] After training the training set using a machine learning algorithm, a power clearing price prediction model is established.

[0024] Furthermore, the online simulation calculation is performed based on the digital twin model of multiple units in the thermal power plant, the coal consumption of multiple units in the thermal power plant under different electric load and thermal load combination intervals, different operation combination modes and multi-dimensional factors affecting coal consumption are analyzed, and a plant-level multi-unit multi-mode coal consumption prediction model is established, which specifically includes:

[0025] According to the electricity load and heat load borne by the thermal power plant in the historical period, the electricity load and heat load are divided into multiple combination intervals according to the set threshold value to reflect the change trend of the electricity load and heat load;

[0026] Analyze the coal consumption characteristics of units in different operating modes, consider the operating mode combinations of different units, and set up multi-unit multi-operation combination mode strategies;

[0027] Obtain the multi-dimensional factors that affect coal consumption, including internal operating variables of each unit, unit load and ambient temperature;

[0028] Under stable operation conditions of the thermal power plant, based on the digital twin model of multiple units in the thermal power plant, the changes in coal consumption of the thermal power plant under different electric load and heat load combination ranges, multi-unit multi-operation combination mode strategies and multi-dimensional factors affecting coal consumption are analyzed. This model is used as the training set for the coal consumption prediction model. The machine learning algorithm is used for training and learning, and a plant-level multi-unit multi-mode coal consumption prediction model is established to reflect the changes in coal consumption of multiple units in different load combination ranges and different operation combination modes.

[0029] Furthermore, the electrical load and the thermal load are divided into a plurality of combination intervals according to a set threshold value, specifically including:

[0030] According to the historical electric load and heat load of the thermal power plant, the thresholds of the electric load and heat load are pre-set, and the electric load and heat load are divided into intervals, which are expressed as:

[0031]

[0032] f elec is the electric load interval division function; L elec 、M elec , H elec are low, medium and high ranges of electric load respectively; P elec is the electrical load; P threshold1 , P threshold2 are all set electric load thresholds; f heat is the heat load interval division function; L heat 、M heat , H heat are low, medium and high ranges of heat load respectively; Q heat is the heat load; Q threshold1 , Q threshold2 All are set heat load thresholds;

[0033] Establish multiple combined intervals of electrical load and thermal load, expressed as:

[0034]

[0035] Furthermore, the optimization of the plant-level multi-unit operation combination mode is performed with the goal of minimizing the plant-level multi-unit coal consumption, and the optimal operation combination mode of the multi-units under different electric load and thermal load combination intervals is obtained, which specifically includes:

[0036] The objective function is to minimize the coal consumption of multiple units at the plant level, which can be expressed as:

[0037]

[0038] C is the energy consumption of the unit; N is the number of units; c i is the coal consumption function of the i-th unit; f elec,iis the range of the electric load of the i-th unit; f heat,i is the heat load interval of the i-th unit; m i is the operation mode of the i-th unit;

[0039] Set constraints, including: electrical load balance constraints, thermal load balance constraints, electrical load upper and lower limit constraints, thermal load upper and lower limit constraints, and unit operation constraints;

[0040] Solve and obtain the optimal operation combination mode of multiple units under different electric load and thermal load combination ranges, monitor the real-time changes of electric load and thermal load, and dynamically switch the optimal operation combination mode.

[0041] Furthermore, based on the optimal operation combination mode of multiple units and according to the quantified results of dynamic boundary conditions, under the condition of meeting the electric load dispatching instructions and the dynamic balance of heat network supply and demand, with the goal of optimizing the plant-level economy, environmental protection and rapid response, a plant-level multi-unit optimization dispatching model is established, and the optimal load dispatching strategy of the plant-level multi-units at different time scales is output, which specifically includes:

[0042] On the basis of the optimal operation combination mode of multiple units, according to the thermal load forecast results, renewable energy power generation and electric load dispatching instructions, under the condition of meeting the electric load dispatching instructions and the price adjustment of the dynamic balance of supply and demand of the heat network, give priority to the use of renewable energy power generation, and analyze the total electric load and thermal load that the thermal power plant needs to bear in each period;

[0043] The objective functions are the optimization of plant-level economy, environmental protection and rapid response, which are expressed as follows:

[0044]

[0045] F1 is the plant-level economic target; f i,t is the peak load-shaving benefit of the i-th unit at time t; P i,t is the power generation of the i-th unit at time t; e t is the electricity clearing price at time t; Q i,t is the heat supply of the i-th unit at time t; h t is the hot selling price at time t; B i,t is the coal consumption of the i-th unit at the moment; k t is the fuel price at time t; T is the entire scheduling period;

[0046]

[0047] F2 is the plant-level environmental protection target; g i is the pollutant emission function of the i-th unit;

[0048] minF3=min(max{t i(ΔP i )});

[0049] F3 is the plant-level rapid response target, indicating the minimum time for a thermal power plant to complete load changes; t i is the time it takes for the i-th unit to complete load increase or decrease; ΔP i is the load variation; v i is the speed of load increase and decrease of the i-th unit;

[0050] Set the operating constraints of thermal power plants, including power balance constraints within thermal power plants, unit load constraints, ramp and landslide constraints, and new energy load constraints;

[0051] Solve the optimal load dispatching strategy for multiple units at the output plant level, including the distribution of thermal load and electrical load of multiple units.

