Underground vehicle battery replacing system, control method and storage medium

Through the downhole vehicle battery swap system and control method, VCU and camera assist technology are used to realize the automatic battery replacement of downhole vehicles, solving the problems of complexity and low efficiency of battery swap, and improving the battery swap efficiency and safety.

CN118928142APending Publication Date: 2024-11-12WUHAI IRIDIUM MOLYBDENUM NEW ENERGY TECHNOLOGY CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411328068.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-23
Publication Date
2024-11-12

AI Technical Summary

Technical Problem

Downhole vehicle battery replacement faces the problems of complex battery replacement process, low efficiency and poor accuracy, and requires strict compliance with safety regulations to ensure the safety of personnel and equipment.

Method used

A system and control method for downhole vehicle battery replacement are adopted. The VCU controls the relay or switch to realize automatic lifting and locking of the main battery and the backup battery, and coordinates with the camera to assist in the alignment to ensure the accuracy and safety of the battery replacement process.

Benefits of technology

The driver can complete the battery replacement process in the entire cab, improve battery replacement efficiency, save battery replacement time, and improve the accuracy and safety of battery replacement.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118928142A_ABST
    Figure CN118928142A_ABST
Patent Text Reader

Abstract

The invention provides an underground vehicle battery replacement control method, which comprises the steps of battery replacement preparation, main battery power-off, standby battery high-voltage loading, main battery replacement, standby battery power-off, main battery high-voltage loading, state monitoring after battery replacement and the like, and further provides a matched underground vehicle battery replacement system which comprises a vehicle main body component, a vehicle control unit (VCU) of a vehicle main body component controls the battery replacing executing mechanism to execute the battery replacing action, and the sensor, the switch and the auxiliary component are used for ensuring the accuracy of the battery replacing action executed by the battery replacing executing mechanism.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of vehicle control technology, and in particular to a system and control method for battery replacement of underground vehicles. Background Art

[0002] The advantages of the vehicle battery swap mode are concentrated in its efficiency, economy, safety and environmental protection. It can quickly replenish power in a very short time, greatly improving travel efficiency and convenience. The battery swap mode also helps to improve the safety of battery use and extend its service life. Through centralized charging and management, it can effectively monitor battery performance and promptly discover and solve potential problems. Most importantly, the vehicle battery swap mode plays an important role in energy conservation and emission reduction. By optimizing energy utilization, it reduces the negative impact on the environment and provides strong support for the realization of green and sustainable travel.

[0003] However, underground vehicle battery swapping faces a series of unique difficulties, which mainly stem from the complexity of the underground environment, the high standards of safety requirements, and the particularity of vehicles and battery swapping equipment. Due to the high safety risks of underground operations, the battery swapping process must strictly comply with safety regulations to ensure the safety of personnel and equipment. In addition, underground vehicles often have specific designs and configurations, which are significantly different from ground vehicles, increasing the complexity and challenges of battery swapping technology. To this end, we proposed a system and control method for underground vehicle battery swapping. Summary of the invention

[0004] The present invention proposes a system and control method for battery replacement of underground vehicles, which solves the problems of complex battery replacement process, low battery replacement efficiency and poor accuracy faced by underground vehicle battery replacement in the prior art, and enables the driver to complete the battery replacement process while sitting in the cab throughout the process, thereby improving the battery replacement efficiency and saving battery replacement time.

[0005] The technical solution of the present invention is achieved in this way:

[0006] A control method for underground vehicle battery replacement, comprising the following steps:

[0007] Step S1: Prepare for battery replacement. Confirm that the vehicle is in the initial parking state, press the battery replacement start switch, and officially start the battery replacement process.

[0008] Step S2: The main battery is powered off. The VCU detects the current voltage state of the main battery and performs a power-off operation: if the main battery is in a high voltage state, the VCU controls the corresponding relay or switch to power off the main battery to a low voltage state; if the main battery is already in a low voltage state, skip this step;

[0009] Step S3: The backup battery is high-voltage, and the backup battery is high-voltage controlled by the VCU to provide necessary power support for the vehicle;

[0010] Step S4: Replace the main battery by using the battery replacement actuator;

[0011] Step S5: The backup battery is powered off. After confirming that the main battery has been locked in place, the backup battery is powered off to a low voltage state through the VCU;

[0012] Step S6: High voltage on the main battery, power-on operation: After the main battery is locked and confirmed to be correct, the main battery is controlled to be high voltage through the VCU;

[0013] Step S7: After the battery replacement is completed, status monitoring is performed. When the system continues to monitor the power status of the main battery, the VCU displays a prompt message indicating that the battery replacement is completed on the dashboard.

