Suction type foundation penetration equipment and negative sinking construction method thereof

By using deep water pump components and internal silting pipeline crushing soil plugs in the sinking equipment of suction foundations, the problem of suction foundation being obstructed by soil plugs during offshore construction is solved, and the stable sinking of the foundation is achieved and Efficient installation reduces operation and maintenance costs.

CN118895768AInactive Publication Date: 2024-11-05NEPTUNE OFFSHORE ENG DEV
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202310482796.8
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2023-05-03
Publication Date
2024-11-05
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

During offshore construction, the soil plug phenomenon caused by negative pressure hinders the sinking of the foundation and affects the load-bearing capacity. The structure of the top part is easily washed away, increasing the cost of later operation and maintenance.

Method used

Using a sinking equipment including a frame, a deep water pump assembly, a water pipe valve group and an interface assembly, the crushing and extraction of the internal soil plug of the suction foundation and the mud-water mixture are achieved through two sets of deep water pump assembly and internal silting pipeline. , the combined control of the water pipe valve group is used to achieve penetration and lifting, ensuring that the foundation can sink to the seabed stably.

Benefits of technology

Effectively crush the soil plug, realize the stable sinking of the suction base into the seabed, reduces dependence on anti-srushing devices, reduces operation and maintenance costs, and improves installation accuracy and long-term stability of the structure.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118895768A_ABST
    Figure CN118895768A_ABST
Patent Text Reader

Abstract

The invention discloses suction type foundation penetration equipment and a negative sinking construction method thereof. The penetration equipment is composed of a rack, a deepwater electric pump assembly arranged in the rack, a water pipe valve group connected with a pump suction opening and an outlet of the deepwater electric pump assembly through flanges, and a connector assembly installed on the lower portion of the rack. A connector assembly with multi-way connection is adopted to be connected with a suction type foundation with an inner spraying and flushing pipeline, through synchronous water injection ground breaking and suction silt discharging, silt in a barrel is discharged, the influence of an inner soil plug is eliminated, and penetration under the mud surface is achieved; and meanwhile, a double-pump series connection pressurization mode is adopted, it is ensured that the penetration negative pressure is increased, the top of the inner cylinder is more tightly attached to the mud surface and deeply penetrates into the position below the seabed mud surface, and long-term in-place stability of the suction type foundation can be achieved without special anti-scouring treatment. The suction type foundation can be accurately installed at the needed position and the set depth, the installation precision and long-term structural stability are effectively guaranteed, and good economic benefits are achieved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of offshore wind power installation, and in particular to a suction foundation sinking device and a negative sinking construction method thereof. Background Art

[0002] At present, offshore wind turbines, fixed platforms or floating production systems and floating wind turbines all use suction foundations as bearing foundations. Suction piles as bearings and suction anchors as mooring anchors are widely used. Due to their fast construction and high economic efficiency, they have begun to be valued and applied in new projects at home and abroad. The suction foundation is a large-diameter steel circular cylindrical structure with an open bottom and a closed top like an inverted buckle. Compared with the steel pipe piles of the structure, it is shallow in the mud and can be constructed without large-scale piling equipment. During offshore construction, the suction foundation cylindrical structure is lowered by a crane, and the structure relies on its own weight to enter a certain depth in the seabed soil to form a closed space. Then, a special sinking equipment is used to extract the seawater in the cylinder, so that a pressure difference is formed inside and outside the cylinder, and it is gradually pressed into the predetermined depth in the seabed to complete the installation. When the negative pressure in the foundation is extracted, the soil in the cylinder will lose the water contained in it under the action of negative pressure, forming an expansion and bulge from bottom to top, which is the so-called "soil plug" phenomenon. The greater the negative pressure and the longer it lasts, the higher the soil plug will be. The soil plug in the center will hold up the top of the cylinder, hindering the sinking of the cylinder foundation, making it difficult for the cylinder foundation to sink to the designed depth. Since the suction foundation can only penetrate the cylinder section, the top part of the structure is higher than the seabed. The protruding structure can easily affect the direction of the water flow and cause scouring of the exposed part, weakening the bearing capacity of the foundation, and easily causing the foundation to become unstable over a long period of time. At present, the negative pressure cylinders used in engineering projects are to regularly throw stones on the protruding parts, or install anti-scouring devices, which makes the later operation and maintenance costs of the structure safety high. Summary of the invention

[0003] In order to make up for the deficiencies of the prior art, the present invention provides a suction-type foundation sinking device and a negative sinking construction method thereof.

