Ecological restoration device and method for metal mine side slope
By drilling holes in metal mines to fill soil and using folding covers and column planting devices, the problem of vegetation on the slopes of acidic metal mines is solved, the plant survival rate and vegetation stability are improved, and the harsh environment is adapted.
Patent Information
- Application Number
- CN202411198869.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-29
- Publication Date
- 2024-11-12
AI Technical Summary
The ecological restoration method of existing acidic metal mines can easily lead to vegetation death in the absence of deep roots of the plant and inclement weather.
Design an ecological restoration device for the slope of metal mines, including a base, insertion device and planting device. By drilling holes in the metal mines and filling soil with drilling pipes, the plant planting and automatic closing of soil is achieved by using folding covers and columns. , ensure plant roots grow and breathable.
It improves the survival rate of plants on the slopes of metal mines and the stability of vegetation, and enhances the vegetation's ability to resist harsh environment.
Smart Images

Figure CN118923386A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the field of metal mine management devices, and in particular to a metal mine slope ecological restoration device and method. Background Art
[0002] Slope management has always been an important ecological restoration project. Engineering protection and ecological greening of slopes are carried out to prevent slope damage and soil erosion, conserve water resources, purify the air, and beautify the environment. This is necessary to reduce ecological disasters and protect the environment. Let's take a look at the common management methods.
[0003] After a long period of over-exploitation, mines usually have geological instability problems and safety hazards such as mountain collapse. Before mountain ecological restoration, it is necessary to fully understand the geological environment of the damaged mountain, analyze and demonstrate the dangers of various geological disasters, and conduct a current status assessment.
[0004] Through on-site investigation and mapping, the distribution and scale of the damaged mountains, the susceptibility of mining sidewall geological disasters, the main inducing factors, stability and development trends, and hazard characteristics are identified.
[0005] According to the results of geological environmental assessment, engineering control measures are adopted to control the damaged mountain, such as clearing loose dangerous rock and potentially unstable blocks on the slope, cutting steep slopes, and reinforcing the slopes with systematic anchoring.
[0006] At present, a Chinese patent with publication number CN112715318A discloses an ecological restoration method for abandoned slopes of acidic metal mines, which includes spraying a first nutrient base and a second nutrient base onto the slope, wherein the first nutrient base forms a first matrix layer in contact with the slope, and the second nutrient base forms a second matrix layer located above the first matrix layer, and the thickness of the first matrix layer is 1.5 to 2 times the thickness of the second matrix layer; the second nutrient base includes seeds.
[0007] In this method of ecological restoration of abandoned slopes of acidic metal mines, although the first matrix layer is provided with sulfur powder and has strong alkalinity, and the thickness of the first matrix layer is 1.5 to 2 times the thickness of the second matrix layer, the thicker first matrix layer can not only reliably connect the slope and carry out neutralization reaction, but also provide sufficient depth for the seeds in the second matrix layer to grow reliably. However, during the improvement process, the plant roots are often not deep and easy to fall off, and the vegetation is easy to die in bad weather. Summary of the invention
[0008] One purpose of the present invention is to provide a metal mine slope ecological restoration device, which has the advantages of ecologically transforming the surface of the metal mine and ensuring the survival of plants.
[0009] The above technical objectives of the present invention are achieved through the following technical solutions: A metal mine slope ecological restoration device comprises a base, an insertion device is provided on the base, the insertion device comprises a through hole provided on the base, a drilling device is provided in the through hole, the drilling device comprises a drilling tube threadedly connected to the through hole, an insertion head is provided at the top of the drilling tube, an edge is provided at the top of the drilling tube, and a planting device is also provided at the top of the drilling tube.
[0010] By adopting the above technical solution, holes are drilled in the metal mine and filled with soil to ensure that plants can survive in the metal mine. At the same time, the entire base can stabilize the drilled pipe to ensure the overall firmness.
[0011] Further configuration: the planting device includes a folding cover hinged to the drilling tube, the folding cover is truncated, a pressing device is provided at the bottom of the folding cover, the pressing device includes a flap hinged at the bottom of the folding cover, a connecting rod is provided on the flap, and the top of the connecting rod is hinged to a column.
[0012] By adopting the above technical solution, the provided planting device can press the soil in the drilled tube down through the column to open it, and after the seeds are put in, the soil is automatically closed again to complete the planting. After the planting in the drilled tube is completed, the column can be driven back into the surface of the metal mine on one side, and potted green plants can be added on the other side.
[0013] Further configuration: the drilling tube is also provided with a plurality of through holes.
[0014] By adopting the above technical solution, the provided through holes are convenient for the growth of plant roots and for ventilation underneath.
[0015] It is further configured that: an insertion cone head is also provided at the top end of the drilling tube.
[0016] By adopting the above technical solution, the provided insertion cone head facilitates the insertion of the entire drilling tube.
[0017] Further configuration: a pressing ring is provided on the column.
[0018] By adopting the above technical solution, it is convenient for users to press.
[0019] Another object of the present invention is to provide a method for using a metal mine slope ecological restoration device, which has the advantages of being able to quickly plant on the metal mine slope and improve the survival rate of vegetation.
