Phosphorus ecological intelligent control method, system and equipment for sewage plant and storage medium

Through the multi-source data prediction model and adaptive neural fuzzy control system, the phosphorus removal treatment measures in sewage plants are dynamically adjusted, solving the problem of inaccurate response of traditional sewage plants' phosphorus removal technology, and achieving the stability and environmental protection goals of phosphorus removal effect.

CN118915564APending Publication Date: 2024-11-08HUADIAN WATER TECH CO LTD
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202411061036.0
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-02
Publication Date
2024-11-08

AI Technical Summary

Technical Problem

Traditional sewage plant biological phosphorus removal technology is difficult to respond to environmental changes in real time, resulting in unstable phosphorus removal effect and relies on chemical phosphorus removal to consume energy, increasing costs and environmental risks.

Method used

The multi-source data prediction model and an adaptive neural fuzzy control system are used to dynamically predict the phosphorus ecological parameters of sewage plants, adjust the phosphorus removal treatment measures in real time, optimize the phosphorus removal process, and automatically control the water volume of upstream pollutant discharge units to ensure the safe operation of the phosphorus ecological.

Benefits of technology

Real-time dynamic control of the phosphorus removal process in the sewage plant has been achieved, the phosphorus removal effect and stability has been improved, energy consumption and environmental risks have been reduced, and environmental protection requirements have been met.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118915564A_ABST
    Figure CN118915564A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of intelligent sewage treatment, and discloses an ecological intelligent phosphorus control method, system and equipment for a sewage plant and a storage medium, and the method comprises the steps: inputting data related to phosphorus indexes generated by a distribution well and an upstream sewage pipe network of the sewage plant into a phosphorus index prediction model to obtain first phosphorus discharge data, determining a real-time predicted value of the treatment load capacity of the sewage plant and starting corresponding phosphorus treatment measures based on the real-time predicted value; inputting data related to phosphorus indexes in the biological treatment part of the sewage treatment plant into the phosphorus index prediction model to obtain second phosphorus discharge data, and determining the treatment load capacity of the sewage treatment plant to start corresponding phosphorus treatment measures; and inputting the data related to the biological flora in the water outlet and the composting place into phosphorus discharge data obtained by the phosphorus index prediction model to evaluate the phosphorus index processing capacity of the sewage plant. According to the method, the phosphorus removal treatment operation scheme can be adjusted in real time while the phosphorus ecological parameters of the sewage plant are dynamically predicted, and safe phosphorus ecological operation is guaranteed.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of intelligent sewage treatment, and in particular to a phosphorus ecological intelligent control method, system, equipment and storage medium for a sewage plant. Background Art

[0002] At present, the known biological phosphorus removal technology (including auxiliary physical and chemical combination technology) and control technology of sewage treatment plants are process treatment technologies selected according to the design conditions and indicators at that time. With the development of social economy and science and technology, these sewage treatment plants that have been built using traditional control methods are bound to have various defects due to various factors and cannot meet people's increasingly improved environmental protection requirements. Isolated technology and control operation of some set indicators often cause the effluent indicators to exceed the standard. Most sewage treatment plants in my country use manual testing or online monitoring to obtain water quality parameters. The detection lag time is long, the values ​​are unstable, and the operation of phosphorus ecology cannot be controlled in real time. The main disadvantages are: insensitive to changes in environmental ecological conditions, such as influent water quality, water volume, weather, dissolved oxygen, etc., resulting in unstable phosphorus removal effects; the biological phosphorus removal load capacity of the sewage treatment plant cannot be dynamically controlled, and sometimes it may rely too much on chemical phosphorus removal, consume too much energy, and have a long reaction time, resulting in increased costs and potential environmental risks.

[0003] From an ecological perspective, it is necessary to predict the phosphorus removal load of the sewage treatment plant in real time and operate dynamically according to changes in the environment, microorganisms, dosage, etc. Set up prediction and alarm units for key units upstream of the sewage treatment plant and the drainage network to ensure the normal operation of the sewage treatment plant's own ecology. Summary of the invention

[0004] In view of this, the present invention provides a method, system, device and storage medium for intelligent control of phosphorus ecology in a sewage treatment plant, so as to address the deficiency that existing sewage treatment plants cannot predict and control phosphorus ecology operation in real time.

[0005] In a first aspect, the present invention provides a phosphorus ecological intelligent control method for a sewage treatment plant, the method comprising:

[0006] Obtaining data related to phosphorus indicators generated by the sewage treatment plant distribution well and the upstream sewage pipe network, and inputting the data into a first preset phosphorus indicator prediction model to obtain first phosphorus discharge data;

[0007] Based on the first phosphorus discharge data, the sewage treatment plant determines a real-time prediction value of the treatment load capacity of the sewage treatment plant, and initiates corresponding treatment measures to control the phosphorus treatment ecological parameters so that the water quality meets the standard;

[0008] Obtaining data related to phosphorus indicators in the biological treatment part of the sewage treatment plant, and inputting the data into a second preset phosphorus indicator prediction model to obtain second phosphorus discharge data;

[0009] Comparing the second phosphorus discharge data with the preset effluent phosphorus index standard value, determining the treatment load capacity of the sewage treatment plant according to the comparison result, and initiating corresponding treatment measures to control the phosphorus treatment ecological parameters so that the water quality meets the standard;

[0010] The data related to the biological flora in the outlet and the composting site are obtained, and input into the third preset phosphorus index prediction model to obtain the third phosphorus discharge data, which is used to evaluate the phosphorus index treatment capacity of the sewage treatment plant.

