New energy automobile charging pile transformer operation state monitoring method

By analyzing the current, voltage, and power factor data of the transformers used in new energy vehicle charging piles, an operational imbalance was constructed, which solved the problem of accuracy in monitoring the aging of the internal circuit insulation of the charging pile transformers, thus ensuring charging stability and safety.

CN118914929AActive Publication Date: 2024-11-08WUXI JINGFEI ELECTRONIC CO LTD
View PDF 9 Cites 0 Cited by

Patent Information

Application Number
CN202411404533.6
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-10-10
Publication Date
2024-11-08
Estimated Expiration
2044-10-10

AI Technical Summary

Technical Problem

Existing technologies cannot accurately monitor the insulation aging status of the internal circuits of new energy vehicle charging pile transformers, resulting in unstable operation of charging piles during peak nighttime hours, affecting charging efficiency and safety.

Method used

By collecting current, voltage, and power factor data of charging pile transformers, detrended fluctuation analysis and abrupt change point detection are performed. Combined with partial discharge intensity and efficiency loss degree, an operational imbalance degree is constructed to achieve accurate monitoring of transformer status.

Benefits of technology

This improves the accuracy of monitoring the aging of insulation in the internal circuits of charging pile transformers, ensuring charging stability and safety, and avoiding interference during peak charging periods.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118914929A_ABST
    Figure CN118914929A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of new energy charging piles, in particular to a new energy automobile charging pile transformer operation state monitoring method, which comprises the following steps: performing detrending fluctuation analysis on current data and voltage data in each time period to determine the local change tendency of each time period; performing abrupt change point detection on the voltage data in each time period to extract abrupt change voltage, and determining the partial discharge intensity of each time period according to the difference between the average level of all the abrupt change voltage in each time period and the average level of all the voltage data in combination with the local change tendency of each time period; determining the efficiency loss degree of each time period based on the first-order difference condition of the power factor of each time period; and the operation state unbalance degree of the charging pile transformer in each time period is obtained by combining the partial discharge intensity and the efficiency loss degree in each time period, and the operation state of the new energy automobile charging pile transformer is monitored. The monitoring accuracy of the operation state of the new energy automobile charging pile transformer can be improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of new energy charging piles, and in particular to a method for monitoring the operating status of a transformer in a new energy vehicle charging pile. Background Art

[0002] At present, the use of new energy charging piles in major cities shows a rapid growth trend. They are mainly installed near parking stations in public buildings or residential areas. Affected by the fluctuations in charging prices at night, most new energy vehicle owners choose to charge at night, which can easily cause the charging pile transformer to overload for a long time at night.

[0003] As the charging pile transformer is used for a longer time, the insulation of the internal circuit of the charging pile transformer ages, which can easily cause partial discharge in the charging pile transformer, resulting in the charging pile being unable to provide stable voltage to new energy vehicles in a timely manner, thus greatly reducing the charging power of the charging pile. Monitoring whether the operation of the charging pile transformer is in a balanced state can detect the serious insulation aging characteristics inside the charging pile transformer as early as possible, and timely repair the charging pile transformer to ensure the stability and safety of charging of the charging pile.

[0004] However, the operating state of the charging pile transformer will be affected by the peak charging period, and the operating state of the charging pile transformer is prone to change. Therefore, it is easy to misjudge the operating state of the internal circuit of the charging pile transformer when the insulation is aged, resulting in poor monitoring accuracy. Therefore, how to accurately monitor the operating state of the internal circuit of the charging pile transformer when the insulation is aged has become an urgent problem to be solved. Summary of the invention

[0005] In order to solve the above technical problems, the present application provides a method for monitoring the operating status of a new energy vehicle charging pile transformer to solve the existing problems.