[0004] The present invention is achieved through the following technical solutions: A suction foundation sinking device, comprising a frame, a deep water electric pump assembly, a water pipe valve group and an interface assembly. The frame is a frame made of steel, the deep-water electric pump assembly is installed inside the frame, the deep-water electric pump assembly includes a first deep-water electric pump assembly and a second deep-water electric pump assembly, the two groups of deep-water electric pump assemblies are standby for each other, the deep-water electric pump assembly is integrated with the underwater motor and driven by power transmitted through the surface umbilical cable, the water pipe valve group is an assembly composed of 12 groups of hydraulic ball valves and pipelines, the 12 groups of hydraulic ball valves are composed of 10 sets of two-way valves and 2 sets of three-way valves, the water pipe valve group is connected to the pump suction port and pump outlet of the deep-water electric pump assembly through flanges, The interface assembly is installed at the center of the lower part of the frame, and the interface assembly consists of a central bottom plate, a locking device and a sealing lip. The central bottom plate is a square steel plate with four circular hole suction ports cut in the middle. The circular hole suction ports are equipped with the sealing lips. Two sets of the locking devices are fixedly installed on both sides of the central bottom plate. The central bottom plate is welded to the bottom of the water pipe valve group.

[0005] Preferably, the upper part of the frame is provided with lifting points that meet the lifting requirements, and a protective net is arranged around it.

[0006] Preferably, the deep-water electric pump assembly is a water pump capable of pumping mud-water mixture and controlling flow rate and lift by frequency conversion.

[0007] Preferably, the valve diameters of the 12 groups of hydraulic ball valves of the water pipe valve group are consistent, and all use hydraulic actuators.

[0008] Preferably, the sealing lip is a ring made of polymer material.

[0009] Preferably, the locking device is a claw operated by a hydraulic cylinder for grasping the suction foundation.

[0010] Preferably, the suction foundation is a large-diameter foundation that adopts negative pressure sinking. The suction foundation is composed of a top cover, a mounting seat, a cylinder, a mooring towing plate and an internal desilting pipeline. The top cover is a disc structure formed by welding and cutting steel plates, and the upper part is provided with a grid-type reinforcing bracket to avoid buckling of the large-diameter plate surface. The mounting seat is welded on the top cover, and the mounting seat is aligned with the central bottom plate through the perforated bottom plate arranged thereon; the cylinder is coaxially welded to the lower part of the top cover. In order to avoid deformation of the structure under internal pressure, the outside of the cylinder is welded with circumferentially uniformly distributed There are multiple longitudinal reinforcing plates, the inside of the cylinder is welded with the mooring towing edge plate that spans the inside and protrudes from the outer wall, the cylinder is also designed with necessary weight-reducing openings, the internal dredging pipeline is welded under the top cover, the internal dredging pipeline consists of 4 groups of bifurcated internal dredging pipelines, the other end of the internal dredging pipeline is welded and connected to the perforated bottom plate of the mounting seat to form a fluid channel, the diameter of the end of the bifurcated internal dredging pipeline is 50% smaller than the hole diameter of the perforated bottom plate of the mounting seat, which can achieve a better throttling section and is conducive to increasing the jet pressure for breaking the soil.