[0011] The intelligent control method for phosphorus ecology of a sewage plant provided in this embodiment can dynamically predict the phosphorus ecological parameters of the sewage plant, adjust the operation plan of phosphorus removal treatment measures in real time, optimize the phosphorus removal process, and has an adaptive self-learning function, thereby dynamically predicting the phosphorus treatment load of the sewage plant, automatically controlling the water volume of upstream sewage discharge units, and ensuring the safe operation of phosphorus ecology.

[0012] In an optional embodiment, the process of constructing the first preset phosphorus index prediction model includes:

[0013] Obtain multi-source variable sample data related to phosphorus indicators in the sewage treatment plant distribution well and upstream sewage pipe network, the multi-source variable sample data including: variable data sets related to phosphorus indicators at different time periods and temperatures and corresponding phosphorus concentrations in sewage, and perform principal component analysis on the multi-source variable sample data to obtain principal component characteristic data; wherein the variable data sets related to phosphorus indicators include: flow rate, concentrations of multiple chemical substances;

[0014] Using principal component feature data to train the preset neural network;

[0015] The trained model is evaluated based on preset evaluation indicators, and the model is optimized based on the evaluation results to obtain the first preset phosphorus index prediction model, which is used to predict the phosphorus concentration of sewage entering the sewage treatment plant.

[0016] The embodiment of the present invention uses sample data from multiple sources and multiple time periods to accurately predict phosphorus indicators, uses PCA to perform dimensionality reduction processing, extracts major characteristic components, reduces the dimension and redundant information of the data, and reduces the complexity of the subsequent BP neural network model.

[0017] In an optional embodiment, the process of constructing the second preset phosphorus index prediction model includes:

[0018] Obtain influent water quality parameters related to phosphorus indicators in sewage treatment plants, including: pH value, DO, ORP,

[0019] Inputting the influent water quality parameters into the ANFIS model for training;

[0020] The performance of the model is verified, and the model that meets the preset performance requirements is used as the second preset phosphorus index prediction model for prediction.

[0021] The embodiment of the present invention adopts an adaptive neural fuzzy reasoning system, and realizes the three basic processes of fuzzification, fuzzy reasoning and defuzzification of fuzzy control by neural networks. The learning mechanism of the neural network is used to automatically extract rules from input and output sample data to form an adaptive neural fuzzy controller. The fuzzy reasoning control rules are self-adjusted through offline training and online learning algorithms, so that the system itself develops in the direction of self-adaptation, self-organization and self-learning. Based on the adaptive self-learning function, the phosphorus treatment load of the sewage treatment plant is dynamically predicted.

[0022] In an optional implementation, the process of constructing the third preset phosphorus index prediction model includes:

[0023] Obtain data related to the biological flora in the outlet and composting site, including: DO, ORP, temperature, nutrients and phosphorus content in sewage plant effluent and compost;

[0024] Inputting the biological flora and related data into the ANFIS model for training;

[0025] The trained model is evaluated based on preset evaluation indicators, and the model is optimized based on the evaluation results to obtain the third preset phosphorus index prediction model, which is used to predict the phosphorus content in sewage plant effluent and compost.

[0026] The embodiment of the present invention predicts the phosphorus content in the effluent of the sewage plant and the compost, which facilitates the calculation of the phosphorus removal amount and can comprehensively judge the phosphorus treatment capacity.

[0027] In an optional embodiment, the initiation of corresponding treatment measures to control the phosphorus treatment ecological parameters so that the water quality meets the standard includes:

[0028] Under the conditions of meeting the requirements of biological phosphorus removal and the treatment load capacity of the sewage treatment plant, the first-stage chemical phosphorus removal, the second-stage chemical phosphorus removal and the third-stage deep phosphorus removal are used in sequence to meet the water quality standards. If the treatment load capacity of the sewage treatment plant is exceeded, the flow of the water inlet valve and the water inlet pump is controlled.

[0029] The embodiment of the present invention will use biological phosphorus removal as the main process and physical and chemical phosphorus removal as an auxiliary process. That is, when biological phosphorus removal is met, if the phosphorus exceeds the biological treatment range, chemical phosphorus removal is adopted. If it is difficult to treat, deep phosphorus removal measures are adopted, which is beneficial to protecting the water quality and ecological environment.

[0030] In an optional embodiment, the above method further comprises: establishing a database in the effluent and sludge disposal part of the sewage plant to record the phosphorus ecological parameters of the renewable resources, specifically including:

[0031] Determine the data items that need to be collected, including: sludge generation, disposal methods, disposal time, and phosphorus concentration in treated effluent at different time periods;

[0032] Identify database tools and determine the structure of data tables based on the type of data items;

[0033] Collect sludge disposal and phosphorus index data according to the preset time period, verify the accuracy of the data based on the preset specification requirements, and update the data according to the preset update frequency and process;

[0034] Set corresponding data access permissions based on the needs and responsibilities of different users;

[0035] Back up the database according to the preset time period and formulate a data recovery plan.

[0036] The embodiment of the present invention can better store the entire phosphorus treatment process data of the sewage treatment plant, provide data sharing, reduce data redundancy, maintain data independence, and realize data centralized control by establishing a complete sewage treatment plant sludge disposal and phosphorus index database, which is conducive to real-time supervision.

