Method and system for determining opportunity of water plugging operation of oil well
By constructing a three-dimensional geological model and a two-phase oil-water flow model, and introducing injection and procurement conditions, the problem that the impact of changes in injection and procurement conditions in traditional simulation methods is solved, and more accurate prediction of water blockage of oil wells and operation optimization is achieved, reducing costs and production interference.
Patent Information
- Application Number
- CN202411165135.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-23
- Publication Date
- 2024-11-12
- Estimated Expiration
- 2044-08-23
AI Technical Summary
Traditional reservoir simulation methods fail to effectively reflect the dynamic changes in injection and production conditions, resulting in deviations in the prediction results of oil wells blocked water, affecting the stable production and life cycle of oil wells.
A three-dimensional geological model is used to construct a three-dimensional geological model, establish a two-phase oil-water flow model, introduce the influence of injection and production conditions, and predict the advancement of the water-drive leading edge by optimizing model parameters and time-lapse simulations to determine the timing of water blockage in the oil well.
It improves the accuracy and reliability of water blocking prediction, accurately predicts the response of oil wells and locates severe flooded areas, reducing operating costs and production interference.
Smart Images

Figure CN118940673A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of petroleum engineering, and in particular to a method and a system for determining the timing of water plugging operation in an oil well. Background Art
[0002] As the oil well is produced, the water in the reservoir will gradually gather towards the oil well, causing the water content of the oil well to increase, which is called water flooding. Water flooding will not only reduce the oil production efficiency of the oil well, but also increase the production cost, because the treatment and separation of produced water requires additional energy consumption and expenses. In addition, severe water flooding may also cause the oil well to stop production prematurely. Therefore, accurately predicting the development trend of water flooding and taking water plugging measures in advance are crucial to maintaining the stable production of oil wells and extending the life cycle of oil wells. In recent years, the advancement of geological modeling software, the improvement of high-performance computing capabilities, and the application of big data analysis technology have provided new opportunities for oil well management. The dynamic changes of water injection wells and production wells, such as water injection pressure, water injection volume, production well pumping rate, bottom hole pressure, etc., will affect the distribution and movement of fluids in the reservoir. If the model cannot accurately reflect these changes, the prediction results will be biased. Traditional reservoir simulation simplifies the influence of injection and production conditions, resulting in deviations between the model and the actual production situation. Therefore, a method and system for determining the timing of oil well water plugging operations are provided. Summary of the invention
[0003] The purpose of the present invention is to provide a method and system for determining the timing of oil well water plugging operations, so as to solve the problem that the simplified injection and production conditions proposed in the above background technology, such as the dynamic changes of injection and production wells, capillary pressure effects, etc., lead to deviations between the model and the actual production situation.
[0004] To achieve the above object, the present invention provides a method for determining the timing of oil well water plugging operation, comprising the following steps:
[0005] S1. Collect historical production data of oil wells, injection water data of water injection wells connected to the oil wells, and geological data of the block where the oil wells are located;
[0006] S2. Based on the collected historical production data of the oil wells, the injected water data of the water injection wells connected to the oil wells, and the geological data of the block where the oil wells are located, define the initial oil and water conditions and boundary conditions, and use geological modeling software to construct a three-dimensional geological model;
[0007] S3. On the basis of the three-dimensional geological model, an oil-water two-phase flow model is established. The historical production data of the oil wells, the injection water data of the water injection wells connected to the oil wells, and the geological data of the block where the oil wells are located are input into the oil-water two-phase flow model to determine whether the oil-water two-phase flow model is established. In this process, which parameters have an impact on the model results are determined, and then these parameters are adjusted first. The parameters are adjusted repeatedly and iteratively until satisfactory results are achieved.
[0008] The oil-water two-phase flow model includes the mass conservation equation of the oil phase flow, the mass conservation equation of the water phase flow, the momentum conservation equation of the oil phase and the momentum conservation equation of the water phase;
[0009] The influence of injection and production conditions is introduced into the mass conservation equation of oil phase flow and the mass conservation equation of water phase flow for optimization. The optimized oil-water two-phase flow model is as follows:
[0010] Injection-production conditions include injection-production ratio, injection well spacing, and injection method;
[0011]
[0012] q w,adjusted =q w ×(1+R)×e -αd ×g(t)
[0013] g(t)=Asin(ωt)+B
[0014] Among them, q o,adjusted is the optimized oil source and sink term; R is the injection-production ratio; α is the empirical constant; d is the distance between the injection and production wells; q w,adjusted is the optimized water source and sink term; g(t) is the time function; A is the amplitude; ω is the angular frequency; t is the time; B is the offset;
[0015] The mass conservation equation of the optimized oil phase flow is:
[0016]
[0017] The optimized mass conservation equation for water phase flow is:
[0018]
[0019] S4. Use the time-lapse simulation method to simulate the movement of oil and water in different time periods of the oil-water two-phase flow model and predict the advancement of the water flooding front;
[0020] S5. Evaluate the current water flooding status of the oil well based on the predicted advancement of the water drive front. If the oil well enters the high water flooding stage, determine whether water plugging is economically feasible. If it is economically feasible, implement water plugging operations.
