Power distribution network load prediction method, device, equipment and storage medium

By clustering smart meter data and combining load prediction models, using low-voltage substation and cloud node data, the problem of limited client smart meter data is solved, and the short-term load prediction accuracy of the distribution network and prediction capabilities in extreme cases are improved. .

CN118899838APending Publication Date: 2024-11-05XIAN JIAOTONG LIVERPOOL UNIV
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410963790.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-18
Publication Date
2024-11-05

AI Technical Summary

Technical Problem

The prior art is difficult to improve the short-term load prediction accuracy of low-voltage and medium-voltage distribution networks when client smart meter data is limited, especially in extreme cases prediction accuracy is affected.

Method used

By obtaining smart meter load data, low-voltage substation load data and edge data center weather data, clustering processing is performed to obtain target clustering results, and using a preset load prediction model combined with cloud node weather data for load prediction, improving prediction accuracy.

Benefits of technology

In the case of limited smart meter data, the combination of clustering and prediction models improves the short-term load prediction accuracy of low-voltage and medium-voltage distribution networks, and enhances the ability to respond to extreme situations.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118899838A_ABST
    Figure CN118899838A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of power grids, in particular to a power distribution network load prediction method, device and equipment and a storage medium, and the method comprises the steps: obtaining monitoring data which at least comprises intelligent electric meter load data, low-voltage substation load data and edge data center weather data; clustering the intelligent electric meter load data to obtain a target clustering result; processing the target clustering result, the load data of the low-voltage transformer substation and the weather data of the edge data center based on a preset first load prediction model to obtain a load prediction result of the low-voltage transformer substation; and processing the low-voltage substation load prediction result, the low-voltage substation load data and the acquired cloud node weather data based on a preset second load prediction model to obtain a cloud node load prediction result. The short-term load prediction precision of the low-voltage and medium-voltage power distribution network can be improved under the condition that the data of the intelligent electric meter of the client is limited.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the field of power grid technology, and in particular to a distribution network load prediction method, device, equipment and storage medium. Background Art

[0002] Accurate load forecasting is the key to safe and efficient scheduling of distributed energy in distribution networks. Therefore, load forecasting of distribution networks is required before distributing power.

[0003] At present, many load forecasting methods have been proposed in existing studies. Traditional models include nonparametric regression models, autoregressive integrated moving average (ARIMA) models, support vector machine (SVM) models, random forest (RF) models, gradient boosted regression tree (GBRT) models, etc. Extreme gradient boost (XGboost), as a major improvement of GBRT, is widely used in forecasting due to its convergence, accuracy and anti-interference ability. In addition, the latest developments in deep learning have also greatly influenced forecasting. Convolutional neural networks (CNN) and long short-term memory (LSTM) make deep neural networks (DDN) highly flexible and effective. The above studies are usually conducted under normal conditions. However, their forecasting accuracy is affected under unexpected extreme conditions. In order to improve the load forecasting accuracy for unexpected extreme conditions, some studies have also proposed solutions, such as developing an adaptive functional state space model.

[0004] However, there are still four problems in achieving accurate and robust short-term load forecasting for distribution networks. 1) The load distribution of different distribution networks has different volatility and noise. 2) The increasing popularity of renewable energy generation, especially photovoltaic power generation systems, brings additional uncertainties. 3) Due to the inevitable problem of global warming, the increase in sudden extreme events such as extreme weather and epidemics poses challenges to short-term load forecasting at the distribution level. 4) Utilizing low-level node data is a way to improve forecasting accuracy. However, compared with national-level load forecasting, low-voltage power grids have data scarcity problems, especially client smart meter data. The current industrial status quo is that the installation of smart meters depends entirely on the willingness of customers, and the deployment of smart meters so far is far from expectations.

[0005] In summary, it is currently difficult to improve the short-term load forecasting accuracy of low-voltage and medium-voltage distribution networks when client smart meter data is limited. Summary of the invention

[0006] In order to improve the short-term load forecasting accuracy of low-voltage and medium-voltage distribution networks when the client smart meter data is limited, the embodiments of the present application provide a distribution network load forecasting method, device, equipment and storage medium.

[0007] In a first aspect, an embodiment of the present application provides a distribution network load prediction method, comprising:

[0008] Acquire monitoring data, where the monitoring data includes at least smart meter load data, low voltage substation load data, and edge data center weather data;

[0009] Clustering the smart meter load data to obtain a target clustering result;

[0010] Processing the target clustering result, the low-voltage substation load data, and the edge data center weather data based on a preset first load forecasting model to obtain a low-voltage substation load forecasting result;

[0011] The low-voltage substation load forecast result, the low-voltage substation load data and the acquired cloud node weather data are processed based on a preset second load forecasting model to obtain a cloud node load forecast result.

[0012] In a second aspect, an embodiment of the present application provides a distribution network load prediction device, comprising:

[0013] A data monitoring module, used to obtain monitoring data, wherein the monitoring data at least includes smart meter load data, low-voltage substation load data, and edge data center weather data;

[0014] A data clustering module, used for clustering the load data of the smart meter to obtain a target clustering result;

[0015] A first prediction module, configured to process the target clustering result, the low-voltage substation load data, and the edge data center weather data based on a preset first load prediction model to obtain a low-voltage substation load prediction result;

[0016] The second prediction module is used to process the low-voltage substation load prediction result, the low-voltage substation load data and the acquired cloud node weather data based on a preset second load prediction model to obtain a cloud node load prediction result.

[0017] In a third aspect, an embodiment of the present application provides a computer device, the computer device comprising a memory and a processor, the memory storing a computer program, and the processor implementing the steps in the above method when executing the computer program.

[0018] In a fourth aspect, an embodiment of the present application provides a computer-readable storage medium having a computer program stored thereon, which implements the steps in the above-mentioned method when executed by a processor.

[0019] In a fifth aspect, the embodiments of the present application further provide a computer program product, wherein the computer program product includes a computer program, and when the computer program is executed by a processor, the steps in any of the above method embodiments are implemented.