[0037] In a second aspect, the present invention provides a phosphorus ecological intelligent control system for a sewage treatment plant, the system comprising:

[0038] A first phosphorus index prediction module is used to obtain data related to phosphorus index generated in real time by the sewage treatment plant distribution well and the upstream sewage pipe network, and input the data into a first preset phosphorus index prediction model to obtain first phosphorus discharge data;

[0039] A first control module is used to determine a real-time prediction value of the treatment load capacity of the sewage treatment plant based on the first phosphorus discharge data, and initiate corresponding treatment measures to control the phosphorus treatment ecological parameters so that the water quality meets the standard;

[0040] A second phosphorus index prediction module is used to obtain data related to phosphorus indexes entering the biological treatment part of the sewage treatment plant, and input it into a second preset phosphorus index prediction model to obtain second phosphorus discharge data;

[0041] A second control module is used to compare the second phosphorus discharge data with a preset effluent phosphorus index standard value, determine the treatment load capacity of the sewage treatment plant according to the comparison result, and initiate corresponding treatment measures to control the phosphorus treatment ecological parameters so that the water quality meets the standard;

[0042] The third phosphorus index prediction module is used to obtain data related to the biological flora in the outlet and the composting site, and input the third preset phosphorus index prediction model to obtain the third phosphorus discharge data, which is used to evaluate the phosphorus index treatment capacity of the sewage treatment plant.

[0043] In a third aspect, the present invention provides a computer device, comprising: a memory and a processor, the memory and the processor being communicatively connected to each other, the memory storing computer instructions, and the processor executing the phosphorus ecological intelligent control method of a sewage plant according to the first aspect or any corresponding embodiment thereof by executing the computer instructions.

[0044] In a fourth aspect, the present invention provides a computer-readable storage medium having computer instructions stored thereon, the computer instructions being used to enable a computer to execute the phosphorus ecological intelligent control method for a sewage plant according to the first aspect or any corresponding embodiment thereof.

[0045] In a fifth aspect, the present invention provides a computer program product, comprising computer instructions for causing a computer to execute the phosphorus ecological intelligent control method for a sewage treatment plant according to the first aspect or any corresponding embodiment thereof. BRIEF DESCRIPTION OF THE DRAWINGS

[0046] In order to more clearly illustrate the specific implementation methods of the present invention or the technical solutions in the prior art, the drawings required for use in the specific implementation methods or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are some implementation methods of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0047] Figure 1 is a flow chart of a phosphorus ecological intelligent control method for a sewage plant according to an embodiment of the present invention;

[0048] Figure 2 is a schematic diagram of the process of phosphorus ecological treatment in a sewage plant according to an embodiment of the present invention;

[0049] Figure 3 is a schematic diagram of a Sugeno fuzzy system and a corresponding ANFIS network structure according to an embodiment of the present invention;

[0050] Figure 4 is a structural block diagram of a phosphorus ecological intelligent control system for a sewage plant according to an embodiment of the present invention;

[0051] Figure 5 It is a schematic diagram of the hardware structure of a computer device according to an embodiment of the present invention. DETAILED DESCRIPTION

[0052] In order to make the purpose, technical solution and advantages of the embodiments of the present invention clearer, the technical solution in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative work are within the scope of protection of the present invention.

[0053] According to an embodiment of the present invention, an embodiment of a phosphorus ecological intelligent control method for a sewage treatment plant is provided. It should be noted that the steps shown in the flowchart of the accompanying drawings can be executed in a computer device such as a set of computer executable instructions, and although a logical order is shown in the flowchart, in some cases, the steps shown or described can be executed in an order different from that shown here.

[0054] In this embodiment, a phosphorus ecological intelligent control method for a sewage plant is provided, which can be used for the above-mentioned computer equipment. Figure 1 is a flow chart of a phosphorus ecological intelligent control method for a sewage plant according to an embodiment of the present invention. Figure 1 As shown, the process includes the following steps:

[0055] Step S101, obtaining data related to phosphorus indicators generated by the sewage treatment plant distribution well and the upstream sewage pipe network, and inputting the data into a first preset phosphorus indicator prediction model to obtain first phosphorus discharge data.

[0056] Specifically, the first preset phosphorus index prediction model in the embodiment of the present invention is a prediction module obtained through pre-training based on the BP neural network model, and the specific training process is:

[0057] A1. Obtain multi-source variable sample data related to phosphorus indicators in the sewage treatment plant distribution wells and upstream sewage pipe networks. The multi-source variable sample data include: variable data sets related to phosphorus indicators at different time periods and temperatures and the corresponding phosphorus concentrations in sewage. Perform principal component analysis on the multi-source variable sample data to obtain characteristic component data.

[0058] Specifically, the sources of multi-source variable sample data collection include government databases, online measurements, experimental data, etc., and the time periods include winter and summer temperatures, rainy season rainfall, etc., which have a greater impact on the temperature, flow rate, and chemical concentration of sewage. The embodiment of the present invention uses multi-source and multi-time period sample data for accurate phosphorus index prediction; further pre-processing such as cleaning, missing value processing, and normalization of the data ensures the accuracy and integrity of the data. PCA is used to reduce the dimension of the multi-source variable sample data after pre-processing to extract the main characteristic components, reduce the dimension and redundant information of the data, and reduce the complexity of the subsequent BP neural network model.