[0014] As a preferred technical solution, step S1 specifically includes the following steps:

[0015] 1) Check vehicle speed: confirm whether the vehicle's current speed is 0, that is, whether the vehicle is completely stationary;

[0016] 2) Check the parking brake status: Check whether the parking brake is pulled to ensure that the vehicle will not move during the battery replacement process.

[0017] 3) Check the status of the cargo box: confirm that there is no need to lift or lower the cargo box to avoid accidents during the battery replacement process;

[0018] 4) Check the backup battery status: Use the system to detect whether there is a high-level fault in the backup battery to ensure that the backup battery can work normally;

[0019] 5) Press the battery replacement start switch: The driver or operator presses the battery replacement start switch to officially start the battery replacement process.

[0020] As a preferred technical solution, in step S3, the high voltage on the backup battery also needs to be confirmed to have no high-level faults, that is, the system is tested again to confirm that there are no high-level faults at present.

[0021] As a preferred technical solution, high-level faults include abnormal performance, abnormal operating conditions and abnormal noise.

[0022] As a preferred technical solution, step S4 of replacing the main battery includes the following steps:

[0023] a) Driver operation and main battery descent

[0024] High voltage on the vehicle: Confirm that the vehicle has high voltage and the speed of the upper motor has reached the idle state;

[0025] Driver operation: The driver presses the main battery lowering switch;

[0026] VCU control: After receiving the switch enable signal, VCU controls the main battery to release the solenoid valve and start working;

[0027] Release confirmation: When the VCU receives the signal from the proximity switch that the main battery is completely released, the control stops outputting, indicating that the main battery has been completely released;

[0028] b) Main battery drops

[0029] Lowering operation: After the main battery is released, the lowering solenoid valve starts to output and controls the main battery to lower;

[0030] Descent confirmation: When the VCU receives the signal from the main battery’s complete descent proximity switch, the control stops outputting, indicating that the main battery has descended to the specified position;

[0031] Instrument prompt: A prompt message is displayed on the instrument panel to inform the driver that the vehicle can be driven to the location where the main battery is to be replaced;

[0032] c) Main battery rises

[0033] Driver operation: After the driver has aligned the vehicle, he applies the parking brake and presses the main battery up button;

[0034] VCU control: After receiving the switch enable signal, the VCU controls the main battery rising solenoid valve to start working;

[0035] Ascent confirmation: When the VCU receives the signal from the main battery fully ascending proximity switch, the control stops outputting, indicating that the main battery has ascended to the specified position;

[0036] d) Main battery lock

[0037] Locking operation: After the main battery rises into place, the locking solenoid valve starts to output and controls the main battery locking mechanism to work;

[0038] Locking confirmation: When the VCU receives the signal from the main battery fully locked proximity switch, the control stops output, indicating that the main battery is fully locked.

[0039] As a preferred technical solution, in step c), an auxiliary alignment step is also included before the main battery is raised: the camera system equipped in the vehicle is automatically started, and when the driver releases the handbrake and prepares to drive, the instrument automatically switches to the camera screen. In the camera screen, the correct position of the battery is circled by a green frame to help the driver align accurately.

[0040] A system for battery replacement of underground vehicles includes: a vehicle main body component, a battery replacement actuator, sensors and switches, and auxiliary components. The VCU of the vehicle main body component controls the battery replacement actuator to perform a battery replacement action. The sensors and switches and the auxiliary components are used to ensure the accuracy of the battery replacement action performed by the battery replacement actuator.

[0041] As a preferred technical solution, the vehicle main body components include:

[0042] Battery pack: includes main battery and backup battery, which is the main energy source of the vehicle;

[0043] Motor: A key component that drives the vehicle. The upper motor needs to reach idle speed during the battery replacement process to drive the hydraulic system to work;

[0044] VCU: The vehicle's control center, responsible for receiving sensor signals, executing control strategies, and controlling the coordinated work of other components.

