Hybrid energy storage wind power fluctuation stabilizing capacity optimization control strategy and configuration method based on CPO-VMD
Through CPO-VMD algorithm and fuzzy control optimization, the problems of inconsistent charge and discharge state and over-charge state in hybrid energy storage systems are solved, effectively suppressing wind power fluctuations and extending energy storage life, ensuring grid stability.
Patent Information
- Application Number
- CN202410978992.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-22
- Publication Date
- 2024-11-01
AI Technical Summary
The existing technology fails to fully consider the problems of inconsistent charge and discharge state and the charge state exceeding the limit in the actual operation of the energy storage equipment, resulting in an additional increase in the number of charge and discharge conversions, affecting the energy storage life, and stabilizing the power grid. Sexual impact.
Adopting a hybrid energy storage capacity optimization control strategy based on CPO-VMD, the hybrid energy storage power is decomposed through adaptive sliding filtering and CPO-VMD algorithm, and the dual-layer optimization and capacity configuration are carried out to ensure the charging of lead-acid batteries and supercapacitors. Discharge state consistency and power distribution is optimized through fuzzy controllers to extend the life of energy storage equipment.
Effectively suppress wind power fluctuations, reduce grid-connected component losses, extend the operating life of energy storage, improve the net energy storage efficiency, and ensure the safe and stable operation of the power grid.
Smart Images

Figure CN118889464A_ABST
Abstract
Description
Technical Field
[0001] The present invention belongs to the technical field of hybrid energy storage for smoothing wind power, and in particular relates to a hybrid energy storage for smoothing wind power fluctuation capacity optimization control strategy and configuration method based on CPO-VMD. Background Art
[0002] In recent years, due to the advantages of wind power such as cleanliness and renewable energy, the proportion of wind power generation has gradually increased and is becoming a key development target. However, due to the large volatility and randomness of wind power output, large-scale wind power output grid connection will affect the stability of power grid operation. In order to promote friendly wind power grid connection and improve system stability, the fluctuation of wind power output can be smoothed by reasonably configuring energy storage devices. In the algorithm for smoothing the fluctuation of new energy power, the adaptive sliding average method is used to obtain the grid-connected power. The optimal sliding window that meets the grid connection standard can be adaptively obtained according to the degree of wind power fluctuation at different times, and the obtained grid-connected power can be guaranteed to track the original wind power to the maximum extent, reducing the pressure of energy storage. There are many methods for allocating HESS power tasks. Among them, the VMD algorithm can adaptively determine the center frequency and bandwidth of each mode, has good robustness, and overcomes the problems of modal aliasing of the EMD algorithm. The values of the number of modes K and the penalty factor α in the VMD algorithm will have a great influence on the decomposition results, so it is very important to determine the appropriate K and α. The algorithm with excellent performance can be used to optimize the values of K and α. Since a single energy storage is not only difficult to meet the requirements in terms of technical characteristics, but also has higher costs, HESS composed of different types of energy storage has been widely used in recent years. Among them, supercapacitors are power-type energy storage, and lead-acid batteries are energy-type energy storage to complement each other's advantages and form a hybrid energy storage system. At present, the problems that may exist in actual operation, such as inconsistent charging and discharging states of HESS at the same time and over-limit of energy storage state of charge SoC, additional increase in the number of charging and discharging conversions of energy storage, and affecting the life of energy storage, have not been fully considered. Therefore, the present invention discloses a hybrid energy storage based on CPO-VMD to smooth wind power fluctuation capacity optimization control strategy and configuration method. Summary of the invention
[0003] In order to solve the above technical problems, the present invention proposes a hybrid energy storage based on CPO-VMD to smooth the wind power fluctuation capacity optimization control strategy and configuration method to solve the problems existing in the above-mentioned prior art.
[0004] To achieve the above objectives, the present invention provides a hybrid energy storage capacity optimization control strategy and configuration method for smoothing wind power fluctuations based on CPO-VMD, including:
[0005] Calculate the maximum wind power fluctuation of the wind farm based on the active power data of the wind farm, and when the maximum wind power fluctuation of the wind farm exceeds the grid connection standard limit, use adaptive sliding filtering to obtain the grid connection power and hybrid energy storage power;
[0006] Decomposing the hybrid energy storage power based on the CPO-VMD algorithm to obtain the allocated lead-acid battery power and supercapacitor power;
[0007] Performing double-layer optimization on the charge and discharge states of the lead-acid battery power and the supercapacitor power to obtain corrected lead-acid battery power and supercapacitor power;
[0008] Based on the corrected lead-acid battery power and supercapacitor power, the lead-acid battery and supercapacitor capacities are configured to obtain a capacity configuration that maximizes the net benefit of energy storage.