[0011] The negative sinking construction method of the suction-type foundation sinking equipment comprises the following steps: Transport the suction foundation and the submersible equipment to the offshore construction site. After completing the on-site power connection and function test of the submersible equipment, lift the hook of the submersible equipment, align the interface assembly with the mounting seat, operate the locking device to tighten, squeeze the sealing lip to form a seal between the mounting seat and the center bottom plate, and form a good channel to connect the No. 1 valve, No. 2 valve, No. 3 valve, and No. 4 valve of the water pipe valve group with the No. 1 internal desilting pipeline, No. 2 internal desilting pipeline, No. 3 internal desilting pipeline, and No. 4 internal desilting pipeline of the 4 groups respectively; Release the suction-type foundation release. Before the bottom of the cylinder touches the water, control the No. 1, No. 2, No. 3 and No. 4 valves of the water pipe valve group to open. The No. 1 and No. 2 valves are connected to the outside through the No. 7 and No. 11 valves, and the No. 3 and No. 4 valves are connected to the outside through the No. 9 and No. 12 valves, forming an exhaust channel to achieve rapid exhaust of the air in the cylinder. Use a crane to lower the suction foundation at a speed of no more than 6 meters per hour until the submersible equipment installed on the top cover is submerged in the water. When the deep-water electric pump assembly is completely submerged, turn on the submersible equipment to test the water pump injection and drainage functions. After completion, continue to lower the suction foundation, keep the exhaust open, and control the crane lowering speed to no more than 3 meters per hour until the bottom of the cylinder touches the seabed, and control the crane lowering speed to 15 meters per hour; Open one of the two sets of deep-water electric pump assemblies that serve as backup for each other, close valves No. 7, No. 8, and No. 9, operate valve No. 6 to connect with the suction port of the first deep-water electric pump assembly, open valve No. 11, control the motor to the minimum frequency, and temporarily close any valve of valve No. 1, valve No. 2, valve No. 3, and valve No. 4 according to the horizontality of the suction foundation until the cylinder reaches the self-weighted mud entry depth; After the cylinder reaches the self-weighted depth of the mud and stands for 2 hours, the penetration construction is carried out. Open valves 1, 2, 3 and 4, gradually increase the motor frequency to the full load of the deep-water electric pump assembly, control the penetration speed to no more than 15 meters / hour, and gradually penetrate until the current of the motor decreases. At this time, the soil plug in the cylinder has supported the bottom of the top cover, and the penetration is suspended; Adjust valve No. 6 and valve No. 10 of the water pipe valve group to allow the deep-water electric pump assembly to pump water from the outside and inject it into the cylinder. Due to the branching and throttling of the internal desilting pipeline, the internal soil plug is broken. Combined with the elevation change, the lifting range is 15 cm to 20 cm. Close the No. 8 valve of the water pipe valve group, adjust the first deep-water electric pump assembly to lift, inject into the suction foundation through the No. 1 and No. 2 valves, adjust the second deep-water electric pump assembly to suck the No. 3 and No. 4 valves, and discharge through the No. 10 valve. The frequency of the first deep-water electric pump assembly is lower than that of the second deep-water electric pump assembly, so that the internal mud-water mixture is extracted from the suction foundation. Due to the difference in flow rates of the two sets of deep-water electric pump assemblies, the mud-water mixture inside the cylinder is continuously discharged, gradually to the top cover elevation to 5 cm below the seabed mud surface; Pressurize and sink to the bottom until the water pump current of the deep-water electric pump assembly is 0. At this time, the bottom of the top cover is completely close to the mud surface and the whole is below the mud surface to achieve scour protection. Adjust valve No. 7, valve No. 8, valve No. 9, and valve No. 10 of the water pipe valve group to achieve suction at the suction port of the first deep-water electric pump assembly and connect valve No. 1, valve No. 2, valve No. 3, and valve No. 4. The outlet enters the suction port of the second deep-water electric pump assembly through valve No. 8 and is discharged through the outlet from valve No. 10. Control the current of the second deep-water electric pump assembly to be greater than that of the first deep-water electric pump assembly to achieve double pump series pressurization, increase the suction inside the suction foundation, until the currents of the second deep-water electric pump assembly and the first deep-water electric pump assembly are both 0, so that the bottom of the top cover is close to the mud surface; After completing the penetration close to the mud surface, the diver or underwater robot closes the valve between the mounting seat and the internal dredging pipeline to isolate the cylinder from the seawater, lift the penetration equipment, and when there is still a depth of 5 meters from the water outlet, start the deep-water electric pump assembly and adjust the valve combination of the water pipe valve group to flush all the pipes in the penetration equipment and discharge the internal silt.

