Manufacturing process of drill jumbo boom

By manually combining automated welding technology and special four-gun welding equipment, combined with process ribs and core mold fixing, the problems of unstable welding quality and low production efficiency of rock drilling trolley boom frame are solved, and high strength, high precision and high efficiency are achieved manufacturing process.

CN118905569APending Publication Date: 2024-11-08CHANGSHA LICHENG MASCH CO LTD +1
View PDF 10 Cites 0 Cited by

Patent Information

Application Number
CN202411027282.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-30
Publication Date
2024-11-08

AI Technical Summary

Technical Problem

The existing rock drilling trolley boom welding quality is unstable, the weld appearance is uncontrollable, the production efficiency is low, and the labor intensity is high.

Method used

Using manual combination of automated welding technology, special four-gun welding equipment is used to weld the four gaps of the arm frame, combining the installation of process ribs and core mold fixation, the strength and manufacturing accuracy of the arm frame are improved, and laser collimator, ultrasonic detection and Post-weld inspection is carried out by magnetic powder flaw detection and other methods.

Benefits of technology

The stability and accuracy of welding quality are improved, production efficiency is improved, labor intensity is reduced, and the high strength and reliability of the boom are ensured.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118905569A_ABST
    Figure CN118905569A_ABST
Patent Text Reader

Abstract

The invention provides a drill jumbo boom manufacturing process which comprises the working procedures of plate machining, part forming, boom riveting, preparation before welding, boom welding, inspection after welding, accessory mounting, transferring and warehousing and the like, and particularly comprises the steps that material preparation, discharging, groove preparation, grinding operation, accessory casting and rivet hole drilling are conducted on plates; the straightness and flatness of arm support riveting are checked, and cleaning before welding is conducted; welding at the joints of the plates, and inspecting the quality of welding seams after welding is completed; and accessories such as the top seat and the oil cylinder seat are welded on the arm frame, and the machined and inspected workpiece is put in storage. In the machining process of the drill jumbo boom, a core mold is used for fixing an inner cavity to guarantee the size precision, process ribs are arranged in the inner cavity of the boom before welding to reduce welding deformation, special four-gun welding equipment is used for welding four gaps of the boom at the same time, automation of the long-distance welding process is achieved, the welding defects can be greatly reduced, and the production efficiency is improved. The manufacturing cost is saved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of boom processing, and in particular to a manufacturing process for a rock drilling trolley boom. Background Art

[0002] The rock drilling rig is a new type of rock drilling equipment in the field of tunnels and underground engineering. Its working arm has the functions of supporting the rock drill, locating the construction position and advancing. Due to the large reaction force impact during the drilling process, it has high requirements for structural strength and rigidity. Therefore, the existing welding work is mainly completed manually, and there are problems such as unstable welding quality, uncontrollable weld appearance, low production efficiency, and high labor intensity. With the rapid development of the tunnel construction industry, various mechanical equipment are developing in the direction of large-scale, high efficiency, and high quality. The competition among enterprises is becoming increasingly fierce, and the requirements for the reliability and performance of mechanical products are getting higher and higher. Improving product production efficiency and quality has become a key issue that needs to be solved urgently.

[0003] In order to solve the existing problems, the present invention proposes a drilling rig boom manufacturing process with manual and automated welding, which is used to solve the problems of unstable welding quality, uncontrollable weld appearance, low production efficiency, high labor intensity, etc. of the existing drilling rig boom. During the riveting process of the drilling rig boom, the inner cavity is fixed by a core mold to ensure the size of the inner cavity. Before welding, process ribs are placed in the inner cavity of the boom, which enhances the strength of the boom and improves the manufacturing dimensional accuracy of the boom. In the boom welding process, a special four-gun welding device is used to weld the four gaps of the boom at the same time, realizing the automation of the long-distance welding process. Summary of the invention

[0004] To achieve the above purpose, the technical solution adopted by the present invention is as follows.

[0005] A manufacturing process for a rock drilling trolley boom, the rock drilling trolley boom comprising a top seat, a cylinder seat, a first plate, an arm body, and a second plate; the top seat comprising a sleeve, a sleeve opening, two ear plates, a base, and a top seat bottom plate; the cylinder seat comprising a cylinder seat, a cylinder seat bottom plate, a bottom plate circular hole, and two seat body holes; the first plate comprising two welding holes, ten rivet holes, and a center hole; the arm body comprising process ribs, a bottom plate, two webs, a top plate, and eight mounting openings; the second plate comprising two welding holes, ten rivet holes, and two center holes.