[0052] Furthermore, the thermal load and electrical load of the multiple units are distributed as a plant-level multiple-unit day-ahead dispatching strategy; based on the day-ahead dispatching strategy, it also includes establishing a daily rolling optimization model and a real-time dispatching model; the daily rolling optimization model and the real-time dispatching model update the dispatching strategy according to the actual load and equipment operating parameters, and prioritize the operating constraints of the thermal power plant, and some constraints may not be met in a short time.

[0053] Furthermore, on the basis of the optimal dispatching strategy for multi-unit loads, a multi-unit load control target is set, and according to the multi-unit load control target and the real-time monitoring data indicators, an equipment-level optimization control model is established to obtain the operation control parameters of each plant-level equipment, and send them to the controller for execution and tracking of the execution status, specifically including:

[0054] According to the optimal dispatching strategy for multi-unit loads, set the multi-unit load control targets, including at least the boiler system control target, turbine system control target, heat recovery and heating system control target, and auxiliary system control target of each unit;

[0055] Based on the load control targets of multiple units and real-time monitored temperature, pressure, flow data indicators, as well as heat-to-electricity ratio and coal consumption performance data indicators, an equipment-level optimization control model is established to obtain the operating control parameters of each plant-level equipment. The parameters are sent to the controller for execution, and the load change rate, flow change rate and performance data of multiple units in the thermal power plant are tracked.

[0056] Furthermore, the boiler system control targets include fuel supply, air distribution adjustment, feed water flow, blower and induced draft fan control parameters; the turbine system control targets include inlet steam flow parameters and cooling water flow parameters; the heat recovery and heating system control targets include water flow and temperature adjustment parameters of the heat exchanger, and control parameters of the hot water circulation pump; the auxiliary system control targets include cooling water circulation control parameters and boiler ash treatment parameters.

[0057] The beneficial effects of the present invention are:

[0058] (1) Based on the variable operating data of the multi-mode flexibility transformation units in the thermal power plant, the present invention establishes a digital twin model of multiple units in the thermal power plant, which can simulate and map the actual operating conditions of each device in the thermal power plant, facilitating the subsequent simulation analysis of the scheduling and control of each unit and equipment in the thermal power plant;

[0059] (2) The present invention quantifies the dynamic boundary conditions of plant-level optimal scheduling, including heat load prediction, fuel price prediction, new energy power generation prediction, and power clearing price prediction based on the power market mechanism; it can quantify the dynamic boundary conditions that affect plant-level optimal scheduling, and predict and analyze the unpredictable parameters before scheduling in advance, taking into account factors such as environmental parameters and real-time changes in power clearing prices, and can improve the accuracy of subsequent plant-level optimal scheduling;

[0060] (3) The present invention performs online simulation calculations based on the digital twin model of multiple units in a thermal power plant, analyzes the coal consumption of multiple units in the thermal power plant under different electric load and thermal load combination intervals, different operation combination modes and multi-dimensional factors affecting coal consumption, and establishes a plant-level multi-unit multi-mode coal consumption prediction model; with the goal of minimizing the coal consumption of multiple units at the plant level, optimizes the operation combination mode of multiple units at the plant level, and obtains the optimal operation combination mode of multiple units under different electric load and thermal load combination intervals; can effectively use the plant-level multi-unit digital twin model to simulate the operation of units in different load intervals and different operation modes, analyze the corresponding coal consumption, and facilitate the thermal power plant to carry out unit operation mode transformation and operation mode combination, save coal consumption of thermal power plant units, and adapt to load changes;

[0061] (4) Based on the optimal operation combination mode of multiple units and according to the quantitative results of dynamic boundary conditions, the present invention establishes a plant-level multi-unit optimization scheduling model and outputs the optimal load scheduling strategy of the plant-level multi-units with the goal of optimizing the plant-level economy, environmental protection and rapid response under the condition of satisfying the dynamic balance of power load scheduling instructions and heat network supply and demand; it can calculate the plant-level economy, environmental protection and rapid response goals according to the quantitative results of dynamic boundary conditions, formulate the load scheduling strategy of the plant-level multi-units, meet the unit operation optimization scheduling of the power load scheduling instructions and the dynamic balance of heat network supply and demand, improve the accuracy of the plant-level scheduling model, and realize the energy-saving, economical and efficient operation of the thermal power plant;

[0062] (5) On the basis of the optimal dispatching strategy for multi-unit loads, set the load control targets for multiple units, and establish an equipment-level optimization control model based on the load control targets for multiple units and the data indicators of real-time monitoring, obtain the operation control parameters of each plant-level equipment, and send them to the controller for execution and tracking of the execution status; by establishing the equipment-level optimization control model, it is possible to guide the operation control parameters of each unit equipment and achieve the load control targets assigned to each unit. Through plant-level optimization dispatching and equipment-level optimization control, an integration of plant-level optimization and dispatching control is formed.

[0063] Other features and advantages will be described in the following description, and partly become apparent from the description, or understood by practicing the invention. The purpose and other advantages of the invention are realized and obtained by the structures particularly pointed out in the description and the drawings.