[0020] The embodiments of the above-mentioned distribution network load forecasting method, device, equipment and storage medium obtain monitoring data, and the monitoring data at least includes smart meter load data, low-voltage substation load data and edge data center weather data; clustering the smart meter load data to obtain target clustering results; processing the target clustering results, the low-voltage substation load data and the edge data center weather data based on a preset first load forecasting model to obtain a low-voltage substation load forecasting result; processing the low-voltage substation load forecasting result, the low-voltage substation load data and the acquired cloud node weather data based on a preset second load forecasting model to obtain a cloud node load forecasting result. Through the implementation of the above embodiments, by clustering the smart meter load data, the target clustering result can representatively reflect the smart meter load data when the smart meter data is limited, thereby facilitating the solution to the problem of poor load prediction accuracy caused by limited smart meter data on the client side, and by simultaneously considering the influence of the target clustering result, the low-voltage substation load data and the edge data center weather data on the load prediction accuracy through the first load prediction model, the prediction accuracy of the load prediction results of the low-voltage substation (low-voltage distribution network) can be improved. In addition, by simultaneously considering the influence of the low-voltage substation load prediction results, the low-voltage substation load data and the acquired cloud node weather data on the load prediction accuracy through the first load prediction model, the prediction accuracy of the load prediction results of the cloud node (medium-voltage distribution network) can be improved. In summary, the implementation of the above steps can facilitate the improvement of the short-term load prediction accuracy of the low-voltage and medium-voltage distribution networks when the client smart meter data is limited.

[0021] It should be understood that the content described in this section is not intended to identify the key or important features of the embodiments of the present application, nor is it intended to limit the scope of the present application. Other features of the present application will become easily understood through the following description. BRIEF DESCRIPTION OF THE DRAWINGS

[0022] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the drawings required for use in the embodiments are briefly introduced below. It should be understood that the following drawings only show certain embodiments of the present invention and therefore should not be regarded as limiting the scope. For ordinary technicians in this field, other related drawings can be obtained based on these drawings without creative work.

[0023] Figure 1 This is an application environment diagram of a distribution network load prediction method in one embodiment of the present application;

[0024] Figure 2 A flow chart of a distribution network load prediction method provided in Embodiment 1 of the present application;

[0025] Figure 3 A schematic diagram of a power grid structure in which a cloud node is located provided in Embodiment 1 of the present application;

[0026] Figure 4 A schematic diagram of the structure of a distribution network load prediction device provided in one embodiment of the present application;

[0027] Figure 5 A schematic diagram of the structure of a computer device provided in one embodiment of the present application;

[0028] Figure 6 An internal structure diagram of a computer-readable storage medium provided in one embodiment of the present application. DETAILED DESCRIPTION

[0029] In order to make the purpose, technical solution and advantages of the present disclosure more clear, the present disclosure is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present disclosure and are not used to limit the present disclosure.

[0030] It should be noted that the terms "first", "second", etc. in the specification and claims of this article and the above-mentioned drawings are used to distinguish similar objects, and are not necessarily used to describe a specific order or sequence. It should be understood that the data used in this way can be interchanged where appropriate, so that the embodiments of this article described here can be implemented in an order other than those illustrated or described here. In addition, the terms "including" and "having" and any variations thereof are intended to cover non-exclusive inclusions, for example, a process, method, device, product or equipment that includes a series of steps or units is not necessarily limited to those steps or units clearly listed, but may include other steps or units that are not clearly listed or inherent to these processes, methods, products or equipment.

[0031] In this article, the term "and / or" is only a description of the association relationship between related objects, indicating that there can be three relationships. For example, A and / or B can mean: A exists alone, A and B exist at the same time, and B exists alone. In addition, the character " / " in this article generally indicates that the related objects before and after are in an "or" relationship.

[0032] To solve the above problems, the present disclosure provides a method for predicting load in a distribution network, which can be applied to Figure 1In the application environment shown. Among them, the terminal 102 communicates with the server 104 through the network. The data storage system can store the data that the server 104 needs to process. The data storage system can be integrated on the server 104, or it can be placed on the cloud or other network servers. Among them, the terminal 102 can be but is not limited to various personal computers, laptops, smart phones, tablets, Internet of Things devices and portable wearable devices. The Internet of Things devices can be smart speakers, smart TVs, smart air conditioners, smart car-mounted devices, etc. Portable wearable devices can be smart watches, smart bracelets, head-mounted devices, etc. The server 104 can be implemented with an independent server or a server cluster consisting of multiple servers.

[0033] Embodiment 1

[0034] Figure 2 A flow chart of a distribution network load prediction method provided in Example 1 of the present application, referring to Figure 2 The method may be performed by a device for performing the method, and the device may be implemented by software and / or hardware. The method includes:

[0035] S110. Acquire monitoring data, where the monitoring data at least includes smart meter load data, low-voltage substation load data, and edge data center weather data.

[0036] Please refer to Figure 3 The power grid structure where the cloud node is located includes multiple edge data centers that are communicatively connected to the cloud node, such as edge data center 1, edge data center 2, ..., edge data center x; each edge data center is communicatively connected to multiple low-voltage substations, such as edge data center 1 is communicatively connected to low-voltage substation 1, low-voltage substation 2, ..., low-voltage substation y; each low-voltage substation is communicatively connected to multiple smart meters, such as low-voltage substation 1 is communicatively connected to smart meter 1, smart meter 2, ..., smart meter z; it should be noted that the low-voltage substation is used to supply power to multiple users for which it is responsible, but only some of the multiple users for which it is responsible may have smart meters installed. For example, a low-voltage substation is responsible for 100 users, but only 10 households out of the 100 users have smart meters installed.

[0037] Among them, the smart meter load data is the power consumption data of the corresponding user at each preset time τ in a day monitored by each smart meter under the cloud node. For example, the user sets a total of 144 equally spaced preset times in a day, that is, a preset time τ is set every 10 minutes in a day; and the power consumption monitored by the nth smart meter under the i-th low-voltage transformer under the k-th edge data center corresponding to each preset time t is recorded as Lcus t,k,i,nThe set of power consumption monitored by each smart meter under each low-voltage transformer under each edge center corresponding to each preset time t under the cloud node in a day is the smart meter load data Lcus t,k,i , Lcus t,k,i =[Lcus t,k,i,1 ,Lcus t,k,i,2 ,…,Lcus t,k,i,n ,…,Lcus t,k,i,z ].

