Cold region strip mine draw shaft ore discharging and drawing test device and method

By designing a test device for unloading ore in open-pit mines in cold areas, simulating the freeze-thawing effect and monitoring the stress of the well wall, the problem of difficult to analyze the impact of freeze-thawing wells in cold areas is solved, and scientific analysis of impact wear and blockage of the well wall is achieved. Improved mine safety and production efficiency.

CN118933787APending Publication Date: 2024-11-12NORTHEASTERN UNIV CHINA
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411030585.1
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-30
Publication Date
2024-11-12

AI Technical Summary

Technical Problem

Under the freezing and thawing of open-pit mines in cold areas, the well walls are susceptible to impact and wear, resulting in damage and blockage. The existing technology is difficult to effectively simulate and analyze the impact of freezing and thawing on the smoothing, affecting the safe and efficient mining of mines.

Method used

A test device for unloading ore in open-pit mines in cold areas is designed, including a freeze-thawing shaft, a top ore unloading system and a bottom ore depot system for freeze-thawing treatment. It is equipped with pressure sensors for data collection and storage, simulates the actual project and monitors the well wall response. force situation.

Benefits of technology

It can truly simulate the freezing and thawing effects of open-pit mines in cold areas, analyze the impact wear and blockage of well walls, and provide scientific reference to improve mine safety and production efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure HDA0004969828310000011
    Figure HDA0004969828310000011
  • Figure HDA0004969828310000012
    Figure HDA0004969828310000012
  • Figure HDA0004969828310000021
    Figure HDA0004969828310000021
Patent Text Reader

Abstract

The invention relates to a cold region strip mine draw shaft ore unloading and drawing test device and method, and belongs to the technical field of mining. The cold region strip mine draw shaft ore unloading and drawing test device comprises a top ore unloading system, an ore drawing system and a bottom ore drawing system which are sequentially connected from top to bottom; wherein the ore sliding system comprises a draw shaft, and a chute section at the top of the draw shaft is subjected to freeze thawing treatment; and the data acquisition and storage system is used for monitoring the stress condition of the shaft wall of the draw shaft. According to the method, the actual engineering condition can be simulated more truly, the influence of freezing and thawing of the cold region draw shaft wellhead on a draw shaft system can be simulated and analyzed, and reference is provided for ore discharging and drawing of the cold region strip mine draw shaft.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of mining, and in particular relates to a test device and method for unloading ore from a chute in a cold region open-pit mine. Background Art

[0002] The exploration and development of resources in western my country has been increasing, and the number of open-pit mines in cold regions has gradually increased. In order to ensure the safe and efficient mining of open-pit mines in cold regions, the impact of freeze-thaw on open-pit mine production has become a new hotspot. The most notable feature of open-pit mines in cold regions is that under the influence of diurnal and seasonal temperature changes, the surface rocks show a two-state cycle of freezing and melting with periodic temperature changes, and the surface rocks will experience different degrees of freeze-thaw damage.

[0003] The adit chute development system is used in mines as a development and transportation system for energy conservation and emission reduction because it can make full use of the weight of the ore, shorten the transportation distance, save a lot of transportation costs and reduce carbon emissions. For open-pit mines in cold regions, the chute mouth is located on the surface. Therefore, the mouth is affected by the freeze-thaw effect for a long time, which will change the mechanical properties of the surrounding rock of the chute mouth section.

[0004] There are two main ways to move ore in a chute: ore sliding and ore discharge. During the ore sliding process, the ore flows into the chute along the chute at a certain angle, collides with the well wall several times and falls to the bottom of the well. The continuous impact of the ore on the well wall can cause impact damage to the well wall in the chute section. During the ore discharge process, the ore in the storage section frequently rubs against the well wall, which can cause wear and damage to the well wall in this section. In this process, the ore is also prone to blockage. Therefore, the impact and wear of the ore are important factors that cause the damage to the well wall of the chute. Under the action of long-term erosion and wear, the well wall of the chute will gradually break, expand, and even collapse accidents will occur. Ore blockage will seriously hinder the production of the mine.