[0006] The top seat is welded to the end of the arm, the cylinder seat is welded to the top plate, the two first plates and the two second plates are riveted to the arm accessory installation ports corresponding to the web and the opposite web, and the process ribs are installed in the inner cavity of the arm near the end. The manufacturing process includes the following procedures: plate processing, part forming, boom riveting, pre-welding preparation, boom welding, post-welding inspection, accessory installation, and transfer to storage.

[0007] The plate processing procedure refers to the preparation, cutting, groove preparation and grinding of the plate. The plate material is 690 annealed pre-treated high-strength steel plate, with a length of 10 to 15m and a plate thickness of 10 to 30mm. During the preparation process, the oil and dust on the surface of the plate are cleaned, and the processing area is marked. The laser cutting method is used to obtain the ear plate, top seat bottom plate, cylinder seat bottom plate, first plate, bottom plate, belly plate, top plate and second plate. The preparation of the welding groove adopts the flame processing method, and the groove is polished after processing to prepare for the subsequent installation of the workpiece.

[0008] The parts forming process refers to the use of directional solidification method to cast the sleeve, base and cylinder seat. During casting, the local area mold is preheated, and the liquid metal is poured into the mold cavity from the mold input port, and then demolding is performed to obtain the sleeve, base and cylinder seat. Rivet holes and openings are drilled at the corresponding positions of the top seat, the first plate, the arm body and the second plate to obtain the sleeve opening, welding hole 1, riveting hole 1, center hole 1, installation opening, welding hole 2, riveting hole 2 and center hole 2.

[0009] The boom riveting process refers to the use of a flat positioning fixture to fix the web on the bottom plate and place the core mold, then align the rivet holes between the web and the core mold for riveting and fixing. Place the top plate on the web to ensure that the web is perpendicular to the bottom plate and the top plate, and the two webs are parallel. After the plate is initially fixed with a fixture, process ribs are installed inside the boom to reduce welding deformation of the boom.

[0010] The pre-welding preparation process refers to checking the straightness and flatness of the arm after riveting, and cleaning it before welding to remove oil and dust from the arm in preparation for subsequent welding work.

[0011] The boom welding process refers to the use of four-gun welding equipment dedicated to the boom. First, the boom is positioned on the welding platform, and the welding groove and the surrounding 100mm area are preheated to 90-110℃ with a flame. Then, welding is performed at the bottom of the boom. Press the equipment travel button, and the welding gun automatically moves to the process ribs for manual gun alignment and welding. After completion, the welding gun is returned. Finally, continuous carbon dioxide gas shielded welding is used to improve the quality of single-sided welding and double-sided forming. The welding power source is a pulse welding machine. The welding current is 200-240A and the welding voltage is 22-26V when welding the bottom plate. The welding current is 260-280A and the welding voltage is 26-30V when welding the top plate.

[0012] The post-weld inspection process refers to the use of a laser collimator to detect the straightness and flatness of the arm after welding, the use of measuring tools to detect the geometric shape and size of the weld, the use of ultrasonic testing within 24 hours after welding is completed to inspect the weld quality, and the use of penetrant testing to inspect the external defects of the weld. The weld defect assessment is carried out in accordance with the JB4730 standard. When the weld point fails the inspection, the welded area is repaired.

[0013] The accessory installation process refers to the assembly of the accessory top seat, cylinder seat, first plate and second plate. First, assemble the top seat, weld the top seat bottom plate to the end of the arm body, weld the sleeve to the upper end of the base, and weld the two ear plates to the left and right sides of the base. Then assemble the cylinder seat, weld the cylinder seat bottom plate to the top plate, and weld the cylinder seat to the cylinder seat bottom plate; finally, assemble the remaining accessories, align the rivet holes one and two with the rivet hole positions corresponding to the arm body installation port, and rivet the first plate, the second plate and the arm body. Use the circumference welding method to weld. When welding, avoid arcing and arcing at the corners. Ensure that the joint position is staggered with the corner by more than 50mm, and grind the weld after cooling.

[0014] The transfer and warehousing process refers to the warehousing of workpieces that have been processed and inspected. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] In order to more clearly illustrate the embodiments of the present application or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0016] Figure 1 It is a schematic diagram of the overall structure of the drilling rig boom.