[0012] Due to the adoption of the above technical solution, the present invention has the following beneficial effects compared with the prior art: 1. Through the use of a submersible equipment consisting of two sets of deep-water electric pump components, the suction foundation with an internal desilting pipeline is submerged and constructed. Relying on the combination of the internal control water pipe valve group of the equipment, the suction foundation can be submerged or lifted separately; 2. Use the deep-water electric pump assembly to inject water into the cylinder and perform pressure jetting through the internal desilting pipeline to break the soil plug in the center of the suction cylinder to form a mud-water mixture. Another set of deep-water electric pump assemblies suck the mud-water mixture. By adjusting the difference in flow between the two sets of pump groups, it is possible to achieve simultaneous dredging and sinking of the suction foundation until the top cover is close to the mud or below the mud surface. 3. Through the series connection of two sets of deep-water electric pump assemblies to increase pressure, high-pressure suction is achieved in the suction-type foundation cylinder, further increasing the penetration depth and the top cover tightly attached to the mud surface, forming a more stable support; 4. By penetrating deeply below the seabed mud surface, the suction foundation can be stabilized for a long time without special anti-scouring treatment; 5. By using the controlled construction of the sinking equipment, the suction foundation can be accurately installed to the required position and set depth, effectively ensuring the installation accuracy and long-term structural stability, and having good economic benefits.

[0013] Additional aspects and advantages of the present invention will become apparent from the following description or may be learned by practice of the present invention. BRIEF DESCRIPTION OF THE DRAWINGS

[0014] The above and / or additional aspects and advantages of the present invention will become apparent and easily understood from the description of the embodiments in conjunction with the following drawings, in which: Figure 1 It is a schematic diagram of the overall structure of the sinking equipment of the preferred embodiment of the present invention; Figure 2 This is a front view of the overall structure of the sinking device of the preferred embodiment of the present invention; Figure 3 It is a composition diagram of the interface of the sinking equipment of the preferred embodiment of the present invention; Figure 4 This is a diagram showing the arrangement and composition of the pump and valve parts of the sinking equipment of the preferred embodiment of the present invention; Figure 5 It is a schematic diagram of the overall structure of the suction-type foundation of a preferred embodiment of the present invention; Figure 6 It is a detailed structural diagram of a suction-type foundation of a preferred embodiment of the present invention; Figure 7 This is a schematic diagram of the internal components of a suction foundation according to a preferred embodiment of the present invention; Figure 8 It is a schematic diagram of the piping system of the immersion equipment according to the preferred embodiment of the present invention.

[0015] in, Figure 1-8 The corresponding relationship between the reference numerals and the components is as follows: 1. Frame; 2. Deepwater electric pump assembly; 21. First deepwater electric pump assembly; 22. Second deepwater electric pump assembly; 3. Water pipe valve group; 301. No. 1 valve; 302. No. 2 valve; 303. No. 3 valve; 304. No. 4 valve; 305. No. 5 valve; 306. No. 6 valve; 307. No. 7 valve; 308. No. 8 valve; 309. No. 9 valve; 310. No. 10 valve; 311. Valve No. 11; 312, Valve No. 12; 4, Interface assembly; 41, Center base plate; 42, Locking device; 43, Sealing lip; 5, Suction foundation; 51, Top cover; 52, Mounting seat; 53, Cylinder; 54, Mooring towing plate; 55, Internal dredging pipeline; 551, Internal dredging pipeline No. 1; 552, Internal dredging pipeline No. 2; 553, Internal dredging pipeline No. 3; 554, Internal dredging pipeline No. 4. Implementation

[0016] In order to more clearly understand the above-mentioned purpose, features and advantages of the present invention, the present invention is further described in detail below in conjunction with the accompanying drawings and specific embodiments. It should be noted that the embodiments of the present application and the features in the embodiments can be combined with each other without conflict.

[0017] In the following description, many specific details are set forth to facilitate a full understanding of the present invention. However, the present invention may also be implemented in other ways different from those described herein. Therefore, the protection scope of the present invention is not limited to the specific embodiments disclosed below.

[0018] Combine the following Figure 1-8 A suction foundation sinking device and a sinking construction method thereof according to an embodiment of the present invention are specifically described.