[0006] A method for monitoring the operating status of a new energy vehicle charging pile transformer in this application adopts the following technical solution: An embodiment of the present application provides a method for monitoring the operating status of a new energy vehicle charging pile transformer, the method comprising the following steps: Obtain the current data, voltage data and power factor at each collection moment of the charging pile transformer end; Detrending fluctuation analysis is performed on the current data and voltage data in each time period respectively, and the local change trend of each time period is determined based on the difference between the current data in each time period and the detrending fluctuation analysis results, as well as the difference between the voltage data and the detrending fluctuation analysis results; The voltage data in each period is subjected to mutation point detection to extract mutation voltage. The local discharge intensity in each period is determined by the difference between the average level of all mutation voltages in each period and the average level of all voltage data, combined with the local change trend of each period. Based on the difference between positive and negative numbers in the first-order difference results of the power factor in each time period, determine the efficiency loss degree of each time period; The imbalance degree of the operating status of the charging pile transformer in each period is obtained by combining the local discharge intensity and efficiency loss in each period, and the operating status of the new energy vehicle charging pile transformer is monitored.

[0007] Furthermore, the method for determining the local change trend of each time period is: Based on all current data in each period, the current time series of each period is constructed, and the sequence obtained by performing detrending fluctuation analysis on the current time series is recorded as the current detrended time series; The difference between the current time series of each period and all the elements in the same position in the current detrended time series is used to form the current trend difference sequence of each period. Correspondingly, for the voltage data of each period, the voltage trend difference sequence of each period is obtained; Based on the differences in the elements in the current trend difference sequence and the differences in the elements in the voltage trend difference sequence, the local change trend of each time period is determined.

[0008] Furthermore, the current time series of each time period is a sequence composed of all current data in each time period arranged in ascending order of time.

[0009] Furthermore, the local change trend of each time period is the product of the difference between the first and last elements in the current trend difference sequence and the difference between the first and last elements in the voltage trend difference sequence.

[0010] Furthermore, the method for determining the partial discharge intensity in each time period is: The number of mutation voltages in each time period is counted respectively, and the difference between the mean value of the mutation voltage in each time period and the mean value of the voltage data in each time period is analyzed, which is recorded as the mutation degree of each time period. The number, mutation degree and local change trend of each time period are integrated to obtain the local discharge intensity of each time period.

[0011] Furthermore, the local discharge intensity is the product of the quantity, the mutation degree and the local change trend.

[0012] Furthermore, the method for determining the efficiency loss degree of each time period is as follows: For the power factor in each time period, the current time series construction method is used to obtain the power factor time series of each time period, and the number of negative numbers and positive numbers in the first-order difference sequence of the power factor time series of each time period are counted respectively; The ratio of the number of negative numbers to the number of positive numbers is analyzed, and the ratio of the absolute value of the sum of all the negative numbers to the sum of all the positive numbers is analyzed, and the two ratios are combined to obtain the energy consumption degree of each time period.

[0013] Furthermore, the energy loss degree is the product of two ratios.

[0014] Furthermore, the imbalance degree of the operating state of the charging pile transformer in each time period is a fusion of the local discharge intensity and the efficiency loss degree in each time period.

[0015] Furthermore, the monitoring of the operating status of the new energy vehicle charging pile transformer further includes: when the operating status imbalance is greater than a preset threshold, the new energy vehicle charging pile transformer operates abnormally in the corresponding time period.

[0016] This application has at least the following beneficial effects: The present application realizes monitoring the operating status of the internal circuit of the new energy vehicle charging pile transformer when insulation aging occurs. Since the operating status of the charging pile transformer will be affected by the peak charging period, the operating status of the charging pile transformer will also change. Therefore, there is interference caused by the peak charging period when monitoring the operating status of the internal circuit of the charging pile transformer when insulation aging occurs. Based on the local discharge characteristics caused by aging of the circuit in the charging pile transformer, the present application analyzes the electric pulse effect generated by local discharge, and constructs an operating status imbalance degree in combination with the efficiency loss characteristics caused by aging of the circuit in the charging pile transformer. The insulation aging degree of the internal circuit of the charging pile transformer is obtained through the operating status imbalance degree, which solves the problem of interference caused by the peak charging period when monitoring the operating status of the internal circuit of the charging pile transformer when insulation aging occurs, and improves the accuracy of monitoring the operating status of the internal circuit of the charging pile transformer when insulation aging occurs. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] In order to more clearly illustrate the technical solutions and advantages in the embodiments of the present application or the prior art, the drawings required for use in the embodiments or the prior art descriptions are briefly introduced below. Obviously, the drawings described below are only some embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work.