[0017] Figure 2 It is a schematic diagram of the top base structure of the boom.

[0018] Figure 3 It is a schematic diagram of the cylinder seat structure of the boom.

[0019] Figure 4 It is a schematic diagram of the first plate structure of the arm.

[0020] Figure 5 It is a schematic diagram of the arm structure of the boom.

[0021] Figure 6 It is a schematic diagram of the second plate structure of the arm.

[0022] Figure 7 It is a schematic diagram of the process reinforcement structure of the boom.

[0023] Figure 8 This is the manufacturing process flow chart of the rock drilling rig boom.

[0024] Description of reference numerals:

[0025] 1. Top seat, 1-1. Sleeve, 1-2. Sleeve opening, 1-3. Ear plate, 1-4. Base, 1-5. Top seat bottom plate, 2. Cylinder seat, 2-1. Cylinder seat, 2-2. Cylinder seat bottom plate, 2-3. Bottom plate round hole, 2-4. Body hole, 3. First plate, 3-1. Welding hole one, 3-2. Riveting hole one, 3-3. Center hole one, 4. Arm body, 4-1. Process ribs, 4-2. Bottom plate, 4-3. Web plate, 4-4. Top plate, 4-5. Installation opening, 5. Second plate, 5-1. Welding hole two, 5-2. Riveting hole two, 5-3. Center hole two. DETAILED DESCRIPTION

[0026] In order to make the above-mentioned purposes, features and advantages of the present application more obvious and easy to understand, the specific implementation methods of the present application are described in detail below in conjunction with the accompanying drawings. In the following description, many specific details are set forth to facilitate a full understanding of the present application. However, the present application can be implemented in many other ways different from those described herein, and those skilled in the art can make similar improvements without violating the connotation of the present application, so the present application is not limited by the specific embodiments disclosed below.

[0027] In the description of the present application, it should be understood that the terms "center", "longitudinal", "lateral", "length", "width", "thickness", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", "clockwise", "counterclockwise", "axial", "radial", "circumferential" and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present application and simplifying the description, and do not indicate or imply that the referred device or element must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as a limitation on the present application.

[0028] In addition, the terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Therefore, the features defined as "first" and "second" may explicitly or implicitly include at least one of the features. In the description of this application, the meaning of "plurality" is at least two, such as two, three, etc., unless otherwise clearly and specifically defined.

[0029] In this application, unless otherwise clearly specified and limited, the terms "installed", "connected", "connected", "fixed" and the like should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements, unless otherwise clearly defined. For ordinary technicians in this field, the specific meanings of the above terms in this application can be understood according to specific circumstances.

[0030] In the present application, unless otherwise clearly specified and limited, a first feature being “above” or “below” a second feature may mean that the first and second features are in direct contact, or the first and second features are in indirect contact through an intermediate medium. Moreover, a first feature being “above”, “above”, and “above” a second feature may mean that the first feature is directly above or obliquely above the second feature, or simply means that the first feature is higher in level than the second feature. A first feature being “below”, “below”, and “below” a second feature may mean that the first feature is directly below or obliquely below the second feature, or simply means that the first feature is lower in level than the second feature.

[0031] It should be noted that when an element is referred to as being "fixed to" or "disposed on" another element, it may be directly on the other element or there may be a central element. When an element is considered to be "connected to" another element, it may be directly connected to the other element or there may be a central element at the same time. The terms "vertical", "horizontal", "upper", "lower", "left", "right" and similar expressions used herein are for illustrative purposes only and do not represent the only implementation method.

[0032] A manufacturing process of a rock drilling trolley boom, the rock drilling trolley boom comprises a top seat 1, a cylinder seat 2, a first plate 3, an arm body 4, and a second plate 5. The top seat 1 comprises a sleeve 1-1, a sleeve opening 1-2, two ear plates 1-3, a base 1-4, and a top seat bottom plate 1-5; the cylinder seat 2 comprises a cylinder seat 2-1, a cylinder seat bottom plate 2-2, a bottom plate circular hole 2-3, and two seat body holes 2-4; the first plate 3 comprises two welding holes 3-1, ten riveting holes 3-2, and a center hole 3-3; the arm body 4 comprises a process rib 4-1, a bottom plate 4-2, two webs 4-3, a top plate 4-4, and eight mounting ports 4-5; the second plate 5 comprises two welding holes 5-1, ten riveting holes 5-2, and a center hole 5-3.