[0059] A2, use the principal component feature data to train the preset neural network.

[0060] The embodiment of the present invention builds a suitable BP neural network structure based on the data characteristics, including determining the number of input layer nodes (based on the number of principal components after PCA), the number of hidden layers and the number of nodes, and the number of output layer nodes (i.e., the phosphorus concentration in sewage). The BP neural network is trained using the data of the characteristic component data after PCA, and the model can learn the patterns and relationships in the data by adjusting the weights and biases of the network.

[0061] A3, evaluating the trained model based on preset evaluation indicators, and optimizing the model based on the evaluation results to obtain the first preset phosphorus index prediction model, which is used to predict the phosphorus concentration of sewage entering the sewage treatment plant.

[0062] After the training is completed, the performance of the model is evaluated through various model evaluation indicators (such as mean square error, correlation coefficient, etc.), and the model is optimized and adjusted according to the evaluation results, such as adjusting the network structure, training parameters, etc., to obtain the optimized model as the first preset phosphorus index prediction model.

[0063] In practice, the first preset phosphorus index prediction model is used to perform dimensionality reduction processing on the data related to the phosphorus index generated in real time by the sewage treatment plant distribution well and the upstream sewage network, and the data is input into the first preset phosphorus index prediction model to predict the phosphorus index.

[0064] Step S102, based on the first phosphorus discharge data, determine the real-time prediction value of the sewage treatment plant's treatment load capacity, and initiate corresponding treatment measures to control the phosphorus treatment ecological parameters to make the water quality meet the standard.

[0065] The embodiment of the present invention measures the phosphorus concentration of the sewage discharged by the sewage discharge unit into the sewage treatment plant in real time and dynamically to calculate the real-time predicted value of the sewage treatment load capacity, and then takes corresponding phosphorus ecological treatment measures to ensure that the sewage treatment plant meets the water quality standards and operates safely. In actual operation, the sewage discharge unit has discharge requirements, such as Figure 2 The flow diagram of phosphorus ecological treatment in sewage treatment plants is shown in the figure. Under normal circumstances, the first and second level treatments can meet the requirements. In rainy season or winter, if the predicted phosphorus value exceeds the second level treatment capacity, the third level treatment is started. If the treatment load capacity of the sewage treatment plant is exceeded (the first, second and third level treatments are all exceeded), the flow of the water inlet valve and the water inlet pump is controlled. And under the conditions of meeting the biological phosphorus removal and the treatment load capacity of the sewage treatment plant, the first level chemical phosphorus removal, the second level chemical phosphorus removal and the third level deep phosphorus removal are used in sequence to make the water quality meet the standards.

[0066] In the embodiment of the present invention, in a sewage treatment plant that adopts the activated sludge method for nitrogen and phosphorus removal, biological phosphorus removal is used as the main process, and physicochemical phosphorus removal is used as an auxiliary process. That is, when biological phosphorus removal is met, if the phosphorus exceeds the biological treatment range, chemical phosphorus removal is used; if it is difficult to treat, deep phosphorus removal measures are adopted, which is beneficial to protecting the water quality ecological environment.

[0067] Step S103, obtaining data related to phosphorus indicators entering the biological treatment part of the sewage treatment plant, and inputting them into a second preset phosphorus indicator prediction model to obtain second phosphorus discharge data.

[0068] The second preset phosphorus index prediction model in the embodiment of the present invention adopts an adaptive neural fuzzy inference system (ANFIS). Specifically, the construction process of the second preset phosphorus index prediction model includes:

[0069] B1, obtain the influent water quality parameters related to phosphorus indicators in the sewage treatment plant, including: pH value, DO (dissolved oxygen), ORP (oxidation-reduction potential),

[0070] B2, input the influent water quality parameters into the ANFIS model for training;

[0071] B3, based on the performance verification of the model, the model that meets the preset performance requirements is used as the second preset phosphorus index prediction model for prediction

[0072] The embodiment of the present invention adopts an adaptive neural fuzzy inference system structure as follows Figure 3 As shown, it is a single-output Sugeno model, which is divided into a three-layer neural network structure, which respectively calculates the membership of the input quantity, the antecedent of each rule, and the applicability of each rule. The number of rules is equal to the number of outputs. The back propagation method (BP) is used for propagation during training, and the error accuracy and the maximum number of training times are set for training. After the training, the validation set can be used to verify the performance of the model to obtain the second preset phosphorus index prediction model.

[0073] Step S104, comparing the second phosphorus discharge data with the preset effluent phosphorus index standard value, determining the treatment load capacity of the sewage treatment plant according to the comparison result, and initiating corresponding treatment measures to control the phosphorus treatment ecological parameters so that the water quality meets the standard.

[0074] The embodiment of the present invention determines the treatment load capacity of the sewage treatment plant based on the phosphorus discharge data obtained by the model prediction of the water after entering the sewage treatment plant, thereby dynamically adjusting and optimizing the phosphorus ecological treatment measures to ensure that the water quality of the sewage treatment plant meets the standards and operates safely. The specific phosphorus ecological treatment measures are similar to the description of step S102 and will not be repeated here.

