Method for predicting soil body vertical deformation caused by space curve shield grouting pressure
By decomposing the action direction of grouting pressure, predicting the vertical deformation of the soil by the shield grouting pressure, solving the problem of predicting the vertical deformation of the soil in the spatial curve shield construction, and improving the accuracy and control ability of tunnel construction.
Patent Information
- Application Number
- CN202411270266.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-11
- Publication Date
- 2024-11-12
AI Technical Summary
In the construction of space curve shields, it is difficult to accurately predict the vertical deformation of the shield grouting pressure on the soil, affecting the accuracy and ground impact of tunnel construction.
By establishing a spatial rectangular coordinate system and calculation model, the direction of grouting pressure is decomposed, and the impact of each component of the shield grouting pressure on the soil is obtained, and the vertical deformation of the soil is predicted.
Accurate prediction of the vertical deformation of soil caused by the grouting pressure of the space curve shield structure is achieved, providing a reference for actual tunnel construction, and improving construction accuracy and control capabilities.
Smart Images

Figure BDA0005038497350000021 
Figure BDA0005038497350000024 
Figure BDA0005038497350000027
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of tunnel engineering, and in particular relates to a method for predicting vertical deformation of soil caused by grouting pressure of a space curved shield. Background Art
[0002] Shield construction has the advantages of little interference with urban ground traffic, short construction period, and adaptability to complex and changeable underground environments. It is currently the preferred construction method for urban tunnels. With the continuous development of underground space and the further improvement of tunnel selection requirements, more and more space arc shield tunnels are designed and constructed. The construction of space line shield tunnels is more difficult and the impact on the ground is more complicated. In order to ensure that the shield machine excavates according to the predetermined space axis, the attitude control requirements of the shield machine are also relatively high. These are the main problems in space line shield construction.
[0003] The main factors that affect soil settlement during shield construction are soil loss and construction load. Soil loss mainly comes from the integration gap at the shield tail, and there is also an over-excavation gap in the small radius turning section. The construction loads with greater influence include: additional front thrust, axial friction of the shield shell on the soil, and grouting pressure at the shield tail.
[0004] In view of the grouting pressure at the shield tail, a method for predicting the vertical deformation of soil caused by the grouting pressure of a spatial curved shield is needed. Summary of the invention
[0005] The purpose of the present invention is to provide a method for predicting the vertical deformation of soil caused by the grouting pressure of a spatial curved shield based on the deficiencies of the above-mentioned prior art. The shield grouting pressure is decomposed according to the direction of action of the grouting pressure, and the vertical soil loss caused by the various components of the shield grouting pressure acting on the soil behind the shield shell is obtained, thereby realizing the prediction of the vertical deformation of soil caused by the grouting pressure of a spatial curved shield and providing a reference for actual tunnel construction.
[0006] The purpose of the present invention is achieved by the following technical solutions:
[0007] A method for predicting vertical deformation of soil caused by grouting pressure of a space curved shield, the prediction method comprising the following steps:
[0008] S1: Establish a spatial rectangular coordinate system and construct a spatial curved shield tunnel calculation model based on the tunneling posture of the shield machine;
[0009] The coordinate origin O, the x-axis and the y-axis in the spatial rectangular coordinate system are all located on the surface of the earth, and the z-axis is vertically downward;
[0010] Assume that the shield machine is located at a depth of h underground, starts from the negative half-axis of the y-axis, and turns right with a curvature radius of Q to excavate; the shield machine excavates to the xOz surface, indicating that the shield machine enters the abnormal excavation section from the normal excavation section;
[0011] S2: Take the shield tail section as the first ring segment control section, and obtain the spatial parameter equation of the outer wall of the control section according to the equation of the rotating surface in space;
[0012] Among them, the spatial parameter equation of the outer wall of the control section is:
[0013]
[0014] In the formula, is the angle between any point on the shield shell of the shield machine and the vertical line connecting the central axis of the shield machine and the x-axis; R is the shield excavation radius; α is the yaw angle of the shield machine; β is the pitch angle of the shield machine; θ s is the rotation angle of the shield machine during the excavation of the abnormal excavation section; the length occupied by the shield machine is converted into an angle θ L for: L is the length of the shield machine, Q yaw is the curvature radius of the shield machine during the excavation process of the abnormal excavation section;