[0005] At present, chutes are widely used in underground mines. Scholars have conducted a lot of research on chutes at normal temperature. However, for chutes in cold open-pit mines, there are obvious differences between chutes in cold open-pit mines and those in normal temperature areas. In addition to the wear caused by blockage and collision between ore and the shaft wall, the freeze-thaw problem at the chute mouth caused by temperature changes in cold areas has a great impact on the wear of the chute. Therefore, it is very important to develop a test device and method for unloading ore in cold open-pit mines to study the influence of freeze-thaw on chutes. Summary of the invention

[0006] In view of the deficiencies in the prior art, the present invention provides a cold region open-pit mine chute unloading and ore-releasing test device and method, which can more realistically simulate actual engineering conditions.

[0007] A cold region open-pit mine chute unloading and ore-discharging test device comprises a top unloading system, an ore-discharging system and a bottom ore-discharging system connected in sequence from top to bottom;

[0008] The chute system includes a chute shaft, the top of which is subjected to freeze-thaw treatment;

[0009] The data acquisition and storage system monitors the stress conditions of the shaft wall of the chute.

[0010] The top unloading system comprises a silo and a chute. The silo is located directly above the chute, and a silo valve is arranged on the top of the silo.

[0011] The two support plates are symmetrically arranged on both sides of the silo and the chute, the bottom of the support plates is connected to the fixed frame, and the support plates are firmly welded to the top of the fixed frame.

[0012] A horizontal rectangular groove is provided on the support plate, and guide rails are provided on both sides of the silo, and the guide rails on both sides of the silo are slidably connected to the rectangular groove; an arc groove is also provided on the support plate, and guide rails are provided on both sides of the chute, and the guide rails on both sides of the chute are slidably connected to the arc groove; the bottom end of the chute is semi-fixed on the support plate, and the entire chute rotates with the bottom end as the axis. During the rotation, the guide rails on both sides of the chute move along the arc groove.

[0013] The ore chute system also includes a fixed frame, in which the ore chute shaft is fixed, and a plurality of fixed plates are arranged inside the frame along the height direction. The fixed plates are sleeved on the outside of the ore chute shaft to fix the ore chute shaft and keep it stable.

[0014] The fixing frame is in the shape of a rectangular parallelepiped.

[0015] The chute shaft is cast in sections by concrete in a cylindrical steel mold, including a chute mouth section and multiple other sections. The chute mouth section includes multiple small sections, and each small section is subjected to freeze-thaw treatment separately. Bolts are installed on the steel mold to fix and connect the molds of different sections.

[0016] According to the similarity theory, the chute shaft is cast in sections using concrete similar to the surrounding rock material of the chute in cold-region open-pit mines.

[0017] The data acquisition and storage system includes a pressure sensor and a computer electrically connected thereto for storing data. The pressure sensor is arranged on the wall of the chute shaft, and the monitoring point is pre-selected before concrete pouring.

[0018] A cold region open-pit mine chute unloading and ore-discharging test method, using the cold region open-pit mine chute unloading and ore-discharging test device, specifically comprises the following steps:

[0019] S1: According to the rock properties of the chute wall at the mine site and in accordance with the similarity theory, the proportion of the chute shaft casting materials is designed and the chute shaft is cast;

[0020] S2: According to the diurnal and seasonal temperature changes in the mine, the freeze-thaw temperature is set, and each segment of the upper chute section of the chute is freeze-thawed separately. After the freeze-thaw is completed, it is connected with other segments of the chute shaft;

[0021] S3: Install sensors at the monitoring positions reserved on the well wall and detect whether the data acquisition and storage systems are working properly;

[0022] S4: Before the test begins, close the bottom ore discharge system, fill the silo with the ore prepared in advance, and adjust the inclination of the chute;

[0023] S5: Open the ore bin valve and start the ore unloading test, so that the ore falls into the chute shaft along the chute under the influence of gravity. When all the ore falls to the bottom of the shaft, record the data of each pressure sensor on the wall of the chute shaft, repeat the ore unloading and store multiple sets of data;

[0024] S6: When the ore in the shaft reaches the storage height required for the test, close the ore bin valve to stop unloading the ore, and wait for the ore in the shaft to be naturally compacted under the influence of its own weight;

[0025] S7: Open the ore discharge baffle at the bottom of the chute shaft to allow the ore to fall into the ore container below the shaft. After releasing a certain volume of ore according to the experimental requirements, close the baffle, record the data of each sensor on the wall of the chute storage section during the process, and observe whether the ore is blocked during the ore discharge; open the ore bin valve to continue to discharge the ore, so that the ore in the chute shaft returns to the height before the ore discharge, and then repeat the ore discharge test and record the sensor data;

[0026] S8: Based on the data from sensor testing, it provides a reference for unloading ore from open-pit mines in cold regions.