[0019] like Figure 1-4 As shown, a suction-based sinking equipment includes a frame 1, a deep-water electric pump assembly 2, a water pipe valve group 3 and an interface assembly 4. The frame 1 is a frame made of steel. The upper part of the frame 1 is provided with lifting points that meet the lifting needs, and a protective net is arranged around it. The deep-water electric pump assembly 2 is installed inside the frame 1. The deep-water electric pump assembly 2 is a water pump that can pump mud and water mixture and uses frequency conversion to control flow and head. The deep-water electric pump assembly 2 includes a first deep-water electric pump assembly 21 and a second deep-water electric pump assembly 22. The deep-water electric pump assembly 2 is integrated with the underwater motor and driven by transmitting electricity through the surface umbilical cable. The water pipe valve group 3 is an assembly composed of 12 groups of hydraulic ball valves and pipelines. The 12 groups of hydraulic ball valves are composed of 10 sets of two-way valves and The water pipe valve group 3 is composed of 2 sets of three-way valves. The valve diameters of the 12 groups of hydraulic ball valves of the water pipe valve group 3 are consistent and all use hydraulic actuators. The water pipe valve group 3 is connected to the pump suction port and pump outlet of the deep water electric pump assembly 2 through flanges. An interface assembly 4 is installed at the center of the lower part of the frame 1. The interface assembly 4 consists of a central base plate 41, a locking device 42 and a sealing lip 43. The central base plate 41 is a square steel plate with 4 circular hole suction ports cut in the middle. The circular hole suction ports are equipped with sealing lips 43. The sealing lips 43 are circular rings made of polymer materials. Two sets of locking devices 42 are fixedly installed on both sides of the central base plate 41. The locking devices 42 are claws controlled by hydraulic cylinders for grasping the suction foundation 5. The central base plate 41 is welded to the bottom of the water pipe valve group 3.

[0020] like Figure 5-7As shown, the suction foundation 5 is composed of a top cover 51, a mounting seat 52, a cylinder 53, a mooring towing plate 54 and an internal desilting pipeline 55. The top cover 51 is a disc structure formed by welding and cutting steel plates, and a grid-type reinforcing bracket is arranged on the upper part. The mounting seat 52 is welded on the top cover 51, and the mounting seat 52 is aligned with the central bottom plate 41 through the perforated bottom plate arranged thereon; the cylinder 53 is coaxially welded to the lower part of the top cover 51, and a mooring towing plate 54 is welded inside the cylinder 53, which spans the interior and protrudes from the outer wall; the internal desilting pipeline 55 is welded below the top cover 51, and the internal desilting pipeline 55 is composed of 4 groups of forked internal desilting pipelines, and the other end of the internal desilting pipeline 55 is welded to the perforated bottom plate of the mounting seat 52.

