Interrupted landing test flight method suitable for troposphere manned airship
Through the interrupted landing test flight method of the troposphere manned airship, including the selection of test conditions and specific flight steps, the problem of domestic test flight technology gaps has been solved, the repeatable and standardized test flight process has been realized, and the test flight efficiency and quality of the manned airship has been improved. Ensures stable climb and driver expectations conditions.
Patent Information
- Application Number
- CN202410921755.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-10
- Publication Date
- 2024-11-12
- Estimated Expiration
- 2044-07-10
AI Technical Summary
The domestic tropospheric airship model qualification certification test flight technology and methods are basically blank, and there is a lack of repeatable and standardized test flight requirements, which makes it difficult to improve the efficiency and quality of manned airship test flights.
Provide a method for interrupted landing test flight suitable for tropospheric manned airships, including selecting test conditions, closing a small throttle with the elevator to control and sliding, sliding down into the predetermined landing point range, lift pull rod to the end and maintaining the maximum throttle, maintaining a positive climb rate, and returning to the normal And the step of landing ensures that the process is easy to manipulate and does not require special flight technology.
The repeatable and standardized solution for the interrupted landing test flight of the troposphere manned airship has been realized, which improves the test flight efficiency and quality, meets the expected sinking volume and attitude changes of the driver, and ensures that the stable climbing gradient is no less than 1/30.
Smart Images

Figure CN118936819A_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of airship flight test, and in particular relates to an interrupted landing flight test method suitable for a tropospheric manned airship. Background Art
[0002] The Civil Aviation Administration of China issued the type certification of the airship (AC-21-AA-2009-09R1), which adopted the (FAA P-8110-2) airship design guidelines, Article 2.12, which stipulates the rejected landing. It clearly requires that the airship must demonstrate its ability to glide in at the maximum landing weight, land and then transition to an rejected landing climb. No special driving skills are required during the process, and the airship must not sink excessively. The airship's configuration at this time includes: the auxiliary airbags are pressed down for gliding and landing balance and the landing gear is in the lowered position.
[0003] So far, the domestic flight test technology and methods for tropospheric airship type certification flight test are basically blank. It is necessary to implement repeatable and standardized flight test requirements for airship flight test, standardize the flight test weight center of gravity, flight test procedures, and flight test methods, form unified verification requirements, and improve the efficiency and quality of manned airship flight test. Summary of the invention
[0004] Purpose of the Invention
[0005] In order to improve the test flight efficiency and quality of a manned airship, the present invention provides an interrupted landing test flight method applicable to a tropospheric manned airship.
[0006] Inventing technical solutions
[0007] A method for aborted landing test flight applicable to a tropospheric manned airship comprises the following steps:
[0008] Step 1: Select the test conditions;
[0009] Step 2: Reduce the throttle and use the elevator to descend;
[0010] Step 3: Glide down into the range of the predetermined landing point;
[0011] Step 4: Pull the elevator stick to the bottom and hold it, push the throttle to the maximum continuously, and the action is completed when the climb rate is positive and maintained for the set time;
[0012] Step 5: Return and land normally.
[0013] Preferably, in the first step, the maximum landing weight and the front center of gravity of the airship are selected as the test conditions.
[0014] Preferably, the time set in the third step is 5s.
[0015] Preferably, the second step is performed after the airship takes off normally and climbs to a set altitude.
[0016] Preferably, in the third step, when the aircraft glides down into the range of the predetermined landing point, an interrupted landing recovery maneuver is performed at a set field height, and then the fourth step is performed.
[0017] Preferably, the entire test flight process needs to satisfy the requirement that the airship is easy to control during the transition from landing approach to aborted landing and recovery climb.
[0018] Preferably, the entire test flight process also needs to satisfy the requirement that the pilot does not need any special flying skills.
[0019] Preferably, the entire test flight process must also satisfy the requirement that the airship's sinking amount and attitude change during the test flight meet the pilot's expectations.
[0020] Preferably, the entire test flight process must also meet the requirement that after the landing is interrupted and the stable climb is changed, the climb gradient is not less than 1 / 30.
[0021] Advantages of the present invention: The present invention fills the gap in the test flight method for type certification of tropospheric manned airships in interrupted landing, realizes a repeatable and standardized test flight plan, forms unified verification requirements, and improves the test flight efficiency and test flight quality of tropospheric manned airships in interrupted landing. BRIEF DESCRIPTION OF THE DRAWINGS
[0022] Figure 1 The present invention is a flow chart of an interrupted landing test flight method applicable to a tropospheric manned airship. DETAILED DESCRIPTION
[0023] The present invention is achieved through the following technical solutions.