[0021] As a further improvement of the technical solution, in S1, the historical production data includes production and water content; the injected water data of the water injection well connected to the oil well includes injection volume, injection pressure and geological data; the geological data of the block where the oil well is located includes geological structure map, core data, logging data, oil well fluid properties and capillary pressure;
[0022] As a further improvement of the technical solution, the specific steps of S2 are as follows:
[0023] S21. Divide the study area into multiple cells based on geological data;
[0024] S22, assigning corresponding geological attributes to each grid, and using Kriging interpolation method to estimate the attribute values of the locations that are not directly measured;
[0025] S23, defining the fluid type in the oil well, initializing the fluid and setting the boundary conditions of the model; setting the initial fluid distribution and pressure conditions, and at the same time, setting the boundary conditions of the model;
[0026] S24. Use geological modeling software to integrate the above information and generate a complete three-dimensional geological model.
[0027] As a further improvement of the technical solution, in S22, the specific method of estimating the attribute value of the location not directly measured by the Kriging interpolation method is as follows:
[0028]
[0029] Among them, λ i is the proportion of the i-th observation point in predicting the attribute value of the unknown point u0; C(u0,u i ) is the predicted unknown point u0 and the observed point u i The covariance of the observations between 2 is a small error; u0 is the unknown point of prediction; u i is the position of the i-th observation point; u j is the position of the jth observation point.
[0030] As a further improvement of the technical solution, the fluid initialization in S23 includes initialization saturation and initialization pressure, and the boundary conditions include closed boundary, constant pressure boundary and constant flow boundary. The specific method is as follows:
[0031] Initialize saturation:
[0032]
[0033] S o (x) = 1-S w (x)
[0034] Among them, S w (x) is the initial water phase saturation at position x; S w is the initial water phase saturation in the water saturated zone; Ω w is the spatial area occupied by the water phase; Ω o is the spatial area occupied by the oil phase; S o (x) is the initial oil phase saturation at position x;
[0035] Initial pressure:
[0036] P(x)=P ref +ρ·g·z
[0037] Where P(x) is the initial pressure at position x; P ref is the reference pressure; ρ is the density of the fluid; g is the acceleration due to gravity; z is the depth;
[0038] Closed boundary: q(x b )=0;
[0039] Constant pressure boundary: P(x b )=P b ;
[0040] Constant current boundary: q(x b )=q b ;
[0041] Among them, q(x b ) is on the boundary x b Fluid flow rate at; P(x b ) is on the boundary x b The pressure at b is the set boundary pressure value; q b is the set boundary flow value.
[0042] As a further improvement of the technical solution, in S3, the specific method for establishing the oil-water two-phase flow model is as follows:
[0043] Mass conservation equation for oil phase flow:
[0044]
[0045] Where φ is the porosity; S o is the saturation of the oil phase; ρ o is the density of the oil phase; is the net inflow or outflow rate of fluid per unit volume; u o Average velocity of the oil phase; q o is the source and sink term of the oil phase;
[0046] The mass conservation equation for water phase flow is:
[0047]
[0048] Among them, S w is the saturation of the water phase; ρ w is the density of the water phase; u w is the average velocity of the water phase; q w is the source and sink term of the water phase;
[0049] The momentum conservation equation for the oil phase is:
[0050]
[0051] Among them, k ro is the relative permeability of the oil phase; μ o is the dynamic viscosity of the oil phase; k is the absolute permeability; p o is the pressure of the oil phase; g is the acceleration due to gravity; λ o is the effective fluidity of the oil phase; p c is the capillary pressure;
[0052] The momentum conservation equation for the oil phase is:
[0053]
[0054] Among them, k rw is the relative permeability of the water phase; μ w is the dynamic viscosity of the water phase; p w is the pressure of the water phase; ω is the effective mobility of the water phase;
[0055] As a further improvement of the present technical solution, the advancement of the water flooding front in S4 includes the moving speed, direction and water saturation distribution of the oil-water interface. The specific position of the water flooding front is determined by analyzing the moving speed, direction and water saturation distribution of the oil-water interface.
[0056] As a further improvement of the technical solution, by analyzing the moving speed, direction and water saturation distribution of the oil-water interface, the specific method for determining the specific position of the water flooding front is as follows:
[0057] Movement speed of oil-water interface:
[0058]
[0059] Among them, v avg is the moving speed of the oil-water interface; d1 is the first position of the oil-water interface; d2 is the second position of the oil-water interface; t1 is the first time; t2 is the second time;
[0060] Water saturation distribution:
[0061]
[0062] Among them, Δx and Δy are the sizes of the spatial grid; is the water saturation at the next time step; is the water saturation of the current time step; Δt is the time step; is the amount of water injected at the k+1th time step; is the water output at the k+1th time step; is the amount of water flowing in or out from the adjacent grid cell at the k+1th time step;
[0063] Specific location of the water drive front:
[0064]
[0065] Among them, L f (t) is the position of the water drive front at time T; S w (x,T) is the distribution function of water saturation; x is the spatial position; T is the time; S w,threshold is the water saturation threshold; is the operation of taking the maximum value among all spatial positions x.