[0038] The load data of low-voltage substation is the load data of smart meter Lcus t,k,i The set of loads of the corresponding low-voltage substation at each preset time t, where the load specifically refers to the power consumption; the load of the low-voltage substation at the preset time t is recorded as Lsub t,k,i , and the low voltage substation load data is recorded as X t,k,i , where t represents the preset time t, k represents the kth edge data center under the cloud node, and i represents the ith low-voltage substation under the edge data center; X t,k,i =[Lsub t,k, , Lcus t,k,i ].

[0039] The edge data center weather data is the weather data near each edge data center corresponding to each preset time t. The edge data center weather data can be monitored by the corresponding edge data center; and the edge data center weather data is recorded as Weather t,k , where t represents the preset time, and k represents the kth edge data center under the cloud node; in this implementation, the monitoring data specifically includes the smart meter load data Lcus t,k,i , low voltage substation load data X t,k,i And edge data center weather data Weather t,k , low voltage substation load data X t,k,i Contains smart meter load data Lsus t,k,i ; and record the monitoring data as X t,k , X t,k =Weather t,k , X t,k,i ]

[0040] Specifically, taking one day as an example, the cloud node obtains the smart meter load data Lcus reported by each edge data center, each low-voltage substation, and each smart meter at each preset time t in a day. t,k,i , low voltage substation load data X t,k,i And edge data center weather data Weanther t,k , thus obtaining the monitoring data X t,k .

[0041] S120: Clustering the smart meter load data to obtain a target clustering result.

[0042] Among them, clustering is to use the preset clustering method to classify the smart meter load data Lcus t,k,i Clustering is performed. For example, the preset clustering method may be hierarchical clustering and K-means clustering. The target clustering result is to cluster the load data Lcus of the smart meter. t,k,i The result after clustering.

[0043] Specifically, the cloud node uses a preset clustering method to cluster the smart meter load data Lcus in the monitoring data. t,k,i Perform clustering processing to obtain the target clustering result Y0.

[0044] It should be noted that the total number of users under a cloud node may be much greater than the number of users with smart meters installed. If the smart meter load data Lcus collected by the smart meter is directly used t,k,i The low-voltage substation load data in the monitoring data and the edge data center weather data are used to predict the low-voltage substation load and cloud node load. However, due to the limited number of smart meters, the smart meter load data Lcus obtained by the cloud node t,k,i The amount of data is also very limited, which will lead to poor prediction accuracy of low-voltage substation load and cloud node load; and by analyzing the smart meter load data Lcus t,k,i Clustering can be performed on the load data Lcus of smart meters with limited data volume. t,k,i Representative data, that is, the target clustering results, are obtained from the dataset, which makes it easier to improve the short-term load forecasting accuracy of low-voltage and medium-voltage distribution networks when the data of smart meters is limited.

[0045] S130. Process the target clustering result, the low-voltage substation load data, and the edge data center weather data based on a preset first load forecasting model to obtain a low-voltage substation load forecasting result.

[0046] Among them, the first load forecasting model is used to process the target clustering result Y0, the low-voltage substation load data X t,k,i And edge data center weather data Weather t,k , and generate the corresponding processing results, that is, the low-voltage substation load prediction results Low voltage substation load forecast results That is, the load prediction results of each low-voltage substation under each edge data center under the cloud node, where k represents the kth edge data center under the cloud node, and i represents the i-th low-voltage substation under the edge data center.

[0047] Specifically, the target clustering result Y0, the low-voltage substation load data X t,k,i And edge data center weather dataWeather t,k The input is processed into the preset first load prediction model, and the first load prediction model outputs the low-voltage substation load prediction result.

[0048] It should be noted that when calculating the load forecast results of low-voltage substations When considering the low voltage substation load data X t,k,i Load forecast results for low voltage substations The target clustering result Y0 and the edge data center weather data Weather are also considered. t,k The load prediction results of low voltage substation This will improve the final calculated low-voltage substation load forecast results. prediction accuracy.

[0049] S140. Process the low-voltage substation load prediction result, the low-voltage substation load data and the acquired cloud node weather data based on a preset second load prediction model to obtain a cloud node load prediction result.

[0050] The second load forecasting model is used to process the load forecasting results of low-voltage substations. Low voltage substation load dataX t,k,i And the obtained cloud node weather data Weather t,k , and generate the corresponding processing results, that is, the cloud node load prediction result D cv ; Cloud node load prediction result D cv That is, the predicted result of the total electricity load of all users under the cloud node.

[0051] Specifically, the load forecast results of low-voltage substations are Low voltage substation load dataX t,k,i And the obtained cloud node weather data Weather t,k The second load prediction model is used to process the load, and the second load prediction model outputs the cloud node load prediction result D cv .

[0052] It should be noted that when calculating the cloud node load prediction result D cv The load forecast results of low-voltage substations were comprehensively considered. Low voltage substation load dataX t,k,i And the obtained cloud node weather data Weather t,kThe load prediction result of cloud node D cv In this way, it is easy to improve the final calculated cloud node load prediction result D cv prediction accuracy.

