Arc-shaped large-span grating curtain wall and construction method

By adopting arc-shaped large-span grille curtain wall design in large public buildings and combining with specific construction methods, the problem of insufficient safety and stability of arc-shaped large-span curtain wall structure is solved, and the safety of large-span and high-rise grille curtain walls is achieved. The quality and aesthetics reduce construction difficulty and improve architectural aesthetics.

CN118911324APending Publication Date: 2024-11-08WUYE GRP DECORATION ENG CO LTD
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202411184718.0
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-27
Publication Date
2024-11-08

AI Technical Summary

Technical Problem

The structural safety and stability of arc-shaped large-span curtain walls in the prior art have been lacking, resulting in increased design and construction difficulties, especially in large public buildings, where the realization of interior decoration effects such as atriums are faced.

Method used

The arc-shaped large-span grille curtain wall design includes main steel structure, ultra-long vertical keel, transverse arc keel, curved glass and decorative grille. A stable vertical keel system is formed through welding and docking bolt connections, and Grid connections are provided on the vertical keel to achieve fixation and angle adjustment of the decorative layer, combined with specific construction steps such as measuring and laying, supporting installation, hoisting and spraying anti-corrosion treatment, ensuring structural integrity and aesthetics.

Benefits of technology

It effectively solves the design and construction problems of grille curtain walls in large spans and large space areas, ensures the safety, reliability and economy of the structure, and creates a unique aesthetic effect of the building.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118911324A_ABST
    Figure CN118911324A_ABST
Patent Text Reader

Abstract

The invention discloses an arc-shaped large-span grating curtain wall and a construction method, and the arc-shaped large-span grating curtain wall is characterized in that the arc-shaped large-span grating curtain wall comprises a main body steel structure, a super-long vertical keel, a transverse arc-shaped keel, arc-shaped glass and a decorative grating, the top of the super-long vertical keel is connected to a top steel support in a welding mode, and the bottom of the super-long vertical keel is connected to a bottom steel support in a welding mode; and a plurality of super-long vertical keels are regularly arranged between the top steel support and the bottom steel support to form a vertical keel system of the arc-shaped large-span grating curtain wall. By means of the arc-shaped large-span grid curtain wall and the construction method, the technical problems of design and construction of a large-span and large-space grid curtain wall are effectively solved, the arc-shaped large-span grid curtain wall is different from a conventional curtain wall structure and has a large-span and large-space unique structure, the difficulty of design deterioration and construction is increased, and the construction cost is lowered. By means of the arc-shaped large-span grating curtain wall and the construction method, the field construction problem is effectively solved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of building curtain walls, and in particular to an arc-shaped large-span grid curtain wall and a construction method. Background Art

[0002] In order to show the rhythm, light and shadow, hierarchy and changes of architectural features, the architects used this to show a more beautiful, more prominent curve and more representative building. The inverted curved curtain wall and the adjustable angle grille are used to create the unique and dynamic aesthetics of the building. As an indispensable part of the facade of public buildings, the curtain wall plays a key role.

[0003] Especially in large public buildings with steel structures as the main building, in order to create better indoor decoration effects such as atriums, large span and large space structures are often used, which brings great challenges to the design of the facade curtain wall. How to design the curtain wall well, ensure the safety and stability of the structure, and facilitate design and construction has become a problem that needs to be solved. Summary of the invention

[0004] The purpose of the present invention is to provide a curved large-span grid curtain wall and a construction method to solve the problem of lack of structural safety and stability of the curved large-span curtain wall in the prior art.

[0005] The present invention is implemented by adopting the following technical scheme: an arc-shaped large-span grille curtain wall, characterized in that it includes a main steel structure, an extra-long vertical keel, a transverse arc-shaped keel, an arc-shaped glass and a decorative grille, wherein the top of the extra-long vertical keel is connected to the top steel support through a docking bolt shaft, and the bottom is connected to the bottom steel support through a docking bolt shaft, and a plurality of extra-long vertical keels are regularly arranged between the top steel support and the bottom steel support to form a vertical keel system of the arc-shaped large-span grille curtain wall.

[0006] Furthermore, the main steel structure includes main steel structure columns, main steel beams, top edge beams and bottom edge beams, wherein the main steel beams are fixed on the main steel structure columns, and the top edge beams and the bottom edge beams are fixedly connected to the main steel structure columns through the main steel beams, providing support for the entire grille curtain wall.

[0007] Furthermore, a number of transverse arc keels are connected between the extra-long vertical keels by welding. The transverse arc keels are bent in the factory according to the designed curvature and sprayed with anti-corrosion and decorative paints to enhance the structural stability and aesthetics of the curtain wall. A steel insert is also provided between the transverse arc keel and the extra-long vertical keel. The steel insert is fixed to the extra-long vertical keel by unilateral welding and inserted into the transverse arc keel.