[0066] As a further improvement of the technical solution, the specific method for judging whether water plugging of the oil well is economically feasible in S5 is as follows:
[0067] Remaining oil distribution prediction:
[0068] S r (i,j)=S o (i,j)-S w (i,j)
[0069] Among them, S r (i, j) is the residual oil saturation; S o (i,j) is the oil saturation; S w (i,j) is water saturation;
[0070] V r (i,j)=φ(i,j)·Δx·Δy·S r (i,j)
[0071] Among them, V r (i,j) is the volume of remaining oil; φ(i,j) is the porosity;
[0072] Water plugging cost:
[0073] C=(C che m+C labor)+(V los t·P)
[0074] Among them, C is the total cost; C chem C is the cost of chemicals; labor V is labor cost; lost is the reduced output; P is the crude oil price;
[0075] Expected Returns:
[0076] R=∑ (i,j) ΔV r (i,j)·P
[0077] Where R is the expected return; ∑ (i,j) ΔV r (i,j) is the amount of recoverable crude oil;
[0078] Net Present Value:
[0079] NPV=RC
[0080] Among them, NPV is the net present value.
[0081] On the other hand, the present invention provides a system for determining the timing of oil well water plugging operations, comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein the processor executes the computer program to implement any of the above-described methods for determining the timing of oil well water plugging operations.
[0082] Compared with the prior art, the present invention has the following beneficial effects:
[0083] 1. In the method and system for determining the timing of oil well water plugging operation, advanced geological modeling software constructs a three-dimensional geological model, which can more accurately reflect the actual situation of the oil well, improve the accuracy of water plugging prediction, and use time-lapse simulation method to predict the changes in oil-water two-phase flow in different time periods, thereby predicting the advancement of the water drive front;
[0084] 2. In the method and system for determining the timing of oil well water plugging operations, the influence of injection and production conditions is introduced into the oil-water two-phase flow model, so that the model is closer to actual working conditions, the accuracy and reliability of the prediction are improved, and the response of the oil well is predicted more accurately and the area with the most serious water flooding in the oil well is located more accurately, so as to implement water plugging operations in a targeted manner, avoid unnecessary comprehensive adjustments to the entire oil well or oil well network, and reduce operating costs and production interference. BRIEF DESCRIPTION OF THE DRAWINGS
[0085] Figure 1 The figure is a flow chart of the overall method of the present invention. DETAILED DESCRIPTION
[0086] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0087] Example 1: Please refer to Figure 1 As shown, this embodiment provides a method for determining the timing of oil well water plugging operation, comprising the following steps:
[0088] S1. Collect historical production data of oil wells, injection water data of water injection wells connected to the oil wells, and geological data of the block where the oil wells are located;
[0089] Among them, historical production data includes production and water content; temperature is the temperature of the fluid in the oil well, measured by a downhole thermometer; production is the daily production of the oil well, including the production of crude oil, natural gas and water; pressure is the bottom hole static pressure and flowing pressure of the oil well, reflecting the energy state of the reservoir, obtained by downhole pressure gauge testing; water content is the percentage of water in the fluid produced by the oil well, obtained by fluid laboratory analysis or on-site measurement;
[0090] The injection water data of the water injection wells connected to the oil wells include injection volume, injection pressure and geological data; the injection volume is the daily injection water volume of the water injection well, which is used to maintain the reservoir pressure or drive the crude oil in the reservoir, and is recorded by the flow meter of the water injection well; the injection pressure is the wellhead pressure or bottom hole pressure of the water injection well, which reflects the difficulty of water injection and the pressure condition of the reservoir, and is obtained through the wellhead pressure gauge or downhole pressure sensor; water quality analysis mainly analyzes the content of impurities in the injected water, such as minerals, dissolved gases and microorganisms. Water quality analysis is generally carried out in the laboratory by performing chemical and physical analysis on the samples;
[0091] The geological data of the block where the oil well is located include geological structure maps, core data, logging data, oil well fluid properties and capillary pressure; geological structure maps can show the three-dimensional structure of the reservoir and are generated by seismic exploration and geological interpretation; core data are rock samples taken from the well, providing information about the physical and chemical properties of the reservoir rock, and are also analyzed in the laboratory, including the color structure, mineral composition, chemical composition, porosity and permeability, saturation and ground stress of the rock; logging data refers to the data on the physical properties of underground rock formations obtained by various logging instruments lowered into the well during the drilling process. These data include information about the resistivity of the formation, natural gamma ray intensity, sound wave velocity, etc. The physical properties of crude oil include color, density, viscosity, freezing point, wax content, solubility, etc., and the chemical properties of crude oil include chemical composition, calorific value and fraction composition; the physical properties of natural gas include density, compressibility, solubility and flow rate, and the chemical properties of natural gas include main components, impurities and calorific value; the physical properties of formation water include density and conductivity, and the chemical properties of formation water include chemical composition, pH value, hardness and solubility; capillary pressure can describe the movement characteristics of the oil-water interface in the rock pores and affect the oil-water distribution, and is obtained through laboratory rock sample testing.
[0092] S2. Based on the collected historical production data of oil wells, injected water data and geological data, define the initial conditions and boundary conditions of oil and water, and use geological modeling software to build a three-dimensional geological model; the specific steps are as follows:
[0093] S21. Divide the study area into multiple cells based on geological data; specifically, select the appropriate cell scale according to the data to be collected, select the appropriate geographic coordinate system to ensure that all data are in the same framework, use professional geological modeling software to generate cells according to the selected size and shape, and assign the collected data to each cell, where:
[0094] S22, assigning corresponding geological attributes to each grid, and calculating attribute values of locations not directly measured using Kriging interpolation method;
[0095] Attribute values include porosity, permeability, and saturation, which means assigning geological attributes to each unit in the three-dimensional grid. This step is based on existing drilling data, logging curves, and other geological data. However, since it is impossible to make direct measurements at each grid point, Kriging interpolation technology is needed to estimate the attribute values of unmeasured locations; Kriging interpolation is a geostatistical method that not only considers the correlation in spatial position, but also the variability and uncertainty of the data, thus providing a more accurate interpolation result. By analyzing the attribute values of known points and their spatial distribution, Kriging interpolation can predict the geological attributes of unknown points and give the predicted variance to evaluate the uncertainty of the prediction.