[0009] Optionally, the adaptive sliding filter uses a sliding average method to implement sliding filtering of the signal; wherein the expression is:
[0010]
[0011] Where i is the original data number; L is the length of the sliding window at time i, P w (ij) is the wind power data at time (ij); P bw (i) is the grid-connected component after adaptive sliding filtering at time i.
[0012] Optionally, the process of decomposing the hybrid energy storage power based on the CPO-VMD algorithm includes:
[0013] S1. Based on the CPO-VMD algorithm, the hybrid energy storage power is decomposed to obtain several modal components and margins;
[0014] S2, performing Hilbert transform on the modal components and the residuals to obtain a Hilbert marginal spectrum;
[0015] S3, selecting adjacent modal components with the least mixing overlap in the Hilbert marginal spectrum to obtain high and low frequency division points, and obtaining a first re-decomposed high-frequency component and a first re-decomposed low-frequency component based on the high and low frequency division points;
[0016] S4, decompose the residue of S1 again to obtain several modal components and residues, and repeat S2-S3 to obtain the second decomposition high-frequency component, the second decomposition low-frequency component and the second decomposition residue;
[0017] S5. Add the first decomposed low-frequency component and the second decomposed low-frequency component and distribute them to a lead-acid battery to obtain lead-acid battery power; distribute the first decomposed high-frequency component, the second decomposed high-frequency component and the second decomposed remainder to a supercapacitor to obtain supercapacitor power.
[0018] Optionally, the CPO-VMD algorithm uses the minimum value of envelope entropy as the fitness function in the process of CPO optimizing VMD parameters.
[0019] Optionally, the expressions of the allocated lead-acid battery power and supercapacitor power are:
[0020]
[0021] Where IMF(X) is the modal component of the first decomposition; imf(x) is the xth component of the second decomposition; M f and m f Represent the high and low frequency critical points of the first and second decompositions respectively; N and n represent the total number of modes of the first and second decompositions respectively, P b and P sc They are the command powers of the lead-acid battery and supercapacitor after initial distribution, respectively.
[0022] Optionally, the process of performing double-layer optimization on the charge and discharge states of the lead-acid battery power and the supercapacitor power includes:
[0023] When the allocated lead-acid battery power and supercapacitor power have different charge and discharge states, the lead-acid battery power and supercapacitor power are optimized for consistency at the upper layer and adjusted based on the working characteristics to obtain adjusted lead-acid battery power and supercapacitor power;
[0024] A membership function and a fuzzy control rule are formulated, and based on the membership function and the fuzzy control rule, a dual fuzzy controller is used to perform fuzzy control lower layer optimization on the adjusted lead-acid battery power and supercapacitor power to obtain the corrected lead-acid battery power and supercapacitor power.
[0025] Optionally, the expressions of the corrected lead-acid battery power and supercapacitor power are:
[0026]
[0027] Where P b3 (t), P sc3 (t) is the lead-acid battery power and supercapacitor power command after fuzzy control optimization, K b (t), K SC (t) is the fuzzy control optimization variable, P b2 (t), P sc2 (t) is the lead-acid battery power and supercapacitor power adjusted based on the working characteristics.
[0028] Optionally, the SoC of the lead-acid battery is analyzed by using an equivalent cycle life method and a rain flow counting method to obtain an equivalent number of cycles.