[0018] Figure 1 A flowchart of a method for monitoring the operating status of a new energy vehicle charging pile transformer provided in this application; Figure 2 A schematic diagram of the construction process of local change trends in each time period provided for this application. DETAILED DESCRIPTION

[0019] In order to further explain the technical means and effects adopted by this application to achieve the predetermined invention purpose, the following is a detailed description of the operating status monitoring method of a new energy vehicle charging pile transformer proposed in this application, its specific implementation method, structure, characteristics and effects, in combination with the accompanying drawings and preferred embodiments. In the following description, different "one embodiment" or "another embodiment" does not necessarily refer to the same embodiment. In addition, specific features, structures or characteristics in one or more embodiments may be combined in any suitable form.

[0020] Unless otherwise defined, terms such as "comprises", "comprising" or any other variants thereof are intended to cover non-exclusive inclusion, so that a circuit structure, article or device comprising a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such articles or devices. In the absence of further restrictions, an element defined by the statement "comprising a ..." does not exclude the presence of other identical elements in the article or device comprising the element. In addition, the term "and\or" used herein includes any and all combinations of one or more related listed items. All technical and scientific terms used herein have the same meaning as those commonly understood by those skilled in the art to which the present application belongs.

[0021] The following is a detailed description of a method for monitoring the operating status of a new energy vehicle charging pile transformer provided by the present application in conjunction with the accompanying drawings.

[0022] An embodiment of the present application provides a method for monitoring the operating status of a new energy vehicle charging pile transformer. For details, please refer to Figure 1 , the method comprises the following steps: Step 1: Collect the current, voltage, and power factor at the charging pile transformer end, and perform preprocessing to obtain the current time series, voltage time series, and power factor time series.

[0023] The purpose of this scheme is to improve the accuracy of monitoring the operating status of the internal circuit of the charging pile transformer when insulation aging occurs, so as to timely inspect and repair the charging pile transformer to ensure the stability and safety of charging of the charging pile.

[0024] In the process of using a charging pile to charge a new energy vehicle, the charging pile includes a power module, a communication module, a status monitoring module, and a charging interface, and the charging pile is connected to the device and the terminal respectively; The power module includes a protection module and a transformer module. The transformer module specifically uses the charging pile transformer to safely convert voltage and current, thereby realizing the circuit control function and providing safe voltage for charging new energy vehicles; The state monitoring module collects the current, voltage and power factor of the charging pile transformer in real time through the terminal sensing device, and the terminal sensing device includes but is not limited to a smart meter. In this embodiment, the collection time interval is 10 seconds and the collection time is 24 hours; The current, voltage and power factor collected every hour are respectively arranged in ascending time order as the current time series, voltage time series and power factor time series for each hour.

[0025] Step 2: Analyze the detrended fluctuation analysis results of the current data and voltage data of each time period respectively, and determine the local change trend of each time period based on the difference between the current data of each time period and its detrended fluctuation analysis results, as well as the difference between the voltage data and its detrended fluctuation analysis results.

[0026] Furthermore, under normal circumstances, if insulation aging occurs in the internal circuit of the charging pile transformer, as the degree of insulation aging increases, a higher amount of local discharge will be generated, which will continuously affect the current and voltage of the internal circuit of the charging pile transformer. That is, the characteristics of the degree of insulation aging of the circuit are manifested as a trend change in the current and voltage at the charging pile transformer end.