[0096] In S22, the specific method of estimating the attribute values of locations that are not directly measured by the Kriging interpolation method is as follows:
[0097]
[0098] Among them, λ i is the proportion of the ith observation point in predicting the attribute value of the unknown point u0. The size of the weight reflects the contribution of the observation point to the predicted value, which is usually related to the distance between the observation point and the predicted point and the spatial correlation of the attribute value; C(u0,u i ) is the predicted unknown point u0 and the observed point u i The covariance of the observed values between two points reflects the strength of the linear relationship between the attribute values of two points. A positive value indicates a positive correlation, a negative value indicates a negative correlation, and zero indicates no correlation. 2 is a small error, reflecting the random variation or measurement error in the observed data that cannot be explained by the spatial structure; u0 is the predicted unknown point; u i is the position of the i-th observation point; u j is the position of the jth observation point.
[0099] The core function of Kriging interpolation is to predict the attribute values of unobserved points, such as rock porosity and permeability, based on the existing observation point data. By calculating the weight of each observation point to the prediction point, an optimal linear unbiased prediction value can be obtained. In addition to predicting the attribute values of unknown points, Kriging interpolation can also provide the variance or standard error of the prediction value, which helps to evaluate the uncertainty of the prediction results.
[0100] S23, defining the fluid types in the oil well, which are oil and water in this embodiment, and initializing the fluid and setting the boundary conditions of the model; setting the initial fluid distribution and pressure conditions, and setting the boundary conditions of the model;
[0101] Among them, fluid initialization includes initialization saturation and initialization pressure, and boundary conditions include closed boundary, constant pressure boundary and constant flow boundary. Closed boundary is a boundary that does not allow fluid to enter or exit; constant pressure boundary is a condition for maintaining constant pressure on the boundary; constant flow boundary is a condition for maintaining constant flow on the boundary. The specific methods are as follows:
[0102] Initialize saturation. Initialize saturation to give the distribution of water and oil phases in the oil well when the model starts running:
[0103]
[0104] S o (x) = 1-S w (x)
[0105] Among them, S w (x) is the initial water phase saturation at position x; S w is the initial water phase saturation in the water saturated zone; Ω w is the spatial area occupied by the water phase; Ω o is the spatial area occupied by the oil phase; S o (x) is the initial oil phase saturation at position x;
[0106] Initial pressure:
[0107] P(x)=P ref +ρ·g·z
[0108] Where P(x) is the initial pressure at position x; P ref is the reference pressure; ρ is the density of the fluid; g is the acceleration due to gravity; z is the depth;
[0109] The setting of the initial pressure takes into account the influence of gravity and ensures that the model can correctly reflect the pressure gradient caused by the depth difference inside the oil well. This setting is crucial for predicting the direction and speed of fluid flow and the movement of the oil-water interface, because the flow of the fluid is driven by the pressure gradient. ref By considering the influence of depth z, the model can simulate the pressure distribution in the oil well more realistically;
[0110] Closed boundary: q(x b )=0; closed boundary conditions ensure that specific boundaries in the model do not allow fluid to enter or exit, which can prevent the model results from being improperly affected by boundary conditions;
[0111] Constant pressure boundary: P(x b )=P b Setting constant pressure boundary conditions, such as wellhead pressure or natural pressure at the edge of the well, helps simulate the response of the well at a specific pressure;
[0112] Constant current boundary: q(x b )=q b ; Constant flow boundary conditions are used to simulate the response of an oil well at a specific flow rate, such as setting a constant water injection rate in an injection well;
[0113] Among them, q(x b ) is on the boundary x b Fluid flow rate at; P(x b ) is on the boundary x b The pressure at b is the set boundary pressure value; q b is the set boundary flow value.
[0114] S24. Use geological modeling software to integrate the above information to form a complete three-dimensional geological model, including the geological structure, lithology distribution, porosity, permeability, etc. of the oil well. The geological modeling software is Petrel, which is widely used in the oil and gas industry to process and interpret various geological and geophysical data to build a detailed three-dimensional geological model. Petrel provides an integrated working environment that enables geologists, geophysicists and engineers to work collaboratively to improve reservoir understanding and development efficiency.