[0021] like Figure 8 As shown, the negative sinking construction method of the present invention comprises the following steps: Step S1: transport the suction foundation 5 and the submersible equipment to the offshore construction site, complete the on-site power connection and function test of the submersible equipment, lift the submersible equipment hook, align the interface assembly 4 with the mounting seat 52, operate the locking device 42 to tighten, squeeze the sealing lip 43 to form a seal between the mounting seat 52 and the central bottom plate 41, and form a good channel, so that the No. 1 valve 301, No. 2 valve 302, No. 3 valve 303, No. 4 valve 304 of the water pipe valve group 3 are connected with the No. 1 internal desilting pipeline 551, No. 2 internal desilting pipeline 552, No. 3 internal desilting pipeline 553, and No. 4 internal desilting pipeline 554 of the four groups of internal desilting pipelines 5 respectively; Step S2: Release the transportation fixation of the suction foundation 5, hang the lock to lift the suction foundation 5 installed with the sinking equipment, adjust the position and lower it, and before the bottom of the cylinder 53 touches the water, control the valve No. 1 301, valve No. 2 302, valve No. 303, and valve No. 4 304 of the water pipe valve group 3 to open, valve No. 1 301 and valve No. 2 302 are connected to the outside through valve No. 7 307 and valve No. 11 311, and valve No. 303 and valve No. 4 304 are connected to the outside through valve No. 9 309 and valve No. 12 312, forming an exhaust channel to achieve rapid exhaust of air in the cylinder 53; Step S3: lower the suction foundation 5 by means of a crane at a speed of no more than 6 m / h until the submersible device installed on the top of the top cover 51 is submerged in the water. When the deepwater electric pump assembly 2 is completely submerged, the submersible device is turned on to test the water pump filling and drainage functions. After completion, the suction foundation 5 is continued to be lowered, the exhaust is kept on, and the lowering speed of the crane is controlled to be no more than 3 m / h until the bottom of the cylinder 53 contacts the seabed, and the lowering speed of the crane is controlled to 15 m / h; Step S4: Open one of the two sets of deep-water electric pump assemblies 2 that are used as backup for each other, close valve No. 7 307, valve No. 8 308, and valve No. 9 309, operate valve No. 6 306 to communicate with the suction port of the first deep-water electric pump assembly 21, open valve No. 11 311, control the motor to the minimum frequency, and temporarily close any valve of valve No. 1 301, valve No. 2 302, valve No. 3 303, and valve No. 4 304 according to the horizontal degree of the suction foundation 5 until the cylinder 53 reaches the self-weighted mud entry depth; Step S5: After the cylinder 53 reaches the self-weighted mud entry depth and stands for 2 hours, the penetration construction is carried out, the No. 1 valve 301, the No. 2 valve 302, the No. 3 valve 303, and the No. 4 valve 304 are opened, and the motor frequency is gradually increased to the full load of the deep-water electric pump assembly 2, and the sinking speed is controlled to be no higher than 15 meters / hour, and the penetration is gradually carried out until the current of the motor decreases. At this time, the soil plug in the cylinder 53 has supported the bottom of the top cover 51, and the penetration is suspended; Step S6: adjust the No. 6 valve 306 and No. 10 valve 310 of the water pipe valve group 3 so that the deep water electric pump assembly 2 pumps water from the outside and injects it into the cylinder 53. Due to the branching and throttling and pressurization of the internal desilting pipeline 55, the internal soil plug is broken. Combined with the elevation change, the lifting range is 15 cm to 20 cm; Step S7: close the No. 8 valve 308 of the water pipe valve group 3, adjust the first deep-water electric pump assembly 21 for lifting, inject into the suction foundation 5 through the No. 1 valve 301 and the No. 2 valve 302, adjust the second deep-water electric pump assembly 22 to suck the No. 3 valve 303 and the No. 4 valve 304, and discharge through the No. 10 valve 310. The frequency of the first deep-water electric pump assembly 21 is lower than that of the second deep-water electric pump assembly 22, so that the internal mud and water mixture is extracted from the suction foundation 5. Due to the difference in flow rates of the two sets of deep-water electric pump assemblies 2, the mud and water mixture inside the cylinder 53 is continuously discharged, and gradually reaches the top cover 51 elevation to 5 cm below the seabed mud surface; Step S8: pressurize and sink to the bottom until the water pump current of the deep-water electric pump assembly 2 is 0. At this time, the bottom of the top cover 51 is completely close to the mud surface and the whole is below the mud surface to achieve scour protection. Adjust the No. 7 valve 307, No. 8 valve 307, No. 9 valve 309, and No. 10 valve 310 of the water pipe valve group 3 to achieve suction at the suction port of the first deep-water electric pump assembly 21 and connect the No. 1 valve 301, No. 2 valve 302, No. 3 valve 303, and No. 4 valve 304. The outlet enters the suction port of the second deep-water electric pump assembly 22 through the No. 8 valve 308 and is discharged through the No. 10 valve 310. Control the current of the second deep-water electric pump assembly 22 to be greater than that of the first deep-water electric pump assembly 21 to achieve double pump series pressurization, increase the suction of the inside of the suction-type foundation 5, until the currents of the second deep-water electric pump assembly 22 and the first deep-water electric pump assembly 21 are both 0, so that the bottom of the top cover 51 is close to the mud surface; Step S9: After the sinking is completed close to the mud surface, the diver or underwater robot closes the valve between the mounting seat 52 and the internal desilting pipeline 55 to isolate the cylinder 53 from the seawater, lift the sinking equipment, and when there is still a depth of 5 meters from the water outlet, open the deep water electric pump assembly 2, adjust the valve combination of the water pipe valve group 3, and flush all the pipes in the sinking equipment to discharge the internal silt.

[0022] The above are only preferred embodiments of the present invention and are not intended to limit the present invention. For those skilled in the art, the present invention may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.