[0053] It should also be noted that this embodiment obtains monitoring data, and the monitoring data includes at least smart meter load data, low-voltage substation load data and edge data center weather data; clusters the smart meter load data to obtain a target clustering result; processes the target clustering result, the low-voltage substation load data and the edge data center weather data based on a preset first load prediction model to obtain a low-voltage substation load prediction result; and processes the low-voltage substation load prediction result, the low-voltage substation load data and the acquired cloud node weather data based on a preset second load prediction model to obtain a cloud node load prediction result. Through the implementation of the above embodiments, by clustering the smart meter load data, the target clustering result can representatively reflect the smart meter load data when the smart meter data is limited, thereby facilitating the solution to the problem of poor load prediction accuracy caused by limited client smart meter data, and by simultaneously considering the influence of the target clustering results, the low-voltage substation load data and the edge data center weather data on the load prediction accuracy through the first load prediction model, the prediction accuracy of the load prediction results of the low-voltage substation (low-voltage distribution network) can be improved. In addition, by simultaneously considering the influence of the low-voltage substation load prediction results, the low-voltage substation load data and the acquired cloud node weather data on the load prediction accuracy through the first load prediction model, the prediction accuracy of the load prediction results of the cloud node (medium-voltage distribution network) can be improved. In summary, the implementation of the above steps can facilitate the improvement of the short-term load prediction accuracy of the low-voltage and medium-voltage distribution networks when the smart meter data is limited.

[0054] Embodiment 2

[0055] Embodiment 2 of the present application provides a flow chart of a method for load prediction of a distribution network, which optimizes the "clustering the load data of the smart meter to obtain a target clustering result" in Embodiment 1; it should be noted that for the parts not described in detail in this embodiment, reference may be made to the descriptions of other embodiments, and the method includes:

[0056] S210. Acquire monitoring data, where the monitoring data at least includes smart meter load data, low-voltage substation load data, and edge data center weather data.

[0057] S221. Use a variety of clustering methods to process the smart meter load data respectively to obtain a clustering result set.

[0058] In this embodiment, the multiple clustering methods specifically include hierarchical clustering and k-means clustering. In other embodiments, the multiple clustering methods are not limited. The clustering result set is the multiple clustering methods respectively processing the smart meter load data Lcus t,k,i The collection of results obtained.

[0059] Specifically, the hierarchical clustering method is used to cluster the smart meter load data Lcus t,k,i The first clustering result is obtained by processing; the k-means clustering method is also used to cluster the smart meter load data Lcus t,k,i The second clustering result is obtained by processing, and the first clustering result and the second clustering result are combined to obtain a clustering result set.

[0060] S222: Compare the clustering result sets to obtain target clustering results.

[0061] Among them, each clustering result in the clustering result set corresponds to a different clustering method. The clustering results corresponding to different clustering methods can be further calculated with corresponding merits. The merit comparison is to compare the merits corresponding to each clustering result in the clustering result set. The clustering result corresponding to the best merit is also the target clustering result.

[0062] Specifically, the merits of each clustering result in the clustering result set are calculated, and then the merits are compared to obtain the best merit, and then the clustering result corresponding to the best merit is used as the target clustering result.

[0063] It should be noted that different clustering methods process smart meter load data Lcus t,k,i The obtained clustering results are divided into good and bad. The better the clustering results, the more accurate the low-voltage substation load prediction results and cloud node load prediction results calculated based on the clustering results. By using a variety of clustering methods to classify the smart meter load data Lcus t,k,i The data are processed to obtain a variety of clustering results, and then the corresponding merits of the various clustering results are compared, and the clustering result corresponding to the best merit is used as the target clustering result. This helps to determine the optimal clustering result from multiple clustering results, thereby facilitating the improvement of the prediction accuracy of the low-voltage substation load prediction results and the cloud node load prediction results, and even improving the short-term load prediction accuracy of the low-voltage and medium-voltage distribution networks when the smart meter data is limited.

[0064] S230. Process the target clustering result, the low-voltage substation load data, and the edge data center weather data based on a preset first load forecasting model to obtain a low-voltage substation load forecasting result.

[0065] S240. Process the low-voltage substation load prediction result, the low-voltage substation load data and the acquired cloud node weather data based on a preset second load prediction model to obtain a cloud node load prediction result.

[0066] Embodiment 3

[0067] Embodiment 3 of the present application provides a flow chart of a method for load prediction of a distribution network, which optimizes the "comparing the clustering result set to obtain a target clustering result" in Embodiment 2; it should be noted that for the parts not described in detail in this embodiment, reference may be made to the descriptions of other embodiments, and the method includes:

[0068] S310. Acquire monitoring data, where the monitoring data at least includes smart meter load data, low-voltage substation load data, and edge data center weather data.

[0069] S321. Use multiple clustering methods to process the smart meter load data respectively to obtain a clustering result set.

[0070] The clustering result set includes primary clustering results corresponding to a variety of clustering methods.

[0071] S3221. Calculate the evaluation standard value of the quality of each primary clustering result to obtain an evaluation standard set.

[0072] Among them, the primary clustering result is a corresponding clustering method to process the smart meter load data Lcus t,k,i The result obtained. The standard value of the evaluation of the quality of the m (θ m ) is used to evaluate the quality of the corresponding primary clustering results, where represents the mth primary clustering result or the mth clustering method, and θ represents the number of clusters in the corresponding primary clustering result; the evaluation standard set is a set of evaluation standard values ​​of the quality of multiple primary clustering results, and the evaluation standard set can be expressed as [es1(θ1), es2(θ2),…, es o (θ o )], where o means there are a total of o primary clustering results or o clustering methods.

[0073] Specifically, calculate the corresponding evaluation standard values ​​es of various primary clustering results m (θ m ), and the calculated multiple evaluation criteria are combined to obtain the evaluation criteria set [es1(θ1), es2(θ2),…,eso (θ o )].

[0074] S3222. Obtain a target evaluation standard value based on the evaluation standard set.

[0075] Among them, the target evaluation standard value is the evaluation standard set [es1(θ1), es2(θ2),…,es o (θ o )] is the best quality evaluation standard value.

[0076] Specifically, from the evaluation criteria set [es1(θ1), es2(θ2),…,es o (θ o )] Select the best evaluation standard value to obtain the target evaluation standard value.

[0077] S3223. Use the primary clustering result corresponding to the target evaluation standard value as the target clustering result.

[0078] Among them, each goodness or badness evaluation standard value in the evaluation standard set corresponds to a primary clustering result, and the target evaluation standard value belongs to an element in the evaluation standard set, so the target evaluation standard value also has a corresponding primary clustering result, and the target clustering result is also the primary clustering result corresponding to the target evaluation standard value.