[0115] S3. On the basis of the three-dimensional geological model, an oil-water two-phase flow model is established. The historical production data of the oil wells, the injection water data of the water injection wells connected to the oil wells, and the geological data of the block where the oil wells are located are input into the oil-water two-phase flow model to determine whether the oil-water two-phase flow model is established. In this process, it is determined which parameters have an impact on the model results, and then these parameters are adjusted first. The parameters are adjusted repeatedly and iteratively until satisfactory results are achieved. In S3, the specific method for establishing the oil-water two-phase flow model is as follows:
[0116] Mass conservation equation for oil phase flow:
[0117]
[0118] Where φ is the porosity, which indicates the proportion of pore space in the porous medium to the total volume; S o is the saturation of the oil phase, which refers to the proportion of the pore space occupied by the oil phase; ρ o is the density of the oil phase; is the net inflow or outflow rate of the fluid per unit volume, which indicates the rate of change of the fluid mass flux with space, that is, the net inflow or outflow rate of the fluid per unit volume. For the oil phase or water phase, this helps to describe the flow of the fluid in the porous medium, including how the fluid gathers or disperses at different spatial locations; u o The average velocity of the oil phase represents the average flow velocity of the oil phase in the porous medium; q o is the source and sink term of the oil phase; when qo >0, indicating the injection of oil phase (source). o When <0, it indicates the output (sink) of the oil phase;
[0119] The mass conservation equation for water phase flow is:
[0120]
[0121] Among them, S w is the saturation of the water phase; ρ w is the density of the water phase; u w is the average velocity of the water phase; q w is the source and sink term of the water phase;
[0122] The momentum conservation equation for the oil phase is:
[0123]
[0124] Among them, k ro is the relative permeability of the oil phase, which describes the reduction in the actual permeability of the oil phase and the water phase relative to the absolute permeability in the porous medium; μ o is the dynamic viscosity of the oil phase; k is the absolute permeability, which indicates the ability of the porous medium to allow fluid flow; p o is the pressure of the oil phase, indicating the pressure distribution of the fluid in the porous medium; g is the acceleration of gravity; λ o is the effective fluidity of the oil phase; p c is the capillary pressure, which means that in porous media, there is an additional pressure difference between the oil phase and the water phase due to the surface tension;
[0125] The momentum conservation equation for the oil phase is:
[0126]
[0127] Among them, k rw is the relative permeability of the water phase; μ w is the dynamic viscosity of the water phase; p w is the pressure of the water phase; ω is the effective fluidity of the water phase.
[0128] The influence of injection and production conditions is introduced into the mass conservation equation of oil phase flow and the mass conservation equation of water phase flow for optimization. The optimized oil-water two-phase flow model is as follows:
[0129] Injection-production conditions include injection-production ratio, injection well spacing, and injection method;
[0130] The injection-production ratio is the ratio of water injection to oil production, which affects the advancement speed of water drive and the maintenance of reservoir pressure. In the model, the source and sink terms qo and q wTo reflect the injection-production ratio, for example, if the water injection volume increases, it will lead to q w The decrease in oil production will increase q o This will affect the pressure balance and fluid flow in the oil well.
[0131] The distance between injection and production wells affects the scope of water flooding. Too large a distance between injection and production wells may reduce the efficiency of water flooding. A short distance between injection and production wells may cause the injected water to flow from the injection well to the production well too quickly, causing the so-called "water channeling", which reduces the efficiency of oil removal. In the model, the effect of the distance between injection and production wells can be adjusted by adjusting q o and q w The spatial distribution of the pressure is reflected by considering the pressure gradient changes between the injection and production wells.
[0132] Water injection methods include edge injection, area injection, point injection, etc. Different water injection methods will affect the shape and advancement speed of the water drive front. In the model, q w The time-varying pattern reflects different water injection methods. For example, periodic water injection will w This introduces periodic changes in the flow, which will affect the pressure and fluid distribution in the oil well.
[0133]
[0134] q w,adjusted =q w ×(1+R)×e -αd ×g(t)
[0135] g(t)=Asin(ωt)+B
[0136] Among them, q o,adjusted is the optimized oil source and sink term; R is the injection-production ratio, which defines the ratio of injection volume to production volume. If R>1, it means that the injection volume is greater than the production volume, and vice versa; α is an empirical constant, which is used to describe the attenuation degree of flow efficiency caused by the distance between injection and production wells. Under normal circumstances, as d increases, the flow efficiency of fluid from injection wells to production wells will decrease. The larger α is, the more significant the negative impact of distance on efficiency will be; d is the distance between injection and production wells, that is, the average distance between injection wells and production wells. This distance affects the injection efficiency and the pressure distribution of oil wells; q w,adjusted is the optimized water source and sink term; g(t) is the time function; A is the amplitude, which describes the amplitude of the fluctuation of the water source and sink term under the periodic water injection mode; ω is the angular frequency, which determines the speed of the periodic change, that is, the frequency of periodic water injection; t is the time; B is the offset, which indicates the basic value of the water source and sink term when there is no periodic change;
[0137] The mass conservation equation of the optimized oil phase flow is:
[0138]
[0139] The optimized mass conservation equation for water phase flow is:
[0140]
[0141] By carefully simulating the injection and production conditions, we can better understand the well dynamics, including fluid flow path, pressure change trend and oil and water saturation distribution, and provide a basis for the subsequent prediction of water flooding front advancement;
[0142] S4. Use the time-lapse simulation method to simulate the oil-water movement in different time periods of the oil-water two-phase flow model and predict the advancement of the water drive front; the advancement of the water drive front includes the movement speed, direction and water saturation distribution of the oil-water interface. By analyzing the movement speed, direction and water saturation distribution of the oil-water interface, the specific position of the water drive front is determined.