[0045] As a preferred technical solution, the battery replacement execution component includes:

[0046] Battery lifting mechanism: including an ascending solenoid valve and a descending solenoid valve, used to control the lifting and lowering operation of the battery pack;

[0047] Battery locking mechanism: used to lock the battery firmly on the vehicle after it rises to the specified position;

[0048] Release solenoid valve: used to control the release operation of the battery pack at the beginning of battery replacement.

[0049] A non-temporary storage medium, when the instructions in the storage medium are executed by the system for replacing the battery of an underground vehicle, the system is able to execute any of the above-mentioned control methods for replacing the battery of an underground vehicle. BRIEF DESCRIPTION OF THE DRAWINGS

[0050] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0051] Figure 1 A flowchart of the descent of the main battery of an underground vehicle battery replacement system according to the present invention;

[0052] Figure 2 This is a flowchart of replacing the main battery in an underground vehicle battery replacement system of the present invention. DETAILED DESCRIPTION

[0053] The technical solution of the present invention will be clearly and completely described below in conjunction with the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0054] Reference Figure 1 and 2 The present invention provides a system and control method for underground vehicle battery replacement, and the specific execution steps are as follows:

[0055] 1. Preparation for battery replacement

[0056] Check vehicle speed: confirm whether the vehicle's current speed is 0, that is, whether the vehicle is completely stationary.

[0057] Confirm the parking brake status: Check whether the parking brake is pulled to ensure that the vehicle will not move during the battery replacement process.

[0058] Check the status of the cargo box: confirm that there is no need to lift or lower the cargo box to avoid accidents during the battery replacement process.

[0059] Check the backup battery status: Check the backup battery system to see if there is a high-level fault and ensure that the backup battery can work normally.

[0060] Press the battery replacement start switch: The driver or operator presses the battery replacement start switch to officially start the battery replacement process.

[0061] 2. Main battery is powered off

[0062] Detect the main battery voltage: Detect the current voltage status of the main battery through the VCU (Vehicle Control Unit).

[0063] Perform power-off operation: If the main battery is in a high voltage state, control the corresponding relay or switch through the VCU to power off the main battery to a low voltage state. If the main battery is already in a low voltage state, skip this step.

[0064] 3. High voltage on the backup battery

[0065] Confirm that there are no high-level faults: Perform system detection again to confirm that there are no high-level faults at present.

[0066] Powering up the backup battery: After confirming that there is no fault, the VCU controls the backup battery to increase high voltage to provide the necessary power support for the vehicle.

[0067] 4. Driver operation and main battery drop

[0068] The vehicle is on high voltage: Confirm that the vehicle is on high voltage and the speed of the upper motor reaches the idle state.

[0069] Driver operation: The driver presses the main battery lowering switch.

[0070] VCU control: After receiving the switch enable signal, VCU controls the main battery to release the solenoid valve and start working.

[0071] Release confirmation: When the VCU receives the signal from the proximity switch that the main battery is fully released, the control stops outputting, indicating that the main battery has been fully released.

[0072] 5. Main battery drops

[0073] Lowering operation: After the main battery is released, the lowering solenoid valve starts to output and controls the main battery to lower.

[0074] Descent confirmation: When the VCU receives the signal from the main battery fully descending proximity switch, the control stops outputting, indicating that the main battery has descended to the specified position.

[0075] Instrument prompt: A prompt message is displayed on the instrument panel, informing the driver that it is time to drive the vehicle to the location where the main battery is to be replaced.

[0076] 6. Assisted alignment

[0077] Camera activation: The camera system equipped in the vehicle is activated automatically.

[0078] Screen switching: When the driver releases the handbrake and prepares to drive, the instrument automatically switches to the camera screen.

[0079] Position marking: In the camera image, the correct position of the battery is circled by a green frame to help the driver align it accurately.

[0080] 7. Main battery rise

[0081] Driver Operation: After the driver has aligned the vehicle into position, apply the parking brake and press the main battery up button.

[0082] VCU control: After receiving the switch enable signal, VCU controls the main battery rising solenoid valve to start working.

[0083] Ascent confirmation: When the VCU receives the signal from the main battery fully ascending proximity switch, the control stops outputting, indicating that the main battery has ascended to the specified position.

[0084] 8. Main battery lock

[0085] Locking operation: After the main battery rises into place, the locking solenoid valve starts to output and controls the main battery locking mechanism to work.