[0079] Specifically, the primary clustering result corresponding to the target evaluation standard value is determined, and the primary clustering result corresponding to the target evaluation standard value is used as the target clustering result.

[0080] It should be noted that by determining the target clustering results, it is convenient to subsequently improve the prediction accuracy of the low-voltage substation load forecast results and the cloud node load forecast results, that is, to improve the short-term load forecast accuracy of the low-voltage and medium-voltage distribution networks when the smart meter data is limited.

[0081] S330. Process the target clustering result, the low-voltage substation load data, and the edge data center weather data based on a preset first load forecasting model to obtain a low-voltage substation load forecasting result.

[0082] S340. Process the low-voltage substation load prediction result, the low-voltage substation load data and the acquired cloud node weather data based on a preset second load prediction model to obtain a cloud node load prediction result.

[0083] Embodiment 4

[0084] Embodiment 4 of the present application provides a flow chart of a method for load forecasting in a distribution network, which optimizes the "calculating the evaluation standard value of the superiority or inferiority of each primary clustering result to obtain an evaluation standard set" in Embodiment 3; it should be noted that for the parts not described in detail in this embodiment, reference may be made to the descriptions of other embodiments, and the method includes:

[0085] S410. Acquire monitoring data, where the monitoring data at least includes smart meter load data, low-voltage substation load data, and edge data center weather data.

[0086] S421. Use multiple clustering methods to process the smart meter load data respectively to obtain a clustering result set.

[0087] The clustering result set includes primary clustering results corresponding to a variety of clustering methods.

[0088] S4221A. Calculate the inter-cluster distance based on the primary clustering result.

[0089] Among them, the inter-cluster distance Sc(θ m ) is calculated as:

[0090]

[0091] Among them, a(θ m ) is the average distance between any two data in the same cluster in the corresponding primary clustering result. It should be noted that the distance between any two data is the Euclidean distance; b(θ m ) is the average distance between the average loads of any two clusters in the corresponding primary clustering results, and the average load is the center of the corresponding cluster.

[0092] Specifically, taking one of the primary clustering results as an example, the data in multiple clusters in the primary clustering result are substituted into the inter-cluster distance calculation formula for calculation, so as to obtain the inter-cluster distance Sc(θ m ).

[0093] S4221B. Calculate the number of users with similar mean and similar variance based on the smart meter load data.

[0094] Among them, taking the smart meter load data corresponding to a user as an example, the smart meter load data corresponding to the user includes the power consumption corresponding to 144 preset times in a day, and the average of the 144 power consumptions is calculated to obtain the target mean, and then the mean value that is numerically close to the target mean value is determined from the 144 power consumption means of all users under the cloud node to obtain a mean set, and then the number of all means in the mean set is calculated to obtain the number of users with similar means u ave (θ m); It should be noted that the mean set includes the target mean.

[0095] Taking the smart meter load data corresponding to a user as an example, the smart meter load data corresponding to the user includes the power consumption corresponding to 144 preset moments in a day, and the variance of the 144 power consumption is calculated to obtain the target variance, and then the variance that is numerically close to the target variance is determined from the variances of the 144 power consumptions of all users under the cloud node to obtain the variance set, and then the number of all variances in the variance set is calculated to obtain the number of users with similar variances u var (θ m ); It should be noted that the variance set includes the target variance.

[0096] Specifically, the number of similar mean users u is calculated based on the smart meter load data ave (θ m ) and the number of users with similar variance u ave (θ m ).

[0097] S4221C, calculating a standard value for evaluating the quality of the primary clustering result based on the inter-cluster distance, the number of users with similar mean values, the number of users with similar variances, and the total number of electricity meters under the node.

[0098] Among them, the total number of meters under the node U is the sum of all smart meters under the cloud node;

[0099] Specifically, first, calculate the number of similar mean users u ave (θ m ) and the total number of electricity meters under the node U, and the first quotient value R is obtained ave (θ m )=u ave (θ m ) / U.

[0100] Then, calculate the similarity variance user number u var (θ m ) and the total number of electricity meters under the node U, and the second quotient R is obtained var (θ m )=u var θ m ) / U.

[0101] Furthermore, the inter-cluster distance Sc(θ m ), the first quotient value R ave (θ m ) and the second quotient R var (θ m ) to obtain the standard value of goodness / badness evaluation es m ; The calculation formula for the standard value of the evaluation of goodness and badness is: in, is the standardized inter-cluster distance Sc(θ m ), is the normalized first quotient value, is the normalized second quotient value.

[0102] S4221D. Obtain an evaluation standard set based on the evaluation standard value of the superiority or inferiority of each of the primary clustering results.

[0103] Among them, by performing the above steps on each primary clustering result, we can obtain the corresponding goodness evaluation standard values ​​es1(θ1), es2(θ2),…,es o (θ o ), and then collect the evaluation criteria values ​​es1(θ1), es2(θ2),…,es o (θ o ) to obtain the evaluation criteria set [es1(θ1), es2(θ2),…,es o (θ o )].

[0104] Specifically, the evaluation standard value es of the quality of each primary clustering result is collected m Get the evaluation criteria set [es1(θ1), es2(θ2),…,es o (θ o )].

[0105] S4222. Obtain a target evaluation standard value based on the evaluation standard set.

[0106] Among them, the target evaluation standard value f cluster is the evaluation criteria set [es1(θ1), es2(θ2),…,es o (θ o )]; target evaluation standard value f cluster The calculation formula is: cluster =min{es1(θ1),es2(θ2),…,es o (θ o )}.

[0107] Specifically, determine the evaluation criteria set [es1(θ1), es2(θ2),…,es o (θ o )] and takes the minimum value as the target evaluation standard value.