[0143] By analyzing the movement speed, direction and water saturation distribution of the oil-water interface, the specific method for determining the specific position of the water flooding front is as follows:
[0144] Movement speed of oil-water interface:
[0145]
[0146] Among them, v avg is the moving speed of the oil-water interface; d1 is the first position of the oil-water interface; d2 is the second position of the oil-water interface; t1 is the first time; t2 is the second time;
[0147] This formula can obtain the speed of interface movement by comparing the positions of the oil-water interface (d1 and d2) at two different times (t1 and t2), which is a key parameter for understanding water flooding effects and oil well performance.
[0148] Water saturation distribution:
[0149]
[0150] Among them, Δx and Δy are the sizes of the spatial grid; is the water saturation at the next time step; is the water saturation of the current time step; Δt is the time step; is the amount of water injected at the k+1th time step; is the water output at the k+1th time step; is the amount of water flowing in or out from the adjacent grid cell at the k+1th time step;
[0151] This equation is based on the principle of mass conservation and is used to calculate the change of water saturation over time. It takes into account the amount of injected water, the amount of produced water, and the water exchange between adjacent grid cells. By solving this equation, the water saturation distribution of each point in the oil well can be obtained.
[0152] Specific location of the water drive front:
[0153]
[0154] Among them, L f (t) is the position of the water flooding front at time T, where “position” usually refers to the distance along the flow direction of the oil well, which can be a horizontal distance or a vertical depth, depending on the geometry of the oil well and the flow direction; S w (x, T) is the distribution function of water saturation, x is the spatial position; T is the time; it is a variable that depends on the spatial position x and time T. x can be a one-dimensional, two-dimensional or three-dimensional spatial coordinate, depending on the complexity of the oil well model; S w,threshold is the water saturation threshold. When the water saturation S w When (x,T) exceeds this threshold, it can be considered that the location has been affected by water flooding and is within the coverage of the water flooding front. The selection of this threshold depends on the specific oil well conditions and production objectives, and usually needs to be determined through experiments or experience; The operation of taking the maximum value among all spatial positions x is the farthest point where the water saturation first exceeds the threshold, i.e. the exact location of the water flooding front.
[0155] This formula is used to determine the specific location of the water flooding front at any time T. The water flooding front refers to the water saturation exceeding a certain threshold S w,threshold By finding the maximum water saturation in all spatial positions x that meet the conditions, the farthest advancement boundary in the water flooding process can be clearly pointed out.
[0156] Assume that on the 200th and 300th day of oilfield development, the locations of the oil-water interface are recorded as d1 = 1500 m and d2 = 1750 m, respectively, and the time points are t1 = 200 days and t2 = 300 days, respectively;
[0157] Calculation of oil-water interface movement speed:
[0158] Water saturation distribution: Assuming Δx = 10m and Δy = 10m, Δt = 1 day, the water saturation threshold S w,threshold =0.7;
[0159] Assume that on the 300th day, the water saturation S at the grid location x = 3000m is w(3000,300) = 0.75, and it is the first time that the water saturation exceeds the threshold S at all locations w,threshold location;
[0160] Water drive front position: On the 300th day, the water drive front position L f (300) is 3000m;
[0161] Through the above steps, the specific location of the water drive front in the reservoir can be accurately determined, providing a decision-making basis for oilfield development strategies.
[0162] S5. Evaluate the current water flooding status of the oil well based on the predicted advancement of the water drive front. If the oil well enters the high water flooding stage, determine whether water plugging is economically feasible. If it is economically feasible, implement water plugging operations.
[0163] Water plugging of oil wells needs to first determine whether it has entered the high water flooding stage. The determination of whether it has entered the high water flooding stage is based on whether the water cut is higher than the predetermined threshold and whether the water drive front is rapidly approaching or has reached the vicinity of the oil well. The water cut is the most direct indicator reflecting the degree of water flooding in the oil well. A sharp increase in water cut, especially a significant increase in a short period of time, is usually a signal of entering the high water flooding stage; at the same time, the judgment criteria of the water drive front are increased. The rapidly advancing water drive front may indicate that the water flooding in the oil well area is accelerating, especially when the water drive front is rapidly advancing along the main permeation path. Once it is determined that the oil well has entered the high water flooding stage and the economic evaluation shows that the cost-effectiveness ratio of the water plugging operation is reasonable, the water plugging operation is implemented. For the production layer section with high water cut, chemical agents, mechanical devices, etc. are used to reduce the water inflow into the wellbore. In some cases, it may be necessary to re-complete the well or side-drill a new wellbore to avoid the severely flooded area, find new oil layers or improve the oil and water flow direction.
[0164] Among them, the specific method for judging whether water plugging of the oil well is economically feasible is as follows:
[0165] Remaining oil distribution prediction:
[0166] S r (i,j)=S o (i,j)-S w (i,j)
[0167] Among them, S r (i, j) is the residual oil saturation; S o (i,j) is the oil saturation; S w (i,j) is water saturation;
[0168] V r (i,j)=φ(i,j)·Δx·Δy·S r (i,j)
[0169] Among them, V r (i,j) is the volume of remaining oil; φ(i,j) is the porosity;
[0170] Knowing the distribution of remaining oil can help engineers determine the best development plan, such as selecting the appropriate injection well location or adjusting the layout of production wells;
[0171] Water plugging cost:
[0172] C=(C chem +C labor )+(V lost ·P)
[0173] Among them, C is the total cost; C chem C is the cost of chemicals; labor V is labor cost; lost is the reduced output; P is the crude oil price; among them, C chem +C labor is the direct cost; V lost P is the indirect cost;
[0174] Expected Returns:
[0175] R=∑ (i,j) ΔV r (i,j)·P
[0176] Where R is the expected return; ∑ (i,j) ΔV r (i,j) is the amount of recoverable crude oil;
[0177] Net Present Value:
[0178] NRV=RC
[0179] Among them, NPV is the net present value.