Claims

1. A suction foundation sinking device, comprising a frame (1), a deep water electric pump assembly (2), a water pipe valve assembly (3) and an interface assembly (4), characterized in that: The frame (1) is a frame made of steel. The deepwater electric pump assembly (2) is installed inside the frame (1). The deepwater electric pump assembly (2) includes a first deepwater electric pump assembly (21) and a second deepwater electric pump assembly (22). The deepwater electric pump assembly (2) is integrated with an underwater motor and driven by transmitting electricity through a surface umbilical cable. The water pipe valve assembly (3) is an assembly consisting of 12 groups of hydraulic ball valves and pipelines. The 12 groups of hydraulic ball valves are composed of 10 sets of two-way valves and 2 sets of three-way valves. The water pipe valve assembly (3) is connected to the pump suction port and pump outlet of the deepwater electric pump assembly (2) through flanges. The interface assembly (4) is installed at the center of the lower part of the frame (1). The interface assembly (4) consists of a central bottom plate (41), a locking device (42) and a sealing lip (43). The central bottom plate (41) is a square steel plate with four circular suction ports cut in the middle. The circular suction ports are equipped with the sealing lip (43). Two sets of the locking devices (42) are fixedly installed on both sides of the central bottom plate (41). The central bottom plate (41) is welded to the bottom of the water pipe valve group (3).

2. A suction-based foundation sinking device according to claim 1, characterized in that: The upper part of the frame (1) is provided with lifting points that meet lifting requirements, and a protective net is arranged around it.

3. The suction foundation sinking equipment according to claim 1, characterized in that: The deep-water electric pump assembly (2) is a water pump capable of pumping mud-water mixture and using a variable frequency method to control flow rate and head.

4. The suction foundation sinking equipment according to claim 1, characterized in that: The valve diameters of the 12 groups of hydraulic ball valves in the water pipe valve group (3) are consistent, and all use hydraulic actuators.

5. The suction-based foundation sinking equipment according to claim 1, characterized in that: The sealing lip (43) is a circular ring made of a polymer material.

6. The suction-based foundation sinking equipment according to claim 1, characterized in that: The locking device (42) is a claw controlled by a hydraulic cylinder and used to grasp the suction foundation (5).

7. The suction-based foundation sinking device according to claim 1, characterized in that: The suction foundation (5) is composed of a top cover (51), a mounting seat (52), a cylinder (53), a mooring towing plate (54) and an internal desilting pipeline (55). The top cover (51) is a disc structure formed by welding and cutting steel plates, and is provided with a grid-type reinforcing bracket on the upper part. The mounting seat (52) is welded on the top cover (51), and the mounting seat (52) is aligned with the central bottom plate (41) through a perforated bottom plate provided on the mounting seat. The cylinder (53) is coaxially welded to the lower part of the top cover (51), and the mooring towing plate (54) spanning the inner part and protruding from the outer wall is welded inside the cylinder (53). The internal desilting pipeline (55) is welded below the top cover (51), and the internal desilting pipeline (55) is composed of four groups of bifurcated internal desilting pipelines. The other end of the internal desilting pipeline (55) is welded to the perforated bottom plate of the mounting seat (52).