[0029] Compared with the prior art, the present invention has the following advantages and technical effects:
[0030] The present invention discloses a hybrid energy storage capacity optimization control strategy and configuration method for smoothing wind power fluctuations based on CPO-VMD. First, the wind power data of the wind farm is monitored the day before, the wind power fluctuation is calculated, the wind power fluctuation amount and the fluctuation rate bar chart are counted and drawn, the hybrid energy storage power is extracted by adaptive sliding filtering, the hybrid energy storage power is allocated once by CPO-VMD, and the upper power optimization is completed by considering the consistency of charge and discharge, and the working characteristics of lead-acid batteries and supercapacitors, and then the lower power optimization is realized by the fuzzy controller, so as to realize the double-layer optimization of the hybrid energy storage power, and adopt a general capacity configuration method to construct a full life cycle cost model and benefit model, and calculate the cost, benefit, and net benefit generated by the present invention in the full life cycle. The present invention effectively smoothes the wind power fluctuation under the premise of reducing the loss of the grid-connected component, and realizes the capacity configuration that improves the net benefit of energy storage by adjusting the operation of HESS to extend the operating life of energy storage, which provides scientific support for ensuring the safe and stable operation of the power grid. BRIEF DESCRIPTION OF THE DRAWINGS
[0031] The drawings constituting a part of the present application are used to provide a further understanding of the present application. The illustrative embodiments and descriptions of the present application are used to explain the present application and do not constitute an improper limitation on the present application. In the drawings:
[0032] Figure 1 A structure diagram of a wind power generation system based on a CPO-VMD hybrid energy storage to smooth wind power fluctuation capacity optimization control strategy and configuration method according to an embodiment of the present invention;
[0033] Figure 2 An adaptive sliding filtering flow chart for smoothing wind power fluctuations based on a hybrid energy storage capacity optimization control strategy and configuration method for smoothing wind power fluctuations of an embodiment of the present invention based on CPO-VMD;
[0034] Figure 3 A flow chart of CPO optimized VMD parameters for smoothing wind power fluctuations according to a capacity optimization control strategy and configuration method for hybrid energy storage to smooth wind power fluctuations based on CPO-VMD according to an embodiment of the present invention;
[0035] Figure 4 A membership function diagram of a dual fuzzy controller for smoothing wind power fluctuations based on a hybrid energy storage capacity optimization control strategy and configuration method for smoothing wind power fluctuations based on CPO-VMD in an embodiment of the present invention;
[0036] Figure 5 is a graph showing actual output power on a typical day according to an embodiment of the present invention;
[0037] Figure 6 is the probability distribution of 1-minute volatility on a typical day in an embodiment of the present invention;
[0038] Figure 7is the probability distribution of the 10-minute volatility on a typical day in an embodiment of the present invention;
[0039] Figure 8 This is a comparison diagram of wind power before and after using adaptive sliding filtering in an embodiment of the present invention;
[0040] Fig. 9 This is a hybrid energy storage reference power curve diagram for a typical day according to an embodiment of the present invention. DETAILED DESCRIPTION
[0041] It should be noted that, in the absence of conflict, the embodiments and features in the embodiments of the present application can be combined with each other. The present application will be described in detail below with reference to the accompanying drawings and in combination with the embodiments.
[0042] It should be noted that the steps shown in the flowcharts of the accompanying drawings can be executed in a computer system such as a set of computer executable instructions, and that, although a logical order is shown in the flowcharts, in some cases, the steps shown or described can be executed in an order different from that shown here.
[0043] Embodiment 1
[0044] like Figure 1 As shown, in this embodiment, a hybrid energy storage capacity optimization control strategy and configuration method for smoothing wind power fluctuations based on CPO-VMD is provided, including: calculating the maximum wind power fluctuation amount of the wind farm based on the active power data of the wind farm, and when the maximum wind power fluctuation amount of the wind farm exceeds the grid-connected standard limit, an adaptive sliding filter is used to obtain the grid-connected power and the hybrid energy storage power; based on the CPO-VMD algorithm, the hybrid energy storage power is decomposed to obtain the allocated lead-acid battery power and supercapacitor power; the charge and discharge states of the lead-acid battery power and the supercapacitor power are double-layer optimized to obtain the corrected lead-acid battery power and supercapacitor power; based on the corrected lead-acid battery power and supercapacitor power, the lead-acid battery and supercapacitor capacity are configured to obtain a capacity configuration that maximizes the net benefit of energy storage.
[0045] The specific implementation steps are as follows:
[0046] Step 1: The structure diagram of wind power generation system is as follows: Figure 1 As shown. The system mainly consists of wind farms, lead-acid battery packs, supercapacitors, AD-DC and DC-AC converters. The wind farm is connected in parallel to the grid-connected inverter hybrid energy storage. The converter works together with the wind farm after power control and is connected to the grid through the transformer to smooth the active power fluctuation of wind power. The power dispatch of hybrid energy storage is realized by adaptive sliding filter controller, CPO-VMD realizes the primary distribution of hybrid energy storage power, and the double-layer optimization and fuzzy controller jointly optimize the secondary distribution of hybrid energy storage. Among them, P w (t) is the output power of the wind farm, Pbw (t) is the grid-connected power, P HESS (i) is the reference power of hybrid energy storage. Monitor the active power data of the wind farm on the previous day and draw a wind power active power diagram. Calculate the wind power fluctuation and volatility of the wind farm, and draw its wind power fluctuation and volatility bar chart. Calculate the maximum wind power fluctuation and volatility of the wind farm, compare the wind power active power change limit in the national standard GB / T 19963.1-2021, and judge whether the maximum wind power fluctuation of the wind farm meets the requirements of wind power grid connection. If the maximum wind power fluctuation exceeds the wind power active power change limit, P w Adaptive sliding filtering is used to obtain the grid-connected component P bw and hybrid energy storage power P HESS ; Otherwise, no action is required. The Moving Average filter (MAF) performs arithmetic averaging on the data in a fixed window, and extends the time series sliding window to introduce new data and remove old data to achieve sliding filtering of the signal. Its expression is:
[0047]
[0048] P HESS (i) = P w (i)-P bw (i)
[0049] Where: i is the original data number; L is the length of the sliding window at time i; P w (ij) is the wind power data at time (ij); P bw (i) is the grid-connected component after adaptive sliding filtering at time i; P HESS (i) is the reference power of hybrid energy storage at time i.