[0075] Step S105, obtaining data related to the biological flora in the water outlet and the composting site, and inputting the data into a third preset phosphorus index prediction model to obtain third phosphorus discharge data for evaluating the phosphorus index treatment capacity of the sewage treatment plant.

[0076] Specifically, the third preset phosphorus index prediction model of the embodiment of the present invention also adopts an adaptive neural fuzzy inference system (ANFIS), wherein the construction process of the third preset phosphorus index prediction model includes:

[0077] C1, obtain data related to the biological flora in the outlet and composting site, including: DO (dissolved oxygen), ORP (oxidation-reduction potential), temperature, nutrients (C / N / P) and phosphorus content in the sewage plant effluent and compost;

[0078] C2, input the biological flora and related data into the ANFIS model for training;

[0079] C3, evaluates the trained model based on the preset evaluation index, and optimizes the model based on the evaluation result to obtain the third preset phosphorus index prediction model, which is used to predict the phosphorus content in the effluent and compost of the sewage plant.

[0080] The construction process of the third preset phosphorus index prediction model in this step is similar in principle to the construction process of the second preset phosphorus index prediction model in step S103. The difference lies in the difference in model input and output, which will not be repeated here. The embodiment of the present invention predicts the phosphorus content in the effluent and compost of the sewage treatment plant to facilitate the calculation of the phosphorus removal amount, thereby evaluating the phosphorus index treatment capacity of the sewage treatment plant.

[0081] In the embodiment of the present invention, a database is established in the effluent and sludge disposal part of the sewage treatment plant to record the phosphorus ecological parameters of renewable resources, such as composting, recycled water utilization, etc. The following are the steps for establishing a database of phosphorus indicators in the sludge disposal and effluent of the sewage treatment plant:

[0082] D1. Determine the data items that need to be collected, including: sludge generation, disposal method, disposal time, and phosphorus concentration in treated effluent at different time periods.

[0083] D2, determine the database tool and determine the structure of the data table according to the type of data item; you can choose common relational database management systems, such as MySQL, SQL Server, etc., or some tools specifically used for data storage and management, and plan the structure of the data table according to the determined data content, including field names, data types, etc. For example, establish a table for sludge disposal, containing relevant information; establish another table for phosphorus indicators to record concentration values ​​at different time points.

[0084] D3, collect data on sludge disposal and phosphorus indicators according to the preset time period, verify the accuracy of the data based on the preset specification requirements, and update the data according to the preset update frequency and process; for example, regularly collect data on sludge disposal and phosphorus indicators through the sewage treatment plant's monitoring system, record documents, etc., verify and check the entered data, and correct and clean up errors or abnormal data in a timely manner to ensure the integrity and accuracy of the data, and update the data regularly to ensure that the data in the database always reflects the latest situation.

[0085] D4, set corresponding data access permissions according to the needs and responsibilities of different users; ensure data security by setting corresponding data access permissions for different users.

[0086] D5, perform database backup according to the preset time period and formulate a data recovery plan; prevent data loss by performing database backup regularly and formulate a data recovery plan in case of emergency.

[0087] Through the above steps, a complete sewage treatment plant sludge disposal and phosphorus index database can be gradually established. It can better store the entire phosphorus treatment process data of the sewage treatment plant, provide data sharing, reduce data redundancy, maintain data independence, and realize data centralized control, which is conducive to real-time supervision.

[0088] The phosphorus ecology intelligent control method of a sewage plant provided by the present invention can dynamically predict the phosphorus ecology parameters of the sewage plant, adjust the operation plan of phosphorus removal treatment measures in real time, optimize the phosphorus removal process, and has an adaptive self-learning function, thereby dynamically predicting the phosphorus treatment load of the sewage plant, automatically controlling the water volume of the upstream sewage discharge unit, and ensuring the safe operation of the phosphorus ecology.

[0089] In this embodiment, a sewage plant phosphorus ecological intelligent control system is also provided, which is used to implement the above-mentioned embodiments and preferred implementation modes, and the descriptions that have been made will not be repeated. As used below, the term "module" can implement a combination of software and / or hardware for a predetermined function. Although the system described in the following embodiments is preferably implemented in software, the implementation of hardware, or a combination of software and hardware, is also possible and conceivable.

[0090] This embodiment provides a phosphorus ecological intelligent control system for a sewage plant, such as Figure 4 As shown, including:

[0091] The first phosphorus index prediction module 401 is used to obtain data related to phosphorus index generated by the sewage treatment plant distribution well and the upstream sewage pipe network, and input the data into the first preset phosphorus index prediction model to obtain the first phosphorus discharge data;

[0092] A first control module 402 is used to determine a real-time prediction value of the treatment load capacity of the sewage treatment plant based on the first phosphorus discharge data, and initiate corresponding treatment measures to control the phosphorus treatment ecological parameters so that the water quality meets the standard;

[0093] The second phosphorus index prediction module 403 is used to obtain data related to phosphorus index entering the biological treatment part of the sewage treatment plant, and input it into the second preset phosphorus index prediction model to obtain second phosphorus discharge data;

[0094] The second control module 404 is used to compare the second phosphorus discharge data with the preset effluent phosphorus index standard value, determine the treatment load capacity of the sewage treatment plant according to the comparison result, and initiate corresponding treatment measures to control the phosphorus treatment ecological parameters so that the water quality meets the standard;

[0095] The third phosphorus index prediction module 405 is used to obtain data related to the biological flora in the water outlet and the composting site, and input the third preset phosphorus index prediction model to obtain third phosphorus discharge data for evaluating the phosphorus index treatment capacity of the sewage treatment plant.