[0086] Locking confirmation: When the VCU receives the signal from the main battery fully locked proximity switch, the control stops output, indicating that the main battery is fully locked.

[0087] 9. Backup battery power off

[0088] Power-off operation: After confirming that the main battery has been locked in place, control the backup battery to power off to a low voltage state through the VCU.

[0089] 10. High voltage on the main battery

[0090] Power-on operation: After the main battery is locked and confirmed to be correct, the high voltage of the main battery is controlled by the VCU.

[0091] 11. Battery replacement completed

[0092] Status monitoring: The system continuously monitors the main battery power status.

[0093] Completion prompt: When the main battery is powered on successfully, the dashboard displays a prompt message indicating that the battery replacement is completed.

[0094] The battery swap system mentioned above, as a complex automated process, includes multiple key components to ensure the smooth operation of the battery swap. These components can be roughly divided into the following categories:

[0095] 1. Vehicle main parts

[0096] Battery pack: includes main battery and backup battery, which is the main energy source of the vehicle.

[0097] Motor: A key component that drives the vehicle. The upper motor needs to reach idle state during the battery replacement process to drive the hydraulic system to work.

[0098] Vehicle Control Unit (VCU): The vehicle's control center, responsible for receiving sensor signals, executing control strategies, and controlling the coordinated work of other components.

[0099] 2. Battery replacement execution components

[0100] Battery lifting mechanism: includes an ascending solenoid valve and a descending solenoid valve, which are used to control the lifting and lowering operation of the battery pack.

[0101] Battery locking mechanism: used to lock the battery securely to the vehicle after it rises to the specified position.

[0102] Release solenoid valve: used to control the release operation of the battery pack at the beginning of battery replacement.

[0103] 3. Sensors and switches

[0104] Proximity switch: used to detect the lifting and locking status of the battery pack to ensure the accuracy of the battery replacement operation.

[0105] Battery replacement start switch: Pressed by the driver or operator to start the battery replacement process.

[0106] Main battery lowering / raising button: operated by the driver during the battery replacement process to control the lowering and raising of the battery pack.

[0107] 4. Auxiliary components

[0108] Camera system: used to assist the driver in aligning the battery position during the battery replacement process to improve the efficiency of battery replacement.

[0109] Dashboard: Displays various prompt information and status during the battery replacement process to help the driver understand the progress of the battery replacement.

[0110] Handbrake: Ensures the vehicle remains stationary during the battery swap process to prevent accidental movement.

[0111] The battery swap system is a highly integrated automated system that includes multiple key components such as the vehicle main body, battery swap execution components, sensors and switches, auxiliary components, and other systems. These components work together to achieve rapid and accurate replacement of battery packs, improving the endurance and ease of use of electric vehicles. The above-mentioned system and method solve the problems existing in the prior art, and enable the driver to complete the battery swap process while sitting in the cab, thereby improving the efficiency of battery swapping and saving battery swapping time.

[0112] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims

1. A control method for underground vehicle battery replacement, characterized in that: The following steps are involved: Step S1: Prepare for battery replacement. Confirm that the vehicle is in the initial parking state, press the battery replacement start switch, and officially start the battery replacement process. Step S2: The main battery is powered off. The VCU detects the current voltage state of the main battery and performs a power-off operation: if the main battery is in a high voltage state, the VCU controls the corresponding relay or switch to power off the main battery to a low voltage state; If the main battery is already in low voltage state, skip this step; Step S3: The backup battery is high-voltage, and the backup battery is high-voltage controlled by the VCU to provide necessary power support for the vehicle; Step S4: Replace the main battery by using the battery replacement actuator; Step S5: The backup battery is powered off. After confirming that the main battery has been locked in place, the backup battery is powered off to a low voltage state through the VCU; Step S6: High voltage on the main battery, power-on operation: After the main battery is locked and confirmed to be correct, the main battery is controlled to be high voltage through the VCU; Step S7: After the battery replacement is completed, status monitoring is performed. When the system continues to monitor the power status of the main battery, the VCU displays a prompt message indicating that the battery replacement is completed on the dashboard.