[0033] The top seat 1 is welded to the end of the arm body 4, the cylinder seat 2 is welded to the top plate 4-4, the two first plates 3 and the two second plates 5 are riveted to the corresponding mounting openings 4-5 of the web 4-3, and the process ribs 4-1 are installed in the inner cavity near the end of the arm body 4. The manufacturing process includes the following procedures: plate processing, part forming, boom riveting, pre-welding preparation, boom welding, post-welding inspection, accessory installation, and transfer to storage.

[0034] The plate processing process refers to the preparation, cutting, groove preparation and grinding of the plate. The plate material is 690 annealed pre-treated high-strength steel plate, the length is 10-15m, and the plate thickness is 10-30mm. During the preparation process, the oil and dust on the surface of the plate are cleaned, and the processing area is marked. The laser cutting method is used to obtain the ear plate 1-3, the top seat bottom plate 1-5, the cylinder seat bottom plate 2-2, the first plate 3, the bottom plate 4-2, the web plate 4-3, the top plate 4-4 and the second plate 5. The preparation of the welding groove adopts the flame processing method, and the groove is polished after processing to reduce the residual stress inside the plate, eliminate the excess height, and ensure the appearance quality.

[0035] The parts forming process refers to the use of directional solidification method to cast the sleeve 1-1, base 1-4, cylinder seat 2-1. During casting, the local area mold is preheated, and the liquid metal is poured into the mold cavity from the mold input port, and the parts are demoulded to obtain the parts. Rivet holes and openings are drilled at the corresponding positions of the parts to ensure the consistency of geometric dimensions, accuracy and forming quality, and the sleeve opening 1-2, welding hole 3-1, riveting hole 3-2, center hole 3-3, installation port 4-5, welding hole 5-1, riveting hole 5-2 and center hole 5-3 are obtained. By controlling the process parameters, the mechanical properties and reliability of the parts are improved, which is suitable for mass production.

[0036] The boom riveting process refers to the use of a plane positioning fixture to fix a web 4-3 on the bottom plate 4-2 and place a core mold, clamp the web 4-3, align the rivet hole position corresponding to the core mold, and rivet and fix it. Use a plane positioning fixture to place the top plate 4-4 on the web 4-3 to ensure the verticality between the bottom plate 4-2, the web 4-3 and the top plate 4-4, as well as the parallelism requirements between the webs 4-3. After the plate is initially fixed by the positioning fixture, the process ribs 4-1 are installed inside the boom to reinforce the arm body 4 structure. The drilling trolley boom uses the core mold to fix the inner cavity during the riveting process, which is conducive to ensuring the size of the inner cavity. The combined use of different positioning fixtures increases the riveting accuracy. Placing process ribs in the inner cavity of the boom before welding enhances the strength of the boom, effectively solves the problems of welding deformation and large dimensional errors of traditional booms, and improves the dimensional accuracy of the boom.

[0037] The pre-welding preparation process refers to checking the straightness and flatness of the arm body 4 after riveting, ensuring that it is within a reasonable error range, and cleaning the oil and dust to prepare for subsequent welding work.

[0038] The arm welding process refers to the welding of the riveted arm body. A special four-gun welding equipment is selected. The equipment mainly includes: walking system, gun feeding system, equipment placement platform, welding system, and welding platform. The flame is used to preheat the welding groove and the surrounding 100mm area, and the preheating temperature is 100℃. Position the arm body and match the weld on the welding platform. Press the equipment walking button to move the welding gun to the top of the gap. The gun feeding assembly automatically feeds the gun. After the welding gun is in place, the gun is manually matched and welding begins. After welding, the welding gun is returned. Continuous carbon dioxide gas shielded welding is used to improve the quality of single-sided welding and double-sided forming. The welding power source uses a pulse welding machine. The welding current is 220A and the welding voltage is 24V for bottom welding. Then the cover plate is welded in the same process steps. The welding current is 270A and the welding voltage is 28V for cover welding. After welding, the arm body is removed. The special four-gun welding equipment can weld the four gaps of the arm at the same time, which can realize the automation of the long-distance welding process and solve the problems of unstable welding quality and uncontrollable weld appearance. At the same time, it is also possible to carry out welding work on booms of different types and sizes, which only requires repositioning of the workpiece and rematching of the welds. The manufacturing process has strong applicability and a wide range of applications.