[0050] This paper proposes an adaptive moving average filter (AMAF) to obtain grid-connected power. AMAF can adaptively obtain the optimal sliding window that meets the grid-connected standard according to the degree of wind power fluctuation at different times, and ensure that the obtained grid-connected power tracks the original wind power to the maximum extent, reducing the pressure on energy storage. The algorithm flow is as follows: Figure 2 shown.
[0051] Step 2: Use the crown porcupine optimizer to optimize the mode number K and quadratic penalty term α of the VMD algorithm. HESSDecompose to obtain several modal components IMF and residual RES, perform Hilbert transform on the modal components IMF and residual RES decomposed by CPO-VMD, and obtain the Hilbert marginal spectrum. Select the adjacent modal components with the least overlapping in the Hilbert marginal spectrum and use them as high and low frequency division points. Decompose the residual res obtained by the first CPO-VMD again by CPO-VMD to obtain several modal components imf and residual res. Repeat the above operation to obtain high-frequency components, low-frequency components and their res. Reconstruct the components after CPO-VMD decomposition. Add the low-frequency components of power obtained by the two decompositions and assign them to the lead-acid battery. The high-frequency components of power obtained by the two decompositions and the residual of the second decomposition are assigned to the supercapacitor to obtain the lead-acid battery power P decomposed and reconstructed by CPO-VMD. b And the supercapacitor power P cs The present invention uses the minimum value of envelope entropy as the fitness function in the process of CPO optimizing VMD parameters. The optimization flow chart is as follows: Figure 3 As shown. The low-frequency components of the power obtained by the two decompositions are added and allocated to the lead-acid battery, and the high-frequency components and the remainder of the second decomposition are allocated to the supercapacitor. The initial allocation result is shown in the following formula:
[0052]
[0053] Where IMF(X) is the modal component of the first decomposition; imf(x) is the xth component of the second decomposition; M f and m f Represent the high and low frequency critical points of the first and second decompositions respectively; N and n represent the total number of modes of the first and second decompositions respectively, P b and P sc They are the command powers of the lead-acid battery and supercapacitor after initial distribution, respectively.
[0054] Step 3: If the lead-acid battery power P b And the supercapacitor power P cs In the case of inconsistent charging and discharging states, the consistency coefficient μ is introduced to optimize the consistency of the power after the initial allocation. The expression of μ is as follows:
[0055]
[0056] Where e is a natural constant. If 1≤μ≤e, it means that the charge and discharge of the two are the same at this time; otherwise, it means that the charge and discharge state of the lead-acid battery and the supercapacitor are opposite. If μ<1, it means that the absolute value of the supercapacitor power is greater than that of the lead-acid battery, so the supercapacitor bears the total power and the lead-acid battery does not work; similarly, if μ>e, the lead-acid battery bears the total power and the supercapacitor does not work.
[0057] The HESS optimization strategy expression considering the charge and discharge consistency is as follows:
[0058]
[0059] Where P b1 (t) and P cs1 (t) are the command powers of lead-acid battery and supercapacitor after charge and discharge consistency optimization.
[0060] According to the working characteristics of lead-acid batteries and supercapacitors, the lead-acid battery power P b1 And the supercapacitor power P cs1 Adjustment, due to the lead-acid battery power command P b1 There are some low-frequency and small-amplitude components, which cause the lead-acid battery to charge and discharge frequently, which affects the battery life. Supercapacitors allow a large number of charge and discharge times, so these low-frequency and small-amplitude components can be allocated to supercapacitors. Therefore, the optimization and adjustment of energy storage working characteristics are shown in the following formula:
[0061]
[0062] Where P b2 (t), P sc2 (t) is the adjusted power command, d is the set threshold, which is selected according to the actual situation. In this paper, d=2%P bN ;P bN The rated power of the lead-acid battery
[0063] Get P b2 , P cs2 In order to avoid the SoC of lead-acid batteries and supercapacitors exceeding the limit and prolong the life of lead-acid batteries, the membership function and fuzzy control rules are formulated in combination with expert experience. The rules of fuzzy controller 1 are shown in Table 1, the rules of fuzzy controller 2 are shown in Table 2, and the fuzzy controller membership function diagram is shown in Figure 4 After the lower layer optimization, the power instructions of the lead-acid battery and supercapacitor are as follows:
[0064]
[0065] Where P b3 (t), P sc3 (t) is the lead-acid battery power and supercapacitor power command after fuzzy control optimization, K b (t), K SC (t) is the fuzzy control optimization variable, P b2 (t), P sc2 (t) is the lead-acid battery power and supercapacitor power adjusted based on the working characteristics.