[0020] The above technical objectives of the present invention are achieved through the following technical solutions: A metal mine slope ecological restoration device, the specific use method of which is as follows: S1, place the base on the surface of the metal mine, drill a hole on the surface of the metal mine with a drilling machine, and insert the insertion tube; S2, pour soil into the drilled hole, and flip the folding cover, place it on the top of the drilled tube, press down the pressing ring, open the flip cover, put in the plant seeds, fold the flip cover, and close the soil; S3, reopen the folding cover and insert the vertical pole into the metal mine surface in the reverse direction, and place the potted plants in the folding cover, so as to achieve the purpose of planting greening. In summary, the present invention has the following beneficial effects:. BRIEF DESCRIPTION OF THE DRAWINGS
[0021] The present invention is further described below in conjunction with the accompanying drawings.
[0022] Figure 1 It is a schematic diagram of the overall structure of the metal mine slope ecological restoration device; Figure 2 It is a metal mine slope ecological restoration device Figure 1 A magnified schematic diagram of the species.
[0023] In the figure, 1, base; 2, insertion device; 21, through hole; 22, drilling device; 221, drilling tube; 222, insertion head; 223, edge; 3, planting device; 31, folding cover; 32, pressing device; 321, flip cover; 322, connecting rod; 323, column; 4, through hole; 5, insertion cone head; 6, pressing ring. DETAILED DESCRIPTION
[0024] The specific implementation of the present invention will be further described below in conjunction with the accompanying drawings.
[0025] The technical solution adopted by the present invention is: a metal mine slope ecological restoration device, including a base 1, an insertion device 2 is provided on the base 1, the insertion device 2 includes a through hole 421 provided on the base 1, a drilling device 22 is provided in the through hole 421, the drilling device 22 includes a drilling tube 221 threadedly connected to the through hole 421, an insertion head 222 is provided at the top of the drilling tube 221, an edge 223 is provided at the top of the drilling tube 221, and a planting device 3 is also provided at the top of the drilling tube 221 The planting device 3 includes a folding cover 31 hinged to the drilling tube 221, the folding cover 31 is truncated, and a pressing device 32 is provided at the bottom of the folding cover 31. The pressing device 32 includes a flap 321 hinged at the bottom of the folding cover 31, a connecting rod 322 is provided on the flap 321, and a column 323 is hinged at the top of the connecting rod 322. A plurality of through holes 421 are also provided on the drilling tube 221, and an insertion cone head 5 is also provided at the top of the drilling tube 221, and a pressing ring 6 is provided on the column 323.
[0026] Its main working principle is as follows: during use, the base 1 is placed on the surface of the metal mine, and then the entire drilling tube 221 is inserted into the metal mine through the action of the insertion cone head 5, and the green plants are planted into the drilling tube 221 through the planting device 3. The provided planting device 3 can plant the green plants again through the folding cover 31, and potted planting is carried out on one side of the base 1 to increase the greening area.
[0027] The specific method of using the above device is as follows: S1, place the base 1 on the surface of the metal mine, drill a hole on the surface of the metal mine with a drilling machine, and insert the insertion tube; S2, pour soil into the drilled hole, and turn the folding cover 31 over, place it on the top of the drilling tube 221, press down the pressing ring 6, open the flip cover 321, put the plant seeds in, fold the flip cover 321, and close the soil; S3, reopen the folding cover 31 and insert the vertical pole into the surface of the metal mine in the opposite direction, and place the potted plants in the folding cover 31, so as to achieve the purpose of planting greenery.
[0028] The above are only preferred embodiments of the present invention, and are not intended to limit the present invention in any form. Any simple modifications, equivalent changes and modifications made to the above embodiments based on the technical essence of the present invention are within the scope of the technical solution of the invention.
Claims
1. A metal mine slope ecological restoration device, comprising a base (1), characterized in that: An insertion device (2) is provided on the base (1), the insertion device (2) comprising a through hole (4) (21) provided on the base (1), a drilling device (22) being provided in the through hole (4) (21), the drilling device (22) comprising a drilling tube (221) threadedly connected to the through hole (4) (21), an insertion head (222) being provided at the top end of the drilling tube (221), an edge (223) being provided at the top end of the drilling tube (221), and a planting device (3) being further provided at the top end of the drilling tube (221).
2. The metal mine slope ecological restoration device according to claim 1 is characterized by: The planting device (3) comprises a folding cover (31) hinged to the drilling tube (221); the folding cover (31) is in the shape of a truncated cone; a pressing device (32) is provided at the bottom of the folding cover (31); the pressing device (32) comprises a folding cover (321) hingedly provided at the bottom of the folding cover (31); a connecting rod (322) is provided on the folding cover (321); and a top end of the connecting rod (322) is hingedly connected to a column (323).
3. A metal mine slope ecological restoration device according to claim 2, characterized in that: The drilling tube (221) is also provided with a plurality of through holes (4) (21).
4. The metal mine slope ecological restoration device according to claim 3 is characterized by: The top end of the drilling tube (221) is also provided with an insertion cone head (5).
5. The metal mine slope ecological restoration device according to claim 4 is characterized by: A pressing ring (6) is provided on the upright column (323).
6. A metal mine slope ecological restoration device according to claims 1-4, characterized in that: The specific method of use is as follows: S1, placing the base (1) on the surface of the metal mine, drilling a hole on the surface of the metal mine with a drilling machine, and inserting the insertion tube; S2, pouring soil into the drilled hole, and flipping the folding cover (31), placing it on the top of the drilling tube (221), pressing the pressing ring (6), opening the folding cover (321), putting plant seeds in, folding the folding cover (321), and closing the soil; S3, reopening the folding cover (31) and inserting the vertical pole into the surface of the metal mine in the reverse direction, and placing the potted plant in the folding cover (31), thereby achieving the purpose of planting greenery.