[0027] In order to analyze the impact of partial discharge on the internal circuit of the charging pile transformer, the current time series of each hour is used as the input of the DFA detrended fluctuation analysis method (Detrended Fluctuation Analysis, DFA). The sequence obtained by performing detrended fluctuation analysis on the current time series corresponding to each hour is recorded as the current detrended time series of each hour. Correspondingly, the voltage detrended time series of each hour is obtained. The DFA detrended fluctuation analysis method is a well-known technology and the specific process is not repeated here.

[0028] Based on the trend characteristics of the current and voltage changes at the charging pile transformer end, the partial discharge characteristics of the internal circuit of the charging pile transformer are analyzed. Therefore, it is necessary to extract the trend characteristics in the current time series and voltage time series.

[0029] Furthermore, for the convenience of analysis and description, in this embodiment, one hour is taken as a period, and the difference between the current time series of each period and all the elements in the same position in the current detrended time series constitutes the current trend difference sequence of each period. Specifically, the corresponding elements between the current time series of each hour and the current detrended time series are subtracted, and the sequence composed of all the differences is taken as the current trend difference sequence of each hour; Similarly, the corresponding elements of the voltage time series of each hour are subtracted from the voltage detrended time series, and the sequence composed of all the differences is used as the voltage trend characteristic sequence of each hour; Based on the above analysis, the local change trend of the charging pile transformer during the hourly operation is calculated, and the product of the difference between the first and last elements in the current trend difference sequence and the difference between the first and last elements in the voltage trend difference sequence is taken as the local change trend of each time period. Specifically, in this embodiment, the calculation formula of the local change trend is: ; in, is the local change trend of the charging pile transformer during the operation process of the i-th hour, and They represent the first data and the nth data in the current trend difference sequence in the i-th hour, that is, the last data in the current trend difference sequence. and They are respectively the first data and the mth data in the voltage trend feature sequence in the ith hour, that is, the last data in the voltage trend feature sequence.

[0030] According to the above process, it can be understood that The bigger and The larger it is, the stronger the trend of current and voltage changes in the charging pile transformer. Due to the aging of the insulation of the lines in the charging pile transformer, a higher amount of local discharge is generated, which will continuously affect the current and voltage of the internal lines of the charging pile transformer, resulting in a trend of changes in current and voltage. That is, the stronger the trend of current and voltage changes, the more it can explain the local discharge characteristics caused by line aging, and the greater the trend of local changes.

[0031] For a detailed diagram of the construction process of local change trends in each period, please refer to Figure 2 .

[0032] Step 3: Perform mutation point detection on the voltage data in each time period to extract the mutation voltage. Determine the local discharge intensity of each time period by the difference between the average level of all mutation voltages in each time period and the average level of all voltage data, combined with the local change trend of each time period.

[0033] Furthermore, when a large partial discharge feature appears in the charging pile transformer, an obvious electromagnetic wave will be generated, which will cause the change of the charging pile transformer terminal voltage to have an electric pulse effect, that is, the voltage has a sudden change feature in a short period of time. At the same time, the larger the partial discharge feature appears in the charging pile transformer, the stronger the electric pulse effect generated when the charging pile transformer is running.

[0034] In order to reflect the characteristics of sudden changes in the voltage at the terminal of the charging pile transformer, the voltage time series of each hour is used as the input of the Pettitt mutation point detection algorithm, and the output of the Pettitt mutation point detection algorithm is used as all the mutation points in the voltage time series. The Pettitt mutation point detection algorithm is a well-known technology and the specific process will not be repeated here.

[0035] The more mutation points appear in the voltage time series and the greater the voltage change at the mutation points, the stronger the electric pulse effect generated by the charging pile transformer during operation.

[0036] Based on the above analysis, the partial discharge intensity of the charging pile transformer during operation per hour is calculated: , where is the partial discharge intensity of the charging pile transformer during the operation of the i-th hour, is the local change trend of the charging pile transformer during the operation process of the i-th hour, is the number of mutation points in the voltage time series in the i-th hour, is the mean value of the voltage at all mutation points in the voltage time series of the i-th hour, is the mean value of all voltages in the voltage time series in the i-th hour, It is recorded as the mutation degree in the i-th hour.