[0064] In order to make the above-mentioned objects, features and advantages of the present invention more obvious and easy to understand, preferred embodiments are given below and described in detail with reference to the accompanying drawings. BRIEF DESCRIPTION OF THE DRAWINGS

[0065] In order to more clearly illustrate the specific implementation methods of the present invention or the technical solutions in the prior art, the drawings required for use in the specific implementation methods or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are some implementation methods of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0066] Figure 1 A flow chart of a plant-level multi-unit scheduling and control method including digital twins and boundary condition quantification according to the present invention;

[0067] Figure 2 It is a schematic diagram of the plant-level multi-unit scheduling and control principle of the present invention. DETAILED DESCRIPTION

[0068] In order to make the purpose, technical solution and advantages of the embodiments of the present invention clearer, the technical solution of the present invention will be clearly and completely described below in conjunction with the accompanying drawings. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0069] Example 1

[0070] like Figure 1 , Figure 2 As shown, this embodiment 1 provides a plant-level multi-unit scheduling and control method including digital twins and boundary condition quantification, including:

[0071] Based on the variable operating data of the multi-mode flexibility transformation units in the thermal power plant, a digital twin model of multiple units in the thermal power plant is established;

[0072] Quantify the dynamic boundary conditions for plant-level optimal scheduling, including thermal load forecasting, fuel price forecasting, renewable energy power generation forecasting, and power clearing price forecasting based on power market mechanisms;

[0073] Based on the digital twin model of multiple units in a thermal power plant, online simulation calculations are performed to analyze the coal consumption of multiple units in the thermal power plant under different electric load and thermal load combination ranges, different operation combination modes, and multi-dimensional factors affecting coal consumption, and a plant-level multi-unit multi-mode coal consumption prediction model is established;

[0074] With the goal of minimizing the coal consumption of multiple units at the plant level, the optimization of the operation combination mode of multiple units at the plant level is carried out to obtain the optimal operation combination mode of multiple units under different combination ranges of electrical load and thermal load;

[0075] On the basis of the optimal operation combination mode of multiple units and according to the quantitative results of dynamic boundary conditions, under the condition of meeting the electric load dispatching instructions and the dynamic balance of heat network supply and demand, with the goal of optimizing the plant-level economy, environmental protection and rapid response, a plant-level multi-unit optimization dispatching model is established, and the optimal load dispatching strategy of the plant-level multi-unit is output;

[0076] On the basis of the optimal dispatching strategy for multi-unit loads, multi-unit load control targets are set, and according to the multi-unit load control targets and real-time monitoring data indicators, an equipment-level optimization control model is established to obtain the operating control parameters of each plant-level equipment, which are then sent to the controller for execution and tracking of the execution status.

[0077] In this embodiment, the multi-unit digital twin model of the thermal power plant is established based on the variable operating condition operation data of the multi-mode flexibility transformation units in the thermal power plant, specifically including:

[0078] Carry out multi-mode flexibility transformation of units in a thermal power plant, including high back pressure units, extraction steam units, cylinder cutting units, and light axis units; the thermal power plant includes multiple thermal power units, which take fuel as input and output electrical energy and thermal energy;

[0079] Use modeling simulation analysis software to build a mechanism model consistent with the structure of the thermal power plant heating system;

[0080] The variable operating condition data of the units in the thermal power plant under different load conditions and different heating modes are obtained, and the data are connected to the mechanism model after preprocessing. The model simulation results are identified and corrected to build a digital twin model of multiple units in the thermal power plant.

[0081] In this embodiment, the power clearing price forecasting based on the power market mechanism specifically includes:

[0082] The process of setting up thermal power plants as market players to participate in the electricity market mechanism: the trading center publishes trading rules to various market participants, eligible power generators report their bidding information to the trading center in advance, and the trading center analyzes the information of both power generators and power users and conducts centralized clearing;

[0083] Obtain the multi-dimensional factors that affect the power clearing price of thermal power plants, including: historical power demand curve, power supply of each unit, power supply and demand coefficient, renewable energy power generation, renewable energy penetration rate, fuel price, power generator quotation, historical power clearing price, meteorological factors, and future renewable energy power generation forecast results and fuel price forecast results;

[0084] Calculate the weight coefficient of each factor affecting the electricity clearing price;

[0085] The similar day theory is used to analyze the multi-dimensional factors of historical days and days to be predicted, and several historical days with similar influencing factors to the days to be predicted are selected according to the weight coefficients. The multi-dimensional factors of historical days and the weight coefficients of each factor affecting the power clearing price, as well as the forecast error of renewable energy power generation, the forecast error of fuel prices, and the forecast error of power demand caused by meteorological factors are used as the training set of the power clearing price forecast model.

[0086] After training the training set using a machine learning algorithm, a power clearing price prediction model is established.

[0087] In practical applications, the entropy method is used to calculate the weight coefficients of various factors affecting the electricity clearing price. The specific process includes:

[0088] 1) Data standardization: Since the dimensions and units of the multidimensional factors affecting the electricity clearing price are different, the original data needs to be standardized, expressed as:

[0089]

[0090] X j is the parameter value of the jth factor; min(X j ) is the minimum value of the jth factor in the multidimensional factors; max(X j ) is the maximum value of the jth factor in the multidimensional factors; X′ ij is the standardized value of the jth factor on the current day;

[0091] 2) Normalization processing, expressed as:

[0092]

[0093] Y ij is the weight of the jth factor on the current day; n is the number of multidimensional factors;

[0094] 3) Calculate the information entropy and information utility value of each factor, expressed as:

[0095]

[0096] d j =1-e j ;

[0097] e j is information entropy; d j is the information utility value;

[0098] 4) Calculate the weight w of each factor j , expressed as:

[0099]

[0100] The similar day theory is used to analyze the multi-dimensional factors of historical days and the day to be predicted, and several historical days with similar influencing factors to the day to be predicted are selected according to the weight coefficient, including:

[0101] Set a hybrid distance method including the Euclidean distance method and the cosine distance method;