8. The negative sinking construction method of the suction-type foundation sinking equipment is characterized in that: The following steps are involved: Step S1: transport the suction foundation (5) and the submersible equipment to the offshore construction site, complete the on-site power connection and function test of the submersible equipment, lift the submersible equipment hook, align the interface assembly (4) with the mounting seat (52), operate the locking device (42) to tighten, squeeze the sealing lip (43) to form a seal between the mounting seat (52) and the central bottom plate (41), form a good channel, and realize that the No. 1 valve (301), No. 2 valve (302), No. 3 valve (303), and No. 4 valve (304) of the water pipe valve group (3) are connected with the No. 1 internal desilting pipeline (551), No. 2 internal desilting pipeline (552), No. 3 internal desilting pipeline (553), and No. 4 internal desilting pipeline (554) of the four groups of internal desilting pipelines (5), respectively; Step S2: releasing the suction foundation (5) from transportation and fixing, hanging a lock to lift the suction foundation (5) equipped with the sinking device, adjusting the position and lowering it, and before the bottom of the cylinder (53) touches the water, controlling the valve No. 1 (301), valve No. 2 (302), valve No. 3 (303), and valve No. 4 (304) of the water pipe valve group (3) to open, valve No. 1 (301) and valve No. 2 (302) to communicate with the outside via valve No. 7 (307) and valve No. 11 (311), valve No. 3 (303) and valve No. 4 (304) to communicate with the outside via valve No. 9 (309) and valve No. 12 (312), thereby forming an exhaust passage and realizing the rapid exhaust of air in the cylinder (53); Step S3: lowering the suction foundation (5) by means of a crane at a speed of no more than 6 m / h until the submersible device installed on the top of the top cover (51) is submerged in water. When the deepwater electric pump assembly (2) is completely submerged, the submersible device is turned on to perform a water pump injection and drainage function test. After completion, the suction foundation (5) is continued to be lowered, the exhaust is kept on, and the crane lowering speed is controlled to be no more than 3 m / h until the bottom of the cylinder (53) contacts the seabed. The crane lowering speed is controlled to 15 m / h. Step S4: Open one of the two sets of deep-water electric pump assemblies (2) that serve as backup for each other, close valve No. 7 (307), valve No. 8 (308), and valve No. 9 (309), operate valve No. 6 (306) to connect with the suction port of the first deep-water electric pump assembly (21), open valve No. 11 (311), control the motor to the minimum frequency, and temporarily close any valve of valve No. 1 (301), valve No. 2 (302), valve No. 3 (303), and valve No. 4 (304) according to the horizontality of the suction foundation (5), until the cylinder (53) reaches the self-weighted mud immersion depth; Step S5: After the cylinder (53) reaches the self-weighted mud entry depth and is left to stand for 2 hours, the penetration construction is carried out, the No. 1 valve (301), the No. 2 valve (302), the No. 3 valve (303), and the No. 4 valve (304) are opened, and the motor frequency is gradually increased to the full load of the deep water electric pump assembly (2), and the penetration speed is controlled to be no higher than 15 meters / hour. The penetration is gradually carried out until the current of the motor decreases. At this time, the soil plug in the cylinder (53) has supported the bottom of the top cover (51), and the penetration is suspended; Step S6: adjusting the No. 6 valve (306) and the No. 10 valve (310) of the water pipe valve group (3) so that the deep water electric pump assembly (2) draws water from the outside and injects it into the cylinder (53). Due to the branching and throttling and pressurization of the internal desilting pipeline (55), the internal soil plug is broken. Combined with the elevation change, the lifting range is 15 cm to 20 cm; Step S7: close the No. 8 valve (308) of the water pipe valve group (3), adjust the first deep-water electric pump assembly (21) to lift, inject into the suction foundation (5) through the No. 1 valve (301) and the No. 2 valve (302), adjust the second deep-water electric pump assembly (22) to suck the No. 3 valve (303) and the No. 4 valve (304), and discharge through the No. 10 valve (310). The frequency of the first deep-water electric pump assembly (21) is lower than that of the second deep-water electric pump assembly (22), so that the internal mud and water mixture is extracted from the suction foundation (5). Due to the difference in flow rates between the two sets of deep-water electric pump assemblies (2), the mud and water mixture inside the cylinder (53) is continuously discharged, and gradually reaches the elevation of the top cover (51) to 5 cm below the seabed mud surface; Step S8: Pressurize and sink to the bottom until the water pump current of the deep-water electric pump assembly (2) is 0. At this time, the bottom of the top cover (51) is completely close to the mud surface and the whole is below the mud surface to achieve scour protection. Adjust the No. 7 valve (307), No. 8 valve (307), No. 9 valve (309), and No. 10 valve (310) of the water pipe valve group (3) to achieve suction at the suction port of the first deep-water electric pump assembly (21) and connect the No. 1 valve (301), No. 2 valve (302), and No. 3 valve (310). 03), the No. 4 valve (304), the outlet enters the suction port of the second deep-water electric pump assembly (22) through the No. 8 valve (308) and is discharged through the outlet by the No. 10 valve (310), controlling the current of the second deep-water electric pump assembly (22) to be greater than that of the first deep-water electric pump assembly (21), realizing double pump series pressure increase, increasing the suction of the inside of the suction foundation (5), until the currents of the second deep-water electric pump assembly (22) and the first deep-water electric pump assembly (21) are both 0, so that the bottom of the top cover (51) is closely attached to the mud surface; Step S9: After the submersion is completed close to the mud surface, the valve between the mounting seat (52) and the internal desilting pipeline (55) is closed by a diver or an underwater robot to isolate the cylinder (53) from the seawater, and the submersible equipment is hoisted. When there is still a depth of 5 meters from the water outlet, the deep-water electric pump assembly (2) is turned on, and the valve combination of the water pipe valve group (3) is adjusted to achieve flushing of all the pipes in the submersible equipment and discharge the internal silt.