[0037] It is understandable that the number of mutation points The larger the voltage, the greater the difference between the voltage mean at the mutation point and the voltage mean in the voltage time series. The larger the value, the more times the electric pulses are and the higher the intensity of the electric pulses. The larger it is, the stronger the characteristics of local discharge in the charging pile transformer are. The stronger the electric pulse generated at this time is, the greater the intensity of local discharge is.

[0038] Step 4: Based on the first-order difference of the power factor in each time period, determine the efficiency loss in each time period.

[0039] Furthermore, when the insulation of the internal circuit of the charging pile transformer ages, local discharge characteristics will occur, which will greatly affect the working efficiency of the charging pile transformer. At this time, the change of the power factor in the charging pile transformer will show a continuously decreasing characteristic, which will have a great impact on the operating balance state of the charging pile transformer.

[0040] Calculate the first-order difference sequence of the power factor time series for each hour, and count the number of all positive values ​​and the number of all negative values ​​in the first-order difference sequence; Calculate the efficiency loss of the charging pile transformer during each hour of operation, form the power factor time series of each time period with all power factors of each time period, and count the number of negative numbers and positive numbers in the first-order difference sequence of the power factor time series of each time period respectively; analyze the ratio of the number of negative numbers to the number of positive numbers, and analyze the ratio of the absolute value of the sum of all the negative numbers to the sum of all the positive numbers, and merge the two ratios to obtain the energy consumption loss of each time period. Preferably, in this embodiment, the calculation process of the efficiency loss is: , where is the efficiency loss of the charging pile transformer during the operation of the i-th hour, and are the number of negative numbers and the number of positive numbers in the first-order difference sequence of the power factor time series in the i-th hour, and The sum of all negative numbers and the sum of all positive numbers in the first-order difference sequence of the power factor time series at the i-th hour are respectively. The higher the value, the greater the proportion of the absolute value of the sum of all negative numbers. The higher it is, to a certain extent, it shows that the characteristic of the power factor change decrease in the charging pile transformer is more obvious, that is, the more serious the efficiency loss of the charging pile transformer when it is working, the greater the efficiency loss.

[0041] Step 5: Combine the local discharge intensity and efficiency loss of each time period to obtain the imbalance degree of the operating status of the charging pile transformer at each time, and monitor the operating status of the new energy vehicle charging pile transformer.

[0042] Furthermore, based on the electric pulse effect generated by partial discharge during the operation of the charging pile transformer and the efficiency loss characteristics of the charging pile transformer, the operating state imbalance of the charging pile transformer is constructed to evaluate the operating balance state of the charging pile transformer. Among them, the stronger the electric pulse effect and the greater the efficiency loss characteristics of the charging pile transformer, the worse the operating balance state of the charging pile transformer, and the higher the corresponding operating state imbalance. Therefore, the operating state imbalance of the charging pile transformer in each time period is the fusion of the local discharge intensity and the efficiency loss degree of each time period. It should be noted that the fusion is determined according to the specific application scenario, and aims to evaluate the operating state imbalance of the charging pile transformer in each time period by combining the local discharge intensity and the efficiency loss degree of each time period. The greater the local discharge intensity and the efficiency loss degree of each time period, the greater the operating state imbalance of the charging pile transformer in the corresponding time period. Preferably, this embodiment will calculate the operating state imbalance of the charging pile transformer during each hour of operation: , where is the imbalance degree of the operation state of the charging pile transformer during the i-th hour of operation, is the normalization function, is the partial discharge intensity of the charging pile transformer during the operation of the i-th hour, It is the efficiency loss degree of the charging pile transformer in the ith hour of operation. It should be noted that, in the actual application process, the implementer can use the normalized result of the sum of the local discharge intensity in the ith hour of operation and the efficiency loss degree in the ith hour of operation as the operating state imbalance degree of the charging pile transformer in the ith hour of operation, and this embodiment does not impose any special restrictions on this.