[0102] Suppose two time series are A=[a1,a2,…,a n ]、B=[b1,b2,…,b n ];

[0103] The Euclidean distance method is used to calculate the Euclidean distance between two time series, which is expressed as:

[0104]

[0105] D(A,B) is the Euclidean distance between two time series A and B; a k、b k are the kth sample values ​​of the two time series respectively; n is the total number of samples;

[0106] The cosine distance method is used to calculate the cosine distance between two time series, which is expressed as:

[0107]

[0108] θ(A,B) is the cosine distance between two time series A and B;

[0109] Calculate the hybrid distance, expressed as:

[0110] ζ(A,B)=δD(A,B)+(1-δ)θ(A,B);

[0111] ζ(A,B) is the mixed distance of two time series A and B; δ is the Euclidean distance weight coefficient;

[0112] Find similar days to the day to be predicted: calculate the mixed distance value corresponding to each factor of each historical day, multiply it by the weight coefficient of each factor and add them up to obtain the comprehensive coefficient of the historical day. By comparing the comprehensive coefficients of each historical day, select the historical day corresponding to the minimum value as the similar day to the day to be predicted.

[0113] In this embodiment, the online simulation calculation is performed based on the digital twin model of multiple units in the thermal power plant, the coal consumption of multiple units in the thermal power plant under different electric load and thermal load combination intervals, different operation combination modes and multi-dimensional factors affecting coal consumption are analyzed, and a plant-level multi-unit multi-mode coal consumption prediction model is established, which specifically includes:

[0114] According to the electricity load and heat load borne by the thermal power plant in the historical period, the electricity load and heat load are divided into multiple combination intervals according to the set threshold value to reflect the change trend of the electricity load and heat load;

[0115] Analyze the coal consumption characteristics of units in different operating modes, consider the operating mode combinations of different units, and set up multi-unit multi-operation combination mode strategies;

[0116] Obtain the multi-dimensional factors that affect coal consumption, including internal operating variables of each unit, unit load and ambient temperature;

[0117] Under stable operation conditions of the thermal power plant, based on the digital twin model of multiple units in the thermal power plant, the changes in coal consumption of the thermal power plant under different electric load and heat load combination ranges, multi-unit multi-operation combination mode strategies and multi-dimensional factors affecting coal consumption are analyzed. This model is used as the training set for the coal consumption prediction model. The machine learning algorithm is used for training and learning, and a plant-level multi-unit multi-mode coal consumption prediction model is established to reflect the changes in coal consumption of multiple units in different load combination ranges and different operation combination modes.

[0118] When establishing the electricity clearing price prediction model, the machine learning algorithm used is VMD-NGO-KELM. VMD is used to decompose the original training set; NGO is the Northern Goshawk optimization algorithm, which is used to optimize the kernel function parameters and regularization coefficient of the KELM algorithm; the KELM algorithm is an extreme learning machine algorithm based on the kernel function.

[0119] In this embodiment, the electrical load and the thermal load are divided into a plurality of combination intervals according to a set threshold value, specifically including:

[0120] According to the historical electric load and heat load of the thermal power plant, the thresholds of the electric load and heat load are pre-set, and the electric load and heat load are divided into intervals, which are expressed as:

[0121]

[0122] f elec is the electric load interval division function; L elec 、M elec , H elec are low, medium and high ranges of electric load respectively; P elec is the electrical load; P threshold1 , P threshold2 are all set electric load thresholds; f heat is the heat load interval division function; L heat 、M heat , H heat are low, medium and high ranges of heat load respectively; Q heat is the heat load; Q threshold1 , Q threshold2 All are set heat load thresholds;

[0123] Establish multiple combined intervals of electrical load and thermal load, expressed as:

[0124]

[0125] In this embodiment, the optimization of the plant-level multi-unit operation combination mode is performed with the goal of minimizing the plant-level multi-unit coal consumption, and the optimal operation combination mode of the multi-units under different electric load and thermal load combination intervals is obtained, which specifically includes:

[0126] The objective function is to minimize the coal consumption of multiple units at the plant level, which can be expressed as:

[0127]

[0128] C is the energy consumption of the unit; N is the number of units; c i is the coal consumption function of the i-th unit; f elec,i is the range of the electric load of the i-th unit; f heat,iis the heat load interval of the i-th unit; m i is the operation mode of the i-th unit;

[0129] Set constraints, including: electrical load balance constraints, thermal load balance constraints, electrical load upper and lower limit constraints, thermal load upper and lower limit constraints, and unit operation constraints;

[0130] Solve and obtain the optimal operation combination mode of multiple units under different electric load and thermal load combination ranges, monitor the real-time changes of electric load and thermal load, and dynamically switch the optimal operation combination mode.

[0131] It should be noted that the operation of units in different modes can adapt to the changing electric and thermal load requirements and achieve the purpose of energy saving and consumption reduction, for example:

[0132] 1) High back pressure operation mode

[0133] When the heat load demand is high, the high back pressure mode can effectively utilize the waste heat of exhaust steam and reduce energy waste, which is particularly suitable for cogeneration of heat and power.

[0134] By adjusting the turbine back pressure, the heat recovery efficiency can be optimized and the coal consumption can be reduced;

[0135] 2) Extraction steam operation mode

[0136] The extraction mode is particularly effective when the electric and thermal loads are relatively balanced. It extracts steam from the middle stage of the steam turbine for heating, which can ensure both power supply and thermal energy demand.