[0039] The post-weld inspection process refers to the use of a laser collimator to detect the straightness and flatness of the arm body 4 after welding, the use of a measuring tool to check the geometry and size of the weld, and the use of ultrasonic testing technology to inspect the weld quality within 24 hours after welding. The magnetic particle inspection method is used to check the external defects of the weld, and the weld defect evaluation is carried out according to the JB4730 standard. When the weld point fails the inspection, the weld part is repaired.

[0040] The accessory installation process refers to assembling the accessory top seat 1, the cylinder seat 2, the first plate 3 and the second plate 4. First, assemble the top seat 1, weld the top seat bottom plate 1-5 to the end of the arm body 4, weld the sleeve 1-1 to the upper end of the base 1-4, and weld the two ear plates 1-3 to the left and right sides of the base 1-4. Then assemble the cylinder seat 2, weld the cylinder seat bottom plate 2-2 to the top plate 4-4, and weld the cylinder seat 2-1 to the cylinder seat bottom plate 2-2. Finally, assemble the remaining accessories, align the rivet hole one 3-2, the rivet hole two 5-2 with the rivet hole positions corresponding to the arm body installation port 4-5, and rivet the first plate 3, the second plate 5 and the arm body 4. Use the circumference welding method to weld. Avoid arc starting and arc ending at the corners during welding. Ensure that the joint position is staggered with the corner by more than 50mm. Grind the weld after cooling to remove surface burrs, ensure the flatness of the weld and surrounding areas, and increase corrosion resistance.

[0041] The transfer and warehousing process refers to the warehousing of workpieces that have been processed and inspected.

[0042] The above process flow, through strict process parameter control and weld defect detection and other technical means, as well as special equipment such as four-gun welding system, ensures that the workpiece quality meets the standard and improves the safety and reliability of the boom.

[0043] The contents explained in the above embodiments should be understood as these embodiments are only used to more clearly illustrate the present invention, and are not used to limit the scope of the present invention. After reading the present invention, various equivalent forms of modifications to the present invention by those skilled in the art all fall within the scope defined by the claims attached to this application.

Claims

1. A manufacturing process for a rock drilling trolley boom, the rock drilling trolley boom comprising a top seat (1), a cylinder seat (2), a first plate (3), an arm body (4), and a second plate (5); the top seat (1) comprises a sleeve (1-1), a sleeve opening (1-2), an ear plate (1-3), a base (1-4), and a top seat bottom plate (1-5); the cylinder seat (2) comprises a cylinder seat (2-1), a cylinder seat bottom plate (2-2), a bottom plate circular hole (2-3), and a seat body hole (2-4); the first plate (3) comprises a welding hole (3-1), a rivet hole (3-2), and a center hole (3-3) ; The arm body (4) includes a process rib (4-1), a bottom plate (4-2), a web plate (4-3), a top plate (4-4), and a mounting opening (4-5); the second plate (5) includes two welding holes (5-1), two riveting holes (5-2), and two center holes (5-3); the top seat (1) is welded to the end of the arm body (4), the cylinder seat (2) is welded to the top plate (4-4), the first plate (3) and the second plate (5) are riveted to the mounting opening (4-5) corresponding to the web plate (4-3), and the process rib (4-1) is installed in the inner cavity of the arm body (4); it is characterized in that, The manufacturing process includes the following procedures: plate processing, parts forming, boom riveting, pre-welding preparation, boom welding, post-welding inspection, accessory installation, and transfer to storage.

2. A drilling rig boom manufacturing process according to claim 1, characterized in that: The plate processing procedure refers to the preparation, cutting, groove preparation and grinding of the plate. The plate material is 690 annealed pretreated high-strength steel plate with a length of 10 to 15 meters and a plate thickness of 10 to 30 mm. During the preparation process, the oil and dust on the surface of the plate are cleaned, and the processing area is marked. Laser cutting is used to obtain ear plates (1-3), top seat bottom plates (1-5), cylinder seat bottom plates (2-2), first paste plates (3), bottom plates (4-2), web plates (4-3), top plates (4-4) and second paste plates (5). The preparation of the welding groove adopts a flame processing method, and the groove is polished after processing to prepare for the subsequent workpiece installation.