[0066] Table 1
[0067]
[0068] Table 2
[0069]
[0070]
[0071] Step 4: Obtain the lead-acid battery power P b3 And the supercapacitor power P cs3 Capacity configuration, the capacity configuration is as follows:
[0072] Assume the rated power of energy storage is P rate , configured P rate The maximum excess power or maximum power shortage of the energy storage power P(t) that should be absorbed or supplemented during the assessment period T, taking into account the converter efficiency and the charging and discharging efficiency of the energy storage element, the energy storage rated power is shown as follows:
[0073]
[0074] Where: P dis (t), P ch (t) are the discharge power and charging power of the energy storage at time t; t0 is the initial time; η DC-DC , η DC-AC are the efficiencies of DC-DC and DC-AC respectively; η c and η d are the charging and discharging efficiencies of the energy storage element, respectively.
[0075] Rated capacity configuration:
[0076] Assume the rated capacity of energy storage is S rate , the energy storage capacity configuration needs to consider the state of charge (SOC) of the energy storage itself. The rated capacity of the energy storage is shown in the following formula.
[0077]
[0078] Where: SOC(0) is the reference state of charge of energy storage; SOC max , SOC min They are the maximum and minimum states of charge, respectively.
[0079] According to the measured lead-acid battery dod-n data, the equivalent number of cycles is fitted, and the equivalent number of cycles is obtained by using the equivalent cycle life method and rain flow counting method for the SoC of the lead-acid battery. The full life cycle is set, and the replacement times of the lead-acid battery and the replacement times of the supercapacitor in the full life cycle are calculated. The cost and benefit model in the full life cycle is constructed to calculate the cost, benefit, and net benefit of the full life cycle. The specific operations are as follows:
[0080] Depth of discharge (dod) is an important factor affecting the battery life. Table C1 shows the measured data of dod and equivalent cycle number n in different lead-acid battery projects. This paper uses VEB2 lead-acid battery and uses second-order exponential fitting of dod-n function relationship. The fitted dod-n function is shown below:
[0081] N=24090e -(9.346*dod) +6085e -(1.319*dod)
[0082] The rain flow counting method is used to count the number of cycles under different dods, and the fitted dod-n function is used to convert n under different dods to n under dod = 1 and sum them to obtain the battery energy storage cycle life.
[0083] N life,b , the life calculation model of battery energy storage is as follows:
[0084]
[0085] Where: N1 is the number of cycles when dod = 1; N z It is the number of cycles converted under real-time dod.
[0086] Supercapacitors are less affected by dod. The main factor affecting their lifespan is the number of charge and discharge cycles. Their service life is estimated based on their actual daily charge and discharge cycles. Assuming that they operate for one day a year, the calculation model for supercapacitors is as follows:
[0087]
[0088] Where: N life,b is the service life of the supercapacitor; N gmax N is the maximum number of charge and discharge times in the life cycle of the supercapacitor; grreal The actual number of charge and discharge times of the supercapacitor per day.
[0089] The total life cycle cost of the HESS of the present invention is C lcc Consider the investment cost, operation and maintenance cost, decommissioning and disposal cost, replacement cost, auxiliary cost, and residual value recovery of HESS during its entire life cycle. lccModel, each sub-cost model is shown as follows, using the cost present value method, and the base discount rate is r.
[0090] C lcc =C inv +C o +C d +C rep +C bop -C res
[0091] 1) Investment cost
[0092]
[0093] In the formula, C pinv is the unit power investment cost; C sinv is the investment cost per unit capacity.
[0094] 2) Operation and maintenance costs
[0095]
[0096] Where: C po is the unit power operation and maintenance cost; C so is the unit capacity operation and maintenance cost; W(t) is the annual charge and discharge capacity of energy storage.
[0097] 3) Decommissioning costs
[0098]
[0099] In the formula, C pd is the decommissioning cost per unit power; C sd is the decommissioning and disposal cost per unit capacity.
[0100] 4) Update and replacement costs
[0101]
[0102] In the formula, C prep is the unit power replacement cost; C srep Update the replacement cost per unit capacity.