[0137] In this mode, the amount of steam extraction needs to be precisely controlled to achieve the best match between the electric and thermal loads, thereby reducing coal consumption;

[0138] 3) Cylinder cutting operation mode

[0139] The cylinder cutting mode is enabled when the electrical load is low. By stopping the use of some turbine cylinders, unnecessary steam consumption is reduced and the efficiency of low-load operation is improved.

[0140] This mode helps to reduce coal consumption during the low-load period and improve the economic operation of the unit;

[0141] 4) Optical axis operation mode

[0142] The light axis mode focuses on power production and does not extract steam for heating. It is suitable for working conditions with large power load demand and small heat load demand.

[0143] By optimizing the operating parameters of the steam turbine, the power generation efficiency can be improved and the coal consumption can be reduced;

[0144] Taking the operation modes such as high back pressure, steam extraction, cylinder cutting and bare axis as decision variables, the model is solved to find the optimal operation combination mode under different electric and thermal load combination ranges.

[0145] In this embodiment, based on the optimal operation combination mode of multiple units and according to the quantified results of dynamic boundary conditions, under the condition of satisfying the electric load dispatching instruction and the dynamic balance of heat network supply and demand, with the goal of optimizing the plant-level economy, environmental protection and rapid response, a plant-level multi-unit optimization dispatching model is established, and the optimal load dispatching strategy of the plant-level multi-units at different time scales is output, which specifically includes:

[0146] On the basis of the optimal operation combination mode of multiple units, according to the thermal load forecast results, renewable energy power generation and electric load dispatching instructions, under the condition of meeting the electric load dispatching instructions and the price adjustment of the dynamic balance of supply and demand of the heat network, give priority to the use of renewable energy power generation, and analyze the total electric load and thermal load that the thermal power plant needs to bear in each period;

[0147] The objective functions are the optimization of plant-level economy, environmental protection and rapid response, which are expressed as follows:

[0148]

[0149] F1 is the plant-level economic target; f i,t is the peak load-shaving benefit of the i-th unit at time t; P i,t is the power generation of the i-th unit at time t; e t is the electricity clearing price at time t; Q i,t is the heat supply of the i-th unit at time t; h t is the hot selling price at time t; B i,t is the coal consumption of the i-th unit at the moment; k t is the fuel price at time t; T is the entire scheduling period;

[0150]

[0151] F2 is the plant-level environmental protection target; g i is the pollutant emission function of the i-th unit;

[0152] min F3=min(max{t i (ΔP i )});

[0153] F3 is the plant-level rapid response target, indicating the minimum time for a thermal power plant to complete load changes; t i is the time it takes for the i-th unit to complete load increase or decrease; ΔP i is the load variation; v i is the speed of load increase and decrease of the i-th unit;

[0154] Set the operating constraints of thermal power plants, including power balance constraints within thermal power plants, unit load constraints, ramp and landslide constraints, and new energy load constraints;

[0155] Solve the optimal load dispatching strategy for multiple units at the output plant level, including the distribution of thermal load and electrical load of multiple units.

[0156] In this embodiment, the thermal load and electrical load of the multiple units are distributed as a plant-level multi-unit day-ahead scheduling strategy; based on the day-ahead scheduling strategy, it also includes establishing a daily rolling optimization model and a real-time scheduling model; the daily rolling optimization model and the real-time scheduling model update the scheduling strategy according to the actual load and equipment operating parameters, and prioritize the operating constraints of the thermal power plant, and some constraints may not be met in a short time.

[0157] In this embodiment, on the basis of the optimal dispatching strategy for multi-unit loads, a multi-unit load control target is set, and according to the multi-unit load control target and the data indicators of real-time monitoring, an equipment-level optimization control model is established to obtain the operation control parameters of each plant-level device, and send them to the controller for execution and tracking of the execution status, specifically including:

[0158] According to the optimal dispatching strategy for multi-unit loads, set the multi-unit load control targets, including at least the boiler system control target, turbine system control target, heat recovery and heating system control target, and auxiliary system control target of each unit;

[0159] Based on the load control targets of multiple units and real-time monitored temperature, pressure, flow data indicators, as well as heat-to-electricity ratio and coal consumption performance data indicators, an equipment-level optimization control model is established to obtain the operating control parameters of each plant-level equipment. The parameters are sent to the controller for execution, and the load change rate, flow change rate and performance data of multiple units in the thermal power plant are tracked.

[0160] It should be noted that the boiler system control objectives are: ensuring efficient combustion of fuel, maintaining appropriate furnace temperature and pressure, and optimizing the air / fuel ratio to reduce emissions and improve thermal efficiency. The turbine system control objectives are: controlling steam pressure and temperature to achieve optimal thermodynamic efficiency while avoiding overpressure and overheating that damage equipment. The heat recovery and heating system control objectives are: maximizing the recovery and utilization of thermal energy, reducing energy waste, and improving the overall efficiency of the entire system. The auxiliary system control objectives are: such as the cooling water circulation system, dust removal and desulfurization system, etc., to ensure the effective operation of these systems, which not only supports the operation of the main system, but also meets environmental protection standards.

[0161] In this embodiment, the boiler system control targets include fuel supply, air distribution adjustment, feed water flow, blower and induced draft fan control parameters; the turbine system control targets include inlet steam flow parameters and cooling water flow parameters; the heat recovery and heating system control targets include water flow and temperature adjustment parameters of the heat exchanger, and control parameters of the hot water circulation pump; the auxiliary system control targets include cooling water circulation control parameters and boiler ash treatment parameters.