[0024] A method for a tropospheric manned airship aborted landing test flight, the method comprising the following steps:
[0025] Step 1: Select the maximum landing weight and front center of gravity of the airship as the test conditions;
[0026] Step 2: Reduce the throttle and use the elevator to descend;
[0027] Step 3: Glide down into the range of the predetermined landing point;
[0028] Step 4: Pull the elevator stick to the bottom and hold it, push the throttle to the maximum continuously, and the action is completed when the climb rate is positive and remains for 5 seconds;
[0029] Step 5: Return and land normally;
[0030] Step 6: The process of the airship switching from landing approach to landing interruption and climbing is easy to control and does not require special flying skills. The airship's sinking amount and attitude change are in line with the pilot's expectations. After the landing is interrupted and the climb is changed to a stable climb, the climb gradient is not less than 1 / 30. Special flying skills refer to driving skills that are beyond the operating capabilities of ordinary pilots and require special training to master.
[0031] Implementation example: The process of the type certification flight test of a manned airship with aborted landing is as follows:
[0032] 1) Before the test, set the weight, center of gravity position, etc. according to the test requirements;
[0033] 2) The airship takes off normally and climbs to a height of 100m;
[0034] 3) When the airship is at an altitude of 100m, adjust the bow to face the wind, reduce the throttle and start the approach descent by controlling the elevator, adjust the descent speed to about 50km / h, and the descent pitch angle to about -10° for a stable descent;
[0035] 4) When the aircraft enters the range of the planned landing point during descent, execute the aborted landing recovery maneuver when the ground altitude is not less than 20m;
[0036] 5) Pull the elevator stick to the bottom and hold it, push the throttle to the maximum continuously, and the action is completed when the climb rate is positive and remains for 5 seconds;
[0037] 6) Adjust the altitude, return home and land normally;
[0038] 7) The process of the airship switching from landing approach to aborted landing and climbing out is easy to control and does not require special flying skills. The airship's sinking amount and attitude changes during this period are in line with the pilot's expectations.
[0039] After the landing is interrupted and the aircraft is switched to a steady climb, the climb gradient shall not be less than 1 / 30.
[0040] The above embodiments are only for illustrating the technical concept and features of the present invention, and their purpose is to enable technicians familiar with the technical field to understand the content of the present invention and implement it accordingly, and they cannot be used to limit the protection scope of the present invention. Any equivalent transformation or modification made according to the spirit and essence of the present invention should be included in the protection scope of the present invention. The technology, shape, and structure parts not described in detail in the present invention are all well-known technologies.
Claims
1. A method for aborted landing test flight suitable for a tropospheric manned airship. It is characterized in that The steps include: Step 1: Select the test conditions; Step 2: Reduce the throttle and use the elevator to descend; Step 3: Glide down into the range of the predetermined landing point; Step 4: Pull the elevator stick to the bottom and hold it, push the throttle to the maximum continuously, and the action is completed when the climb rate is positive and maintained for the set time; Step 5: Return and land normally.
2. A method for aborted landing test flight for a tropospheric manned airship as claimed in claim 1, It is characterized in that In the first step, the maximum landing weight and the front center of gravity of the airship are selected as the test conditions.
3. The method for aborted landing test flight for a tropospheric manned airship as claimed in claim 1, It is characterized in that The time set in the third step is 5s.
4. The method for aborted landing test flight for a tropospheric manned airship as claimed in claim 1, It is characterized in that The second step is performed after the airship takes off normally and climbs to the set altitude.
5. The method for aborted landing test flight for a tropospheric manned airship as claimed in claim 1, It is characterized in that The third step is to execute the interrupted landing recovery maneuver at the set field height when the aircraft descends into the predetermined landing point range, and then proceed to the fourth step.
6. The method for aborted landing test flight for a tropospheric manned airship as claimed in claim 1, It is characterized in that The entire test flight process must ensure that the airship is easy to control from the landing approach to the interrupted landing and climb.
7. A method for aborted landing test flight for a tropospheric manned airship as claimed in claim 6, It is characterized in that The entire test flight process must also not require the pilot to have special flying skills.
8. The method for aborted landing test flight for a tropospheric manned airship as claimed in claim 7, It is characterized in that The entire test flight process must also ensure that the airship's sinking amount and attitude changes during the test flight meet the pilot's expectations.
9. The method for aborted landing test flight for a tropospheric manned airship as claimed in claim 8, It is characterized in that The entire test flight process must also meet the requirement that after the landing is interrupted and the climb is changed to a stable climb, the climb gradient must be no less than 1 / 30.
Citation Information
Patent Citations
Low-risk helicopter rising and landing critical decision point test flight method
CN105628326A
Automatic landing control method for large-gliding-ratio unmanned aerial vehicle
CN112433533A
Aircraft landing monitor
US20150367956A1
IN7016CH2015A