[0103] 5) Auxiliary equipment cost
[0104] C bop =C pbop P rate or C bop =C sbop S rate
[0105] In the formula, C pbop is the unit power auxiliary equipment cost; C sbopis the auxiliary equipment cost per unit capacity.
[0106] 6) Recover residual value
[0107] C res =σ res (C inv +C rep +C bop )(1+r) -t
[0108] HESS Participation in Wind Power Benefit Stabilization Model
[0109] The HESS of the present invention participates in stabilizing the wind power benefit B and considers reducing the reserve power benefit B r , reduce the capacity benefit of grid connection channel construction B s 、Environmental Benefits B env 、Frequency Modulation Subsidy B b , and combined with the HESS full life cycle cost model, the HESS participation in the wind power leveling cost-benefit calculation model NPV is constructed. Benefit B model, net benefit NPV model, and each sub-benefit model are shown in the following formula.
[0110] B=B r +B s +B env +B b
[0111] NPV=BC lcc
[0112] 1) Reduce the required reserve capacity benefit B r
[0113]
[0114] Where P rd (d) is the wind power spinning reserve capacity on a typical day; χ is the reliability of wind farm output prediction;
[0115]
[0116] In the formula, e r is the reserve capacity price; N day is the number of sampling points in a day; D ay The number of days in the year.
[0117] 2) Benefits of reducing the construction capacity of grid-connected channels B s
[0118] B s =k c max{0,max(P w (t))-max(P w (t)-PHESS (t))}
[0119] In the formula, k c It is the unit power cost of the grid-connected channel.
[0120] 3) Environmental Benefits B env
[0121]
[0122] In the formula, Q v is the emission of the vth pollutant of conventional coal-fired power generation, kg / (MW·h); R UEC , v is the unit cost of the environmental load of the vth pollutant, yuan / kg; I is the total number of pollutants emitted.
[0123] 4) Frequency Regulation Subsidy B b
[0124]
[0125] Where: P PFR Subsidy for unit power of energy storage.
[0126] In step 1, the maximum wind power fluctuation and volatility of the 30MW wind farm in 1 minute are 3.114MW and 10.38%, and the maximum wind power fluctuation and volatility in 10 minutes are 10.13MW and 33.7%, which do not meet the wind power active power change limit of 3MW in 1 minute and 10MW in 10 minutes in the national standard GB / T 19963.1-2021. Through adaptive sliding filtering, the minimum sliding window under the fluctuation constraint is 3, the maximum wind power fluctuation and volatility in 1 minute are 1.59MW and 5.3%, and the maximum wind power fluctuation and volatility in 10 minutes are 9.71MW and 32.37%. After smoothing, all fluctuation indicators of grid-connected power have decreased, and its maximum fluctuation and volatility in 1 minute and 10 minutes meet the grid-connected standards.
[0127] In step 2, the crown porcupine optimizer is used to optimize the modal number K and quadratic penalty term α of the VMD algorithm to 10 and 1972 respectively. The results of CPO-VMD decomposition are subjected to Hilbert transform, and the obtained Hilbert marginal spectrum shows that the overlap between IMF1 and IMF2 is the least, so IMF1 is assigned to lead-acid batteries, and IMF2 to IMF9 are assigned to supercapacitors. Similarly, the res of the first decomposition is decomposed by CPO-VMD again, and then imf1 to imf6 are assigned to lead-acid batteries, and imf7 to imf10 and res are assigned to supercapacitors.
[0128] In step 3, when the charge and discharge states of the power of the lead-acid battery and the supercapacitor after allocation are inconsistent, perform upper-layer optimization on the power of the lead-acid battery and the supercapacitor for consistency and adjust based on the working characteristics to obtain the adjusted power of the lead-acid battery and the supercapacitor; formulate the membership function and fuzzy control rules, and use a dual fuzzy controller based on the membership function and fuzzy control rules to perform lower-layer optimization of the fuzzy control on the adjusted power of the lead-acid battery and the supercapacitor to obtain the corrected power of the lead-acid battery and the supercapacitor.