[0162] It should be noted that the equipment-level control of thermal power plant units mainly involves the operation control of various key equipment and systems to ensure the stable, efficient and safe operation of the units. The following are some of the main equipment and their control points:

[0163] 1) Boiler system

[0164] Burner control: adjust the fuel supply and air ratio to maintain a stable combustion state and optimize combustion efficiency;

[0165] Feedwater control: manage feedwater flow to ensure boiler water level is within a safe range while avoiding water hammer;

[0166] Blower and induced draft fan control: adjust air volume, control furnace pressure, ensure sufficient oxygen supply and smooth flue gas discharge;

[0167] Flue gas desulfurization (FGD) and denitrification (SCR) system control: monitor and control the addition of chemicals to reduce SO x and NO x emissions;

[0168] 2) Steam turbine system

[0169] Steam valve control: Control the turbine speed and power output by adjusting the steam flow at the turbine inlet;

[0170] Governor control: ensures that the turbine runs at the specified speed and is synchronized with the power grid;

[0171] Lubricating oil system control: monitor and adjust the pressure and temperature of the lubricating oil to ensure bearing lubrication;

[0172] Condenser control: adjust cooling water flow and control condenser vacuum to improve thermal efficiency;

[0173] 3) Heat recovery and heating system

[0174] Heat exchanger control: adjusts water flow and temperature in the heat exchanger to meet the needs of external heat users;

[0175] Pump control: Control the speed and flow of the hot water circulation pump to ensure the stable operation of the heating system;

[0176] 4) Auxiliary systems

[0177] Cooling water system control: manage the circulation of cooling water to ensure the cooling effect of key equipment;

[0178] Ash handling system control: manage the collection and treatment of boiler ash to avoid environmental pollution;

[0179] Fuel handling system control: monitors the storage, transfer and preparation of fuel.

[0180] In practical applications, the establishment of the device-level optimization control model specifically includes:

[0181] According to the simulation models of the boiler system, turbine system, heat recovery and heating system, and auxiliary system in the digital twin model of multiple units in a thermal power plant, relevant input and output interfaces of equipment-level optimization control are added to the simulation model. The input interface is used to set the fuel supply, air distribution, feed water flow, blower and induced draft fan control parameters of the boiler system, the inlet steam flow and cooling water flow parameters of the turbine system, the water flow and temperature of the heat exchanger of the heat recovery and heating system, the control parameters of the hot water circulation pump, the cooling water circulation control parameters of the auxiliary system, and the boiler ash treatment parameters; the output interface is used to calculate the supplied electrical load and thermal load;

[0182] Taking the minimum deviation between the actual electric load and heat load supplied by each unit and the allocated electric load and heat load as the objective function, the process of sparrow search algorithm is adopted to establish the initial population of sparrows, design the fitness function with the minimum load deviation as the goal, select individuals according to the fitness value, update the predator position, update the joiner position, update the guard position, calculate the fitness value of all individuals and update the sparrow position, and determine the stopping condition;

[0183] Iterative calculations and simulation optimization are performed to output the operating control parameters of each plant-level equipment.

[0184] In several embodiments provided in the present application, it should be understood that the disclosed system and method can also be implemented in other ways. The system embodiments described above are merely schematic. For example, the flowcharts and block diagrams in the accompanying drawings show the possible architecture, functions and operations of the systems, methods and computer program products according to multiple embodiments of the present invention. In this regard, each box in the flowchart or block diagram can represent a module, a program segment or a part of the code, and a part of the module, program segment or code contains one or more executable instructions for implementing the specified logical function. It should also be noted that in some alternative implementations, the functions marked in the box can also occur in a different order from the order marked in the accompanying drawings. For example, two consecutive boxes can actually be executed substantially in parallel, and they can sometimes be executed in the opposite order, depending on the functions involved. It should also be noted that each box in the block diagram and / or flowchart, and the combination of boxes in the block diagram and / or flowchart can be implemented with a dedicated hardware-based system that performs a specified function or action, or can be implemented with a combination of dedicated hardware and computer instructions.

[0185] In addition, the functional modules in each embodiment of the present invention can be integrated together to form an independent part, or each module can exist separately, or two or more modules can be integrated to form an independent part. If the function is implemented in the form of a software functional module and sold or used as an independent product, it can be stored in a computer-readable storage medium. Based on this understanding, the technical solution of the present invention, in essence, or the part that contributes to the prior art or the part of the technical solution can be embodied in the form of a software product, which is stored in a storage medium and includes several instructions for a computer device (which can be a personal computer, a server, or a network device, etc.) to perform all or part of the steps of the methods of each embodiment of the present invention. The aforementioned storage medium includes: U disk, mobile hard disk, read-only memory (ROM, Read-Only Memory), random access memory (RAM, RandomAccess Memory), disk or optical disk and other media that can store program codes.

[0186] Based on the above ideal embodiments of the present invention, the relevant staff can make various changes and modifications without departing from the technical concept of the present invention through the above description. The technical scope of the present invention is not limited to the contents of the specification, and its technical scope must be determined according to the scope of the claims.