[0108] It should be noted that, in order to calculate the target evaluation standard value, a corresponding clustering optimization model is provided in the cloud node and is used to execute steps S4221A-S4222. The expression of the clustering optimization model is:

[0109] f cluster =min{es1(θ1),es2(θ2),…,es o (θ o )};

[0110]

[0111] R var (θ m )=u var (θ m ) / U;

[0112] R ave (θ m )=u ave (θ m ) / U;

[0113]

[0114] In addition, the constraint expression of the clustering optimization model is:

[0115] 0≤R ave (θ m )<1;

[0116] 0≤R var (θ m )<1;

[0117] -1≤Sc(θ m )≤1;

[0118] θ min ≤θ m ≤θ max ;

[0119] θ m is an integer;

[0120] Among them, θ min With θ max Default value.

[0121] S4223. Use the primary clustering result corresponding to the target evaluation standard value as the target clustering result.

[0122] S430. Process the target clustering result, the low-voltage substation load data, and the edge data center weather data based on a preset first load forecasting model to obtain a low-voltage substation load forecasting result.

[0123] S440. Process the low-voltage substation load prediction result, the low-voltage substation load data and the acquired cloud node weather data based on a preset second load prediction model to obtain a cloud node load prediction result.

[0124] Embodiment 5

[0125] Embodiment 5 of the present application provides a flow chart of a method for load forecasting of a distribution network, which optimizes the method of "processing the target clustering result, the low-voltage substation load data, and the edge data center weather data based on a preset first load forecasting model to obtain a low-voltage substation load forecasting result" in Embodiment 1; it should be noted that, for the parts not described in detail in this embodiment, reference may be made to the descriptions of other embodiments, and the method includes:

[0126] S510. Acquire monitoring data, where the monitoring data at least includes smart meter load data, low-voltage substation load data, and edge data center weather data.

[0127] S520: Cluster the smart meter load data to obtain a target clustering result.

[0128] It should be noted that the first load forecasting model includes a trained XGboost model and a forecast correction model.

[0129] The steps for training the XGboost model include:

[0130] According to the preset primary XGboost model, the historical low-voltage substation load data, the edge data center weather data and the target clustering results are processed to obtain iterative leaf node data; the iterative residual data is calculated based on the iterative leaf node data and the preset actual leaf node data; based on the iterative residual data, the primary XGboost model is corrected and iterated until the preset iteration stop condition is met, thereby obtaining a trained XGboost model.

[0131] S531. Process the target clustering result, the low-voltage substation load data, and the edge data center weather data based on the XGboost model to obtain a prediction result to be corrected.

[0132] Among them, the clustering result of the target Y0 and the weather data Weather of the edge data center t,k The eigenvector F can be obtained e,k,i , F e,k,i =Weather k , Y0]; Weather k =Weather 1,k ,Weather 2,k ,…,Weather τ,k ] T , τ represents a total of τ prediction moments, and k represents the kth edge data center.

[0133] Specifically, the target clustering result Y0 is combined with the weather data Weather of the edge data center t,k Get the eigenvector F e,k,i , and record this eigenvector as the first eigenvector F e,k,i ; Further, the first eigenvector F e,k,i With low voltage substation load data X t,k,i The input is processed into the trained XGboost model, and the XGboost model outputs the prediction result to be corrected.

[0134] S532. Process the prediction result to be corrected based on the prediction correction model to obtain the low-voltage substation load prediction result.

[0135] Among them, the revised prediction result is the low-voltage substation load prediction result initially predicted by the XGboost model. However, the initially predicted low-voltage substation load prediction result is slightly different from the expected low-voltage substation load prediction result. Therefore, the initially predicted low-voltage substation load prediction result needs to be corrected. The prediction correction model is used to correct the initially predicted low-voltage substation load prediction result and obtain the expected low-voltage substation load prediction result.

[0136] Specifically, the prediction results to be corrected are input into the prediction correction model for processing, and the prediction correction model outputs the expected low-voltage substation load prediction results.

[0137] It should be noted that, in the case of the low-voltage substation load forecast results preliminarily predicted by the XGboost model, further correction of the preliminarily predicted low-voltage substation load forecast results can obtain the expected low-voltage substation load forecast results, which is convenient for improving the accuracy of the final calculated low-voltage substation load forecast results and the cloud node load forecast results.

[0138] S540. Process the low-voltage substation load prediction result, the low-voltage substation load data and the acquired cloud node weather data based on a preset second load prediction model to obtain a cloud node load prediction result.

[0139] Embodiment 6

[0140] Embodiment 6 of the present application provides a flow chart of a method for load forecasting in a distribution network, which optimizes the method of "processing the load forecast result of the low-voltage substation, the load data of the low-voltage substation and the acquired cloud node weather data based on a preset second load forecasting model to obtain the cloud node load forecast result" in Embodiment 1; it should be noted that, for the parts not described in detail in this embodiment, reference may be made to the descriptions of other embodiments, and the method includes:

[0141] S610. Acquire monitoring data, where the monitoring data at least includes smart meter load data, low-voltage substation load data, and edge data center weather data.

[0142] S620: Cluster the smart meter load data to obtain a target clustering result.

[0143] S630. Process the target clustering result, the low-voltage substation load data, and the edge data center weather data based on a preset first load forecasting model to obtain a low-voltage substation load forecasting result.

[0144] It should be noted that the second load forecasting model includes a convolutional neural network and a recurrent neural network.

[0145] Among them, the recurrent neural network is an improved recurrent neural network, and specifically, the improved recurrent neural network is a GRU network.

[0146] S641. Obtain a total load set of the substation at a preset time based on the load data of the low-voltage substation.

[0147] Among them, according to the low voltage substation load data X t,k,i The total power consumption of all low-voltage substations under the cloud node at the preset time can be calculated and recorded as the total load of the substation at the preset time Ltot τ , collect the total substation load Ltot corresponding to each preset time τ The total load set D of the substation at the preset time can be obtained c .

[0148] Specifically, first according to the low voltage substation load data X t,k,i Calculate the total power consumption of all low-voltage substations under the cloud node at each preset time, and obtain the total load Ltot of the substation at the preset time corresponding to each preset time. τ , and then collect the total substation load Ltot corresponding to each preset time τ Get the total load set D of the substation at the preset time c .

[0149] S642. Obtain a feature vector based on the acquired cloud node weather data and the low-voltage substation load forecast result.