[0180] If the NPV is positive, it means that the water shutoff measures are economically feasible, otherwise it is not feasible. This can not only help them better understand the physical processes in the reservoir, but also evaluate the feasibility of the development strategy at the economic level, so as to make more informed investment decisions. In this way, the overall efficiency and economic benefits of oil field development can be improved.
[0181] Assume that oil well A has 10000m before water plugging 3 The remaining oil volume, water plugging can increase the recovery volume by 1000m 3 , the crude oil price is 60 yuan / barrel (assuming 1m 3 =6.2898 barrels), the plugging cost is 100,000 for chemicals and 50,000 for labor. The reduction in production due to plugging is 200m 3
[0182] Remaining oil volume: 10000m 3
[0183] Chemical cost: 100,000 yuan
[0184] Labor cost: 50,000 yuan
[0185] Crude oil price: 60 yuan / barrel
[0186] Reduced production: 200m 3
[0187] Expected revenue: R = 1000m3 × 6.2898 × 60 = 377,3882
[0188] Total cost: C = 150000 + (200m 3 ×6.2898×60)=275,3883
[0189] Calculate the net present value: NPV = 377,388 - 275,388 = 102,000 102,000
[0190] Since the NPV is positive, it means that water plugging is economically feasible and the expected benefits are greater than the costs.
[0191] Embodiment 2: This embodiment provides a system for determining the timing of oil well water plugging operations, including a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein the processor executes the computer program to implement any one of the above methods for determining the timing of oil well water plugging operations.
[0192] The above shows and describes the basic principles, main features and advantages of the present invention. Those skilled in the art should understand that the present invention is not limited by the above embodiments, and the above embodiments and descriptions are only preferred examples of the present invention, and are not intended to limit the present invention. Without departing from the spirit and scope of the present invention, the present invention may have various changes and improvements, and these changes and improvements all fall within the scope of the present invention to be protected.
Claims
1. A method for determining the timing of water plugging operations in oil wells, It is characterized in that The following steps are involved: S1. Collect historical production data of oil wells, injection water data of water injection wells connected to the oil wells, and geological data of the block where the oil wells are located; S2. Based on the collected historical production data of the oil wells, the injected water data of the water injection wells connected to the oil wells, and the geological data of the block where the oil wells are located, define the initial oil and water conditions and boundary conditions, and use geological modeling software to construct a three-dimensional geological model; S3. On the basis of the three-dimensional geological model, an oil-water two-phase flow model is established. The historical production data of the oil wells, the injection water data of the water injection wells connected to the oil wells, and the geological data of the block where the oil wells are located are input into the oil-water two-phase flow model to determine whether the oil-water two-phase flow model is established. In this process, which parameters have an impact on the model results are determined, and then these parameters are adjusted first. The parameters are adjusted repeatedly and iteratively until satisfactory results are achieved. The oil-water two-phase flow model includes the mass conservation equation of the oil phase flow, the mass conservation equation of the water phase flow, the momentum conservation equation of the oil phase and the momentum conservation equation of the water phase; The influence of injection and production conditions is introduced into the mass conservation equation of oil phase flow and the mass conservation equation of water phase flow for optimization. The optimized oil-water two-phase flow model is as follows: Injection-production conditions include injection-production ratio, injection well spacing, and injection method; q w,adjusted =q w ×(1+R)×e -αd ×g(t) g(t)=Asin(ωt)+B Among them, q o,adjusted is the optimized oil source and sink term; R is the injection-production ratio; α is the empirical constant; d is the distance between the injection and production wells; q w,adjusted is the optimized water source and sink term; g(t) is the time function; A is the amplitude; ω is the angular frequency; t is the time; B is the offset; The mass conservation equation of the optimized oil phase flow is: The optimized mass conservation equation for water phase flow is: S4. Use the time-lapse simulation method to simulate the movement of oil and water in different time periods of the oil-water two-phase flow model and predict the advancement of the water flooding front; S5. Evaluate the current water flooding status of the oil well based on the predicted advancement of the water drive front. If the oil well enters the high water flooding stage, determine whether water plugging is economically feasible. If it is economically feasible, implement water plugging operations.
2. The method for determining the timing of oil well water plugging operation according to claim 1, Features: In S1, the historical production data includes production and water content; the injected water data of the water injection wells connected to the oil wells include injection volume, injection pressure and geological data; the geological data of the block where the oil wells are located include geological structure maps, core data, logging data, oil well fluid properties and capillary pressure.
3. The method for determining the timing of oil well water plugging operation according to claim 2, Features: The specific steps of S2 are as follows: S21. Divide the study area into multiple cells based on geological data; S22, assigning corresponding geological attributes to each grid, and using Kriging interpolation method to estimate the attribute values of the locations that are not directly measured; S23, defining the fluid type in the oil well, initializing the fluid and setting the boundary conditions of the model; setting the initial fluid distribution and pressure conditions, and setting the boundary conditions of the model; S24. Use geological modeling software to integrate the above information and generate a complete three-dimensional geological model.