3. A drilling rig boom manufacturing process according to claim 1, characterized in that: The parts forming process refers to the use of a directional solidification method to cast a sleeve (1-1), a base (1-4), and a cylinder seat (2-1). During casting, the local area mold is preheated, and liquid metal is poured into the mold cavity from the mold input port, and then demolding is performed to obtain the sleeve (1-1), the base (1-4), and the cylinder seat (2-1); rivet holes and openings are drilled at corresponding positions of the top seat (1), the first plate (3), the arm body (4), and the second plate (5) to obtain a sleeve opening (1-2), a welding hole one (3-1), a riveting hole one (3-2), a center hole one (3-3), an installation opening (4-5), a welding hole two (5-1), a riveting hole two (5-2), and a center hole two (5-3).

4. A drilling rig boom manufacturing process according to claim 1, characterized in that: The boom riveting process refers to using a plane positioning fixture to fix the web (4-3) on the bottom plate (4-2) and place a core mold, aligning the rivet hole positions between the web (4-3) and the core mold, and riveting and fixing; placing the top plate (4-4) on the web (4-3) to ensure that the web (4-3) is perpendicular to the bottom plate (4-2) and the top plate (4-4) respectively, and the two webs (4-3) are parallel; after using a fixture to preliminarily fix the plate, installing a process rib (4-1) inside the boom to reduce the subsequent welding deformation of the arm body (4).

5. A drilling rig boom manufacturing process according to claim 1, characterized in that: The pre-welding preparation process refers to checking the straightness and flatness of the arm body (4) after riveting, and cleaning the oil and dust to prepare for the subsequent welding process.

6. A drilling rig boom manufacturing process according to claim 1, characterized in that: The boom welding process refers to the use of a four-gun welding device dedicated to the boom, first positioning the boom on a welding platform, and preheating the welding groove and the surrounding 100mm area to 90-110°C with a flame; then welding is performed at the bottom of the boom, and the equipment travel button is pressed, and the welding gun automatically moves to the gap around the process rib (4-1), and manual gun alignment and welding are performed, and the welding gun is returned after completion; finally, continuous carbon dioxide gas shielded welding is used to improve the single-sided welding and double-sided forming quality, and a pulse welding machine is selected as the welding power source. When welding the bottom plate (4-2), the welding current is 200-240A, and the welding voltage is 22-26V. When welding the top plate (4-4), the welding current is 260-280A, and the welding voltage is 26-30V.

7. A drilling rig boom manufacturing process according to claim 1, characterized in that: The post-weld inspection process refers to using a laser collimator to detect the straightness and flatness of the arm body (4) after welding, using a measuring tool to detect the geometric shape and size of the weld, and using an ultrasonic detection method to inspect the weld quality within 24 hours after welding is completed; using a penetrant flaw detection method to inspect the external defects of the weld, and the weld defect evaluation is carried out according to the JB4730 standard. When the weld point fails the inspection, the weld part is repaired.

8. A drilling rig boom manufacturing process according to claim 1, characterized in that: The accessory installation process refers to assembling the accessory top seat (1), the cylinder seat (2), the first plate (3) and the second plate (4); first assembling the top seat (1), welding the top seat bottom plate (1-5) to the end of the arm body (4), welding the sleeve (1-1) to the upper end of the base (1-4), and welding the two ear plates (1-3) to the left and right sides of the base (1-4); then assembling the cylinder seat (2), welding the cylinder seat bottom plate (2-2) to the top plate (4 -4), and weld the cylinder seat (2-1) to the cylinder seat bottom plate (2-2); finally, assemble the remaining accessories, align the rivet hole 1 (3-2), the rivet hole 2 (5-2) and the rivet hole position corresponding to the arm body installation opening (4-5), and rivet the first plate (3), the second plate (5) and the arm body (4); adopt the circumferential welding method to weld, and avoid arc starting and arc ending at the corner during welding, ensure that the joint position is staggered with the corner by more than 50 mm, and grind the weld after cooling.

9. A drilling rig boom manufacturing process according to claim 1, characterized in that: The transfer and warehousing process refers to the warehousing of workpieces that have been processed and inspected.

Citation Information

Patent Citations

  • Main jib structure for fork installing machine

    CN102249170A

  • Manufacturing method of high altitude operation mechanical arm frame

    CN103231213A

  • Welding technology for swing arm of crawler-type bucket loader

    CN103586591A

  • Method for manufacturing lift big arm of underground high-bucket capacity carry-scraper

    CN104057256A

  • Propelling beam normal position servo mechanism of drill jumbo

    CN104763329A