[0150] The cloud node weather data is the weather data near the cloud node at each preset time.

[0151] Specifically, the cloud node weather data Weather is obtained from the collection c The load forecast results of low-voltage substations corresponding to each preset time Get the eigenvector and record it as the second eigenvector F c .

[0152] S643. Process the characteristic vector and the total load of the substation at the preset time based on a preset second load prediction model to obtain a cloud node load prediction result.

[0153] The preset second load forecasting model is used to predict the second eigenvector F c The total load set D of the substation at the preset time c Processing is performed to obtain the cloud node load prediction result D cv ;D cv =f cs (F c ,D c ), where f cs () is the calculation function of the second load forecasting model.

[0154] Specifically, the second eigenvector F c The total load set D of the substation at the preset time c The calculation function f is input to the second load forecasting model cs () is processed to obtain the cloud node load prediction result D cv .

[0155] It should be noted that the cloud node load prediction result D can be calculated by the second load prediction model. cv , which makes it easier to predict the load of cloud nodes and to allocate energy to the power grid of the corresponding cloud nodes.

[0156] It should be understood that, although the various steps in the flowcharts involved in the above-mentioned embodiments are displayed in sequence according to the indication of the arrows, these steps are not necessarily executed in sequence according to the order indicated by the arrows. Unless there is a clear explanation in this article, the execution of these steps does not have a strict order restriction, and these steps can be executed in other orders. Moreover, at least a part of the steps in the flowcharts involved in the above-mentioned embodiments can include multiple steps or multiple stages, and these steps or stages are not necessarily executed at the same time, but can be executed at different times, and the execution order of these steps or stages is not necessarily to be carried out in sequence, but can be executed in turn or alternately with other steps or at least a part of the steps or stages in other steps.

[0157] Embodiment 7

[0158] Based on the same inventive concept, the embodiment of the present disclosure also provides a distribution network load prediction device for implementing the distribution network load prediction method involved above. The implementation scheme for solving the problem provided by the device is similar to the implementation scheme recorded in the above method, so the specific limitations in one or more distribution network load prediction device embodiments provided below can refer to the limitations of the distribution network load prediction method above, and will not be repeated here.

[0159] In this embodiment, Figure 4 As shown, a distribution network load prediction device is provided, comprising:

[0160] A data monitoring module, used to obtain monitoring data, wherein the monitoring data at least includes smart meter load data, low-voltage substation load data, and edge data center weather data;

[0161] A data clustering module, used for clustering the load data of the smart meter to obtain a target clustering result;

[0162] A first prediction module, configured to process the target clustering result, the low-voltage substation load data, and the edge data center weather data based on a preset first load prediction model to obtain a low-voltage substation load prediction result;

[0163] The second prediction module is used to process the low-voltage substation load prediction result, the low-voltage substation load data and the acquired cloud node weather data based on a preset second load prediction model to obtain a cloud node load prediction result.

[0164] Each module in the above-mentioned distribution network load forecasting device can be implemented in whole or in part by software, hardware and a combination thereof. Each of the above-mentioned modules can be embedded in or independent of a processor in a computer device in the form of hardware, or can be stored in a memory in a computer device in the form of software, so that the processor can call and execute the operations corresponding to each of the above modules.

[0165] It should be noted that, in this embodiment, monitoring data is acquired, and the monitoring data includes at least smart meter load data, low-voltage substation load data and edge data center weather data; the smart meter load data is clustered to obtain a target clustering result; based on a preset first load prediction model, the target clustering result, the low-voltage substation load data and the edge data center weather data are processed to obtain a low-voltage substation load prediction result; based on a preset second load prediction model, the low-voltage substation load prediction result, the low-voltage substation load data and the acquired cloud node weather data are processed to obtain a cloud node load prediction result. Through the implementation of the above embodiments, by clustering the smart meter load data, the target clustering result can representatively reflect the smart meter load data when the smart meter data is limited, thereby facilitating the solution to the problem of poor load prediction accuracy caused by limited smart meter data on the client side, and by simultaneously considering the influence of the target clustering result, the low-voltage substation load data and the edge data center weather data on the load prediction accuracy through the first load prediction model, the prediction accuracy of the load prediction results of the low-voltage substation (low-voltage distribution network) can be improved. In addition, by simultaneously considering the influence of the low-voltage substation load prediction results, the low-voltage substation load data and the acquired cloud node weather data on the load prediction accuracy through the first load prediction model, the prediction accuracy of the load prediction results of the cloud node (medium-voltage distribution network) can be improved. In summary, the implementation of the above steps can facilitate the improvement of the short-term load prediction accuracy of the low-voltage and medium-voltage distribution networks when the client smart meter data is limited.

[0166] In one embodiment, a computer device is provided. The computer device may be a server, and its internal structure diagram may be as follows: Figure 5 As shown. The computer device includes a processor, a memory and a network interface connected through a system bus. Among them, the processor of the computer device is used to provide computing and control capabilities. The memory of the computer device includes a non-volatile storage medium and an internal memory. The non-volatile storage medium stores an operating system, a computer program and a database. The internal memory provides an environment for the operation of the operating system and the computer program in the non-volatile storage medium. The database of the computer device is used to store data. The network interface of the computer device is used to communicate with an external terminal through a network connection. When the computer program is executed by the processor, a distribution network load forecasting method is implemented.

[0167] Those skilled in the art will understand that Figure 5 The structure shown in the figure is only a block diagram of a part of the structure related to the scheme of the present disclosure, and does not constitute a limitation on the computer device to which the scheme of the present disclosure is applied. The specific computer device may include more or fewer components than those shown in the figure, or combine certain components, or have a different arrangement of components.

[0168] In one embodiment, a computer readable storage medium is provided. Figure 6 As shown, a computer program is stored thereon, and when the computer program is executed by a processor, the steps in the above-mentioned method embodiments are implemented.

[0169] In one embodiment, a computer program product is provided, including a computer program, which implements the steps in the above method embodiments when executed by a processor.