[0129] Introduce the consistency coefficient μ. When the power P b of the lead-acid battery and the power P cs of the supercapacitor have inconsistent charge and discharge states, and the absolute value of the power of the lead-acid battery is greater than that of the supercapacitor, let the lead-acid battery bear the total power and the supercapacitor does not act; otherwise, let the supercapacitor bear the total power and the lead-acid battery does not act, and obtain the P b1 with consistent charge and discharge, P cs1 . Introduce the coefficients d1 = 5%P scN , d2 = 22%S bN . When the power P cs1 of the supercapacitor is less than d1, let the lead-acid battery bear the output of this part with a small energy amplitude to prevent the supercapacitor from charging and discharging frequently, extend its life, and improve the utilization efficiency of the SoC of the lead-acid battery. When P b1 is greater than d2 / 60, let the battery bear the output of this small part with a large energy amplitude, reduce the configuration requirements of the lead-acid battery, and improve its operation safety and stability, and obtain the P b2 , P cs2 considering the working characteristics of the lead-acid battery and the supercapacitor. According to the formulated membership function and fuzzy control rules, input SoC sc (t), ΔSoC sc (t) and SoC b (t) and ΔSoC b (t) to output K sc (t), K b (t), and respectively correct P b2 , P cs2 to obtain P b3 , P cs3 .
[0130] In step 4, through P b3 , P cs3The rated power is obtained by configuring the lead-acid battery and supercapacitor capacity, and the rated capacity is 0.145MW / 0.0263MWh and 1.042MW / 0.0859MWh respectively. The full life cycle is set to 10 years, and the equivalent cycle number obtained by the equivalent cycle life method and rain flow counting method is 18.444. The replacement number of lead-acid batteries and supercapacitors in the full life cycle is 40 and 12 respectively. The full life cycle cost is calculated to be 3.493×10 7 Yuan, benefit 7.434×10 7 Yuan, with a net benefit of 3.94×10 7 Yuan.
[0131] The following is a further explanation of this scheme through example simulation.
[0132] This example is based on the MATLAB simulation platform to build a wind farm to carry out simulation verification. In order to verify the feasibility of the method proposed in the present invention in the wind farm to participate in the smoothing of wind power fluctuations, a wind farm in a certain area is selected as the research object.
[0133] 1) Smoothing out wind power fluctuations
[0134] The actual output power data of a 30MW wind farm on a typical day in 2024 (sampling time is 1min) is used for simulation analysis in Matlab. Figure 5 This is a graph of actual output power on a typical day.
[0135] Figure 6 is the probability distribution of 1-minute volatility on a typical day; Figure 7 is the probability distribution of the 10-minute volatility on a typical day; Figure 8 This is a comparison chart of wind power before and after using adaptive sliding filtering. Fig. 9 This is a hybrid energy storage reference power curve diagram for a typical day according to an embodiment of the present invention.
[0136] Table 3
[0137]
[0138] It can be seen from Table 3 that when the wind power data does not meet the grid connection requirements, the method of the present invention is effective in the indicators of smoothing fluctuations. The maximum fluctuation rate of 1 minute decreases by 5.08%, and the maximum fluctuation rate of 10 minutes decreases by 1.33%. The smoothness is only 66% of that before the sliding average. The maximum fluctuation amount and fluctuation rate of 1 minute and 10 minutes meet the grid connection standards.
[0139] 2) Capacity configuration and economic evaluation
[0140] This example will use EMD, VMD, and the method proposed in the present invention will compare the CPO-VMD method of allocating hybrid energy storage power through charge and discharge consistency, taking into account the energy storage working characteristics, and fuzzy control optimization. The allocated lead-acid battery power and supercapacitor power are configured for capacity respectively, and the full life cycle is set to 10 years. The cost, benefit, and net benefit of each hybrid energy storage power allocation within the full life cycle are calculated. Table 4 shows the capacity configuration of each allocation method, and Table 5 shows the economic indicators of each allocation method. It can be seen from the table that profitability cannot be achieved by relying solely on single energy storage. The present invention can effectively reduce the capacity configuration of lead-acid batteries and supercapacitors, reduce costs, and improve benefits.
[0141] Table 4
[0142]
[0143] Table 5
[0144]
[0145] The above are only preferred specific implementations of the present application, but the protection scope of the present application is not limited thereto. Any changes or substitutions that can be easily thought of by a person skilled in the art within the technical scope disclosed in the present application should be included in the protection scope of the present application. Therefore, the protection scope of the present application should be based on the protection scope of the claims.
Claims
1. A hybrid energy storage capacity optimization control strategy and configuration method for smoothing wind power fluctuations based on CPO-VMD, It is characterized in that The following steps are involved: Calculate the maximum wind power fluctuation of the wind farm based on the active power data of the wind farm, and when the maximum wind power fluctuation of the wind farm exceeds the grid connection standard limit, use adaptive sliding filtering to obtain the grid connection power and hybrid energy storage power; Decomposing the hybrid energy storage power based on the CPO-VMD algorithm to obtain the allocated lead-acid battery power and supercapacitor power; Performing double-layer optimization on the charge and discharge states of the lead-acid battery power and the supercapacitor power to obtain corrected lead-acid battery power and supercapacitor power; Based on the corrected lead-acid battery power and supercapacitor power, the lead-acid battery and supercapacitor capacities are configured to obtain a capacity configuration that maximizes the net benefit of energy storage.