[0027] The beneficial effects of the present invention are:

[0028] (1) The shaft of the chute of the present invention is cast in sections using concrete similar to the surrounding rock material of the chute in cold-region open-pit mines according to similarity theory, which can simulate actual engineering conditions more realistically.

[0029] (2) The present invention can simulate and analyze the impact of freezing and thawing of the wellhead in cold regions on the well system by placing the wellhead section at the top of the well into a freeze-thaw box for freeze-thaw treatment.

[0030] (3) The present invention can simulate the entire workflow of unloading ore from a chute, monitor the stress on the chute wall through sensors, and analyze the impact, wear and damage of ore on the chute wall and the problem of ore blockage. BRIEF DESCRIPTION OF THE DRAWINGS

[0031] Figure 1 A schematic diagram of the structure of a cold region open-pit mine chute unloading and ore-discharging test device provided by the present invention;

[0032] Figure 2 It is a structural diagram of the ore chute system in the present invention;

[0033] Figure 3 A schematic diagram of a chute shaft in the present invention;

[0034] Figure 4 It is a structural schematic diagram of the top unloading system in the present invention;

[0035] Figure 5 It is a schematic diagram of the internal structure of the top unloading system of the present invention;

[0036] Figure 6 It is a structural diagram of the bottom ore drawing system in the present invention;

[0037] Figure 7 It is a schematic diagram of the data acquisition and storage system in the present invention;

[0038] in,

[0039] 1- ore chute system, 2- top ore unloading system, 3- bottom ore discharge system, 4- data acquisition and storage system, 11- chute shaft, 111- chute mouth section, 12- fixed frame, 13- fixed plate, 21- silo, 22- chute, 23- support plate, 24- ore bin valve, 31- ore discharge baffle, 32- ore container, 33- support base, 41- pressure sensor, 42- computer, 43- data cable. DETAILED DESCRIPTION

[0040] In order to better explain the present invention and facilitate understanding, the technical solutions and effects of the present invention are described in detail below through specific implementation modes in conjunction with the accompanying drawings.

[0041] like Figure 1-7 As shown, a cold region open-pit mine chute unloading and ore-discharging test device comprises a top unloading system 2, a chute system 1 and a bottom ore-discharging system 3 connected in sequence from top to bottom, and a data acquisition and storage system 4 for data acquisition and storage.

[0042] The top unloading system 2 includes a silo 21, a chute 22 and a support plate 23. The silo 21 is located directly above the chute 22, and a silo valve 24 is provided on the top of the silo 21; two support plates 23 are symmetrically arranged on both sides of the silo 21 and the chute 22, and the bottom of the support plate 23 is connected to the fixed frame 12, and the support plate 23 is firmly welded to the top of the fixed frame 12.

[0043] The support plate 23 is provided with a horizontal rectangular groove, and guide rails are provided on both sides of the silo 21, and the guide rails on both sides of the silo 21 are slidably connected to the rectangular groove. The support plate 23 is also provided with an arc groove, and guide rails are provided on both sides of the chute 22, and the guide rails on both sides of the chute 22 are slidably connected to the arc groove. The bottom end of the chute 22 is half fixed on the support plate, and the entire chute 22 rotates with the bottom end as the axis. During the rotation, the guide rails on both sides of the chute 22 move along the arc groove. Specifically, fixed rods are provided on both sides of the bottom end of the chute 22, and a circular hole is provided on the support plate 23. The bottom end of the chute 22 cooperates with the circular hole on the support plate through the fixed rod and is fixed by a nut. The chute 22 can rotate with the fixed rod at the bottom as the axis.

[0044] The ore chute system includes a fixed frame 12 and a chute shaft 11 fixed therein. The fixed frame 12 is a rectangular parallelepiped, and a plurality of fixed plates 13 are arranged inside the frame along the height direction. The fixed plates 13 are sleeved on the outside of the chute shaft 11 to fix the chute shaft 11 and keep it stable so that it does not shake forward, backward, left, or right.