[0008] Furthermore, a grille connector is provided on the extra-long vertical keel for fixing the decorative grille to form an outer surface decorative layer of the curtain wall.

[0009] Furthermore, the curved glass is fixed in a frame formed by extra-long vertical keels and transverse curved keels by means of glass pressing blocks or pressure strips, thereby achieving the integrity and light transmittance of the curtain wall.

[0010] A construction method for a curved large-span grid curtain wall comprises the following steps: Step 1: Measure and lay out the lines. According to the coordinate control points reserved in the early stage of the main structure construction, draw the control lines and measure and lay out the installation positions of the top steel support and the bottom steel support; Step 2: Support installation: connect the top steel support and the bottom steel support to the steel box girder of the main steel structure according to the measurement and layout results; Step 3: Hoisting of extra-long vertical keels: Use a high-altitude crane on the ground to lift the extra-long vertical keels to the position where they need to be installed, and then adjust the position. Then use the docking bolt shaft on the support to fix the extra-long vertical keels on the top support and the bottom support respectively, so as to achieve the fixed installation of the extra-long vertical keels and provide a foundation for the installation of the horizontal curved keels. Step 4: Install the horizontal curved keel and fix the horizontal curved keel on the extra-long vertical keel; Step 5: Install the curved glass. Hang the curved glass to the designated location and place it into the installation slot of the keel frame. Step 6: Grille hoisting; Step 7: Cleaning and acceptance.

[0011] Furthermore, in the step 2, the top steel support and the bottom steel support are respectively connected to the top edge beam and the bottom edge beam of the steel structure body by welding.

[0012] Furthermore, in step four, an aerial work vehicle or a hanging basket is used to transport personnel to the installation location, and the movable end connected to the steel insert is first inserted into the steel insert, and the other end is connected and fixed to the vertical extra-long keel by full welding, and anti-corrosion and fire-retardant coatings are sprayed.

[0013] Furthermore, in the step five, the curved glass is lifted to a designated position using a glass suction cup vehicle, placed in a mounting groove of the keel frame, fixed by a glass pressing block, and sealed with glue.

[0014] Furthermore, in step six, the decorative grille is lifted to a designated location using an overhead crane, and is fixed to the extra-long vertical keel via a reserved grille connector to complete the installation of the grille.

[0015] The curved large-span grid curtain wall and construction method described in the present invention have the following beneficial effects: This curved large-span grille curtain wall and construction method effectively solves the design and construction technical problems of grille curtain walls in large spans and large spaces. The curved large-span grille curtain wall is different from the conventional curtain wall structure. It has a unique structure of large span and large space, which increases the difficulty of design and construction. The curved large-span grille curtain wall and construction method effectively solve the construction problems on site. And by setting the grille connector on the vertical super-long keel, the connection of the outer surface decorative grille is guaranteed, and the effective adjustment of the grille angle is achieved, creating a unique and dynamic aesthetic of the building, and effectively ensuring the safety, reliability and economy of the large-span, high-rise high-grid curtain wall structure. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. The drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on the structures shown in these drawings without paying creative work.

[0017] Figure 1 It is a schematic diagram of a curved large-span grid curtain wall skeleton structure; Figure 2 This is a schematic diagram of a curved large-span grille curtain wall; In the figure, 1-main steel structure column; 2-main steel beam; 3-top edge beam; 4-extra-long vertical keel; 5-transverse arc keel; 6-bottom edge beam; 7-top steel support; 8-bottom steel support; 9-curved glass; 10-decorative grille. DETAILED DESCRIPTION

[0018] In order to make the purpose, technical solutions and advantages of the embodiments of the present invention clearer, the technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Generally, the components of the embodiments of the present invention described and shown in the drawings here can be arranged and designed in various different configurations.

[0019] Therefore, the following detailed description of the embodiments of the present invention provided in the accompanying drawings is not intended to limit the scope of the invention claimed for protection, but merely represents selected embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0020] like Figure 1-2As shown, a curved large-span grille curtain wall includes a main steel structure column 1, a main steel beam 2, a top edge beam 3, an extra-long vertical keel 4, a transverse curved keel 5, a bottom edge beam 6, a top steel support 7, a bottom steel support 8, a curved glass 9 and a decorative grille 10. The main steel structure column 1, the main steel beam 2, the top edge beam 3 and the bottom edge beam 6 are the main structure of the building.

[0021] The main steel structure column 1 is an important component of the main steel structure, providing a supporting foundation for the main steel beam 2, the top edge beam 3 and the bottom edge beam 6, and providing a vertical supporting foundation for the entire large-span and large-space curtain wall.