[0096] In some optional implementations, the first control module 402 includes:

[0097] The first data acquisition unit is used to acquire multi-source variable sample data related to phosphorus index in the sewage treatment plant distribution well and the upstream sewage pipe network, wherein the multi-source variable sample data includes: variable data sets related to phosphorus index at different time periods and different temperatures and the actual value of corresponding phosphorus, and perform principal component analysis on the multi-source variable sample data to obtain principal component characteristic data; wherein the variable data sets related to phosphorus index include: flow rate, concentration of multiple chemical substances;

[0098] A first model training unit is used to train a preset neural network using principal component feature data;

[0099] The first preset phosphorus index prediction model generation unit is used to evaluate the trained model based on the preset evaluation index, and optimize the model based on the evaluation result to obtain the first preset phosphorus index prediction model.

[0100] In some optional implementations, the second control module 404 includes:

[0101] The second data acquisition unit is used to obtain the influent water quality parameters related to phosphorus indicators in the sewage treatment plant, including: pH value, DO, ORP,

[0102] The second model training unit is used to input the influent water quality parameters into the ANFIS model for training, so as to predict

[0103] The second preset phosphorus index prediction model generation unit is used to verify the performance of the model and use the model that meets the preset performance requirements as the second preset phosphorus index prediction model.

[0104] In some optional implementations, the third phosphorus index prediction module 405 includes:

[0105] The third data acquisition unit is used to acquire data related to the biological flora in the water outlet and the composting site, including: DO, ORP, temperature, nutrients and actual values ​​of corresponding phosphorus;

[0106] A third model training unit is used to input the biological flora and related data into the ANFIS model for training;

[0107] The third preset phosphorus index prediction model generation unit is used to evaluate the trained model based on the preset evaluation index, and optimize the model based on the evaluation result to obtain the third preset phosphorus index prediction model.

[0108] In some optional embodiments, in the first control module 402 and the second control module 404, corresponding treatment measures are initiated to control the ecological parameters of phosphorus treatment to meet the water quality standards, including: using primary chemical phosphorus removal, secondary chemical phosphorus removal and tertiary deep phosphorus removal in sequence to meet the water quality standards under the conditions of satisfying biological phosphorus removal and the treatment load capacity of the sewage treatment plant; if the treatment load capacity of the sewage treatment plant is exceeded, the flow of the water inlet valve and the water inlet pump is controlled.

[0109] In some optional embodiments, the system further comprises: a database establishment module, which is used to establish a database in the effluent and sludge disposal part of the sewage plant to record the phosphorus ecological parameters of the renewable resources, specifically including:

[0110] The data content determination unit is used to determine the data items that need to be collected, including: sludge generation, disposal method, disposal time, and phosphorus concentration in the treated effluent at different time periods;

[0111] The data structure design unit is used to determine the database tools and determine the structure of the data table according to the type of data items;

[0112] A data maintenance unit is used to collect data on sludge disposal and phosphorus indicators according to a preset time period, verify the accuracy of the data based on the preset specification requirements, and update the data according to the preset update frequency and process;

[0113] The permission setting unit is used to set corresponding data access permissions according to the needs and responsibilities of different users;

[0114] The backup unit is used to back up the database according to the preset time period and formulate a data recovery plan.

[0115] The further functional description of each of the above modules and units is the same as that of the above corresponding embodiments and will not be repeated here.

[0116] The above modules can adaptively optimize the phosphorus treatment system of the sewage treatment plant through configuration programming software and communication technology modules in the computer intelligent control system. The following are the general steps to build a phosphorus ecological intelligent control system for sewage treatment plants:

[0117] Step 1: Demand analysis, clarify the process requirements, control objectives and parameters that need to be monitored and controlled, such as liquid level, flow, water quality indicators, etc. of the sewage treatment plant.

[0118] Step 2: Hardware selection: choose appropriate computer equipment (such as industrial computers), sensors, actuators (such as control valves, pumps, etc.), data acquisition cards and other hardware equipment.

[0119] Step 3: Network architecture design. Design a reasonable network topology to ensure reliable data transmission and real-time performance. Industrial Ethernet can be used.

[0120] Step 4: Software platform selection: choose a suitable industrial control software platform with functions such as data acquisition, monitoring, and control algorithms.

[0121] Step 5: System configuration, perform system configuration on the software platform, including defining input and output points, drawing monitoring interface, setting control logic and parameters, etc.

[0122] Step 6: Control algorithm design: According to the process characteristics and control requirements, design a suitable control algorithm, such as PID control, to automatically adjust the equipment operation.

[0123] Step 7: Data storage and management, establish a database to store real-time data and historical data for data analysis and report generation.

[0124] Step 8: Security and reliability design, consider the security of the system, such as setting access rights, backup and recovery mechanisms, etc., to ensure stable and reliable operation of the system.

[0125] Step 9: Debug and test, debug and test the entire system to ensure that the hardware and software work together normally and the control effect meets the requirements.

[0126] Step 10: Training and Maintenance Train operators to familiarize them with system operation and maintenance. At the same time, establish a regular maintenance mechanism to ensure long-term stable operation of the system.