4. The method for determining the timing of oil well water plugging operation according to claim 3, Features: In S22, the specific method of estimating the attribute value of the location not directly measured by the Kriging interpolation method is as follows: Among them, λ i For the i-th observation point in predicting the unknown point u 0 The proportion of the attribute value; C(u 0 ,u i ) is the predicted unknown point u 0 and observation point u i The covariance of the observations between 2 is a small error; u 0 To predict unknown points; u i is the position of the i-th observation point; u j is the position of the jth observation point.
5. The method for determining the timing of oil well water plugging operation according to claim 4, Features: The fluid initialization in S23 includes initialization saturation and initialization pressure, and the boundary conditions include closed boundary, constant pressure boundary and constant flow boundary. The specific method is as follows: Initialize saturation: S o (x)=1-S w (x) Among them, S w (x) is the initial water phase saturation at position x; S w is the initial water phase saturation in the water saturated zone; Ω w is the spatial area occupied by the water phase; Ω o is the spatial area occupied by the oil phase; S o (x) is the initial oil phase saturation at position x; Initial pressure: P(x)=P ref +ρ·g·z Where P(x) is the initial pressure at position x; P ref is the reference pressure; ρ is the density of the fluid; g is the acceleration due to gravity; z is the depth; Closed boundary: q(x b )=0; Constant pressure boundary: P(x b )=P b ; Constant current boundary: q(x b )=q b ; Among them, q(x b ) is on the boundary x b Fluid flow rate at; P(x b ) is on the boundary x b The pressure at b is the set boundary pressure value; q b is the set boundary flow value.
6. The method for determining the timing of oil well water plugging operation according to claim 5, Features: In S3, the specific method for establishing the oil-water two-phase flow model is as follows: The mass conservation equation for oil phase flow is: Where φ is the porosity; S o is the saturation of the oil phase; ρ o is the density of the oil phase; is the net inflow or outflow rate of fluid per unit volume; u o Average velocity of the oil phase; q o is the source and sink term of the oil phase; The mass conservation equation for water phase flow is: Among them, S w is the saturation of the water phase; ρ w is the density of the water phase; u w is the average velocity of the water phase; q w is the source and sink term of the water phase; The momentum conservation equation for the oil phase is: Among them, k ro is the relative permeability of the oil phase; μ o is the dynamic viscosity of the oil phase; k is the absolute permeability; p o is the pressure of the oil phase; g is the acceleration due to gravity; λ o is the effective fluidity of the oil phase; p c is the capillary pressure; The momentum conservation equation for the oil phase is: Among them, k rw is the relative permeability of the water phase; μ w is the dynamic viscosity of the water phase; p w is the pressure of the water phase; ω is the effective fluidity of the water phase.
7. The method for determining the timing of oil well water plugging operation according to claim 6, Features: The advancement of the water flooding front in S4 includes the moving speed, direction and water saturation distribution of the oil-water interface. The specific position of the water flooding front is determined by analyzing the moving speed, direction and water saturation distribution of the oil-water interface.
8. The method for determining the timing of oil well water plugging operation according to claim 7, Features: By analyzing the movement speed, direction and water saturation distribution of the oil-water interface, the specific method for determining the specific position of the water flooding front is as follows: Movement speed of oil-water interface: Among them, v avg is the moving speed of the oil-water interface; d 1 is the first position of the oil-water interface; d 2 is the second position of the oil-water interface; t 1 is the first time; t 2 For the second time; Water saturation distribution: Among them, Δx and Δy are the sizes of the spatial grid; is the water saturation at the next time step; is the water saturation of the current time step; Δt is the time step; is the amount of water injected at the k+1th time step; is the water output at the k+1th time step; is the amount of water flowing in or out from the adjacent grid cell at the k+1th time step; Specific location of the water drive front: Among them, L f (t) is the position of the water drive front at time T; S w (x,T) is the distribution function of water saturation; x is the spatial position; T is the time; S w,threshold is the water saturation threshold; is the operation of taking the maximum value among all spatial positions x.
9. The method for determining the timing of oil well water plugging operation according to claim 8, Features: The specific method for judging whether water plugging of the oil well is economically feasible in S5 is as follows: Remaining oil distribution prediction: S r (i,j)=S o (i,j)-S w (i,j) Among them, S r (i, j) is the residual oil saturation; S o (i,j) is the oil saturation; S w (i,j) is water saturation; V r (i,j)=φ(i,j)·Δx·Δy·S r (i,j) Among them, V r (i,j) is the volume of remaining oil; φ(i,j) is the porosity; Water plugging cost: C=(C chem +C labor +(V lost ·P) Among them, C is the total cost; C chem C is the cost of chemical agents; labor V is labor cost; lost is the reduced output; P is the crude oil price; C chem +C labor is the direct cost; V lost P is the indirect cost; Expected Returns: R=∑ (i,j) ΔV r (i,j)·P Where R is the expected return; ∑ (i,j) ΔV r (i, j) is the amount of recoverable crude oil; Net Present Value: NPV=RC Among them, NPV is net present value; If the net present value NPV is a positive number, it means that the water plugging measures are economically feasible, otherwise they are not feasible.
10. A system for determining the timing of an oil well water plugging operation, comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, Features: The processor executes a computer program to implement the method for determining the timing of an oil well water plugging operation as described in any one of claims 1-9.