[0022] There are two main steel beams 2, both fixed on the main steel structure column 1, and respectively located at the top and bottom of the arc-shaped large-span grid curtain wall. The main steel beams 2 extend outward along the wall surface, and the extended parts are respectively connected to the top edge beam 3 and the bottom edge beam 6.

[0023] The top steel support 7 is located at the top of the curved large-span grid curtain wall, providing an installation foundation for the top of the extra-long vertical keel 4 of the curved large-span grid curtain wall, and is fixed to the top edge beam 3 of the main structure in the steel structure by welding, playing the role of bearing the top load.

[0024] The bottom steel support 8 is located at the bottom of the curved large-span grid curtain wall, providing an installation foundation for the bottom of the extra-long vertical keel 4 of the curved large-span grid curtain wall, and is fixed to the bottom edge beam 6 of the main structure in the steel structure by welding, playing the role of bearing the load transferred by the grid curtain wall.

[0025] The extra-long vertical keel 4 is located between the top steel support 7 and the bottom steel support 8. A plurality of extra-long vertical keels 4 are arranged regularly to form a vertical keel system of the arc-shaped large-span grid curtain wall. At the same time, a plurality of transverse arc-shaped keels 5 are connected between the extra-long vertical keels 4 by welding to form a stable steel structure system. A grid connector is connected to the extra-long vertical keel 4 to provide an installation foundation for the surface decorative grid 10. Considering the large span effect, the extra-long vertical keel 4 is made of high-strength steel, generally processed by steel, and sprayed with anti-corrosion and fluorocarbon paint decorative paint on the surface.

[0026] The transverse arc keel 5 is located between the extra-long vertical keels 4 and is welded to the extra-long vertical keels 4 by full welding, providing an installation foundation for the installation of the curved glass 9 and ensuring the stability and reliability of the glass installation. Considering the large span effect, the transverse arc keel 5 is bent in the factory according to the designed arc and is made of high-strength steel. It is generally processed by steel and sprayed with anti-corrosion and decorative paint on the surface.

[0027] A steel insert is also provided between the transverse arc keel 5 and the extra-long vertical keel 4. The steel insert is fixed to the vertical extra-long keel by single-sided welding to achieve a movable connection between the transverse arc keel and the vertical extra-long keel, thereby reducing damage to the curtain wall structure caused by external forces and earthquakes and ensuring the safety of the structure.

[0028] The curved glass 9 is located between the extra-long vertical keel and the transverse curved keel, and is fixed to the extra-long vertical keel by means of a glass pressing block or a pressure strip, thereby achieving the integrity of the entire decorative curtain wall.

[0029] A construction method for a curved large-span grid curtain wall mainly comprises the following steps: Step 1: Construction preparation, use the BIM model to extract material processing parameters, and complete the processing of top, bottom, extra-long vertical keel, horizontal curved keel, curved glass and other materials.

[0030] Step 2: Measure and lay out the lines. According to the coordinate control points reserved in the previous main structure construction, draw the control lines to determine the installation positions of the top and bottom steel supports. Use red paint and ink lines to mark the installation positions to provide a basis for subsequent construction.

[0031] Step 3: Support installation. According to the measurement and layout results, the top steel support and the bottom steel support are connected to the steel box girder of the steel structure body by welding to prepare for the installation of the extra-long vertical keel.

[0032] Step 4: Hoist the extra-long vertical keel, weld the link support corresponding to the grid connector to the vertical keel on the ground. Use an aerial crane to hoist the extra-long vertical keel to the designated position, and after correction, fix it to the top support and bottom support through the docking bolt shaft on the support.

[0033] Step 5: Install the horizontal curved keel. Use an aerial work vehicle or hanging basket to transport personnel to the installation location and check the installation location of the horizontal curved keel. After removing the anti-rust paint, first insert the movable end connected to the steel insert into the steel insert, and then connect and fix the other end to the vertical extra-long keel by full welding. After welding, spray anti-corrosion and fire-retardant coatings.

[0034] Step 6: Install the curved glass, check the number of the curved glass, and verify the installation position. Use a glass suction cup car to lift the curved glass to the designated position, put it into the installation slot of the keel frame, and fix it with a glass pressure block. After the installation is completed, glue the glass to ensure the sealing of the gap.

[0035] Step 7: Grille hoisting, check the grille position and information number before installation. Use an aerial crane to hoist the grille to the designated location and fix it to the extra-long vertical keel through the reserved grille connector. Long grilles need to be hoisted in sections and the joints should be sealed with glue.

[0036] Step 8: Cleaning and acceptance, clean the protective film on the grille and the glass glue and other debris produced during gluing. Organize several responsible parties to conduct on-site inspection and acceptance, sign the quality acceptance document after passing the acceptance, and complete the relevant handover work.