Claims

1. A plant-level multi-unit scheduling and control method with digital twins and boundary condition quantification, characterized in that: include: Based on the variable operating data of the multi-mode flexibility transformation units in the thermal power plant, a digital twin model of multiple units in the thermal power plant is established; Quantify the dynamic boundary conditions for plant-level optimal scheduling, including thermal load forecasting, fuel price forecasting, renewable energy power generation forecasting, and power clearing price forecasting based on power market mechanisms; Based on the digital twin model of multiple units in a thermal power plant, online simulation calculations are performed to analyze the coal consumption of multiple units in the thermal power plant under different electric load and thermal load combination ranges, different operation combination modes, and multi-dimensional factors affecting coal consumption, and a plant-level multi-unit multi-mode coal consumption prediction model is established; With the goal of minimizing the coal consumption of multiple units at the plant level, the optimization of the operation combination mode of multiple units at the plant level is carried out to obtain the optimal operation combination mode of multiple units under different combination ranges of electrical load and thermal load; On the basis of the optimal operation combination mode of multiple units and according to the quantitative results of dynamic boundary conditions, under the condition of meeting the electric load dispatching instructions and the dynamic balance of heat network supply and demand, with the goal of optimizing the plant-level economy, environmental protection and rapid response, a plant-level multi-unit optimization dispatching model is established, and the optimal load dispatching strategy of the plant-level multi-unit is output; On the basis of the optimal dispatching strategy for multi-unit loads, multi-unit load control targets are set, and according to the multi-unit load control targets and real-time monitoring data indicators, an equipment-level optimization control model is established to obtain the operating control parameters of each plant-level equipment, which are then sent to the controller for execution and tracking of the execution status.

2. The plant-level multi-unit scheduling and control method according to claim 1, characterized in that: The multi-unit digital twin model of the thermal power plant is established based on the variable operating condition operation data of the multi-mode flexibility transformation units in the thermal power plant, specifically including: Carry out multi-mode flexibility transformation of units in a thermal power plant, including high back pressure units, extraction steam units, cylinder cutting units, and light axis units; the thermal power plant includes multiple thermal power units, which take fuel as input and output electrical energy and thermal energy; Use modeling simulation analysis software to build a mechanism model consistent with the structure of the thermal power plant heating system; The variable operating condition data of the units in the thermal power plant under different load conditions and different heating modes are obtained, and the data are connected to the mechanism model after preprocessing. The model simulation results are identified and corrected to build a digital twin model of multiple units in the thermal power plant.

3. The plant-level multi-unit scheduling and control method according to claim 1, characterized in that: The power clearing price forecast based on the power market mechanism specifically includes: The process of setting up thermal power plants as market players to participate in the electricity market mechanism: the trading center publishes trading rules to various market participants, eligible power generators report their bidding information to the trading center in advance, and the trading center analyzes the information of both power generators and power users and conducts centralized clearing; Obtain the multi-dimensional factors that affect the power clearing price of thermal power plants, including: historical power demand curve, power supply of each unit, power supply and demand coefficient, renewable energy power generation, renewable energy penetration rate, fuel price, power generator quotation, historical power clearing price, meteorological factors, and future renewable energy power generation forecast results and fuel price forecast results; Calculate the weight coefficient of each factor affecting the electricity clearing price; The similar day theory is used to analyze the multi-dimensional factors of historical days and days to be predicted, and several historical days with similar influencing factors to the days to be predicted are selected according to the weight coefficients. The multi-dimensional factors of historical days and the weight coefficients of each factor affecting the power clearing price, as well as the forecast error of renewable energy power generation, the forecast error of fuel prices, and the forecast error of power demand caused by meteorological factors are used as the training set of the power clearing price forecast model. After training the training set using a machine learning algorithm, a power clearing price prediction model is established.

4. The plant-level multi-unit scheduling and control method according to claim 1, characterized in that: The online simulation calculation is performed based on the digital twin model of multiple units in the thermal power plant, the coal consumption of multiple units in the thermal power plant under different electric load and thermal load combination intervals, different operation combination modes and multi-dimensional factors affecting coal consumption are analyzed, and a plant-level multi-unit multi-mode coal consumption prediction model is established, which specifically includes: According to the electricity load and heat load borne by the thermal power plant in the historical period, the electricity load and heat load are divided into multiple combination intervals according to the set threshold value to reflect the change trend of the electricity load and heat load; Analyze the coal consumption characteristics of units in different operating modes, consider the operating mode combinations of different units, and set up multi-unit multi-operation combination mode strategies; Obtain the multi-dimensional factors that affect coal consumption, including internal operating variables of each unit, unit load and ambient temperature; Under stable operation conditions of the thermal power plant, based on the digital twin model of multiple units in the thermal power plant, the changes in coal consumption of the thermal power plant under different electric load and heat load combination ranges, multi-unit multi-operation combination mode strategies and multi-dimensional factors affecting coal consumption are analyzed. This model is used as the training set for the coal consumption prediction model. The machine learning algorithm is used for training and learning, and a plant-level multi-unit multi-mode coal consumption prediction model is established to reflect the changes in coal consumption of multiple units in different load combination ranges and different operation combination modes.