[0170] It should be noted that the user information (including but not limited to user device information, user personal information, etc.) and data (including but not limited to data used for analysis, stored data, displayed data, etc.) involved in this disclosure are all information and data authorized by the user or fully authorized by all parties.

[0171] Those skilled in the art can understand that all or part of the processes in the above-mentioned embodiment methods can be completed by instructing the relevant hardware through a computer program, and the computer program can be stored in a non-volatile computer-readable storage medium. When the computer program is executed, it can include the processes of the embodiments of the above-mentioned methods. Among them, any reference to the memory, database or other medium used in the embodiments provided by the present disclosure can include at least one of non-volatile and volatile memory. Non-volatile memory can include read-only memory (ROM), magnetic tape, floppy disk, flash memory, optical memory, high-density embedded non-volatile memory, resistive random access memory (ReRAM), magnetoresistive random access memory (MRAM), ferroelectric random access memory (FRAM), phase change memory (PCM), graphene memory, etc. Volatile memory can include random access memory (RAM) or external cache memory, etc. As an illustration and not limitation, RAM can be in various forms, such as static random access memory (SRAM) or dynamic random access memory (DRAM). The database involved in each embodiment provided by the present disclosure may include at least one of a relational database and a non-relational database. Non-relational databases may include distributed databases based on blockchains, etc., but are not limited thereto. The processor involved in each embodiment provided by the present disclosure may be a general-purpose processor, a central processing unit, a graphics processor, a digital signal processor, a programmable logic device, a data processing logic device based on quantum computing, etc., but are not limited thereto.

[0172] The technical features of the above embodiments may be combined arbitrarily. To make the description concise, not all possible combinations of the technical features in the above embodiments are described. However, as long as there is no contradiction in the combination of these technical features, they should be considered to be within the scope of this specification.

[0173] The above-described embodiments only express several implementation methods of the present disclosure, and the descriptions thereof are relatively specific and detailed, but they cannot be understood as limiting the scope of the present invention. It should be pointed out that, for a person of ordinary skill in the art, several modifications and improvements can be made without departing from the concept of the present disclosure, and these all belong to the protection scope of the present disclosure. Therefore, the protection scope of the present disclosure shall be subject to the attached claims.

Claims

1. A distribution network load forecasting method, characterized in that: include: Acquire monitoring data, where the monitoring data includes at least smart meter load data, low voltage substation load data, and edge data center weather data; Clustering the smart meter load data to obtain a target clustering result; Processing the target clustering result, the low-voltage substation load data, and the edge data center weather data based on a preset first load forecasting model to obtain a low-voltage substation load forecasting result; The low-voltage substation load forecast result, the low-voltage substation load data and the acquired cloud node weather data are processed based on a preset second load forecasting model to obtain a cloud node load forecast result.

2. The method according to claim 1, characterized in that The clustering of the smart meter load data to obtain a target clustering result includes: Using a variety of clustering methods to process the smart meter load data respectively to obtain a clustering result set; The clustering result set is compared for quality to obtain a target clustering result.

3. The method according to claim 2, characterized in that The clustering result set includes primary clustering results corresponding to a plurality of clustering methods one by one; the clustering result set is compared for quality to obtain a target clustering result, including: Calculate the evaluation criteria of the quality of each primary clustering result to obtain the evaluation criteria set; Obtaining a target evaluation standard value based on the evaluation standard set; The primary clustering result corresponding to the target evaluation standard value is used as the target clustering result.

4. The method according to claim 3, characterized in that: The evaluation criteria set obtained by calculating the evaluation criteria of the quality of each primary clustering result includes: Calculating the inter-cluster distance based on the primary clustering result; Calculate the number of users with similar mean and variance based on the smart meter load data; Calculate the quality evaluation standard value of the primary clustering result based on the inter-cluster distance, the number of similar mean users, the number of similar variance users, and the total number of electricity meters under the node; An evaluation standard set is obtained based on the evaluation standard value of the quality of each of the primary clustering results.

5. The method according to claim 1, characterized in that The first load forecasting model includes a trained XGboost model and a forecast correction model; the first load forecasting model based on the preset first load forecasting model processes the target clustering result, the low-voltage substation load data, and the edge data center weather data to obtain a low-voltage substation load forecasting result, including: Processing the target clustering result, the low-voltage substation load data, and the edge data center weather data based on the XGboost model to obtain a prediction result to be corrected; The prediction result to be corrected is processed based on the prediction correction model to obtain the low-voltage substation load prediction result.

6. The method according to claim 1, characterized in that The method of processing the low voltage substation load forecast result, the low voltage substation load data and the acquired cloud node weather data based on the preset second load forecast model to obtain the cloud node load forecast result includes: Obtaining the total load of the substation at a preset time based on the load data of the low-voltage substation; Obtaining a feature vector based on the acquired cloud node weather data and the low voltage substation load forecast result; The cloud node load prediction result is obtained by processing the characteristic vector and the total load of the substation at the preset time based on a preset second load prediction model.

7. A distribution network load forecasting device, characterized in that: The device comprises: A data monitoring module, used to obtain monitoring data, wherein the monitoring data at least includes smart meter load data, low-voltage substation load data, and edge data center weather data; A data clustering module, used for clustering the load data of the smart meter to obtain a target clustering result; A first prediction module, configured to process the target clustering result, the low-voltage substation load data, and the edge data center weather data based on a preset first load prediction model to obtain a low-voltage substation load prediction result; The second prediction module is used to process the low-voltage substation load prediction result, the low-voltage substation load data and the acquired cloud node weather data based on a preset second load prediction model to obtain a cloud node load prediction result.

8. A computer device comprising a memory and a processor, wherein the memory stores a computer program, wherein: When the processor executes the computer program, the steps of the method according to any one of claims 1 to 6 are implemented.

9. A computer-readable storage medium having a computer program stored thereon, characterized in that: When the computer program is executed by a processor, the steps of the method according to any one of claims 1 to 6 are implemented.

10. A computer program product, comprising a computer program, characterized in that When the computer program is executed by a processor, the steps of the method according to any one of claims 1 to 6 are implemented.