[0037] The above embodiments describe the basic principles and main features of the present invention and the advantages of the present invention. Those skilled in the art should understand that the present invention is not limited by the above embodiments, and the above embodiments and descriptions are only for explaining the principles of the present invention. Without departing from the spirit and scope of the present invention, the changes and modifications made by those skilled in the art shall be within the scope of protection of the appended claims of the present invention without departing from the spirit and scope of the present invention.

Claims

1. A curved large-span grille curtain wall, It is characterized in that The invention comprises a main steel structure, an extra-long vertical keel (4), a transverse arc-shaped keel (5), an arc-shaped glass (9) and a decorative grille (10), wherein the top of the extra-long vertical keel (4) is connected to a top steel support (7) via a docking bolt shaft, and the bottom is connected to a bottom steel support (8) via a docking bolt shaft, and a plurality of extra-long vertical keels (4) are regularly arranged between the top steel support (7) and the bottom steel support (8), so as to form a vertical keel system of an arc-shaped large-span grille curtain wall.

2. The curved large-span grid curtain wall according to claim 1, It is characterized in that The main steel structure comprises a main steel structure column (1), a main steel beam (2), a top edge beam (3) and a bottom edge beam (6), wherein the main steel beam (2) is fixed on the main steel structure column (1), and the top edge beam (3) and the bottom edge beam (6) are fixedly connected to the main steel structure column (1) via the main steel beam (2), thereby providing support for the entire grid curtain wall.

3. The curved large-span grid curtain wall according to claim 1, It is characterized in that A plurality of transverse arc keels (5) are connected between the extra-long vertical keels (4) by welding. The transverse arc keels (5) are bent in a factory according to a designed curvature and sprayed with anti-corrosion and decorative paint to enhance the structural stability and aesthetics of the curtain wall. A steel insert is also provided between the transverse arc keel (5) and the extra-long vertical keel (4). The steel insert is fixed to the extra-long vertical keel (4) by single-side welding and inserted into the transverse arc keel (5).

4. The curved large-span grid curtain wall according to claim 1, It is characterized in that The extra-long vertical keel (4) is provided with a grille connector for fixing the decorative grille (10) to form a decorative layer on the outer surface of the curtain wall.

5. The curved large-span grid curtain wall according to claim 1, It is characterized in that The curved glass (9) is fixed in a frame formed by the extra-long vertical keel (4) and the transverse curved keel (5) by means of glass pressing blocks or pressure strips, thereby achieving the integrity and light transmittance of the curtain wall.

6. A construction method for a curved large-span grid curtain wall as described in claims 1-5, It is characterized in that The following steps are involved: Step 1: Measure and lay out the lines. According to the coordinate control points reserved in the early stage of the main structure construction, draw the control lines and measure and lay out the installation positions of the top steel support (7) and the bottom steel support (8); Step 2: Support installation: connect the top steel support (7) and the bottom steel support (8) to the steel box girder of the main steel structure according to the measurement and layout results; Step 3: hoisting the extra-long vertical keel, using a high-altitude crane on the ground to lift the extra-long vertical keel (4) to the position where it needs to be installed and then calibrate the position, and then use the docking bolt shaft on the support to fix the vertical extra-long keel on the top support and the bottom support respectively, so as to achieve the fixed installation of the extra-long vertical keel (4) and provide a foundation for the installation of the horizontal arc keel (5); Step 4: Install the transverse arc keel, fix the transverse arc keel (5) on the extra-long vertical keel (4); Step 5: Install the curved glass. Lift the curved glass (9) to the designated location and place it into the installation slot of the keel frame. Step 6: Grille hoisting; Step 7: Cleaning and acceptance.

7. A construction method for a curved large-span grid curtain wall according to claim 6, It is characterized in that In step 2, the top steel support (7) and the bottom steel support (8) are respectively connected to the top edge beam (3) and the bottom edge beam (6) of the main steel structure by welding.

8. The construction method of a curved large-span grid curtain wall according to claim 6, It is characterized in that In step four, personnel are transported to the installation location using an aerial work vehicle or hanging basket. The movable end connected to the steel insert is first inserted into the steel insert, and the other end is fully welded and fixed to the vertical extra-long keel, and then sprayed with anti-corrosion and fire-retardant coatings.

9. The construction method of a curved large-span grid curtain wall according to claim 6, It is characterized in that In step 5, the curved glass (9) is lifted to a designated position using a glass suction cup vehicle, placed in the installation slot of the keel frame, fixed by a glass pressing block, and sealed with glue.

10. The construction method of a curved large-span grid curtain wall according to claim 6, It is characterized in that In step six, the decorative grille (10) is lifted to a designated location using an overhead crane and fixed to the extra-long vertical keel (4) via a reserved grille connector, thereby completing the installation of the grille.

Citation Information

Cited By

  • Installation method of indoor special-shaped decorative curtain

    CN121101335A