5. The plant-level multi-unit scheduling and control method according to claim 4 is characterized in that: The electrical load and the thermal load are divided into a plurality of combination intervals according to the set threshold value, specifically including: According to the historical electric load and heat load of the thermal power plant, the thresholds of the electric load and heat load are pre-set, and the electric load and heat load are divided into intervals, which are expressed as: f elec is the electric load interval division function; L elec 、M elec , H elec are low, medium and high ranges of electric load respectively; P elec is the electrical load; P threshold1 , P threshold2 are all set electric load thresholds; f heat is the heat load interval division function; L heat 、M heat , H heat are low, medium and high ranges of heat load respectively; Q heat is the heat load; Q threshold1 , Q threshold2 All are set heat load thresholds; Establish multiple combined intervals of electrical load and thermal load, expressed as:

6. The plant-level multi-unit scheduling and control method according to claim 1, characterized in that: The optimization of the plant-level multi-unit operation combination mode is carried out with the goal of minimizing the plant-level multi-unit coal consumption, and the optimal operation combination mode of the multi-units under different electric load and thermal load combination ranges is obtained, which specifically includes: The objective function is to minimize the coal consumption of multiple units at the plant level, which can be expressed as: C is the energy consumption of the unit; N is the number of units; c i is the coal consumption function of the i-th unit; f elec,i is the range of the electric load of the i-th unit; f heat,i is the heat load interval of the i-th unit; m i is the operation mode of the i-th unit; Set constraints, including: electrical load balance constraints, thermal load balance constraints, electrical load upper and lower limit constraints, thermal load upper and lower limit constraints, and unit operation constraints; Solve and obtain the optimal operation combination mode of multiple units under different electric load and thermal load combination ranges, monitor the real-time changes of electric load and thermal load, and dynamically switch the optimal operation combination mode.

7. The plant-level multi-unit scheduling and control method according to claim 1, characterized in that: Based on the optimal operation combination mode of multiple units and according to the quantitative results of dynamic boundary conditions, under the condition of meeting the electric load dispatching instructions and the dynamic balance of heat network supply and demand, with the goal of optimizing the plant-level economy, environmental protection and rapid response, a plant-level multi-unit optimization dispatching model is established, and the optimal load dispatching strategy of the plant-level multi-units at different time scales is output, which specifically includes: On the basis of the optimal operation combination mode of multiple units, according to the thermal load forecast results, renewable energy power generation and electric load dispatching instructions, under the condition of meeting the electric load dispatching instructions and the price adjustment of the dynamic balance of supply and demand of the heat network, give priority to the use of renewable energy power generation, and analyze the total electric load and thermal load that the thermal power plant needs to bear in each period; The objective functions are the optimization of plant-level economy, environmental protection and rapid response, which are expressed as follows: F1 is the plant-level economic target; f i,t is the peak load-shaving benefit of the i-th unit at time t; P i,t is the power generation of the i-th unit at time t; e t is the electricity clearing price at time t; Q i,t is the heat supply of the i-th unit at time t; h t is the hot selling price at time t; B i,t is the coal consumption of the i-th unit at the moment; k t is the fuel price at time t; T is the entire scheduling period; F2 is the plant-level environmental protection target; g i is the pollutant emission function of the i-th unit; min F3=min(max{t i (ΔP i )}); F3 is the plant-level rapid response target, indicating the minimum time for a thermal power plant to complete load changes; t i is the time it takes for the i-th unit to complete load increase or decrease; ΔP i is the load variation; v i is the speed of load increase and decrease of the i-th unit; Set the operating constraints of thermal power plants, including power balance constraints within thermal power plants, unit load constraints, ramp and landslide constraints, and new energy load constraints; Solve the optimal load dispatching strategy for multiple units at the output plant level, including the distribution of thermal load and electrical load of multiple units.

8. The plant-level multi-unit scheduling and control method according to claim 7, characterized in that: The thermal load and electrical load distribution of the multiple units is a plant-level multiple unit day-ahead dispatching strategy; based on the day-ahead dispatching strategy, it also includes establishing a daily rolling optimization model and a real-time dispatching model; the daily rolling optimization model and the real-time dispatching model update the dispatching strategy according to the actual load and equipment operating parameters, and prioritize the operating constraints of the thermal power plant, and some constraints may not be met in a short time.

9. The plant-level multi-unit scheduling and control method according to claim 1, characterized in that: On the basis of the optimal dispatching strategy for multi-unit loads, the load control targets for multiple units are set, and according to the load control targets for multiple units and the data indicators for real-time monitoring, the equipment-level optimization control model is established to obtain the operation control parameters of each plant-level equipment, and send them to the controller for execution and tracking of the execution status, specifically including: According to the optimal dispatching strategy for multi-unit loads, set the multi-unit load control targets, including at least the boiler system control target, turbine system control target, heat recovery and heating system control target, and auxiliary system control target of each unit; Based on the load control targets of multiple units and real-time monitored temperature, pressure, flow data indicators, as well as heat-to-electricity ratio and coal consumption performance data indicators, an equipment-level optimization control model is established to obtain the operating control parameters of each plant-level equipment. The parameters are sent to the controller for execution, and the load change rate, flow change rate and performance data of multiple units in the thermal power plant are tracked.

10. The plant-level multi-unit scheduling and control method according to claim 9, characterized in that: The boiler system control targets include fuel supply, air distribution adjustment, feed water flow, blower and induced draft fan control parameters; the turbine system control targets include inlet steam flow parameters and cooling water flow parameters; the heat recovery and heating system control targets include water flow and temperature adjustment parameters of the heat exchanger, and control parameters of the hot water circulation pump; the auxiliary system control targets include cooling water circulation control parameters and boiler ash treatment parameters.

Citation Information

Cited By

  • Recycling equipment intelligent scheduling system based on digital twin multi-data analysis

    CN119205092A

  • Intelligent thermal power plant layered optimization control method based on multiple agents

    CN120044789A

  • Station air conditioning system control parameter optimization method

    CN120181462A

  • Intelligent scheduling method and scheduling system for thermal power plant unit operation equipment

    CN120377242A

  • A method and system for intelligent scheduling of operating equipment in thermal power plant units

    CN120377242B