[0127] The phosphorus ecological intelligent control system of the sewage treatment plant in this embodiment is presented in the form of functional units, where the units refer to ASIC (Application Specific Integrated Circuit) circuits, processors and memories that execute one or more software or fixed programs, and / or other devices that can provide the above functions.

[0128] The embodiment of the present invention also provides a computer device having the above Figure 4 The phosphorus ecological intelligent control system of the sewage treatment plant is shown.

[0129] See also Figure 5 , Figure 5 is a schematic diagram of the structure of a computer device provided by an optional embodiment of the present invention, such as Figure 5 As shown, the computer device includes: one or more processors 10, memory 20, and interfaces for connecting various components, including high-speed interfaces and low-speed interfaces. Various components utilize different buses to communicate with each other, and can be installed on a common mainboard or installed in other ways as required. The processor can process the instructions executed in the computer device, including instructions stored in the memory or on the memory to display the graphical information of the GUI on an external input / output system (such as, a display device coupled to the interface). In some optional embodiments, if necessary, multiple processors and / or multiple buses can be used together with multiple memories and multiple memories. Similarly, multiple computer devices can be connected, and each device provides part of the necessary operations (for example, as a server array, a group of blade servers, or a multi-processor system). Figure 5 A processor 10 is taken as an example.

[0130] The processor 10 may be a central processing unit, a network processor or a combination thereof. The processor 10 may further include a hardware chip. The hardware chip may be a dedicated integrated circuit, a programmable logic device or a combination thereof. The programmable logic device may be a complex programmable logic device, a field programmable gate array, a general purpose array logic or any combination thereof.

[0131] The memory 20 stores instructions executable by at least one processor 10, so that at least one processor 10 executes the method shown in the above embodiment.

[0132] The memory 20 may include a program storage area and a data storage area, wherein the program storage area may store an operating system, an application required for at least one function; the data storage area may store data created according to the use of the computer device, etc. In addition, the memory 20 may include a high-speed random access memory, and may also include a non-transient memory, such as at least one disk storage device, a flash memory device, or other non-transient solid-state storage device. In some optional embodiments, the memory 20 may optionally include a memory remotely arranged relative to the processor 10, and these remote memories may be connected to the computer device via a network. Examples of the above-mentioned network include, but are not limited to, the Internet, an intranet, a local area network, a mobile communication network, and combinations thereof.

[0133] The memory 20 may include a volatile memory, such as a random access memory; the memory may also include a non-volatile memory, such as a flash memory, a hard disk or a solid state drive; the memory 20 may also include a combination of the above types of memory.

[0134] The computer device further comprises a communication interface 30 for the computer device to communicate with other devices or a communication network.

[0135] The embodiment of the present invention also provides a computer-readable storage medium. The method according to the embodiment of the present invention can be implemented in hardware, firmware, or can be implemented as a computer code that can be recorded in a storage medium, or can be implemented as a computer code that is originally stored in a remote storage medium or a non-temporary machine-readable storage medium and will be stored in a local storage medium through a network download, so that the method described herein can be stored in such software processing on a storage medium using a general-purpose computer, a dedicated processor, or programmable or dedicated hardware. Among them, the storage medium can be a magnetic disk, an optical disk, a read-only storage memory, a random access memory, a flash memory, a hard disk or a solid-state hard disk, etc.; further, the storage medium can also include a combination of the above types of memories. It can be understood that a computer, a processor, a microprocessor controller, or programmable hardware includes a storage component that can store or receive software or computer code. When the software or computer code is accessed and executed by a computer, a processor, or hardware, the method shown in the above embodiment is implemented.

[0136] A part of the present invention may be applied as a computer program product, such as a computer program instruction, which, when executed by a computer, can call or provide the method and / or technical solution according to the present invention through the operation of the computer. Those skilled in the art should understand that the existence of the computer program instruction in a computer-readable medium includes, but is not limited to, a source file, an executable file, an installation package file, etc., and accordingly, the way in which the computer program instruction is executed by the computer includes, but is not limited to: the computer directly executes the instruction, or the computer compiles the instruction and then executes the corresponding compiled program, or the computer reads and executes the instruction, or the computer reads and installs the instruction and then executes the corresponding installed program. Here, the computer-readable medium may be any available computer-readable storage medium or communication medium accessible to the computer.

[0137] Although the embodiments of the present invention have been described in conjunction with the accompanying drawings, those skilled in the art may make various modifications and variations without departing from the spirit and scope of the present invention, and such modifications and variations are all within the scope defined by the appended claims.

Claims

1. A phosphorus ecological intelligent control method for a sewage treatment plant, characterized in that: The method comprises: Obtaining data related to phosphorus indicators generated by the sewage treatment plant distribution well and the upstream sewage pipe network, and inputting the data into a first preset phosphorus indicator prediction model to obtain first phosphorus discharge data; Determine a real-time prediction value of the treatment load capacity of the sewage treatment plant based on the first phosphorus discharge data, and initiate corresponding treatment measures to control the phosphorus treatment ecological parameters so that the water quality meets the standard; Obtaining data related to phosphorus indicators in the biological treatment part of the sewage treatment plant, and inputting the data into a second preset phosphorus indicator prediction model to obtain second phosphorus discharge data; Comparing the second phosphorus discharge data with the preset effluent phosphorus index standard value, determining the treatment load capacity of the sewage treatment plant according to the comparison result, and initiating corresponding treatment measures to control the phosphorus treatment ecological parameters so that the water quality meets the standard; The data related to the biological flora in the outlet and the composting site are obtained, and input into the third preset phosphorus index prediction model to obtain the third phosphorus discharge data, which is used to evaluate the phosphorus index treatment capacity of the sewage treatment plant.