[0015] It can be seen that the coordinates of the center C3 of the control section are:
[0016] C3=(Q·cos(θ s -α-θ L ),Q·sin(θ s -α-θ L ),h+Q·(θ s -α-θ L )·tanβ);
[0017] Suppose any point on the ring is Then the vector in:
[0018]
[0019] vector That is the point The direction of grouting pressure action;
[0020] S3: Decompose the shield grouting pressure f3 according to the direction of grouting pressure, and obtain the vertical soil loss W caused by the various components of the shield grouting pressure f3 acting on the soil behind the shield shell GP ;
[0021] Among them, the shield grouting pressure f3 is decomposed into:
[0022]
[0023] In the formula, f 3x 、f 3y and f 3z represents the components of f3 in the x, y and z directions;
[0024] The vertical soil loss caused by the components of shield grouting pressure f3 acting on the soil behind the shield shell is:
[0025]
[0026] Where b is the width of the segment;
[0027] φ is the angle range of the shield machine in the tunnel;
[0028] ω x is the thickness of the over-excavation layer in the x-axis direction, ω y is the thickness of the over-excavation layer in the y-axis direction, ω z is the thickness of the over-excavation layer in the z-axis direction;
[0029] in:
[0030]
[0031] The value of φ is:
[0032]
[0033] ω x ,ω y and ω z This is a rewrite of the classic Mindlin displacement solution, that is, the point of action of the concentrated force F (0,0,c) is changed to an arbitrary point (x0,y0,z0), and the vertical displacement calculation formula of a point (x,y,z) in the soil body caused by a unit force acting on an arbitrary point (x0,y0,z0) in the semi-infinite elastic body along the positive direction of the x,y and z axes is obtained:
[0034]
[0035] In the formula, G is the shear elastic modulus, μ is the Poisson's ratio, r is the distance between point (x, y, z) and point (x0, y0, z0), is the distance between the point (x,y,z) and the point (x0,y0,–z0).
[0036] The advantages of the present invention are: the shield grouting pressure is decomposed according to the direction of action of the grouting pressure, and then the vertical soil loss caused by the various components of the shield grouting pressure acting on the soil behind the shield shell is obtained, thereby realizing the prediction of the vertical deformation of the soil caused by the grouting pressure of the spatial curve shield, and providing a reference for actual tunnel construction. DETAILED DESCRIPTION
[0037] The features of the present invention and other related features are further described in detail below through embodiments to facilitate understanding by those skilled in the art:
[0038] Embodiment: This embodiment specifically relates to a method for predicting the vertical deformation of soil caused by grouting pressure of a space curved shield, and the prediction method mainly includes the following steps:
[0039] S1: Establish a spatial rectangular coordinate system and construct a spatial curved shield tunnel calculation model based on the tunneling posture of the shield machine.
[0040] Among them, the coordinate origin O, the x-axis and the y-axis in the spatial rectangular coordinate system are all located on the surface, and the z-axis is vertically downward. Assume that the shield machine is located at a depth of h underground, starting from the negative half of the y-axis (normal excavation section), and turning right with a curvature radius of Q; the shield machine excavates to the xOz surface, that is, when y=0, it reaches the end point of the normal excavation surface, indicating that the shield machine enters the abnormal excavation section from the normal excavation section.
[0041] S2: Take the shield tail section as the first ring segment control section, and obtain the spatial parameter equation of the outer wall of the control section based on the equation of the rotating surface in space.
[0042] Among them, the spatial parameter equation of the outer wall of the control section is:
[0043]
[0044] In the formula, is the angle between any point on the shield shell of the shield machine and the vertical line connecting the central axis of the shield machine and the x-axis; R is the shield excavation radius; α is the yaw angle of the shield machine; β is the pitch angle of the shield machine; θ s is the rotation angle of the shield machine during the excavation of the abnormal excavation section; the length occupied by the shield machine is converted into an angle θ L for:
[0045] L is the length of the shield machine, Q yaw is the curvature radius of the shield machine during the excavation process in the abnormal excavation section;
[0046] It can be seen that the coordinates of the center C3 of the control section are:
[0047] C3=(Q·cos(θ s -α-θ L ),Q·sin(θ s -α-θ L ),h+Q·(θ s -α-θ L )·tanβ);
[0048] Suppose any point on the ring is Then the vector in:
[0049]
[0050] vector That is the point The direction of grouting pressure.
[0051] S3: Decompose the shield grouting pressure f3 according to the direction of grouting pressure, and obtain the vertical soil loss W caused by the various components of the shield grouting pressure f3 acting on the soil behind the shield shell GP .