[0043] It is understandable that the partial discharge intensity The larger the performance, the greater the loss The larger it is, to a certain extent, it means that the electric pulse effect generated by local discharge during the operation of the charging pile transformer is stronger, and the greater the efficiency loss characteristics of the charging pile transformer are, the worse the operating balance state of the charging pile transformer is, and the greater the imbalance of the operating state is.

[0044] At this point, this embodiment constructs the operating status imbalance based on the electric pulse effect caused by local discharge when the charging pile transformer is running and the efficiency loss characteristics of the charging pile transformer, thereby avoiding the imbalance effect caused by the peak charging period and making the operating status monitoring of the charging pile transformer internal insulation aging more accurate.

[0045] Furthermore, this embodiment accurately monitors the degree of insulation aging of the internal circuit of the charging pile transformer based on the imbalance degree of the operating state of the charging pile transformer during each hour of operation. The greater the imbalance degree of the operating state, the greater the electric pulse effect in the charging pile transformer and the greater the efficiency loss of the charging pile transformer, which reflects that the more obvious the characteristics of partial discharge in the charging pile transformer, the higher the degree of insulation aging of the internal circuit of the charging pile transformer.

[0046] Preferably, in this embodiment, when the operating state imbalance is greater than a preset threshold, the new energy vehicle charging pile transformer operates abnormally in the corresponding period. Specifically, when the operating state imbalance is less than or equal to 0.5, it is determined that the internal circuit of the charging pile transformer is normal, and the operating state of the charging pile transformer is normal at this time; when the operating state imbalance is greater than 0.5, it is determined that the insulation aging degree of the internal circuit of the charging pile transformer is relatively serious at this time, and the operating state of the charging pile transformer is abnormal.

[0047] It can be understood that the greater the imbalance in the operating status, the more severe the degree of aging of the insulation of the internal circuit of the charging pile transformer, and the more abnormal the operating status of the charging pile transformer. At this point, the monitoring of the operating status of the charging pile transformer is completed based on the imbalance in the operating status.

[0048] It is understood that references to "one embodiment" or "some embodiments" etc. described in the specification of the present application mean that one or more embodiments of the present application include specific features, structures or characteristics described in conjunction with the embodiment. Therefore, if "in one embodiment", "in some embodiments", "in some other embodiments", "in some other embodiments", etc. appear in different places in this specification, they do not necessarily refer to the same embodiment, but mean "one or more but not all embodiments", unless otherwise specifically emphasized in other ways. The terms "including", "comprising", "having" and their variations all mean "including but not limited to", unless otherwise specifically emphasized in other ways.

[0049] It should be noted that the sequence of the above-mentioned embodiments of the present application is only for description and does not represent the advantages and disadvantages of the embodiments. And the above-mentioned specific embodiments of this specification are described. In addition, the process depicted in the accompanying drawings does not necessarily require the specific order or continuous order shown to achieve the desired results. In some embodiments, multi-tasking and parallel processing are also possible or may be advantageous. At the same time, the size of the sequence number of each step in the embodiment does not mean the order of execution. The execution order of each process should be determined by its function and internal logic, and should not constitute any limitation on the implementation process of the embodiments in this specification.

[0050] The above embodiments are only used to illustrate the technical solutions of the present application, rather than to limit them. Although the present application has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or make equivalent replacements for some of the technical features therein. These modifications or replacements do not deviate the essence of the corresponding technical solutions from the scope of the technical solutions of the embodiments of the present application, and should all be included in the protection scope of the present application.

Claims

1. A method for monitoring the operating status of a new energy vehicle charging pile transformer, characterized in that: The method comprises the following steps: Obtain the current data, voltage data and power factor at each collection moment of the charging pile transformer end; Detrending fluctuation analysis is performed on the current data and voltage data in each time period respectively, and the local change trend of each time period is determined based on the difference between the current data in each time period and the detrending fluctuation analysis results, as well as the difference between the voltage data and the detrending fluctuation analysis results; The voltage data in each period is subjected to mutation point detection to extract mutation voltage. The local discharge intensity in each period is determined by the difference between the average level of all mutation voltages in each period and the average level of all voltage data, combined with the local change trend of each period. Based on the difference between positive and negative numbers in the first-order difference results of the power factor in each time period, determine the efficiency loss degree of each time period; The imbalance degree of the operating status of the charging pile transformer in each period is obtained by combining the local discharge intensity and efficiency loss in each period, and the operating status of the new energy vehicle charging pile transformer is monitored.