2. The method according to claim 1, characterized in that The process of constructing the first preset phosphorus index prediction model includes: Obtain multi-source variable sample data related to phosphorus indicators in the sewage treatment plant distribution well and upstream sewage pipe network, the multi-source variable sample data including: variable data sets related to phosphorus indicators at different time periods and temperatures and corresponding phosphorus concentrations in sewage, and perform principal component analysis on the multi-source variable sample data to obtain principal component characteristic data; wherein the variable data sets related to phosphorus indicators include: flow rate, concentrations of multiple chemical substances; Using principal component feature data to train the preset neural network; The trained model is evaluated based on preset evaluation indicators, and the model is optimized based on the evaluation results to obtain the first preset phosphorus index prediction model, which is used to predict the phosphorus concentration of sewage entering the sewage treatment plant.

3. The method according to claim 1, characterized in that: The construction process of the second preset phosphorus index prediction model includes: Obtain influent water quality parameters related to phosphorus indicators in sewage treatment plants, including: pH value, DO, ORP, Inputting the influent water quality parameters into the ANFIS model for training; The performance of the model is verified, and the model that meets the preset performance requirements is used as the second preset phosphorus index prediction model for prediction.

4. The method according to claim 1, characterized in that: The construction process of the third preset phosphorus index prediction model includes: Obtain data related to the biological flora in the outlet and composting site, including: DO, ORP, temperature, nutrients and phosphorus content in sewage plant effluent and compost; Inputting the biological flora and related data into the ANFIS model for training; The trained model is evaluated based on preset evaluation indicators, and the model is optimized based on the evaluation results to obtain the third preset phosphorus index prediction model, which is used to predict the phosphorus content in sewage plant effluent and compost.

5. The method according to claim 1, characterized in that The initiation of corresponding treatment measures to control the ecological parameters of phosphorus treatment so that the water quality meets the standards includes: Under the conditions of meeting the requirements of biological phosphorus removal and the treatment load capacity of the sewage treatment plant, the first-stage chemical phosphorus removal, the second-stage chemical phosphorus removal and the third-stage deep phosphorus removal are used in sequence to meet the water quality standards. If the treatment load capacity of the sewage treatment plant is exceeded, the flow of the water inlet valve and the water inlet pump is controlled.

6. The method according to any one of claims 1 to 5, characterized in that: Also includes: A database is set up in the sewage plant effluent and sludge disposal part to record the phosphorus ecological parameters of renewable resources, including: Determine the data items that need to be collected, including: sludge generation, disposal method, disposal time, and phosphorus concentration in treated effluent at different time periods; Identify database tools and determine the structure of data tables based on the type of data items; Collect sludge disposal and phosphorus index data according to the preset time period, verify the accuracy of the data based on the preset specification requirements, and update the data according to the preset update frequency and process; Set corresponding data access permissions based on the needs and responsibilities of different users; Back up the database according to the preset time period and formulate a data recovery plan.

7. A phosphorus ecological intelligent control system for a sewage treatment plant, characterized in that: The system comprises: A first phosphorus index prediction module is used to obtain data related to phosphorus index generated by the sewage treatment plant distribution well and the upstream sewage pipe network, and input the data into a first preset phosphorus index prediction model to obtain first phosphorus discharge data; A first control module, used to determine a real-time prediction value of the treatment load capacity of the sewage treatment plant based on the first phosphorus discharge data, and initiate corresponding treatment measures to control the phosphorus treatment ecological parameters so that the water quality meets the standard; A second phosphorus index prediction module is used to obtain data related to phosphorus indexes entering the biological treatment part of the sewage treatment plant, and input it into a second preset phosphorus index prediction model to obtain second phosphorus discharge data; A second control module is used to compare the second phosphorus discharge data with a preset effluent phosphorus index standard value, determine the treatment load capacity of the sewage treatment plant according to the comparison result, and initiate corresponding treatment measures to control the phosphorus treatment ecological parameters so that the water quality meets the standard; The third phosphorus index prediction module is used to obtain data related to the biological flora in the outlet and the composting site, and input the third preset phosphorus index prediction model to obtain the third phosphorus discharge data, which is used to evaluate the phosphorus index treatment capacity of the sewage treatment plant.

8. A computer device, characterized in that: include: A memory and a processor, wherein the memory and the processor are communicatively connected to each other, the memory stores computer instructions, and the processor executes the phosphorus ecological intelligent control method for a sewage plant according to any one of claims 1 to 6 by executing the computer instructions.

9. A computer-readable storage medium, characterized in that: The computer-readable storage medium stores computer instructions, and the computer instructions are used to enable a computer to execute the phosphorus ecological intelligent control method for a sewage plant according to any one of claims 1 to 6.

10. A computer program product, characterized in that It comprises computer instructions, and the computer instructions are used to enable a computer to execute the phosphorus ecological intelligent control method for a sewage plant according to any one of claims 1 to 6.

Citation Information

Cited By

  • Automatic adjusting method and system for dephosphorization and dosing of integrated sewage equipment

    CN121426290A