2. According to claim 1, the hybrid energy storage based on CPO-VMD to smooth the wind power fluctuation capacity optimization control strategy and configuration method, It is characterized in that The adaptive sliding filter uses a sliding average method to implement the sliding filtering of the signal; wherein the expression is: Where i is the original data number; L is the length of the sliding window at time i, P w (ij) is the wind power data at time (ij); P bw (i) is the grid-connected component after adaptive sliding filtering at time i.
3. According to claim 1, the CPO-VMD-based hybrid energy storage capacity optimization control strategy and configuration method for smoothing wind power fluctuations, It is characterized in that The process of decomposing the hybrid energy storage power based on the CPO-VMD algorithm includes: S1. Based on the CPO-VMD algorithm, the hybrid energy storage power is decomposed to obtain several modal components and margins; S2, performing Hilbert transform on the modal components and the residuals to obtain a Hilbert marginal spectrum; S3, selecting adjacent modal components with the least mixing overlap in the Hilbert marginal spectrum to obtain high and low frequency division points, and obtaining a first re-decomposed high-frequency component and a first re-decomposed low-frequency component based on the high and low frequency division points; S4, decompose the residue of S1 again to obtain several modal components and residues, and repeat S2-S3 to obtain the second decomposition high-frequency component, the second decomposition low-frequency component and the second decomposition residue; S5. Add the first decomposed low-frequency component and the second decomposed low-frequency component and distribute them to a lead-acid battery to obtain lead-acid battery power; distribute the first decomposed high-frequency component, the second decomposed high-frequency component and the second decomposed remainder to a supercapacitor to obtain supercapacitor power.
4. According to claim 3, the hybrid energy storage based on CPO-VMD to smooth wind power fluctuation capacity optimization control strategy and configuration method, It is characterized in that The CPO-VMD algorithm uses the minimum value of envelope entropy as the fitness function in the process of CPO optimizing VMD parameters.
5. According to claim 3, the CPO-VMD-based hybrid energy storage capacity optimization control strategy and configuration method for smoothing wind power fluctuations, It is characterized in that The expressions of the allocated lead-acid battery power and supercapacitor power are: Where IMF(X) is the modal component of the first decomposition; imf(x) is the xth component of the second decomposition; M f and m f Represent the high and low frequency critical points of the first and second decompositions respectively; N and n represent the total number of modes of the first and second decompositions respectively, P b and P sc They are the command powers of the lead-acid battery and supercapacitor after initial distribution, respectively.
6. According to claim 3, the CPO-VMD-based hybrid energy storage capacity optimization control strategy and configuration method for smoothing wind power fluctuations, It is characterized in that The process of performing double-layer optimization on the charge and discharge states of the lead-acid battery power and the supercapacitor power includes: When the allocated lead-acid battery power and supercapacitor power have different charge and discharge states, the lead-acid battery power and supercapacitor power are optimized for consistency at the upper layer and adjusted based on the working characteristics to obtain adjusted lead-acid battery power and supercapacitor power; A membership function and a fuzzy control rule are formulated, and based on the membership function and the fuzzy control rule, a dual fuzzy controller is used to perform fuzzy control lower layer optimization on the adjusted lead-acid battery power and supercapacitor power to obtain the corrected lead-acid battery power and supercapacitor power.
7. The CPO-VMD-based hybrid energy storage capacity optimization control strategy and configuration method for smoothing wind power fluctuations according to claim 6, It is characterized in that The expressions of the corrected lead-acid battery power and supercapacitor power are: Where P b3 (t), P sc3 (t) is the lead-acid battery power and supercapacitor power command after fuzzy control optimization, K b (t), K SC (t) is the fuzzy control optimization variable, P b2 (t), P sc2 (t) is the lead-acid battery power and supercapacitor power adjusted based on the working characteristics.
8. The CPO-VMD-based hybrid energy storage capacity optimization control strategy and configuration method for smoothing wind power fluctuations according to claim 6, It is characterized in that The equivalent cycle life method and rain flow counting method are used to obtain the equivalent number of cycles for the SoC of lead-acid batteries.
Citation Information
Cited By
Multi-mode hybrid energy storage power distribution method in wind and light storage system
CN119602323A
Battery-superconducting magnet composite energy storage configuration method and system
CN120955699A
New energy grid-connected optimization method and system considering generated power fluctuation
CN121602539A