2. A method for monitoring the operating status of a new energy vehicle charging pile transformer as claimed in claim 1, characterized in that: The method for determining the local change trend of each time period is as follows: Based on all current data in each period, the current time series of each period is constructed, and the sequence obtained by performing detrending fluctuation analysis on the current time series is recorded as the current detrended time series; The difference between the current time series of each period and all the elements in the same position in the current detrended time series is used to form the current trend difference sequence of each period. Correspondingly, for the voltage data of each period, the voltage trend difference sequence of each period is obtained; Based on the differences in the elements in the current trend difference sequence and the differences in the elements in the voltage trend difference sequence, the local change trend of each time period is determined.

3. A method for monitoring the operating status of a new energy vehicle charging pile transformer as claimed in claim 2, characterized in that: The current time series of each time period is a sequence consisting of all current data in each time period arranged in ascending order of time.

4. A method for monitoring the operating status of a new energy vehicle charging pile transformer as claimed in claim 2, characterized in that: The local change trend of each time period is the product of the difference between the first and last elements in the current trend difference sequence and the difference between the first and last elements in the voltage trend difference sequence.

5. A method for monitoring the operating status of a new energy vehicle charging pile transformer as claimed in claim 1, characterized in that: The method for determining the partial discharge intensity in each time period is: The number of mutation voltages in each time period is counted respectively, and the difference between the mean value of the mutation voltage in each time period and the mean value of the voltage data in each time period is analyzed, which is recorded as the mutation degree of each time period. The number, mutation degree and local change trend of each time period are integrated to obtain the local discharge intensity of each time period.

6. A method for monitoring the operating status of a new energy vehicle charging pile transformer as claimed in claim 5, characterized in that: The local discharge intensity is the product of the quantity, the mutation degree and the local change trend.

7. A method for monitoring the operating status of a new energy vehicle charging pile transformer as claimed in claim 3, characterized in that: The method for determining the efficiency loss of each time period is as follows: For the power factor in each time period, the current time series construction method is used to obtain the power factor time series of each time period, and the number of negative numbers and positive numbers in the first-order difference sequence of the power factor time series of each time period are counted respectively; The ratio of the number of negative numbers to the number of positive numbers is analyzed, and the ratio of the absolute value of the sum of all the negative numbers to the sum of all the positive numbers is analyzed, and the two ratios are combined to obtain the energy consumption degree of each time period.

8. A method for monitoring the operating status of a new energy vehicle charging pile transformer as claimed in claim 7, characterized in that: The energy loss degree is the product of the two ratios.

9. A method for monitoring the operating status of a new energy vehicle charging pile transformer as claimed in claim 1, characterized in that: The imbalance degree of the operating state of the charging pile transformer in each time period is a fusion of the local discharge intensity and the efficiency loss degree in each time period.

10. A method for monitoring the operating status of a new energy vehicle charging pile transformer as claimed in claim 1, characterized in that: The monitoring of the operating status of the new energy vehicle charging pile transformer further includes: when the operating status imbalance is greater than a preset threshold, the new energy vehicle charging pile transformer operates abnormally in the corresponding time period.

Citation Information

Patent Citations

  • Generator stator partial discharge evaluation method and system

    CN114397542A

  • Method and device for predicting running state of electric vehicle charging pile

    CN116215293A

  • Fan operation fault early warning method and system based on artificial intelligence

    CN116994416A

  • Transformer operation monitoring method based on electrical parameter time sequence analysis

    CN117633695A

  • Method and system for managing running state of electric energy meter

    CN117932501A