[0052] Among them, the shield grouting pressure f3 is decomposed into:
[0053]
[0054] In the formula, f 3x 、f 3y and f 3z represents the components of f3 in the x, y and z directions;
[0055] The vertical soil loss caused by the components of shield grouting pressure f3 acting on the soil behind the shield shell is:
[0056]
[0057] Where b is the width of the segment;
[0058] φ is the angle range of the shield machine in the tunnel, and the value of φ is:
[0059]
[0060] ω x is the thickness of the over-excavation layer in the x-axis direction, ω y is the thickness of the over-excavation layer in the y-axis direction, ω z is the thickness of the over-excavation layer in the z-axis direction;
[0061] ω x ,ω y and ω z This is a rewrite of the classic Mindlin displacement solution, that is, the point of action of the concentrated force F (0,0,c) is changed to an arbitrary point (x0,y0,z0), and the vertical displacement calculation formula of a point (x,y,z) in the soil body caused by a unit force acting on an arbitrary point (x0,y0,z0) in the semi-infinite elastic body along the positive direction of the x,y and z axes is obtained:
[0062]
[0063]
[0064] In the formula, G is the shear elastic modulus, μ is the Poisson's ratio, r is the distance between point (x, y, z) and point (x0, y0, z0), is the distance between the point (x,y,z) and the point (x0,y0,–z0).
[0065] in:
[0066]
[0067] The beneficial effect of this embodiment is that the shield grouting pressure is decomposed according to the direction of action of the grouting pressure, and then the vertical soil loss caused by the various components of the shield grouting pressure acting on the soil behind the shield shell is obtained, thereby realizing the prediction of the vertical deformation of the soil caused by the grouting pressure of the spatial curve shield, and providing a reference for actual tunnel construction.
Claims
1. A method for predicting the vertical deformation of soil caused by grouting pressure of a space curved shield, characterized in that The prediction method comprises the following steps: S1: Establish a spatial rectangular coordinate system and construct a spatial curved shield tunnel calculation model based on the tunneling posture of the shield machine; The coordinate origin O, the x-axis and the y-axis in the spatial rectangular coordinate system are all located on the surface of the earth, and the z-axis is vertically downward; Assume that the shield machine is located at a depth of h underground, starts from the negative half-axis of the y-axis, and turns right with a curvature radius of Q to excavate; the shield machine excavates to the xOz surface, indicating that the shield machine enters the abnormal excavation section from the normal excavation section; S2: Take the shield tail section as the first ring segment control section, and obtain the spatial parameter equation of the outer wall of the control section according to the equation of the rotating surface in space; Among them, the spatial parameter equation of the outer wall of the control section is: In the formula, is the angle between any point on the shield shell of the shield machine and the vertical line connecting the central axis of the shield machine and the x-axis; R is the shield excavation radius; α is the yaw angle of the shield machine; β is the pitch angle of the shield machine; θ s is the rotation angle of the shield machine during the excavation of the abnormal excavation section; the length occupied by the shield machine is converted into an angle θ L for: L is the length of the shield machine, Q yaw is the curvature radius of the shield machine during the excavation process of the abnormal excavation section; It can be seen that the coordinates of the center C3 of the control section are: C3=(Q·cos(θ) s -a-i L ),Q·sin(θ s -a-i L ),h+Q·(θ s -a-i L )·tanβ); Suppose any point on the ring is Then the vector in: vector That is the point The direction of grouting pressure action; S3: Decompose the shield grouting pressure f3 according to the direction of grouting pressure, and obtain the vertical soil loss W caused by the various components of the shield grouting pressure f3 acting on the soil behind the shield shell GP ; Among them, the shield grouting pressure f3 is decomposed into: In the formula, f 3x 、f 3y and f 3z represents the components of f3 in the x, y and z directions; The vertical soil loss caused by the components of shield grouting pressure f3 acting on the soil behind the shield shell is: Where b is the width of the segment; φ is the angle range of the shield machine in the tunnel; ω x is the thickness of the over-excavation layer in the x-axis direction, ω y is the thickness of the over-excavation layer in the y-axis direction, ω z is the thickness of the over-excavation layer in the z-axis direction; in:
2. A method for predicting soil vertical deformation caused by grouting pressure of a space curved shield according to claim 1, characterized in that The value of φ is:
3. The method for predicting soil vertical deformation caused by grouting pressure of a space curved shield according to claim 1 is characterized in that ω x ,ω y and ω z This is a rewrite of the classic Mindlin displacement solution, that is, the point of action of the concentrated force F (0,0,c) is changed to an arbitrary point (x0,y0,z0), and the vertical displacement calculation formula of a point (x,y,z) in the soil body caused by a unit force acting on an arbitrary point (x0,y0,z0) in the semi-infinite elastic body along the positive direction of the x,y and z axes is obtained: In the formula, G is the shear elastic modulus, μ is the Poisson's ratio, r is the distance between point (x, y, z) and point (x0, y0, z0), is the distance between the point (x,y,z) and the point (x0,y0,–z0).