[0045] The chute shaft 11 is located at the center of the fixed frame 12 and is cast in sections by concrete, including a chute section 111 and the remaining three sections. The chute section 111 is further divided into multiple small sections, and each small section is subjected to freeze-thaw treatment separately. According to the similarity theory, concrete materials similar to the surrounding rock materials of the chute in cold-region open-pit mines are designed to make the chute shaft. The chute shaft 11 is cast in sections in a cylindrical steel mold, and bolts are installed on the steel mold to fix and connect the molds of different sections.

[0046] The bottom ore-discharging system 3 is located below the fixed frame 12, and includes an ore-discharging baffle 31, an ore container 32 and a support base 33. The ore container 32 is placed on the support base 33 and is located directly below the chute shaft 11 to collect the ore that has been dropped. The ore-discharging baffle 31 is installed under the fixed frame below the chute shaft 11 and can be pulled and pulled flexibly to control the chute ore-discharging.

[0047] The data acquisition and storage system 4 includes a pressure sensor 41 and a computer 42 electrically connected to the pressure sensor 41 through a data line 43. The pressure sensor 41 is arranged on the wall of the chute shaft 11 to monitor the stress of the wall of the chute shaft 11 poured with concrete. The monitoring points should be pre-selected before pouring concrete. The monitoring points of the chute section are obtained by observing the ore movement trajectory in the acrylic chute model test with a high-speed camera. The monitoring points of the ore storage section are distributed on both sides of the shaft. The computer 42 is used to store the data collected by the sensor 41.

[0048] The above-mentioned cold region open-pit mine chute unloading and ore-discharging test method adopts the above-mentioned cold region open-pit mine chute unloading and ore-discharging test device, which is specifically as follows:

[0049] S1: Based on the rock properties of the chute wall at the mine site and in accordance with the similarity theory, the proportion of the chute shaft casting materials is designed, and the chute shaft 11 is cast.

[0050] S2: According to the diurnal and seasonal temperature changes in the mine, the freeze-thaw temperature is set, and each segment of the upper chute section 111 of the chute shaft 11 is freeze-thawed respectively. After the freeze-thaw is completed, it is connected with other segments of the chute shaft 11 through bolts on the steel mold.

[0051] S3: Install the sensor 41 at the monitoring position reserved on the well wall, and detect whether the data acquisition and storage system 4 works normally.

[0052] S4: Before the test begins, the ore discharge baffle 31 of the bottom ore discharge system 3 is closed, the silo 21 is filled with ore of a certain proportion prepared in advance, and the inclination of the chute 22 is adjusted.

[0053] S5: Open the ore bin valve 24 and start the ore unloading test, so that the ore falls into the chute shaft 11 along the chute 22 under the influence of gravity. When all the ore falls to the bottom of the well, record the data of each pressure sensor 41 on the wall of the chute shaft 11, repeat the ore unloading and store multiple sets of data.

[0054] S6: When the ore in the chute shaft 11 is stored to the storage height required for the test, which in this embodiment is 2 / 3 of the total height of the chute shaft 11, the ore bin valve 24 is closed to stop unloading the ore, and wait for twenty minutes to allow the ore in the shaft to be naturally compacted under the influence of its own weight.

[0055] S7: Open the ore discharge baffle 31 at the bottom of the chute shaft 11 to allow the ore to fall into the ore container 32 below the shaft. After a certain volume of ore is discharged according to the experimental requirements, close the baffle 31, record the data of each sensor 41 on the wall of the chute storage section during the process, and observe whether the ore is blocked during the discharge. Open the ore bin valve 24 to continue the discharge, so that the ore in the chute shaft 11 returns to the height before the discharge, and then repeat the discharge test and record the data of the sensor 41.

[0056] S8: Based on the test data of sensor 41, the stress conditions at different positions of the chute shaft 11 and the impact and wear conditions of the chute wall are analyzed; according to the recorded blockage conditions and positions, the influencing factors of the chute blockage are analyzed to provide a reference for chute unloading in cold-region open-pit mines.

Claims

1. A cold region open-pit mine chute unloading and ore-discharging test device, characterized in that: It includes a top unloading system, a chute system and a bottom ore placing system which are connected in sequence from top to bottom; The chute system includes a chute shaft, the top of which is subjected to freeze-thaw treatment; The data acquisition and storage system monitors the stress conditions of the shaft wall of the chute.