2. The underground vehicle battery replacement control method according to claim 1, characterized in that: The step S1 specifically includes the following steps: 1) Check vehicle speed: confirm whether the vehicle's current speed is 0, that is, whether the vehicle is completely stationary; 2) Check the parking brake status: Check whether the parking brake is pulled to ensure that the vehicle will not move during the battery replacement process. 3) Check the status of the cargo box: confirm that there is no need to lift or lower the cargo box to avoid accidents during the battery replacement process; 4) Check the backup battery status: Use the system to detect whether there is a high-level fault in the backup battery to ensure that the backup battery can work normally; 5) Press the battery replacement start switch: The driver or operator presses the battery replacement start switch to officially start the battery replacement process.

3. A control method for underground vehicle battery replacement as claimed in claim 1, characterized in that: In step S3, the high voltage on the backup battery also needs to be confirmed to have no high-level faults, that is, the system is tested again to confirm that there are no high-level faults at present.

4. A system and control method for underground vehicle battery replacement as claimed in claim 3, characterized in that: The high-level faults include voltage that is too high or too low, and temperature that is too high or too low.

5. The system and control method for underground vehicle battery replacement according to claim 1, characterized in that: The step S4 of replacing the main battery comprises the following steps: a) Driver operation and main battery descent High voltage on the vehicle: Confirm that the vehicle has high voltage and the speed of the upper motor has reached the idle state; Driver operation: The driver presses the main battery lowering switch; VCU control: After receiving the switch enable signal, VCU controls the main battery to release the solenoid valve to start working; Release confirmation: When the VCU receives the signal from the proximity switch that the main battery is completely released, the control stops outputting, indicating that the main battery has been completely released; b) Main battery drops Lowering operation: After the main battery is released, the lowering solenoid valve starts to output and controls the main battery to lower; Descent confirmation: When the VCU receives the signal from the main battery’s complete descent proximity switch, the control stops outputting, indicating that the main battery has descended to the specified position; Instrument prompt: A prompt message is displayed on the instrument panel to inform the driver that the vehicle can be driven to the location where the main battery is to be replaced; c) Main battery rises Driver operation: After the driver has aligned the vehicle, he applies the parking brake and presses the main battery up button; VCU control: After receiving the switch enable signal, the VCU controls the main battery rising solenoid valve to start working; Ascent confirmation: When the VCU receives the signal from the main battery fully ascending proximity switch, the control stops outputting, indicating that the main battery has ascended to the specified position; d) Main battery lock Locking operation: After the main battery rises into place, the locking solenoid valve starts to output and controls the main battery locking mechanism to work; Locking confirmation: When the VCU receives the signal from the main battery fully locked proximity switch, the control stops output, indicating that the main battery is fully locked.

6. The underground vehicle battery replacement control method according to claim 1, characterized in that: In step c), an auxiliary alignment step is also included before the main battery is raised: the camera system equipped in the vehicle is automatically started. When the driver releases the handbrake and prepares to drive, the instrument automatically switches to the camera screen. In the camera screen, the correct position of the battery is circled by a green frame to help the driver align accurately.

7. A system for replacing batteries in underground vehicles, characterized in that: include: The vehicle's main body components, a battery swap actuator, sensors and switches, and auxiliary components. The VCU of the vehicle's main body components controls the battery swap actuator to perform the battery swap action. The sensors and switches and the auxiliary components are used to ensure the accuracy of the battery swap actuator in performing the battery swap action.

8. The underground vehicle battery replacement system according to claim 7, characterized in that: The vehicle body components include: Battery pack: includes main battery and backup battery, which is the main energy source of the vehicle; Motor: A key component that drives the vehicle. The upper motor needs to reach idle speed during the battery replacement process to drive the hydraulic system to work; VCU: The vehicle's control center, responsible for receiving sensor signals, executing control strategies, and controlling the coordinated work of other components.

9. The underground vehicle battery replacement system according to claim 7, characterized in that: The battery replacement execution component includes: Battery lifting mechanism: including an ascending solenoid valve and a descending solenoid valve, used to control the lifting and lowering operation of the battery pack; Battery locking mechanism: used to lock the battery firmly on the vehicle after it rises to the specified position; Release solenoid valve: used to control the release operation of the battery pack at the beginning of battery replacement.

10. A non-temporary storage medium, characterized in that: When the instructions in the storage medium are executed by a system for underground vehicle battery replacement as described in claims 7 to 9, the system is enabled to execute any one of the control methods for underground vehicle battery replacement in claims 1 to 6 above.