2. The cold region open-pit mine chute unloading and ore-discharging test device according to claim 1 is characterized by: The top unloading system comprises a silo and a chute. The silo is located directly above the chute, and a silo valve is arranged on the top of the silo.

3. The cold region open-pit mine chute unloading and ore-discharging test device according to claim 2 is characterized by: The two support plates are symmetrically arranged on both sides of the silo and the chute, the bottom of the support plates is connected to the fixed frame, and the support plates are firmly welded to the top of the fixed frame.

4. The cold region open-pit mine chute unloading and ore-drawing test device according to claim 3 is characterized by: A horizontal rectangular groove is provided on the support plate, and guide rails are provided on both sides of the silo, and the guide rails on both sides of the silo are slidably connected to the rectangular groove; an arc groove is also provided on the support plate, and guide rails are provided on both sides of the chute, and the guide rails on both sides of the chute are slidably connected to the arc groove; the bottom end of the chute is semi-fixed on the support plate, and the entire chute rotates with the bottom end as the axis. During the rotation, the guide rails on both sides of the chute move along the arc groove.

5. The cold region open-pit mine chute unloading and ore-discharging test device according to claim 1 is characterized by: The ore chute system also includes a fixed frame, in which the ore chute shaft is fixed, and a plurality of fixed plates are arranged inside the frame along the height direction. The fixed plates are sleeved on the outside of the ore chute shaft to fix the ore chute shaft and keep it stable.

6. The cold region open-pit mine chute unloading and ore-drawing test device according to claim 5, characterized in that: The fixing frame is in the shape of a rectangular parallelepiped.

7. The cold region open-pit mine chute unloading and ore-discharging test device according to claim 1 is characterized by: The chute shaft is cast in sections by concrete in a cylindrical steel mold, including a chute mouth section and multiple other sections. The chute mouth section includes multiple small sections, and each small section is subjected to freeze-thaw treatment separately. Bolts are installed on the steel mold to fix and connect the molds of different sections.

8. The cold region open-pit mine chute unloading and ore-drawing test device according to claim 7 is characterized by: According to the similarity theory, the chute shaft is cast in sections using concrete similar to the surrounding rock material of the chute in cold-region open-pit mines.

9. The cold region open-pit mine chute unloading and ore-drawing test device according to claim 7, characterized in that: The data acquisition and storage system includes a pressure sensor and a computer electrically connected thereto for storing data. The pressure sensor is arranged on the wall of the chute shaft, and the monitoring point is pre-selected before concrete pouring.

10. A cold region open-pit mine chute unloading and ore discharge test method, using the cold region open-pit mine chute unloading and ore discharge test device according to any one of claims 1 to 9, characterized in that: The specific steps include: S1: According to the rock properties of the chute wall at the mine site and in accordance with the similarity theory, the proportion of the chute shaft casting materials is designed and the chute shaft is cast; S2: According to the diurnal and seasonal temperature changes in the mine, the freeze-thaw temperature is set, and each segment of the upper chute section of the chute is freeze-thawed separately. After the freeze-thaw is completed, it is connected with other segments of the chute shaft; S3: Install sensors at the monitoring positions reserved on the well wall and detect whether the data acquisition and storage systems are working properly; S4: Before the test begins, close the bottom ore discharge system, fill the silo with the ore prepared in advance, and adjust the inclination of the chute; S5: Open the ore bin valve and start the ore unloading test, so that the ore falls into the chute shaft along the chute under the influence of gravity. When all the ore falls to the bottom of the shaft, record the data of each pressure sensor on the wall of the chute shaft, repeat the ore unloading and store multiple sets of data; S6: When the ore in the shaft reaches the storage height required for the test, close the ore bin valve to stop unloading the ore, and wait for the ore in the shaft to be naturally compacted under the influence of its own weight; S7: Open the ore discharge baffle at the bottom of the chute shaft to allow the ore to fall into the ore container below the shaft. After releasing a certain volume of ore according to the experimental requirements, close the baffle, record the data of each sensor on the wall of the chute storage section during the process, and observe whether the ore is blocked during the ore discharge; open the ore bin valve to continue to discharge the ore, so that the ore in the chute shaft returns to the height before the ore discharge, and then repeat the ore discharge test and record the sensor data; S8: Based on the data from sensor testing, it provides a reference for unloading ore from open-pit mines in cold regions.